Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 1 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Tabiyeh Gas Project
HAZOP and PTR plan
Rev. Status Date Revision memo Issued by Checked by Approved by
00 IFC 7/10/2009 Lydia Lostan Alain Pougis P. Vercruysse
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 2 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Purpose
To establish a tentative planning for HAZOPs and PTRs for each phases of the TAB Gas Project.
Reference Documents:
Reference Title
Directive EP 11 Development project
CR-EP-HSE-032 HSE Risk Management in oil & gas installation
projects.
CR-EXP-602 Project Technical Review
GM-SAF-008 Conducting Hazard & Operability Studies
GM-SAF-012 Guidelines to establish a budget estimate for a
HAZOP review
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 3 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Table of Contents
1 TABIYEH Project Description 4
2 Tentative schedule 6
3 HAZOP’s & PTR’s Organization 7
3.1 Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION 7
3.2 Phase 3 (2016): TABIYEH LOW PRESSURE COMPRESSION 7
3.3 Phase 1 (2010): TABIYEH COMMINGLED PRODUCTION 7
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 4 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
1 TABIYEH Project Description
The Tabiyeh Gas Expansion project aims at increasing the sales gas quantity available for export from
DEZ gas plant in order to partly fill Syria's gas deficit for Power generation. The main objective of the
development scheme proposed by TEPS is to increase the amount of export gas from 150MMscf/d to
170MMscf/d and optimize the liquid recovery from Tabiyeh.
TAB GAS Project is divided in the following phases:
Phase 1 (20101
): TABIYEH COMMINGLED PRODUCTION
The objective of the commingled production of Tabiyeh oil rim and gas cap is to accelerate the oil
rim production and maximize the liquid recovery.
• Two new commingled wells TAB-COM1 &TAB-COM2 will be drilled and 2 existing wells TAB-
108 & TAB-207 will be converted to commingled production.
• 3 new flowlines from TAB-108, TAB-COM1 and TAB-COM2 will be laid to a new Production
Header in DEZ Gas plant.
• A new Commingled Production separator will be installed in DEZ Gas plant to handle the
effluents from the commingled wells. The new separator will be integrated to the existing DEZ
Gas Plant facilities ( Process, flare, drains, control systems, ESD)
• 1 new 6” NGL line will be laid from the Commingled separator liquid outlet to Jafra inlet
production manifold.
Early Development phase:
To accelerate the implementation of Tabiyeh commingled gas production, an Early Development
Scheme is considered:
• The existing Test separator at DEZ Gas plant will be used temporarily as a Commingled
Separator.
• The NGL line will be installed.
• A 6” flowline will be laid to connect TAB-108 to the existing DEZ Gas plant Test Header.
• TAB-207 will be perforated in the oil reservoir (Coiled Tubing + perforation)
Note:
- If a well has to be tested during the Early Production Scheme, the commingled production
(TAB-108 & TAB-207) will be interrupted for the test.
- Upon completion of full phase 1, the Test separator will be working in its original operating
mode (Test).
1
Expected completion date
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 5 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION (MP PRODUCTION)
The Tabiyeh Gas Train is currently operating at 75 barg inlet and the gas chilling for the recovery
of liquid is achieved by a Joule-Thomson pressure reduction (75 to 32 barg).
With the progressive depletion of Tabiyeh gas cap, the wellhead flowing pressure (WHFP) and
he Tabiyeh Gas Train inlet pressure will drop levels and the Joule Thomson operating mode will
become ineffective to chill the gas and recover NGL. At this point, the Tabiyeh Gas Train must be
converted to an external refrigeration mode identical to the Associated Gas Train with an inlet
pressure of 30-35 barg. This conversion requires the installation of new equipments: 2 new Gas
Chillers, 1 New Propane Compressor with Scrubbers/Condenser/Economizer.
Phase 3 (2016): TABIYEH LOW PRESSURE PRODUCTION
(Reduction of TABIYEH gas reservoir pressure to 11 bara).
The objective of this phase is to allow the blowdown of Tabiyeh gas cap to 15 bar WHFP by
installing a low pressure gas compression unit. This low pressure compression unit will compress
gas from 10 to 35 barg to return to a normal operation of Tabiyeh Gas Train. 1 new LP
Production Separator will be purchased and integrated to DEZ Gas plant facilities. 4 new NGL
pumps will be added and 1 Export Gas Compressor will be modified to 1 LP Compressor.
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 6 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
2 Tentative schedule
