Case Study
FGL_Table 1Forge Group LtdTable 1. Timeline of Forge Group
Ltd (FGL)DateClosing Market Major
Announcement/ChangeJune 27, 2007$0.56FGL listed on
Australian Stock ExchangeJune 30, 2008$0.78June 30,
2009$0.43Global Financial Crisis impactApril 6,
2010$2.96Clough purchases 10.5 million shares for 13%
ownershipJune 30, 2010$2.66June 30, 2012$5.46June 30,
2012$4.37January 13, 2012$5.25FGL purchases 100% of CTEC
Pty Ltd for $32.26 millionMarch 6, 2013$6.98Peak share
priceMarch 26, 2013$6.05Clough sells FGL shares at $6.05
($187 million, 35% of FGL)May 17, 2013FGL awarded major
contract (Dugald Rover)June 3, 2013FGL acquires Taggart
Global (U.S. company) at $43 millionJuly 2, 2013FGL awarded
major contract (TAN Burrup plant)June 30, 2013$4.09August
29, 2013Annual Report released NPAT at $63 million, equity at
$213.5 million, dividend at $0.14 per shareSeptember 2,
2013$1.47 billion joint venture with Duro Felguera announced
(value to Forge is $830 million – order book now at $2.1
billion)September 12, 2013FGL awarded major contract
(Yandicooogina for Rio Tinto – $100 million
contract)September 19, 2013FGL major contract terminated
(Dugald River)October 7, 2013FGL declares $50 million in
major contracts in U.S. and Australia since June 1,
2013November 4, 2013$4.18Trading haltNovember 5, 2013ANZ
Bank (major financier) appoints KordaMentha to review
booksNovember 28, 2013FGL Market Announcement: –ANZ
Bank supports and negotiates new finance facilities –
Considering equity capital raising –Identifies underperforming
assets (i.e., CTEC projects) –Negotiates agreements with
customers and sub-contractors –Normal operations for other
parts of businessNovember 28, 2013$0.69FGL Market
Announcement:-$127 profit write down on two large contracts
(Diamantina Power Station and West Angelas Power Station;
$45 million to complete both projects) –Challenging liquidity
period (net cash flow Nov. and Dec.) –ANZ Bank continued
support with some adjustment to finance facilities –Business as
usualNovember 28, 2013$0.69Trading halt liftedDecember 4,
2013FGL Market Announcement:– In response to ASX query,
indicated became aware of problems with Diamantina Power
Station and West Angelas Power Station projects in late Sept.
with margin erosions due to cost overruns and delays causing
the profit down-grade. Costing analysis during Oct. and Nov.
led to requested trading halt and profit downgrade in
Nov.December 17, 2013FGL awarded major $40 million
contract in North American coal sectorJanuary 10,
2014$1.25Trading halt until January 14, 2014January 14,
2014$1.02Trading halt until January 28, 2014January 24,
2014January 28, 2014$0.90February 10, 2014$0.92Trading
ceasesFebruary 11, 2014Board appoints administrators, and
secured creditors appoint receivers.
FGL_Table 2Forge Group LtdTable 2. Comprehensive Income
Statement (in thousands of Australian dollars)June 30, 2010June
30, 2011June 30, 2012June 30, 2013Unaudited January 31,
2014Revenue$246,169$421,595$774,879$1,054,100$520,041Co
st of sales(711,430)Changes in inventories of finished goods
and WIP9,69615,000Materials, plant, and contractor
costs(125,171)(211,000)(516,867)(656,334)Employee benefits
expense(79,194)(157,191)(164,502)(256,515)Depreciation and
amortization(3,218)(5,159)(16,292)(21,361)Consulting
fees(582)(5,380)Provision for impairment
losses(1,628)(304)Other
expenses(7,132)(8,043)(12,711)(21,033)Other gains and
losses537257188ExpensesResults from Operating
Activities40,05954,89864,18293,665Finance
income1,0233,0795,6986,939Finance
costs(716)(711)(2,850)(4,816)Net finance
income3072,3682,8482,123Share of profit/(loss) of associates
and jointly controlled entities(513)3,052(5,679)Net Profit
Before Tax40,36656,75370,08290,109(324,162)Income tax
expense(10,915)(17,920)(20,780)(27,190)(2,301)Net Profit
After Tax29,45138,83349,30262,919(326,463)Foreign exchange
differences (net of tax)(346)(1,946)(310)1,826Total
Comprehensive Income29,10536,88748,99264,745
FGL_Table 3Forge Group LtdTable 3. Balance Sheet (in
thousands of Australian dollars)June 30, 2010June 30, 2011June
30, 2012June 30, 2013Unaudited January 31, 2014Current
Assets Cash and cash
equivalents51,92178,28551,09190,72815,316Short-term
deposits72,5002,748Trade and other
receivables42,16249,542196,88483,254103,279Inventories and
WIP14,62129,62211,331150,49140,616Current tax
assets2,535Other
assets2,2461,5742,4871,560(23,415)Noncurrent assets classified
as held for sale6,900Total Current
Assets117,850159,023334,293331,316135,796Noncurrent
Assets Trade and other receivables7,0511,42473,293Term
deposits14,26010,468Property, plant, and
equipment26,78936,57767,73671,546Deferred tax
assets1,8272,0434,2739,124Investments accounted for using
equity method2,545Intangibles15,62115,63748,24340,332Other
assets90,467Total Noncurrent
Assets44,23754,257144,108132,894163,760Total
Assets162,087213,280478,401464,210299,556Current
Liabilities Trade and other
payables52,96872,845267,169219,568299,909Borrowings2,7893
,2728,73411,139Current tax
liabilities8,6446,3878,367Provisions5257558253,970Other
liabilities63,731Total Current
Liabilities64,92683,259285,095234,677363,640Noncurrent
Liabilities Trade and other
payables9,2461,517Borrowings4,90117,45314,547Deferred tax
liabilities512,7931,067Investments accounted for using the
equity method308489493Provisions164299489493Other
liabilities50,667Total Noncurrent
Liabilities3,7855,55929,98116,10752,184Total
Liabilities68,71188,818315,076250,784415,824Net
Assets93,376124,462163,325213,426(116,268)Equity Issued
capital42,83944,29445,43045,43042,768Profit
reserve62,919Reserves1,034(912)(1,221)1,471(159,036)Retaine
d earnings49,50581,080119,116103,606Total
Equity93,376124,462163,325213,426(116,268)Number of
shares70,699,48781,541,56986,169,01486,169,01486,169,014Sh
are price2.665.464.374.20
FGL_Table 4Forge Group LtdTable 4. Statement of Cash Flows
(in thousands of Australian dollars)2010201120122013Cash
Flows from Operating Activities Receipts from
customers245,418431,399744,7201,176,226Payments to
suppliers and
employees(215,240)(373,464)(631,924)(1,113,073)Other
revenue943638Income taxes
paid(670)(20,390)(21,537)(45,231)Net cash flows provided by
operating activities$30,451$38,183$91,259$17,922Cash Flows
from Investing Activities Payments for property, plant, and
equipment(8,371)(11,257)(39,737)(19,521)Proceeds from
disposal of property, plan, and
equipment2246,485500869Interest
received1,0233,0795,6497,379Term deposits
matured/expired(86,760)73,545Amount received from joint
ventures130Acquisition of investments or
associates(205)(3,439)Payment of deferred
consideration(19,798)Net cash flows provided by/used in
financing activities(7,124)(1,898)(123,787)42,604Cash Flows
from Financing Activities Proceeds from issue of share
capital18,9071,4581,136Proceeds from
borrowings23,0119,152Repayment of
borrowings(4,131)(3,464)(4,698)(9,654)Interest
paid(271)(658)(2,850)(4,877)Dividends
paid(3,419)(7,257)(11,265)(15,510)Net cash provided by/used
in financing activities$11,086-$9,921$5,334-$20,889Net
increase/decrease in cash and
equivalents34,41326,364(27,194)39,637Cash and equivalents at
beginning of year17,44051,92178,28551,091Effect of exchange
rate changes67Cash and equivalents at end of
year51,92078,28551,09190,728
FGL_Table 5Forge Group LtdTable 5. Reconciliation (in
thousands of Australian dollars)2010201120122013Profit for
the year after tax$29,450$38,832$49,302$62,919Depreciation
and amortization3,2175,15916,29221,361Other noncash
differences907(1,815)(43,488)28,409Decrease/Increase in trade
debtors and
receivables(25,202)(7,380)(154,393)119,258Decrease/Increase
in inventories and
WIP(9,696)(15,000)18,291(139,160)Decrease/Increase in other
current assets(104)671(913)927Increase in deferred tax
assets(779)(215)(2,231)(4,851)Decrease/Increase in trade and
payables21,88119,877203,417(37,123)Decrease/Increase in
current tax
liabilities10,649(2,311)1,980(10,903)Decrease/Increase in
deferred tax liabilities642,742(1,727)Increase in other
provisions6436526086Net cash inflow from operating
activities$30,451$38,183$91,259$39,196
Unit 6_Student TemplateUnit 6Forge Group Case
StudyMeasureFormula
(Words)2014
(Calculation - substitute words in formula with numbers from
the financial statements)Final AnswerProfitabilityROEROA
Profit Margin Ratio EfficiencyAssetTurnoverLiquidityCurrent
RatioCash Flow RatioGearingDebt to Equity RatioInterest
Coverage Debt CoverageNTABMarketEPSDPSPER
Adapted from IMA
IMA EDUCATIONAL CASE JOURNAL VOL. 8, NO. 1, ART.
2, MARCH 2015
ISSN 1940-204X
Forge Group Ltd Case Study (A)The Revealing Nature of
Numbers
Suzanne Maloney
University of Southern Queensland
Toowoomba, Australia, 4350.
[email protected]
THE FORGE GROUP LTD SUMMARY
In 2012-2013, Forge Group Limited had more than 2,000
employees working across
eight countries on four continents. The pride in the growth story
is evident, as Forge
Group’s 2012 Annual Report (released in September 2013) lists
accomplishments in
what is described as a groundbreaking year. The main
milestones give a snapshot of
the types of projects the company was involved in (see Figure
1). At the time of listing
(June 26, 2007), Forge Group Ltd (FGL) shares traded for
$0.56. (All monetary amounts
discussed herein are in Australian dollars. To convert to another
currency, visit www.x-
rates.com.) The shares peaked at $6.98 on March 6, 2013,
valuing the company at
$600 million. In less than a year, FGL was placed in a trading
halt (February 11, 2014).
Voluntary administrators and receivers were appointed.
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F201
30829%2F01438557.pdf
THE ENGINEERING AND CONSTRUCTION INDUSTRY
The engineering and construction sector provides significant
