SlideShare a Scribd company logo
1 of 59
Download to read offline
CLOSE OUT REPORT
HSE DEPARTMENT
Period : JUNE 2013 – OCTOBER 2013
1st ARTICLE – SUB SEA MANIFOLD PROJECT

PT GUNANUSA
UTAMA
FABRICATORS
HSE CLOSE OUT REPORT 2013

CONTENT
1. INTRODUCTION ................................................................................................. 3
1.1

PURPOSE ..................................................................................................... 3

1.2

SCOPE .......................................................................................................... 3

2. HSE MANAGEMENT SYSTEM ............................................................................. 3
3. HSE POLICY 2013 ............................................................................................... 5
4. PROJECT HSE OBJECTIVE 2013 ........................................................................... 5
4.1

SAFETY OBJECTIVES ..................................................................................... 5

4.2

OCCUPATION HEALTH OBJECTIVES............................................................... 5

4.3

ENVIRONMENTAL OBJECTIVES ..................................................................... 5

5. PROJECT HSE ACHIEVEMENT 2013 ..................................................................... 6
5.1

SAFETY OBJECTIVES ..................................................................................... 6

5.2

OCCUPATION HEALTH OBJECTIVES............................................................... 7

6. HSE ORGANIZATION CHART .............................................................................. 8
7. HSE PERFORMANCE STATISTIC .......................................................................... 8
7.1

MAN HOURS EXPOSURE .............................................................................. 8

7.2

FATALITY (FAT)........................................................................................... 10

7.3

LOSS TIME INJURY (LTI) .............................................................................. 10

7.4

MEDICAL TREATMENT CASE (MTC) ............................................................ 10

7.5

FIRST AID CASES (FAC) ............................................................................... 10

7.6

DAY LOSS ................................................................................................... 10

7.7

NEAR MISS INCIDENT (NMI) ....................................................................... 11

7.8

MEDICAL RECORDS .................................................................................... 11

7.9

HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) .......................... 11

7.10

MANAGEMENT QHSE WALKTHROUGH RECORDS .................................... 11

8. AREA OF CONCERN AND FOLLOW UP FOR CORRECTIVE ACTION ..................... 11
8.1

AREA OF CONCERN .................................................................................... 11

8.2

FOLLOW UP FO FOR CORRECTIVE ACTION OF CONCERN AREA ................... 12

9. SUMMARY OF HSE PROGRAM IMPLEMENTATION........................................... 13
9.1

INDUCTION AND TRAINING........................................................................ 13
1
HSE CLOSE OUT REPORT 2013

9.2

JOB RISK ASSESSMENT ............................................................................... 14

9.3

HSE AUDITS................................................................................................ 14

9.4

HSE TRACKING RECORDS............................................................................ 14

9.5

HSE INSPECTION PROGRAM ....................................................................... 14

9.6

HSE COMMUNICATION PROGRAM ............................................................ 15

9.7

HEALTH AND HYGIENE ............................................................................... 16

9.8

ENVIRONMENTAL IMPROVEMENT ............................................................. 16

9.9

HSE PROCEDURE DEVELOPED..................................................................... 17

9.10

HSE REPORTING SYSTEM ......................................................................... 17

ATTACHMENT 1

HSE POLICY

ATTACHMENT 2

YARD HSE ORGANIZATION CHART

ATTACHMENT 3

SUMMARY WORK PERMITS YARD ACTIVITY

ATTACHMENT 4

JRA RECORDS

ATTACHMENT 5

MANAGEMENT WALKTHROUGH

ATTACHMENT 6

HSE MASTER DOCUMENT REGISTERS

ATTACHMENT 7

LOAD OUT PICTURE

ATTACHMENT 8

INSPECTION REPORT

2
HSE CLOSE OUT REPORT 2013

1. INTRODUCTION
PT. Gunanusa Utama Fabricators HSE dossier is provided as Close Out Report for measurement
of the HSE Management System include HSE Program implementation of FMC Technologies
has been awarded 1st article Project for PT Gunanusa Utama Fabricators yard Grenyang –
Serang Banten.

