Method statementMethod statement
New bathroom installNew bathroom install
ProjectProject reference:reference: REF100
SiteSite address:address:
1 Greenwich Place
London
SE10
Client:Client: British Land
PrincipalPrincipal contractor:contractor: Wilmott Dixon
LocationLocation ofof works:works: Ground floor toilets
StartStart datedate andand endend date:date: 01/10/2014 to 31/10/2014
SiteSite supervisor:supervisor: Mark Talbot
SiteSite supervisorsupervisor phone:phone: 07555333111
Description of activityDescription of activity
Remove existing pipework from ground floor toilets, basins and showers.
Install new pipework, shower tray, and bathroom cabinetry to new toilets on ground floor. All works to be
undertaken during normal working hours 8am - 4pm
Sequence of OperationsSequence of Operations
PlumbingPlumbing
Sign in and inductionSign in and induction
• All engineers will arrive onsite and sign in at site office
• All engineers will undertake a site induction
Removal of existing plumbing servicesRemoval of existing plumbing services
• Isolating water supply at source
• Removal of internal fixtures and fittings
1
• Remove all items from site according to site waste management plan
Internal pipework installationInternal pipework installation
• Pipework delivered to a safe, pre-determined secure location onsite
• Erect access equipment in accordance with safe use of ladders guidance notes / erection of tower
scaffolds
• Cut, bend and fit pipework according to approved layout
• Locate fixture outlets according to working drawing
• Hot works to be organised and agreed with client management before undertaking work
• Insulate hot water pipes with the specified material
Install fixtures and fittingsInstall fixtures and fittings
• Deliver fixtures and fittings to required areas following manual handling method statement
• Flush new pipework to remove debris or blockages
• Fit fixtures and fittings to their locations
• Fit bathroom cabinetry & fittings
• Fit shower fittings
• Fit water heaters
• Fixtures and fittings to be connected to power supply by others
• Connect to fixtures and fittings to water supply
• Connect to fixtures and fittings to waste
TrainingTraining
All operatives are adequately trained to carry out required tasks
Site Foreman is SSSTS approved
Site Managers are SMSTS approved
All operatives hold current certification:
CSCS certification
All site operatives have the following training:
Stepladder training
Working at heights training
Asbestos awareness training
Abrasive wheels training
JIB trade cards
All operatives are apprenticeship served plumbing engineers
Supervision and personnelSupervision and personnel
Rupert Havis - Plumbing Engineer - 07222111444
LegislationLegislation
Health and Safety Work Act 1974
The Management of Health and Safety at Work Regulations 1999
Workplace (Health, Safety and Welfare) Regulations 1992
The Control of Asbestos Regulations 2012
Provision and Use of Work Equipment Regulations (PUWER) 1998
The Reportable Injuries Diseases & Dangerous Occurance Regulations 2012 (RIDDOR)
Control of Substances Hazardous to Health Regulations 2002
The Work at Height Regulations 2007
The Personal Protective Equipment at Work Regulations 1992
The Manual Handling Operations Regulations 1992
Pressure system safety Regulations 2000
2
Codes of practiceCodes of practice
PlumbingPlumbing
BS 8000-13:1989 Workmanship on building sites. Code of practice for above ground drainage and sanitary
appliances.
BS 8000-15:1990 Workmanship on building sites. Code of practice for hot and cold water services (domestic
scale).
BS 6465-2:1996 Sanitary installations. Code of practice for space requirements for sanitary appliances.
OtherOther
Health risk management: a guide to working with solvents [HS(G)188]
Health and safety in construction [HS(G)150]
Health and safety in arc welding [HS(G)204]
Manual Handling [HS(G)115]
The safe use of compressed gases in welding, flame cutting and allied processes [HS(G)139]
Safety in pressure testing [GS4]
Tools and equipmentTools and equipment
All equipment or tools brought on to premises will be of sound construction and will meet the statutory
requirements applicable to these tools or equipment. Refer to risk assessment specific control measures for
any tools & equipment.
Hand tools
Step ladders/podium steps/access towers
Power tools (battery or 110v)
Digital Volt/Ohm/Amp meter
Pipe bender & cutter
Welding / arc tools
Special permitsSpecial permits
Hot Works
Site operatives shall adhere to the principal contractors HWP requirements and fire watch policies
The principal contractor will be the sole issuing authority for HWP
The principal contractor will ensure all site operatives are aware of emergency procedures at site induction
The principal contractor will make all site operatives aware of their basic requirements when undertaking Hot
works which may include the following:
The user must comply with safe procedures and manufacturers instructions whilst undertaking hot works
Any areas where hot works are to be undertaken must ensure combustible materials, flammable liquids and
gas cylinders are removed from immediate area
Fire extinguishers placed in local area of proposed hot works
Hot works area co-ordoned off and operatives told of immanent works
The user must not use an open flame whilst wearing clothing soiled with grease or flammable liquids
The user must not use open flame in an atmosphere containing flammable vapors, explosives, dust or in
confined spaces such as tanks
The user must not use open flame in conditions where there are strong winds
The user must extinguish any open flame when not in use
The user and site supervisor should ensure of adequate ventilation to area
It is advised a second person should watch over the hot works whilst being undertaken as a spotter
3
Once hot works complete, the immediate area should be tidied up, checked for signs of ignition and signed
off as a safe and now normal working area
Manual handlingManual handling
The Manual Handling Operations Regulations (MHOR) 1992 establish a clear hierarchy of measures for
dealing with risks from manual handling, these are:
Avoid hazardous manual handling operations so far as is reasonably practicable.
Assess any hazardous manual handling operations that cannot be avoided.
Reduce the risk of injury so far as is reasonably practicable.
The workforce will be trained to, observe safe lifting techniques, and safely handle loads.
No one will be expected to lift on their own, materials weighing more than 25kg.
Safe manual handling procedures should be followed at all times.
There are some basic principles that everyone should observe prior to carrying out a manual handling
operation:
Ensure that the object is light enough to lift, is stable and unlikely to shift or move.
Heavy or awkward loads should be moved using a handling aid.
Make sure the route is clear of obstructions.
Make sure there is somewhere to put the load down wherever it is to be moved to.
Stand as close to the load as possible, and spread your feet to shoulder width.
Bend your knees and try and keep the back's natural, upright posture.
Grasp the load firmly as close to the body as you can.
Use the legs to lift the load in a smooth motion as this offers more leverage reducing the strain on your
back.
Carry the load close to the body with the elbows tucked into the body.
Avoid twisting the body as much as possible by turning your feet to position yourself with the load.
When ever manual handling is to be undertaken, especially if it is an uncommon or high risk task, an
assessment of four specific activities – Task, Individual, Load and Environment (easily remembered by the
acronym TILE) needs to be implemented:
The Task
Does the activity involve twisting, stooping, bending, excessive travel, pushing, pulling or precise positioning
of the load, sudden movement, inadequate rest or recovery periods, team handling or seated work?
The Individual
Does the individual require unusual strength or height for the activity, are they pregnant, disabled or
suffering from a health problem. Is specialist knowledge or training required?
The Load
Is the load heavy, unwieldy, difficult to grasp, sharp, hot, cold, difficult to grip, are the contents likely to
move or shift?
The Environment
Are there space constraints, uneven, slippery or unstable floors, variations in floor levels, extremely hot, cold
