SlideShare a Scribd company logo
1 of 16
Download to read offline
Shivee Energy integrated energy complex
...As far as the production of energy, “Shivee Energy” proj-
ect is being implemented. First, we need to build 4 to 5
power plants to ensure the supply of energy over the next
10 years. By doing so, we will be capable of fully supplying
domestic energy demands in the next 10 to 15 years.
In the long run, once our energy supply exceeds domestic
demand, we intend to export the excess energy. Under this
requirement, we will continue to utilize our thermal coal.
We have an abundant amount of natural resources, which
are in high global demand and we have the opportunity to
utilize and process those resources efficiently...
Prime Minister of Mongolia, Erdenebat Jargaltulga
“
“
100-day report of the Government of Mongolia
27.10.2016
Shivee Energy integrated energy complex
Project Profile
2016
Shivee Energy integrated energy complex
Summary
Introduction
About Us
Project Overview	
Location
Exploration History
	
Resource Data
Mining Licenses
Project Description	
Regulatory Environment
Feasibility Study
Contact
Contents
* Any information mentioned in this com-
pany profile contains no conflict of interest
and is intended for internal introductory
purposes only. All data and information
regarding operations are in the research
stages and may change depending on the
market conditions.
05
06
07
09
10
10
11
12
13
14
15
16
Shivee Energy integrated energy complex
Summary
Resources:
Renewable energy (wind, solar)
Coal-1,303.1 Mt and Coal bed methane (CBM)
Feasibility Study:
Pre-feasibility Study- Completed in April, 2016
Feasibility Study- Expected to be completed
in November, 2016 by State Grid Corporation
of China
Our aim:
Our project aim is to build integrated
eco-friendly and economical coal and
renewable energy based power plant to
supply energy to both domestic and Chinese
market as well as Northeast Asia
Project Developer: Erdenes Shivee Energy LLC
Shareholders:
Erdenes Mongol, LLC & Aq Sora, LLC
Ulaanbaatar
Russia
China
Mongolia
Legend
ESE project Transmission line
Northeast Asia
interconnection
Coal mineWind power plant
Solar power plant
Japan
South
Korea
5
Shivee Energy integrated energy complex
Introduction
Mongolia has enormous resources in terms of its mineral reserves and
renewable energy such as wind and solar. Oyu Tolgoi (OT), in the South
Gobi region of the country, is the world’s largest undeveloped cop-
per-gold project and the reserve value of the asset is greater than the en-
tire current GDP level of Mongolia. The government has signed an histor-
ic agreement with Ivanhoe mines and Rio Tinto for the development of
this project. Next biggest project is Tavan Tolgoi (TT) mine, which is the
biggest coal operation in Mongolia. The government is now in process of
selecting the strategic investment partner to take over the management
of Mongolian state-owned firm in charge of TT coal deposit.
It is estimated that the total coal resource of Mongolia is about 175 billion
tons. As of today, there are 300 coal deposits within 15 coal basins in
Mongolia. In addition to the coal resources, 12 active renewable energy
projects including 5 wind energy and 7 solar energy projects now ac-
complishing the research phase and ready to be implemented. Three of
them are planned to be implemented in the area of Choir and Dornogobi
region nearby Shivee-Ovoo, where our company plans to implement the
Shivee Energy Complex Project of Energy Export.
6
Renewable Energy Projects in Mongolia
Enormous amount
of mineral reserves
and renewable
energy source in
Shivee Energy
project area
“
“
Shivee energy
project area
Shivee Energy integrated energy complex 7
“15% of total installed capacity
will be renewable energy”
Shivee Energy integrated energy complex
About Us
Erdenes Shivee Energy, LLC is established as a state and private
joint Mongolian company in accordance with an agreement between
Erdenes Mongol, LLC and Aq Sora, LLC on March 4, 2016.
Erdenes Shivee Energy, LLC was established to provide 1.2 billion
tons of productive capacity resource to the Shivee Energy Complex
Project of Energy Export based on strategical deposit, Shivee-Ovoo.
50 percent of the company is currently owned by Erdenes Mongol,
LLC, a stated owned enterprise and the other 50 percent is owned
by Aq Sora, LLC, a private entitiy that owns shares of Shine Shivee,
LLC. The establishment of Erdenes Shivee Energy, LLC is based
on the Cabinet discussion no. 64 dated on November 16, 2015 to
support the complex project to build a large scale ultra-high voltage
power plant, cross-border transmission lines and coal mine near the
strategical coal deposit, Shivee Ovoo.
On October 26, 2015, “Shivee Energy Complex Project of
Energy Export” project unit was established under the Ministry of
Energy of Mongolia and Erdenes Mongol, LLC by the Government
Resolution no. 422. The main goal of the Project Unit is to provide
the preparatory work of the Feasibilityt Study for renewable energy
power plant, thermal power plant, transmission line, water supply
