A study on the analysis and modeling of multipurpose concert center by the integration
of Building information modeling (BIM)
VISHNU VIJAYAN
Assistant Professor and HOD, Baselios Mathews II College of Engineering, Kerala, India
AMINA S VAHAB
Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India
ELIZABETH M MATHEW
Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India
JYOTHI JOHNSON
Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India
ABSTRACT
In this project we made a sincere attempt to propose a multipurpose auditorium by considering the limitations of existing halls for the same
purpose. Our college does not have a separate building for an auditorium. The existing halls have so many limitations such as improper
visibility, audibility issues and also in architectural views. An auditorium is a room built to enable the audience to hear and watch various of
activities and can also used as an indoor stadium. The project deals with the drafting, modeling, designing, analysis, and estimation using BIM
software. BIM (Building Information Modeling) is an intelligent 3d model supported by various software that can be efficiently used for
planning, designing, constructing and managing building and infra-structure. Plinth area of proposed auditorium is 8500sqft with a seating
capacity of 900nos, Height of the auditorium will be at two levels ,safe bearing capacity of the soil is taken as 200KN/M², Hence the footing is
designed as isolated type. All the plans are drawn by using the AUTOCADD 2015.The auditorium is planned as per the guidelines given in the
National Building Code (NBC). Design as per IS 456-2000 Plain and reinforced code of practice and the reinforced concrete IS 456-1978 is
followed and structural element are done using Staad pro.V8i software ,code of practice for acoustical design of auditorium and cafeteria halls
.Telescopic grandstand chairs are introduced for accomplishing the auditorium as multipurpose.
Key Words: Building information modeling, BIM, Auditorium, Acoustics and architectural consideration, Auto Cad, Revit,
Staad pro, Structural design and Analysis etc.
1. INTRODUCTION
An auditorium could be a room built to enable an audience to listen to and watch performances at venues like theatres. Auditorium
will be found in entertainment venues, community halls, and theatres and will be used for rehearsal, presentation, arts and cultural
activities or as a learning space.
Auditorium, conference hall are necessary for an Engineering college. In Baselios Mathews II College of Engineering, there is
no special building for Auditorium. In this project we made a sincere attempt to propose a multipurpose auditorium by considering
the limitations of existing halls for the same purpose. Our college does not have a separate building for an auditorium. The
existing halls have so many limitations such as improper visibility, audibility issues and also in architectural views. We have two
facilities for the same purpose, one is the seminar hall at the ground floor and other is main gathering hall at the second floor.
While considering the seminar hall it is insufficient for gathering all crowd in our college at once ie, insufficient space. Insight of
floor it is made as stepped for which provide proper visibility but inturn it reduces the height of the hall at the rear side which is
not the standard minimum. For avoiding the intermediate columns grid beams are used. Grid beams are good for load carrying
without columns and fot proper acoustics but there its dept is too large which affects its architectural side.
In case of the main hall at the second floor, the hall is essentially big but there use of intermediate colums affects the visibility.
There is also the acoustics issues in which sound make echos. And it is not arranged a stage and proper seating. The floor is flat
and while using normal chairs there is a problem of vision. These halls cannot be used for arts functions and we are using
temporary stages for the purpose which cause additional expenses. Also our college is conducting so many national and
international programs. We thought that the existing facility is not feasible for such programs. We are proposing a concert center
in which it is established as a separate building, where all the limitations of the existing halls have given more importance. It can
be used for conducting national and international conference, seminars, functions like arts, tech fest, sports or any other
celebrations, speeches and so on. We attempted to make it as a multipurpose auditorium by use.
This project reports on the proposal of an auditorium including drafting, analysis, designing and estimation. Analysing and
designing all structural components. Isolated footing is adopted for all columns. Safe bearing capacity of soil is taken as
200kN/m2.Limit state method is used for structural design. Adopting M20 concrete and Fe415 HYSD bars for the design. Site
plan, plan of the building, section of the building, elevation of the building and detailing of reinforcements for Beam, Column, and
Footing are also enclosed..
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3837
1.1 Building information modeling [BIM]
The idea of BIM was arise in 70's and then it is called Building Description System (BDS).The word Building Model was first
used in 1985.In 2002 Autodesk published the paper entitled Building Information Modeling. Building Information Modeling is
intelligent 3D software which help in coordination, collaboration, reducing errors at the time of construction, productivity,
profitability and motivate during the entire lifecycle of the project such as (plan, design, build operation, and maintenance). Every
minute details of the building can be available by using this software. This model can be used to analyse the design and also
provide a clear view of the building to the designer and to the client before the construction which may increase the efficiency of
the construction procedures Currently BIM software is used in all sectors such as public and private for efficient completing of the
project.
Future potentials
• Improve visualization
• Improve collaboration and coordination
• Good relation between designer and client
• Speed and progress of work
• Reduce the cost
1. Process: It is the order of work from the starting to the end of the construction; it will provide the output of each stage
2. Policies: Policies refer to the measure that should be adopted for each construction process. It may reduce the argument
between the client and the designer and which may enhance a good relation between them.
3. Information: Information are one of the important element of BIM, there are two type of information system models and
documents, models means it is clarifying the objects, roads etc., and they are stored in files and documents are the digital
version of the print, drawings etc.
4. Technology: Software and hardware tools are used for various stages for BIM.
1.2 Telescopic grandstand chairs
Telescopic seating system is commonly used in different spaces like stadiums , Theatres, and all kinds of public gathering places,
advantage of these chair is it is space saving. You will enjoy all the events comfortably in sitting on the telescopic grandstand
chairs. It is pulled and extended in a shape of steps. It is retractable and by this way you can save a lot of spaces, and carry out