economic activity in many
countries. Large-scale engineering and construction projects—
including highways,
bridges, railways, airports, harbors, production facilities, and
office and apartment
buildings—provide employment opportunities and attract large
capital investment. The
quantum of resources employed in this industry and the
profound affect they have on
society means that there are strict compliance, regulatory,
environmental, and tax
requirements on those operating in the sector. The governments
of many countries
publicly funded a number of large-scale infrastructure projects
in the aftermath of the
Global Financial Crisis (GFC) to stimulate the economy.
Joint ventures and public/private partnerships are common in
the industry to reduce the
risk of large-scale projects and to ensure adequate capital and
expertise. Major
contracts generally involve a number of different companies
with primary contractor and
sub-contractor status, all tendering and quoting on various
stages of work in a project.
This makes the industry highly competitive, and therefore it is
vital to have appropriate
costing and project management expertise.
Mining companies also took advantage of the cheaper finance
post GFC and the
upswing in demand for minerals and resources. Large-scale
mining projects have been
the driving force for some economies, especially in Australia.
But with the construction
of a number of the large projects nearing completion (and
moving into production
phase), there is a drop in engineering and construction
spending. In Australia in 2013-
2014, engineering and construction spending was $128 billion,
dropping $1 billion from
the previous year. This increased competition in the sector and,
therefore, demand for
lower-priced contracts and shorter completion times.
The market value of engineering and construction companies are
based partly on their
future secured order book. “Order book” is a term used in the
engineering and
construction sector to capture the company’s future work and
the dollar value of the
work. The future work is contracted through the normal selling
of services and through
“tendering” for large-scale works needed by governments and
large private companies.
If a project is very large, it may be divided into segments with a
separate tender process
for each segment. Companies have to carefully consider the risk
attached to each
segment of the larger project and the interrelationship of each
of the segments. A
company can be held liable to another company if their segment
completion is delayed
and the other company cannot complete its work on time, as per
their contract, because
of the delay. For example, when building a tunnel, the riskier
segment may be blasting
the rock and strengthening the actual tunnel. Excavating the
ground and surfacing the
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F20130829%2F01438557.pdf
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F20130829%2F01438557.pdf
road may not carry the same risk but could be held up if the
blasting and strengthening
is not completed on time.
In comparison to a retail or manufacturing concern, the products
being sold are large
capital works that tend not to be completed within a neat 12-
month period. This means
that there needs to be payment points built into the contracts.
These are called
“milestones.” Once a project milestone is reached, it triggers a
point when the
engineering and construction company can invoice the
purchaser and recognize the
revenue in its accounts. The product cost (Cost-of-Goods-Sold)
expensed against this
revenue will contain material, labor, equipment costs, and sub-
contractor costs. These
costs are all capitalized into inventory at the time they are
incurred but not expensed
until they reach a milestone. A lot of dollars, long-term time
horizons, subjective
milestones, and the application of large capital equipment costs
contribute to the overall
business risk in the sector. Many companies have suffered as a
result of stalled
projects, unforeseen circumstances or problems, poor costing of
the work, and
mismanaged cash flow.
Within the industry, there is usually significant take-over
activity. This is driven in part by
companies not performing well and/or insolvency and also by
normal merger and
acquisition activity. Smaller companies find it difficult to
compete with larger companies
for the larger projects and generally need to combine or merge
in some way or stay
small. This adds further risk and places the financial statements
and the order book
under increased scrutiny as business valuations rely on this
information.
THE FORGE GROUP LTD (FGL)
The company was a success story. It listed on the Australian
stock exchange on June
26, 2007, from a private construction company called
AiConstruction. It was a well-run
company that needed access to more capital if it was to continue
to grow. Within a year,
it made its first acquisition by taking over Abesque
Engineering. The company survived
the Global Financial Crisis and leveraged to the subsequent
mining and construction
boom led by China’s appetite for minerals and resources. Over
the next few years, the
company grew organically and in April 2010 another
construction company called
Clough bought 13% (10.5 million shares) of FGL ordinary
shares, thus becoming the
largest shareholder. Clough continued to purchase shares in
FGL until it divested its
total holding of 35% in March 2013. Clough management
explained its divestment by
indicating that expectations of joint ventures between the two
companies did not
eventuate, and, therefore, the equity holding was cashed in to
allow the pursuit of other
objectives.
In January 2012, FGL undertook a major acquisition by
purchasing CTEC Pty Ltd. In
essence, the acquisition meant taking over two major projects.
The Diamantina Power
Station (DPS) Project in Queensland, Australia, and the West
Angelas Power Station
(WAPS) Project in the Pilbara region of Western Australia. It
was expected that these
major projects would add $7.5 million and $10.8 million to
earnings before interest, tax,
depreciation, and amortization (EBITDA) in 2012 and 2013,
respectively. The purchase
price was $16 million up-front with further payments due on the
meeting of specified
performance targets (total paid was $32.26 million). This
increased FGL’s order book
significantly, and FGL’s share price rose in response. In June
2013, FGL acquired
Taggart Global for $43 million. This purchase meant that FGL
was now diversifying into
asset management and into other economies.
SHARE MARKET INFORMATION
The historical share price chart since listing is shown in Figure
2.
The market closing prices, major announcements, and
significant shareholding changes
are listed in chronological order in Table 1.
CTEC PURCHASE
In the wash up of the demise of FGL is the attention being paid
to two main contracts:
The Diamantina Power Station (DPS) Project in Queensland,
Australia, and the West
Angelas Power Station (WAPS) Project in the Pilbara region of
Western Australia. Both
projects were acquired after FGL took over CTEC Pty Ltd on
January 13, 2012. The
purchase of CTEC was to change the business model by
bringing sub-contracting work
in-house with the intended consequence of taking out the
“middle man” and thereby
increasing earnings (by negating sub-contractor margins). The
CTEC purchase
payment terms required an up-front payment of $16 million with
subsequent payments
conditional on meeting performance criteria (possible further
payment of $40 million in
total). CTEC’s prior year (June 30, 2011) EBIT was $2 million,
with expected EBITDA at
year end 2012 and 2013 to be $18.4 million and $24.8 million,
respectively. The DPS
and WAPS projects were to increase this expected EBITDA by
$7.5 million in 2012 and
$10.8 million in 2013.
Instead cost overruns and poor budgeting meant that the
projects’ revised 2013
estimates showed a $61 million project margin loss for the DPS
project and a $41.7
million project margin loss on the WAPS project. The cost
overruns on these two
projects lead to the profit downgrade and contributed to the
resulting shortage of cash.
Added to that was the discovery of an early payment to the
vendors of CTEC Pty Ltd
before its performance conditions were met. Further, the
payment of bonuses to the
previous Managing Director, Peter Hutchinson, of $375,000 was
made for a successful
acquisition and integration. These payments are the subject of
further investigations by
the liquidator.
DPS AND WAPS COSTING AND BUDGETING
In any business the costing and budgeting systems are critical to
success. The FGL
administrator report for 2013/2014 (year ending January 2014)
shows that the:
• Actual work-in-progress income for the period was $126
million below
management forecast.
• Labor costs were $70 million over budget.
• Material costs were $55 million over budget.
• Work-in-progress overheads were $22 million over budget.
FINANCIAL INFORMATION
The financial statements for 2010-2014 are presented in Tables
2-5 in your Excel
workbook.
Forge Group Ltd.
Adapted from IMA
IMA EDUCATIONAL CASE JOURNAL VOL. 8, NO. 1, ART.
2, MARCH 2015
ISSN 1940-204X
Forge Group Ltd Case Study (A)The Revealing Nature of
Numbers
Suzanne Maloney
University of Southern Queensland
Toowoomba, Australia, 4350.
[email protected]
THE FORGE GROUP LTD SUMMARY
In 2012-2013, Forge Group Limited had more than 2,000
employees working across
eight countries on four continents. The pride in the growth story
is evident, as Forge
Group’s 2012 Annual Report (released in September 2013) lists
accomplishments in
what is described as a groundbreaking year. The main
milestones give a snapshot of
the types of projects the company was involved in (see Figure
