Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Strayer cis 348 week 10 term paper change management
1. STRAYER CIS 348 Week 10 Term Paper Change
Management, Communication and Leadership (2
Papers) NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-348-
strayer/cis-348-week-10-term-paper-change-
management,communication-and-leadership-
recent
For more classes visit
http://www.uopassignments.com/
This Tutorial contains 2 Papers
CIS 348 Week 10 Term Paper Change Management,
Communication and Leadership
Write an eight to ten (8-10) page paper in which
you:
Explain the project procurement process.
Explain how change control is implemented in the
information technology processes.
2. Analyze the required elements of a communication
plan.
Describe the different organizational structures as
it relates to project management (i.e., functional,
project-based, matrix).
Assess the importance of the project manager’s
role in organizational leadership.
Examine the different leadership approaches and
determine when each approach is best utilized.
Describe three (3) conflict resolution techniques
that project managers can utilize to keep team
members productive.
Describe five (5) ethical situations that project
managers may face in their role.
Explain the role of technology in project
management.
Use at least two (2) quality resources in this
assignment. Note: Wikipedia and similar Websites
do not qualify as quality resources.
Your assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman
font (size 12), with one-inch margins on all sides;
citations and references must follow APA or
school-specific format. Check with your professor
for any additional instructions.
Include a cover page containing the title of the
3. assignment, the student’s name, the professor’s
name, the course title, and the date. The cover
page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated
with this assignment are:
Prepare strategies to manage project resources to
include human resources, capital equipment, and
time.
Summarize the project procurement process
including external acquisition and outsourcing.
Design project execution activities including
change control and communicating project status.
Summarize methods to control technology
projects through information tracking and cost
and change control techniques.
Evaluate the ethical issues in complex project
environments.
Identify and plan communication strategies for
project constituents and stakeholders across
global teams and those internal to the
organization.
Use technology and information resources to
research issues in information systems and
technology.
Write clearly and concisely about Information
Technology Project Management topics using
4. proper writing mechanics and technical style
conventions.
Grading for this assignment will be based on
answer quality, logic / organization of the paper,
and language and writing skills, using the