Abstract
• As many utilities have elected to deploy advanced metering systems
and millions of new solid-state, microprocessor based end-points
with communications under glass, there has been a dramatic shift in
the approach to qualifying and certifying electricity meters.
• This presentation will highlight the need for a rigorous approach to
meter certification as well as continued testing as both the meter
and the communication module and the firmware to run both are
upgraded and changed over the course of deployment.
• Examples of issues which have arisen over the course of various
deployments along with varying approaches to and interpretations of
the same ANSI tests by manufacturers will be discussed.
AMI Deployment
Common Features and Common Sources of Concern
• Compressed time frames for pre-deployment, pilots,
and deployment, pilots, and deployment
• New features and functionality being added at a
tremendous rate
• Bugs, fixes, improvements being implemented
constantly in the meter
• Metering typically under represented or not
represented at all in AMI planning teams and
AMI deployment teams.
• The need for testing throughout this process is
rarely understood or even appreciated by AMI
planning and deployment teams.
• Issues around certification testing and acceptance
testing are initially seen simply as obstacles to
staying on schedule and not as valuable safeguards
against making potentially expensive mistakes
The Difference Between Meter Qualification, Meter
Certification & Meter Acceptance Testing
• Meter Qualification – the easiest and least time consuming aspect
of putting a new AMI technology in the field.
• Meter Certification – typically underestimated for the initial effort
and unanticipated over the course of deployment.
• Meter Acceptance Testing – more than just accuracy testing.
Includes functional, firmware and communication testing of all
incoming shipments.
Managing Change – at the utility, at the vendor
and from the suppliers to our vendor
• Every change is potentially important and should be treated this
way.
• There is no “small change”.
• There is rarely the same level of testing done for both the meter and
the communication device and never for the meter and the
communication module as an integrated device.
• Are ANSI tests without the communication module integrated always
suitable from a business, commission and customer view point.
And who is left standing that can do some
of these things at each step in the process?
• Meter Vendors
• Communication device vendors
• AMI Team
• Metering Group
• Third Party test Labs
- Where are the risks?
- How closely should each
participant be held accountable
and at which steps?
Who Should be Doing What?
Effective Methodologies
• Define the difference between each of the three types of testing and
certification
• Define the testing protocols to be used – talk to other utilities,
vendors, third party labs. Define your own and be prepared for them
to evolve over the course of your project
• Keep to the protocols.
Approvals, Failures
(do not term this “has
not passed yet”),
Deviations should all
be documented
DEFINEDEFINE
EVOLVEEVOLVE
FOLLOWFOLLOW
Typical Protocols:
• AMI Teams typically do a good job of defining what they expect the meters and
communications devices to do.
• Meter Services can take this specifications document and check to see if the
devices proposed can handle these tasks.
Ways to stay out of trouble and to set yourself up for success in the subsequent
steps:
• Define the testing protocols to be used – talk to other utilities, vendors, third
party labs. Define your own and be prepared for them to evolve over the
course of your project.
• Keep to the protocols. Approvals, Failures (do not term this “has not passed
yet”), Deviations should all be documented.
• Check for yourself. If a feature is advertised then you should be able to verify
the feature is functional and whether this feature meets your needs. When
purchasing a “Smart” meter, know what you are getting.
Qualification Testing
• ANSI Testing
• Meter Functionality
• Meter Data Acquisition Accuracy for Each Form
• Dual Socket Meter Comparison – Data Collection & Accuracy
(Energy, Demand, Load Profile)
• Large Test Platform Meter Comparison –
Data Collection & Accuracy
• Disconnect/Reconnect Functionality
• Outage Performance
• Meter Communications Performance
Pre-deployment Certification Testing
• ANSI Testing
• Meter Functionality
• Meter Data Acquisition Accuracy for Each Form
• Dual Socket Meter Comparison – Data Collection & Accuracy
(Energy, Demand, Load Profile)
• Large Test Platform Meter Comparison –
Data Collection & Accuracy
• Disconnect/Reconnect Functionality
• Outage Performance
• Meter Communications Performance
Deployment and Post-Deployment
Certification Testing
• Accuracy testing
• Meter Communications
Performance
• Software and firmware
verification
• Setting verification
• Functional testing
• Disconnect/reconnect
Functionality
and as left setting
Acceptance Testing
Questions that need to be asked:
• How does Acceptance Testing
differ from Certification Testing?
• When do we return to
Certification Testing?
• What should be built in to the
AMI Vendor Contracts?
• Who should be involved in
developing the Certification and
Acceptance Test Plans and
when should this be done?
Setting up Certification and
Acceptance Testing Plans
Useful Tools & Potential Resources
• ISO 9001
• Quality System Documentation if not ISO 9001
• Quality systems and test reports from vendors
• ANSI Test results, and protocols used by various
manufacturers for these tests. Insist upon
additional testing where you feel necessary
• Third Party Labs for your own certification testing