or humid conditions, poor lighting, poor ventilation, gusty winds, clothing or Personal Protective Equipment
that restricts movement?
Lifting and handling in teamsLifting and handling in teams
Team lifting needs to be co-ordinated properly; try make sure that those lifting are around the same height
and build, make sure one person is responsible for giving instructions, etc. and make sure that everyone
lifts, moves off, stops and places the load down at the same time.
Lifting in teams does not mean that the weight of the load can be doubled for each extra person in the
team.
All potential hazards are removed from the route that the team will be manual handling to-and-from.
4
Handling aidsHandling aids
Mechanical handling aids can reduce the risk of injury when used correctly; even simple aids such as
trolleys, sack trucks and wheelbarrows can be used to move items and reduce the likelihood of injury.
It is better to push rather than pull, and to use body weight and leg muscles to do the work, make sure the
load is kept under control, particularly on slopes.
In some cases more sophisticated manual handling aids may be required; cranes, hoists, pallet trucks,
conveyors and fork lift trucks are used where applicable to eliminate manual handling.
It should be remembered that, although the handling aids will eliminate many of the manual handling risks,
their use will introduce others and these risks must be assessed and a competent person must be employed
to use any handling aids.
Method of accessMethod of access
All operatives will be inducted by onsite supervisor.
All operatives will maintain access and egress routes, and ensure that materials required for the task do not
obstruct access to work areas and any debris caused by their operation will be removed.
Waste will be kept to a minimum and removed from site each as agreed with client.
Any problems with access & egress routes will be reported to the Site Supervisor.
Working from heightWorking from height
Working at height will be carried out from step ladders, podium steps, towers scaffolds or as specified in risk
assessment
Erect access equipment in accordance with Safe Use of Ladders Guidance Notes/Safe Use of Stepladders
Guidance Notes/Erection of Tower Scaffolds
If working at heights greater than 2m, use of tower scaffold or podium to be used
All operatives are competent to use working at height method they choose, no operative will work form
height in any other method
General waste handlingGeneral waste handling
A suitable route to transport waste must be considered prior to the work.
Internal routes should be protected to prevent damage to the fabric and decoration of the building. Particular
attention should be made to door frames and sharp changes of route direction.
If external routes cross pedestrian footpaths an alternative route should be provided for the public. The
waste route should be segregated using barrier fencing with suitable signage to direct the public to the
alternative pathway and prevent unauthorised persons accessing the waste route.
Ensure the correct PPE is worn when handling waste.
Always use a mechanical means of moving waste whenever possible (e.g. wheel barrow). Use good manual
handling techniques when mechanical assistance is not practical or safe.
Always dispose of waste in accordance with principle contractor’s environmental policy and waste
management plan.
Report any environmental waste accidents or spillages immediately to the principle contractor who will put
into action the emergency waste containment plan and inform the relevant authorities.
Use of skipsUse of skips
Waste is to be deposited into a skip.
Barrier fencing should be positioned around the skip with ‘keep out’ signage attached.
Skips will be covered and secured to reduce the risk of arson and theft.
Skips should be positioned a minimum of 6m away from buildings or other objects to reduce the spread of
5
HarmfulHarmful ExplosiveExplosive
fire and to satisfy the requirements of insurance.
Skips should be positioned to allow easy access for the skip vehicles to drop off new skips and collect full
skips.
Always use a banksman when skip vehicles are reversing.
Skips are to be emptied regularly to reduce the risk of arson and theft.
No hazardous material is to be deposited into skips.
Temporary ramps used to gain access to skips should be sufficiently wide to prevent falls. On large or high
skips, ramps should include side fall protection.
Never climb into a skip.
Hazardous wasteHazardous waste
Hazardous waste such as asbestos must be collected by an approved licensed contractor.
Hazardous waste should not be put with non-hazardous waste or sent for landfill.
Sharps waste should be placed in a yellow sharps container and the lid firmly closed during transit. Sharps
should never be carried in the front of vehicles.
Hazardous SubstancesHazardous Substances
Emergency proceduresEmergency procedures
The client or principal contractor will ensure that the existing site emergency procedures are followed and
that relevant information is given to operatives at time of induction or when changes are made to
procedures.
The principle contractor is responsible for ensuring that all operatives under their control adhere to the site
emergency procedures at all times.
First aid facilitiesFirst aid facilities
Refer to the onsite safety notice board for all first aid information.
A first aid box with enough equipment to cope with the number of workers on site should be provided for by
the client or principal contractor.
The client or principal contractor should nominate an appointed person to take care of first-aid
arrangements.
The number of appointed first aiders shall be dependent on the number of employees:
< 5: At least one appointed person.
5–50: At least one first-aider trained in EFAW or FAW, depending on the type of injuries that may occur.
More than 50: At least one first-aider trained in FAW for every 50 people employed.
Welfare requirementsWelfare requirements
Welfare arrangements are supplied by the client or principal contractor.
These should be in line with Schedule 2 of the Construction Design & Management Regulations 2007
(CDM). All sites are to have a minimum amount of welfare facilities available for workers, which include the
6
Hard HatsHard Hats RespiratoryRespiratory
ProtectionProtection
Safety BootsSafety Boots Hi Vis VestHi Vis Vest Eye ProtectionEye Protection
Safety GlovesSafety Gloves
following:
Toilets
Washing facilities
Drinking water
Changing rooms and lockers
Heating
Rest facilities
PPE RequirementsPPE Requirements
All work will be undertaken by qualified competent persons with experience of the type of work described
above, and in all cases in full accordance with safety procedures specified in the company's health and
safety Policy.
The work activities described within this method statement and all associated safety measures are not to be
deviated from in any way. If, for any reason, the method statement cannot be implemented in full or should
the described process be found inadequate for the purpose of providing a safe working environment, the
affected activities must cease until such time as the method statement has been amended and reapproved
as appropriate.
7
Acme plumbingAcme plumbing
123 High Street
London
W1
Telephone:Telephone: 0207 123 1234
Fax:Fax: 0207 123 1234
www.acmeplumbing.com
Document created:Document created: 02 Sep 14
Document updated:Document updated: 02 Sep 14
Prepared by:Prepared by: John Smith
44
55
2020
Likelihood
xx
Severity
==
Risk/residual risk
LikelihoodLikelihood
VeryVery
unlikelyunlikely
UnlikelyUnlikely PossiblePossible LikelyLikely
VeryVery
likelylikely
11 22 33 44 55
NegligibleNegligible 11 11 22 33 44 55
MinorMinor 22 22 44 66 88 1010
ModerateModerate 33 33 66 99 1212 1515
MajorMajor 44 44 88 1212 1616 2020
SeveritySeverity
ExtremeExtreme 55 55 1010 1515 2020 2525
Risk assessmentRisk assessment
New bathroom installNew bathroom install
ProjectProject reference:reference: REF100
SiteSite address:address:
1 Greenwich Place
London
SE10
Client:Client: British Land
PrincipalPrincipal contractor:contractor: Wilmott Dixon
LocationLocation ofof works:works: Ground floor toilets
StartStart datedate andand endend date:date: 01/10/2014 to 31/10/2014
SiteSite supervisor:supervisor: Mark Talbot
