SlideShare a Scribd company logo
1 of 5
Download to read offline
The International Journal Of Engineering And Science (IJES)
|| Volume || 3 || Issue || 6 || Pages || 57-60 || 2014 ||
ISSN (e): 2319 โ€“ 1813 ISSN (p): 2319 โ€“ 1805
www.theijes.com The IJES Page 57
Erratic Power Supply and Socio- Economic Development in Ado-
Ekiti, Ekiti State, Nigeria
Adeoye. O .S 1
and Titiloye. S. O 2
Electrical and Electronic Engineering Department, Federal Polytechnic, Ado-Ekiti. Nigeria.1
Electrical and Electronic Engineering Department, Federal Polytechnic, Bida. Nigeria.2
--------------------------------------------------------------ABSTRACT-------------------------------------------------------
This paper appraises the structure of power supply in Nigeria. Data were sourced through the conduct of
interview with electricity consumers and the use of questionnaires for selected areas of Ado-Ekiti in order to
determine the level of power supply in one year (2012). The frequency of power outages for the areas under
consideration was determined and the effects of constant power failure on the socio-economic development of
the metropolis were adequately assessed. Recommendations were made to proffer solution to erratic power
supply in the metropolis with a view of improving the level of power supply.
KEYWORDS: Development, Erratic, Outage, Power, Supply
---------------------------------------------------------------------------------------------------------------------------------------
Date of Submission: 01 April 2014 Date of Publication: 25 June 2014
---------------------------------------------------------------------------------------------------------------------------------------
I. INTRODUCTION
Power supply in Nigeria at the moment is faced with many challenges and this had ravaged the country
with slow pace of development. The components of power supply universally are the generating stations, the
transmission system and the distribution networks (Adeoye etal, 2012). The bulk electric power is produced by
special plants known as generating stations (Metha, 2005). A generating station employs a prime mover
coupled to an alternator for the production of electric power. The form of energy is converted into electrical
energy depending on the type of generating station. Today, the world has moved to a level by which the
environmental pollution through CO2 emission from the conventional generating stations is discouraged. The
use of renewable energy is the solution to power shortage in most developed nations of the world in recent
years. Transmission lines have three constants, resistance, inductance and capacitance which are distributed
uniformly along the whole length of the line (Metha, 2005). The overhead lines are classified into short,
medium and long transmission lines depending on their voltage level and span. The part of power which
distributes electric power for local use is called the distribution system. Distribution system is classified based
on the nature of current, types of construction and scheme of connection. The hydropower in Nigeria and
thermal generating stations are incapable to generate the required power to sufficiently feed the domestic,
commercial and industrial demand of the country. The population of Nigeria is 140,003,544 with the estimated
power demand of the country as 13,160.33W. It is obvious that the country needs to generate about 15,000MW
to meet up with the growing population and power demand required for socio economic development (Adeoye
etal, 2011). The present power generation is 4439.5MW with Lagos taking about 1,124MW which represents
25.32% of the total power generated in the country (The Nation, 2012). The distribution system has the major
challenges ranging from inadequate transformers capacity, maintenance, and low current densities for
conductors and cross sectional areas, improper planning, problems of power supply authorities, and
staffing. Nigeria has an installed capacity of 8,644MW of which 6,905MW is government owned. The
population of the country has increased to about 150 million with an average GDP growth rate of 6.66%.
25,561MW will be required in the next 9 years to meet demand by vision20: 2020 target (Presidential
Taskforce on Power, 2011).
A study on power supply on Ado -Ekiti showed that women whose age ranges from 18 -29 and their
men counterpart had 67% access to electricity (Adeoye etal, 2013).
Successive Governments have tried to improve power supply over the past few decades. Trillions of
Naira had been spent but little had been achieved. The problems are inadequacy of past policies and their poor
implementations. Others are: High capital, intensive nature of power sector projects; inadequate power
generation capacity of a peak value of about 4300MW; the use of older power plants; vandalisation of existing
power infrastructure; gas supply constraints; inadequate maintenance of equipments; dearth of skilled
manpower; dependence on imports of parts; and foreign experts to effect repairs and overhaul.
Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria
www.theijes.com The IJES Page 58
(http://www.power.gov.ng/index).
The Manufacturers Association of Nigeria indicated that capacity utilisation which was recently at a
disturbingly low level of 35 percent has plunged further to 27 percent as a result of inadequate and erratic power
supply. A grossly inefficient fuel distribution system compounds the power problem for all economic operators.
Service organisations are losing man hours and business opportunities while operational costs are escalating.
Energy experts noted that the energy crisis adds at least 40 percent to the cost of doing business in Nigeria. This
makes the cost of production very high and renders Nigerian made goods uncompetitive in both the local and
international market place. Data from the Nigerian Electricity Regulatory Agency indicates that Nigerians spend
around N797 billion yearly to buy fuel for powering their generators. A sum N540.9 billion goes into
purchasing diesel while N255 billion go into petrol(http://www.nigerianoilgas.com, 2010).
Over the year, the nationโ€™s power sector has been be-devilled by managerial inefficiencies and leakages, lack of