ANSI & Other Standards
• Not all Standards are created equal. The same Standard is
often not interpreted the same way by all test facilities. The
devil is always in the details. Do not just ask if the meter
passed a particular test, but learn the details about how this
test was run. Also find out,
• What version of the meter?
• Was the communication module
integrated with the meter for any
of these tests?
Vendors, Consultants, Independent Labs,
Other Utilities, Networking
• You are not the first Utility to go through this process. At this point several others
utilities have completed or are nearing completion of a deployment with your
meter of choice or one of the meters you are considering choosing. There may
even be utilities who have deployed the same meter with the same
communication device. Ask your peers. Pick their brains. Talk to the metering
folks. We are pretty friendly individuals.
• Most of the vendors have gotten better about no
longer stone walling with “we have never seen
that issue before”. We are asking our meter
vendors to deploy new technology and new
features very rapidly. They generally want to
learn of any issues as quickly as possible and
address these issues as quickly as possible.
• You always have a first or a final resort to go to
an independent test facility – new feature never
used in the industry or a problem that crops
up after deployment has begun
Quality Audits
• Schedule these for your meter manufacturer and your communication device
manufacturer.
• Objective is to understand how they tested the product in the first place as well as
how any concerns that come up will be addressed. What is the mechanism, who are
the people, what capabilities do they have to investigate and determine root cause.
How and when are these responses fed back to you the customer and to the
manufacturing and supply chain.
• In plant final inspection and testing
• Plant first pass test results… if the number is less than 95% (which is typical),
validating and auditing the off-line repair process becomes equally as important as
auditing the main line quality checks
• Vendor supply change management
• Validation testing of firm ware changes
RMA’s and Self-Audits
• In conjunction with auditing your vendor you should
audit your own procedures for identifying, reporting and
following up on issues.
• For many this is simply a review of their RMA
procedures. These procedures need to be
strengthened and personnel assigned to them as the
number of issues will skyrocket over the course of a
deployment. Most will be of no or little consequence.
Some will be important and one or more may have
catastrophic results if not addressed quickly and
followed-up forcefully and with persistence.
• Regardless of the extent of the self-audit, your quality
system will have to be strengthened and staffed to
handle the demands and the rigors of an AMI
deployment. Clear chains of command and reporting
protocols and decision matrixes will be as important as
any testing protocols.
Post-Deployment
Meter Farms as a Tool
• Once deployment is complete the certification and acceptance testing does not
stop.
• Everyone understands the importance of acceptance testing, but future
generations of a smart meter also require certification testing.
• One new method for managing existing meter populations as well as future state
meters is through meter farms.
• New software and firmware can be tested and compared against the performance
of older generations.
• New hardware can be tested and compared to older generations.
• Firmware upgrades can be checked
• Long term issues can be identified or verified in the
meter farm
• New head end systems or IT protocols can be
tested against the meter farm before going live
as well.
Real Life Examples of Change
Management in Action
• Issues in the system not the components – what is the definition of a meter
and when did the meter change?
– Meter and communication device interface
• Feature Creep – every manufacturer wants to differentiate themselves –
sometimes this works in unanticipated ways
– Recovery from power outages
– Short and long demand periods
• But we only changed….lessons we should
have learned from Microsoft
– Over the air upgrades
• Thank Goodness for testing plans and
contracts – right?
– Half closed disconnect devices
– Disconnect devices of unknown state
– Meters with incorrect firmware
Expected & Unexpected Trends Toward
the End of Deployment
Expected:
• The AMI deployment team will declare victory at some point and move on.
Clean-up will be left for the meter service department
• Change Management continues to be a tremendous challenge for every
vendor through every deployment
• Meter Acceptance testing including far more than accuracy testing for every
deployment
• Firmware upgrades must be checked and tested before mass deployment
Unexpected:
• Not all forms are available by the end of
deployment and must be installed as
part of normal operations by the meter
service department
• Meter Certification Testing never slowed
down over the course of any of the
deployments
Summary
• There are no bad manufacturers. Everyone is moving very
fast to meet the market demands. Without adequate checks
and balances there will be problems. Even with them, there
may still be problems – that is why we call this Risk Mitigation
and not Risk Elimination
• Each Utility must take a far more active role as part of this
system of checks and balances
Questions and Discussion
Tom Lawton
TESCO – The Eastern Specialty Company
Bristol, PA
215-688-0298 (cell)
1-800-762-8211
This presentation can also be found under Meter
Conferences and Schools on the TESCO web site:
www.tesco-advent.com