and coal mine as well as to ensure project implementation.
Today, the company’s headquarters is located at Monnis tower, 13th
floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaan-
baatar-14240, Mongolia. The headquarter office is responsible for
providing legal, accounting, administrative, engineering and geolog-
ical services, international and local procurement, liaison with regu-
latory authorities, logistics, translation, accounting, and coordination
of local and international suppliers and contractors.
Aq Sora
8
Shivee Energy integrated energy complex
Project
Overview
The Company intends to utilize its coal resources to build the
Shivee Energy Complex Project of Energy Export, which will
become the first energy export based project for Mongolia. The
complex project will be an important initiative for Mongolia,
where the country’s energy sector is underdeveloped. By bring-
ing a new idea of combining renewable energy with coal-based
energy in Mongolia, this project will significantly improve the
Mongolian economy and the energy sector.
By building a global scale power plant in Mongolia and exporting
the produced energy, our company will commence a new era in
the Mongolian energy sector. Furthermore, we will build an en-
vironmentally friendly wind farm and solar energy station within
the complex project using the abundant amount of renewable
energy resource of Mongolia. In addition to the project, there is
potential for the company to utilize economic value of CBM prior
to coal mining. This opportunity shall be researched and studied
thoroughly upon funding.
9
...Exporting the
produced energy...
The beginning
of a new era in the
Mongolian energy
sector
“
“
Shivee Energy integrated energy complex
Location
Exploration
History
The project is located in the Shivee Ovoo strategic coal deposit
area in Shivee-Gobi and Sumber soum of Gobi-Sumber province,
Mongolia, as shown in Figure-2. The project location lies 260 km to
the southeast of Ulaanbaatar, the capital city of Mongolia, 20 km
to the southeast of Choir City the provincial capital and 5 km to
the northeast of Shivee-Gobi soum.
From 1986-1988, a huge scale of complex and supplementary
geological exploration work that provides resources evaluation
of Shivee-Ovoo coal deposit. As a result of the exploration coal
resources within Shine Us area was discovered as defined category
of Measured and Indicated resources.
Preliminary exploration covering remained part of the deposit
Oekhii Tsagaan and Nogoon Toirom was carried out during 2007-
2010. In 2011-2012, detailed exploration work performed relating
to the result of the preliminary exploration and coal resources
approved by Mongolian Mineral Resources Professional Council in
2015.
Project location
Trans Mongolian
Railway
10
260km
Shivee Energy integrated energy complex
Resource Data
Resource clarification and calculation report for License no. 13311A,
13312A, 13313A was discussed and approved during the Mongolian
Mineral Resources Professional Council meeting on April 14, 2015.
Resource clarification and calculation report for License no. 20423A,
20421A, 20419A was discussed and approved during the Mongolian
Mineral Resource Professional Council meeting on August 21, 2015.
Approved resource report results are summarized as follows:
	 • Measured /A/, 		 24.41 Mt		
	 • Indicated /B/, 		 654.72 Mt
	 • Inferred /C/, 		 612.10 Mt
	 • A+B+C, 		 1,291.44 Mt
	 • Prognosis resource /P/, t 423.95 Mt
Further exploration is necessary for a complete research of the coal
deposit and increase the approved geological resource of the License
no. 20421A. In the case of License no. 20421A, further exploration is
being planned in order to bring P type resource to B, C type resource.
In the case of Nogoon Toirom deposit no. 2, further exploration of 65
drill holes of 22,710 meters of drilling is required.
In the case of Oekhii Tsagaan deposit, further exploration of 11 drill
holes of 3,710 meters of drilling is required. The above mentioned ex-
ploration will require about 9.1 billion MNT to execute. By transferring
the speculated P type resource to B, C type resource:
	 • Geological resource may increase by up to 70-80%
	 • Productive capacity resource may increase by
	 up to 50-60%
	 • NPV of the deposit may increase by up to 50-60%
11
Shivee Energy integrated energy complex
30 yearsShivee-1Nogoon toirom-2
31.Dec.
2015
20419A 549.41
License No. Area
Shine Us
Shine Us
Talbai-1
Talbai-2
07.Feb.
2008
30 years
30 years
30 years
30 years
30 years
27.Feb.
2008
27.Feb.
2008
Shine Us
Oekhii Tsagaan
Nogoon toirom-2
Talbai-3
Shiveegobi
Shiveegobi-1
31.Dec.
2015
31.Dec.
2015
Deposit Name Area name Granted
Date
Duration
13311A
13312A
13313A
20423A
20421A
Total
Mining Licences
12
2,781.20
1,238.11
269.73
7,862.7
5,447.2
18,148.35
Shivee Energy integrated energy complex
Project
Description
The goal of Shivee Energy Complex Project of Energy Export is to build
a large scale coal fired power plant in Mongolia and supply the produced
energy to domestic market and export into People’s Republic of China
