I. HEALTH & SAFETY
II. ORGANIZATION CHART
III.FORECAST CURVE OF MANPOWER
IV. PROGRAM OF WORKS
a) General Planning
b) Planning Civil Works Typical Level
c) Rotation Structural Works Typical Floor
d) Planning Secondary Trades
e) Rotation Guest Room
f) Planning Civil Works Typical Level
2
g) Lifts
h) Optional & Excluded Works
i) Design Status
V. FAÇADE: OKYANUS INTRODUCTION
VI. MEP: PROGRESS STATUS BY LEM
3
I. HEALTH & SAFETY
4
5
II. ORGANIZATION CHART
6
III. FORECAST CURVE OF MANPOWER
7
IV. PROGRAM OF WORKS
a) General Planning
8
9
b) Planning Civil Works Typical Level
10
c) Rotation Structural Works Typical Floor
11
12
13
14
15
16
17
18
19
20
21
22
d) Planning Secondary Trades
23
24
e) Rotation Guest Room
1. Mock-up Room
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
2. Whole Typical Floor
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
f) Planning Civil Works Typical Level
1. Masonry Works (Program of block wall delivery and block wall execution)
60
61
62
63
2. Plastering Works
64
65
66
3. Forecast Screed Works
67
68
69
4. Wall and False Ceiling Works
70
71
g) Lifts
72
2014 2015
Today
Aug Sep Oct Nov Dec 2015
1
20 Aug
2
12 Sep
3
23 Sep
4
21 Nov
5
1 Dec
6
23 Dec
7
1 Jan
Groupe Package
Dates acc.
Workshop
09.2014
Milestones
acc.Program
of Works
Remark
1
Access Card Control System & Intruder System
20/08/2014
15/10/2014
BMS 15/10/2014
Car Park Vehicle Counting System 15/10/2014
CCTV System 15/10/2014
Centralized Emergency Exit Management System 15/10/2014
Digital Lighting Control System 15/10/2014
Fire Alarm system 15/10/2014
Intercommunication System -PABX 15/10/2014
Public Address and Sound Sysytems 11/11/2014
15/10/2014Telecommunication System
2
UPS
12/09/2014
15/10/2014
Additional Cubicle on MV SWITCHGEARS 15/10/2014
3
Analogic Clock System
23/09/2014
15/10/2014
ANSUL Suppression System 11/11/2014
FM200 Suppression System 11/11/2014
Kitchen Equipments 15/10/2014
Nurse Call System 15/10/2014
4 UPS Panel Boards 21/11/2014 15/10/2014
5 MV connection 01/12/2014 03/11/2014
6
Generators
23/12/2014
11/11/2014
IP Television 11/11/2014
Totalizing Panel 11/11/2014
7 Scanners & metal Detectors 12/01/2015 12/01/2015
1. Status of Optional Works
Access Card Control System & Intruder System
h) Optional & Excluded Works
Intercommunication System -PABX
Telecommunication System
NOT YET
AWARDED
Analogic Clock System
73
2. Excluded Works (EKO)
f) UPS (for lifts) 2 proposals submitted
g) Bore Hole & Water treatment plant
i) Swimming pool already contracted by EKO
Dates according Program of the Works
h) Sewage treatment plant
b) All services related to medical zones (white partitions, plumbed
partitions,equipments, specific lighting,..)
c) All material and installations related to kitchen zones and restaurant
d) Fixed furnitures (ex. Placards, desks, …hall equipment and sport court)
e) Mobile furnitures (ex.: beds, tables,…)COBEL declined for this Trade
a) Roads, lanscaping and other external works
01.10.2014
01.08.2014
04.07.2014
74
Received 26 Aug
Received 04 Sep
Received 07 Nov
2014 2015Aug Sep Oct Nov Dec 2015
Coordinated PRO
2014 as per POW
11 Aug
Today
21 Jan