More Related Content

What's hot

Regression testing
Regression testingRegression testing
Regression testinggokilabrindha
 
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010TEST Huddle
 
Meter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI SystemMeter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI SystemTESCO - The Eastern Specialty Company
 
Michael Snyman - Software Test Automation Success
Michael Snyman - Software Test Automation Success Michael Snyman - Software Test Automation Success
Michael Snyman - Software Test Automation Success TEST Huddle
 
Quality in software industry
Quality in software industryQuality in software industry
Quality in software industryRicha Goel
 
Questions for successful test automation projects
Questions for successful test automation projectsQuestions for successful test automation projects
Questions for successful test automation projectsDaniel Ionita
 
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinarsoftware testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI WebinarXBOSoft
 
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...Tom Wiesen
 
Ian Smith - Mobile Software Testing - Facing Future Challenges
Ian Smith -  Mobile Software Testing - Facing Future ChallengesIan Smith -  Mobile Software Testing - Facing Future Challenges
Ian Smith - Mobile Software Testing - Facing Future ChallengesTEST Huddle
 
Verification and validation process in software testing
Verification and validation process in software testingVerification and validation process in software testing
Verification and validation process in software testingpooja deshmukh
 
Zero defect zero excursions
Zero defect zero excursionsZero defect zero excursions
Zero defect zero excursionsdotram
 
Performance testing
Performance testing Performance testing
Performance testing BugRaptors
 
Performance testing
Performance testingPerformance testing
Performance testingRanpreet kaur
 
Unit 2 hci in software process
Unit 2   hci in software processUnit 2   hci in software process
Unit 2 hci in software processRoselin Mary S
 

What's hot (20)

Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations In a Post AMI World
Meter Operations In a Post AMI WorldMeter Operations In a Post AMI World
Meter Operations In a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Regression testing
Regression testingRegression testing
Regression testing
 
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010
Bjarne Mansson - Risk-based Testing,A Must For Medical Devices - EuroSTAR 2010
 
Meter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI SystemMeter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI System
 
Michael Snyman - Software Test Automation Success
Michael Snyman - Software Test Automation Success Michael Snyman - Software Test Automation Success
Michael Snyman - Software Test Automation Success
 
Quality in software industry
Quality in software industryQuality in software industry
Quality in software industry
 
Questions for successful test automation projects
Questions for successful test automation projectsQuestions for successful test automation projects
Questions for successful test automation projects
 
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinarsoftware testing metrics do's - don'ts-XBOSoft-QAI Webinar
software testing metrics do's - don'ts-XBOSoft-QAI Webinar
 
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...
Beyond Shingo: Prompt, Do, Check, Act (PDCA) & Universal Mistake Prevention a...
 
Ian Smith - Mobile Software Testing - Facing Future Challenges
Ian Smith -  Mobile Software Testing - Facing Future ChallengesIan Smith -  Mobile Software Testing - Facing Future Challenges
Ian Smith - Mobile Software Testing - Facing Future Challenges
 
Verification and validation process in software testing
Verification and validation process in software testingVerification and validation process in software testing
Verification and validation process in software testing
 
Zero defect zero excursions
Zero defect zero excursionsZero defect zero excursions
Zero defect zero excursions
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Performance testing
Performance testing Performance testing
Performance testing
 
[Mush Honda] Metrics & Reports from Test Teams (QA)
[Mush Honda] Metrics & Reports from Test Teams (QA)[Mush Honda] Metrics & Reports from Test Teams (QA)
[Mush Honda] Metrics & Reports from Test Teams (QA)
 
