SlideShare a Scribd company logo
1 of 18
Meter Operations 
in a Post AMI World 
10/02/2012 Slide 1 
Notes from the Field 
Prepared by Tom Lawton,TESCO 
for the 2014 Southeastern Electricity Metering Association (SEMA) Conference
Abstract 
• As many utilities have elected to deploy advanced metering systems 
and millions of new solid-state, microprocessor based end-points 
with communications under glass, a dramatic shift has begun 
regarding where metering resources are being deployed and what 
they are doing. 
• This presentation will highlight the new value proposition for 
metering personnel at their respective utility companies in a post- 
AMI World. 
• Examples of issues which have arisen or been identified over the 
course of various deployments and in the immediate aftermath of an 
AMI deployment.
Pre-AMI Meter Operations 
Common Features and Common Sources of Concern 
• Fewer meter techs in the field and in the shop than 
there were 25 years ago 
• Fewer Field checks and site verifications due to lack of 
personnel, lack of experience and lack of expertise 
• More features under glass in the meters even before 
AMI deployed 
• Significantly more features under glass in every AMR 
and AMI system being considered or being deployed 
• Metering losses starting to be identified “by accident” as 
opposed to being “by design”.
The Pendulum Starts to Move 
• Meter Operations. Prior to deployment many larger utilities take an attitude 
of “this is only metering – how hard can that be?”. Over the course of 
deployment Meter Operations gains a stature and a respect from the rest of 
the organization that was not previously accorded them – even if this is only 
begrudging respect. 
• New tests for AMI meters (e.g. communication, 
disconnect) are identified 
• The complexity and issues around high revenue 
metering are at least acknowledged by the rest of 
the organization 
• Tests which have not been performed in years are 
suddenly back in vogue
The New Realities 
• Electro-Mechanical Meters typically lasted 30 years and more. Electronic AMI 
meters are typically envisioned to have a life span of fifteen years and given the 
pace of technology advances in metering are not expected to last much longer 
than this. 
• This means entire systems are envisioned to be exchanged every fifteen years 
or so. In the interim the meter population and communication network inherent 
in the infrastructure for each utility must be maintained. 
• Meter communication and meter data 
management are becoming as important to 
metering operations as meter accuracy. 
• Firmware upgrades, firmware stability and cyber 
security are becoming increasingly important to 
metering departments
Expected & Unexpected Trends at the 
End of Deployment 
Expected: 
• The AMI deployment team will declare victory at some point and move on. 
Clean-up will be left for the meter service department 
• Change Management continues to be a tremendous challenge for every vendor 
through every deployment 
• Meter Acceptance testing including far more than accuracy testing for every 
deployment 
• Firmware upgrades must be checked and tested before mass deployment 
Unexpected: 
• Not all forms are available by the end 
of deployment and must be installed 
as part of normal operations by the 
meter service department 
• Meter Certification Testing never 
slowed down over the course of any of 
the deployments
Why do AMI meters fail? 
Looking back at various deployments – what are the chief 
causes to reject meter shipments? 
Meter functional test failures including but not limited to; 
• Incorrect firmware 
• Bad settings 
• Alarms and errors that do not clear 
• Communication test failures 
• Bad tables 
• Failed disconnect switches
Lessons for the Future? 
• Are these infant mortality issues or are these issues to be concerned about 
going forward? 
• What was NEVER the reason for rejecting a shipment – meter accuracy. 
• Which are the most difficult meters for every deployment – the transformer 
rated meters. Often these forms are not available until very late in the 
deployment and sometimes not until the deployment has officially ended.
Commercial and Industrial Metering Challenges 
• Most AMI deployments utilize third party contractors to handle the 
residential and some self contained non-2S services. The balance are 
typically handled by the meter service department of the utility. 
• No AMI deployment has used the AMI communication network to handle the 
communication with the largest customer meters. The risk from even a 
short term interruption of communication or loss of data far outweighs to 
benefit of meters which are already being communicated with daily or even 
several times a day. 
• As these services are evaluated for new metering technology issues are 
being found at some accounts. These issues represent revenue losses due 
to inappropriate metering schemes or partially failed metering components 
