SlideShare a Scribd company logo
1 of 17
Nestlé Continuous Excellence
October 2008
• What is TPM
• How TPM works
12 July 2023
NCE 2
Our ambition and challenge
(look to other industries)
How soap is packed
How beer is packed
Question: Which product is more critical?
12 July 2023
NCE 3
The floor of a motor plant
The floor of a soft drink plant
Questions:
Where do you prefer to work?
Which floor shows a better control?
Our ambition and challenge
(look to other industries)
12 July 2023
NCE 4
Change parts of a paper plant
Change parts in a dairy factory
Questions:
Who has to search more for a part? (time)
Which part will have more tear&wear?
Our ambition and challenge
(look to other industries)
12 July 2023
NCE 5
Question:
Which pump looks younger?
Which pump will live longer?
If one breaks down, which one is easier to repair? (time)
...a 8 year old pump at a tire factory
... 3 year old pump at a soft drink plant
Our ambition and challenge
(look to other industries)
12 July 2023
NCE 6
...a TPM machine
...a not-TPM machine
Question: If one breaks down, which is easier to repair? (time)
Our ambition and challenge
(look to other industries)
12 July 2023
NCE 7
The floor in a machine company
The floor in a soft drink plant
Question:
Where do you prefer to work?
Which floor seems better in control?
Our ambition and challenge
(look to other industries)
12 July 2023
NCE 8
So what is TPM?
Found in Japan after WWII
No money, a broken country
“We cannot afford losses”
“We cannot afford investments”
The only asset we have is people
Principle= working smarter
Working with structure step by step
Work with improvement teams: Kaizen
TPM= Total Performance Management
12 July 2023 9
9
9
TPM : A manufacturing management model...
 Safe working environment
 High quality product
 High flexibility and freshness
 Process stability and capability
 Competitive costs
 Learning Organisation
Total Performance Management:
“Maximizing the use of resources
through elimination of waste”
Engaging the hearts and minds of all people
to create a continuous improvement culture
12 July 2023
NCE 11
Improving equipment reliability through equipment care ...
Autonomous Maintenance
Planned Maintenance
Education & Training
Focused Improvement
… with 9 integrated pillars
Early Management
Quality Management
Office
Safety, Health and Environment
A step by step process for improving facility maintenance ...
Focused knowledge and capability building ...
Structured method to identify and prevent problems ...
Design and implementation of new equipment ...
Creating a system incapable of producing quality defects ...
Lean and error free business processes ...
Elimination of unsafe behaviors and conditions ...
Lean Factory Lean thinking in Manufacturing ...
12 July 2023
NCE 12
TPM Full implementation takes years but delivers short-term results
0
1
2
3
4
5
6
7
8
9
10
11
12
Phase 0
Phase 1
Phase 2
Phase 3
Phase 4
Consolidate TPM and Raise
Levels for JIPM PM Prize
Launch Safety, Health, and
Environment Pillar
Formally Announce Decision
to Introduce TPM
Preparation
Create TPM Promotion Organization
Establish TPM Basic Policy and Goals
Draft Operational Master Plan
Expand the Reliability Pillars (AM, PM,
FI and E&T) to Next Lines
Kick Off TPM Initiative
Launch Early Management Pillar for
New Products and Equipment
Launch Quality Management Pillar
Launch LEAN factory and Office pillar
Conduct TPM Introductory Education,
Begin Pilot Line, Launch AM, PM, FI, ET
8 months
26 – 32 months
38 – 50 months
50 – 62 months
Continual
Breaking the 12 TPM
Implementation Steps into
“Maturity Phases” allows
for easier corporate
governance and
standardized progression
for an entire factory and
across various markets.
Cumulative
conclusion
time
(Indicative
times)
12 July 2023
NCE 13
We are implementing the TPM Methodology to...
Learning, strengthening, competing and surviving
(The learning Organization)
MACHINE
MAN
METHOD
MATERIAL
Restore and extract
knowledge
Re-education
Makes people more
pro-active
Stabilizes and
creates reliability
Garantees quality at
competitive costs
Reliability
Pró
Activity
Increase
capability
Satisfied
Customer
(Zero Defect)
Lean Production
DMAIC
Cycle
... guarantee equipment reliability and capability of processes.
12 July 2023
NCE 14
... reach the manufacturing goals that are
lined up with the business objectives.
We are implementing the TPM Methodology to...
12 July 2023
NCE 15
... promote the participation of all the
areas through the pillars.
TPM
GLOBE
BE
Education & Training
Autonomous Maintenance
Planned Maintenance
Focused Improvement
We are implementing the TPM Methodology to...
12 July 2023
NCE 16
... develop knowledge to enable people toward preventive actions and
continuous improvement.
We are implementing the TPM Methodology to...
12 July 2023
NCE 17
...maximize the use of the industrial assets guaranteeing the
generation of high-quality products and competitive costs.
STABILITY &
RELIABILITY
We are implementing the TPM Methodology to...
12 July 2023
NCE 18