Note: The numbers given to the HAZOPs and PTRs are in accordance with those of, respectively, GM-
SAF-008(and Directive EP 11) and CR-EXP-602-.
Figure 1 TABIYEH Gas Project Tentative Planning
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 7 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
3 HAZOP’s & PTR’s Organization
3.1 Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION
A pre-project phase is expected to be launched in the first quarter of 2010.
Tentative planning for HAZOP’s and PTR’s:
• HAZOP 1 and PTR1: June - August 2010
• HAZOP 2 and PTR 2: February - April 2011
• HAZOP 3 (if required) and PTR 3: April - June 2012
Exact timing will be updated with project’s progress.
Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP.
3.2 Phase 3 (2016): TABIYEH LOW PRESSURE COMPRESSION
A pre-project phase is expected to be launched in the second quarter of 2013.
Tentative planning for HAZOP’s and PTR’s:
• HAZOP 1 and PTR 1: December 2013 - February 2014
• HAZOP 2 and PTR 2: December 2014 - February 2015
• HAZOP 3 (if required) and PTR 3: November 2015 - January 2016
Exact timing will be updated throughout project’s progress.
Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP.
3.3 Phase 1 (2010): TABIYEH COMMINGLED PRODUCTION
A Preliminary Study was performed by APP in October 2007 which was completed by an additional
Process study in July 2008.
Due to the ever possible early signature of the contract between TEP Syrie and the Syrian Authorities,
no Pre-project was ever launched and no HAZOP 1 / PTR 1 were performed.
The scope of the Basic Engineering for Phase1 will be submitted to APP for review and HAZOP’s and
PTR’s 2 and 3 will be performed in accordance with DGEP procedures.
The Phase 1 Early Scheme is a temporary mode of operation (approx 6 months) with a limited scope
which does not include the installation of additional equipments in DEZ Gas Plant. The target completion
date for the Early Scheme is end March 2010.
The Basic Engineering will be done in-house and the Detailed Engineering of the flow-line and NGL line
will be done by the Construction Contractor as is currently the case for all new DEZPC flow-lines. The
Detailed Engineering of the Plant tie-ins will be done by an Engineering Contractor.
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 8 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Specific ad hoc Reviews for this Early Scheme will be performed locally, possibly with the assistance of
a DGEP facilitator. Personnel from TEP Syrie (Tabiyeh Project and HSE) as well as representatives of
DEZPC and SGC will participate.
Tentative Planning Early Scheme:
• Review 2: 2nd
half of November 2009 (week 46 or 47)
• Review 3: middle of December 2010 (week 50 or 51)
Tentative Planning Phase 1
• HAZOP 2: end of January- beginning of February 2010 (week 4 or 5)
• PTR 2: 1st
half of February 2010 (week 6 or 7)
• HAZOP 3 (if required): 2nd
half of May 2010 (week 20 or 21)
• PTR 3 : 1st
half of June 2010 (week 22 or 23)
Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP.
Document number
TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan
Revision 00 Status: IFC
Document Type: PLN System/Subsystem:
NA
Discipline: HSE Rev Date: 11-10-2009
Contractor Document number: NA Page 9 of 9
This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization
from the Company.
TEPS-TABPJ- HSE- PLN- 001
Appendix 1: Documents for HAZOP#2
Following documents should be made available one week before commencing the HAZOP:
• PFDs
• P&IDs
• UFDs
• Layouts
• Safety Concept
• Statement of Requirements
• Line list, Piping Class &Typical Instrument, Drainage, Sampling, Tie-In Points
• Emergency Shutdown Diagram (ESD) Logic Diagram
• Single Line Electrical Diagram/ List of essential and normal electrical consumers
• Shutdown Matrix, SAFE Chart
• Operating Philosophy
• Hazardous Fluid Data Sheets.
Appendix 2: Documents for PTR 2
• HAZID reports
• Energy and Mass balance
• Specifications of equipment and package units
• Classification of areas
• Fire fighting and anti-explosion protection philosophy
• Protection of structure (principles)
• Rescue equipment
• Survival equipment and escape plans
• Navigation aids
• Toxic and explosive products, datasheets
• Overall plan for construction, hook up, commissioning and start up
• Systems of Fire and Gas Detection (General schemes and bloc diagrams)
• Fire extinguishing systems
• HVAC
• PDS and ESD, general scheme and cause and effects diagrams
• Studies concerning depressurization and flaring system
Appendix 3: Documents for PTR3
• PIDs by engineering contractor
• Equipment/package specifications from vendors
• HAZOP dossier
• Project HAZAN dossier and Environmental Impact Assessment.
• All documentation from the detailed engineering prepared as approved for construction
including purchase orders and construction contracts.