transmission, efficient investment in generation, distribution, and continued increase in load demand. With
Nigeria on the quest to become one of the 20 leading economies by 2020, fast tracking the nationโ€™s electricity
needs is critical for industrialisation.
The growth of any nation is critically dependent on the sufficiency of its electricity supply industry.
However, the development of the various sectors of the economy, such as industry, agriculture, health,
education, tourism, etc, depends heavily on reliable, adequateandeconomicallypricedpower
(http://www.businessdayonline.com March, 2012).
Electricity generation, transmission and distribution have been faced with many challenges. The erratic power
supply experienced has been a source of concern for individuals, businesses and investors and has hampered the
economic growth of the nation. In most urban areas, power supply is a privilege that should be enjoyed when
available but should not be expected to last for long. While in some rural areas and new communities, power
supply is very erratic and cannot be hoped for rapid improvement at the moment. Energy is central to improved
social and economic well-being and indispensable to most industrial and commercial wealth generation,
analysts, stakeholders and well meaning Nigerians believe that for the nation to become one of the twenty most
developed countries by 2020, the country would require adequate and reliable energy services at affordable
costs in a secure and reliable energy services at affordable-costs. (http://www.businessdayonline. 26 March ,
2012 ).
Sequel to the fact that only 40 % of Nigerians enjoyed electricity supply, most Companies had been
driven out of the country. The epileptic electricity supply in spite of huge investment by the Federal
Government cannot be dissociated from the Management of the defunct Power Holding Company of Nigeria.
(New Agency of Nigeria, retrieved from http://www.nanngronline.com, 28th
Nov, 2013). Erratic delivery of
power supply for domestic and industrial use is dependent on the low level of water in some power plants and
shortage of gas supply, inadequate human capacity and insufficient system synergy (Vanguard Newspaper,
retrieved from http://www.vanguardngr.com, 1st
May,2012).
Nigeriaโ€™s power sector is credited with high energy loss of 30-50% from generation to billing, a low revenue
collection rate of 75-80%. This inefficiencies result in low access to electricity by the largest part of the
population (http://blueprinting.com/2012).
Methodology: The method employed in this research is the use of questionnaires and direct interview with the
residents. Selected areas in Ado-Ekiti metropolis such as Adebayo, Ekute Quarters and Omisanjana were visited
in order to assess the level of their supply of power and frequency of outages in one year (January-December
,2012). Omisajana and Ekute were selected as residential areas with a population of over 10,000 and 12,000
residents respectively (estimate). Adebayo was selected as another area being both residential and commercial
part of the state with a population of about 50,000 people (estimate). Adebayo area is an area where the
residents are Students, families and artisans. Simple mathematical approach was used to assess the level of
incessant power supply in these areas. Recommendations were made with a view of minimising the present
erratic power supply in the country. The simple mathematical equations were used to assess the frequency (%)
of power supply per person and the selected people of such areas that were interviewed. The equations are stated
as in equations 1.1 and 1.2. The rate of power outages were determined as inverse of the frequency of power
supply (%) as stated in equation 1.3.
...............1.1
..................1.2
...........1.3
Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria
www.theijes.com The IJES Page 59
Discussion: The study shows that the state of power supply in the country is devastating. Most streets
in the selected areas of Ado-Ekiti are suffering from in-adequate power supply due to low power allocation,
planning deficiencies from the power authority, inadequate capacity of transformers, poor voltage regulation,
cable undersize, and lack of maintenance of transformer substations. The effects of the incessant power failure
are numerous ranging from waste of resources, productive deficiencies, insecurity and slow rate of development.
It was observed that the 132/33 kV has not been adequately utilised. 200 questionnaires were distributed and
only 180 were returned which represents 90%. 70, 75 and 55 people were interviewed from Omisanjana,
Adebayo and Ekute Quarters respectively. 60, 70 and 50 out of questionnaires were returned for analysis. The
respondents at Adebayo who were students and other residents believed that the level of power supply in the
area is grossly inadequate. They complained that power supply to the area could be guaranteed from 11p.m to
4a.m of each day of the week. This signifies 5 hours a day, 35 hours in a week, 140 hours in a month and 1820
hours in a year signifying 20.78 % supply of power throughout the year as shown in Table 1 and fig.1.
Commercial activities in the area are usually paralysed during the day. This had forced residents and traders to
purchase generators. Not only that, they need to buy petrol or diesel and carry out maintenance on the mechano-
electrical device on constant basis. This is a set back for the metropolis because the amount to carry out the
maintenance is uneconomical which could be invested on the socio โ€“economic development of Ado-Ekiti.
Omisanjana residents stated that the state of power supply was fairly encouraging based on the fact that power
supply is made available for 5 days in a week for about 18hours per day due to constant load shedding in the
area. The implication is that in a year, the supply is for 4680 hours representing 53.42 % as shown in Table 1
and fig. 1 respectively. In Ekute area, most resident applauded the Power Holding Company of Nigeria sequel to
the fact that they usually enjoy power supply for about 20 hours in a day. This represents 7280 hours per year at