(e.g. transformers, electronic components).
How are these new realities starting to affect 
metering operations? 
• Metering is becoming more about IT. Some metering departments have 
been reorganized after AMI as part of the IT department. 
• Metering emphasis will shift strongly toward C&I customers and further and 
further away from residential meters 
• Metering resources are being refocused on C&I accounts. 
• There are fewer levels of meter tech. Every meter tech needs to be at the 
higher level as there is not enough lower level work to warrant full time 
employees 
• Utility commissions are being less forgiving of allowing rate relief for project 
over runs and metering inaccuracies
New or expanded roles for metering 
• Responsible for either reviewing ANSI Tests or even performing some of 
these ANSI Tests 
• Perform Meter Functionality testing on new and returned AMI meters 
• Register and communication module energy measurement comparison 
• Disconnect/Reconnect Functionality 
• Outage Performance 
• Meter Communications Performance 
• Consumer safety and combating real and perceived issues 
• Near continuous research into the “next” technology and the next 
deployment 
departments of all sizes
• Accuracy testing 
• Meter Communications 
Performance 
• Software and firmware 
verification 
• Setting verification 
• Functional testing 
• Disconnect/reconnect 
Functionality 
and as left setting 
Shop Testing
Field Testing 
• Accuracy Testing 
• Meter Communications Performance 
• Software & Firmware Verification 
• Setting Verification 
• Functional Testing 
• Disconnect/Reconnect Functionality 
and as left setting 
• Tamper Verification 
• Site Audits appropriate to the type 
of meter
RMA’s, Root Cause Analysis and 
In Service Testing 
No one knows the actual life of their AMI meter. To do this we must learn as 
much as we can from the failures and the performance of the meters we have 
deployed. 
Opportunities to Learn: 
• Meters returned from the field as bad or flagged on incoming inspection. These 
RMA’s need to be tracked not only for warranty purposes but more importantly to 
understand the root cause of the issues. 
• In Service Test programs need to be utilized to understand 
the overall performance of AMI meters and as failures are 
identified these meters need to be dissected and the 
failure mode understood. If necessary, once the failure 
mode is understood the meter population may need to also 
be dissected to identify sub-groups of meter that may be 
similarly affected. This could be a group of meters… 
• from the same shipment. 
• that were deployed in the same geographic area. 
• that saw the same type of usage or environment.
Post-Deployment Needs 
• Once deployment is complete the certification and acceptance testing does not stop. 
• Everyone understands the importance of acceptance testing, but future generations 
of a smart meter also require certification testing. 
• New software and firmware needs to be tested and compared against the 
performance of older generations. 
• New hardware must be tested and compared to older generations. 
• Firmware upgrades need to be checked 
• New head end systems or IT protocols need to be tested against a large 
group of meters before going live.
Real Life Examples of Change 
Management in Action 
• Issues in the system not the components – what is the definition of a meter and 
when did the meter change? 
– Meter and communication device interface 
• Feature Creep – every manufacturer wants to differentiate themselves – 
sometimes this works in unanticipated ways 
– Recovery from power outages 
– Short and long demand periods 
• But we only changed….lessons we 
should have learned from Microsoft 
– Over the air upgrades 
• Thank Goodness for test plans – right? 
– Half closed disconnect devices 
– Disconnect devices of unknown state 
– Meters with incorrect firmware
Summary 
• The focus is on far more than accuracy 
• The meter man of the future knows not only metering but they are communication 
experts and are involved with handling, reporting and analyzing far more customer 
and system data 
• There are fewer “routine jobs” in the field and many of the standard tasks are no 
longer required. This will lead to fewer classifications of meter techs going forward 
and the need for a more highly trained tech. 
• Each Utility must take a far more active role as part of checking, certifying, and 
rechecking the functionality of their meters. 
• Metering will be in a near constant cycle of looking for 
the next technology, evaluating those technologies, 
planning for deploying these technologies, and 
cleaning up the aftermath of the deployment of 
these technologies.
Questions and Discussion 
Tom Lawton 
TESCO – The Eastern Specialty Company 
Bristol, PA 
1-800-762-8211 
This presentation can also be found under Meter 
Conferences and Schools on the TESCO web site: 
www.tesco-advent.com