another activities. It is operated in such a way that normally opened and folded manually. The larger set of chairs can be operated
by motorised , automatic opening, remote control devices etc are used.
Advantages: Flexibility, Economic, Space saving, Comfort, Perfectly normal structure that can withstand a load of 600kg/sqm ,
Ideal in education, sports halls or small theatres.
Limitations: Floor must be suitable for structure to be rolled over its on wheels provided, The floor must be able to withstand the
stress due to weight of the grandstand
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3838
Fig 1.1 Telescopic grandstand chairs
2. OBJECTIVE AND SCOPE
1. To study the modern architectural features of convention Centre.
2. To carry out a investigation on BIM software and its benifits.
3. Use technique skill and modern tools necessary for the construction engineering and management practices.
4. Determine how structural analysis, design and detailing software helps to a project.
5. To study the workflow of the process from design execution.
3. ACOUSTICS AND ARCHITECTURAL CONSIDERATIONS
Acoustics can be defined as the sound produced in a compressed atmosphere. There are some design considerations that must be
taken into account for the design of the hall for any public gathering. They are given in code of practice for acoustical design of
auditorium and conference halls IS2526-1963. We also consider some of the criteria from the code as possible, following
consideration are taken in the design of the proposed auditorium.
1. Selection of site
The site should keep distance from major source of noise, that is building should be planned as far as possible from any potential
noise such as highways, train tracks, or industrial areas. The auditorium building be isolated from potential noises from other
buildings.
2. Volume
The size of the auditorium should remain optimum. The maximum length can be provided is 30m. The main goal while
considering the volume of auditorium, is that to reduce the sound energy loss for the audience should be close to the sound source
as possible and there by reducing the distance that the sound must travel.
3. Shape and form
For proper acoustics the shape of the hall should be properly selected. The stage to audience distance can be minimized by
carefully considering the geometry of the room. The rectangular shoe box type hall with a stage on narrow end may be excellent
for proper acoustics and a greater ratio of reverberation sound is desirable. Due to the less availability of space that is due to the
less width of the plot we provide a rectangular geometry. However rectangular geometry is only suitable for small halls. The rear
walls should be either flat or convex in shape and splayed side walls must be preferable.
4. Use of absorbent
There are so many sound absorbing materials available in the market, such as sound absorbing panels and sound proofing
materials that can be used to eliminate sound reflections, some types of sound absorbing materials are
i. Acoustical foam panels
ii. Fabric wrapped panels
iii. Acoustical wall coverings
iv. Ceiling tiles
5. Sighting
A sight line is a clear line of sight between spectator and the stage, it is one of the most important factor to be considered at the
time of construction of an auditorium, conference hall, or a seminar hall, so the designer should check properly the way which
seating are to be arranged. These are the grasping and inspecting angles obtained from the viewer’s mental perception and
inspecting angles for a good look from all sides.
 30⁰ -no movement
 60⁰ - Slight movement
 110⁰-more eye movement
 360⁰-full head and shoulder movement
For good eye sight the consecutive rows of the seats should be elevated over the foregoing one.The elevation being raised on the
principle that each viewer shall raised with the person sitting successively of him, so that the viewer head is 0.15m above the way
of sound which overlook the head of the person sitting in front of him.
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3839
Top of the balcony should not be more than 65feet above the stage to avoid lower path difference and ceiling should be 1/3(larger
halls) or 2/3(smaller halls) of average width of the auditorium
4. PLANNING
The plan, section and elevation of the proposed building is drawn by using AutoCAD(2016). Autocad is computer aided design
software that helps for creating 2D and 3D drawings.
The proposed plot is in rectangle shape. We measured the plot by using tape. The total area of the plot is 15400sqft. Hence we
decided to build a rectangular shaped building which may utilize the size to its maximum.
Table 4.1 Faciliities in the auditorium
Facilities Provided Dimension
Assembly hall 30m x 20m
Green room 3m x 5m (2nos)
Office room 4m x 4m
Guest room 3m x 5m
Technical room 4m x 5.5m
Store room 3m x5m
Toilet & Wash area 0.8m x 1.2m (20nos)
Cafeteria ( as a separate unit) 7m x 20m
Fig 4.1 Floor Plan
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3840
Fig 4.2 Section
5. MODELLING
Modelling is the representation of a structure to understand the design of a building, which may help to understand 3D model and
help to communicate with the customers about the building appearance. We use REVIT 2015 software for modelling of our
proposed building.
Fig 5.1 Interior view
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3841
Fig 5.2 Interior view
Fig 5.3 Exterior view
6. DESIGNING & DETAILING
Design is a concept that pays particular attention to various elements of a building like roof, beams, columns etc. and can be done
by the software STADD Pro V8i. The structural design is mainly focused on stability, strength and rigidity of structures. The main
aim of the structural design is make the structure capable for withstanding the applied loads. Here we use Limit state method for
structural design. Adopting M20 concrete and Fe415 HYSD bars for the design.
6.1 Design of Beams
M30 Fe415 (Main) Fe415 (Sec.)
Length: 4000.0 mm
Size: 400.0 mm X 400.0 mm
Cover: 25.0 mm
Sheardesignresultsat 569.0 mm away from start support
VY =5.41 MX =0.00 LD=1
Provide 2 Legged 8í @ 225 mm c/c
Sheardesign resultsat 569.0 mm away from end support
VY =-5.41 MX =0.00 LD=1
Provide 2 Legged 8í @ 225 mm c/c
6.2 Design of column
M30 Fe415 (Main) Fe415 (Sec.)
Length: 4000.0 mm
Cross section: 400.0 mm X 400.0 mm
Cover: 40.0 mm
Guiding load case:1 End joint:1 Tension column
Reqd. Steel area : 1280.00 Sq.mm.
Reqd. concrete area: 158720.00 Sq.mm.
Main reinforcement : Provide 12 - 12 dia. (0.85%,1357.17 Sq.mm.) (Equally distributed)
Tie reinforcement : Provide 8 mm dia. rectangular ties @ 190 mm c/c
Section capacity based on reinforcement required (KNS-MET)
Puz :2541.12 Muz1 : 75.65 Muy1 :75.65
Interaction ratio: 0.00 (as per Cl. 39.6, IS456:2000)
Secction capacity based on reinforcement provided (KNS-MET)
Worst load case: 1
End joint: 2
Puz :2564.10 Muz :79.72 Muy :79.72 Interaction ratio: 0.00
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3842
6.3Design of footing
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 12.000 in
Footing Length - X (Fl) : 40.000 in
Footing Width - Z (Fw) : 40.000 in
Eccentricity along X (Oxd) : 0.000 in
Eccentricity along Z (Ozd) : 0.000 in
Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 150.000 lb/ft3
Strength of Concrete : 4.000 ksi
Yield Strength of Steel : 60.000 ksi