83.11% as shown in Table 1 and fig.1. The percentage power supply and outages are shown in Table 2 and fig.2
respectively. The average analysis of power supply to the three areas depict that power supply is 52.44% while
the frequency of power outage is 47.56%. The present power supply in Ado Ekiti can be used as an average of
approximately 52% power supply to residents and other commercial activities. This is a serious problem for the
countryโ€™s socio economic development. The hindrances to constant power supply are poor power allocation,
inadequate planning, and load shedding. It is sad that most Companies in the country today had migrated to
South Africa and Ghana due to erratic power supply. Examples of such are: Michelin, Dunlop, and PZ which
had skyrocketed the unemployment rate in the country. Some small and medium scale industries had closed
down. It is obvious that most residents in the metropolis make use of both petrol and diesel generators. The
premium motor spirit and auto mobile gas oil in Ado-Ekiti presently cost 110 and 160 naira respectively. Fuel
consumption for Ado Ekiti residents for a year domestically, commercially and industrially is several millions of
naira. This amount could have been invested into provision of infrastructural facilities such as roads, electricity
supply, drinkable water, agricultural development with a view of providing succour for the residents. The
wasted resources could also generate employment opportunities for the people.
Conclusion: The present power allocations, maintenance, conductor sizes, voltage regulations and adequate
planning should be properly scrutinized for adequate power supply to the country. The power supply in Ekiti in
spite of the present increase in the supply capacity is grossly inadequate due to the fact that the 132/33kV is yet
to be adequately utilised. It was established that the power supply level in Adebayo area was 1820 hours in a
year signifying 20.78 % supply throughout the year and about 79.22 % of the year is characterised with power
outage. In Omisanjana area, the power supply level was 4680 hours representing 53.42 % and 46.58 %
representing period of power outage in the area. It Should be noted that in Ekute area, the power supply was
7280 hours in a year representing 83.11 % while the power outage was only 16.89 %. The average power supply
to the areas under consideration was put at 52 %. The effective utilisation of the installed 132/33kV in the state
will at least provide between 70-75% power supply to the entire populace which will form an economic base for
the state. The farmlands in the rural areas of the state will have access to regular power supply so as to preserve
the agricultural produce and the industries would be able to transform raw materials to finished products.
Domestic consumers would be able to enjoy almost twenty-four hours supply in a day while artisans would also
access about 24 hrs supplies for productive service. Renewable energy would help the country to provide stable
power supply to meet up with domestic and commercial loads. The use of smart grids technologies and smart
grids metering will proffer solution to all technical and non technical losses in both transmission and distribution
lines.
1.7 Recommendations: The following recommendations were made in order to reduce the erratic power supply
in the country.
Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria
www.theijes.com The IJES Page 60
1. The power allocation to Ekiti should be increased.
2. Adequate planning should be put in place by the power authorities.
3. Good voltage regulating devices must be put in place.
4. Cable size for armoured and Aluminium conductors should be of the required standard.
5. Engineering maintenance of power facilities must be adequate.
6. Renewable energy should be used to boost the level of power supply in the state.
7. Smart grid technology should be incorporated.
8. Embedded Generation (EG) and Independent Electricity Distribution Network (IEDN) should be made
operational in the country.
9. The wasted resources being expended on purchase and maintenance of generating sets should be used to
generate employment opportunities for the people.
REFERENCES:
[1]. Adeoye, O.S, Bamisaye, A.J and Akinsaya, O.A (2011):Renewable Energy Sources for Economic Growth and Stability in
Nigeria (Power Demand and Supply as a Planning Scheme). 7TH
Engineering Forum, School of Engineering, Federal
Polytechnic, Ado-Ekiti, 2(1):199 -204.
[2]. Adeoye, O.S, Akinsanya, O.A and Alake, T.J (2012): Erratic Power Supply in Nigeria: Bane of Development (Ado-Ekiti as a
case study). 8TH
Engineering Forum, School of Engineering, Federal Polytechnic, Ado-Ekiti, 2(1):188-194.
[3]. Adeoye, O.S and Akinsanya, O.A (2013): Evaluation of Power Demand Capacity for Socio-Economic Development in Nigeria.
SEEM Research and Development Journal, 2(1):19-30.
[4]. Mehta, V.K and Mehta, R (2005) : Principles of Power System, S.Chand and Company Ltd, Ram Nagar, New Delhi -110 -
055.pp 228.
[5]. News Agency of Nigeria (2013). Retrieved 28th November, 2013, from nanngronline.com.
[6]. The Nation ((2012): Vol 7, No 2246, Wednesday, September 12, 2012. pp 1.
[7]. The-Business-day-online-(2012). Retrieved-8th-
March-,2012-from
http//www.power.gov.ng/index.
[8]. Presidential Task force on Power Supply in Nigeria(2011)
[9]. Vanguard Newspaper(2012): Retrieved 1st
May,2012.
[10]. http:www.blueprinting.com, Retrieved November, 2012.
[11]. http//:www.businessdayonline.com, Retrieved on 26th
March,2012.
[12]. http://ww.nigerianoilgas.com retrieved in 2010.
Fig.1: Power supply (hours) to the Areas in Ado - Ekiti
Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria
www.theijes.com The IJES Page 61
Fig. 2 Percentage power supply and outage for selected Areas in Ado - Ekiti
Table 1: Power Supply to selected areas in Ado- Ekiti
S/N Areas Daily
(hrs)
Weekly
(hrs)
Monthly
(hrs)
Annual
(hrs)
1. Adebayo 5 35 140 1820
2. Omisanjana 18 90 360 4680
3. Ekute 20 140 560 7280
Table 2: Percentage power supply and outage to Areas in Ado-Ekiti
S/
N
Areas Annual
Supply (%)
Annual
Outage (%)
1. Adebayo 20.78 79.22
2. Omisanjana 53.42 46.58
3. Ekute 83.11 16.89

