SlideShare a Scribd company logo
1 of 20
Download to read offline
Case Study: Building Intelligent Content
          from 30 Years of Legacy Documents


                Paul Wlodarczyk
                Director, Solutions Consulting
                Earley & Associates




                                                                 Copyright © 2010 Earley & Associates Inc. All Rights Reserved.

COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
What do we assume about Intelligent Content?

                                                                     We usually assume:
                                                                     –   Loads of systems
                                                                     –   Information design
                                                                     –   Structured content
                                                                     –   Tied to the business
                                                                     –   Personalized
                                                                     –   Semantic
                                                                     –   Etc.

                                                                     We assume new.




                                                                 2
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Case Study: Applied Materials
 Global leader in Nanomanufacturing Technology solutions for the
 fabrication of semiconductor chips, flat panel displays, solar
 photovoltaic cells, flexible electronics and energy efficient glass
 – Founded in 1967, $5B revenue, 8 Product Business Groups
 – Produces the technology that helps produce virtually every semiconductor chip and
   flat panel display in the world
 – Long-lived products – some in service over 30 years
 – 2500 customer engineers (“CEs” – 20% of work force) maintain, diagnose, and repair
   their equipment in customer fabs worldwide
 Business need:
 – Improve CE troubleshooting and repair performance in the fab through improved
   information access




                                                                 3
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
What do we mean by Intelligent Content?

   • In our client’s words:
             – “Deliver the right information at the right time
                                  information,             time,
                in the right format to the right person
                             format,             person.”
   • In our words:
                    right        information = Relevant, accurate, up-to-date, approved
                    right        time = In the context of work / business process
                    right        format = Accessible
                    right        person = Authorized




                                                                 4
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Information Challenge #1:
   30 Years of Legacy Content
   • …and lots of it
             – PDFs – manuals, drawings, some are scans
             – Communities – forums, shared drives, bulletin boards
             – Knowledge Management – tips, Best Known Methods
   • How much gets “chunked”? How to convert it?
   • How to search it effectively?




                                                                 5
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Information Challenge #2:
   Point of need is in the clean room
   • Physical Access for the CE
             – Double / triple gloves
                       • Typing/pointing are difficult
             – No place to set a laptop down
   • Wireless / Internet Access
             – Closest point of access to company
               internet may be across town
   • Customer Information Security
     Concerns
             – Protection of trade secrets
             – Some won’t allow laptops in fab
             – Some won’t even allow paper in fab
   • “Tools” are all unique in the fab
             – Need docs that reflect product “DNA”


                                                                 6
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Information Challenge #3:
   KM is complicated by IP / InfoSec concerns
   • Garden-walling Customer IP
             – Have to be sure that when a CE
               shares a tip or asks for help that they
               are not exposing customer IP to other
               customers (with whom they compete)
   • Protecting Company Product IP
             – DRM for preventing piracy / reverse
               engineering of products, parts
   • Preserving Company Services IP
             – Assure that customers pay for value-
               added services
             – Secure service IP from competitive
               service providers




                                                                 7
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Information Challenge #4:
   An “archipelago” of content centric systems

                                                                                   PLM
                              Tech Pubs Library
                                                                                                  Product
                                                                                                  Library



                                                                               Forum
                                                                                                            Product
                                                                                       Product              Library

               Drawings                                          DRM           Forum   Library
                                                                                                                   Forum
                                                                                                               Forum

           Product                                                                                                    Product
                                                                                        Product         Forum
           Library                                                                                                    Library
                                                                                        Library
                                                                                                      Forum
                                                                       Email
               SAP                                          Parts
                                                                                  Diagnostics
                                             QA                                                                       Product
                                                                                                                      Library




                                                                                       Best Practices
     Search and integration are issues                                  Product
                                                                        Library


                                                                         8
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Where to begin eating the elephant?
                                                                 • Key observation:
                                                                    “Last thing we need is another system”
                                                                 • Need a balanced viewpoint –
                                                                   the “Four Pillars of KM”:
                                                                    –   People
                                                                    –   Process
                                                                    –   Technology
                                                                    –   Content
                                                                 • Assess the current state
                                                                 • Define the desired state
                                                                 • Define the gap closing actions