1). At the time of listing
(June 26, 2007), Forge Group Ltd (FGL) shares traded for
$0.56. (All monetary amounts
discussed herein are in Australian dollars. To convert to another
currency, visit www.x-
rates.com.) The shares peaked at $6.98 on March 6, 2013,
valuing the company at
$600 million. In less than a year, FGL was placed in a trading
halt (February 11, 2014).
Voluntary administrators and receivers were appointed.
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F201
30829%2F01438557.pdf
THE ENGINEERING AND CONSTRUCTION INDUSTRY
The engineering and construction sector provides significant
economic activity in many
countries. Large-scale engineering and construction projects—
including highways,
bridges, railways, airports, harbors, production facilities, and
office and apartment
buildings—provide employment opportunities and attract large
capital investment. The
quantum of resources employed in this industry and the
profound affect they have on
society means that there are strict compliance, regulatory,
environmental, and tax
requirements on those operating in the sector. The governments
of many countries
publicly funded a number of large-scale infrastructure projects
in the aftermath of the
Global Financial Crisis (GFC) to stimulate the economy.
Joint ventures and public/private partnerships are common in
the industry to reduce the
risk of large-scale projects and to ensure adequate capital and
expertise. Major
contracts generally involve a number of different companies
with primary contractor and
sub-contractor status, all tendering and quoting on various
stages of work in a project.
This makes the industry highly competitive, and therefore it is
vital to have appropriate
costing and project management expertise.
Mining companies also took advantage of the cheaper finance
post GFC and the
upswing in demand for minerals and resources. Large-scale
mining projects have been
the driving force for some economies, especially in Australia.
But with the construction
of a number of the large projects nearing completion (and
moving into production
phase), there is a drop in engineering and construction
spending. In Australia in 2013-
2014, engineering and construction spending was $128 billion,
dropping $1 billion from
the previous year. This increased competition in the sector and,
therefore, demand for
lower-priced contracts and shorter completion times.
The market value of engineering and construction companies are
based partly on their
future secured order book. “Order book” is a term used in the
engineering and
construction sector to capture the company’s future work and
the dollar value of the
work. The future work is contracted through the normal selling
of services and through
“tendering” for large-scale works needed by governments and
large private companies.
If a project is very large, it may be divided into segments with a
separate tender process
for each segment. Companies have to carefully consider the risk
attached to each
segment of the larger project and the interrelationship of each
of the segments. A
company can be held liable to another company if their segment
completion is delayed
and the other company cannot complete its work on time, as per
their contract, because
of the delay. For example, when building a tunnel, the riskier
segment may be blasting
the rock and strengthening the actual tunnel. Excavating the
ground and surfacing the
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F20130829%2F01438557.pdf
http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor
t%2FComNews%2F20130829%2F01438557.pdf
road may not carry the same risk but could be held up if the
blasting and strengthening
is not completed on time.
In comparison to a retail or manufacturing concern, the products
being sold are large
capital works that tend not to be completed within a neat 12-
month period. This means
that there needs to be payment points built into the contracts.
These are called
“milestones.” Once a project milestone is reached, it triggers a
point when the
engineering and construction company can invoice the
purchaser and recognize the
revenue in its accounts. The product cost (Cost-of-Goods-Sold)
expensed against this
revenue will contain material, labor, equipment costs, and sub-
contractor costs. These
costs are all capitalized into inventory at the time they are
incurred but not expensed
until they reach a milestone. A lot of dollars, long-term time
horizons, subjective
milestones, and the application of large capital equipment costs
contribute to the overall
business risk in the sector. Many companies have suffered as a
result of stalled
projects, unforeseen circumstances or problems, poor costing of
the work, and
mismanaged cash flow.
Within the industry, there is usually significant take-over
activity. This is driven in part by
companies not performing well and/or insolvency and also by
normal merger and
acquisition activity. Smaller companies find it difficult to
compete with larger companies
for the larger projects and generally need to combine or merge
in some way or stay
small. This adds further risk and places the financial statements
and the order book
under increased scrutiny as business valuations rely on this
information.
THE FORGE GROUP LTD (FGL)
The company was a success story. It listed on the Australian
stock exchange on June
26, 2007, from a private construction company called
AiConstruction. It was a well-run
company that needed access to more capital if it was to continue
to grow. Within a year,
it made its first acquisition by taking over Abesque
Engineering. The company survived
the Global Financial Crisis and leveraged to the subsequent
mining and construction
boom led by China’s appetite for minerals and resources. Over
the next few years, the
company grew organically and in April 2010 another
construction company called
Clough bought 13% (10.5 million shares) of FGL ordinary
shares, thus becoming the
largest shareholder. Clough continued to purchase shares in
FGL until it divested its
total holding of 35% in March 2013. Clough management
explained its divestment by
indicating that expectations of joint ventures between the two
companies did not
eventuate, and, therefore, the equity holding was cashed in to
allow the pursuit of other
objectives.
In January 2012, FGL undertook a major acquisition by
purchasing CTEC Pty Ltd. In
essence, the acquisition meant taking over two major projects.
The Diamantina Power
Station (DPS) Project in Queensland, Australia, and the West
Angelas Power Station
(WAPS) Project in the Pilbara region of Western Australia. It
was expected that these
major projects would add $7.5 million and $10.8 million to
earnings before interest, tax,
depreciation, and amortization (EBITDA) in 2012 and 2013,
respectively. The purchase
price was $16 million up-front with further payments due on the
meeting of specified
performance targets (total paid was $32.26 million). This
increased FGL’s order book
significantly, and FGL’s share price rose in response. In June
2013, FGL acquired
Taggart Global for $43 million. This purchase meant that FGL
was now diversifying into
asset management and into other economies.
SHARE MARKET INFORMATION
The historical share price chart since listing is shown in Figure
2.
The market closing prices, major announcements, and
significant shareholding changes
are listed in chronological order in Table 1.
CTEC PURCHASE
In the wash up of the demise of FGL is the attention being paid
to two main contracts:
The Diamantina Power Station (DPS) Project in Queensland,
Australia, and the West
Angelas Power Station (WAPS) Project in the Pilbara region of
Western Australia. Both
projects were acquired after FGL took over CTEC Pty Ltd on
January 13, 2012. The
purchase of CTEC was to change the business model by
bringing sub-contracting work
in-house with the intended consequence of taking out the
“middle man” and thereby
increasing earnings (by negating sub-contractor margins). The
CTEC purchase
payment terms required an up-front payment of $16 million with
subsequent payments
conditional on meeting performance criteria (possible further
payment of $40 million in
total). CTEC’s prior year (June 30, 2011) EBIT was $2 million,
with expected EBITDA at
year end 2012 and 2013 to be $18.4 million and $24.8 million,
respectively. The DPS
and WAPS projects were to increase this expected EBITDA by
$7.5 million in 2012 and
$10.8 million in 2013.
Instead cost overruns and poor budgeting meant that the
projects’ revised 2013
estimates showed a $61 million project margin loss for the DPS
project and a $41.7
million project margin loss on the WAPS project. The cost
overruns on these two
projects lead to the profit downgrade and contributed to the
resulting shortage of cash.
Added to that was the discovery of an early payment to the
vendors of CTEC Pty Ltd
before its performance conditions were met. Further, the
payment of bonuses to the
previous Managing Director, Peter Hutchinson, of $375,000 was
made for a successful
acquisition and integration. These payments are the subject of
further investigations by
the liquidator.
DPS AND WAPS COSTING AND BUDGETING
In any business the costing and budgeting systems are critical to
success. The FGL
administrator report for 2013/2014 (year ending January 2014)
shows that the:
• Actual work-in-progress income for the period was $126
million below
management forecast.
• Labor costs were $70 million over budget.
• Material costs were $55 million over budget.
• Work-in-progress overheads were $22 million over budget.
FINANCIAL INFORMATION
The financial statements for 2010-2014 are presented in Tables
2-5 in your Excel
workbook.