More Related Content

What's hot

Electricity ppt
Electricity pptElectricity ppt
Electricity pptAnoop K Mishra
ย 
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...IJAAS Team
ย 
IRJET- The Power of Electricity and itโ€™s Problems in India
IRJET- The Power of Electricity and itโ€™s Problems in IndiaIRJET- The Power of Electricity and itโ€™s Problems in India
IRJET- The Power of Electricity and itโ€™s Problems in IndiaIRJET Journal
ย 
The energy access dividend in honduras and haiti
The energy access dividend in honduras and haitiThe energy access dividend in honduras and haiti
The energy access dividend in honduras and haitiStanleylucas
ย 
The Impact of Working Capital Management in Enhancing Profitability in the El...
The Impact of Working Capital Management in Enhancing Profitability in the El...The Impact of Working Capital Management in Enhancing Profitability in the El...
The Impact of Working Capital Management in Enhancing Profitability in the El...Premier Publishers
ย 
Detailed Analysis Of Power Plant Equipments (Power Sector)
Detailed Analysis Of Power Plant Equipments (Power Sector)Detailed Analysis Of Power Plant Equipments (Power Sector)
Detailed Analysis Of Power Plant Equipments (Power Sector)KAMALAKKANNAN G
ย 
Building Electricity Supplies in Africa
Building Electricity Supplies in AfricaBuilding Electricity Supplies in Africa
Building Electricity Supplies in Africaasafeiran
ย 
Contemporary issues and challenges of power sector in haryana
Contemporary issues and challenges of power sector in haryanaContemporary issues and challenges of power sector in haryana
Contemporary issues and challenges of power sector in haryanaSubmissionResearchpa
ย 
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTS
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTSDESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTS
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTSIAEME Publication
ย 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisArjun Yadav
ย 
Contemporary issues and challenges of power sector in Haryana
Contemporary issues and challenges of power sector in HaryanaContemporary issues and challenges of power sector in Haryana
Contemporary issues and challenges of power sector in HaryanaSubmissionResearchpa
ย 
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...IAEME Publication
ย 
Investment opportunity in energy sector of Nepal
Investment opportunity in energy sector of Nepal   Investment opportunity in energy sector of Nepal
Investment opportunity in energy sector of Nepal Dr Ramhari Poudyal
ย 
Prabin kc
Prabin kcPrabin kc
Prabin kcPraeen KC
ย 
Energy sustainable-rural-india-final
Energy sustainable-rural-india-finalEnergy sustainable-rural-india-final
Energy sustainable-rural-india-finalIjcem Journal
ย 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorAlexander Decker
ย 

What's hot (20)

Electricity ppt
Electricity pptElectricity ppt
Electricity ppt
ย 
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
ย 
IRJET- The Power of Electricity and itโ€™s Problems in India
IRJET- The Power of Electricity and itโ€™s Problems in IndiaIRJET- The Power of Electricity and itโ€™s Problems in India
IRJET- The Power of Electricity and itโ€™s Problems in India
ย 
Abdulsalam Kamara
Abdulsalam Kamara Abdulsalam Kamara
Abdulsalam Kamara
ย 
The energy access dividend in honduras and haiti
The energy access dividend in honduras and haitiThe energy access dividend in honduras and haiti
The energy access dividend in honduras and haiti
ย 
The Impact of Working Capital Management in Enhancing Profitability in the El...
The Impact of Working Capital Management in Enhancing Profitability in the El...The Impact of Working Capital Management in Enhancing Profitability in the El...
The Impact of Working Capital Management in Enhancing Profitability in the El...
ย 
Detailed Analysis Of Power Plant Equipments (Power Sector)
Detailed Analysis Of Power Plant Equipments (Power Sector)Detailed Analysis Of Power Plant Equipments (Power Sector)
Detailed Analysis Of Power Plant Equipments (Power Sector)
ย 
Building Electricity Supplies in Africa
Building Electricity Supplies in AfricaBuilding Electricity Supplies in Africa
Building Electricity Supplies in Africa
ย 
Contemporary issues and challenges of power sector in haryana
Contemporary issues and challenges of power sector in haryanaContemporary issues and challenges of power sector in haryana
Contemporary issues and challenges of power sector in haryana
ย 
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTS
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTSDESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTS
DESIGN AND CONSTRUCTION OF A 0.5 KW SOLAR TREE FOR POWERING FARM SETTLEMENTS
ย 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry Analysis
ย 
Promoting massive renewable energy by benjamin
Promoting massive renewable energy by benjaminPromoting massive renewable energy by benjamin
Promoting massive renewable energy by benjamin
ย 
Contemporary issues and challenges of power sector in Haryana
Contemporary issues and challenges of power sector in HaryanaContemporary issues and challenges of power sector in Haryana
Contemporary issues and challenges of power sector in Haryana
ย 
B0320108012
B0320108012B0320108012
B0320108012
ย 
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...
TECHNO-ECONOMIC EVALUATION OF COAL-FIRED POWER PLANT IN SOUTH EAST NIGERIA, A...
ย 
Investment opportunity in energy sector of Nepal
Investment opportunity in energy sector of Nepal   Investment opportunity in energy sector of Nepal
Investment opportunity in energy sector of Nepal
ย 
Prabin kc
Prabin kcPrabin kc
Prabin kc
ย 
Energy sustainable-rural-india-final
Energy sustainable-rural-india-finalEnergy sustainable-rural-india-final
Energy sustainable-rural-india-final
ย 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sector
ย 
India : Power Sector Report_August 2013
India : Power Sector Report_August 2013India : Power Sector Report_August 2013
India : Power Sector Report_August 2013
ย 

Viewers also liked

H0362053057
H0362053057H0362053057
H0362053057theijes
ย 
C0373013023
C0373013023C0373013023
C0373013023theijes
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)theijes
ย 
F0363046051
F0363046051F0363046051
F0363046051theijes
ย 
I0373072083
I0373072083I0373072083
I0373072083theijes
ย 
J0371055062
J0371055062J0371055062
J0371055062theijes
ย 
G0373049057
G0373049057G0373049057
G0373049057theijes
ย 
D0363022039
D0363022039D0363022039
D0363022039theijes
ย 
A0363001009
A0363001009A0363001009
A0363001009theijes
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
ย 
P036401020107
P036401020107P036401020107
P036401020107theijes
ย 
F0366041045
F0366041045F0366041045
F0366041045theijes
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)theijes
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)theijes
ย 
O03640900101
O03640900101O03640900101
O03640900101theijes
ย 
A03640106
A03640106A03640106
A03640106theijes
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
ย 

Viewers also liked (18)