More Related Content

What's hot

Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
Timothy Wooi
 

What's hot (20)

TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
Lean conference 2014 Dan Alexander - Hoshin Kanri
Lean conference 2014 Dan Alexander - Hoshin KanriLean conference 2014 Dan Alexander - Hoshin Kanri
Lean conference 2014 Dan Alexander - Hoshin Kanri
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
Powerful TPM-OEE implementation details
Powerful TPM-OEE  implementation details Powerful TPM-OEE  implementation details
Powerful TPM-OEE implementation details
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Kaizen
KaizenKaizen
Kaizen
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Game
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
Small dojo concept for reference-converted
Small dojo concept   for reference-convertedSmall dojo concept   for reference-converted
Small dojo concept for reference-converted
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
IBM Transformation
IBM TransformationIBM Transformation
IBM Transformation
 
Maintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational ExcellenceMaintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational Excellence
 
OEE System - Overall Equipment Effectiveness
OEE System - Overall Equipment EffectivenessOEE System - Overall Equipment Effectiveness
OEE System - Overall Equipment Effectiveness
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
 

Similar to 1. what is tpm and how it works.ppt

Achieving sustainable development by integrating it into the business proces...
Achieving sustainable development by integrating it into the business proces...Achieving sustainable development by integrating it into the business proces...
Achieving sustainable development by integrating it into the business proces...
Tomislav Rozman
 

Similar to 1. what is tpm and how it works.ppt (20)

Training Strategie Action Learning
Training Strategie  Action Learning Training Strategie  Action Learning
Training Strategie Action Learning
 
TPM.pdf
TPM.pdfTPM.pdf
TPM.pdf
 
Achieving sustainable development by integrating it into the business proces...
Achieving sustainable development by integrating it into the business proces...Achieving sustainable development by integrating it into the business proces...
Achieving sustainable development by integrating it into the business proces...
 
1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf
 
Improving Productivity Improves Operating Margin
Improving Productivity Improves Operating MarginImproving Productivity Improves Operating Margin
Improving Productivity Improves Operating Margin
 
ICT ERP & SDLC Presentation
ICT ERP & SDLC PresentationICT ERP & SDLC Presentation
ICT ERP & SDLC Presentation
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Csc vietnam
Csc vietnamCsc vietnam
Csc vietnam
 
Share & care july 2012
Share & care july 2012Share & care july 2012
Share & care july 2012
 
Vinay and Anup siit phase 1 final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1  final report-Pragati Engineering BelgaumVinay and Anup siit phase 1  final report-Pragati Engineering Belgaum
Vinay and Anup siit phase 1 final report-Pragati Engineering Belgaum
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slide
 
Ctrm lean
Ctrm leanCtrm lean
Ctrm lean
 
quality engineering(ME522) part 2
quality engineering(ME522) part 2quality engineering(ME522) part 2
quality engineering(ME522) part 2
 
0Intro to OM.pptx
0Intro to OM.pptx0Intro to OM.pptx
0Intro to OM.pptx
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
latihan industri
latihan industrilatihan industri
latihan industri
 
Sts plus lean pt2 final
Sts plus lean pt2 finalSts plus lean pt2 final
Sts plus lean pt2 final
 
Root Cause Failure Analysis by Eugene Cottle-Lifecycle Engineering
Root Cause Failure Analysis by Eugene Cottle-Lifecycle EngineeringRoot Cause Failure Analysis by Eugene Cottle-Lifecycle Engineering
Root Cause Failure Analysis by Eugene Cottle-Lifecycle Engineering
 
Building effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportBuilding effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project report
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