22 Aug
Layouts
Basement to L08
22 Aug
Layouts L09
to L25
12 Sep
Elevations &
Sections
19
Sep
Stairs and
swimming Pool
26 Sep
External ceilings
and Fences
26 Sep
Other
architectural
drawings
26 SepFire Zoning
Received
Rev.D
23.10.2014
Rev.E still
to be
received
(Status
20.01.15 11:00)
1. Architectural Design PRO 2014
Planned to be received 11.08.2014 acc. POW
f. Design Status
75
Received
31.10.2014
Received
07.11.2014
Receive
27.11.2014
2014 2015Aug Sep Oct Nov Dec 2015
Milestone PRO 2014 as per POW
11 Aug
Today
21 Jan
22 Sep - 1 Oct
Serie 200
Flooring
2 Oct - 10 Oct
Serie 300 Flase
Ceilings
22 Sep - 1 Oct
Serie 500 Wall
covering
14 Oct - 24 OctSerie 400 & 600 Part 1
27 Oct - 14 NovSerie 400 & 600 Part 2
17 Nov - 28 NovSerie 400 & 600 Part 3
1 Dec - 12 DecSerie 400 & 600 Part 4
12 DecSerie 700, 800 & 900
1 Oct
Serie
100
2. Interior Design
Planned to be received 30.08.2014 acc. POW
Received
revision
16.01.2015
Except Plumbing
and Sanitary
Fixtures
700: Zoning
800: Access Control
900: Floor Boxes
76
3. Status of Documents Submitted
77
78
4. Variations Status
1 CEILINGS Verbal Approval
3 WALL COVERING Rejected
11 INTERIOR PAINTS Verbal Approval (No Floor & Wall painting in
Parking)
• QTY & LOCATION OF CEILING TILES 99%HR
a) PRICING TRANSMITTED FOR INTERIOR DESIGN
TO BE CONFIRMED BY EKO:
 REVISION ACCORDING TO REVISED ID PACKAGES RECEIVED
22.08.2014 - SUBMITTED 28.10.2014 Rejected
 NEW REVISION – SUBMITTED 19.12.2014
(1)VARIATION 4 PACKAGES/14 SUB-PACKAGES SUBMITTED 12.05.2014
2 FLOORINGS & SKIRTINGS Rejected (except alternative rubber
flooring for sport room)
• COLOR OF FLOOR TILES & WALL CERAMICS
• COLOR OF PAINT
• UPDATED ID CONSIDERING THESE CHANGES
• ACCEPTANCE OF VARIATION
16.01.2015
16.01.2015
16.01.2015
79
(2)VARIATION 2 PACKAGES SUBMITTED 08.08.2014
 RESUBMISSION 27.10.2014 Rejected 16.12.2014
 NEW REVISION ( ALTERNATIVE ROCA )SUBMITTED 05.12.2014
13 PLUMBING & SANITARY FIXTURES
14 SANITARY&HOSPITALITY ACCESSORIES
ACCEPTANCE OF VARIATION TO BE CONFIRMED BY EKO
80
b) OTHER VARIATIONS SUBMITTED
(1)FACADE NEW WINDOW AT SPORT ROOM
(2)FACADE BULLET PROOF GLASS
(3)FACADE MAINTENANCE PLATFORMS
(4)SWIMMING POOL (STRUCTURAL WORKS ONLY)
81
c) PENDING VARIATIONS
5. STONE & SOLID SURFACES Stone Thresholds cancelled
6. PARTITIONS
9. METAL WORKS
10. GLAZING WORKS Waiting updated Work Package
(2)SHAFT ACCESS HATCHES (New Schedule Received 28.08.2014)
(1)ID FINISHES (5, 6, 9 & 10) ACC. UPDATED ID PRO 2014 TO BE RECEIVED
(3)DOORS (Last Revised Schedule Received 17.12.2014) still to be coordinated
with ELV Packages/ waiting for selection of colours
(4)NEW SECURITY ROOM (IN PLACE OF 2 PARKING) Received 20.08.2014 –
waiting design
(5)NEW LAYOUT OF THE BATHROOMS OF THE GUEST ROOMS FROM LEVEL
G+15 TO LEVEL G+24 Received 09.09.2014
(6)FACADES WATERPROOFING SYSTEM
(7)ROOF PAVEMENT According To New Concept Pro 2014 Received
23.10.2014
82
(8)DRAINING SCREED AND SLOPES IN BASEMENT According Concept Received
15.10.2014
(10)EXTERNAL WORKS
(9)LIFTS EMERGENCY DOORS According To Arch. File Received 28.10.2014
83
V. FAÇADE: OKYANUS INTRODUCTION
84
VI. MEP: PROGRESS STATUS BY LEM
85