Minimum Bar Size : #3 Maximum Bar Size : #10
Minimum Bar Spacing : 2.000 in
Maximum Bar Spacing : 18.000 in
Pedestal Clear Cover (P, CL) : 3.000 in
Footing Clear Cover (F, CL) : 3.000 in
Soil Properties
Soil Type : UnDrained
Unit Weight : 112.000 lb/ft3
Soil Bearing Capacity : 4.000 kip/ft2
Soil Surcharge : 0.000 kip/in2
Depth of Soil above Footing : 0.000 in
Undrained Shear Strength : 0.000 kip/in2
Design for Flexure about Z Axis (For Reinforcement Parallel to X Axis)
Based on spacing reinforcement increment; provided reinforcement is #3 @ 8.000 in o.c.
Design For Top Reinforcement Parallel to Z Axis
Based on spacing reinforcement increment; provided reinforcement is #3 @ 8.000 in o.c.
Design For Top Reinforcement Parallel to z Axis
Based on spacing reinforcement increment; provided reinforcement is #3 @ 8 in o.c.
Design For Top Reinforcement Parallel to X Axis
Based on spacing reinforcement increment; provided reinforcement is#4 @ 16 in o.c.
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3843
Fig 6.1 Isolated footing
7. STRUCTURAL ANALYSIS
Here we are using STAAD Pro software for analysing the structure, it is the best structural analysis software. In structural analysis
we determine the effect of load on the building and structural components. Structural analysis is a method where we are able to
find out how a structure behave under certain loads or combination of loads, it is to understand the support reactions, bending
moment, shear force, deflection etc.
The analysis is done through member structural member properties and support specification and modelling. The dimensions of all
the structural members as per the preliminary design and it is assigned. The support specification of assigned.
Fig 7.1Displacement of loadcase 1
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3844
Fig 7.2 Stress details
Fig 7.3 Load case details
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3845
Fig 7.4 Whole structure loads
Fig 7.55 Load case
8. ESTIMATION
Estimation is the approximate cost of construction calculated before the construction starting. Estimation is the approximate
calculation of the amount, for the construction of the building. If the fund available is less than the estimated cost which may
cause delay in the work. For producing an estimate the cost of unit materials should be known.Long wall short wall method is
used and estimation is done by manually.
The total cost of the auditorium isRS.6505282/-
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3846
9. CONCLUSION
Our project was successfully completed by the joint effort of the concerned faculty member and the members of the project. We
have completed this project with best of our ability and knowledge and satisfying the requirement of an educational building.
The project was focused on the planning, design, analysis of an concert hall in our college, by using an intelligent 3-d software
Building Information Modeling (BIM). The project consists of designing of structural members like beams, columns, footings
etc., Design by AutoCAD 2015 design and analysis by Stadd pro V8i. BIM improve its design quality and collaborate in real time
to support project delivery process. The design and analysis are done by the IS specifications. This project helps us to study work
flow process from design execution, and to study the modern architectural features of convention Centre, to carry out research on
BIM technology. We also learned that the success of an auditorium depend on architectural and acoustics considerations,
acoustics plays an important role in enhancing the desirable sounds and eliminating the unwanted noise and architectural for the
proper vision. The final estimated cost for the completion of the project is RS.6505282/-
We made this proposal according to the requirements so, we hope that the proposal will be accepted and implemented by the
concerned authorities and it should be asset for our Civil Engineering Department.
ACKNOWLEDGEMENT
The author thanks, faculty member of BMCE, technical staff of Arcite institute, our parents and our friends for their
valuable time spending with me for the completion of this project.
REFERENCES
1. A.Q Saraireh, Ibrahim Moh'd and Haron, Ahmad Tarmizi, ‘’Understanding the Conceptual of Building Information
Modeling‘’, International journal of Academic research in business and social science, 8(1),957-963, 2018
2. Miss. Irin Ann Isaac and Dr. Anoop CK, ‘’ Analysis of BIM and scope of BIM in India’’, IJERT, Vol 08, issue 11, 2019
3. C.R Vigneshwar, “Planning, Analysis, Designing and Estimation of an auditorium”, isjournals, Vol 03, issue 01, 2018
4. Ch. Pratysha, V. Vijaya KumarPlanning, “Analysis and Design of Auditorium”, International journal for technical
research in engineering, Vol 04, issue 12, 2017
5. Vijayan, Vishnu and V, ACHU and Riyana, M. S. and Jayakrishnan, R., Time-Cost-Risk Optimization in Construction
Work by using Ant Colony Algorithm (April 4, 2018). International Research Journal of Engineering and Technology,
Volume: 05 Issue: 04 | Apr-2018. Available at SSRN: https://ssrn.com/abstract=3570079
6. Vijayan, Vishnu, A Comparative Study on Sustainable Building Construction with Conventional Residential Building
(April 20, 2018). International journal of current engineering and scientific research (ijcesr), 2018. Available at
SSRN: https://ssrn.com/abstract=3591429
7. Vijayan, Vishnu, A Study on Flyover Construction with Eco Technical Road System (June 2, 2018). International
Journal of Emerging Technologies and Innovative Research, 2018. Available at
SSRN: https://ssrn.com/abstract=3591306
8. Vijayan, Vishnu and V, ACHU and M. S., Riyana, Mechanical Strength of Concrete using Bottom Ash as Fine
Aggregate (April 5, 2018). International Journal of Current Engineering and Scientific Research Volume 5-issue-4-2018.
Available at SSRN: https://ssrn.com/abstract=3570084
9. C.M.F Pangu,M.S Prawirasasra, Abrar Ismardi, “Measurement of acoustics performance of an auditorium”,IOP
publishing, 2017
10. Kabiru Maishanu and Dr Halil Zafer Alibaba, “Auditorium acoustics from past to present”, Int journal of engineering
research and application, vol 07, issue01, 2017
11. zhonghua gou, Acoustic Design for an Auditorium Project Using Building Performance Simulation to Enhance
Architectural Quality, 2017
12. Vijayan, Vishnu and M. S., Riyana, A Study About the Status of Implementation on Safety Standards and Legal
Requirements Pertaining to Construction Safety (April 4, 2018). Journal of Emerging Technologies and Innovative
Research, April 2018, Volume 5, Issue 4. Available at SSRN: https://ssrn.com/abstract=3496217
13. Vijayan, Vishnu, An Experimental Study on Chitosan for Water Treatment (May 28, 2018). Available at
SSRN: https://ssrn.com/abstract=3591432 or http://dx.doi.org/10.2139/ssrn.3591432
14. Vijayan, Vishnu and Jasna Jamal. "A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using GFRP
Sheets." International Journal for Scientific Research and Development 6.1 (2018): 659-663
15. Vijayan, Vishnu, et al. "a study on sustainable and cost effective building construction in housing sector." (2019).
International Journal of Current Engineering And Scientific Research vol.6, issue 6,
16. Vijayan, Jasna Jamal1 Vishnu. "A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using GFRP
Sheets."
Mukt Shabd Journal
Volume IX, Issue VI, JUNE/2020
ISSN NO : 2347-3150
Page No : 3847