                                                                    9
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Technology
   • Technical Publishing
             – Authoring: Office, FrameMaker
             – Team Center - Drawings
             – Publishing in PDF, Live Cycle DRM
   • ECM
             – LiveLink  SharePoint
   • ERP
             – SAP for service billing, parts ordering, etc.
   • Various proprietary systems
             – Parts, diagnostics, KM, etc.
   • Connectivity and access to laptops in the fab
             – Ranges from “none” to “near” to “Nirvana”
             – Need to support a low-tech solution

                                                                 10
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
People
   • Several key user groups:
             –      CEs (content consumers and contributors)
             –      Support (content consumers and contributors)
             –      Tech pubs and training (content publishers)
             –      Engineering teams (content contributors)
   • Understood roles, expectations,
     alignment, barriers to change
   • Key findings:
             – Content authors had well-defined needs and
               were extremely engaged
             – Content publishers had good alignment for
               change and good orientation around topic-
               oriented content
             – Strong need for governance over technology
               projects

                                                                 11
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Process
   • Service Work / Business Process
             – CEs spend lot of time searching – mostly
               during diagnosis
             – Business value is not in reducing search time; it
               is reducing product downtime.
   • Content Lifecycle
             – Authoring, Publishing processes fairly traditional
             – More engineering contribution and editing than
               authoring
   • Collaboration
             – KM starting to hit its stride. Sorting the IP issues
   • Program Governance
             – Service IT programs were stove-piped
             – Coordination needed for true intelligent content

                                                                 12
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Content

   • Monolithic PDF needs to be “chunked”
   • Terabytes of content
             – Most relevant content is PDF, tagged to
               corporate taxonomy, in a CMS
             – Some scans of 30 year-old manuals
   • Sales-oriented Taxonomy
             – Needs to reflect the service view (failure
               modes, symptoms, function, etc.)
             – Taxonomy governance process neglected
   • Info Security
             – Access Management and DRM is essential




                                                                 13
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Roadmap to Intelligent Content




   Phase 1:                                                      Phase 2:                       Phase 3:
   Foundations for                                               Access at Point of             Intelligent Content
   Intelligent Content                                           Need                           Platform
   • Service Technology                                          • CE Platform for Fab          • Common client platform
     Council                                                       Access                       • SOA-based application
   • ECM implementation                                          • Intelligent work packages      integration
     • Faceted search                                            • CE training, certification   • Interactive Electronic
     • Federated search                                          • XML Pilots                     Technical Manual (IETM)
   • Taxonomy development                                                                         viewer
   • Modular content, tagged                                                                      • XML content
   • Continuous Improvement                                                                       • “Smart art”
     for other service systems




                                                                                14
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Project deployment
                                        • Service Technology Governance
                                        • Modular Content Strategy
                                        • Taxonomy and Metadata Development
        Five Core                       • CMS IA and User Experience
        Activities                      • Search and UX Technology



                                        • Several divisions, several products
                                        • Real users, active service data, “live fire” trial
       Production                       • Collect data, evaluate, and refine
          Pilot



                 • Plan for what to migrate and how
       Scale and • Get to an 80%-ish solution
          Migrate


                                                                  15
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
What about XML?

   • Can publish component PDF without XML
             – Largely maintain components at the source level
               today in Word and FrameMaker
   • Chunking and tagging legacy content will inform a
     content model for XML
   • No near-term drive for XML
             – No real reuse – little “transcluded” content
             – No multi-channel publishing
             – No localization
   • Need for XML in 3-5 years
             – Emerging need for localized content
             – Need to integrate XML content into IT systems
               for real service dashboard – dynamic publishing

                                                                 16
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Intelligent Content Myths

   • You need XML for intelligent content.
             – We can get there with well indexed component
               content. The key is relevant semantic markup.
   • We can just find everything with enterprise
     search / Google.
             – Taxonomy and component content strategy are essential
               for relevancy and contextual navigation.
   • We can justify the project with the time
     we save by not searching.
             – In the real world, projects can only get sponsored with a
               real ROI at every phase, and buy-in of all stakeholders.
   • Intelligent Content is futuristic.
             – We can get there TODAY.