More Related Content

What's hot

Fall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongFall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongWRONG PERSON
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
 
Item # 6 Notice of Intent - 934 Patterson The Argyle
Item # 6   Notice of Intent - 934 Patterson The ArgyleItem # 6   Notice of Intent - 934 Patterson The Argyle
Item # 6 Notice of Intent - 934 Patterson The Argyleahcitycouncil
 
Item # 4 PPT 160 Terrell Compatibility Review
Item # 4   PPT 160 Terrell Compatibility ReviewItem # 4   PPT 160 Terrell Compatibility Review
Item # 4 PPT 160 Terrell Compatibility Reviewahcitycouncil
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Ernesto Correa
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13cityofevanston
 

What's hot (8)

Fall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongFall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De Jong
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Item # 6 Notice of Intent - 934 Patterson The Argyle
Item # 6   Notice of Intent - 934 Patterson The ArgyleItem # 6   Notice of Intent - 934 Patterson The Argyle
Item # 6 Notice of Intent - 934 Patterson The Argyle
 
Item # 4 PPT 160 Terrell Compatibility Review
Item # 4   PPT 160 Terrell Compatibility ReviewItem # 4   PPT 160 Terrell Compatibility Review
Item # 4 PPT 160 Terrell Compatibility Review
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2
 
12900 Old Wellborn Rd. Rezoning
12900 Old Wellborn Rd. Rezoning12900 Old Wellborn Rd. Rezoning
12900 Old Wellborn Rd. Rezoning
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13
 
Land development Ukraine
Land development UkraineLand development Ukraine
Land development Ukraine
 

Viewers also liked

Calendário 2017
Calendário 2017Calendário 2017
Calendário 201720161974
 
Randstad Technologies All Capabilitles
Randstad Technologies All CapabilitlesRandstad Technologies All Capabilitles
Randstad Technologies All CapabilitlesConnor Wilson
 
Salesfusion pa webinar_040214
Salesfusion pa webinar_040214Salesfusion pa webinar_040214
Salesfusion pa webinar_040214Salesfusion
 
Prot. 038 17 pl dispõe sobre o parcelamento de multas de trânsito na cidade...
Prot. 038 17   pl dispõe sobre o parcelamento de multas de trânsito na cidade...Prot. 038 17   pl dispõe sobre o parcelamento de multas de trânsito na cidade...
Prot. 038 17 pl dispõe sobre o parcelamento de multas de trânsito na cidade...Claudio Figueiredo
 
EU_CBCR_ShaneJessica_article_final
EU_CBCR_ShaneJessica_article_finalEU_CBCR_ShaneJessica_article_final
EU_CBCR_ShaneJessica_article_finalJessica Hayes
 
Trabajo de estadistica tercer corte primer 20%
Trabajo de estadistica tercer corte primer 20%Trabajo de estadistica tercer corte primer 20%
Trabajo de estadistica tercer corte primer 20%Angelo Verges Chourio
 
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017Civil Service Exam Info
 
Cracking the Coding Interview - 7 steps - Udacity
Cracking the Coding Interview - 7 steps - UdacityCracking the Coding Interview - 7 steps - Udacity
Cracking the Coding Interview - 7 steps - UdacityGayle McDowell
 

Viewers also liked (12)

Inyeccion con polimeros
Inyeccion con polimerosInyeccion con polimeros
Inyeccion con polimeros
 
Calendário 2017
Calendário 2017Calendário 2017
Calendário 2017
 
Beneficios de la manzana
Beneficios de la manzanaBeneficios de la manzana
Beneficios de la manzana
 
Randstad Technologies All Capabilitles
Randstad Technologies All CapabilitlesRandstad Technologies All Capabilitles
Randstad Technologies All Capabilitles
 
Salesfusion pa webinar_040214
Salesfusion pa webinar_040214Salesfusion pa webinar_040214
Salesfusion pa webinar_040214
 
Unidad 4 ccss
Unidad 4 ccssUnidad 4 ccss
Unidad 4 ccss
 
Prot. 038 17 pl dispõe sobre o parcelamento de multas de trânsito na cidade...
Prot. 038 17   pl dispõe sobre o parcelamento de multas de trânsito na cidade...Prot. 038 17   pl dispõe sobre o parcelamento de multas de trânsito na cidade...
Prot. 038 17 pl dispõe sobre o parcelamento de multas de trânsito na cidade...
 