via transmission lines. The complex project consists of 3 main compo-
nents. First, a coal mine with the capacity to extract 20 million tons of
coal per year. Second, a power plant with an installed capacity of 5,280
MW. Third, renewable power plants with an installed capacity of 15 per-
cent of the installed capacity of coal fired power plants. Lastly, transmis-
sion line with the capability to transmit 4,600 MW ±660 kV UHV.
Since the northeast part of the project site is rich in wind energy and
southwest part of the project site is rich in solar energy, it is suitable to
incorporate solar and wind power plants to the complex project and
export renewable energy.
Currently, ESB Solar Energy, Ltd. obtained licenses to build 10 MW solar
plant and Aydiner Global, Ltd. obtained licenses to build 50.4 MW wind
power plant in the following areas in where our project is nearby in the
region.
13
Govisumber province
Cornerstone project
for Global Energy
Interconnection
“
“
Shivee Energy integrated energy complex
Regulatory
Environment
The Mongolian Law on Energy was adopted in February, 2001 in order to regulate matters
related to energy generation, transmission, distribution, and supply activities, construction of
energy facilities and energy consumption through utilization of energy resources.
The Mongolian Law on Renewable Energy was adopted in January, 2007 to regulate genera-
tion and supply of energy utilizing renewable energy sources.
The State Policy on Energy was announced in July, 2015 to promote and extend renewable
energy development in Mongolia. The Policy shall be implemented in two stages /2015-
2030/.
The State Policy on Energy is pursuing the following targets for renewable energy develop-
ment in Mongolia:
	 • to increase the share of renewable energy in the total energy supply to
	 20% by 2020 and to 30% by 2030.
	 • to create the legal and taxation environment for promoting investment in renew		
	 able energy
Moreover, the Government of Mongolia supports renewable energy development by exempt-
ing imported equipment and parts from customs duties and value-added taxes in 2016.
14
Shivee Energy integrated energy complex
Feasibility
Study
Aq Sora
15
Currently, State Grid Corporation of China, the world’s largest state owned utility
company established in 2002 by the State Council of China is carrying out feasibility study
of Shivee Energy Complex Project of Energy Export. State Grid Corporation of China pro-
vides power to over 1.1 billion people in 26 provinces and covers 88% of China’s national ter-
ritory. With an estimated total workforce of 1,800,000 and 330 billion USD in revenue, State
Grid Corporation of China was ranked 2nd in the Fortune Global 500 in 2016. Furthermore,
State Grid Corporation of China owns 40% of the Philippines’ power grid, 25% of Portugal’s
power grid and 30% of Italy’s power grid.
On November 10, 2015 The Ministry of Energy of Mongolia and State Grid Corporation of Chi-
na has signed an agreement to carry out the Feasibility Study for the Shivee Energy Com-
plex Project of Energy Export. In accordance with the agreement, State Grid Corporation of
China selected 3 different institutions in early 2016 through an international open tender to
carry out the Feasibility Study for the Shivee Energy Complex Project of Energy Export. The
3 institutions are currently carrying out the Feasibility Study of the 3 main components of
the complex project. 										
							`	`
First, Shandong Electric Power Engineering Consulting Institute Corporation, Ltd is carrying
out the Feasibility Study for the Power Plant and Transmission Line. Second, CCTEG Shen-
yang Engineering Company is carrying out the Feasibility Study for the Coal mine. Lastly, the
Inner Mongolia Water Resources and Hydropower Survey and Design Institute is carrying out
the Feasibility Study for the Water supply of the complex project.
Another organization with a vested interest in the Shivee Energy Complex Project of Energy
Export is the Global Energy Interconnection Development and Cooperation Organization
(GEIDCO). GEIDCO is a non-governmental, non-profit international organization among will-
ing firms, organizations and institutes dedicated to promoting sustainable development of
energy worldwide. The main goal of GEIDCO is to promote the establishment of the Global
Energy Interconnection system to meet the global demand for clean and green electricity.
In order to establish a Global Energy Interconnection system, GEIDCO is looking to establish
a regional power grid starting from Northeast Asia. Therefore, the Shivee Energy Complex
Project of Energy Export has a great potential to supply energy not only to Mongolia and
China but also to the Northeast Asian Power Grid and Global Energy Interconnection as well.
Shivee Energy integrated energy complex
Address: Monnis tower, 13th floor, Chinggis avenue-15,
	 1st khoroo, Sukhbaatar district,
	 Ulaanbaatar-14240, Mongolia
Web: 	 www.erdenes-shivee-energy.com
E-mail: info@erdenes-shivee-energy.com
16