More Related Content

What's hot

Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationTESCO - The Eastern Specialty Company
 
EPR coverage-smart meter
EPR coverage-smart meterEPR coverage-smart meter
EPR coverage-smart meterethandoyle
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...Cisco Canada
 
Enhanced Technical Support
Enhanced Technical SupportEnhanced Technical Support
Enhanced Technical SupportLeon Henry
 

What's hot (20)

ECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the FutureECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the Future
 
Meter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI SystemMeter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI System
 
Metering in a Post AMI World
Metering in a Post AMI WorldMetering in a Post AMI World
Metering in a Post AMI World
 
Advanced Metering Infrastructure (AMI) Overview
Advanced Metering Infrastructure (AMI) OverviewAdvanced Metering Infrastructure (AMI) Overview
Advanced Metering Infrastructure (AMI) Overview
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Managing Vendor Issues on AMI Design
Managing Vendor Issues on AMI DesignManaging Vendor Issues on AMI Design
Managing Vendor Issues on AMI Design
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and Information
 
Meter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni'sMeter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni's
 
Meter Asset Management at Coop's, IOU's and Muni's
Meter Asset Management at Coop's, IOU's and Muni'sMeter Asset Management at Coop's, IOU's and Muni's
Meter Asset Management at Coop's, IOU's and Muni's
 
Asset Tracking Systems for Meter Services
Asset Tracking Systems for Meter ServicesAsset Tracking Systems for Meter Services
Asset Tracking Systems for Meter Services
 
Managing Vendor Issues on AMI Design
Managing Vendor Issues on AMI DesignManaging Vendor Issues on AMI Design
Managing Vendor Issues on AMI Design
 
EPR coverage-smart meter
EPR coverage-smart meterEPR coverage-smart meter
EPR coverage-smart meter
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
 
Enhanced Technical Support
Enhanced Technical SupportEnhanced Technical Support
Enhanced Technical Support
 
How to get the most out of your existing DCS
How to get the most out of your existing DCSHow to get the most out of your existing DCS
How to get the most out of your existing DCS
 

Viewers also liked

Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsTESCO - The Eastern Specialty Company
 
Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsTESCO - The Eastern Specialty Company
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO - The Eastern Specialty Company
 

Viewers also liked (16)

Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Keeping the Customer Safe
Keeping the Customer SafeKeeping the Customer Safe
Keeping the Customer Safe
 
Meter Testing Programs & Traceability
Meter Testing Programs & TraceabilityMeter Testing Programs & Traceability
Meter Testing Programs & Traceability
 
TESCO AMI Risk Mitigation & Quality
TESCO AMI Risk Mitigation & QualityTESCO AMI Risk Mitigation & Quality
TESCO AMI Risk Mitigation & Quality
 
Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering Installations
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
ANSI Standards & Updates
ANSI Standards & UpdatesANSI Standards & Updates
ANSI Standards & Updates
 
Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering Installations
 
AMI Lessons Learned
AMI Lessons LearnedAMI Lessons Learned
AMI Lessons Learned
 
TESCO Meter Testing & Traceability
TESCO Meter Testing & TraceabilityTESCO Meter Testing & Traceability
TESCO Meter Testing & Traceability
 
New TESCO Product Update
New TESCO Product UpdateNew TESCO Product Update
New TESCO Product Update
 
TESCO Product Catalog
TESCO Product CatalogTESCO Product Catalog
TESCO Product Catalog
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
 
UL Listing for Electric Meters
UL Listing for Electric MetersUL Listing for Electric Meters
UL Listing for Electric Meters
 
AMI Case Studies
AMI Case StudiesAMI Case Studies
AMI Case Studies
 
TESCO Meter Services
TESCO Meter ServicesTESCO Meter Services
TESCO Meter Services
 

Similar to Meter Operations in a Post AMI World

Functional Testing - How to Cope With Ever Changing Needs & Requirements
Functional Testing - How to Cope With Ever Changing Needs & RequirementsFunctional Testing - How to Cope With Ever Changing Needs & Requirements
Functional Testing - How to Cope With Ever Changing Needs & RequirementsTESCO - The Eastern Specialty Company
 

Similar to Meter Operations in a Post AMI World (14)

Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
AMI Technology Overview
AMI Technology OverviewAMI Technology Overview
AMI Technology Overview
 
AMI Technology Overview
AMI Technology OverviewAMI Technology Overview
AMI Technology Overview
 
AMI Technology Overview
AMI Technology OverviewAMI Technology Overview
AMI Technology Overview
 
Meter Operations During and After AMI Deployment
Meter Operations During and After AMI DeploymentMeter Operations During and After AMI Deployment
Meter Operations During and After AMI Deployment
 
Tesco's AMI Specific Products and Services
Tesco's AMI Specific Products and ServicesTesco's AMI Specific Products and Services
Tesco's AMI Specific Products and Services
 
AMI Case Studies
AMI Case StudiesAMI Case Studies
AMI Case Studies
 
Fundamentals of AMI Testing
Fundamentals of AMI TestingFundamentals of AMI Testing
Fundamentals of AMI Testing
 
