Cable-Stayed Bridges; Introduction
and Analysis.
Making the complex simple.
Summary Presentation of a lecture by
David Collings BSc CEng FICE
at University of Surrey, UK; March 2014.
Introduction
Start by looking at bridges others have
designed and built. See books such as
Collings, Steel Concrete Composite
Bridges and ICE Manual of Bridge
Engineering, as well as papers in
Proceedings of ICE, Bridge Engineering.
Chapter 10
Cable stay bridges
“..have a system of forces that are
resolved within the deck-stay-tower
system..”
From MOBE by ICE publishing
Left, Stonecutters
bridge during
construction, picture
from VSL. Below,
cantilevering of
Rusky Bridge, picture
from NCE.
Scan of BE cover
Ahkai Sha Bridge a stiff decked
cable-stayed form
Ah Kai Sha bridge; a cable-stay form with a stiff double deck, the deck
stiffness of such bridges is often larger than that of an extradosed
bridge, for some layouts of stay there may be some overlap in
behaviour (see figure 6).
Image from RBA archives
Analysis
The basic stay system is basically a series of
superimposed triangular trusses. A good
approximation of the behaviour can be
obtained relatively simply, however, in detail
the bending, shear and axial load interaction
together with non linear behaviour of the
stays make detailed analysis relatively
complex.
Analysis
Consider an isolated deck-stay-tower system shown in
the figure. Element 1 of the main span has a weight
W1 and is located a distance L1 from the tower, it is
attached to a tower of height h1. A tension T1 in the
stay and compression C1 in the deck is required for
stability.
C1 = W1 L1 /h C2 = W2 L2 / h
T1 = (W12
+ C12
)½
T2 = (W22
+ C22
)½
To
avoid out of balance forces at the tower top and in the
deck, C1 = C2, and W2 = W1 L1/ L2. Which
also gives equilibrium about point o.
The natural frequency (fn) of a structure is a
function of its mass (m) and stiffness (K):
fn = 1 (K / m )½
2π
The frequency of various bridge structures
are shown in figure (see full presentation).
Dynamics
Analysis of Second
Severn Bridge,
see Collings, Steel-
concrete composite
bridges.
From MOBE by ICE publishing
Loads
Key loads to consider:
• Construction;
• Traffic, Rail, People;
• Wind;
• Ship Impact.
Loads
Viana Bridge, see Proceedings of ICE,
Bridge Engineering, Dec 2013
Wind, vortex shedding and flutter. Picture is an extract from
Collings, Steel-Concrete Composite Bridges.
The susceptibility of a bridge to dynamic wind
effects can be determined by a factor P
P = (ρ b2
/m) (44 vmo
2
/ b L fb
2
)
Where ρ is the density of air, b is the bridge width, L is the span, m
is the mass per unit length of the bridge and fb the first bending
frequency of the structure. For P < 0.04 the structure is unlikely to
be susceptible to aerodynamic excitation. For P < 1 the structure
should be checked against some simplified criteria to check for any
aerodynamic instability. If P > 1 the structure is likely to be
susceptible to aerodynamic excitation and some changes to the
mass, stiffness or structure layout may be required, wind tunnel
testing will be required to verify the structures behaviour.
Ship Impact
Design stays to limit stress at
working loads to 0.4Pu, or limit live
load variation to 200 Mpa.
Deck- Stay Connection
From SCCD by D COLLINGS,ICE publishing
Towers
The main visual element,
they can use many
differing shapes.
Example 1
Taney Bridge, Ireland, see ICE
Proceedings paper by Collings
and Brown.
Summary
Cable-Stayed Bridges; Introduction
and Analysis.
Making the complex simple.
Summary Presentation of a lecture by
David Collings BSc CEng FICE
at University of Surrey, UK; March 2014.
Presentation by CRD and Wolf
productions.