More Related Content

Similar to A study on the analysis and modeling of multipurpose concert center by the integration of bim

Space based BIM technology
Space based BIM technologySpace based BIM technology
Space based BIM technologySeungkyu Yang
 
CPD BIM for small engineering practices
CPD BIM for small  engineering practicesCPD BIM for small  engineering practices
CPD BIM for small engineering practicesEwa Ostrowska
 
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...Whitepaper: "Construction Lifecycle Management – a necessary business strateg...
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...Ionel GRECESCU
 
Essential Autodesk Revit Fire Protection Courses
Essential Autodesk Revit Fire Protection CoursesEssential Autodesk Revit Fire Protection Courses
Essential Autodesk Revit Fire Protection CoursesNI BT
 
Design of multi storey sleeve car parking with stadd pro.
Design of multi storey sleeve car parking with stadd pro.Design of multi storey sleeve car parking with stadd pro.
Design of multi storey sleeve car parking with stadd pro.vivatechijri
 
Low Cost Interior Design
Low Cost Interior DesignLow Cost Interior Design
Low Cost Interior DesignIRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
Project presentation.pptx
Project presentation.pptxProject presentation.pptx
Project presentation.pptxLikhithPB
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxAtulBhagwat6
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav Gupta
 
Bringing Meaning to BIM Data
Bringing Meaning to BIM DataBringing Meaning to BIM Data
Bringing Meaning to BIM DataAna Roxin
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
Cobuilder's construction industry glossary
Cobuilder's   construction industry glossaryCobuilder's   construction industry glossary
Cobuilder's construction industry glossaryMariela Daskalova
 
Buildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentBuildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentDavid Burden
 
Buildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentBuildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentDaden Limited
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
IRJET- Determination of the Efficacy of Civil soft Quick Series in the Desi...
IRJET- 	 Determination of the Efficacy of Civil soft Quick Series in the Desi...IRJET- 	 Determination of the Efficacy of Civil soft Quick Series in the Desi...
IRJET- Determination of the Efficacy of Civil soft Quick Series in the Desi...IRJET Journal
 
Application of building information modelling tools for green building design
Application of building information modelling tools for green building designApplication of building information modelling tools for green building design
Application of building information modelling tools for green building designNuhu Bamalli Polytechnic Zaria
 

Similar to A study on the analysis and modeling of multipurpose concert center by the integration of bim (20)

Space based BIM technology
Space based BIM technologySpace based BIM technology
Space based BIM technology
 
CPD BIM for small engineering practices
CPD BIM for small  engineering practicesCPD BIM for small  engineering practices
CPD BIM for small engineering practices
 
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...Whitepaper: "Construction Lifecycle Management – a necessary business strateg...
Whitepaper: "Construction Lifecycle Management – a necessary business strateg...
 