                                                                 17
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Advantages of the “four pillars” approach

   • Comprehensive view of the
     issues, benefits, and
     constraints
   • Achieved buy-in at all
     levels of the organization
   • Yielded a clear roadmap to
     Intelligent Content
   • Clarified potential phasing
     of a large, complex project




                                                                 18
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
Questions/Discussion
Paul Wlodarczyk
Earley & Associates, Inc
585-598-6050
paul@earley.com
www.earley.com




COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
About Earley & Associates, Inc.


           • Focus: Information Architecture                     • Consulting Philosophy:
             (“IA”) Services                                       • Organizing Principles based on
                                                                     business context and goals
           • Founded: 1994
                                                                   • Four Pillars - People, Content,
           • Personnel: Twenty core team                             Process, and Technology
             consultants, plus a network of
             other top industry experts
             • ECM and KM experts
             • taxonomy specialists
             • search experts
             • information architects
             • usability professionals
             • technology consultants
             • business process experts
           • Headquarters: Boston, MA



                                                                 20
COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.

More Related Content

What's hot

Risk Factory: Beyond Data Leakage
Risk Factory: Beyond Data LeakageRisk Factory: Beyond Data Leakage
Risk Factory: Beyond Data Leakage
Risk Crew
 

What's hot (10)

Ausspc 2012 case study ozone oakton
Ausspc 2012 case study   ozone oaktonAusspc 2012 case study   ozone oakton
Ausspc 2012 case study ozone oakton
 
Business ontology - integrate knowledge 1/3 An overview
Business ontology - integrate knowledge 1/3 An overviewBusiness ontology - integrate knowledge 1/3 An overview
Business ontology - integrate knowledge 1/3 An overview
 
Tran Assoc Brochure
Tran Assoc BrochureTran Assoc Brochure
Tran Assoc Brochure
 
Risk Factory: Beyond Data Leakage
Risk Factory: Beyond Data LeakageRisk Factory: Beyond Data Leakage
Risk Factory: Beyond Data Leakage
 
Introduction Of Sinostrat Solution (Sn)
Introduction Of Sinostrat Solution (Sn)Introduction Of Sinostrat Solution (Sn)
Introduction Of Sinostrat Solution (Sn)
 
Remodeling Space and Support
Remodeling Space and SupportRemodeling Space and Support
Remodeling Space and Support
 
Stupid Stock Plan Tricks: Saving Your Mind, Your Time, and Reducing Your Comp...
Stupid Stock Plan Tricks: Saving Your Mind, Your Time, and Reducing Your Comp...Stupid Stock Plan Tricks: Saving Your Mind, Your Time, and Reducing Your Comp...
Stupid Stock Plan Tricks: Saving Your Mind, Your Time, and Reducing Your Comp...
 
1109 siit jfriedrich v02
1109 siit jfriedrich v021109 siit jfriedrich v02
1109 siit jfriedrich v02
 
Risk Factory: Database Security: Oxymoron?
Risk Factory: Database Security: Oxymoron? Risk Factory: Database Security: Oxymoron?
Risk Factory: Database Security: Oxymoron?
 
Intelligent Content Strategies
Intelligent Content StrategiesIntelligent Content Strategies
Intelligent Content Strategies
 

Similar to "Building Intelligent Content from 30 Years of Legacy Documents," Intelligent Content 2010, Paul Wlodarczyk

Manfred Linking the Real World
Manfred Linking the Real WorldManfred Linking the Real World
Manfred Linking the Real World
sssw2012
 
D Space Proposal Tvm 1407
D Space Proposal Tvm 1407D Space Proposal Tvm 1407
D Space Proposal Tvm 1407
Anil Mishra
 
Ecm mythbusters the_real_story_behind_vendor_marketing
Ecm mythbusters the_real_story_behind_vendor_marketingEcm mythbusters the_real_story_behind_vendor_marketing
Ecm mythbusters the_real_story_behind_vendor_marketing
QuestexConf
 

Similar to "Building Intelligent Content from 30 Years of Legacy Documents," Intelligent Content 2010, Paul Wlodarczyk (20)