Pmi innovative pa
Pmi innovative  paPmi innovative  pa
Pmi innovative pa
 
EU_CBCR_ShaneJessica_article_final
EU_CBCR_ShaneJessica_article_finalEU_CBCR_ShaneJessica_article_final
EU_CBCR_ShaneJessica_article_final
 
Trabajo de estadistica tercer corte primer 20%
Trabajo de estadistica tercer corte primer 20%Trabajo de estadistica tercer corte primer 20%
Trabajo de estadistica tercer corte primer 20%
 
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017
March 12, 2017 CSE-PPT Examinee's Guide - Exam Advisory 04,s2017
 
Cracking the Coding Interview - 7 steps - Udacity
Cracking the Coding Interview - 7 steps - UdacityCracking the Coding Interview - 7 steps - Udacity
Cracking the Coding Interview - 7 steps - Udacity
 

Similar to Okyanus Hotel Project Status Update

Kamal Mayne CV - 2016
Kamal Mayne CV - 2016Kamal Mayne CV - 2016
Kamal Mayne CV - 2016kamal mayne
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Wael Nafad
 
Make a Gantt Chart from the activities and tasks - Case Descriptio.pdf
Make a Gantt Chart  from the activities and tasks -    Case Descriptio.pdfMake a Gantt Chart  from the activities and tasks -    Case Descriptio.pdf
Make a Gantt Chart from the activities and tasks - Case Descriptio.pdfPierschdJohnstonb
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksCarlo Gabriele Borri MACostE AMICE
 
Polygon Business Mall , Building booklet (build 05)
Polygon Business Mall , Building booklet (build 05) Polygon Business Mall , Building booklet (build 05)
Polygon Business Mall , Building booklet (build 05) Zayed Home
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxcarolinef5
 
Civil engineer reference documents extended
Civil engineer reference documents   extended Civil engineer reference documents   extended
Civil engineer reference documents extended NimeshPoddar
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016Armien Fredericks
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentationMamdouh Attia
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee GreenRakesh Agarwal
 

Similar to Okyanus Hotel Project Status Update (20)

Kamal Mayne CV - 2016
Kamal Mayne CV - 2016Kamal Mayne CV - 2016
Kamal Mayne CV - 2016
 
Speci vol1
Speci vol1Speci vol1
Speci vol1
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
Make a Gantt Chart from the activities and tasks - Case Descriptio.pdf
Make a Gantt Chart  from the activities and tasks -    Case Descriptio.pdfMake a Gantt Chart  from the activities and tasks -    Case Descriptio.pdf
Make a Gantt Chart from the activities and tasks - Case Descriptio.pdf
 
Tech Proposal
Tech Proposal Tech Proposal
Tech Proposal
 
A PPT.pptx
A PPT.pptxA PPT.pptx
A PPT.pptx
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary Works
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
smartparkannb.pdf
smartparkannb.pdfsmartparkannb.pdf
smartparkannb.pdf
 
Polygon Business Mall , Building booklet (build 05)
Polygon Business Mall , Building booklet (build 05) Polygon Business Mall , Building booklet (build 05)
Polygon Business Mall , Building booklet (build 05)
 
1200 13
1200 131200 13
1200 13
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
 
RHI Capability Summary
RHI Capability SummaryRHI Capability Summary
RHI Capability Summary
 
Mitigtion Plan Presentation
Mitigtion Plan PresentationMitigtion Plan Presentation
Mitigtion Plan Presentation
 
Civil engineer reference documents extended
Civil engineer reference documents   extended Civil engineer reference documents   extended
Civil engineer reference documents extended
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016
 
Sports Hub Project
Sports Hub ProjectSports Hub Project
Sports Hub Project
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee Green
 