1.1 PURPOSE
The purpose of this dossier is to report the commitment of PT Gunanusa Utama Fabricator
management on managing the implementation of their HSE policy and other HSE issue
raised during the execution of Project since the Project activities started until the end of
project include the achievement of Project HSE Objectives.

1.2 SCOPE
This HSE Close Out Report (Dossier) is covered the implementation all HSE activities during
engineering, procurement, fabrication and assembly, materials management, Load out
and pre commissioning
PTG has completed successfully all fabrications and SDSS Pipe, Structural Steel, SS Tube
load out (October 24th, 2013).

2. HSE MANAGEMENT SYSTEM
HSE Management System developed based on the integrated of HSE Management System :
OHSAS 18001:2007 (HSE Management System)
ISO 14001:2004 (Environmental Management System)
SMK3 PP No. 5/2012 (OHS Management System of Indonesia)
ISO 9001:2008 (Quality Management System)

-

And also to meet and comply of others requirement both International and National statutory
regulations, Industrial Standard Code Practices and client requirement.
The Elements of HSE Management System consist of :
-

Leadership & commitment
Policy & strategic objective
Organization, responsibility, resources standards and documentation
Hazards and effect management
Planning and procedures
Implementation & performance monitoring
Audit & review
3
HSE CLOSE OUT REPORT 2013

Key Elements Integrated HSE Management System

4
HSE CLOSE OUT REPORT 2013

3. HSE POLICY 2013
This policy statement has been produced in pursuance of CTR statutory and contractual
obligations and is designed to promote high standards of Occupational Health and Safety for
duration of the Yard & Site Construction. (see the attachment 1)

4. PROJECT HSE OBJECTIVE 2013
The HSE Objective of CTR stipulated for the year 2013 is to improve the behavior of all
employees to become habitual by providing more knowledge in understanding the safety
aspect of a project as such to prevent the occurrence of accidents. This objectives shall be
achieved by maintaining the following targets.(Attachment 2)

4.1 SAFETY OBJECTIVES
4.1.1

Safety Objective # 1 - HUMAN DIMENSION

•
•
•
•

No fatality,
No major accident (including lifting and transport),
No major fire,
No explosion.

4.1.2

Safety Objective # 2 TRIR – Total Recordable Injury Rate < 1.06,

4.1.3

Safety Objective # 3 LTIF – Lost Time Injury Frequency < 0.28,

4.1.4

Safety Objectives # 4 – HSE Management System and Performance
Management
• Develop HSE Management System,
• Socialization Key Performance Indicator to workforces,
• Control of Key Performance Indicator

4.1.5

Safety Objectives # 5 – SAFETY BEHAVIOR

4.2 OCCUPATION HEALTH OBJECTIVES
1.
2.
3.

Ensure availability of emergency equipments and maintain medicine stock
Reduce occupation illness and sickness
Continue improve the implementation of industrial hygiene

4.3 ENVIRONMENTAL OBJECTIVES
1. Improve employees environmental awareness by conduct regular training, displayed
label, MSDS hazardous sign.
2. Minimize dust exposure during abrasive blasting and minimize oil spills
3. Improve waste management by waste segregation, storage and regular transportation
5
HSE CLOSE OUT REPORT 2013

5. PROJECT HSE ACHIEVEMENT 2013
5.1 SAFETY OBJECTIVES
5.1.1

General Safety Objective # 1 HUMAN DIMENSION
Total man-hours achievement of FMC Project since period June 2013 up to October 2013
are 13.244 (COD: 16 October 2013) which :
-

no fatality,
no major accident,
no major fire and
no explosion was occurred

Therefore, General Safety Objective # 1 – HUMAN DIMENSION is achieved.