More Related Content

What's hot

Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners L.P.
 
Teekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
Oil & Gas Well Facility Air Quality Permitting/Registration
Oil & Gas Well Facility Air Quality Permitting/RegistrationOil & Gas Well Facility Air Quality Permitting/Registration
Oil & Gas Well Facility Air Quality Permitting/RegistrationBret Gallo
 
Teekay Offshore Partners Fourth Quarter 2013 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2013 Earnings PresentationTeekay Offshore Partners Fourth Quarter 2013 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2013 Earnings PresentationAltera Infrastructure
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceAltera Infrastructure
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay LNG Partners L.P.
 
Teekay LNG Partners First Quarter 2014 Earnings Presentation
Teekay LNG Partners First Quarter 2014 Earnings PresentationTeekay LNG Partners First Quarter 2014 Earnings Presentation
Teekay LNG Partners First Quarter 2014 Earnings PresentationTeekay LNG Partners L.P.
 
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...CohenGrigsby
 
Teekay LNG Partners Q2-2017 Earnings Presentation
Teekay LNG Partners Q2-2017 Earnings PresentationTeekay LNG Partners Q2-2017 Earnings Presentation
Teekay LNG Partners Q2-2017 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Altera Infrastructure
 
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioAltera Infrastructure
 
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners L.P.
 

What's hot (16)

Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation
 
Teekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings Presentation
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
 
Oil & Gas Well Facility Air Quality Permitting/Registration
Oil & Gas Well Facility Air Quality Permitting/RegistrationOil & Gas Well Facility Air Quality Permitting/Registration
Oil & Gas Well Facility Air Quality Permitting/Registration
 
Teekay Offshore Partners Fourth Quarter 2013 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2013 Earnings PresentationTeekay Offshore Partners Fourth Quarter 2013 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2013 Earnings Presentation
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay LNG Partners First Quarter 2014 Earnings Presentation
Teekay LNG Partners First Quarter 2014 Earnings PresentationTeekay LNG Partners First Quarter 2014 Earnings Presentation
Teekay LNG Partners First Quarter 2014 Earnings Presentation
 
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...
Energy Alert - New Pennsylvania Natural Gas Operations Air Permitting Program...
 