More Related Content

What's hot

Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation Chris Kuntz
 
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy ChallengeProspect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy ChallengeIJERA Editor
 
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...Pôle Réseaux de Chaleur - Cerema
 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangleForum Energii
 
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in EuropeThe Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in EuropeNuno Quental
 
Indonesia current gas market 2015 s
Indonesia current gas market 2015 sIndonesia current gas market 2015 s
Indonesia current gas market 2015 sFurqon Hanief
 
Juncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereikenJuncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereikenThierry Debels
 
Wer 2013 1_coal
Wer 2013 1_coalWer 2013 1_coal
Wer 2013 1_coalvhovo
 

What's hot (9)

Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
 
Global Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 YearsGlobal Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 Years
 
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy ChallengeProspect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
 
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangle
 
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in EuropeThe Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
 
Indonesia current gas market 2015 s
Indonesia current gas market 2015 sIndonesia current gas market 2015 s
Indonesia current gas market 2015 s
 
Juncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereikenJuncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereiken
 
Wer 2013 1_coal
Wer 2013 1_coalWer 2013 1_coal
Wer 2013 1_coal
 

Viewers also liked

Шивээ Энержи эрчим хүчний нэгдсэн цогцолбор
Шивээ Энержи эрчим хүчний нэгдсэн цогцолборШивээ Энержи эрчим хүчний нэгдсэн цогцолбор
Шивээ Энержи эрчим хүчний нэгдсэн цогцолборTumee Gantumur
 
Empresas digitales en un país analógico - Alvaro Guzman
Empresas digitales en un país analógico -  Alvaro GuzmanEmpresas digitales en un país analógico -  Alvaro Guzman
Empresas digitales en un país analógico - Alvaro Guzmanagendadigitalbo
 
Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011DeDi
 
Ref plus tenancy form (static)
Ref plus tenancy form (static)Ref plus tenancy form (static)
Ref plus tenancy form (static)Rex Villarin
 
Feedback Responsesfor Rrk
Feedback Responsesfor RrkFeedback Responsesfor Rrk
Feedback Responsesfor Rrkklaudijamedia
 
Using Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculumUsing Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculumMatthew Rogers
 
La empresa 2.0 y la relación electrónica con los clientes
La empresa 2.0 y la relación electrónica con los clientesLa empresa 2.0 y la relación electrónica con los clientes
La empresa 2.0 y la relación electrónica con los clientesFernando Maciá Domene
 
Presentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nuevaPresentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nuevaiesitaba
 
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...nikki tiedtke
 
El dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegosEl dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegosAlicia Morón
 
Revista Tu Guía Central - Edición número 93, diciembre de 2016
Revista Tu Guía Central - Edición número 93, diciembre de 2016Revista Tu Guía Central - Edición número 93, diciembre de 2016
Revista Tu Guía Central - Edición número 93, diciembre de 2016Tu Guía Central
 
Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)Dave McClure
 
Avaluo Cursos En Linea
Avaluo Cursos En LineaAvaluo Cursos En Linea
Avaluo Cursos En LineaDigetech.net
 

Viewers also liked (20)