5.1.2

Safety Objective # 2
During execution of FMC Project period June 2013 up to October 2013, the following HSE
performance with total cumulative man hours achieved there were some 13.244 at yard as
of closed date October 16 June, 2013 some accident has occurred as follows.

a. TRIR (Total Recordable Injury Rate)
During execution of FMC Project period June 2013 up to October 2013, Total FAT
(Fatality) = 0, LTI (Lost Time Accidents) = 0, RWDC (Restricted Work Day Case) = 0, MTC
(Medical Treatment Case) = 0.
There for base on formula ANSI version below :
TRIR = (FAT+RWDC+MTC+LTI) * 1.000.000
Man Hours
TRIR = (0+0+0+0) * 1.000.000

13.244

TRIR = 0,00
Comparing objective TRIR value shall be < 2, 00. it means TRIR archived (0,00 < 2,00)

b. LTIF (Lost Time Injury Frequency)
During execution of FMC Project period June 2013 up to October 2013, Total FAT
(Fatality) = 0, LTI (Lost Time Accidents) = 0
LTIF = (FAT+LTI) * 1.000.000
Man Hours

6
HSE CLOSE OUT REPORT 2013

LTIF = (0+0) * 1.000.000

13.244

LTIF = 0
Comparing objective LTIF value shall be < 0, 75. it means LTIF archived
(0 < 0, 75)
Therefore, Safety Objective # 2 – TRIR = 0,00 and LTIF = 0 are achieved

5.1.3

Safety Objective # 3
During the implementation of fabrication period 2013, there was a significant improvement
of safety behavior by proactive all employees and subcontractors on HSE program
throughout:
1. Participate regularly on meeting program such as Toolbox Meeting in daily basis, mass
meeting in weekly basis, HSE weekly and monthly meeting with client and monthly
Safety Committee meeting
2. Implementation housekeeping (5S) program
3. Discipline on wearing PPE and unsafe practices has been reduced due to the
implementation of violation card system
4. Conduct HSE inspection and internal & external audit in regular basis
5. Implementation safety communication such as safety poster/banner, barricade, HSE
notice board, etc.
6. Management Communication such as management visit / management walkthrough.
At meanwhile, HSE has been recognized for the implementation of HSE Management System
by external audit as below:
1. We successfully in audit surveillance certified by SICS (Sucofindo International
Certification Service) on OHSAS 18001:2007 (HSE Management System), ISO 14001:2004
(Environmental Management System)
2. SMK3 (PERMENAKER No. 5 / 1996 and PP No. 50 / 2012) scored 92 (gold flag) and
certificate will issue on March 2009.
3. We certified by LRQA (Lloyd Register Quality Assurance) on ISO 9001:2008 on Quality

Management System.
4. We conduct internal HSE audit which held by internal auditor. It makes increase
HSE performance.
5. Our corporate HSE manager has been selected as a Chairman of National of
Safety Committee and has been selected as a Chairman of Provincial Banten
Safety Committee by Banten Governor.
Therefore, Safety Objective # 3 – Safety Behavior is achieved

5.2 OCCUPATION HEALTH OBJECTIVES

7
HSE CLOSE OUT REPORT 2013

During the project execution contractor has provided adequate of the availability of
medicine stock to cover employee and medical check up are completed performed to all
employee improved to the project.
1.

Ensure availability of emergency equipments and maintain medicine stock
Emergency equipments and maintenance facilities has been improve such as New
Clinic building complete with ambulance and clinic facilities and ERT Room building
complete with emergency equipment, etc and also we maintain medicine stock in
regular basis. All documents are recorded and reported to involved parties. Conduct
drill regularly in monthly basis.

2.

Reduce occupation illness and sickness
Based on the clinic statistic reported, there was no occupation illness and sickness
occurred.

3.

Continue improve the implementation of industrial hygiene
The implementation of industrial hygiene program is we conducted regularly such as
inspection on canteen, noise level check, emission, illumination, UV Light, radiation,
etc. All documents are recorded and reported to involved parties.
We achieved Occupational Health objectives

6. HSE ORGANIZATION CHART
See attachment 3 – Yard HSE Organization Chart

7. HSE PERFORMANCE STATISTIC
7.1 MAN HOURS EXPOSURE
Since FMC Project started from October June 2013 up to October 2013 total cumulative
man hours achieved are 13.244 .