Asset Management Gas Meter Farms
Asset Management Gas Meter FarmsAsset Management Gas Meter Farms
Asset Management Gas Meter Farms
 
Functional Testing - How to Cope With Ever Changing Needs & Requirements
Functional Testing - How to Cope With Ever Changing Needs & RequirementsFunctional Testing - How to Cope With Ever Changing Needs & Requirements
Functional Testing - How to Cope With Ever Changing Needs & Requirements
 
Field Testing
Field TestingField Testing
Field Testing
 
Meter Testing and AMI Deployment - Before, During and After
Meter Testing and AMI Deployment - Before, During and AfterMeter Testing and AMI Deployment - Before, During and After
Meter Testing and AMI Deployment - Before, During and After
 
New Tools for a Next Generation of Metering - TESCO Solutions
New Tools for a Next Generation of Metering - TESCO SolutionsNew Tools for a Next Generation of Metering - TESCO Solutions
New Tools for a Next Generation of Metering - TESCO Solutions
 
AGA 2017 Gas Meter Farms
AGA 2017 Gas Meter FarmsAGA 2017 Gas Meter Farms
AGA 2017 Gas Meter Farms
 

Recently uploaded

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 

Recently uploaded (20)

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 

Meter Operations in a Post AMI World

  • 1. Meter Operations in a Post AMI World 10/02/2012 Slide 1 Notes from the Field Prepared by Tom Lawton,TESCO for the 2014 Southeastern Electricity Metering Association (SEMA) Conference
  • 2. Abstract • As many utilities have elected to deploy advanced metering systems and millions of new solid-state, microprocessor based end-points with communications under glass, a dramatic shift has begun regarding where metering resources are being deployed and what they are doing. • This presentation will highlight the new value proposition for metering personnel at their respective utility companies in a post- AMI World. • Examples of issues which have arisen or been identified over the course of various deployments and in the immediate aftermath of an AMI deployment.
  • 3. Pre-AMI Meter Operations Common Features and Common Sources of Concern • Fewer meter techs in the field and in the shop than there were 25 years ago • Fewer Field checks and site verifications due to lack of personnel, lack of experience and lack of expertise • More features under glass in the meters even before AMI deployed • Significantly more features under glass in every AMR and AMI system being considered or being deployed • Metering losses starting to be identified “by accident” as opposed to being “by design”.
  • 4. The Pendulum Starts to Move • Meter Operations. Prior to deployment many larger utilities take an attitude of “this is only metering – how hard can that be?”. Over the course of deployment Meter Operations gains a stature and a respect from the rest of the organization that was not previously accorded them – even if this is only begrudging respect. • New tests for AMI meters (e.g. communication, disconnect) are identified • The complexity and issues around high revenue metering are at least acknowledged by the rest of the organization • Tests which have not been performed in years are suddenly back in vogue
  • 5. The New Realities • Electro-Mechanical Meters typically lasted 30 years and more. Electronic AMI meters are typically envisioned to have a life span of fifteen years and given the pace of technology advances in metering are not expected to last much longer than this. • This means entire systems are envisioned to be exchanged every fifteen years or so. In the interim the meter population and communication network inherent in the infrastructure for each utility must be maintained. • Meter communication and meter data management are becoming as important to metering operations as meter accuracy. • Firmware upgrades, firmware stability and cyber security are becoming increasingly important to metering departments
  • 6. Expected & Unexpected Trends at the End of Deployment Expected: • The AMI deployment team will declare victory at some point and move on. Clean-up will be left for the meter service department • Change Management continues to be a tremendous challenge for every vendor through every deployment • Meter Acceptance testing including far more than accuracy testing for every deployment • Firmware upgrades must be checked and tested before mass deployment Unexpected: • Not all forms are available by the end of deployment and must be installed as part of normal operations by the meter service department • Meter Certification Testing never slowed down over the course of any of the deployments
  • 7. Why do AMI meters fail? Looking back at various deployments – what are the chief causes to reject meter shipments? Meter functional test failures including but not limited to; • Incorrect firmware • Bad settings • Alarms and errors that do not clear • Communication test failures • Bad tables • Failed disconnect switches
  • 8. Lessons for the Future? • Are these infant mortality issues or are these issues to be concerned about going forward? • What was NEVER the reason for rejecting a shipment – meter accuracy. • Which are the most difficult meters for every deployment – the transformer rated meters. Often these forms are not available until very late in the deployment and sometimes not until the deployment has officially ended.
