1. USAF â Eglin AFB 694 ARSS Technical Support Lean Event 12 â 14 Dec 2006
2.
3. 694 ARSS Technical Support Lean Team Front Row L to R: De Fischer (Finance), Gabe Chedister (Engineering and Team Lead), Chris Pfledderer (Lead Engineer). Back Row L to R: Keith Johnson (Facilitator), Mike Neil (Engineering), Dwight Westfall (Contracts), Ron Moore (Program Management), John Porche (Lead SAPM)
4.
5.
6. Current State Value Stream Determine Technical Support Requirements Initial De-Obligation of Residual Dollars Total Cycle Time = 508 days
8. Foreign Missile Sales Cycle Time Reduction > 50% 30 days to 5 days 15 days to 1 day 400 days to 180 days 54% Total Cycle Time Reduction, Cross-trained Personnel, Improved Standardization, Coordination and Accuracy