H0362053057
H0362053057H0362053057
H0362053057
ย 
C0373013023
C0373013023C0373013023
C0373013023
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)
ย 
F0363046051
F0363046051F0363046051
F0363046051
ย 
I0373072083
I0373072083I0373072083
I0373072083
ย 
J0371055062
J0371055062J0371055062
J0371055062
ย 
G0373049057
G0373049057G0373049057
G0373049057
ย 
D0363022039
D0363022039D0363022039
D0363022039
ย 
A0363001009
A0363001009A0363001009
A0363001009
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
ย 
P036401020107
P036401020107P036401020107
P036401020107
ย 
F0366041045
F0366041045F0366041045
F0366041045
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)
ย 
The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)The International Journal of Engineering and Science (IJES)
The International Journal of Engineering and Science (IJES)
ย 
O03640900101
O03640900101O03640900101
O03640900101
ย 
A03640106
A03640106A03640106
A03640106
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
ย 

Similar to J0364057060

The Effect of Electricity Supply on the Performance of Small and Medium-Scale...
The Effect of Electricity Supply on the Performance of Small and Medium-Scale...The Effect of Electricity Supply on the Performance of Small and Medium-Scale...
The Effect of Electricity Supply on the Performance of Small and Medium-Scale...Dr. Amarjeet Singh
ย 
D0362023027
D0362023027D0362023027
D0362023027theijes
ย 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17Jhon Smith
ย 
IRJET- Integration of Solar Electricity Into National Grid: Case Study of...
IRJET-  	  Integration of Solar Electricity Into National Grid: Case Study of...IRJET-  	  Integration of Solar Electricity Into National Grid: Case Study of...
IRJET- Integration of Solar Electricity Into National Grid: Case Study of...IRJET Journal
ย 
Analysis of grid connected independent power plant capabilities on electricit...
Analysis of grid connected independent power plant capabilities on electricit...Analysis of grid connected independent power plant capabilities on electricit...
Analysis of grid connected independent power plant capabilities on electricit...Najeem Olawale Adelakun
ย 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorAlexander Decker
ย 
Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...eSAT Publishing House
ย 
Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...eSAT Journals
ย 
H2 business plan v- 1st Sept 2011
H2 business plan v- 1st Sept 2011H2 business plan v- 1st Sept 2011
H2 business plan v- 1st Sept 2011Uzoma Nwakuche
ย 
Assessment of renewable energy in nigeria, challenges and benefits.
Assessment of renewable energy in nigeria, challenges and benefits.Assessment of renewable energy in nigeria, challenges and benefits.
Assessment of renewable energy in nigeria, challenges and benefits.Najeem Olawale Adelakun
ย 
A var analysis of the relationship between energy
A var analysis of the relationship between energyA var analysis of the relationship between energy
A var analysis of the relationship between energyAlexander Decker
ย 
A var analysis of the relationship between energy
A var analysis of the relationship between energyA var analysis of the relationship between energy
A var analysis of the relationship between energyAlexander Decker
ย 
Off-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaOff-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaIJSRED
ย 
Financing Strategy for Nigeria Infrastructural Deficit
Financing Strategy for Nigeria Infrastructural DeficitFinancing Strategy for Nigeria Infrastructural Deficit
Financing Strategy for Nigeria Infrastructural DeficitOla Oluwaseun MATHEW, PMP
ย 
Nigeria electric power report
Nigeria electric power reportNigeria electric power report
Nigeria electric power reportChibuikeOsigwe
ย 
Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...IJAAS Team
ย 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantSulaman Muhammad
ย 
Impact of power outages on developing countries evidence from rural household...
Impact of power outages on developing countries evidence from rural household...Impact of power outages on developing countries evidence from rural household...
Impact of power outages on developing countries evidence from rural household...Dr. Hachimenum Amadi
ย 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaAlex Pischalnikov
ย 

Similar to J0364057060 (20)

F0513644
F0513644F0513644
F0513644
ย 
The Effect of Electricity Supply on the Performance of Small and Medium-Scale...
The Effect of Electricity Supply on the Performance of Small and Medium-Scale...The Effect of Electricity Supply on the Performance of Small and Medium-Scale...
The Effect of Electricity Supply on the Performance of Small and Medium-Scale...
ย 
D0362023027
D0362023027D0362023027
D0362023027
ย 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17
ย 
IRJET- Integration of Solar Electricity Into National Grid: Case Study of...
IRJET-  	  Integration of Solar Electricity Into National Grid: Case Study of...IRJET-  	  Integration of Solar Electricity Into National Grid: Case Study of...
IRJET- Integration of Solar Electricity Into National Grid: Case Study of...
ย 
Analysis of grid connected independent power plant capabilities on electricit...
Analysis of grid connected independent power plant capabilities on electricit...Analysis of grid connected independent power plant capabilities on electricit...
Analysis of grid connected independent power plant capabilities on electricit...
ย 
Recovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sectorRecovery of cost of electricity supply in the nigerian power sector
Recovery of cost of electricity supply in the nigerian power sector
ย 
Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...
ย 
Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...Performance investigation of electricial power supply to owerri for higher pr...
Performance investigation of electricial power supply to owerri for higher pr...
ย 
H2 business plan v- 1st Sept 2011
H2 business plan v- 1st Sept 2011H2 business plan v- 1st Sept 2011
H2 business plan v- 1st Sept 2011
ย 
Assessment of renewable energy in nigeria, challenges and benefits.
Assessment of renewable energy in nigeria, challenges and benefits.Assessment of renewable energy in nigeria, challenges and benefits.
Assessment of renewable energy in nigeria, challenges and benefits.
ย 
A var analysis of the relationship between energy
A var analysis of the relationship between energyA var analysis of the relationship between energy
A var analysis of the relationship between energy
ย 
A var analysis of the relationship between energy
A var analysis of the relationship between energyA var analysis of the relationship between energy
A var analysis of the relationship between energy
ย 
Off-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in NigeriaOff-grid small hydropower for rural development in Nigeria
Off-grid small hydropower for rural development in Nigeria
ย 
Financing Strategy for Nigeria Infrastructural Deficit
Financing Strategy for Nigeria Infrastructural DeficitFinancing Strategy for Nigeria Infrastructural Deficit
Financing Strategy for Nigeria Infrastructural Deficit
ย 
Nigeria electric power report
Nigeria electric power reportNigeria electric power report
Nigeria electric power report
ย 
Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...Solar energy as a potential contributor to help bridge the gap between electr...
Solar energy as a potential contributor to help bridge the gap between electr...
ย 
Feasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power PlantFeasibility Report of Small Hydroelectric Power Plant
Feasibility Report of Small Hydroelectric Power Plant
ย 
Impact of power outages on developing countries evidence from rural household...
Impact of power outages on developing countries evidence from rural household...Impact of power outages on developing countries evidence from rural household...
Impact of power outages on developing countries evidence from rural household...
ย 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
ย 