SiteSite supervisorsupervisor phone:phone: 07555333111
Risk matrixRisk matrix
8
55
44
2020
11
44
44
33
33
99
11
33
33
55
55
11
55
Arrival & departure from siteArrival & departure from site
Task:Task: Leaving or entering site
HazardHazard RiskRisk Control measuresControl measures RRRR
Struck by moving vehicles
xx
==
All operatives and site visitors must ensure they sign in when
entering
Site inductions to be provided to all operative's and visitors
before entering the work site
Ensure correct PPE is worn at all times
All operative's and visitors to keep to pedestrian areas only
The use of cross over points will be incorporated into site plan
by principal contractor
All operative's should be made aware of changes in Site Traffic
Management Plan as or when changed
All operative's and site visitors must ensure they sign out when
exiting
Watch for other contractors leaving the area at the same time
xx
==
Persons at risk:Persons at risk: All site operatives & public
Task:Task: Unloading equipment
HazardHazard RiskRisk Control measuresControl measures RRRR
Muscle strains, sprains &
injuries caused by lifting
heavy loads xx
==
Use correct lifting techniques, all operatives should be trained in
the safe method of lifting - refer to manual handling section in
attached method statement
Ensure two man lift is enforced for reaching or carrying heavier
items
Split loads to make them lighter and safer to handle
Use mechanical aids when loads exceed 25kg per person or as
referenced in method statement
Be aware of handling large or bulky items e.g. plasterboard in
windy conditions
xx
==
Persons at risk:Persons at risk: User
Crushed by falling load with
potentially fatal injuries
xx
==
Deliveries to be taken in designated areas only, other workers &
public to be kept outside of delivery area
Any machinery used for unloading to be operated by trained
personal only and carries a current inspection certificate
xx
==
9
2525 55
44
55
2020
11
55
55
44
44
1616
11
44
44
44
55
11
55
Any items that could potentially be lifted by the wind should be
placed in designated anchor areas and or weighted down
Ensure any equipment used for unloading is not operated in
overly windy conditions - refer to equipment or plant guidelines
Goods should be placed on firm level ground in designated
areas, height of goods should be kept to a minimum to prevent
stack failure
Persons at risk:Persons at risk: All site operatives & public
Electrical shock or fatal
injuries sustained from
contact with overhead
cables
xx
==
Check prevailing site condition and ensure all deliveries
undertaken in pre-determined safe area
No vehicles to be parked or unloaded in the vicinity of overhead
lines
If necessary for deliveries to be undertaken below overhead
cables, ensure works and area coordinated with local authority
with sufficient protection in place for workers and public
xx
==
Persons at risk:Persons at risk: User
Task:Task: Leaving vehicle
HazardHazard RiskRisk Control measuresControl measures RRRR
Struck by moving vehicles
xx
==
All operatives to park in designated areas
Follow site rules and authorised routes provided by client or
principal contractor
All operatives to wear hi-visibility jackets when leaving vehicle
All operatives to enter and sign in onsite
All operatives to receive induction
Banksman to be used when vehicles are reversing
xx
==
Persons at risk:Persons at risk: All site operatives
Preventing slips, trips and fallsPreventing slips, trips and falls
Task:Task: Movement at height or on raised platforms
HazardHazard RiskRisk Control measuresControl measures RRRR
Severe or fatal injuries from
slip, trips and falls at height
xx
Ensure good housekeeping onsite, 'clean as you go'
implemented by all site operatives across the site
xx
10
2020 55
44
33
1212
11
33
33
33
55
1515
11
55
55
== All items on raised platforms to be placed in designated and
safe area away from thoroughfare and edges of platforms
Ensure raised platforms are protected by cappings or fenced off
to prevent entry into any risk area
Ensure correct PPE is worn at heights to prevent falling from
height resulting from slips, trips or falls
==
Persons at risk:Persons at risk: All site operatives
Task:Task: Movement at ground level
HazardHazard RiskRisk Control measuresControl measures RRRR
Severe strains, sprains and
muscle breaks
xx
==
All operatives to be shown the correct area for safe storage of
materials onsite before works begin
Ensure clear working area on site, ensure dustsheets, mats and
other materials cannot slip or slide underfoot
Manage and remove potential slip trip hazards as they arise and
notify site management if assistance required
Do not carry items that will hinder the carrier's clear sight of view
All rubbish to removed from site at scheduled times, organised
by site supervisor and in line with the site waste management
plan
xx
==
Persons at risk:Persons at risk: All site operatives
Using portable power toolsUsing portable power tools
Task:Task: Using portable power tools
HazardHazard RiskRisk Control measuresControl measures RRRR
Serious cuts, injuries or
amputations to body parts
from the incorrect use of
cutting tools
xx
==
All operatives to be trained in the safe usage of power tools
Always choose the right tool for the job
Ensure all portable tools are set up correctly and securely
fastened to worktops as per product specifications
Ensure any portable tools that are set up, are in a designated
safe area avoiding thoroughfare of other workers or vehicles
All cutting tools to have safety guards incorporated, fastened
securely and regularly checked and maintained
Ensure no loose clothing is worn in the vicinity of cutting, and
gloves are worn at all time
xx
==
11
33
22
66
11
22
22
33
55
1515
11
55
55
44
22
88
11
22
22
Persons at risk:Persons at risk: User
Hearing loss to site
operatives working near
noisy power tools xx
==
All operatives trained in risks of noise exposure
Suitable hearing protectors should be provided for operatives
and any surrounding workers
Use low-noise tooling where possible
Other trades using grinders or other high noise emitting tools
should not be working close enough to other site operatives to
cause problems
xx
==
Persons at risk:Persons at risk: All site operatives
Electrocution causing
serious or fatal injuries
whilst using portable power
tools
xx
==
Only 110v or battery operated equipment to be used
Electric equipment to be kept dry and stored in toolbox to
protect from damp and damage
Visual inspection prior to use, plugs, leads, power supply
(transformer), insulation, switches, RCD(if used), signs of burns,
casing, loose parts
Damaged or defective equipment including leads to be replaced
immediately or fixed by competent person
Electrical equipment must not to be tampered with, anything
showing evidence of tampering must not be used until tested by
a professional
Electrical equipment to be PAT tested every three months- PAT
test to be checked prior to use and register of checked items to
be provided before entering site
xx
==
Persons at risk:Persons at risk: User
General plumbing worksGeneral plumbing works
Task:Task: General plumbing
HazardHazard RiskRisk Control measuresControl measures RRRR
Slips, trips and falls
xx
==
Ensure all live pipework is isolated before undertaking any work
to ensure no leakage
See slips trips and falls risk assessment
xx
==
Persons at risk:Persons at risk: All site operatives
12
33
33
99
11
33
33
Lung damage caused by
inhalation of fumes and
skin & eye damage from
sealants
xx
==
All substances required to perform plumbing activities are
identified i.e., lead, solder, plumber flux etc. and the relevant
COSHH Assessments and personal protective equipment is
made available
Consider use of respiratory equipment in confined areas
Avoid skin contact with sealants and wash from skin as soon as
possible if skin contact occurs
All areas must be kept very well ventilated during sealant works
and minimum requirement is to open all doors and windows
xx
==
Persons at risk:Persons at risk: User
13
Site briefing and induction formSite briefing and induction form
New bathroom installNew bathroom install
All persons who have signed below confirm that they have been briefed on the safe working methods and
arrangements detailed in this method of work statement.
DateDate NameName SignatureSignature
14