Шивээ Энержи эрчим хүчний нэгдсэн цогцолбор
Шивээ Энержи эрчим хүчний нэгдсэн цогцолборШивээ Энержи эрчим хүчний нэгдсэн цогцолбор
Шивээ Энержи эрчим хүчний нэгдсэн цогцолбор
 
Empresas digitales en un país analógico - Alvaro Guzman
Empresas digitales en un país analógico -  Alvaro GuzmanEmpresas digitales en un país analógico -  Alvaro Guzman
Empresas digitales en un país analógico - Alvaro Guzman
 
PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015
 
Altdata garanti pos analytics
Altdata garanti pos analyticsAltdata garanti pos analytics
Altdata garanti pos analytics
 
Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011
 
Ref plus tenancy form (static)
Ref plus tenancy form (static)Ref plus tenancy form (static)
Ref plus tenancy form (static)
 
Feedback Responsesfor Rrk
Feedback Responsesfor RrkFeedback Responsesfor Rrk
Feedback Responsesfor Rrk
 
Using Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculumUsing Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculum
 
La empresa 2.0 y la relación electrónica con los clientes
La empresa 2.0 y la relación electrónica con los clientesLa empresa 2.0 y la relación electrónica con los clientes
La empresa 2.0 y la relación electrónica con los clientes
 
Presentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nuevaPresentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nueva
 
Mapping Manager
Mapping ManagerMapping Manager
Mapping Manager
 
Juan y Tadeo Edad Media
Juan y Tadeo Edad MediaJuan y Tadeo Edad Media
Juan y Tadeo Edad Media
 
El internet de las cosas
El internet de las cosasEl internet de las cosas
El internet de las cosas
 
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
 
Solicitud Conexión Matemática
Solicitud Conexión MatemáticaSolicitud Conexión Matemática
Solicitud Conexión Matemática
 
El dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegosEl dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegos
 
Revista Tu Guía Central - Edición número 93, diciembre de 2016
Revista Tu Guía Central - Edición número 93, diciembre de 2016Revista Tu Guía Central - Edición número 93, diciembre de 2016
Revista Tu Guía Central - Edición número 93, diciembre de 2016
 
Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)
 
Avaluo Cursos En Linea
Avaluo Cursos En LineaAvaluo Cursos En Linea
Avaluo Cursos En Linea
 
Caso cinciliacion
Caso cinciliacionCaso cinciliacion
Caso cinciliacion
 

Similar to Shivee Energy integrated energy complex

02.05.2014 Spotlight presentations a chance to showcase your services and pr...
02.05.2014 Spotlight presentations  a chance to showcase your services and pr...02.05.2014 Spotlight presentations  a chance to showcase your services and pr...
02.05.2014 Spotlight presentations a chance to showcase your services and pr...The Business Council of Mongolia
 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...The Business Council of Mongolia
 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...The Business Council of Mongolia
 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...The Business Council of Mongolia
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh BatkhuuThe Business Council of Mongolia
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh BatkhuuThe Business Council of Mongolia
 

Similar to Shivee Energy integrated energy complex (20)

The Project
The ProjectThe Project
The Project
 
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
 
25.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 16025.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 160
 
03.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 17003.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 170
 
21.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 15221.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 152
 
07.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 27707.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 277
 
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
02.05.2014 Spotlight presentations  a chance to showcase your services and pr...02.05.2014 Spotlight presentations  a chance to showcase your services and pr...
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
 
BCM NewsWire Issue 449
BCM NewsWire Issue 449BCM NewsWire Issue 449
BCM NewsWire Issue 449
 
01.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 33601.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 336
 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
 
21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol
 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
 
12.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 18012.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 180
 
03.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 23303.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 233
 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
 
22.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 22722.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 227
 
03.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 7603.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 76
 
13.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 21713.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 217
 

Recently uploaded

Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 

Recently uploaded (20)

Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 

Shivee Energy integrated energy complex

  • 1. Shivee Energy integrated energy complex
  • 2. ...As far as the production of energy, “Shivee Energy” proj- ect is being implemented. First, we need to build 4 to 5 power plants to ensure the supply of energy over the next 10 years. By doing so, we will be capable of fully supplying domestic energy demands in the next 10 to 15 years. In the long run, once our energy supply exceeds domestic demand, we intend to export the excess energy. Under this requirement, we will continue to utilize our thermal coal. We have an abundant amount of natural resources, which are in high global demand and we have the opportunity to utilize and process those resources efficiently... Prime Minister of Mongolia, Erdenebat Jargaltulga “ “ 100-day report of the Government of Mongolia 27.10.2016
  • 3. Shivee Energy integrated energy complex Project Profile 2016
  • 4. Shivee Energy integrated energy complex Summary Introduction About Us Project Overview Location Exploration History Resource Data Mining Licenses Project Description Regulatory Environment Feasibility Study Contact Contents * Any information mentioned in this com- pany profile contains no conflict of interest and is intended for internal introductory purposes only. All data and information regarding operations are in the research stages and may change depending on the market conditions. 05 06 07 09 10 10 11 12 13 14 15 16
  • 5. Shivee Energy integrated energy complex Summary Resources: Renewable energy (wind, solar) Coal-1,303.1 Mt and Coal bed methane (CBM) Feasibility Study: Pre-feasibility Study- Completed in April, 2016 Feasibility Study- Expected to be completed in November, 2016 by State Grid Corporation of China Our aim: Our project aim is to build integrated eco-friendly and economical coal and renewable energy based power plant to supply energy to both domestic and Chinese market as well as Northeast Asia Project Developer: Erdenes Shivee Energy LLC Shareholders: Erdenes Mongol, LLC & Aq Sora, LLC Ulaanbaatar Russia China Mongolia Legend ESE project Transmission line Northeast Asia interconnection Coal mineWind power plant Solar power plant Japan South Korea 5
  • 6. Shivee Energy integrated energy complex Introduction Mongolia has enormous resources in terms of its mineral reserves and renewable energy such as wind and solar. Oyu Tolgoi (OT), in the South Gobi region of the country, is the world’s largest undeveloped cop- per-gold project and the reserve value of the asset is greater than the en- tire current GDP level of Mongolia. The government has signed an histor- ic agreement with Ivanhoe mines and Rio Tinto for the development of this project. Next biggest project is Tavan Tolgoi (TT) mine, which is the biggest coal operation in Mongolia. The government is now in process of selecting the strategic investment partner to take over the management of Mongolian state-owned firm in charge of TT coal deposit. It is estimated that the total coal resource of Mongolia is about 175 billion tons. As of today, there are 300 coal deposits within 15 coal basins in Mongolia. In addition to the coal resources, 12 active renewable energy projects including 5 wind energy and 7 solar energy projects now ac- complishing the research phase and ready to be implemented. Three of them are planned to be implemented in the area of Choir and Dornogobi region nearby Shivee-Ovoo, where our company plans to implement the Shivee Energy Complex Project of Energy Export. 6 Renewable Energy Projects in Mongolia Enormous amount of mineral reserves and renewable energy source in Shivee Energy project area “ “ Shivee energy project area
  • 7. Shivee Energy integrated energy complex 7 “15% of total installed capacity will be renewable energy”
  • 8. Shivee Energy integrated energy complex About Us Erdenes Shivee Energy, LLC is established as a state and private joint Mongolian company in accordance with an agreement between Erdenes Mongol, LLC and Aq Sora, LLC on March 4, 2016. Erdenes Shivee Energy, LLC was established to provide 1.2 billion tons of productive capacity resource to the Shivee Energy Complex Project of Energy Export based on strategical deposit, Shivee-Ovoo. 50 percent of the company is currently owned by Erdenes Mongol, LLC, a stated owned enterprise and the other 50 percent is owned by Aq Sora, LLC, a private entitiy that owns shares of Shine Shivee, LLC. The establishment of Erdenes Shivee Energy, LLC is based on the Cabinet discussion no. 64 dated on November 16, 2015 to support the complex project to build a large scale ultra-high voltage power plant, cross-border transmission lines and coal mine near the strategical coal deposit, Shivee Ovoo. On October 26, 2015, “Shivee Energy Complex Project of Energy Export” project unit was established under the Ministry of Energy of Mongolia and Erdenes Mongol, LLC by the Government Resolution no. 422. The main goal of the Project Unit is to provide the preparatory work of the Feasibilityt Study for renewable energy power plant, thermal power plant, transmission line, water supply and coal mine as well as to ensure project implementation. Today, the company’s headquarters is located at Monnis tower, 13th floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaan- baatar-14240, Mongolia. The headquarter office is responsible for providing legal, accounting, administrative, engineering and geolog- ical services, international and local procurement, liaison with regu- latory authorities, logistics, translation, accounting, and coordination of local and international suppliers and contractors. Aq Sora 8