Artificial99a
Artificial99aArtificial99a
Artificial99a
 
Artificial99a
Artificial99aArtificial99a
Artificial99a
 
Caliber 2009 Tutorial Mgsree
Caliber 2009 Tutorial MgsreeCaliber 2009 Tutorial Mgsree
Caliber 2009 Tutorial Mgsree
 
Beezbox S: the integrated Social CRM & Marketing solution
Beezbox S: the integrated Social CRM & Marketing solutionBeezbox S: the integrated Social CRM & Marketing solution
Beezbox S: the integrated Social CRM & Marketing solution
 
Creating a Cross-Corporate Knowledge Pool
Creating a Cross-Corporate Knowledge PoolCreating a Cross-Corporate Knowledge Pool
Creating a Cross-Corporate Knowledge Pool
 
Collaborative Roadmap Development
Collaborative Roadmap DevelopmentCollaborative Roadmap Development
Collaborative Roadmap Development
 
Axiell DAMS
Axiell DAMSAxiell DAMS
Axiell DAMS
 
Building a Digital Library
Building a Digital LibraryBuilding a Digital Library
Building a Digital Library
 
2004 03 31 ACS ELN Perspectives
2004 03 31 ACS ELN Perspectives2004 03 31 ACS ELN Perspectives
2004 03 31 ACS ELN Perspectives
 
Web-based business models in 2013
Web-based business models in 2013Web-based business models in 2013
Web-based business models in 2013
 
IP: valorisatie en monetization.
IP: valorisatie en monetization.  IP: valorisatie en monetization.
IP: valorisatie en monetization.
 
Sakai And The Academic Enterprise
Sakai And The Academic EnterpriseSakai And The Academic Enterprise
Sakai And The Academic Enterprise
 
Automatic and rapid generation of massive knowledge repositories from data
Automatic and rapid generation of massive knowledge repositories from dataAutomatic and rapid generation of massive knowledge repositories from data
Automatic and rapid generation of massive knowledge repositories from data
 
Deploying Enterprise Search in PLM Context with Aras
Deploying Enterprise Search in PLM Context with ArasDeploying Enterprise Search in PLM Context with Aras
Deploying Enterprise Search in PLM Context with Aras
 
Isis Open House Conference May2010
Isis Open House Conference May2010Isis Open House Conference May2010
Isis Open House Conference May2010
 
Manfred Linking the Real World
Manfred Linking the Real WorldManfred Linking the Real World
Manfred Linking the Real World
 
McQuillan, "Three S’s of Electronic Resource Management: Systems"
McQuillan, "Three S’s of Electronic Resource Management: Systems"McQuillan, "Three S’s of Electronic Resource Management: Systems"
McQuillan, "Three S’s of Electronic Resource Management: Systems"
 
D Space Proposal Tvm 1407
D Space Proposal Tvm 1407D Space Proposal Tvm 1407
D Space Proposal Tvm 1407
 
Data Ninja Services: empowering data science workflows with text analytics
 Data Ninja Services: empowering data science workflows with text analytics Data Ninja Services: empowering data science workflows with text analytics
Data Ninja Services: empowering data science workflows with text analytics
 
Ecm mythbusters the_real_story_behind_vendor_marketing
Ecm mythbusters the_real_story_behind_vendor_marketingEcm mythbusters the_real_story_behind_vendor_marketing
Ecm mythbusters the_real_story_behind_vendor_marketing
 

More from Earley Information Science

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
EIS-Webinar-Most-From-LLMs-2023-08-23.pptx
EIS-Webinar-Most-From-LLMs-2023-08-23.pptxEIS-Webinar-Most-From-LLMs-2023-08-23.pptx
EIS-Webinar-Most-From-LLMs-2023-08-23.pptx
Earley Information Science
 
EIS-Webinar-MDM-Personalization-2023-03-15.pdf
EIS-Webinar-MDM-Personalization-2023-03-15.pdfEIS-Webinar-MDM-Personalization-2023-03-15.pdf
EIS-Webinar-MDM-Personalization-2023-03-15.pdf
Earley Information Science
 
EIS-Webinar-data.world-collab-2023-02-15.pptx
EIS-Webinar-data.world-collab-2023-02-15.pptxEIS-Webinar-data.world-collab-2023-02-15.pptx
EIS-Webinar-data.world-collab-2023-02-15.pptx
Earley Information Science
 