Okyanus Hotel Project Status Update

  • 1. 1
  • 2. I. HEALTH & SAFETY II. ORGANIZATION CHART III.FORECAST CURVE OF MANPOWER IV. PROGRAM OF WORKS a) General Planning b) Planning Civil Works Typical Level c) Rotation Structural Works Typical Floor d) Planning Secondary Trades e) Rotation Guest Room f) Planning Civil Works Typical Level 2
  • 3. g) Lifts h) Optional & Excluded Works i) Design Status V. FAÇADE: OKYANUS INTRODUCTION VI. MEP: PROGRESS STATUS BY LEM 3
  • 4. I. HEALTH & SAFETY 4
  • 5. 5
  • 7. III. FORECAST CURVE OF MANPOWER 7
  • 8. IV. PROGRAM OF WORKS a) General Planning 8
  • 9. 9
  • 10. b) Planning Civil Works Typical Level 10
  • 11. c) Rotation Structural Works Typical Floor 11
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. 15
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. 22
  • 24. 24
  • 25. e) Rotation Guest Room 1. Mock-up Room 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. 36
  • 37. 37
  • 38. 38
  • 39. 39
  • 40. 40
  • 41. 41
  • 42. 2. Whole Typical Floor 42
  • 43. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47. 47
  • 48. 48
  • 49. 49
  • 50. 50
  • 51. 51
  • 52. 52
  • 53. 53
  • 54. 54
  • 55. 55
  • 56. 56
  • 57. 57
  • 58. 58
  • 59. 59
  • 60. f) Planning Civil Works Typical Level 1. Masonry Works (Program of block wall delivery and block wall execution) 60
  • 61. 61
  • 62. 62
  • 63. 63
  • 65. 65
  • 66. 66
  • 67. 3. Forecast Screed Works 67
  • 68. 68
  • 69. 69
  • 70. 4. Wall and False Ceiling Works 70
  • 71. 71
  • 73. 2014 2015 Today Aug Sep Oct Nov Dec 2015 1 20 Aug 2 12 Sep 3 23 Sep 4 21 Nov 5 1 Dec 6 23 Dec 7 1 Jan Groupe Package Dates acc. Workshop 09.2014 Milestones acc.Program of Works Remark 1 Access Card Control System & Intruder System 20/08/2014 15/10/2014 BMS 15/10/2014 Car Park Vehicle Counting System 15/10/2014 CCTV System 15/10/2014 Centralized Emergency Exit Management System 15/10/2014 Digital Lighting Control System 15/10/2014 Fire Alarm system 15/10/2014 Intercommunication System -PABX 15/10/2014 Public Address and Sound Sysytems 11/11/2014 15/10/2014Telecommunication System 2 UPS 12/09/2014 15/10/2014 Additional Cubicle on MV SWITCHGEARS 15/10/2014 3 Analogic Clock System 23/09/2014 15/10/2014 ANSUL Suppression System 11/11/2014 FM200 Suppression System 11/11/2014 Kitchen Equipments 15/10/2014 Nurse Call System 15/10/2014 4 UPS Panel Boards 21/11/2014 15/10/2014 5 MV connection 01/12/2014 03/11/2014 6 Generators 23/12/2014 11/11/2014 IP Television 11/11/2014 Totalizing Panel 11/11/2014 7 Scanners & metal Detectors 12/01/2015 12/01/2015 1. Status of Optional Works Access Card Control System & Intruder System h) Optional & Excluded Works Intercommunication System -PABX Telecommunication System NOT YET AWARDED Analogic Clock System 73
  • 74. 2. Excluded Works (EKO) f) UPS (for lifts) 2 proposals submitted g) Bore Hole & Water treatment plant i) Swimming pool already contracted by EKO Dates according Program of the Works h) Sewage treatment plant b) All services related to medical zones (white partitions, plumbed partitions,equipments, specific lighting,..) c) All material and installations related to kitchen zones and restaurant d) Fixed furnitures (ex. Placards, desks, …hall equipment and sport court) e) Mobile furnitures (ex.: beds, tables,…)COBEL declined for this Trade a) Roads, lanscaping and other external works 01.10.2014 01.08.2014 04.07.2014 74