Performance testing
Performance testingPerformance testing
Performance testing
 
Unit 2 hci in software process
Unit 2   hci in software processUnit 2   hci in software process
Unit 2 hci in software process
 

Viewers also liked

Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsTESCO - The Eastern Specialty Company
 
Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsTESCO - The Eastern Specialty Company
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO - The Eastern Specialty Company
 

Viewers also liked (14)

Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering Installations
 
UL Listing for Electric Meters
UL Listing for Electric MetersUL Listing for Electric Meters
UL Listing for Electric Meters
 
Meter Testing Programs & Traceability
Meter Testing Programs & TraceabilityMeter Testing Programs & Traceability
Meter Testing Programs & Traceability
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
TESCO Meter Testing & Traceability
TESCO Meter Testing & TraceabilityTESCO Meter Testing & Traceability
TESCO Meter Testing & Traceability
 
New TESCO Product Update
New TESCO Product UpdateNew TESCO Product Update
New TESCO Product Update
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Keeping the Customer Safe
Keeping the Customer SafeKeeping the Customer Safe
Keeping the Customer Safe
 
TESCO AMI Risk Mitigation & Quality
TESCO AMI Risk Mitigation & QualityTESCO AMI Risk Mitigation & Quality
TESCO AMI Risk Mitigation & Quality
 
Site Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering InstallationsSite Verification - Protocols & Tools for Complex Metering Installations
Site Verification - Protocols & Tools for Complex Metering Installations
 
ANSI Standards & Updates
ANSI Standards & UpdatesANSI Standards & Updates
ANSI Standards & Updates
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
 
TESCO Meter Services
TESCO Meter ServicesTESCO Meter Services
TESCO Meter Services
 
TESCO Product Catalog
TESCO Product CatalogTESCO Product Catalog
TESCO Product Catalog
 

Similar to AMI Case Studies

Fundamentals OF UAT
Fundamentals OF UATFundamentals OF UAT
Fundamentals OF UATICHOFU VICTOR
 
Software testing acceptance testing
Software testing  acceptance testingSoftware testing  acceptance testing
Software testing acceptance testingGaneshKumarKanthiah
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxPriyaFulpagare1
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationTESCO - The Eastern Specialty Company
 

Similar to AMI Case Studies (20)

Fundamentals of AMI Testing
Fundamentals of AMI TestingFundamentals of AMI Testing
Fundamentals of AMI Testing
 
Meter Testing and AMI Deployment - Before, During and After
Meter Testing and AMI Deployment - Before, During and AfterMeter Testing and AMI Deployment - Before, During and After
Meter Testing and AMI Deployment - Before, During and After
 
Fundamentals OF UAT
Fundamentals OF UATFundamentals OF UAT
Fundamentals OF UAT
 
Asset Management Gas Meter Farms
Asset Management Gas Meter FarmsAsset Management Gas Meter Farms
Asset Management Gas Meter Farms
 
Telecom testing
Telecom testingTelecom testing
Telecom testing
 
Tesco's AMI Specific Products and Services
Tesco's AMI Specific Products and ServicesTesco's AMI Specific Products and Services
Tesco's AMI Specific Products and Services
 
Introduction to Meter Testing
Introduction to Meter TestingIntroduction to Meter Testing
Introduction to Meter Testing
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Testing 101.pptx
Meter Testing 101.pptxMeter Testing 101.pptx
Meter Testing 101.pptx
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Software testing acceptance testing
Software testing  acceptance testingSoftware testing  acceptance testing
Software testing acceptance testing
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and Information
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Metering in a Post AMI World
Metering in a Post AMI WorldMetering in a Post AMI World
Metering in a Post AMI World
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Meter Testing 101
Meter Testing 101Meter Testing 101
Meter Testing 101
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 

Recently uploaded

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 

Recently uploaded (20)

DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 

AMI Case Studies

  • 1. AMI Case Studies Notes from the Field Prepared by Tom Lawton,TESCO for the NC Electric Meter School 2013
  • 2. Abstract • As many utilities have elected to deploy advanced metering systems and millions of new solid-state, microprocessor based end-points with communications under glass, there has been a dramatic shift in the approach to qualifying and certifying electricity meters. • This presentation will highlight the need for a rigorous approach to meter certification as well as continued testing as both the meter and the communication module and the firmware to run both are upgraded and changed over the course of deployment. • Examples of issues which have arisen over the course of various deployments along with varying approaches to and interpretations of the same ANSI tests by manufacturers will be discussed.
  • 3. AMI Deployment Common Features and Common Sources of Concern • Compressed time frames for pre-deployment, pilots, and deployment, pilots, and deployment • New features and functionality being added at a tremendous rate • Bugs, fixes, improvements being implemented constantly in the meter • Metering typically under represented or not represented at all in AMI planning teams and AMI deployment teams. • The need for testing throughout this process is rarely understood or even appreciated by AMI planning and deployment teams. • Issues around certification testing and acceptance testing are initially seen simply as obstacles to staying on schedule and not as valuable safeguards against making potentially expensive mistakes
  • 4. The Difference Between Meter Qualification, Meter Certification & Meter Acceptance Testing • Meter Qualification – the easiest and least time consuming aspect of putting a new AMI technology in the field. • Meter Certification – typically underestimated for the initial effort and unanticipated over the course of deployment. • Meter Acceptance Testing – more than just accuracy testing. Includes functional, firmware and communication testing of all incoming shipments.
  • 5. Managing Change – at the utility, at the vendor and from the suppliers to our vendor • Every change is potentially important and should be treated this way. • There is no “small change”. • There is rarely the same level of testing done for both the meter and the communication device and never for the meter and the communication module as an integrated device. • Are ANSI tests without the communication module integrated always suitable from a business, commission and customer view point.
  • 6. And who is left standing that can do some of these things at each step in the process? • Meter Vendors • Communication device vendors • AMI Team • Metering Group • Third Party test Labs - Where are the risks? - How closely should each participant be held accountable and at which steps? Who Should be Doing What?
  • 7. Effective Methodologies • Define the difference between each of the three types of testing and certification • Define the testing protocols to be used – talk to other utilities, vendors, third party labs. Define your own and be prepared for them to evolve over the course of your project • Keep to the protocols. Approvals, Failures (do not term this “has not passed yet”), Deviations should all be documented DEFINEDEFINE EVOLVEEVOLVE FOLLOWFOLLOW
  • 8. Typical Protocols: • AMI Teams typically do a good job of defining what they expect the meters and communications devices to do. • Meter Services can take this specifications document and check to see if the devices proposed can handle these tasks. Ways to stay out of trouble and to set yourself up for success in the subsequent steps: • Define the testing protocols to be used – talk to other utilities, vendors, third party labs. Define your own and be prepared for them to evolve over the course of your project. • Keep to the protocols. Approvals, Failures (do not term this “has not passed yet”), Deviations should all be documented. • Check for yourself. If a feature is advertised then you should be able to verify the feature is functional and whether this feature meets your needs. When purchasing a “Smart” meter, know what you are getting. Qualification Testing
  • 9. • ANSI Testing • Meter Functionality • Meter Data Acquisition Accuracy for Each Form • Dual Socket Meter Comparison – Data Collection & Accuracy (Energy, Demand, Load Profile) • Large Test Platform Meter Comparison – Data Collection & Accuracy • Disconnect/Reconnect Functionality • Outage Performance • Meter Communications Performance Pre-deployment Certification Testing
  • 10. • ANSI Testing • Meter Functionality • Meter Data Acquisition Accuracy for Each Form • Dual Socket Meter Comparison – Data Collection & Accuracy (Energy, Demand, Load Profile) • Large Test Platform Meter Comparison – Data Collection & Accuracy • Disconnect/Reconnect Functionality • Outage Performance • Meter Communications Performance Deployment and Post-Deployment Certification Testing
  • 11. • Accuracy testing • Meter Communications Performance • Software and firmware verification • Setting verification • Functional testing • Disconnect/reconnect Functionality and as left setting Acceptance Testing
  • 12. Questions that need to be asked: • How does Acceptance Testing differ from Certification Testing? • When do we return to Certification Testing? • What should be built in to the AMI Vendor Contracts? • Who should be involved in developing the Certification and Acceptance Test Plans and when should this be done? Setting up Certification and Acceptance Testing Plans