More from Earley Information Science (20)

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
EIS-Webinar-Info-Governance-Age-AI-2024-02-27-for-distr.pdf
EIS-Webinar-Info-Governance-Age-AI-2024-02-27-for-distr.pdfEIS-Webinar-Info-Governance-Age-AI-2024-02-27-for-distr.pdf
EIS-Webinar-Info-Governance-Age-AI-2024-02-27-for-distr.pdf
 
Reducing Returns to Increase Margin Through Better Product Data
Reducing Returns to Increase Margin Through Better Product DataReducing Returns to Increase Margin Through Better Product Data
Reducing Returns to Increase Margin Through Better Product Data
 
EIS-Webinar-Most-From-LLMs-2023-08-23.pptx
EIS-Webinar-Most-From-LLMs-2023-08-23.pptxEIS-Webinar-Most-From-LLMs-2023-08-23.pptx
EIS-Webinar-Most-From-LLMs-2023-08-23.pptx
 
EIS-Webinar-Silabs-KM-Content-Program-2023-06-07.pdf
EIS-Webinar-Silabs-KM-Content-Program-2023-06-07.pdfEIS-Webinar-Silabs-KM-Content-Program-2023-06-07.pdf
EIS-Webinar-Silabs-KM-Content-Program-2023-06-07.pdf
 
EIS-Webinar- Generative-AI-KM-2023-04-19.pdf
EIS-Webinar- Generative-AI-KM-2023-04-19.pdfEIS-Webinar- Generative-AI-KM-2023-04-19.pdf
EIS-Webinar- Generative-AI-KM-2023-04-19.pdf
 
EIS-Webinar-MDM-Personalization-2023-03-15.pdf
EIS-Webinar-MDM-Personalization-2023-03-15.pdfEIS-Webinar-MDM-Personalization-2023-03-15.pdf
EIS-Webinar-MDM-Personalization-2023-03-15.pdf
 
EIS-Webinar-data.world-collab-2023-02-15.pptx
EIS-Webinar-data.world-collab-2023-02-15.pptxEIS-Webinar-data.world-collab-2023-02-15.pptx
EIS-Webinar-data.world-collab-2023-02-15.pptx
 
Accelerating Product Data Programs with Pre-PIM Software
Accelerating Product Data Programs with Pre-PIM SoftwareAccelerating Product Data Programs with Pre-PIM Software
Accelerating Product Data Programs with Pre-PIM Software
 
What is PIM and Why Your Ecommerce Business Needs It
What is PIM and Why Your Ecommerce Business Needs ItWhat is PIM and Why Your Ecommerce Business Needs It
What is PIM and Why Your Ecommerce Business Needs It
 
Knowledge Management & Virtual Agents
Knowledge  Management & Virtual AgentsKnowledge  Management & Virtual Agents
Knowledge Management & Virtual Agents
 
How Successful B2B Brands Deliver Next-Level Digital Experiences
How Successful B2B Brands Deliver Next-Level Digital ExperiencesHow Successful B2B Brands Deliver Next-Level Digital Experiences
How Successful B2B Brands Deliver Next-Level Digital Experiences
 
Unlock the Value of Data Discovery Using Knowledge Graphs and Hybrid AI
Unlock the Value of Data Discovery Using Knowledge Graphs and Hybrid AIUnlock the Value of Data Discovery Using Knowledge Graphs and Hybrid AI
Unlock the Value of Data Discovery Using Knowledge Graphs and Hybrid AI
 
Webinar: Powering Personalized Search with Knowledge Graphs
Webinar: Powering Personalized Search with Knowledge GraphsWebinar: Powering Personalized Search with Knowledge Graphs
Webinar: Powering Personalized Search with Knowledge Graphs
 
EIS Webinar: Building the AI Powered Enterprise
EIS Webinar: Building the AI Powered EnterpriseEIS Webinar: Building the AI Powered Enterprise
EIS Webinar: Building the AI Powered Enterprise
 
EIS Webinar: The Knowledge Management Imperative - KM Essential to AI
EIS Webinar: The Knowledge Management Imperative - KM Essential to AIEIS Webinar: The Knowledge Management Imperative - KM Essential to AI
EIS Webinar: The Knowledge Management Imperative - KM Essential to AI
 