More Related Content

What's hot (19)

Manual Handling
Manual HandlingManual Handling
Manual Handling
 
Manual Material Handling by CNA
Manual Material Handling by CNAManual Material Handling by CNA
Manual Material Handling by CNA
 
Safety practice In Construction
Safety practice In Construction Safety practice In Construction
Safety practice In Construction
 
Materials Handling and Storage by National Safety Council
Materials Handling and Storage by National Safety CouncilMaterials Handling and Storage by National Safety Council
Materials Handling and Storage by National Safety Council
 
MANUAL HANDLING
MANUAL HANDLINGMANUAL HANDLING
MANUAL HANDLING
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Health and safety induction tcm44 15292
Health and safety induction tcm44 15292Health and safety induction tcm44 15292
Health and safety induction tcm44 15292
 
Manual Handling By J Mc Cann
Manual Handling By J Mc CannManual Handling By J Mc Cann
Manual Handling By J Mc Cann
 
Health & safety part 3
Health & safety part 3Health & safety part 3
Health & safety part 3
 
Site Induction
Site InductionSite Induction
Site Induction
 
Risk assessment for testing &amp; commissioning of cranes
Risk assessment for  testing &amp; commissioning of cranesRisk assessment for  testing &amp; commissioning of cranes
Risk assessment for testing &amp; commissioning of cranes
 
Sample risk assessment roadhaulage
Sample risk assessment   roadhaulageSample risk assessment   roadhaulage
Sample risk assessment roadhaulage
 
Manual handling
Manual handlingManual handling
Manual handling
 
Manual handling
Manual handlingManual handling
Manual handling
 
Lift and grow 2019
Lift and grow 2019Lift and grow 2019
Lift and grow 2019
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Site Induction
Site InductionSite Induction
Site Induction
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Youngman India presentation safe work at height
Youngman India presentation safe work at heightYoungman India presentation safe work at height
Youngman India presentation safe work at height
 

Similar to Acme plumbing bathroom installation in London

DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxCanberra Institute of technology
 
HSE Procedures Awareness Oil & Gas 27.09.2022.pptx
HSE Procedures Awareness Oil & Gas 27.09.2022.pptxHSE Procedures Awareness Oil & Gas 27.09.2022.pptx
HSE Procedures Awareness Oil & Gas 27.09.2022.pptxSyed Neyaz Ahmad
 
LifeSavingRules_AnIntroduction.pptx
LifeSavingRules_AnIntroduction.pptxLifeSavingRules_AnIntroduction.pptx
LifeSavingRules_AnIntroduction.pptxIdrisAdeniran1
 