  • 13. Useful Tools & Potential Resources • ISO 9001 • Quality System Documentation if not ISO 9001 • Quality systems and test reports from vendors • ANSI Test results, and protocols used by various manufacturers for these tests. Insist upon additional testing where you feel necessary • Third Party Labs for your own certification testing
  • 14. ANSI & Other Standards • Not all Standards are created equal. The same Standard is often not interpreted the same way by all test facilities. The devil is always in the details. Do not just ask if the meter passed a particular test, but learn the details about how this test was run. Also find out, • What version of the meter? • Was the communication module integrated with the meter for any of these tests?
  • 15. Vendors, Consultants, Independent Labs, Other Utilities, Networking • You are not the first Utility to go through this process. At this point several others utilities have completed or are nearing completion of a deployment with your meter of choice or one of the meters you are considering choosing. There may even be utilities who have deployed the same meter with the same communication device. Ask your peers. Pick their brains. Talk to the metering folks. We are pretty friendly individuals. • Most of the vendors have gotten better about no longer stone walling with “we have never seen that issue before”. We are asking our meter vendors to deploy new technology and new features very rapidly. They generally want to learn of any issues as quickly as possible and address these issues as quickly as possible. • You always have a first or a final resort to go to an independent test facility – new feature never used in the industry or a problem that crops up after deployment has begun
  • 16. Quality Audits • Schedule these for your meter manufacturer and your communication device manufacturer. • Objective is to understand how they tested the product in the first place as well as how any concerns that come up will be addressed. What is the mechanism, who are the people, what capabilities do they have to investigate and determine root cause. How and when are these responses fed back to you the customer and to the manufacturing and supply chain. • In plant final inspection and testing • Plant first pass test results… if the number is less than 95% (which is typical), validating and auditing the off-line repair process becomes equally as important as auditing the main line quality checks • Vendor supply change management • Validation testing of firm ware changes
  • 17. RMA’s and Self-Audits • In conjunction with auditing your vendor you should audit your own procedures for identifying, reporting and following up on issues. • For many this is simply a review of their RMA procedures. These procedures need to be strengthened and personnel assigned to them as the number of issues will skyrocket over the course of a deployment. Most will be of no or little consequence. Some will be important and one or more may have catastrophic results if not addressed quickly and followed-up forcefully and with persistence. • Regardless of the extent of the self-audit, your quality system will have to be strengthened and staffed to handle the demands and the rigors of an AMI deployment. Clear chains of command and reporting protocols and decision matrixes will be as important as any testing protocols.
  • 18. Post-Deployment Meter Farms as a Tool • Once deployment is complete the certification and acceptance testing does not stop. • Everyone understands the importance of acceptance testing, but future generations of a smart meter also require certification testing. • One new method for managing existing meter populations as well as future state meters is through meter farms. • New software and firmware can be tested and compared against the performance of older generations. • New hardware can be tested and compared to older generations. • Firmware upgrades can be checked • Long term issues can be identified or verified in the meter farm • New head end systems or IT protocols can be tested against the meter farm before going live as well.
  • 19. Real Life Examples of Change Management in Action • Issues in the system not the components – what is the definition of a meter and when did the meter change? – Meter and communication device interface • Feature Creep – every manufacturer wants to differentiate themselves – sometimes this works in unanticipated ways – Recovery from power outages – Short and long demand periods • But we only changed….lessons we should have learned from Microsoft – Over the air upgrades • Thank Goodness for testing plans and contracts – right? – Half closed disconnect devices – Disconnect devices of unknown state – Meters with incorrect firmware
  • 20. Expected & Unexpected Trends Toward the End of Deployment Expected: • The AMI deployment team will declare victory at some point and move on. Clean-up will be left for the meter service department • Change Management continues to be a tremendous challenge for every vendor through every deployment • Meter Acceptance testing including far more than accuracy testing for every deployment • Firmware upgrades must be checked and tested before mass deployment Unexpected: • Not all forms are available by the end of deployment and must be installed as part of normal operations by the meter service department • Meter Certification Testing never slowed down over the course of any of the deployments
  • 21. Summary • There are no bad manufacturers. Everyone is moving very fast to meet the market demands. Without adequate checks and balances there will be problems. Even with them, there may still be problems – that is why we call this Risk Mitigation and not Risk Elimination • Each Utility must take a far more active role as part of this system of checks and balances