  • 9. Commercial and Industrial Metering Challenges • Most AMI deployments utilize third party contractors to handle the residential and some self contained non-2S services. The balance are typically handled by the meter service department of the utility. • No AMI deployment has used the AMI communication network to handle the communication with the largest customer meters. The risk from even a short term interruption of communication or loss of data far outweighs to benefit of meters which are already being communicated with daily or even several times a day. • As these services are evaluated for new metering technology issues are being found at some accounts. These issues represent revenue losses due to inappropriate metering schemes or partially failed metering components (e.g. transformers, electronic components).
  • 10. How are these new realities starting to affect metering operations? • Metering is becoming more about IT. Some metering departments have been reorganized after AMI as part of the IT department. • Metering emphasis will shift strongly toward C&I customers and further and further away from residential meters • Metering resources are being refocused on C&I accounts. • There are fewer levels of meter tech. Every meter tech needs to be at the higher level as there is not enough lower level work to warrant full time employees • Utility commissions are being less forgiving of allowing rate relief for project over runs and metering inaccuracies
  • 11. New or expanded roles for metering • Responsible for either reviewing ANSI Tests or even performing some of these ANSI Tests • Perform Meter Functionality testing on new and returned AMI meters • Register and communication module energy measurement comparison • Disconnect/Reconnect Functionality • Outage Performance • Meter Communications Performance • Consumer safety and combating real and perceived issues • Near continuous research into the “next” technology and the next deployment departments of all sizes
  • 12. • Accuracy testing • Meter Communications Performance • Software and firmware verification • Setting verification • Functional testing • Disconnect/reconnect Functionality and as left setting Shop Testing
  • 13. Field Testing • Accuracy Testing • Meter Communications Performance • Software & Firmware Verification • Setting Verification • Functional Testing • Disconnect/Reconnect Functionality and as left setting • Tamper Verification • Site Audits appropriate to the type of meter
  • 14. RMA’s, Root Cause Analysis and In Service Testing No one knows the actual life of their AMI meter. To do this we must learn as much as we can from the failures and the performance of the meters we have deployed. Opportunities to Learn: • Meters returned from the field as bad or flagged on incoming inspection. These RMA’s need to be tracked not only for warranty purposes but more importantly to understand the root cause of the issues. • In Service Test programs need to be utilized to understand the overall performance of AMI meters and as failures are identified these meters need to be dissected and the failure mode understood. If necessary, once the failure mode is understood the meter population may need to also be dissected to identify sub-groups of meter that may be similarly affected. This could be a group of meters… • from the same shipment. • that were deployed in the same geographic area. • that saw the same type of usage or environment.
  • 15. Post-Deployment Needs • Once deployment is complete the certification and acceptance testing does not stop. • Everyone understands the importance of acceptance testing, but future generations of a smart meter also require certification testing. • New software and firmware needs to be tested and compared against the performance of older generations. • New hardware must be tested and compared to older generations. • Firmware upgrades need to be checked • New head end systems or IT protocols need to be tested against a large group of meters before going live.
  • 16. Real Life Examples of Change Management in Action • Issues in the system not the components – what is the definition of a meter and when did the meter change? – Meter and communication device interface • Feature Creep – every manufacturer wants to differentiate themselves – sometimes this works in unanticipated ways – Recovery from power outages – Short and long demand periods • But we only changed….lessons we should have learned from Microsoft – Over the air upgrades • Thank Goodness for test plans – right? – Half closed disconnect devices – Disconnect devices of unknown state – Meters with incorrect firmware
  • 17. Summary • The focus is on far more than accuracy • The meter man of the future knows not only metering but they are communication experts and are involved with handling, reporting and analyzing far more customer and system data • There are fewer “routine jobs” in the field and many of the standard tasks are no longer required. This will lead to fewer classifications of meter techs going forward and the need for a more highly trained tech. • Each Utility must take a far more active role as part of checking, certifying, and rechecking the functionality of their meters. • Metering will be in a near constant cycle of looking for the next technology, evaluating those technologies, planning for deploying these technologies, and cleaning up the aftermath of the deployment of these technologies.
  • 18. Questions and Discussion Tom Lawton TESCO – The Eastern Specialty Company Bristol, PA 1-800-762-8211 This presentation can also be found under Meter Conferences and Schools on the TESCO web site: www.tesco-advent.com