SlideShare a Scribd company logo
1 of 35
INTRODUCTION
Transportation plays a vital role in
any economy.
Transportation is a key
element for the success of a
business enterprise which is a
manufacturing organisation.
Products or goods
manufactured by any firm
need to be distributed
efficiently and effectively to
its distributors, dealers, sub-
dealers etc.
STRUCTURE OF A TRANSPORT PROBLEM
IN A TRANSPORTATION PROBLEM, WE MAKE FOLLOWING ASSUMPTIONS:
 The number of supply centre are finites and known
 The number of demand centers are finite and known
 Supply from each supply centre is constant for the given problem.
 Demand at each Demand centre is constant for the given problem.
 Cost of transporting one unit from each supply centre to each demand centre
is constant for the given problem.
INITIAL FEASIBLE SOLUTION
NWCR
(NORTH – WEST CORNER
METHOD)
LCM
(LEAST COST METHOD)
VAM
(VOGEL’S APPROXIMATION
METHOD)
Problem No 01
A company has 3 factories F1, F2 and F3 with production capacities of
11, 13 and 19 unit (in thousand). It has four warehouses W1, W2, W3
and W4 with demands of 6,10,12 and 15 respectively. Unit cost of
transportation is given from each warehouse
W1 W2 W3 W4
F1 42 32 50 26
F2 34 36 28 46
F3 64 54 36 82
Cost in Rs
Based on the above information
1) Construct a Transportation table
2) Find Initial Feasible Solution By
a) Northwest Corner Method
(NWCM)
b) Least Cost Method (LCM)
c) Vogel’s Approximation Method
(VAM)
STEP 1: - PROBLEM IS
BALANCED/UNBALANCED
Supply Demand
F1  11 W1 = 6
F2  13 W2 = 10
F3  19 W3 = 12
W4 = 15
Total = 43 Total = 43
A company has 3 factories F1, F2 and F3
with production capacities of 11, 13 and
19 unit (in thousand). It has four
warehouses W1, W2, W3 and W4 with
demands of 6,10,12 and 15 respectively.
Unit cost of transportation is given from
each warehouse
The problem is balanced as supply units are equal to Demand Units i.e.
43 = 43
STEP 2:- MINIMIZATION/ MAXIMISATION
The problem is of Minimization as this
problem is related to cost.
STEP 3:- CONSTRUCTION OF TRANSPORTATION
TABLE
W1 W2 W3 W4
F1 42 32 50 26
F2 34 36 28 46
F3 64 54 36 82
Cost in Rs
NWCM (North West Corner Method]
NWCR (North West Corner Method]
Factory Warehouse Units Cost Price Total Cost
F1 W1 6 42 6 x 42 = 252
F1 W2 5 32 5 x 32 = 160
F2 W2 5 36 5 x 36 = 180
F2 W3 8 28 8 x 28 = 224
F3 W3 4 36 4 x 36 = 144
F3 W4 15 82 15 x 82 = 1230
TOTAL COST BY NWCR = RS. 21,90,000
 In LCM , we start giving allocation from the lowest cost cell in the Transportation table
 Then we proceed to the next available lowest cost and so on until all supply and
demand centres are exhausted.
LEAST COST METHOD
Find the lowest
cost from the
matrix
i.e. 26
Find next
lowest
value
Is 28
LEAST COST METHOD
From Warehouse Units Cost Total
F1 W4 11 26 11 x 26 = 286
F2 W1 1 34 1 x 34 = 34
F2 W3 12 28 12 x 28 = 336
F3 W1 5 64 5 X 64 = 320
F3 W2 10 54 10 x 54 = 540
F3 W4 4 82 4 x 82 = 328
1844 x 1000 =
1844000
Total Transportation Cost () = Rs. 18,44,000
Vogel’s Approximation Method
(VAM)
 Vogel’s Approximation method is based on the concept of penalty
 Penalty = Difference between two lowest costs for Row or Column
 We calculate penalty for each row and column
 Rule of allocation is to compare all penalties (of all rows and columns)
 Then we start with that row or column which has maximum penalty and in that
row or column we give allocation in minimum cost.
 Rule of Allocation : Maximum Penalty and Minimum cost.
P1 with Row penalty
F1 = 32 – 26 = 6
F2 = 34 – 28 = 6
F3 = 54- 36 = 18
W1 = 42 – 34 = 8
W2 = 36 – 32 = 4
W3 = 36 – 28 = 8
W4 = 46 – 26 = 20
Choose the highest of the penalty
Choose the 20 as it is highest and W4 is the
column and from that column choose the least
cost 26
As this row i.e. F1 is exhausted then the Cross that row penalty
P2 with Row penalty
F2 = 34 – 28 = 6
F3 = 54- 36 = 18
P2 For Column Penalty
W1 = 64 – 34 = 30
W2 = 54 – 36 = 18
W3 = 36 – 28 = 8
W4 = 82 – 46 = 36*
Choose the smallest cost i.e. 46 and W4 requirement is 4 and that
demand is over then close the W4
W4 is completed then close the
W4 Column Penalties
Calculation of P3 Row Penalty
F2 = 34 – 28 = 6
F3 = 54 – 36 = 18
Calculation of P3 column penalty
W1 = 64 – 34 = 30*
W2 = 54 – 36 = 18
W3 = 36 – 28 = 8
The highest penalty is 30 then choose W1
Choose the smallest cost i.e. 34
Allocate the 6 units of W1
W1 is exhausted and column penalty is closed
With same process we will solve the P4 penalty of row and column
As the penalty of F3 and W2 penalty = 18
If this case then select that penalty where we allocate
maximum allocation
We will choose F3
Now least of the column from W2 i.e. 36 and allocate the units
From Warehouse Units Cost Total
F1 W4 11 26 11 x 26 = 286
F2 W1 6 34 6 x 34 = 204
F2 W2 3 36 3 x 36 = 108
F2 W4 4 46 4 x 46 = 184
F3 W2 7 54 7 x 54 = 378
F3 W3 12 36 12 x 36 = 432
Total cost by VAM 1592 *1000 =
1592000
IFS Method IFS Cost
1) NWCR Rs. 21,90,000
2) LCM Rs. 18,44,000
3) VAM Rs. 15,92,000
SUMMARY
Problem No 02
A company has three plants A, B, C for which capacities are 7, 10 and 18
units. It has four warehouses P,Q,R, S for which demands are 5, 8, 7 and
15 units.
Unit cost of transportation is given from each warehouse
Cost in Rs
Based on the above information
1) Construct a Transportation table
2) Find Initial Feasible Solution By
a) Northwest Corner Method
(NWCR)
b) Least Cost Method (LCM)
c) Vogel’s Approximation Method
(VAM)
Plant P Q R S
A 38 60 100 24
B 140 60 80 120
C 80 20 120 40
Transportation.pptx