More Related Content

What's hot

Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
coolidiot07
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
Mohammed Abdelkawy
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
Ankit Singh
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
Jigar Shah
 
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush SanthaliaPractical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
Piyush Kumar Santhalia
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
rajdutt1111
 
Punching Shears 1.1
Punching Shears 1.1Punching Shears 1.1
Punching Shears 1.1
Milan Stanic
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
 

What's hot (20)

Concrete bridge-design-to-bs5400
Concrete bridge-design-to-bs5400Concrete bridge-design-to-bs5400
Concrete bridge-design-to-bs5400
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
 
Ch3 Design Considerations (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. M...
Ch3 Design Considerations (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. M...Ch3 Design Considerations (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. M...
Ch3 Design Considerations (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. M...
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
 
Loads and forces
Loads and forcesLoads and forces
Loads and forces
 
BRIDGE OVERVIEW
BRIDGE OVERVIEWBRIDGE OVERVIEW
BRIDGE OVERVIEW
 
steel structural basics
steel structural basicssteel structural basics
steel structural basics
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush SanthaliaPractical Design of Balanced Cantilever Bridges - Piyush Santhalia
Practical Design of Balanced Cantilever Bridges - Piyush Santhalia
 
Structural steel design : beam-columns
Structural steel design : beam-columnsStructural steel design : beam-columns
Structural steel design : beam-columns
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 
Punching Shears 1.1
Punching Shears 1.1Punching Shears 1.1
Punching Shears 1.1
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
design of tower
design of towerdesign of tower
design of tower
 
Cable stayed bridge
Cable stayed bridgeCable stayed bridge
Cable stayed bridge
 

Similar to Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK

Stress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridgesStress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridges
Masum Majid
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
Mohamed Elfike
 
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
ijtsrd
 
4 stress ribbon & arch pedestrian bridges
4 stress ribbon & arch pedestrian bridges4 stress ribbon & arch pedestrian bridges
4 stress ribbon & arch pedestrian bridges
Masum Majid
 

Similar to Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK (20)

Extradosed Bridges: Exploring the Boundaries
Extradosed Bridges: Exploring the BoundariesExtradosed Bridges: Exploring the Boundaries
Extradosed Bridges: Exploring the Boundaries
 
Long Span Bridges
Long Span BridgesLong Span Bridges
Long Span Bridges
 
Steel Bridge Dr.Metwally
Steel Bridge Dr.MetwallySteel Bridge Dr.Metwally
Steel Bridge Dr.Metwally
 
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
 
Stress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridgesStress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridges
 
DESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREDESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDURE
 
Bridge Grillage Analysis using Finite Element Methods
Bridge Grillage Analysis using Finite Element  MethodsBridge Grillage Analysis using Finite Element  Methods
Bridge Grillage Analysis using Finite Element Methods
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
 
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
 
4 stress ribbon & arch pedestrian bridges
4 stress ribbon & arch pedestrian bridges4 stress ribbon & arch pedestrian bridges
4 stress ribbon & arch pedestrian bridges
 
Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000
 
Bridges
BridgesBridges
Bridges
 
Bridge
BridgeBridge
Bridge
 
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMSSUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
 
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMSSUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
 
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMSSUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
SUGGESTING DEFLECTION EXPRESSIONS FOR RC BEAMS
 
application of modern timber structure in short and medium span
application of modern timber structure in short and medium spanapplication of modern timber structure in short and medium span
application of modern timber structure in short and medium span
 
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGEANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
ANALYSIS OF ULTIMATE BEARING CAPACITY FOR LONG-SPAN STEEL BOX TRUSS ARCH BRIDGE
 
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...
 

More from David Collings

More from David Collings (13)

IABSE Keynote abridged chinese.pptx
IABSE Keynote abridged chinese.pptxIABSE Keynote abridged chinese.pptx
IABSE Keynote abridged chinese.pptx
 
IABSE Keynote abridged.pptx
IABSE Keynote abridged.pptxIABSE Keynote abridged.pptx
IABSE Keynote abridged.pptx
 
Infrastructure carbon data
Infrastructure carbon dataInfrastructure carbon data
Infrastructure carbon data
 
Morandi Bridge Collapse
Morandi Bridge Collapse Morandi Bridge Collapse
Morandi Bridge Collapse
 
Current bridges 18
Current bridges 18Current bridges 18
Current bridges 18
 
LSB current bridges 17
LSB current bridges 17LSB current bridges 17
LSB current bridges 17
 
Arching and Compressive Membrane Action in Concrete Slabs
Arching and Compressive Membrane Action in Concrete SlabsArching and Compressive Membrane Action in Concrete Slabs
Arching and Compressive Membrane Action in Concrete Slabs
 
Multi span suspension bridges
Multi span suspension bridgesMulti span suspension bridges
Multi span suspension bridges
 
Current Long Span Bridges 16
Current Long Span Bridges 16Current Long Span Bridges 16
Current Long Span Bridges 16
 
Current Long Span Bridges 15
Current Long Span Bridges 15Current Long Span Bridges 15
Current Long Span Bridges 15
 
Chinese arch bridges, timber, stone, concrete, steel.
Chinese arch bridges, timber, stone, concrete, steel.Chinese arch bridges, timber, stone, concrete, steel.
Chinese arch bridges, timber, stone, concrete, steel.
 