1. what is tpm and how it works.ppt

  • 1. Nestlé Continuous Excellence October 2008 • What is TPM • How TPM works
  • 2. 12 July 2023 NCE 2 Our ambition and challenge (look to other industries) How soap is packed How beer is packed Question: Which product is more critical?
  • 3. 12 July 2023 NCE 3 The floor of a motor plant The floor of a soft drink plant Questions: Where do you prefer to work? Which floor shows a better control? Our ambition and challenge (look to other industries)
  • 4. 12 July 2023 NCE 4 Change parts of a paper plant Change parts in a dairy factory Questions: Who has to search more for a part? (time) Which part will have more tear&wear? Our ambition and challenge (look to other industries)
  • 5. 12 July 2023 NCE 5 Question: Which pump looks younger? Which pump will live longer? If one breaks down, which one is easier to repair? (time) ...a 8 year old pump at a tire factory ... 3 year old pump at a soft drink plant Our ambition and challenge (look to other industries)
  • 6. 12 July 2023 NCE 6 ...a TPM machine ...a not-TPM machine Question: If one breaks down, which is easier to repair? (time) Our ambition and challenge (look to other industries)
  • 7. 12 July 2023 NCE 7 The floor in a machine company The floor in a soft drink plant Question: Where do you prefer to work? Which floor seems better in control? Our ambition and challenge (look to other industries)
  • 8. 12 July 2023 NCE 8 So what is TPM? Found in Japan after WWII No money, a broken country “We cannot afford losses” “We cannot afford investments” The only asset we have is people Principle= working smarter Working with structure step by step Work with improvement teams: Kaizen TPM= Total Performance Management
  • 9. 12 July 2023 9 9 9 TPM : A manufacturing management model...  Safe working environment  High quality product  High flexibility and freshness  Process stability and capability  Competitive costs  Learning Organisation Total Performance Management: “Maximizing the use of resources through elimination of waste” Engaging the hearts and minds of all people to create a continuous improvement culture
  • 10. 12 July 2023 NCE 11 Improving equipment reliability through equipment care ... Autonomous Maintenance Planned Maintenance Education & Training Focused Improvement … with 9 integrated pillars Early Management Quality Management Office Safety, Health and Environment A step by step process for improving facility maintenance ... Focused knowledge and capability building ... Structured method to identify and prevent problems ... Design and implementation of new equipment ... Creating a system incapable of producing quality defects ... Lean and error free business processes ... Elimination of unsafe behaviors and conditions ... Lean Factory Lean thinking in Manufacturing ...
  • 11. 12 July 2023 NCE 12 TPM Full implementation takes years but delivers short-term results 0 1 2 3 4 5 6 7 8 9 10 11 12 Phase 0 Phase 1 Phase 2 Phase 3 Phase 4 Consolidate TPM and Raise Levels for JIPM PM Prize Launch Safety, Health, and Environment Pillar Formally Announce Decision to Introduce TPM Preparation Create TPM Promotion Organization Establish TPM Basic Policy and Goals Draft Operational Master Plan Expand the Reliability Pillars (AM, PM, FI and E&T) to Next Lines Kick Off TPM Initiative Launch Early Management Pillar for New Products and Equipment Launch Quality Management Pillar Launch LEAN factory and Office pillar Conduct TPM Introductory Education, Begin Pilot Line, Launch AM, PM, FI, ET 8 months 26 – 32 months 38 – 50 months 50 – 62 months Continual Breaking the 12 TPM Implementation Steps into “Maturity Phases” allows for easier corporate governance and standardized progression for an entire factory and across various markets. Cumulative conclusion time (Indicative times)
  • 12. 12 July 2023 NCE 13 We are implementing the TPM Methodology to... Learning, strengthening, competing and surviving (The learning Organization) MACHINE MAN METHOD MATERIAL Restore and extract knowledge Re-education Makes people more pro-active Stabilizes and creates reliability Garantees quality at competitive costs Reliability Pró Activity Increase capability Satisfied Customer (Zero Defect) Lean Production DMAIC Cycle ... guarantee equipment reliability and capability of processes.
  • 13. 12 July 2023 NCE 14 ... reach the manufacturing goals that are lined up with the business objectives. We are implementing the TPM Methodology to...
  • 14. 12 July 2023 NCE 15 ... promote the participation of all the areas through the pillars. TPM GLOBE BE Education & Training Autonomous Maintenance Planned Maintenance Focused Improvement We are implementing the TPM Methodology to...
  • 15. 12 July 2023 NCE 16 ... develop knowledge to enable people toward preventive actions and continuous improvement. We are implementing the TPM Methodology to...
  • 16. 12 July 2023 NCE 17 ...maximize the use of the industrial assets guaranteeing the generation of high-quality products and competitive costs. STABILITY & RELIABILITY We are implementing the TPM Methodology to...