Essential Autodesk Revit Fire Protection Courses
Essential Autodesk Revit Fire Protection CoursesEssential Autodesk Revit Fire Protection Courses
Essential Autodesk Revit Fire Protection Courses
 
Design of multi storey sleeve car parking with stadd pro.
Design of multi storey sleeve car parking with stadd pro.Design of multi storey sleeve car parking with stadd pro.
Design of multi storey sleeve car parking with stadd pro.
 
Low Cost Interior Design
Low Cost Interior DesignLow Cost Interior Design
Low Cost Interior Design
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Project presentation.pptx
Project presentation.pptxProject presentation.pptx
Project presentation.pptx
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptx
 
Kaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 webKaustav gupta portfolio 2012 web
Kaustav gupta portfolio 2012 web
 
Bringing Meaning to BIM Data
Bringing Meaning to BIM DataBringing Meaning to BIM Data
Bringing Meaning to BIM Data
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
Engineering 2050
Engineering 2050Engineering 2050
Engineering 2050
 
Cobuilder's construction industry glossary
Cobuilder's   construction industry glossaryCobuilder's   construction industry glossary
Cobuilder's construction industry glossary
 
Buildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentBuildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built Environment
 
Buildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built EnvironmentBuildingscapes - Immersive Worlds and the Built Environment
Buildingscapes - Immersive Worlds and the Built Environment
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
IRJET- Determination of the Efficacy of Civil soft Quick Series in the Desi...
IRJET- 	 Determination of the Efficacy of Civil soft Quick Series in the Desi...IRJET- 	 Determination of the Efficacy of Civil soft Quick Series in the Desi...
IRJET- Determination of the Efficacy of Civil soft Quick Series in the Desi...
 
Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
Application of building information modelling tools for green building design
Application of building information modelling tools for green building designApplication of building information modelling tools for green building design
Application of building information modelling tools for green building design
 

More from VISHNU VIJAYAN

RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTERECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTEVISHNU VIJAYAN
 
Foundation Engineering
Foundation Engineering Foundation Engineering
Foundation Engineering VISHNU VIJAYAN
 
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTORSTUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTORVISHNU VIJAYAN
 
An Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water TreatmentAn Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water TreatmentVISHNU VIJAYAN
 
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine AggregateMechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine AggregateVISHNU VIJAYAN
 
A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...VISHNU VIJAYAN
 
A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...VISHNU VIJAYAN
 
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...VISHNU VIJAYAN
 
Time-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithmTime-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithmVISHNU VIJAYAN
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)VISHNU VIJAYAN
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTVISHNU VIJAYAN
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTVISHNU VIJAYAN
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGVISHNU VIJAYAN
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE VISHNU VIJAYAN
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)VISHNU VIJAYAN
 

More from VISHNU VIJAYAN (20)

RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTERECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Foundation Engineering
Foundation Engineering Foundation Engineering
Foundation Engineering
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTORSTUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
 
An Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water TreatmentAn Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water Treatment
 
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine AggregateMechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
 
A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...
 
A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...
 
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
 
Time-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithmTime-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithm
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
SCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENTSCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENT
 
PROJECT MANAGEMENT
PROJECT MANAGEMENT PROJECT MANAGEMENT
PROJECT MANAGEMENT
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

A study on the analysis and modeling of multipurpose concert center by the integration of bim