David Collings BSc CEng FICE personal career summary
David Collings BSc CEng FICE personal career summaryDavid Collings BSc CEng FICE personal career summary
David Collings BSc CEng FICE personal career summary
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges
 

Recently uploaded

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK

  • 1. Cable-Stayed Bridges; Introduction and Analysis. Making the complex simple. Summary Presentation of a lecture by David Collings BSc CEng FICE at University of Surrey, UK; March 2014.
  • 2. Introduction Start by looking at bridges others have designed and built. See books such as Collings, Steel Concrete Composite Bridges and ICE Manual of Bridge Engineering, as well as papers in Proceedings of ICE, Bridge Engineering.
  • 3.
  • 4. Chapter 10 Cable stay bridges “..have a system of forces that are resolved within the deck-stay-tower system..”
  • 5.
  • 6. From MOBE by ICE publishing
  • 7. Left, Stonecutters bridge during construction, picture from VSL. Below, cantilevering of Rusky Bridge, picture from NCE.
  • 8. Scan of BE cover
  • 9.
  • 10. Ahkai Sha Bridge a stiff decked cable-stayed form Ah Kai Sha bridge; a cable-stay form with a stiff double deck, the deck stiffness of such bridges is often larger than that of an extradosed bridge, for some layouts of stay there may be some overlap in behaviour (see figure 6). Image from RBA archives
  • 11. Analysis The basic stay system is basically a series of superimposed triangular trusses. A good approximation of the behaviour can be obtained relatively simply, however, in detail the bending, shear and axial load interaction together with non linear behaviour of the stays make detailed analysis relatively complex.
  • 12. Analysis Consider an isolated deck-stay-tower system shown in the figure. Element 1 of the main span has a weight W1 and is located a distance L1 from the tower, it is attached to a tower of height h1. A tension T1 in the stay and compression C1 in the deck is required for stability.
  • 13. C1 = W1 L1 /h C2 = W2 L2 / h T1 = (W12 + C12 )½ T2 = (W22 + C22 )½ To avoid out of balance forces at the tower top and in the deck, C1 = C2, and W2 = W1 L1/ L2. Which also gives equilibrium about point o.
  • 14.
  • 15. The natural frequency (fn) of a structure is a function of its mass (m) and stiffness (K): fn = 1 (K / m )½ 2π The frequency of various bridge structures are shown in figure (see full presentation). Dynamics
  • 16. Analysis of Second Severn Bridge, see Collings, Steel- concrete composite bridges.
  • 17. From MOBE by ICE publishing
  • 18. Loads Key loads to consider: • Construction; • Traffic, Rail, People; • Wind; • Ship Impact.
  • 19. Loads Viana Bridge, see Proceedings of ICE, Bridge Engineering, Dec 2013
  • 20. Wind, vortex shedding and flutter. Picture is an extract from Collings, Steel-Concrete Composite Bridges.
  • 21. The susceptibility of a bridge to dynamic wind effects can be determined by a factor P P = (ρ b2 /m) (44 vmo 2 / b L fb 2 ) Where ρ is the density of air, b is the bridge width, L is the span, m is the mass per unit length of the bridge and fb the first bending frequency of the structure. For P < 0.04 the structure is unlikely to be susceptible to aerodynamic excitation. For P < 1 the structure should be checked against some simplified criteria to check for any aerodynamic instability. If P > 1 the structure is likely to be susceptible to aerodynamic excitation and some changes to the mass, stiffness or structure layout may be required, wind tunnel testing will be required to verify the structures behaviour.
  • 23.
  • 24. Design stays to limit stress at working loads to 0.4Pu, or limit live load variation to 200 Mpa.
  • 25. Deck- Stay Connection From SCCD by D COLLINGS,ICE publishing
  • 26. Towers The main visual element, they can use many differing shapes.
  • 27.
  • 28.
  • 29. Example 1 Taney Bridge, Ireland, see ICE Proceedings paper by Collings and Brown.
  • 30.
  • 31.
  • 32.
  • 34. Cable-Stayed Bridges; Introduction and Analysis. Making the complex simple. Summary Presentation of a lecture by David Collings BSc CEng FICE at University of Surrey, UK; March 2014.
  • 35. Presentation by CRD and Wolf productions.