8
HSE CLOSE OUT REPORT 2013

SUMMARY OF HSE PERFORMANCE STATISTIC
1st article Project
PERIOD : June 2013 – October 2013
No
A

Description
WORKED HOURS
1 Total Man Power
2 Total Man Hours
INCIDENT
1 Fatality Accident
2 Lost Time Injury (Company)
3 Lost Time Injury(Contractor)
4 Day Lost
5 Restricted Workday Case

Performance
Statistic

Remarks

20
13244

C

D
E

9

No fatality
No Lost Time Injury

6 Medical Treatment Case

B

0
0
0
0
0
0

No Restricted Work Case

7
8
9
10
11
12
13
14
15
16
17
18
19
20

0
0
0
0
0
0
0
0
0
0
0
0
0
0

No High Potential

1
2
3
4
5
6
7
8
9
10

High Potential (HiPo) Incident
First Aid Case (FAC)
Occupational Illness
Material / Production Loss
Pollution / Spill
Fire (not HPI)
Damage (not HPI)
Incident (Near Miss / NC)
RTA / Incidents
Security
External RTA / Road Incidents
External (Social)
Vehicles Incident
Root Cause Analysis
HSE ACTIVITIES
Safety Tool Box Meeting (Event)
Safety Induction (No. of Persons)
HSE Walkabout
HSE Inspections
SubContractors HSE Audits
Medical Check up
HSE Document Preparation
Safety Weekly Meeting
Safety Monthly Meeting
Weekly Construction Meeting
TRIR
LTIF

24
20
8
7
5
20
8
15
1
5
1,10
0,26

No Lost Day

No Occupational Illness
No Material / Production Loss

No Vehicle Incident
HSE CLOSE OUT REPORT 2013

HSE Objective & HSE Achievement
Period : June 2013 - October 20132
1.20
1.00
0.80
0.60
0.40
0.20
0.00

June

July

August

September

October

Year 2013
TRIR

1.10

1.10

1.10

1.10

1.10

LTIF

0.26

0.26

0.26

0.26

0.26

7.2 FATALITY (FAT)
Since project activities started until the end project there was No Fatality case occurred.

7.3 LOSS TIME INJURY (LTI)
Since project activities started until the end project there was No Lost Time Injury case
occurred.

7.4 MEDICAL TREATMENT CASE (MTC)
Total First Aid cases occurred on June 2013 up to October 2013, there were 6 cases that
occurred at Yard activities. All corrective action as required by Client has been done.

7.5 FIRST AID CASES (FAC)
Total First Aid cases occurred since June 2013 up to October 2013, there were 6 cases that
occurred at Yard activities. All corrective action as required by Client has been done.

7.6 DAY LOSS
During the yard activity performed until the end of the construction project there was no
Day Loss occurred.

10
HSE CLOSE OUT REPORT 2013

7.7 NEAR MISS INCIDENT (NMI)
Total Near miss cases occurred since June 2013 up to October 2013, there were 2 cases. All

corrective action as required by Client has been done (See attachment 12 – HSE Event Log
Accident/Incident register)

7.8 MEDICAL RECORDS
Since the starting of the project on June 2013 up to October 2013, the total clinic visitor
were 20 Reported. (See attachment 9 – Summary Medical Record as Yard Clinic Visitor)

7.9 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA)
PT. Gunanusa has applied hazard identification and risk assessment with JRA & weekly
Management walkthrough. All finding of both program had been closed and corrective
action taken.

7.10

MANAGEMENT QHSE WALKTHROUGH RECORDS
Total management QHSE walkthrough issued from contractor and company during
2013 up to October 2013. All of management QHSE walkthrough had been corrected
and closed out (See attachment 10 - Safety Management QHSE Walkthrough Finding
& Close Summary Number)

8. AREA OF CONCERN AND FOLLOW UP FOR CORRECTIVE ACTION
8.1 AREA OF CONCERN
Referring to the HSE tracking record there were a lot of HSE issued identified from event log
record, issued include findings and comments by Contractor and Client representative during
HSE regular inspection. The finding areas of concerns that need to be improved were as follow:
a.
b.
c.
d.
e.