Recently uploaded

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
ย 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
ย 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
ย 

Recently uploaded (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
ย 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
ย 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
ย 

J0364057060

  • 1. The International Journal Of Engineering And Science (IJES) || Volume || 3 || Issue || 6 || Pages || 57-60 || 2014 || ISSN (e): 2319 โ€“ 1813 ISSN (p): 2319 โ€“ 1805 www.theijes.com The IJES Page 57 Erratic Power Supply and Socio- Economic Development in Ado- Ekiti, Ekiti State, Nigeria Adeoye. O .S 1 and Titiloye. S. O 2 Electrical and Electronic Engineering Department, Federal Polytechnic, Ado-Ekiti. Nigeria.1 Electrical and Electronic Engineering Department, Federal Polytechnic, Bida. Nigeria.2 --------------------------------------------------------------ABSTRACT------------------------------------------------------- This paper appraises the structure of power supply in Nigeria. Data were sourced through the conduct of interview with electricity consumers and the use of questionnaires for selected areas of Ado-Ekiti in order to determine the level of power supply in one year (2012). The frequency of power outages for the areas under consideration was determined and the effects of constant power failure on the socio-economic development of the metropolis were adequately assessed. Recommendations were made to proffer solution to erratic power supply in the metropolis with a view of improving the level of power supply. KEYWORDS: Development, Erratic, Outage, Power, Supply --------------------------------------------------------------------------------------------------------------------------------------- Date of Submission: 01 April 2014 Date of Publication: 25 June 2014 --------------------------------------------------------------------------------------------------------------------------------------- I. INTRODUCTION Power supply in Nigeria at the moment is faced with many challenges and this had ravaged the country with slow pace of development. The components of power supply universally are the generating stations, the transmission system and the distribution networks (Adeoye etal, 2012). The bulk electric power is produced by special plants known as generating stations (Metha, 2005). A generating station employs a prime mover coupled to an alternator for the production of electric power. The form of energy is converted into electrical energy depending on the type of generating station. Today, the world has moved to a level by which the environmental pollution through CO2 emission from the conventional generating stations is discouraged. The use of renewable energy is the solution to power shortage in most developed nations of the world in recent years. Transmission lines have three constants, resistance, inductance and capacitance which are distributed uniformly along the whole length of the line (Metha, 2005). The overhead lines are classified into short, medium and long transmission lines depending on their voltage level and span. The part of power which distributes electric power for local use is called the distribution system. Distribution system is classified based on the nature of current, types of construction and scheme of connection. The hydropower in Nigeria and thermal generating stations are incapable to generate the required power to sufficiently feed the domestic, commercial and industrial demand of the country. The population of Nigeria is 140,003,544 with the estimated power demand of the country as 13,160.33W. It is obvious that the country needs to generate about 15,000MW to meet up with the growing population and power demand required for socio economic development (Adeoye etal, 2011). The present power generation is 4439.5MW with Lagos taking about 1,124MW which represents 25.32% of the total power generated in the country (The Nation, 2012). The distribution system has the major challenges ranging from inadequate transformers capacity, maintenance, and low current densities for conductors and cross sectional areas, improper planning, problems of power supply authorities, and staffing. Nigeria has an installed capacity of 8,644MW of which 6,905MW is government owned. The population of the country has increased to about 150 million with an average GDP growth rate of 6.66%. 25,561MW will be required in the next 9 years to meet demand by vision20: 2020 target (Presidential Taskforce on Power, 2011). A study on power supply on Ado -Ekiti showed that women whose age ranges from 18 -29 and their men counterpart had 67% access to electricity (Adeoye etal, 2013). Successive Governments have tried to improve power supply over the past few decades. Trillions of Naira had been spent but little had been achieved. The problems are inadequacy of past policies and their poor implementations. Others are: High capital, intensive nature of power sector projects; inadequate power generation capacity of a peak value of about 4300MW; the use of older power plants; vandalisation of existing power infrastructure; gas supply constraints; inadequate maintenance of equipments; dearth of skilled manpower; dependence on imports of parts; and foreign experts to effect repairs and overhaul.
  • 2. Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria www.theijes.com The IJES Page 58 (http://www.power.gov.ng/index). The Manufacturers Association of Nigeria indicated that capacity utilisation which was recently at a disturbingly low level of 35 percent has plunged further to 27 percent as a result of inadequate and erratic power supply. A grossly inefficient fuel distribution system compounds the power problem for all economic operators. Service organisations are losing man hours and business opportunities while operational costs are escalating. Energy experts noted that the energy crisis adds at least 40 percent to the cost of doing business in Nigeria. This makes the cost of production very high and renders Nigerian made goods uncompetitive in both the local and international market place. Data from the Nigerian Electricity Regulatory Agency indicates that Nigerians spend around N797 billion yearly to buy fuel for powering their