More Related Content

Similar to Transportation.pptx

Mba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problemsMba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problemsRai University
 
QABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptxQABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptxhonakjannu789
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemVivekSaurabh7
 
VOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODVOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODSwethaShree13
 
Transportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionTransportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionDrDeepaChauhan
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptxAjinRk2
 
Unbalanced Transportation Problem
Unbalanced Transportation ProblemUnbalanced Transportation Problem
Unbalanced Transportation ProblemDrDeepaChauhan
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation pptDeepika Bansal
 
NORTH WEST CORNER METHOD
NORTH WEST CORNER METHODNORTH WEST CORNER METHOD
NORTH WEST CORNER METHODRashiPandey16
 
Transportation and transshipment problems
Transportation  and transshipment problemsTransportation  and transshipment problems
Transportation and transshipment problemsDr. Adinath Damale
 
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”IOSRJM
 
Cost theory and analysis.pptx
 Cost theory and analysis.pptx Cost theory and analysis.pptx
Cost theory and analysis.pptxSominaKhanSneegdha
 
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptxPresentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptxIBMRD Ahmednagar
 
VAM and MODI Method in Solving Transportation Problems
VAM and MODI Method in Solving Transportation ProblemsVAM and MODI Method in Solving Transportation Problems
VAM and MODI Method in Solving Transportation ProblemsKarlo Maniego
 
Top school in delhi ncr
Top school in delhi ncrTop school in delhi ncr
Top school in delhi ncrEdhole.com
 
03-Unit Three -OR.pptx
03-Unit Three -OR.pptx03-Unit Three -OR.pptx
03-Unit Three -OR.pptxAbdiMuceeTube
 

Similar to Transportation.pptx (20)

Mba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problemsMba i qt unit-1.2_transportation, assignment and transshipment problems
Mba i qt unit-1.2_transportation, assignment and transshipment problems
 