Safe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceSafe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceDjCurrie
 
Working at Height Presentation.pptx
Working at Height Presentation.pptxWorking at Height Presentation.pptx
Working at Height Presentation.pptxIlgarKarimov3
 
F6 mf 12 appreciation of access platforms and equipment 1
F6 mf 12 appreciation of access platforms and equipment 1F6 mf 12 appreciation of access platforms and equipment 1
F6 mf 12 appreciation of access platforms and equipment 1michael mcewan
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
household services lesson 1.2 home economics.pptx
household services lesson 1.2 home economics.pptxhousehold services lesson 1.2 home economics.pptx
household services lesson 1.2 home economics.pptxMarycrisLopez6
 
Safe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceSafe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceDjCurrie
 
Materials Handling and Storage by Dr. S.D. Allen Iske
Materials Handling and Storage by Dr. S.D. Allen IskeMaterials Handling and Storage by Dr. S.D. Allen Iske
Materials Handling and Storage by Dr. S.D. Allen IskeAtlantic Training, LLC.
 

Similar to Acme plumbing bathroom installation in London (20)

DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
HSE Procedures Awareness Oil & Gas 27.09.2022.pptx
HSE Procedures Awareness Oil & Gas 27.09.2022.pptxHSE Procedures Awareness Oil & Gas 27.09.2022.pptx
HSE Procedures Awareness Oil & Gas 27.09.2022.pptx
 
LifeSavingRules_AnIntroduction.pptx
LifeSavingRules_AnIntroduction.pptxLifeSavingRules_AnIntroduction.pptx
LifeSavingRules_AnIntroduction.pptx
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
3220 warehouse
3220 warehouse3220 warehouse
3220 warehouse
 
Safe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceSafe Manual Handling in the Workplace
Safe Manual Handling in the Workplace
 
Induction current
Induction   current Induction   current
Induction current
 
Working at Height Presentation.pptx
Working at Height Presentation.pptxWorking at Height Presentation.pptx
Working at Height Presentation.pptx
 
F6 mf 12 appreciation of access platforms and equipment 1
F6 mf 12 appreciation of access platforms and equipment 1F6 mf 12 appreciation of access platforms and equipment 1
F6 mf 12 appreciation of access platforms and equipment 1
 
Safety plan
Safety planSafety plan
Safety plan
 
Safety_First
Safety_FirstSafety_First
Safety_First
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
household services lesson 1.2 home economics.pptx
household services lesson 1.2 home economics.pptxhousehold services lesson 1.2 home economics.pptx
household services lesson 1.2 home economics.pptx
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Safe Manual Handling in the Workplace
Safe Manual Handling in the WorkplaceSafe Manual Handling in the Workplace
Safe Manual Handling in the Workplace
 
Materials Handling and Storage by NSC
Materials Handling and Storage by NSCMaterials Handling and Storage by NSC
Materials Handling and Storage by NSC
 
Materials Handling and Storage by Dr. S.D. Allen Iske
Materials Handling and Storage by Dr. S.D. Allen IskeMaterials Handling and Storage by Dr. S.D. Allen Iske
Materials Handling and Storage by Dr. S.D. Allen Iske
 