generators. A sum N540.9 billion goes into purchasing diesel while N255 billion go into petrol(http://www.nigerianoilgas.com, 2010). Over the year, the nationโ€™s power sector has been be-devilled by managerial inefficiencies and leakages, lack of transmission, efficient investment in generation, distribution, and continued increase in load demand. With Nigeria on the quest to become one of the 20 leading economies by 2020, fast tracking the nationโ€™s electricity needs is critical for industrialisation. The growth of any nation is critically dependent on the sufficiency of its electricity supply industry. However, the development of the various sectors of the economy, such as industry, agriculture, health, education, tourism, etc, depends heavily on reliable, adequateandeconomicallypricedpower (http://www.businessdayonline.com March, 2012). Electricity generation, transmission and distribution have been faced with many challenges. The erratic power supply experienced has been a source of concern for individuals, businesses and investors and has hampered the economic growth of the nation. In most urban areas, power supply is a privilege that should be enjoyed when available but should not be expected to last for long. While in some rural areas and new communities, power supply is very erratic and cannot be hoped for rapid improvement at the moment. Energy is central to improved social and economic well-being and indispensable to most industrial and commercial wealth generation, analysts, stakeholders and well meaning Nigerians believe that for the nation to become one of the twenty most developed countries by 2020, the country would require adequate and reliable energy services at affordable costs in a secure and reliable energy services at affordable-costs. (http://www.businessdayonline. 26 March , 2012 ). Sequel to the fact that only 40 % of Nigerians enjoyed electricity supply, most Companies had been driven out of the country. The epileptic electricity supply in spite of huge investment by the Federal Government cannot be dissociated from the Management of the defunct Power Holding Company of Nigeria. (New Agency of Nigeria, retrieved from http://www.nanngronline.com, 28th Nov, 2013). Erratic delivery of power supply for domestic and industrial use is dependent on the low level of water in some power plants and shortage of gas supply, inadequate human capacity and insufficient system synergy (Vanguard Newspaper, retrieved from http://www.vanguardngr.com, 1st May,2012). Nigeriaโ€™s power sector is credited with high energy loss of 30-50% from generation to billing, a low revenue collection rate of 75-80%. This inefficiencies result in low access to electricity by the largest part of the population (http://blueprinting.com/2012). Methodology: The method employed in this research is the use of questionnaires and direct interview with the residents. Selected areas in Ado-Ekiti metropolis such as Adebayo, Ekute Quarters and Omisanjana were visited in order to assess the level of their supply of power and frequency of outages in one year (January-December ,2012). Omisajana and Ekute were selected as residential areas with a population of over 10,000 and 12,000 residents respectively (estimate). Adebayo was selected as another area being both residential and commercial part of the state with a population of about 50,000 people (estimate). Adebayo area is an area where the residents are Students, families and artisans. Simple mathematical approach was used to assess the level of incessant power supply in these areas. Recommendations were made with a view of minimising the present erratic power supply in the country. The simple mathematical equations were used to assess the frequency (%) of power supply per person and the selected people of such areas that were interviewed. The equations are stated as in equations 1.1 and 1.2. The rate of power outages were determined as inverse of the frequency of power supply (%) as stated in equation 1.3. ...............1.1 ..................1.2 ...........1.3
  • 3. Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria www.theijes.com The IJES Page 59 Discussion: The study shows that the state of power supply in the country is devastating. Most streets in the selected areas of Ado-Ekiti are suffering from in-adequate power supply due to low power allocation, planning deficiencies from the power authority, inadequate capacity of transformers, poor voltage regulation, cable undersize, and lack of maintenance of transformer substations. The effects of the incessant power failure are numerous ranging from waste of resources, productive deficiencies, insecurity and slow rate of development. It was observed that the 132/33 kV has not been adequately utilised. 200 questionnaires were distributed and only 180 were returned which represents 90%. 70, 75 and 55 people were interviewed from Omisanjana, Adebayo and Ekute Quarters respectively. 60, 70 and 50 out of questionnaires were returned for analysis. The respondents at Adebayo who were students and other residents believed that the level of power supply in the area is grossly inadequate. They complained that power supply to the area could be guaranteed from 11p.m to 4a.m of each day of the week. This signifies 5 hours a day, 35 hours in a week, 140 hours in a month and 1820 hours in a year signifying 20.78 % supply of power throughout the year as shown in Table 1 and fig.1. Commercial activities in the area are usually paralysed during the day. This had forced residents and traders to purchase generators. Not only that, they need to buy petrol or diesel and carry out maintenance on the mechano- electrical device on constant basis. This is a set back for the metropolis because the amount to carry out the maintenance is uneconomical which could be invested on the socio โ€“economic development of Ado-Ekiti. Omisanjana residents stated that the state of power supply was fairly encouraging based on the fact that power supply is made available for 5 days in a week for about 18hours per day due to constant load shedding in the area. The implication is that in a year, the supply is for 4680 hours representing 53.42 % as shown in Table 1 and fig. 1 respectively. In Ekute area, most resident applauded the Power Holding Company of Nigeria sequel to the fact that