More Related Content

Similar to Case StudyFGL_Table 1Forge Group LtdTable 1. Timeline of Forge G.docx

Gold 2013 Sydney - Independence Group ASX:IGO
Gold 2013 Sydney - Independence Group ASX:IGOGold 2013 Sydney - Independence Group ASX:IGO
Gold 2013 Sydney - Independence Group ASX:IGOSymposium
 
November Investor Presentation
November Investor Presentation November Investor Presentation
November Investor Presentation Teranga Gold
 
MMP222 2014 T2 Assignment 1 Haroon Sufi
MMP222 2014 T2 Assignment 1 Haroon SufiMMP222 2014 T2 Assignment 1 Haroon Sufi
MMP222 2014 T2 Assignment 1 Haroon SufiHaroon Sufi
 
Globus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationGlobus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationTradeWindsnews
 
Ultratech cement 2 qfy2011 result update- 261010
Ultratech cement  2 qfy2011 result update- 261010Ultratech cement  2 qfy2011 result update- 261010
Ultratech cement 2 qfy2011 result update- 261010Angel Broking
 
European gold forum april 2013
European gold forum april 2013European gold forum april 2013
European gold forum april 2013Teranga Gold
 
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas Lilladher
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas LilladherTata Steel: Sale of Long products Europe, a positive move - Prabhudas Lilladher
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas LilladherIndiaNotes.com
 
Weekly Market Report
Weekly Market Report Weekly Market Report
Weekly Market Report QNB Group
 
Company website presentation february 2014
Company website presentation   february 2014Company website presentation   february 2014
Company website presentation february 2014AnteroResources
 
Dürr AG: Conference Call preliminary figures 2013
Dürr AG: Conference Call preliminary figures 2013Dürr AG: Conference Call preliminary figures 2013
Dürr AG: Conference Call preliminary figures 2013Dürr
 
Daily Newsletter: 25th November, 2010
Daily Newsletter: 25th November, 2010Daily Newsletter: 25th November, 2010
Daily Newsletter: 25th November, 2010Fullerton Securities
 
Euroseas Q1 2013 results presentation
Euroseas Q1 2013 results presentationEuroseas Q1 2013 results presentation
Euroseas Q1 2013 results presentationTradeWindsnews
 
CONFERENCE CALL RESULTS JANUARY – JUNE 2013
CONFERENCE CALL RESULTS JANUARY – JUNE 2013CONFERENCE CALL RESULTS JANUARY – JUNE 2013
CONFERENCE CALL RESULTS JANUARY – JUNE 2013Dürr
 
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015Epic Research Singapore
 
Japara (JHC) equity research initiation report - riding the silver tsunami -...
Japara (JHC) equity research initiation report  - riding the silver tsunami -...Japara (JHC) equity research initiation report  - riding the silver tsunami -...
Japara (JHC) equity research initiation report - riding the silver tsunami -...George Gabriel
 

Similar to Case StudyFGL_Table 1Forge Group LtdTable 1. Timeline of Forge G.docx (20)

Gold 2013 Sydney - Independence Group ASX:IGO
Gold 2013 Sydney - Independence Group ASX:IGOGold 2013 Sydney - Independence Group ASX:IGO
Gold 2013 Sydney - Independence Group ASX:IGO
 
Andritz-company-presentation-Final
Andritz-company-presentation-FinalAndritz-company-presentation-Final
Andritz-company-presentation-Final
 
Finalaya daily wrap_31jan2013
Finalaya daily wrap_31jan2013Finalaya daily wrap_31jan2013
Finalaya daily wrap_31jan2013
 
November Investor Presentation
November Investor Presentation November Investor Presentation
November Investor Presentation
 
MMP222 2014 T2 Assignment 1 Haroon Sufi
MMP222 2014 T2 Assignment 1 Haroon SufiMMP222 2014 T2 Assignment 1 Haroon Sufi
MMP222 2014 T2 Assignment 1 Haroon Sufi
 
Globus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationGlobus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentation
 
Ultratech cement 2 qfy2011 result update- 261010
Ultratech cement  2 qfy2011 result update- 261010Ultratech cement  2 qfy2011 result update- 261010
Ultratech cement 2 qfy2011 result update- 261010
 
European gold forum april 2013
European gold forum april 2013European gold forum april 2013
European gold forum april 2013
 
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas Lilladher
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas LilladherTata Steel: Sale of Long products Europe, a positive move - Prabhudas Lilladher
Tata Steel: Sale of Long products Europe, a positive move - Prabhudas Lilladher
 
Weekly Market Report
Weekly Market Report Weekly Market Report
Weekly Market Report
 
Company website presentation february 2014
Company website presentation   february 2014Company website presentation   february 2014
Company website presentation february 2014
 
Dürr AG: Conference Call preliminary figures 2013
Dürr AG: Conference Call preliminary figures 2013Dürr AG: Conference Call preliminary figures 2013
Dürr AG: Conference Call preliminary figures 2013
 
Daily Newsletter: 25th November, 2010
Daily Newsletter: 25th November, 2010Daily Newsletter: 25th November, 2010
Daily Newsletter: 25th November, 2010
 
Euroseas Q1 2013 results presentation
Euroseas Q1 2013 results presentationEuroseas Q1 2013 results presentation
Euroseas Q1 2013 results presentation
 
CONFERENCE CALL RESULTS JANUARY – JUNE 2013
CONFERENCE CALL RESULTS JANUARY – JUNE 2013CONFERENCE CALL RESULTS JANUARY – JUNE 2013
CONFERENCE CALL RESULTS JANUARY – JUNE 2013
 
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015
EPIC RESEARCH SINGAPORE - Daily SGX Singapore report of 12 February 2015
 
Report on the first half year of 2013 rockwool
Report on the first half year of 2013 rockwoolReport on the first half year of 2013 rockwool
Report on the first half year of 2013 rockwool
 
Q1 2013 presentation final v001 v2g6k8
Q1 2013 presentation final v001 v2g6k8Q1 2013 presentation final v001 v2g6k8
Q1 2013 presentation final v001 v2g6k8
 
Q1 2013 Earnings Presentation
Q1 2013 Earnings PresentationQ1 2013 Earnings Presentation
Q1 2013 Earnings Presentation
 
Japara (JHC) equity research initiation report - riding the silver tsunami -...
Japara (JHC) equity research initiation report  - riding the silver tsunami -...Japara (JHC) equity research initiation report  - riding the silver tsunami -...
Japara (JHC) equity research initiation report - riding the silver tsunami -...
 

More from zebadiahsummers

Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docx
Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docxChapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docx
Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docxzebadiahsummers
 
Chapter 10 Check PointAnswer the following questions. Please.docx
Chapter 10 Check PointAnswer the following questions. Please.docxChapter 10 Check PointAnswer the following questions. Please.docx
Chapter 10 Check PointAnswer the following questions. Please.docxzebadiahsummers
 
Chapter 10 Case Project 10-2 two page report double spaceCas.docx
Chapter 10 Case Project 10-2 two page report double spaceCas.docxChapter 10 Case Project 10-2 two page report double spaceCas.docx
Chapter 10 Case Project 10-2 two page report double spaceCas.docxzebadiahsummers
 
Chapter 1 provided a high-level overview of the Information Syst.docx
Chapter 1 provided a high-level overview of the Information Syst.docxChapter 1 provided a high-level overview of the Information Syst.docx
Chapter 1 provided a high-level overview of the Information Syst.docxzebadiahsummers
 
Chapter 1 Intro to Policy Making in a The Digital Age.docx
Chapter 1 Intro to Policy Making in a The Digital Age.docxChapter 1 Intro to Policy Making in a The Digital Age.docx
Chapter 1 Intro to Policy Making in a The Digital Age.docxzebadiahsummers
 