  • 75. Received 26 Aug Received 04 Sep Received 07 Nov 2014 2015Aug Sep Oct Nov Dec 2015 Coordinated PRO 2014 as per POW 11 Aug Today 21 Jan 22 Aug Layouts Basement to L08 22 Aug Layouts L09 to L25 12 Sep Elevations & Sections 19 Sep Stairs and swimming Pool 26 Sep External ceilings and Fences 26 Sep Other architectural drawings 26 SepFire Zoning Received Rev.D 23.10.2014 Rev.E still to be received (Status 20.01.15 11:00) 1. Architectural Design PRO 2014 Planned to be received 11.08.2014 acc. POW f. Design Status 75
  • 76. Received 31.10.2014 Received 07.11.2014 Receive 27.11.2014 2014 2015Aug Sep Oct Nov Dec 2015 Milestone PRO 2014 as per POW 11 Aug Today 21 Jan 22 Sep - 1 Oct Serie 200 Flooring 2 Oct - 10 Oct Serie 300 Flase Ceilings 22 Sep - 1 Oct Serie 500 Wall covering 14 Oct - 24 OctSerie 400 & 600 Part 1 27 Oct - 14 NovSerie 400 & 600 Part 2 17 Nov - 28 NovSerie 400 & 600 Part 3 1 Dec - 12 DecSerie 400 & 600 Part 4 12 DecSerie 700, 800 & 900 1 Oct Serie 100 2. Interior Design Planned to be received 30.08.2014 acc. POW Received revision 16.01.2015 Except Plumbing and Sanitary Fixtures 700: Zoning 800: Access Control 900: Floor Boxes 76
  • 77. 3. Status of Documents Submitted 77
  • 78. 78
  • 79. 4. Variations Status 1 CEILINGS Verbal Approval 3 WALL COVERING Rejected 11 INTERIOR PAINTS Verbal Approval (No Floor & Wall painting in Parking) • QTY & LOCATION OF CEILING TILES 99%HR a) PRICING TRANSMITTED FOR INTERIOR DESIGN TO BE CONFIRMED BY EKO:  REVISION ACCORDING TO REVISED ID PACKAGES RECEIVED 22.08.2014 - SUBMITTED 28.10.2014 Rejected  NEW REVISION – SUBMITTED 19.12.2014 (1)VARIATION 4 PACKAGES/14 SUB-PACKAGES SUBMITTED 12.05.2014 2 FLOORINGS & SKIRTINGS Rejected (except alternative rubber flooring for sport room) • COLOR OF FLOOR TILES & WALL CERAMICS • COLOR OF PAINT • UPDATED ID CONSIDERING THESE CHANGES • ACCEPTANCE OF VARIATION 16.01.2015 16.01.2015 16.01.2015 79
  • 80. (2)VARIATION 2 PACKAGES SUBMITTED 08.08.2014  RESUBMISSION 27.10.2014 Rejected 16.12.2014  NEW REVISION ( ALTERNATIVE ROCA )SUBMITTED 05.12.2014 13 PLUMBING & SANITARY FIXTURES 14 SANITARY&HOSPITALITY ACCESSORIES ACCEPTANCE OF VARIATION TO BE CONFIRMED BY EKO 80
  • 81. b) OTHER VARIATIONS SUBMITTED (1)FACADE NEW WINDOW AT SPORT ROOM (2)FACADE BULLET PROOF GLASS (3)FACADE MAINTENANCE PLATFORMS (4)SWIMMING POOL (STRUCTURAL WORKS ONLY) 81
  • 82. c) PENDING VARIATIONS 5. STONE & SOLID SURFACES Stone Thresholds cancelled 6. PARTITIONS 9. METAL WORKS 10. GLAZING WORKS Waiting updated Work Package (2)SHAFT ACCESS HATCHES (New Schedule Received 28.08.2014) (1)ID FINISHES (5, 6, 9 & 10) ACC. UPDATED ID PRO 2014 TO BE RECEIVED (3)DOORS (Last Revised Schedule Received 17.12.2014) still to be coordinated with ELV Packages/ waiting for selection of colours (4)NEW SECURITY ROOM (IN PLACE OF 2 PARKING) Received 20.08.2014 – waiting design (5)NEW LAYOUT OF THE BATHROOMS OF THE GUEST ROOMS FROM LEVEL G+15 TO LEVEL G+24 Received 09.09.2014 (6)FACADES WATERPROOFING SYSTEM (7)ROOF PAVEMENT According To New Concept Pro 2014 Received 23.10.2014 82
  • 83. (8)DRAINING SCREED AND SLOPES IN BASEMENT According Concept Received 15.10.2014 (10)EXTERNAL WORKS (9)LIFTS EMERGENCY DOORS According To Arch. File Received 28.10.2014 83
  • 84. V. FAÇADE: OKYANUS INTRODUCTION 84
  • 85. VI. MEP: PROGRESS STATUS BY LEM 85