they usually enjoy power supply for about 20 hours in a day. This represents 7280 hours per year at 83.11% as shown in Table 1 and fig.1. The percentage power supply and outages are shown in Table 2 and fig.2 respectively. The average analysis of power supply to the three areas depict that power supply is 52.44% while the frequency of power outage is 47.56%. The present power supply in Ado Ekiti can be used as an average of approximately 52% power supply to residents and other commercial activities. This is a serious problem for the countryโ€™s socio economic development. The hindrances to constant power supply are poor power allocation, inadequate planning, and load shedding. It is sad that most Companies in the country today had migrated to South Africa and Ghana due to erratic power supply. Examples of such are: Michelin, Dunlop, and PZ which had skyrocketed the unemployment rate in the country. Some small and medium scale industries had closed down. It is obvious that most residents in the metropolis make use of both petrol and diesel generators. The premium motor spirit and auto mobile gas oil in Ado-Ekiti presently cost 110 and 160 naira respectively. Fuel consumption for Ado Ekiti residents for a year domestically, commercially and industrially is several millions of naira. This amount could have been invested into provision of infrastructural facilities such as roads, electricity supply, drinkable water, agricultural development with a view of providing succour for the residents. The wasted resources could also generate employment opportunities for the people. Conclusion: The present power allocations, maintenance, conductor sizes, voltage regulations and adequate planning should be properly scrutinized for adequate power supply to the country. The power supply in Ekiti in spite of the present increase in the supply capacity is grossly inadequate due to the fact that the 132/33kV is yet to be adequately utilised. It was established that the power supply level in Adebayo area was 1820 hours in a year signifying 20.78 % supply throughout the year and about 79.22 % of the year is characterised with power outage. In Omisanjana area, the power supply level was 4680 hours representing 53.42 % and 46.58 % representing period of power outage in the area. It Should be noted that in Ekute area, the power supply was 7280 hours in a year representing 83.11 % while the power outage was only 16.89 %. The average power supply to the areas under consideration was put at 52 %. The effective utilisation of the installed 132/33kV in the state will at least provide between 70-75% power supply to the entire populace which will form an economic base for the state. The farmlands in the rural areas of the state will have access to regular power supply so as to preserve the agricultural produce and the industries would be able to transform raw materials to finished products. Domestic consumers would be able to enjoy almost twenty-four hours supply in a day while artisans would also access about 24 hrs supplies for productive service. Renewable energy would help the country to provide stable power supply to meet up with domestic and commercial loads. The use of smart grids technologies and smart grids metering will proffer solution to all technical and non technical losses in both transmission and distribution lines. 1.7 Recommendations: The following recommendations were made in order to reduce the erratic power supply in the country.
  • 4. Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria www.theijes.com The IJES Page 60 1. The power allocation to Ekiti should be increased. 2. Adequate planning should be put in place by the power authorities. 3. Good voltage regulating devices must be put in place. 4. Cable size for armoured and Aluminium conductors should be of the required standard. 5. Engineering maintenance of power facilities must be adequate. 6. Renewable energy should be used to boost the level of power supply in the state. 7. Smart grid technology should be incorporated. 8. Embedded Generation (EG) and Independent Electricity Distribution Network (IEDN) should be made operational in the country. 9. The wasted resources being expended on purchase and maintenance of generating sets should be used to generate employment opportunities for the people. REFERENCES: [1]. Adeoye, O.S, Bamisaye, A.J and Akinsaya, O.A (2011):Renewable Energy Sources for Economic Growth and Stability in Nigeria (Power Demand and Supply as a Planning Scheme). 7TH Engineering Forum, School of Engineering, Federal Polytechnic, Ado-Ekiti, 2(1):199 -204. [2]. Adeoye, O.S, Akinsanya, O.A and Alake, T.J (2012): Erratic Power Supply in Nigeria: Bane of Development (Ado-Ekiti as a case study). 8TH Engineering Forum, School of Engineering, Federal Polytechnic, Ado-Ekiti, 2(1):188-194. [3]. Adeoye, O.S and Akinsanya, O.A (2013): Evaluation of Power Demand Capacity for Socio-Economic Development in Nigeria. SEEM Research and Development Journal, 2(1):19-30. [4]. Mehta, V.K and Mehta, R (2005) : Principles of Power System, S.Chand and Company Ltd, Ram Nagar, New Delhi -110 - 055.pp 228. [5]. News Agency of Nigeria (2013). Retrieved 28th November, 2013, from nanngronline.com. [6]. The Nation ((2012): Vol 7, No 2246, Wednesday, September 12, 2012. pp 1. [7]. The-Business-day-online-(2012). Retrieved-8th- March-,2012-from http//www.power.gov.ng/index. [8]. Presidential Task force on Power Supply in Nigeria(2011) [9]. Vanguard Newspaper(2012): Retrieved 1st May,2012. [10]. http:www.blueprinting.com, Retrieved November, 2012. [11]. http//:www.businessdayonline.com, Retrieved on 26th March,2012. [12]. http://ww.nigerianoilgas.com retrieved in 2010. Fig.1: Power supply (hours) to the Areas in Ado - Ekiti
  • 5. Erratic Power Supply and Socio- Economic Development in Ado-Ekiti, Ekiti State, Nigeria www.theijes.com The IJES Page 61 Fig. 2 Percentage power supply and outage for selected Areas in Ado - Ekiti Table 1: Power Supply to selected areas in Ado- Ekiti S/N Areas Daily (hrs) Weekly (hrs) Monthly (hrs) Annual (hrs) 1. Adebayo 5 35 140 1820 2. Omisanjana 18 90 360 4680 3. Ekute 20 140 560 7280 Table 2: Percentage power supply and outage to Areas in Ado-Ekiti S/ N Areas Annual Supply (%) Annual Outage (%) 1. Adebayo 20.78 79.22 2. Omisanjana 53.42 46.58 3. Ekute 83.11 16.89