  • 1. A study on the analysis and modeling of multipurpose concert center by the integration of Building information modeling (BIM) VISHNU VIJAYAN Assistant Professor and HOD, Baselios Mathews II College of Engineering, Kerala, India AMINA S VAHAB Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India ELIZABETH M MATHEW Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India JYOTHI JOHNSON Final Year B.Tech Student Department of Civil Engineering, Baselios Mathews II College of Engineering, Kerala, India ABSTRACT In this project we made a sincere attempt to propose a multipurpose auditorium by considering the limitations of existing halls for the same purpose. Our college does not have a separate building for an auditorium. The existing halls have so many limitations such as improper visibility, audibility issues and also in architectural views. An auditorium is a room built to enable the audience to hear and watch various of activities and can also used as an indoor stadium. The project deals with the drafting, modeling, designing, analysis, and estimation using BIM software. BIM (Building Information Modeling) is an intelligent 3d model supported by various software that can be efficiently used for planning, designing, constructing and managing building and infra-structure. Plinth area of proposed auditorium is 8500sqft with a seating capacity of 900nos, Height of the auditorium will be at two levels ,safe bearing capacity of the soil is taken as 200KN/M², Hence the footing is designed as isolated type. All the plans are drawn by using the AUTOCADD 2015.The auditorium is planned as per the guidelines given in the National Building Code (NBC). Design as per IS 456-2000 Plain and reinforced code of practice and the reinforced concrete IS 456-1978 is followed and structural element are done using Staad pro.V8i software ,code of practice for acoustical design of auditorium and cafeteria halls .Telescopic grandstand chairs are introduced for accomplishing the auditorium as multipurpose. Key Words: Building information modeling, BIM, Auditorium, Acoustics and architectural consideration, Auto Cad, Revit, Staad pro, Structural design and Analysis etc. 1. INTRODUCTION An auditorium could be a room built to enable an audience to listen to and watch performances at venues like theatres. Auditorium will be found in entertainment venues, community halls, and theatres and will be used for rehearsal, presentation, arts and cultural activities or as a learning space. Auditorium, conference hall are necessary for an Engineering college. In Baselios Mathews II College of Engineering, there is no special building for Auditorium. In this project we made a sincere attempt to propose a multipurpose auditorium by considering the limitations of existing halls for the same purpose. Our college does not have a separate building for an auditorium. The existing halls have so many limitations such as improper visibility, audibility issues and also in architectural views. We have two facilities for the same purpose, one is the seminar hall at the ground floor and other is main gathering hall at the second floor. While considering the seminar hall it is insufficient for gathering all crowd in our college at once ie, insufficient space. Insight of floor it is made as stepped for which provide proper visibility but inturn it reduces the height of the hall at the rear side which is not the standard minimum. For avoiding the intermediate columns grid beams are used. Grid beams are good for load carrying without columns and fot proper acoustics but there its dept is too large which affects its architectural side. In case of the main hall at the second floor, the hall is essentially big but there use of intermediate colums affects the visibility. There is also the acoustics issues in which sound make echos. And it is not arranged a stage and proper seating. The floor is flat and while using normal chairs there is a problem of vision. These halls cannot be used for arts functions and we are using temporary stages for the purpose which cause additional expenses. Also our college is conducting so many national and international programs. We thought that the existing facility is not feasible for such programs. We are proposing a concert center in which it is established as a separate building, where all the limitations of the existing halls have given more importance. It can be used for conducting national and international conference, seminars, functions like arts, tech fest, sports or any other celebrations, speeches and so on. We attempted to make it as a multipurpose auditorium by use. This project reports on the proposal of an auditorium including drafting, analysis, designing and estimation. Analysing and designing all structural components. Isolated footing is adopted for all columns. Safe bearing capacity of soil is taken as 200kN/m2.Limit state method is used for structural design. Adopting M20 concrete and Fe415 HYSD bars for the design. Site plan, plan of the building, section of the building, elevation of the building and detailing of reinforcements for Beam, Column, and Footing are also enclosed.. Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3837
  • 2. 1.1 Building information modeling [BIM] The idea of BIM was arise in 70's and then it is called Building Description System (BDS).The word Building Model was first used in 1985.In 2002 Autodesk published the paper entitled Building Information Modeling. Building Information Modeling is intelligent 3D software which help in coordination, collaboration, reducing errors at the time of construction, productivity, profitability and motivate during the entire lifecycle of the project such as (plan, design, build operation, and maintenance). Every minute details of the building can be available by using this software. This model can be used to analyse the design and also provide a clear view of the building to the designer and to the client before the construction which may increase the efficiency of the construction procedures Currently BIM software is used in all sectors such as public and private for efficient completing of the project. Future potentials • Improve visualization • Improve collaboration and coordination • Good relation between designer and client • Speed and progress of work • Reduce the cost 1. Process: It is the order of work from the starting to the end of the construction; it will provide the output of each stage 2. Policies: Policies refer to the measure that should be adopted for each construction process. It may reduce the argument between the client and the designer and which may enhance a good relation between them. 3. Information: Information are one of the important element of BIM, there are two type of information system models and documents, models means it is clarifying the objects, roads etc., and they are stored in files and documents are the digital version of the print, drawings etc. 4. Technology: Software and hardware tools are used for various stages for BIM. 1.2 Telescopic grandstand chairs Telescopic seating system is commonly used in different spaces like stadiums , Theatres, and all kinds of public gathering places, advantage of these chair is it is space saving. You will enjoy all the events comfortably in sitting on the telescopic grandstand chairs. It is pulled and extended in a shape of steps. It is retractable and by this way you can save a lot of spaces, and carry out another activities. It is operated in such a way that normally opened and folded manually. The larger set of chairs can be operated by motorised , automatic opening, remote control devices etc are used. Advantages: Flexibility, Economic, Space saving, Comfort, Perfectly normal structure that can withstand a load of 600kg/sqm , Ideal in education, sports halls or small theatres. Limitations: Floor must be suitable for structure to be rolled over its on wheels provided, The floor must be able to withstand the stress due to weight of the grandstand Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3838