Chapter 1 discussed the expansion of the European intermodal rai.docx
Chapter 1 discussed the expansion of the European intermodal rai.docxChapter 1 discussed the expansion of the European intermodal rai.docx
Chapter 1 discussed the expansion of the European intermodal rai.docxzebadiahsummers
 
Change is an activity and mindset that many resists. Kotter proposed.docx
Change is an activity and mindset that many resists. Kotter proposed.docxChange is an activity and mindset that many resists. Kotter proposed.docx
Change is an activity and mindset that many resists. Kotter proposed.docxzebadiahsummers
 
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docx
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docxChapter 1 Government Boss, financial partner, regulator – Entrepre.docx
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docxzebadiahsummers
 
Chapter 1 Combating terrorism has entailed restrictions on civil li.docx
Chapter 1 Combating terrorism has entailed restrictions on civil li.docxChapter 1 Combating terrorism has entailed restrictions on civil li.docx
Chapter 1 Combating terrorism has entailed restrictions on civil li.docxzebadiahsummers
 
Chapter 1 Evaluation and Social Work Making the ConnectionP.docx
Chapter 1 Evaluation and Social Work Making the ConnectionP.docxChapter 1 Evaluation and Social Work Making the ConnectionP.docx
Chapter 1 Evaluation and Social Work Making the ConnectionP.docxzebadiahsummers
 
Changes in the Human Figure in ArtYou likely noticed that during.docx
Changes in the Human Figure in ArtYou likely noticed that during.docxChanges in the Human Figure in ArtYou likely noticed that during.docx
Changes in the Human Figure in ArtYou likely noticed that during.docxzebadiahsummers
 
Chapter #131. Explain the terms Computationalism and Culturalism.docx
Chapter #131. Explain the terms Computationalism and Culturalism.docxChapter #131. Explain the terms Computationalism and Culturalism.docx
Chapter #131. Explain the terms Computationalism and Culturalism.docxzebadiahsummers
 
chapter 8 notes – Asian Americans model minoritieschapter b.docx
chapter  8 notes – Asian Americans model minoritieschapter b.docxchapter  8 notes – Asian Americans model minoritieschapter b.docx
chapter 8 notes – Asian Americans model minoritieschapter b.docxzebadiahsummers
 
CHAPTER 1 This list below indicated various audits, attestation,.docx
CHAPTER 1  This list below indicated various audits, attestation,.docxCHAPTER 1  This list below indicated various audits, attestation,.docx
CHAPTER 1 This list below indicated various audits, attestation,.docxzebadiahsummers
 
Challenges and Resources for Nurses Participating in a Hurrica.docx
Challenges and Resources for Nurses Participating in a Hurrica.docxChallenges and Resources for Nurses Participating in a Hurrica.docx
Challenges and Resources for Nurses Participating in a Hurrica.docxzebadiahsummers
 
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docx
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docxChamberlain College of NursingNR631 Nurse Executive Track—CGE I.docx
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docxzebadiahsummers
 
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docx
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docxChamberlain College of NursingNR449 Evidence-Based PracticeEvide.docx
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docxzebadiahsummers
 
Centralized System for Strategic ResourcesIntroductionAttentio.docx
Centralized System for Strategic ResourcesIntroductionAttentio.docxCentralized System for Strategic ResourcesIntroductionAttentio.docx
Centralized System for Strategic ResourcesIntroductionAttentio.docxzebadiahsummers
 
Challenge your thinking.10) After completing the WebQuest, has y.docx
Challenge your thinking.10) After completing the WebQuest, has y.docxChallenge your thinking.10) After completing the WebQuest, has y.docx
Challenge your thinking.10) After completing the WebQuest, has y.docxzebadiahsummers
 
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docx
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docxCh.10 Discussion - Jingles33 unread replies.33 replies.D.docx
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docxzebadiahsummers
 

More from zebadiahsummers (20)

Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docx
Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docxChapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docx
Chapter 10 Theodore Dalrymple The Frivolity of Evil Theodore Dalrymp.docx
 
Chapter 10 Check PointAnswer the following questions. Please.docx
Chapter 10 Check PointAnswer the following questions. Please.docxChapter 10 Check PointAnswer the following questions. Please.docx
Chapter 10 Check PointAnswer the following questions. Please.docx
 
Chapter 10 Case Project 10-2 two page report double spaceCas.docx
Chapter 10 Case Project 10-2 two page report double spaceCas.docxChapter 10 Case Project 10-2 two page report double spaceCas.docx
Chapter 10 Case Project 10-2 two page report double spaceCas.docx
 
Chapter 1 provided a high-level overview of the Information Syst.docx
Chapter 1 provided a high-level overview of the Information Syst.docxChapter 1 provided a high-level overview of the Information Syst.docx
Chapter 1 provided a high-level overview of the Information Syst.docx
 
Chapter 1 Intro to Policy Making in a The Digital Age.docx
Chapter 1 Intro to Policy Making in a The Digital Age.docxChapter 1 Intro to Policy Making in a The Digital Age.docx
Chapter 1 Intro to Policy Making in a The Digital Age.docx
 
Chapter 1 discussed the expansion of the European intermodal rai.docx
Chapter 1 discussed the expansion of the European intermodal rai.docxChapter 1 discussed the expansion of the European intermodal rai.docx
Chapter 1 discussed the expansion of the European intermodal rai.docx
 
Change is an activity and mindset that many resists. Kotter proposed.docx
Change is an activity and mindset that many resists. Kotter proposed.docxChange is an activity and mindset that many resists. Kotter proposed.docx
Change is an activity and mindset that many resists. Kotter proposed.docx
 
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docx
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docxChapter 1 Government Boss, financial partner, regulator – Entrepre.docx
Chapter 1 Government Boss, financial partner, regulator – Entrepre.docx
 
Chapter 1 Combating terrorism has entailed restrictions on civil li.docx
Chapter 1 Combating terrorism has entailed restrictions on civil li.docxChapter 1 Combating terrorism has entailed restrictions on civil li.docx
Chapter 1 Combating terrorism has entailed restrictions on civil li.docx
 
Chapter 1 Evaluation and Social Work Making the ConnectionP.docx
Chapter 1 Evaluation and Social Work Making the ConnectionP.docxChapter 1 Evaluation and Social Work Making the ConnectionP.docx
Chapter 1 Evaluation and Social Work Making the ConnectionP.docx
 
Changes in the Human Figure in ArtYou likely noticed that during.docx
Changes in the Human Figure in ArtYou likely noticed that during.docxChanges in the Human Figure in ArtYou likely noticed that during.docx
Changes in the Human Figure in ArtYou likely noticed that during.docx
 
Chapter #131. Explain the terms Computationalism and Culturalism.docx
Chapter #131. Explain the terms Computationalism and Culturalism.docxChapter #131. Explain the terms Computationalism and Culturalism.docx
Chapter #131. Explain the terms Computationalism and Culturalism.docx
 
chapter 8 notes – Asian Americans model minoritieschapter b.docx
chapter  8 notes – Asian Americans model minoritieschapter b.docxchapter  8 notes – Asian Americans model minoritieschapter b.docx
chapter 8 notes – Asian Americans model minoritieschapter b.docx
 
CHAPTER 1 This list below indicated various audits, attestation,.docx
CHAPTER 1  This list below indicated various audits, attestation,.docxCHAPTER 1  This list below indicated various audits, attestation,.docx
CHAPTER 1 This list below indicated various audits, attestation,.docx
 
Challenges and Resources for Nurses Participating in a Hurrica.docx
Challenges and Resources for Nurses Participating in a Hurrica.docxChallenges and Resources for Nurses Participating in a Hurrica.docx
Challenges and Resources for Nurses Participating in a Hurrica.docx
 
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docx
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docxChamberlain College of NursingNR631 Nurse Executive Track—CGE I.docx
Chamberlain College of NursingNR631 Nurse Executive Track—CGE I.docx
 
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docx
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docxChamberlain College of NursingNR449 Evidence-Based PracticeEvide.docx
Chamberlain College of NursingNR449 Evidence-Based PracticeEvide.docx
 
Centralized System for Strategic ResourcesIntroductionAttentio.docx
Centralized System for Strategic ResourcesIntroductionAttentio.docxCentralized System for Strategic ResourcesIntroductionAttentio.docx
Centralized System for Strategic ResourcesIntroductionAttentio.docx
 
Challenge your thinking.10) After completing the WebQuest, has y.docx
Challenge your thinking.10) After completing the WebQuest, has y.docxChallenge your thinking.10) After completing the WebQuest, has y.docx
Challenge your thinking.10) After completing the WebQuest, has y.docx
 