Teekay LNG Partners Q2-2017 Earnings Presentation
Teekay LNG Partners Q2-2017 Earnings PresentationTeekay LNG Partners Q2-2017 Earnings Presentation
Teekay LNG Partners Q2-2017 Earnings Presentation
 
Teekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings Presentation
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation
 
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
 
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
 
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
 

Viewers also liked

Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanFlevy.com Best Practices
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fitri Ifony
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan genericfirstpick
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
Sample Strategic Plan
Sample Strategic PlanSample Strategic Plan
Sample Strategic Planbrucemulkey
 
Hotel safety & security
Hotel safety & securityHotel safety & security
Hotel safety & securityzaffar abbasi
 

Viewers also liked (9)

Health Safety Environment (HSE) Plan
Health Safety Environment (HSE) PlanHealth Safety Environment (HSE) Plan
Health Safety Environment (HSE) Plan
 
Hse plan
Hse planHse plan
Hse plan
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management Plan
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Project hse plan
Project hse planProject hse plan
Project hse plan
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
Sample Strategic Plan
Sample Strategic PlanSample Strategic Plan
Sample Strategic Plan
 
Hotel safety & security
Hotel safety & securityHotel safety & security
Hotel safety & security
 

Similar to TEPS-TABPJ- HSE- PLN- 001

DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...yang lu
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFOL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFThinEmir
 
Gas Turbine Basics.pdf
Gas Turbine Basics.pdfGas Turbine Basics.pdf
Gas Turbine Basics.pdfyusuf699644
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxsohamsohamalways
 
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...Marcellus Drilling News
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodpaulus konda
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingEaswaran Kanason
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
Utilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfUtilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfhariskhalil8
 
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011abughaws
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Engyoseph prakosa S
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013TradeWindsnews
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfvishveswar9
 

Similar to TEPS-TABPJ- HSE- PLN- 001 (20)

DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDFOL1-2O71-0027-0-Handover and Punch List Procedure.PDF
OL1-2O71-0027-0-Handover and Punch List Procedure.PDF
 
Gas Turbine Basics.pdf
Gas Turbine Basics.pdfGas Turbine Basics.pdf
Gas Turbine Basics.pdf
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptx
 
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
 
Report
ReportReport
Report
 
Karamoozi
KaramooziKaramoozi
Karamoozi
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT method
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgeting
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Utilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdfUtilities and oil movement-Final.pdf
Utilities and oil movement-Final.pdf
 
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
 
Bikic CV
Bikic CVBikic CV
Bikic CV
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
Vikram ie
Vikram ieVikram ie
Vikram ie
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
 