  • 3. Fig 1.1 Telescopic grandstand chairs 2. OBJECTIVE AND SCOPE 1. To study the modern architectural features of convention Centre. 2. To carry out a investigation on BIM software and its benifits. 3. Use technique skill and modern tools necessary for the construction engineering and management practices. 4. Determine how structural analysis, design and detailing software helps to a project. 5. To study the workflow of the process from design execution. 3. ACOUSTICS AND ARCHITECTURAL CONSIDERATIONS Acoustics can be defined as the sound produced in a compressed atmosphere. There are some design considerations that must be taken into account for the design of the hall for any public gathering. They are given in code of practice for acoustical design of auditorium and conference halls IS2526-1963. We also consider some of the criteria from the code as possible, following consideration are taken in the design of the proposed auditorium. 1. Selection of site The site should keep distance from major source of noise, that is building should be planned as far as possible from any potential noise such as highways, train tracks, or industrial areas. The auditorium building be isolated from potential noises from other buildings. 2. Volume The size of the auditorium should remain optimum. The maximum length can be provided is 30m. The main goal while considering the volume of auditorium, is that to reduce the sound energy loss for the audience should be close to the sound source as possible and there by reducing the distance that the sound must travel. 3. Shape and form For proper acoustics the shape of the hall should be properly selected. The stage to audience distance can be minimized by carefully considering the geometry of the room. The rectangular shoe box type hall with a stage on narrow end may be excellent for proper acoustics and a greater ratio of reverberation sound is desirable. Due to the less availability of space that is due to the less width of the plot we provide a rectangular geometry. However rectangular geometry is only suitable for small halls. The rear walls should be either flat or convex in shape and splayed side walls must be preferable. 4. Use of absorbent There are so many sound absorbing materials available in the market, such as sound absorbing panels and sound proofing materials that can be used to eliminate sound reflections, some types of sound absorbing materials are i. Acoustical foam panels ii. Fabric wrapped panels iii. Acoustical wall coverings iv. Ceiling tiles 5. Sighting A sight line is a clear line of sight between spectator and the stage, it is one of the most important factor to be considered at the time of construction of an auditorium, conference hall, or a seminar hall, so the designer should check properly the way which seating are to be arranged. These are the grasping and inspecting angles obtained from the viewer’s mental perception and inspecting angles for a good look from all sides.  30⁰ -no movement  60⁰ - Slight movement  110⁰-more eye movement  360⁰-full head and shoulder movement For good eye sight the consecutive rows of the seats should be elevated over the foregoing one.The elevation being raised on the principle that each viewer shall raised with the person sitting successively of him, so that the viewer head is 0.15m above the way of sound which overlook the head of the person sitting in front of him. Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3839
  • 4. Top of the balcony should not be more than 65feet above the stage to avoid lower path difference and ceiling should be 1/3(larger halls) or 2/3(smaller halls) of average width of the auditorium 4. PLANNING The plan, section and elevation of the proposed building is drawn by using AutoCAD(2016). Autocad is computer aided design software that helps for creating 2D and 3D drawings. The proposed plot is in rectangle shape. We measured the plot by using tape. The total area of the plot is 15400sqft. Hence we decided to build a rectangular shaped building which may utilize the size to its maximum. Table 4.1 Faciliities in the auditorium Facilities Provided Dimension Assembly hall 30m x 20m Green room 3m x 5m (2nos) Office room 4m x 4m Guest room 3m x 5m Technical room 4m x 5.5m Store room 3m x5m Toilet & Wash area 0.8m x 1.2m (20nos) Cafeteria ( as a separate unit) 7m x 20m Fig 4.1 Floor Plan Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3840
  • 5. Fig 4.2 Section 5. MODELLING Modelling is the representation of a structure to understand the design of a building, which may help to understand 3D model and help to communicate with the customers about the building appearance. We use REVIT 2015 software for modelling of our proposed building. Fig 5.1 Interior view Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3841
  • 6. Fig 5.2 Interior view Fig 5.3 Exterior view 6. DESIGNING & DETAILING Design is a concept that pays particular attention to various elements of a building like roof, beams, columns etc. and can be done by the software STADD Pro V8i. The structural design is mainly focused on stability, strength and rigidity of structures. The main aim of the structural design is make the structure capable for withstanding the applied loads. Here we use Limit state method for structural design. Adopting M20 concrete and Fe415 HYSD bars for the design. 6.1 Design of Beams M30 Fe415 (Main) Fe415 (Sec.) Length: 4000.0 mm Size: 400.0 mm X 400.0 mm Cover: 25.0 mm Sheardesignresultsat 569.0 mm away from start support VY =5.41 MX =0.00 LD=1 Provide 2 Legged 8í @ 225 mm c/c Sheardesign resultsat 569.0 mm away from end support VY =-5.41 MX =0.00 LD=1 Provide 2 Legged 8í @ 225 mm c/c 6.2 Design of column M30 Fe415 (Main) Fe415 (Sec.) Length: 4000.0 mm Cross section: 400.0 mm X 400.0 mm Cover: 40.0 mm Guiding load case:1 End joint:1 Tension column Reqd. Steel area : 1280.00 Sq.mm. Reqd. concrete area: 158720.00 Sq.mm. Main reinforcement : Provide 12 - 12 dia. (0.85%,1357.17 Sq.mm.) (Equally distributed) Tie reinforcement : Provide 8 mm dia. rectangular ties @ 190 mm c/c Section capacity based on reinforcement required (KNS-MET) Puz :2541.12 Muz1 : 75.65 Muy1 :75.65 Interaction ratio: 0.00 (as per Cl. 39.6, IS456:2000) Secction capacity based on reinforcement provided (KNS-MET) Worst load case: 1 End joint: 2 Puz :2564.10 Muz :79.72 Muy :79.72 Interaction ratio: 0.00 Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3842