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docx
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docxCh.10 Discussion - Jingles33 unread replies.33 replies.D.docx
Ch.10 Discussion - Jingles33 unread replies.33 replies.D.docx
 

Recently uploaded

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfstareducators107
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 

Recently uploaded (20)

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Case StudyFGL_Table 1Forge Group LtdTable 1. Timeline of Forge G.docx

  • 1. Case Study FGL_Table 1Forge Group LtdTable 1. Timeline of Forge Group Ltd (FGL)DateClosing Market Major Announcement/ChangeJune 27, 2007$0.56FGL listed on Australian Stock ExchangeJune 30, 2008$0.78June 30, 2009$0.43Global Financial Crisis impactApril 6, 2010$2.96Clough purchases 10.5 million shares for 13% ownershipJune 30, 2010$2.66June 30, 2012$5.46June 30, 2012$4.37January 13, 2012$5.25FGL purchases 100% of CTEC Pty Ltd for $32.26 millionMarch 6, 2013$6.98Peak share priceMarch 26, 2013$6.05Clough sells FGL shares at $6.05 ($187 million, 35% of FGL)May 17, 2013FGL awarded major contract (Dugald Rover)June 3, 2013FGL acquires Taggart Global (U.S. company) at $43 millionJuly 2, 2013FGL awarded major contract (TAN Burrup plant)June 30, 2013$4.09August 29, 2013Annual Report released NPAT at $63 million, equity at $213.5 million, dividend at $0.14 per shareSeptember 2, 2013$1.47 billion joint venture with Duro Felguera announced (value to Forge is $830 million – order book now at $2.1 billion)September 12, 2013FGL awarded major contract (Yandicooogina for Rio Tinto – $100 million contract)September 19, 2013FGL major contract terminated (Dugald River)October 7, 2013FGL declares $50 million in major contracts in U.S. and Australia since June 1, 2013November 4, 2013$4.18Trading haltNovember 5, 2013ANZ Bank (major financier) appoints KordaMentha to review booksNovember 28, 2013FGL Market Announcement: –ANZ Bank supports and negotiates new finance facilities – Considering equity capital raising –Identifies underperforming assets (i.e., CTEC projects) –Negotiates agreements with customers and sub-contractors –Normal operations for other parts of businessNovember 28, 2013$0.69FGL Market Announcement:-$127 profit write down on two large contracts (Diamantina Power Station and West Angelas Power Station;
  • 2. $45 million to complete both projects) –Challenging liquidity period (net cash flow Nov. and Dec.) –ANZ Bank continued support with some adjustment to finance facilities –Business as usualNovember 28, 2013$0.69Trading halt liftedDecember 4, 2013FGL Market Announcement:– In response to ASX query, indicated became aware of problems with Diamantina Power Station and West Angelas Power Station projects in late Sept. with margin erosions due to cost overruns and delays causing the profit down-grade. Costing analysis during Oct. and Nov. led to requested trading halt and profit downgrade in Nov.December 17, 2013FGL awarded major $40 million contract in North American coal sectorJanuary 10, 2014$1.25Trading halt until January 14, 2014January 14, 2014$1.02Trading halt until January 28, 2014January 24, 2014January 28, 2014$0.90February 10, 2014$0.92Trading ceasesFebruary 11, 2014Board appoints administrators, and secured creditors appoint receivers. FGL_Table 2Forge Group LtdTable 2. Comprehensive Income Statement (in thousands of Australian dollars)June 30, 2010June 30, 2011June 30, 2012June 30, 2013Unaudited January 31, 2014Revenue$246,169$421,595$774,879$1,054,100$520,041Co st of sales(711,430)Changes in inventories of finished goods and WIP9,69615,000Materials, plant, and contractor costs(125,171)(211,000)(516,867)(656,334)Employee benefits expense(79,194)(157,191)(164,502)(256,515)Depreciation and amortization(3,218)(5,159)(16,292)(21,361)Consulting fees(582)(5,380)Provision for impairment losses(1,628)(304)Other expenses(7,132)(8,043)(12,711)(21,033)Other gains and losses537257188ExpensesResults from Operating Activities40,05954,89864,18293,665Finance income1,0233,0795,6986,939Finance costs(716)(711)(2,850)(4,816)Net finance income3072,3682,8482,123Share of profit/(loss) of associates and jointly controlled entities(513)3,052(5,679)Net Profit Before Tax40,36656,75370,08290,109(324,162)Income tax
  • 3. expense(10,915)(17,920)(20,780)(27,190)(2,301)Net Profit After Tax29,45138,83349,30262,919(326,463)Foreign exchange differences (net of tax)(346)(1,946)(310)1,826Total Comprehensive Income29,10536,88748,99264,745 FGL_Table 3Forge Group LtdTable 3. Balance Sheet (in thousands of Australian dollars)June 30, 2010June 30, 2011June 30, 2012June 30, 2013Unaudited January 31, 2014Current Assets Cash and cash equivalents51,92178,28551,09190,72815,316Short-term deposits72,5002,748Trade and other receivables42,16249,542196,88483,254103,279Inventories and WIP14,62129,62211,331150,49140,616Current tax assets2,535Other assets2,2461,5742,4871,560(23,415)Noncurrent assets classified as held for sale6,900Total Current Assets117,850159,023334,293331,316135,796Noncurrent Assets Trade and other receivables7,0511,42473,293Term deposits14,26010,468Property, plant, and equipment26,78936,57767,73671,546Deferred tax assets1,8272,0434,2739,124Investments accounted for using equity method2,545Intangibles15,62115,63748,24340,332Other assets90,467Total Noncurrent Assets44,23754,257144,108132,894163,760Total Assets162,087213,280478,401464,210299,556Current Liabilities Trade and other payables52,96872,845267,169219,568299,909Borrowings2,7893 ,2728,73411,139Current tax liabilities8,6446,3878,367Provisions5257558253,970Other liabilities63,731Total Current Liabilities64,92683,259285,095234,677363,640Noncurrent Liabilities Trade and other payables9,2461,517Borrowings4,90117,45314,547Deferred tax liabilities512,7931,067Investments accounted for using the equity method308489493Provisions164299489493Other liabilities50,667Total Noncurrent Liabilities3,7855,55929,98116,10752,184Total
  • 4. Liabilities68,71188,818315,076250,784415,824Net Assets93,376124,462163,325213,426(116,268)Equity Issued capital42,83944,29445,43045,43042,768Profit reserve62,919Reserves1,034(912)(1,221)1,471(159,036)Retaine d earnings49,50581,080119,116103,606Total Equity93,376124,462163,325213,426(116,268)Number of shares70,699,48781,541,56986,169,01486,169,01486,169,014Sh are price2.665.464.374.20 FGL_Table 4Forge Group LtdTable 4. Statement of Cash Flows (in thousands of Australian dollars)2010201120122013Cash Flows from Operating Activities Receipts from customers245,418431,399744,7201,176,226Payments to suppliers and employees(215,240)(373,464)(631,924)(1,113,073)Other revenue943638Income taxes paid(670)(20,390)(21,537)(45,231)Net cash flows provided by operating activities$30,451$38,183$91,259$17,922Cash Flows from Investing Activities Payments for property, plant, and equipment(8,371)(11,257)(39,737)(19,521)Proceeds from disposal of property, plan, and equipment2246,485500869Interest received1,0233,0795,6497,379Term deposits matured/expired(86,760)73,545Amount received from joint ventures130Acquisition of investments or associates(205)(3,439)Payment of deferred consideration(19,798)Net cash flows provided by/used in financing activities(7,124)(1,898)(123,787)42,604Cash Flows from Financing Activities Proceeds from issue of share capital18,9071,4581,136Proceeds from borrowings23,0119,152Repayment of borrowings(4,131)(3,464)(4,698)(9,654)Interest paid(271)(658)(2,850)(4,877)Dividends paid(3,419)(7,257)(11,265)(15,510)Net cash provided by/used in financing activities$11,086-$9,921$5,334-$20,889Net increase/decrease in cash and equivalents34,41326,364(27,194)39,637Cash and equivalents at
  • 5. beginning of year17,44051,92178,28551,091Effect of exchange rate changes67Cash and equivalents at end of year51,92078,28551,09190,728 FGL_Table 5Forge Group LtdTable 5. Reconciliation (in thousands of Australian dollars)2010201120122013Profit for the year after tax$29,450$38,832$49,302$62,919Depreciation and amortization3,2175,15916,29221,361Other noncash differences907(1,815)(43,488)28,409Decrease/Increase in trade debtors and receivables(25,202)(7,380)(154,393)119,258Decrease/Increase in inventories and WIP(9,696)(15,000)18,291(139,160)Decrease/Increase in other current assets(104)671(913)927Increase in deferred tax assets(779)(215)(2,231)(4,851)Decrease/Increase in trade and payables21,88119,877203,417(37,123)Decrease/Increase in current tax liabilities10,649(2,311)1,980(10,903)Decrease/Increase in deferred tax liabilities642,742(1,727)Increase in other provisions6436526086Net cash inflow from operating activities$30,451$38,183$91,259$39,196 Unit 6_Student TemplateUnit 6Forge Group Case StudyMeasureFormula (Words)2014 (Calculation - substitute words in formula with numbers from the financial statements)Final AnswerProfitabilityROEROA Profit Margin Ratio EfficiencyAssetTurnoverLiquidityCurrent RatioCash Flow RatioGearingDebt to Equity RatioInterest Coverage Debt CoverageNTABMarketEPSDPSPER Adapted from IMA IMA EDUCATIONAL CASE JOURNAL VOL. 8, NO. 1, ART. 2, MARCH 2015 ISSN 1940-204X
  • 6. Forge Group Ltd Case Study (A)The Revealing Nature of Numbers Suzanne Maloney University of Southern Queensland Toowoomba, Australia, 4350. [email protected] THE FORGE GROUP LTD SUMMARY In 2012-2013, Forge Group Limited had more than 2,000 employees working across eight countries on four continents. The pride in the growth story is evident, as Forge Group’s 2012 Annual Report (released in September 2013) lists accomplishments in what is described as a groundbreaking year. The main milestones give a snapshot of the types of projects the company was involved in (see Figure 1). At the time of listing (June 26, 2007), Forge Group Ltd (FGL) shares traded for $0.56. (All monetary amounts discussed herein are in Australian dollars. To convert to another currency, visit www.x- rates.com.) The shares peaked at $6.98 on March 6, 2013, valuing the company at $600 million. In less than a year, FGL was placed in a trading halt (February 11, 2014).