TEPS-TABPJ- HSE- PLN- 001

  • 1. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 1 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Tabiyeh Gas Project HAZOP and PTR plan Rev. Status Date Revision memo Issued by Checked by Approved by 00 IFC 7/10/2009 Lydia Lostan Alain Pougis P. Vercruysse
  • 2. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 2 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Purpose To establish a tentative planning for HAZOPs and PTRs for each phases of the TAB Gas Project. Reference Documents: Reference Title Directive EP 11 Development project CR-EP-HSE-032 HSE Risk Management in oil & gas installation projects. CR-EXP-602 Project Technical Review GM-SAF-008 Conducting Hazard & Operability Studies GM-SAF-012 Guidelines to establish a budget estimate for a HAZOP review
  • 3. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 3 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Table of Contents 1 TABIYEH Project Description 4 2 Tentative schedule 6 3 HAZOP’s & PTR’s Organization 7 3.1 Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION 7 3.2 Phase 3 (2016): TABIYEH LOW PRESSURE COMPRESSION 7 3.3 Phase 1 (2010): TABIYEH COMMINGLED PRODUCTION 7
  • 4. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 4 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 1 TABIYEH Project Description The Tabiyeh Gas Expansion project aims at increasing the sales gas quantity available for export from DEZ gas plant in order to partly fill Syria's gas deficit for Power generation. The main objective of the development scheme proposed by TEPS is to increase the amount of export gas from 150MMscf/d to 170MMscf/d and optimize the liquid recovery from Tabiyeh. TAB GAS Project is divided in the following phases: Phase 1 (20101 ): TABIYEH COMMINGLED PRODUCTION The objective of the commingled production of Tabiyeh oil rim and gas cap is to accelerate the oil rim production and maximize the liquid recovery. • Two new commingled wells TAB-COM1 &TAB-COM2 will be drilled and 2 existing wells TAB- 108 & TAB-207 will be converted to commingled production. • 3 new flowlines from TAB-108, TAB-COM1 and TAB-COM2 will be laid to a new Production Header in DEZ Gas plant. • A new Commingled Production separator will be installed in DEZ Gas plant to handle the effluents from the commingled wells. The new separator will be integrated to the existing DEZ Gas Plant facilities ( Process, flare, drains, control systems, ESD) • 1 new 6” NGL line will be laid from the Commingled separator liquid outlet to Jafra inlet production manifold. Early Development phase: To accelerate the implementation of Tabiyeh commingled gas production, an Early Development Scheme is considered: • The existing Test separator at DEZ Gas plant will be used temporarily as a Commingled Separator. • The NGL line will be installed. • A 6” flowline will be laid to connect TAB-108 to the existing DEZ Gas plant Test Header. • TAB-207 will be perforated in the oil reservoir (Coiled Tubing + perforation) Note: - If a well has to be tested during the Early Production Scheme, the commingled production (TAB-108 & TAB-207) will be interrupted for the test. - Upon completion of full phase 1, the Test separator will be working in its original operating mode (Test). 1 Expected completion date
  • 5. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 5 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION (MP PRODUCTION) The Tabiyeh Gas Train is currently operating at 75 barg inlet and the gas chilling for the recovery of liquid is achieved by a Joule-Thomson pressure reduction (75 to 32 barg). With the progressive depletion of Tabiyeh gas cap, the wellhead flowing pressure (WHFP) and he Tabiyeh Gas Train inlet pressure will drop levels and the Joule Thomson operating mode will become ineffective to chill the gas and recover NGL. At this point, the Tabiyeh Gas Train must be converted to an external refrigeration mode identical to the Associated Gas Train with an inlet pressure of 30-35 barg. This conversion requires the installation of new equipments: 2 new Gas Chillers, 1 New Propane Compressor with Scrubbers/Condenser/Economizer. Phase 3 (2016): TABIYEH LOW PRESSURE PRODUCTION (Reduction of TABIYEH gas reservoir pressure to 11 bara). The objective of this phase is to allow the blowdown of Tabiyeh gas cap to 15 bar WHFP by installing a low pressure gas compression unit. This low pressure compression unit will compress gas from 10 to 35 barg to return to a normal operation of Tabiyeh Gas Train. 1 new LP Production Separator will be purchased and integrated to DEZ Gas plant facilities. 4 new NGL pumps will be added and 1 Export Gas Compressor will be modified to 1 LP Compressor.
  • 6. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 6 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 2 Tentative schedule Note: The numbers given to the HAZOPs and PTRs are in accordance with those of, respectively, GM- SAF-008(and Directive EP 11) and CR-EXP-602-. Figure 1 TABIYEH Gas Project Tentative Planning