Recently uploaded

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 

Recently uploaded (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 

Acme plumbing bathroom installation in London

  • 1. Acme plumbingAcme plumbing 123 High Street London W1 Telephone:Telephone: 0207 123 1234 Fax:Fax: 0207 123 1234 www.acmeplumbing.com Document created:Document created: 02 Sep 14 Document updated:Document updated: 02 Sep 14 Prepared by:Prepared by: John Smith Method statementMethod statement New bathroom installNew bathroom install ProjectProject reference:reference: REF100 SiteSite address:address: 1 Greenwich Place London SE10 Client:Client: British Land PrincipalPrincipal contractor:contractor: Wilmott Dixon LocationLocation ofof works:works: Ground floor toilets StartStart datedate andand endend date:date: 01/10/2014 to 31/10/2014 SiteSite supervisor:supervisor: Mark Talbot SiteSite supervisorsupervisor phone:phone: 07555333111 Description of activityDescription of activity Remove existing pipework from ground floor toilets, basins and showers. Install new pipework, shower tray, and bathroom cabinetry to new toilets on ground floor. All works to be undertaken during normal working hours 8am - 4pm Sequence of OperationsSequence of Operations PlumbingPlumbing Sign in and inductionSign in and induction • All engineers will arrive onsite and sign in at site office • All engineers will undertake a site induction Removal of existing plumbing servicesRemoval of existing plumbing services • Isolating water supply at source • Removal of internal fixtures and fittings 1
  • 2. • Remove all items from site according to site waste management plan Internal pipework installationInternal pipework installation • Pipework delivered to a safe, pre-determined secure location onsite • Erect access equipment in accordance with safe use of ladders guidance notes / erection of tower scaffolds • Cut, bend and fit pipework according to approved layout • Locate fixture outlets according to working drawing • Hot works to be organised and agreed with client management before undertaking work • Insulate hot water pipes with the specified material Install fixtures and fittingsInstall fixtures and fittings • Deliver fixtures and fittings to required areas following manual handling method statement • Flush new pipework to remove debris or blockages • Fit fixtures and fittings to their locations • Fit bathroom cabinetry & fittings • Fit shower fittings • Fit water heaters • Fixtures and fittings to be connected to power supply by others • Connect to fixtures and fittings to water supply • Connect to fixtures and fittings to waste TrainingTraining All operatives are adequately trained to carry out required tasks Site Foreman is SSSTS approved Site Managers are SMSTS approved All operatives hold current certification: CSCS certification All site operatives have the following training: Stepladder training Working at heights training Asbestos awareness training Abrasive wheels training JIB trade cards All operatives are apprenticeship served plumbing engineers Supervision and personnelSupervision and personnel Rupert Havis - Plumbing Engineer - 07222111444 LegislationLegislation Health and Safety Work Act 1974 The Management of Health and Safety at Work Regulations 1999 Workplace (Health, Safety and Welfare) Regulations 1992 The Control of Asbestos Regulations 2012 Provision and Use of Work Equipment Regulations (PUWER) 1998 The Reportable Injuries Diseases & Dangerous Occurance Regulations 2012 (RIDDOR) Control of Substances Hazardous to Health Regulations 2002 The Work at Height Regulations 2007 The Personal Protective Equipment at Work Regulations 1992 The Manual Handling Operations Regulations 1992 Pressure system safety Regulations 2000 2
  • 3. Codes of practiceCodes of practice PlumbingPlumbing BS 8000-13:1989 Workmanship on building sites. Code of practice for above ground drainage and sanitary appliances. BS 8000-15:1990 Workmanship on building sites. Code of practice for hot and cold water services (domestic scale). BS 6465-2:1996 Sanitary installations. Code of practice for space requirements for sanitary appliances. OtherOther Health risk management: a guide to working with solvents [HS(G)188] Health and safety in construction [HS(G)150] Health and safety in arc welding [HS(G)204] Manual Handling [HS(G)115] The safe use of compressed gases in welding, flame cutting and allied processes [HS(G)139] Safety in pressure testing [GS4] Tools and equipmentTools and equipment All equipment or tools brought on to premises will be of sound construction and will meet the statutory requirements applicable to these tools or equipment. Refer to risk assessment specific control measures for any tools & equipment. Hand tools Step ladders/podium steps/access towers Power tools (battery or 110v) Digital Volt/Ohm/Amp meter Pipe bender & cutter Welding / arc tools Special permitsSpecial permits Hot Works Site operatives shall adhere to the principal contractors HWP requirements and fire watch policies The principal contractor will be the sole issuing authority for HWP The principal contractor will ensure all site operatives are aware of emergency procedures at site induction The principal contractor will make all site operatives aware of their basic requirements when undertaking Hot works which may include the following: The user must comply with safe procedures and manufacturers instructions whilst undertaking hot works Any areas where hot works are to be undertaken must ensure combustible materials, flammable liquids and gas cylinders are removed from immediate area Fire extinguishers placed in local area of proposed hot works Hot works area co-ordoned off and operatives told of immanent works The user must not use an open flame whilst wearing clothing soiled with grease or flammable liquids The user must not use open flame in an atmosphere containing flammable vapors, explosives, dust or in confined spaces such as tanks The user must not use open flame in conditions where there are strong winds The user must extinguish any open flame when not in use The user and site supervisor should ensure of adequate ventilation to area It is advised a second person should watch over the hot works whilst being undertaken as a spotter 3
  • 4. Once hot works complete, the immediate area should be tidied up, checked for signs of ignition and signed off as a safe and now normal working area Manual handlingManual handling The Manual Handling Operations Regulations (MHOR) 1992 establish a clear hierarchy of measures for dealing with risks from manual handling, these are: Avoid hazardous manual handling operations so far as is reasonably practicable. Assess any hazardous manual handling operations that cannot be avoided. Reduce the risk of injury so far as is reasonably practicable. The workforce will be trained to, observe safe lifting techniques, and safely handle loads. No one will be expected to lift on their own, materials weighing more than 25kg. Safe manual handling procedures should be followed at all times. There are some basic principles that everyone should observe prior to carrying out a manual handling operation: Ensure that the object is light enough to lift, is stable and unlikely to shift or move. Heavy or awkward loads should be moved using a handling aid. Make sure the route is clear of obstructions. Make sure there is somewhere to put the load down wherever it is to be moved to. Stand as close to the load as possible, and spread your feet to shoulder width. Bend your knees and try and keep the back's natural, upright posture. Grasp the load firmly as close to the body as you can. Use the legs to lift the load in a smooth motion as this offers more leverage reducing the strain on your back. Carry the load close to the body with the elbows tucked into the body. Avoid twisting the body as much as possible by turning your feet to position yourself with the load. When ever manual handling is to be undertaken, especially if it is an uncommon or high risk task, an assessment of four specific activities – Task, Individual, Load and Environment (easily remembered by the acronym TILE) needs to be implemented: The Task Does the activity involve twisting, stooping, bending, excessive travel, pushing, pulling or precise positioning of the load, sudden movement, inadequate rest or recovery periods, team handling or seated work? The Individual Does the individual require unusual strength or height for the activity, are they pregnant, disabled or suffering from a health problem. Is specialist knowledge or training required? The Load Is the load heavy, unwieldy, difficult to grasp, sharp, hot, cold, difficult to grip, are the contents likely to move or shift? The Environment Are there space constraints, uneven, slippery or unstable floors, variations in floor levels, extremely hot, cold or humid conditions, poor lighting, poor ventilation, gusty winds, clothing or Personal Protective Equipment that restricts movement? Lifting and handling in teamsLifting and handling in teams Team lifting needs to be co-ordinated properly; try make sure that those lifting are around the same height and build, make sure one person is responsible for giving instructions, etc. and make sure that everyone lifts, moves off, stops and places the load down at the same time. Lifting in teams does not mean that the weight of the load can be doubled for each extra person in the team. All potential hazards are removed from the route that the team will be manual handling to-and-from. 4