  • 9. Shivee Energy integrated energy complex Project Overview The Company intends to utilize its coal resources to build the Shivee Energy Complex Project of Energy Export, which will become the first energy export based project for Mongolia. The complex project will be an important initiative for Mongolia, where the country’s energy sector is underdeveloped. By bring- ing a new idea of combining renewable energy with coal-based energy in Mongolia, this project will significantly improve the Mongolian economy and the energy sector. By building a global scale power plant in Mongolia and exporting the produced energy, our company will commence a new era in the Mongolian energy sector. Furthermore, we will build an en- vironmentally friendly wind farm and solar energy station within the complex project using the abundant amount of renewable energy resource of Mongolia. In addition to the project, there is potential for the company to utilize economic value of CBM prior to coal mining. This opportunity shall be researched and studied thoroughly upon funding. 9 ...Exporting the produced energy... The beginning of a new era in the Mongolian energy sector “ “
  • 10. Shivee Energy integrated energy complex Location Exploration History The project is located in the Shivee Ovoo strategic coal deposit area in Shivee-Gobi and Sumber soum of Gobi-Sumber province, Mongolia, as shown in Figure-2. The project location lies 260 km to the southeast of Ulaanbaatar, the capital city of Mongolia, 20 km to the southeast of Choir City the provincial capital and 5 km to the northeast of Shivee-Gobi soum. From 1986-1988, a huge scale of complex and supplementary geological exploration work that provides resources evaluation of Shivee-Ovoo coal deposit. As a result of the exploration coal resources within Shine Us area was discovered as defined category of Measured and Indicated resources. Preliminary exploration covering remained part of the deposit Oekhii Tsagaan and Nogoon Toirom was carried out during 2007- 2010. In 2011-2012, detailed exploration work performed relating to the result of the preliminary exploration and coal resources approved by Mongolian Mineral Resources Professional Council in 2015. Project location Trans Mongolian Railway 10 260km
  • 11. Shivee Energy integrated energy complex Resource Data Resource clarification and calculation report for License no. 13311A, 13312A, 13313A was discussed and approved during the Mongolian Mineral Resources Professional Council meeting on April 14, 2015. Resource clarification and calculation report for License no. 20423A, 20421A, 20419A was discussed and approved during the Mongolian Mineral Resource Professional Council meeting on August 21, 2015. Approved resource report results are summarized as follows: • Measured /A/, 24.41 Mt • Indicated /B/, 654.72 Mt • Inferred /C/, 612.10 Mt • A+B+C, 1,291.44 Mt • Prognosis resource /P/, t 423.95 Mt Further exploration is necessary for a complete research of the coal deposit and increase the approved geological resource of the License no. 20421A. In the case of License no. 20421A, further exploration is being planned in order to bring P type resource to B, C type resource. In the case of Nogoon Toirom deposit no. 2, further exploration of 65 drill holes of 22,710 meters of drilling is required. In the case of Oekhii Tsagaan deposit, further exploration of 11 drill holes of 3,710 meters of drilling is required. The above mentioned ex- ploration will require about 9.1 billion MNT to execute. By transferring the speculated P type resource to B, C type resource: • Geological resource may increase by up to 70-80% • Productive capacity resource may increase by up to 50-60% • NPV of the deposit may increase by up to 50-60% 11
  • 12. Shivee Energy integrated energy complex 30 yearsShivee-1Nogoon toirom-2 31.Dec. 2015 20419A 549.41 License No. Area Shine Us Shine Us Talbai-1 Talbai-2 07.Feb. 2008 30 years 30 years 30 years 30 years 30 years 27.Feb. 2008 27.Feb. 2008 Shine Us Oekhii Tsagaan Nogoon toirom-2 Talbai-3 Shiveegobi Shiveegobi-1 31.Dec. 2015 31.Dec. 2015 Deposit Name Area name Granted Date Duration 13311A 13312A 13313A 20423A 20421A Total Mining Licences 12 2,781.20 1,238.11 269.73 7,862.7 5,447.2 18,148.35