  • 7. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 7 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 3 HAZOP’s & PTR’s Organization 3.1 Phase 2 (2013): TABIYEH GAS TRAIN CONVERSION A pre-project phase is expected to be launched in the first quarter of 2010. Tentative planning for HAZOP’s and PTR’s: • HAZOP 1 and PTR1: June - August 2010 • HAZOP 2 and PTR 2: February - April 2011 • HAZOP 3 (if required) and PTR 3: April - June 2012 Exact timing will be updated with project’s progress. Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP. 3.2 Phase 3 (2016): TABIYEH LOW PRESSURE COMPRESSION A pre-project phase is expected to be launched in the second quarter of 2013. Tentative planning for HAZOP’s and PTR’s: • HAZOP 1 and PTR 1: December 2013 - February 2014 • HAZOP 2 and PTR 2: December 2014 - February 2015 • HAZOP 3 (if required) and PTR 3: November 2015 - January 2016 Exact timing will be updated throughout project’s progress. Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP. 3.3 Phase 1 (2010): TABIYEH COMMINGLED PRODUCTION A Preliminary Study was performed by APP in October 2007 which was completed by an additional Process study in July 2008. Due to the ever possible early signature of the contract between TEP Syrie and the Syrian Authorities, no Pre-project was ever launched and no HAZOP 1 / PTR 1 were performed. The scope of the Basic Engineering for Phase1 will be submitted to APP for review and HAZOP’s and PTR’s 2 and 3 will be performed in accordance with DGEP procedures. The Phase 1 Early Scheme is a temporary mode of operation (approx 6 months) with a limited scope which does not include the installation of additional equipments in DEZ Gas Plant. The target completion date for the Early Scheme is end March 2010. The Basic Engineering will be done in-house and the Detailed Engineering of the flow-line and NGL line will be done by the Construction Contractor as is currently the case for all new DEZPC flow-lines. The Detailed Engineering of the Plant tie-ins will be done by an Engineering Contractor.
  • 8. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 8 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Specific ad hoc Reviews for this Early Scheme will be performed locally, possibly with the assistance of a DGEP facilitator. Personnel from TEP Syrie (Tabiyeh Project and HSE) as well as representatives of DEZPC and SGC will participate. Tentative Planning Early Scheme: • Review 2: 2nd half of November 2009 (week 46 or 47) • Review 3: middle of December 2010 (week 50 or 51) Tentative Planning Phase 1 • HAZOP 2: end of January- beginning of February 2010 (week 4 or 5) • PTR 2: 1st half of February 2010 (week 6 or 7) • HAZOP 3 (if required): 2nd half of May 2010 (week 20 or 21) • PTR 3 : 1st half of June 2010 (week 22 or 23) Reviews’ venues will be decided later with SCR/ED/APP, HSE/SEI, TDO/EXP.
  • 9. Document number TEPS-TABPJ- HSE- PLN- 001HAZOP and PTR plan Revision 00 Status: IFC Document Type: PLN System/Subsystem: NA Discipline: HSE Rev Date: 11-10-2009 Contractor Document number: NA Page 9 of 9 This Document is the property of Company. It must not be stored, reproduced or disclosed to others without written authorization from the Company. TEPS-TABPJ- HSE- PLN- 001 Appendix 1: Documents for HAZOP#2 Following documents should be made available one week before commencing the HAZOP: • PFDs • P&IDs • UFDs • Layouts • Safety Concept • Statement of Requirements • Line list, Piping Class &Typical Instrument, Drainage, Sampling, Tie-In Points • Emergency Shutdown Diagram (ESD) Logic Diagram • Single Line Electrical Diagram/ List of essential and normal electrical consumers • Shutdown Matrix, SAFE Chart • Operating Philosophy • Hazardous Fluid Data Sheets. Appendix 2: Documents for PTR 2 • HAZID reports • Energy and Mass balance • Specifications of equipment and package units • Classification of areas • Fire fighting and anti-explosion protection philosophy • Protection of structure (principles) • Rescue equipment • Survival equipment and escape plans • Navigation aids • Toxic and explosive products, datasheets • Overall plan for construction, hook up, commissioning and start up • Systems of Fire and Gas Detection (General schemes and bloc diagrams) • Fire extinguishing systems • HVAC • PDS and ESD, general scheme and cause and effects diagrams • Studies concerning depressurization and flaring system Appendix 3: Documents for PTR3 • PIDs by engineering contractor • Equipment/package specifications from vendors • HAZOP dossier • Project HAZAN dossier and Environmental Impact Assessment. • All documentation from the detailed engineering prepared as approved for construction including purchase orders and construction contracts.