  • 7. Voluntary administrators and receivers were appointed. http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F201 30829%2F01438557.pdf THE ENGINEERING AND CONSTRUCTION INDUSTRY The engineering and construction sector provides significant economic activity in many countries. Large-scale engineering and construction projects— including highways, bridges, railways, airports, harbors, production facilities, and office and apartment buildings—provide employment opportunities and attract large capital investment. The quantum of resources employed in this industry and the profound affect they have on society means that there are strict compliance, regulatory, environmental, and tax requirements on those operating in the sector. The governments of many countries
  • 8. publicly funded a number of large-scale infrastructure projects in the aftermath of the Global Financial Crisis (GFC) to stimulate the economy. Joint ventures and public/private partnerships are common in the industry to reduce the risk of large-scale projects and to ensure adequate capital and expertise. Major contracts generally involve a number of different companies with primary contractor and sub-contractor status, all tendering and quoting on various stages of work in a project. This makes the industry highly competitive, and therefore it is vital to have appropriate costing and project management expertise. Mining companies also took advantage of the cheaper finance post GFC and the upswing in demand for minerals and resources. Large-scale mining projects have been the driving force for some economies, especially in Australia. But with the construction of a number of the large projects nearing completion (and moving into production phase), there is a drop in engineering and construction spending. In Australia in 2013-
  • 9. 2014, engineering and construction spending was $128 billion, dropping $1 billion from the previous year. This increased competition in the sector and, therefore, demand for lower-priced contracts and shorter completion times. The market value of engineering and construction companies are based partly on their future secured order book. “Order book” is a term used in the engineering and construction sector to capture the company’s future work and the dollar value of the work. The future work is contracted through the normal selling of services and through “tendering” for large-scale works needed by governments and large private companies. If a project is very large, it may be divided into segments with a separate tender process for each segment. Companies have to carefully consider the risk attached to each segment of the larger project and the interrelationship of each of the segments. A company can be held liable to another company if their segment completion is delayed
  • 10. and the other company cannot complete its work on time, as per their contract, because of the delay. For example, when building a tunnel, the riskier segment may be blasting the rock and strengthening the actual tunnel. Excavating the ground and surfacing the http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F20130829%2F01438557.pdf http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F20130829%2F01438557.pdf road may not carry the same risk but could be held up if the blasting and strengthening is not completed on time. In comparison to a retail or manufacturing concern, the products being sold are large capital works that tend not to be completed within a neat 12- month period. This means that there needs to be payment points built into the contracts. These are called “milestones.” Once a project milestone is reached, it triggers a point when the engineering and construction company can invoice the purchaser and recognize the revenue in its accounts. The product cost (Cost-of-Goods-Sold)
  • 11. expensed against this revenue will contain material, labor, equipment costs, and sub- contractor costs. These costs are all capitalized into inventory at the time they are incurred but not expensed until they reach a milestone. A lot of dollars, long-term time horizons, subjective milestones, and the application of large capital equipment costs contribute to the overall business risk in the sector. Many companies have suffered as a result of stalled projects, unforeseen circumstances or problems, poor costing of the work, and mismanaged cash flow. Within the industry, there is usually significant take-over activity. This is driven in part by companies not performing well and/or insolvency and also by normal merger and acquisition activity. Smaller companies find it difficult to compete with larger companies for the larger projects and generally need to combine or merge in some way or stay small. This adds further risk and places the financial statements and the order book
  • 12. under increased scrutiny as business valuations rely on this information. THE FORGE GROUP LTD (FGL) The company was a success story. It listed on the Australian stock exchange on June 26, 2007, from a private construction company called AiConstruction. It was a well-run company that needed access to more capital if it was to continue to grow. Within a year, it made its first acquisition by taking over Abesque Engineering. The company survived the Global Financial Crisis and leveraged to the subsequent mining and construction boom led by China’s appetite for minerals and resources. Over the next few years, the company grew organically and in April 2010 another construction company called Clough bought 13% (10.5 million shares) of FGL ordinary shares, thus becoming the largest shareholder. Clough continued to purchase shares in FGL until it divested its total holding of 35% in March 2013. Clough management explained its divestment by
  • 13. indicating that expectations of joint ventures between the two companies did not eventuate, and, therefore, the equity holding was cashed in to allow the pursuit of other objectives. In January 2012, FGL undertook a major acquisition by purchasing CTEC Pty Ltd. In essence, the acquisition meant taking over two major projects. The Diamantina Power Station (DPS) Project in Queensland, Australia, and the West Angelas Power Station (WAPS) Project in the Pilbara region of Western Australia. It was expected that these major projects would add $7.5 million and $10.8 million to earnings before interest, tax, depreciation, and amortization (EBITDA) in 2012 and 2013, respectively. The purchase price was $16 million up-front with further payments due on the meeting of specified performance targets (total paid was $32.26 million). This increased FGL’s order book significantly, and FGL’s share price rose in response. In June 2013, FGL acquired Taggart Global for $43 million. This purchase meant that FGL was now diversifying into asset management and into other economies. SHARE MARKET INFORMATION
  • 14. The historical share price chart since listing is shown in Figure 2. The market closing prices, major announcements, and significant shareholding changes are listed in chronological order in Table 1. CTEC PURCHASE In the wash up of the demise of FGL is the attention being paid to two main contracts: The Diamantina Power Station (DPS) Project in Queensland, Australia, and the West Angelas Power Station (WAPS) Project in the Pilbara region of Western Australia. Both projects were acquired after FGL took over CTEC Pty Ltd on January 13, 2012. The purchase of CTEC was to change the business model by bringing sub-contracting work in-house with the intended consequence of taking out the “middle man” and thereby increasing earnings (by negating sub-contractor margins). The CTEC purchase payment terms required an up-front payment of $16 million with subsequent payments
  • 15. conditional on meeting performance criteria (possible further payment of $40 million in total). CTEC’s prior year (June 30, 2011) EBIT was $2 million, with expected EBITDA at year end 2012 and 2013 to be $18.4 million and $24.8 million, respectively. The DPS and WAPS projects were to increase this expected EBITDA by $7.5 million in 2012 and $10.8 million in 2013. Instead cost overruns and poor budgeting meant that the projects’ revised 2013 estimates showed a $61 million project margin loss for the DPS project and a $41.7 million project margin loss on the WAPS project. The cost overruns on these two projects lead to the profit downgrade and contributed to the resulting shortage of cash. Added to that was the discovery of an early payment to the vendors of CTEC Pty Ltd before its performance conditions were met. Further, the payment of bonuses to the previous Managing Director, Peter Hutchinson, of $375,000 was made for a successful acquisition and integration. These payments are the subject of further investigations by
  • 16. the liquidator. DPS AND WAPS COSTING AND BUDGETING In any business the costing and budgeting systems are critical to success. The FGL administrator report for 2013/2014 (year ending January 2014) shows that the: • Actual work-in-progress income for the period was $126 million below management forecast. • Labor costs were $70 million over budget. • Material costs were $55 million over budget. • Work-in-progress overheads were $22 million over budget. FINANCIAL INFORMATION The financial statements for 2010-2014 are presented in Tables 2-5 in your Excel workbook. Forge Group Ltd. Adapted from IMA IMA EDUCATIONAL CASE JOURNAL VOL. 8, NO. 1, ART. 2, MARCH 2015