  • 5. Handling aidsHandling aids Mechanical handling aids can reduce the risk of injury when used correctly; even simple aids such as trolleys, sack trucks and wheelbarrows can be used to move items and reduce the likelihood of injury. It is better to push rather than pull, and to use body weight and leg muscles to do the work, make sure the load is kept under control, particularly on slopes. In some cases more sophisticated manual handling aids may be required; cranes, hoists, pallet trucks, conveyors and fork lift trucks are used where applicable to eliminate manual handling. It should be remembered that, although the handling aids will eliminate many of the manual handling risks, their use will introduce others and these risks must be assessed and a competent person must be employed to use any handling aids. Method of accessMethod of access All operatives will be inducted by onsite supervisor. All operatives will maintain access and egress routes, and ensure that materials required for the task do not obstruct access to work areas and any debris caused by their operation will be removed. Waste will be kept to a minimum and removed from site each as agreed with client. Any problems with access & egress routes will be reported to the Site Supervisor. Working from heightWorking from height Working at height will be carried out from step ladders, podium steps, towers scaffolds or as specified in risk assessment Erect access equipment in accordance with Safe Use of Ladders Guidance Notes/Safe Use of Stepladders Guidance Notes/Erection of Tower Scaffolds If working at heights greater than 2m, use of tower scaffold or podium to be used All operatives are competent to use working at height method they choose, no operative will work form height in any other method General waste handlingGeneral waste handling A suitable route to transport waste must be considered prior to the work. Internal routes should be protected to prevent damage to the fabric and decoration of the building. Particular attention should be made to door frames and sharp changes of route direction. If external routes cross pedestrian footpaths an alternative route should be provided for the public. The waste route should be segregated using barrier fencing with suitable signage to direct the public to the alternative pathway and prevent unauthorised persons accessing the waste route. Ensure the correct PPE is worn when handling waste. Always use a mechanical means of moving waste whenever possible (e.g. wheel barrow). Use good manual handling techniques when mechanical assistance is not practical or safe. Always dispose of waste in accordance with principle contractor’s environmental policy and waste management plan. Report any environmental waste accidents or spillages immediately to the principle contractor who will put into action the emergency waste containment plan and inform the relevant authorities. Use of skipsUse of skips Waste is to be deposited into a skip. Barrier fencing should be positioned around the skip with ‘keep out’ signage attached. Skips will be covered and secured to reduce the risk of arson and theft. Skips should be positioned a minimum of 6m away from buildings or other objects to reduce the spread of 5
  • 6. HarmfulHarmful ExplosiveExplosive fire and to satisfy the requirements of insurance. Skips should be positioned to allow easy access for the skip vehicles to drop off new skips and collect full skips. Always use a banksman when skip vehicles are reversing. Skips are to be emptied regularly to reduce the risk of arson and theft. No hazardous material is to be deposited into skips. Temporary ramps used to gain access to skips should be sufficiently wide to prevent falls. On large or high skips, ramps should include side fall protection. Never climb into a skip. Hazardous wasteHazardous waste Hazardous waste such as asbestos must be collected by an approved licensed contractor. Hazardous waste should not be put with non-hazardous waste or sent for landfill. Sharps waste should be placed in a yellow sharps container and the lid firmly closed during transit. Sharps should never be carried in the front of vehicles. Hazardous SubstancesHazardous Substances Emergency proceduresEmergency procedures The client or principal contractor will ensure that the existing site emergency procedures are followed and that relevant information is given to operatives at time of induction or when changes are made to procedures. The principle contractor is responsible for ensuring that all operatives under their control adhere to the site emergency procedures at all times. First aid facilitiesFirst aid facilities Refer to the onsite safety notice board for all first aid information. A first aid box with enough equipment to cope with the number of workers on site should be provided for by the client or principal contractor. The client or principal contractor should nominate an appointed person to take care of first-aid arrangements. The number of appointed first aiders shall be dependent on the number of employees: < 5: At least one appointed person. 5–50: At least one first-aider trained in EFAW or FAW, depending on the type of injuries that may occur. More than 50: At least one first-aider trained in FAW for every 50 people employed. Welfare requirementsWelfare requirements Welfare arrangements are supplied by the client or principal contractor. These should be in line with Schedule 2 of the Construction Design & Management Regulations 2007 (CDM). All sites are to have a minimum amount of welfare facilities available for workers, which include the 6
  • 7. Hard HatsHard Hats RespiratoryRespiratory ProtectionProtection Safety BootsSafety Boots Hi Vis VestHi Vis Vest Eye ProtectionEye Protection Safety GlovesSafety Gloves following: Toilets Washing facilities Drinking water Changing rooms and lockers Heating Rest facilities PPE RequirementsPPE Requirements All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full accordance with safety procedures specified in the company's health and safety Policy. The work activities described within this method statement and all associated safety measures are not to be deviated from in any way. If, for any reason, the method statement cannot be implemented in full or should the described process be found inadequate for the purpose of providing a safe working environment, the affected activities must cease until such time as the method statement has been amended and reapproved as appropriate. 7
  • 8. Acme plumbingAcme plumbing 123 High Street London W1 Telephone:Telephone: 0207 123 1234 Fax:Fax: 0207 123 1234 www.acmeplumbing.com Document created:Document created: 02 Sep 14 Document updated:Document updated: 02 Sep 14 Prepared by:Prepared by: John Smith 44 55 2020 Likelihood xx Severity == Risk/residual risk LikelihoodLikelihood VeryVery unlikelyunlikely UnlikelyUnlikely PossiblePossible LikelyLikely VeryVery likelylikely 11 22 33 44 55 NegligibleNegligible 11 11 22 33 44 55 MinorMinor 22 22 44 66 88 1010 ModerateModerate 33 33 66 99 1212 1515 MajorMajor 44 44 88 1212 1616 2020 SeveritySeverity ExtremeExtreme 55 55 1010 1515 2020 2525 Risk assessmentRisk assessment New bathroom installNew bathroom install ProjectProject reference:reference: REF100 SiteSite address:address: 1 Greenwich Place London SE10 Client:Client: British Land PrincipalPrincipal contractor:contractor: Wilmott Dixon LocationLocation ofof works:works: Ground floor toilets StartStart datedate andand endend date:date: 01/10/2014 to 31/10/2014 SiteSite supervisor:supervisor: Mark Talbot SiteSite supervisorsupervisor phone:phone: 07555333111 Risk matrixRisk matrix 8