Operation Research
Operation ResearchOperation Research
Operation Research
 
QABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptxQABD Transportation problems-UNIT-3.pptx
QABD Transportation problems-UNIT-3.pptx
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
VOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODVOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHOD
 
Assign transportation
Assign transportationAssign transportation
Assign transportation
 
Transportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionTransportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible Solution
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptx
 
Unbalanced Transportation Problem
Unbalanced Transportation ProblemUnbalanced Transportation Problem
Unbalanced Transportation Problem
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation ppt
 
NORTH WEST CORNER METHOD
NORTH WEST CORNER METHODNORTH WEST CORNER METHOD
NORTH WEST CORNER METHOD
 
Transportation and transshipment problems
Transportation  and transshipment problemsTransportation  and transshipment problems
Transportation and transshipment problems
 
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”
“An Alternate Approach to Find an Optimal Solution of a Transportation Problem.”
 
Cost theory and analysis.pptx
 Cost theory and analysis.pptx Cost theory and analysis.pptx
Cost theory and analysis.pptx
 
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptxPresentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
Presentation%20on%20Transportation%20and%20Assignment%20Problem.pptx
 
VAM and MODI Method in Solving Transportation Problems
VAM and MODI Method in Solving Transportation ProblemsVAM and MODI Method in Solving Transportation Problems
VAM and MODI Method in Solving Transportation Problems
 
Top school in delhi ncr
Top school in delhi ncrTop school in delhi ncr
Top school in delhi ncr
 
03-Unit Three -OR.pptx
03-Unit Three -OR.pptx03-Unit Three -OR.pptx
03-Unit Three -OR.pptx
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Transportation technique
Transportation techniqueTransportation technique
Transportation technique
 

Recently uploaded

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Recently uploaded (20)