  • 17. ISSN 1940-204X Forge Group Ltd Case Study (A)The Revealing Nature of Numbers Suzanne Maloney University of Southern Queensland Toowoomba, Australia, 4350. [email protected] THE FORGE GROUP LTD SUMMARY In 2012-2013, Forge Group Limited had more than 2,000 employees working across eight countries on four continents. The pride in the growth story is evident, as Forge Group’s 2012 Annual Report (released in September 2013) lists accomplishments in what is described as a groundbreaking year. The main milestones give a snapshot of the types of projects the company was involved in (see Figure 1). At the time of listing (June 26, 2007), Forge Group Ltd (FGL) shares traded for $0.56. (All monetary amounts discussed herein are in Australian dollars. To convert to another currency, visit www.x- rates.com.) The shares peaked at $6.98 on March 6, 2013, valuing the company at
  • 18. $600 million. In less than a year, FGL was placed in a trading halt (February 11, 2014). Voluntary administrators and receivers were appointed. http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F201 30829%2F01438557.pdf THE ENGINEERING AND CONSTRUCTION INDUSTRY The engineering and construction sector provides significant economic activity in many countries. Large-scale engineering and construction projects— including highways, bridges, railways, airports, harbors, production facilities, and office and apartment buildings—provide employment opportunities and attract large capital investment. The quantum of resources employed in this industry and the profound affect they have on society means that there are strict compliance, regulatory, environmental, and tax requirements on those operating in the sector. The governments
  • 19. of many countries publicly funded a number of large-scale infrastructure projects in the aftermath of the Global Financial Crisis (GFC) to stimulate the economy. Joint ventures and public/private partnerships are common in the industry to reduce the risk of large-scale projects and to ensure adequate capital and expertise. Major contracts generally involve a number of different companies with primary contractor and sub-contractor status, all tendering and quoting on various stages of work in a project. This makes the industry highly competitive, and therefore it is vital to have appropriate costing and project management expertise. Mining companies also took advantage of the cheaper finance post GFC and the upswing in demand for minerals and resources. Large-scale mining projects have been the driving force for some economies, especially in Australia. But with the construction of a number of the large projects nearing completion (and moving into production
  • 20. phase), there is a drop in engineering and construction spending. In Australia in 2013- 2014, engineering and construction spending was $128 billion, dropping $1 billion from the previous year. This increased competition in the sector and, therefore, demand for lower-priced contracts and shorter completion times. The market value of engineering and construction companies are based partly on their future secured order book. “Order book” is a term used in the engineering and construction sector to capture the company’s future work and the dollar value of the work. The future work is contracted through the normal selling of services and through “tendering” for large-scale works needed by governments and large private companies. If a project is very large, it may be divided into segments with a separate tender process for each segment. Companies have to carefully consider the risk attached to each segment of the larger project and the interrelationship of each of the segments. A company can be held liable to another company if their segment
  • 21. completion is delayed and the other company cannot complete its work on time, as per their contract, because of the delay. For example, when building a tunnel, the riskier segment may be blasting the rock and strengthening the actual tunnel. Excavating the ground and surfacing the http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F20130829%2F01438557.pdf http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Repor t%2FComNews%2F20130829%2F01438557.pdf road may not carry the same risk but could be held up if the blasting and strengthening is not completed on time. In comparison to a retail or manufacturing concern, the products being sold are large capital works that tend not to be completed within a neat 12- month period. This means that there needs to be payment points built into the contracts. These are called “milestones.” Once a project milestone is reached, it triggers a point when the engineering and construction company can invoice the purchaser and recognize the
  • 22. revenue in its accounts. The product cost (Cost-of-Goods-Sold) expensed against this revenue will contain material, labor, equipment costs, and sub- contractor costs. These costs are all capitalized into inventory at the time they are incurred but not expensed until they reach a milestone. A lot of dollars, long-term time horizons, subjective milestones, and the application of large capital equipment costs contribute to the overall business risk in the sector. Many companies have suffered as a result of stalled projects, unforeseen circumstances or problems, poor costing of the work, and mismanaged cash flow. Within the industry, there is usually significant take-over activity. This is driven in part by companies not performing well and/or insolvency and also by normal merger and acquisition activity. Smaller companies find it difficult to compete with larger companies for the larger projects and generally need to combine or merge in some way or stay
  • 23. small. This adds further risk and places the financial statements and the order book under increased scrutiny as business valuations rely on this information. THE FORGE GROUP LTD (FGL) The company was a success story. It listed on the Australian stock exchange on June 26, 2007, from a private construction company called AiConstruction. It was a well-run company that needed access to more capital if it was to continue to grow. Within a year, it made its first acquisition by taking over Abesque Engineering. The company survived the Global Financial Crisis and leveraged to the subsequent mining and construction boom led by China’s appetite for minerals and resources. Over the next few years, the company grew organically and in April 2010 another construction company called Clough bought 13% (10.5 million shares) of FGL ordinary shares, thus becoming the largest shareholder. Clough continued to purchase shares in FGL until it divested its
  • 24. total holding of 35% in March 2013. Clough management explained its divestment by indicating that expectations of joint ventures between the two companies did not eventuate, and, therefore, the equity holding was cashed in to allow the pursuit of other objectives. In January 2012, FGL undertook a major acquisition by purchasing CTEC Pty Ltd. In essence, the acquisition meant taking over two major projects. The Diamantina Power Station (DPS) Project in Queensland, Australia, and the West Angelas Power Station (WAPS) Project in the Pilbara region of Western Australia. It was expected that these major projects would add $7.5 million and $10.8 million to earnings before interest, tax, depreciation, and amortization (EBITDA) in 2012 and 2013, respectively. The purchase price was $16 million up-front with further payments due on the meeting of specified performance targets (total paid was $32.26 million). This increased FGL’s order book significantly, and FGL’s share price rose in response. In June 2013, FGL acquired Taggart Global for $43 million. This purchase meant that FGL was now diversifying into asset management and into other economies.
  • 25. SHARE MARKET INFORMATION The historical share price chart since listing is shown in Figure 2. The market closing prices, major announcements, and significant shareholding changes are listed in chronological order in Table 1. CTEC PURCHASE In the wash up of the demise of FGL is the attention being paid to two main contracts: The Diamantina Power Station (DPS) Project in Queensland, Australia, and the West Angelas Power Station (WAPS) Project in the Pilbara region of Western Australia. Both projects were acquired after FGL took over CTEC Pty Ltd on January 13, 2012. The purchase of CTEC was to change the business model by bringing sub-contracting work in-house with the intended consequence of taking out the “middle man” and thereby increasing earnings (by negating sub-contractor margins). The CTEC purchase
  • 26. payment terms required an up-front payment of $16 million with subsequent payments conditional on meeting performance criteria (possible further payment of $40 million in total). CTEC’s prior year (June 30, 2011) EBIT was $2 million, with expected EBITDA at year end 2012 and 2013 to be $18.4 million and $24.8 million, respectively. The DPS and WAPS projects were to increase this expected EBITDA by $7.5 million in 2012 and $10.8 million in 2013. Instead cost overruns and poor budgeting meant that the projects’ revised 2013 estimates showed a $61 million project margin loss for the DPS project and a $41.7 million project margin loss on the WAPS project. The cost overruns on these two projects lead to the profit downgrade and contributed to the resulting shortage of cash. Added to that was the discovery of an early payment to the vendors of CTEC Pty Ltd before its performance conditions were met. Further, the payment of bonuses to the previous Managing Director, Peter Hutchinson, of $375,000 was made for a successful
  • 27. acquisition and integration. These payments are the subject of further investigations by the liquidator. DPS AND WAPS COSTING AND BUDGETING In any business the costing and budgeting systems are critical to success. The FGL administrator report for 2013/2014 (year ending January 2014) shows that the: • Actual work-in-progress income for the period was $126 million below management forecast. • Labor costs were $70 million over budget. • Material costs were $55 million over budget. • Work-in-progress overheads were $22 million over budget. FINANCIAL INFORMATION The financial statements for 2010-2014 are presented in Tables 2-5 in your Excel workbook.