  • 13. Shivee Energy integrated energy complex Project Description The goal of Shivee Energy Complex Project of Energy Export is to build a large scale coal fired power plant in Mongolia and supply the produced energy to domestic market and export into People’s Republic of China via transmission lines. The complex project consists of 3 main compo- nents. First, a coal mine with the capacity to extract 20 million tons of coal per year. Second, a power plant with an installed capacity of 5,280 MW. Third, renewable power plants with an installed capacity of 15 per- cent of the installed capacity of coal fired power plants. Lastly, transmis- sion line with the capability to transmit 4,600 MW ±660 kV UHV. Since the northeast part of the project site is rich in wind energy and southwest part of the project site is rich in solar energy, it is suitable to incorporate solar and wind power plants to the complex project and export renewable energy. Currently, ESB Solar Energy, Ltd. obtained licenses to build 10 MW solar plant and Aydiner Global, Ltd. obtained licenses to build 50.4 MW wind power plant in the following areas in where our project is nearby in the region. 13 Govisumber province Cornerstone project for Global Energy Interconnection “ “
  • 14. Shivee Energy integrated energy complex Regulatory Environment The Mongolian Law on Energy was adopted in February, 2001 in order to regulate matters related to energy generation, transmission, distribution, and supply activities, construction of energy facilities and energy consumption through utilization of energy resources. The Mongolian Law on Renewable Energy was adopted in January, 2007 to regulate genera- tion and supply of energy utilizing renewable energy sources. The State Policy on Energy was announced in July, 2015 to promote and extend renewable energy development in Mongolia. The Policy shall be implemented in two stages /2015- 2030/. The State Policy on Energy is pursuing the following targets for renewable energy develop- ment in Mongolia: • to increase the share of renewable energy in the total energy supply to 20% by 2020 and to 30% by 2030. • to create the legal and taxation environment for promoting investment in renew able energy Moreover, the Government of Mongolia supports renewable energy development by exempt- ing imported equipment and parts from customs duties and value-added taxes in 2016. 14
  • 15. Shivee Energy integrated energy complex Feasibility Study Aq Sora 15 Currently, State Grid Corporation of China, the world’s largest state owned utility company established in 2002 by the State Council of China is carrying out feasibility study of Shivee Energy Complex Project of Energy Export. State Grid Corporation of China pro- vides power to over 1.1 billion people in 26 provinces and covers 88% of China’s national ter- ritory. With an estimated total workforce of 1,800,000 and 330 billion USD in revenue, State Grid Corporation of China was ranked 2nd in the Fortune Global 500 in 2016. Furthermore, State Grid Corporation of China owns 40% of the Philippines’ power grid, 25% of Portugal’s power grid and 30% of Italy’s power grid. On November 10, 2015 The Ministry of Energy of Mongolia and State Grid Corporation of Chi- na has signed an agreement to carry out the Feasibility Study for the Shivee Energy Com- plex Project of Energy Export. In accordance with the agreement, State Grid Corporation of China selected 3 different institutions in early 2016 through an international open tender to carry out the Feasibility Study for the Shivee Energy Complex Project of Energy Export. The 3 institutions are currently carrying out the Feasibility Study of the 3 main components of the complex project. ` ` First, Shandong Electric Power Engineering Consulting Institute Corporation, Ltd is carrying out the Feasibility Study for the Power Plant and Transmission Line. Second, CCTEG Shen- yang Engineering Company is carrying out the Feasibility Study for the Coal mine. Lastly, the Inner Mongolia Water Resources and Hydropower Survey and Design Institute is carrying out the Feasibility Study for the Water supply of the complex project. Another organization with a vested interest in the Shivee Energy Complex Project of Energy Export is the Global Energy Interconnection Development and Cooperation Organization (GEIDCO). GEIDCO is a non-governmental, non-profit international organization among will- ing firms, organizations and institutes dedicated to promoting sustainable development of energy worldwide. The main goal of GEIDCO is to promote the establishment of the Global Energy Interconnection system to meet the global demand for clean and green electricity. In order to establish a Global Energy Interconnection system, GEIDCO is looking to establish a regional power grid starting from Northeast Asia. Therefore, the Shivee Energy Complex Project of Energy Export has a great potential to supply energy not only to Mongolia and China but also to the Northeast Asian Power Grid and Global Energy Interconnection as well.
  • 16. Shivee Energy integrated energy complex Address: Monnis tower, 13th floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaanbaatar-14240, Mongolia Web: www.erdenes-shivee-energy.com E-mail: info@erdenes-shivee-energy.com 16