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Transportation.pptx

  • 1.
  • 2. INTRODUCTION Transportation plays a vital role in any economy. Transportation is a key element for the success of a business enterprise which is a manufacturing organisation. Products or goods manufactured by any firm need to be distributed efficiently and effectively to its distributors, dealers, sub- dealers etc.
  • 3. STRUCTURE OF A TRANSPORT PROBLEM IN A TRANSPORTATION PROBLEM, WE MAKE FOLLOWING ASSUMPTIONS:  The number of supply centre are finites and known  The number of demand centers are finite and known  Supply from each supply centre is constant for the given problem.  Demand at each Demand centre is constant for the given problem.  Cost of transporting one unit from each supply centre to each demand centre is constant for the given problem.
  • 4. INITIAL FEASIBLE SOLUTION NWCR (NORTH – WEST CORNER METHOD) LCM (LEAST COST METHOD) VAM (VOGEL’S APPROXIMATION METHOD)
  • 5. Problem No 01 A company has 3 factories F1, F2 and F3 with production capacities of 11, 13 and 19 unit (in thousand). It has four warehouses W1, W2, W3 and W4 with demands of 6,10,12 and 15 respectively. Unit cost of transportation is given from each warehouse W1 W2 W3 W4 F1 42 32 50 26 F2 34 36 28 46 F3 64 54 36 82 Cost in Rs Based on the above information 1) Construct a Transportation table 2) Find Initial Feasible Solution By a) Northwest Corner Method (NWCM) b) Least Cost Method (LCM) c) Vogel’s Approximation Method (VAM)
  • 6. STEP 1: - PROBLEM IS BALANCED/UNBALANCED Supply Demand F1  11 W1 = 6 F2  13 W2 = 10 F3  19 W3 = 12 W4 = 15 Total = 43 Total = 43 A company has 3 factories F1, F2 and F3 with production capacities of 11, 13 and 19 unit (in thousand). It has four warehouses W1, W2, W3 and W4 with demands of 6,10,12 and 15 respectively. Unit cost of transportation is given from each warehouse The problem is balanced as supply units are equal to Demand Units i.e. 43 = 43
  • 7. STEP 2:- MINIMIZATION/ MAXIMISATION The problem is of Minimization as this problem is related to cost. STEP 3:- CONSTRUCTION OF TRANSPORTATION TABLE W1 W2 W3 W4 F1 42 32 50 26 F2 34 36 28 46 F3 64 54 36 82 Cost in Rs
  • 8. NWCM (North West Corner Method]
  • 9. NWCR (North West Corner Method] Factory Warehouse Units Cost Price Total Cost F1 W1 6 42 6 x 42 = 252 F1 W2 5 32 5 x 32 = 160 F2 W2 5 36 5 x 36 = 180 F2 W3 8 28 8 x 28 = 224 F3 W3 4 36 4 x 36 = 144 F3 W4 15 82 15 x 82 = 1230 TOTAL COST BY NWCR = RS. 21,90,000
  • 10.  In LCM , we start giving allocation from the lowest cost cell in the Transportation table  Then we proceed to the next available lowest cost and so on until all supply and demand centres are exhausted. LEAST COST METHOD Find the lowest cost from the matrix i.e. 26
  • 13.
  • 14.
  • 15. From Warehouse Units Cost Total F1 W4 11 26 11 x 26 = 286 F2 W1 1 34 1 x 34 = 34 F2 W3 12 28 12 x 28 = 336 F3 W1 5 64 5 X 64 = 320 F3 W2 10 54 10 x 54 = 540 F3 W4 4 82 4 x 82 = 328 1844 x 1000 = 1844000 Total Transportation Cost () = Rs. 18,44,000
  • 16. Vogel’s Approximation Method (VAM)  Vogel’s Approximation method is based on the concept of penalty  Penalty = Difference between two lowest costs for Row or Column  We calculate penalty for each row and column  Rule of allocation is to compare all penalties (of all rows and columns)  Then we start with that row or column which has maximum penalty and in that row or column we give allocation in minimum cost.  Rule of Allocation : Maximum Penalty and Minimum cost.
  • 17.
  • 18. P1 with Row penalty F1 = 32 – 26 = 6 F2 = 34 – 28 = 6 F3 = 54- 36 = 18
  • 19. W1 = 42 – 34 = 8 W2 = 36 – 32 = 4 W3 = 36 – 28 = 8 W4 = 46 – 26 = 20
  • 20. Choose the highest of the penalty Choose the 20 as it is highest and W4 is the column and from that column choose the least cost 26
  • 21.
  • 22. As this row i.e. F1 is exhausted then the Cross that row penalty
  • 23. P2 with Row penalty F2 = 34 – 28 = 6 F3 = 54- 36 = 18 P2 For Column Penalty W1 = 64 – 34 = 30 W2 = 54 – 36 = 18 W3 = 36 – 28 = 8 W4 = 82 – 46 = 36*
  • 24. Choose the smallest cost i.e. 46 and W4 requirement is 4 and that demand is over then close the W4
  • 25. W4 is completed then close the W4 Column Penalties Calculation of P3 Row Penalty F2 = 34 – 28 = 6 F3 = 54 – 36 = 18 Calculation of P3 column penalty W1 = 64 – 34 = 30* W2 = 54 – 36 = 18 W3 = 36 – 28 = 8
  • 26. The highest penalty is 30 then choose W1 Choose the smallest cost i.e. 34 Allocate the 6 units of W1
  • 27. W1 is exhausted and column penalty is closed
  • 28. With same process we will solve the P4 penalty of row and column As the penalty of F3 and W2 penalty = 18 If this case then select that penalty where we allocate maximum allocation We will choose F3
  • 29.
  • 30. Now least of the column from W2 i.e. 36 and allocate the units
  • 31.
  • 32. From Warehouse Units Cost Total F1 W4 11 26 11 x 26 = 286 F2 W1 6 34 6 x 34 = 204 F2 W2 3 36 3 x 36 = 108 F2 W4 4 46 4 x 46 = 184 F3 W2 7 54 7 x 54 = 378 F3 W3 12 36 12 x 36 = 432 Total cost by VAM 1592 *1000 = 1592000
  • 33. IFS Method IFS Cost 1) NWCR Rs. 21,90,000 2) LCM Rs. 18,44,000 3) VAM Rs. 15,92,000 SUMMARY
  • 34. Problem No 02 A company has three plants A, B, C for which capacities are 7, 10 and 18 units. It has four warehouses P,Q,R, S for which demands are 5, 8, 7 and 15 units. Unit cost of transportation is given from each warehouse Cost in Rs Based on the above information 1) Construct a Transportation table 2) Find Initial Feasible Solution By a) Northwest Corner Method (NWCR) b) Least Cost Method (LCM) c) Vogel’s Approximation Method (VAM) Plant P Q R S A 38 60 100 24 B 140 60 80 120 C 80 20 120 40