  • 7. 6.3Design of footing Footing Geomtery Design Type : Calculate Dimension Footing Thickness (Ft) : 12.000 in Footing Length - X (Fl) : 40.000 in Footing Width - Z (Fw) : 40.000 in Eccentricity along X (Oxd) : 0.000 in Eccentricity along Z (Ozd) : 0.000 in Design Parameters Concrete and Rebar Properties Unit Weight of Concrete : 150.000 lb/ft3 Strength of Concrete : 4.000 ksi Yield Strength of Steel : 60.000 ksi Minimum Bar Size : #3 Maximum Bar Size : #10 Minimum Bar Spacing : 2.000 in Maximum Bar Spacing : 18.000 in Pedestal Clear Cover (P, CL) : 3.000 in Footing Clear Cover (F, CL) : 3.000 in Soil Properties Soil Type : UnDrained Unit Weight : 112.000 lb/ft3 Soil Bearing Capacity : 4.000 kip/ft2 Soil Surcharge : 0.000 kip/in2 Depth of Soil above Footing : 0.000 in Undrained Shear Strength : 0.000 kip/in2 Design for Flexure about Z Axis (For Reinforcement Parallel to X Axis) Based on spacing reinforcement increment; provided reinforcement is #3 @ 8.000 in o.c. Design For Top Reinforcement Parallel to Z Axis Based on spacing reinforcement increment; provided reinforcement is #3 @ 8.000 in o.c. Design For Top Reinforcement Parallel to z Axis Based on spacing reinforcement increment; provided reinforcement is #3 @ 8 in o.c. Design For Top Reinforcement Parallel to X Axis Based on spacing reinforcement increment; provided reinforcement is#4 @ 16 in o.c. Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3843
  • 8. Fig 6.1 Isolated footing 7. STRUCTURAL ANALYSIS Here we are using STAAD Pro software for analysing the structure, it is the best structural analysis software. In structural analysis we determine the effect of load on the building and structural components. Structural analysis is a method where we are able to find out how a structure behave under certain loads or combination of loads, it is to understand the support reactions, bending moment, shear force, deflection etc. The analysis is done through member structural member properties and support specification and modelling. The dimensions of all the structural members as per the preliminary design and it is assigned. The support specification of assigned. Fig 7.1Displacement of loadcase 1 Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3844
  • 9. Fig 7.2 Stress details Fig 7.3 Load case details Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3845
  • 10. Fig 7.4 Whole structure loads Fig 7.55 Load case 8. ESTIMATION Estimation is the approximate cost of construction calculated before the construction starting. Estimation is the approximate calculation of the amount, for the construction of the building. If the fund available is less than the estimated cost which may cause delay in the work. For producing an estimate the cost of unit materials should be known.Long wall short wall method is used and estimation is done by manually. The total cost of the auditorium isRS.6505282/- Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3846
  • 11. 9. CONCLUSION Our project was successfully completed by the joint effort of the concerned faculty member and the members of the project. We have completed this project with best of our ability and knowledge and satisfying the requirement of an educational building. The project was focused on the planning, design, analysis of an concert hall in our college, by using an intelligent 3-d software Building Information Modeling (BIM). The project consists of designing of structural members like beams, columns, footings etc., Design by AutoCAD 2015 design and analysis by Stadd pro V8i. BIM improve its design quality and collaborate in real time to support project delivery process. The design and analysis are done by the IS specifications. This project helps us to study work flow process from design execution, and to study the modern architectural features of convention Centre, to carry out research on BIM technology. We also learned that the success of an auditorium depend on architectural and acoustics considerations, acoustics plays an important role in enhancing the desirable sounds and eliminating the unwanted noise and architectural for the proper vision. The final estimated cost for the completion of the project is RS.6505282/- We made this proposal according to the requirements so, we hope that the proposal will be accepted and implemented by the concerned authorities and it should be asset for our Civil Engineering Department. ACKNOWLEDGEMENT The author thanks, faculty member of BMCE, technical staff of Arcite institute, our parents and our friends for their valuable time spending with me for the completion of this project. REFERENCES 1. A.Q Saraireh, Ibrahim Moh'd and Haron, Ahmad Tarmizi, ‘’Understanding the Conceptual of Building Information Modeling‘’, International journal of Academic research in business and social science, 8(1),957-963, 2018 2. Miss. Irin Ann Isaac and Dr. Anoop CK, ‘’ Analysis of BIM and scope of BIM in India’’, IJERT, Vol 08, issue 11, 2019 3. C.R Vigneshwar, “Planning, Analysis, Designing and Estimation of an auditorium”, isjournals, Vol 03, issue 01, 2018 4. Ch. Pratysha, V. Vijaya KumarPlanning, “Analysis and Design of Auditorium”, International journal for technical research in engineering, Vol 04, issue 12, 2017 5. Vijayan, Vishnu and V, ACHU and Riyana, M. S. and Jayakrishnan, R., Time-Cost-Risk Optimization in Construction Work by using Ant Colony Algorithm (April 4, 2018). International Research Journal of Engineering and Technology, Volume: 05 Issue: 04 | Apr-2018. Available at SSRN: https://ssrn.com/abstract=3570079 6. Vijayan, Vishnu, A Comparative Study on Sustainable Building Construction with Conventional Residential Building (April 20, 2018). International journal of current engineering and scientific research (ijcesr), 2018. Available at SSRN: https://ssrn.com/abstract=3591429 7. Vijayan, Vishnu, A Study on Flyover Construction with Eco Technical Road System (June 2, 2018). International Journal of Emerging Technologies and Innovative Research, 2018. Available at SSRN: https://ssrn.com/abstract=3591306 8. Vijayan, Vishnu and V, ACHU and M. S., Riyana, Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate (April 5, 2018). International Journal of Current Engineering and Scientific Research Volume 5-issue-4-2018. Available at SSRN: https://ssrn.com/abstract=3570084 9. C.M.F Pangu,M.S Prawirasasra, Abrar Ismardi, “Measurement of acoustics performance of an auditorium”,IOP publishing, 2017 10. Kabiru Maishanu and Dr Halil Zafer Alibaba, “Auditorium acoustics from past to present”, Int journal of engineering research and application, vol 07, issue01, 2017 11. zhonghua gou, Acoustic Design for an Auditorium Project Using Building Performance Simulation to Enhance Architectural Quality, 2017 12. Vijayan, Vishnu and M. S., Riyana, A Study About the Status of Implementation on Safety Standards and Legal Requirements Pertaining to Construction Safety (April 4, 2018). Journal of Emerging Technologies and Innovative Research, April 2018, Volume 5, Issue 4. Available at SSRN: https://ssrn.com/abstract=3496217 13. Vijayan, Vishnu, An Experimental Study on Chitosan for Water Treatment (May 28, 2018). Available at SSRN: https://ssrn.com/abstract=3591432 or http://dx.doi.org/10.2139/ssrn.3591432 14. Vijayan, Vishnu and Jasna Jamal. "A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using GFRP Sheets." International Journal for Scientific Research and Development 6.1 (2018): 659-663 15. Vijayan, Vishnu, et al. "a study on sustainable and cost effective building construction in housing sector." (2019). International Journal of Current Engineering And Scientific Research vol.6, issue 6, 16. Vijayan, Jasna Jamal1 Vishnu. "A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using GFRP Sheets." Mukt Shabd Journal Volume IX, Issue VI, JUNE/2020 ISSN NO : 2347-3150 Page No : 3847