Using Product Data to Drive Chatbot Dialogs - GS1 2019
Using Product Data to Drive Chatbot Dialogs - GS1 2019Using Product Data to Drive Chatbot Dialogs - GS1 2019
Using Product Data to Drive Chatbot Dialogs - GS1 2019
 
Prerequisites for Effective and Meaningful Automation
Prerequisites for Effective and Meaningful AutomationPrerequisites for Effective and Meaningful Automation
Prerequisites for Effective and Meaningful Automation
 
There's No AI Without IA (Information Architecture)
There's No AI Without IA (Information Architecture)There's No AI Without IA (Information Architecture)
There's No AI Without IA (Information Architecture)
 
Streamlining Information Flows In The Digital Workplace
Streamlining Information Flows In The Digital WorkplaceStreamlining Information Flows In The Digital Workplace
Streamlining Information Flows In The Digital Workplace
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

"Building Intelligent Content from 30 Years of Legacy Documents," Intelligent Content 2010, Paul Wlodarczyk

  • 1. Case Study: Building Intelligent Content from 30 Years of Legacy Documents Paul Wlodarczyk Director, Solutions Consulting Earley & Associates Copyright © 2010 Earley & Associates Inc. All Rights Reserved. COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 2. What do we assume about Intelligent Content? We usually assume: – Loads of systems – Information design – Structured content – Tied to the business – Personalized – Semantic – Etc. We assume new. 2 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 3. Case Study: Applied Materials Global leader in Nanomanufacturing Technology solutions for the fabrication of semiconductor chips, flat panel displays, solar photovoltaic cells, flexible electronics and energy efficient glass – Founded in 1967, $5B revenue, 8 Product Business Groups – Produces the technology that helps produce virtually every semiconductor chip and flat panel display in the world – Long-lived products – some in service over 30 years – 2500 customer engineers (“CEs” – 20% of work force) maintain, diagnose, and repair their equipment in customer fabs worldwide Business need: – Improve CE troubleshooting and repair performance in the fab through improved information access 3 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 4. What do we mean by Intelligent Content? • In our client’s words: – “Deliver the right information at the right time information, time, in the right format to the right person format, person.” • In our words: right information = Relevant, accurate, up-to-date, approved right time = In the context of work / business process right format = Accessible right person = Authorized 4 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 5. Information Challenge #1: 30 Years of Legacy Content • …and lots of it – PDFs – manuals, drawings, some are scans – Communities – forums, shared drives, bulletin boards – Knowledge Management – tips, Best Known Methods • How much gets “chunked”? How to convert it? • How to search it effectively? 5 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 6. Information Challenge #2: Point of need is in the clean room • Physical Access for the CE – Double / triple gloves • Typing/pointing are difficult – No place to set a laptop down • Wireless / Internet Access – Closest point of access to company internet may be across town • Customer Information Security Concerns – Protection of trade secrets – Some won’t allow laptops in fab – Some won’t even allow paper in fab • “Tools” are all unique in the fab – Need docs that reflect product “DNA” 6 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 7. Information Challenge #3: KM is complicated by IP / InfoSec concerns • Garden-walling Customer IP – Have to be sure that when a CE shares a tip or asks for help that they are not exposing customer IP to other customers (with whom they compete) • Protecting Company Product IP – DRM for preventing piracy / reverse engineering of products, parts • Preserving Company Services IP – Assure that customers pay for value- added services – Secure service IP from competitive service providers 7 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 8. Information Challenge #4: An “archipelago” of content centric systems PLM Tech Pubs Library Product Library Forum Product Product Library Drawings DRM Forum Library Forum Forum Product Product Product Forum Library Library Library Forum Email SAP Parts Diagnostics QA Product Library Best Practices Search and integration are issues Product Library 8 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 9. Where to begin eating the elephant? • Key observation: “Last thing we need is another system” • Need a balanced viewpoint – the “Four Pillars of KM”: – People – Process – Technology – Content • Assess the current state • Define the desired state • Define the gap closing actions 9 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 10. Technology • Technical Publishing – Authoring: Office, FrameMaker – Team Center - Drawings – Publishing in PDF, Live Cycle DRM • ECM – LiveLink  SharePoint • ERP – SAP for service billing, parts ordering, etc. • Various proprietary systems – Parts, diagnostics, KM, etc. • Connectivity and access to laptops in the fab – Ranges from “none” to “near” to “Nirvana” – Need to support a low-tech solution 10 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 11. People • Several key user groups: – CEs (content consumers and contributors) – Support (content consumers and contributors) – Tech pubs and training (content publishers) – Engineering teams (content contributors) • Understood roles, expectations, alignment, barriers to change • Key findings: – Content authors had well-defined needs and were extremely engaged – Content publishers had good alignment for change and good orientation around topic- oriented content – Strong need for governance over technology projects 11 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 12. Process • Service Work / Business Process – CEs spend lot of time searching – mostly during diagnosis – Business value is not in reducing search time; it is reducing product downtime. • Content Lifecycle – Authoring, Publishing processes fairly traditional – More engineering contribution and editing than authoring • Collaboration – KM starting to hit its stride. Sorting the IP issues • Program Governance – Service IT programs were stove-piped – Coordination needed for true intelligent content 12 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 13. Content • Monolithic PDF needs to be “chunked” • Terabytes of content – Most relevant content is PDF, tagged to corporate taxonomy, in a CMS – Some scans of 30 year-old manuals • Sales-oriented Taxonomy – Needs to reflect the service view (failure modes, symptoms, function, etc.) – Taxonomy governance process neglected • Info Security – Access Management and DRM is essential 13 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 14. Roadmap to Intelligent Content Phase 1: Phase 2: Phase 3: Foundations for Access at Point of Intelligent Content Intelligent Content Need Platform • Service Technology • CE Platform for Fab • Common client platform Council Access • SOA-based application • ECM implementation • Intelligent work packages integration • Faceted search • CE training, certification • Interactive Electronic • Federated search • XML Pilots Technical Manual (IETM) • Taxonomy development viewer • Modular content, tagged • XML content • Continuous Improvement • “Smart art” for other service systems 14 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 15. Project deployment • Service Technology Governance • Modular Content Strategy • Taxonomy and Metadata Development Five Core • CMS IA and User Experience Activities • Search and UX Technology • Several divisions, several products • Real users, active service data, “live fire” trial Production • Collect data, evaluate, and refine Pilot • Plan for what to migrate and how Scale and • Get to an 80%-ish solution Migrate 15 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 16. What about XML? • Can publish component PDF without XML – Largely maintain components at the source level today in Word and FrameMaker • Chunking and tagging legacy content will inform a content model for XML • No near-term drive for XML – No real reuse – little “transcluded” content – No multi-channel publishing – No localization • Need for XML in 3-5 years – Emerging need for localized content – Need to integrate XML content into IT systems for real service dashboard – dynamic publishing 16 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 17. Intelligent Content Myths • You need XML for intelligent content. – We can get there with well indexed component content. The key is relevant semantic markup. • We can just find everything with enterprise search / Google. – Taxonomy and component content strategy are essential for relevancy and contextual navigation. • We can justify the project with the time we save by not searching. – In the real world, projects can only get sponsored with a real ROI at every phase, and buy-in of all stakeholders. • Intelligent Content is futuristic. – We can get there TODAY. 17 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 18. Advantages of the “four pillars” approach • Comprehensive view of the issues, benefits, and constraints • Achieved buy-in at all levels of the organization • Yielded a clear roadmap to Intelligent Content • Clarified potential phasing of a large, complex project 18 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 19. Questions/Discussion Paul Wlodarczyk Earley & Associates, Inc 585-598-6050 paul@earley.com www.earley.com COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.
  • 20. About Earley & Associates, Inc. • Focus: Information Architecture • Consulting Philosophy: (“IA”) Services • Organizing Principles based on business context and goals • Founded: 1994 • Four Pillars - People, Content, • Personnel: Twenty core team Process, and Technology consultants, plus a network of other top industry experts • ECM and KM experts • taxonomy specialists • search experts • information architects • usability professionals • technology consultants • business process experts • Headquarters: Boston, MA 20 COPYRIGHT © 2010 EARLEY & ASSOCIATES INC. ALL RIGHTS RESERVED.