  • 9. 55 44 2020 11 44 44 33 33 99 11 33 33 55 55 11 55 Arrival & departure from siteArrival & departure from site Task:Task: Leaving or entering site HazardHazard RiskRisk Control measuresControl measures RRRR Struck by moving vehicles xx == All operatives and site visitors must ensure they sign in when entering Site inductions to be provided to all operative's and visitors before entering the work site Ensure correct PPE is worn at all times All operative's and visitors to keep to pedestrian areas only The use of cross over points will be incorporated into site plan by principal contractor All operative's should be made aware of changes in Site Traffic Management Plan as or when changed All operative's and site visitors must ensure they sign out when exiting Watch for other contractors leaving the area at the same time xx == Persons at risk:Persons at risk: All site operatives & public Task:Task: Unloading equipment HazardHazard RiskRisk Control measuresControl measures RRRR Muscle strains, sprains & injuries caused by lifting heavy loads xx == Use correct lifting techniques, all operatives should be trained in the safe method of lifting - refer to manual handling section in attached method statement Ensure two man lift is enforced for reaching or carrying heavier items Split loads to make them lighter and safer to handle Use mechanical aids when loads exceed 25kg per person or as referenced in method statement Be aware of handling large or bulky items e.g. plasterboard in windy conditions xx == Persons at risk:Persons at risk: User Crushed by falling load with potentially fatal injuries xx == Deliveries to be taken in designated areas only, other workers & public to be kept outside of delivery area Any machinery used for unloading to be operated by trained personal only and carries a current inspection certificate xx == 9
  • 10. 2525 55 44 55 2020 11 55 55 44 44 1616 11 44 44 44 55 11 55 Any items that could potentially be lifted by the wind should be placed in designated anchor areas and or weighted down Ensure any equipment used for unloading is not operated in overly windy conditions - refer to equipment or plant guidelines Goods should be placed on firm level ground in designated areas, height of goods should be kept to a minimum to prevent stack failure Persons at risk:Persons at risk: All site operatives & public Electrical shock or fatal injuries sustained from contact with overhead cables xx == Check prevailing site condition and ensure all deliveries undertaken in pre-determined safe area No vehicles to be parked or unloaded in the vicinity of overhead lines If necessary for deliveries to be undertaken below overhead cables, ensure works and area coordinated with local authority with sufficient protection in place for workers and public xx == Persons at risk:Persons at risk: User Task:Task: Leaving vehicle HazardHazard RiskRisk Control measuresControl measures RRRR Struck by moving vehicles xx == All operatives to park in designated areas Follow site rules and authorised routes provided by client or principal contractor All operatives to wear hi-visibility jackets when leaving vehicle All operatives to enter and sign in onsite All operatives to receive induction Banksman to be used when vehicles are reversing xx == Persons at risk:Persons at risk: All site operatives Preventing slips, trips and fallsPreventing slips, trips and falls Task:Task: Movement at height or on raised platforms HazardHazard RiskRisk Control measuresControl measures RRRR Severe or fatal injuries from slip, trips and falls at height xx Ensure good housekeeping onsite, 'clean as you go' implemented by all site operatives across the site xx 10
  • 11. 2020 55 44 33 1212 11 33 33 33 55 1515 11 55 55 == All items on raised platforms to be placed in designated and safe area away from thoroughfare and edges of platforms Ensure raised platforms are protected by cappings or fenced off to prevent entry into any risk area Ensure correct PPE is worn at heights to prevent falling from height resulting from slips, trips or falls == Persons at risk:Persons at risk: All site operatives Task:Task: Movement at ground level HazardHazard RiskRisk Control measuresControl measures RRRR Severe strains, sprains and muscle breaks xx == All operatives to be shown the correct area for safe storage of materials onsite before works begin Ensure clear working area on site, ensure dustsheets, mats and other materials cannot slip or slide underfoot Manage and remove potential slip trip hazards as they arise and notify site management if assistance required Do not carry items that will hinder the carrier's clear sight of view All rubbish to removed from site at scheduled times, organised by site supervisor and in line with the site waste management plan xx == Persons at risk:Persons at risk: All site operatives Using portable power toolsUsing portable power tools Task:Task: Using portable power tools HazardHazard RiskRisk Control measuresControl measures RRRR Serious cuts, injuries or amputations to body parts from the incorrect use of cutting tools xx == All operatives to be trained in the safe usage of power tools Always choose the right tool for the job Ensure all portable tools are set up correctly and securely fastened to worktops as per product specifications Ensure any portable tools that are set up, are in a designated safe area avoiding thoroughfare of other workers or vehicles All cutting tools to have safety guards incorporated, fastened securely and regularly checked and maintained Ensure no loose clothing is worn in the vicinity of cutting, and gloves are worn at all time xx == 11
  • 12. 33 22 66 11 22 22 33 55 1515 11 55 55 44 22 88 11 22 22 Persons at risk:Persons at risk: User Hearing loss to site operatives working near noisy power tools xx == All operatives trained in risks of noise exposure Suitable hearing protectors should be provided for operatives and any surrounding workers Use low-noise tooling where possible Other trades using grinders or other high noise emitting tools should not be working close enough to other site operatives to cause problems xx == Persons at risk:Persons at risk: All site operatives Electrocution causing serious or fatal injuries whilst using portable power tools xx == Only 110v or battery operated equipment to be used Electric equipment to be kept dry and stored in toolbox to protect from damp and damage Visual inspection prior to use, plugs, leads, power supply (transformer), insulation, switches, RCD(if used), signs of burns, casing, loose parts Damaged or defective equipment including leads to be replaced immediately or fixed by competent person Electrical equipment must not to be tampered with, anything showing evidence of tampering must not be used until tested by a professional Electrical equipment to be PAT tested every three months- PAT test to be checked prior to use and register of checked items to be provided before entering site xx == Persons at risk:Persons at risk: User General plumbing worksGeneral plumbing works Task:Task: General plumbing HazardHazard RiskRisk Control measuresControl measures RRRR Slips, trips and falls xx == Ensure all live pipework is isolated before undertaking any work to ensure no leakage See slips trips and falls risk assessment xx == Persons at risk:Persons at risk: All site operatives 12
  • 13. 33 33 99 11 33 33 Lung damage caused by inhalation of fumes and skin & eye damage from sealants xx == All substances required to perform plumbing activities are identified i.e., lead, solder, plumber flux etc. and the relevant COSHH Assessments and personal protective equipment is made available Consider use of respiratory equipment in confined areas Avoid skin contact with sealants and wash from skin as soon as possible if skin contact occurs All areas must be kept very well ventilated during sealant works and minimum requirement is to open all doors and windows xx == Persons at risk:Persons at risk: User 13
  • 14. Site briefing and induction formSite briefing and induction form New bathroom installNew bathroom install All persons who have signed below confirm that they have been briefed on the safe working methods and arrangements detailed in this method of work statement. DateDate NameName SignatureSignature 14