11

Unsafe work practice & poor safety behavior
Lack of PPE/ Fail to wear PPE
Poor of Housekeeping
Lack & unsafe equipment operation
Improper electrical equipment /tools
HSE CLOSE OUT REPORT 2013

8.2 FOLLOW UP FO FOR CORRECTIVE ACTION OF CONCERN AREA
Almost all event log, SHOC Card, and Violation card reported have been corrected and
follow up.
Corrective Action & Follow-Up area of concern were as follow:
1. Unsafe work practice and poor safety behavior
Finding:
 Not followed the correct Standard Operational Procedure (SOP)
 The used of equipment and tools with the wrong method
Action taken:
o Conducted safety behavior training.
o Highlight at tool box talk related unsafe work practice by daily basis.
o Conducted on the job training such as: Safe to use grinding machine, safe to use
body harness, safe to use cutting torch.
o Socializing the slogan” Safety is everybody business “, therefore everybody could
have contribution encourage them to control each other’s and immediately
reported by use SHOC card or correct the unsafe practices before incident
occurred.
2. Lack of PPE / Fail to wear PPE
Finding:
 Undisciplined used of safety glasses although already supplied.
 The used improper of Safety shoes
 The used incorrect PPE for specific work such as working at height
Action taken:
o Supply standard PPE as requirement such as : Safety Helmet, safety glasses,
dust mask, earplug, full body harness, Safety shoes.
o Maintain PPE minimum stock and report the PPE stock by weekly basis.
o Performed PPE inspection at entrance gate prior starting the work by daily basis.
o Law enforcement wears PPE at work place.
o Issue violation card
3. Poor Housekeeping
Finding:
 The storage of material in the wrong position and subtract to the way
 The poor condition of work area waste management
 The spread of welding rod
Action taken:
12
HSE CLOSE OUT REPORT 2013

o
o
o
o

Assign cleaning team who placed at every work place
Perform daily housekeeping lead by supervisor after finish work
Highlight at Tool Box Talk related this topic by daily basis
Provide adequate fire protection equipment, to cover hazardous area when
welding, cutting, grinding and sand blasting work performed

4. Lack and Unsafe Equipment Operation
Finding:
 Used homemade tools that unsafe
 Lack of inspection to all equipment and tool
Action taken :
o Removed unsafe equipment and tools from work place
o Performed all equipments regularly
5. Improper Electrical Equipment/Tools
Finding:
 Improper connection cable for electrical
 Lack of inspection of electrical equipment
Action taken:
o Performed electrical equipment inspection regularly
o Conducted basic electrical training

9. SUMMARY OF HSE PROGRAM IMPLEMENTATION
9.1 INDUCTION AND TRAINING
9.1.1

Induction

HSE induction has conducted for all new hire including Visitor. In HSE induction all new
hire were given information regarding safety rules and knowledge of HSE matters.
During period June 2013 to October 2013, PTG HSE dept has been conducted induction
for PTG & subcontractor and visitors.

9.1.2

Training

In order to comply the Contractor and client requirement those are project employees
are participating. During period June 2013 to October 2013, PTG HSE dept has been
conducted training as per training matrix, training syllabus, training schedule and
training need analysis. PTG has provided two training room which 20 seat capacity and
equipped by computer and LCD projector and audio. (See Attachment 7 – HSE Training
Record)

13
HSE CLOSE OUT REPORT 2013

PTG also have conducted some safety training with Topic:
1. Acceptance Scaffolding
2. HSE Awareness
3. Lifting and rigging practice
4. Job Risk Assessment
5. Radiography
6. Accident Incident investigation
7. First aid & CPR
HSE passport has been implemented and recognized the workers who attended and
participated the training. Also the attendances were given a certificate

9.2 JOB RISK ASSESSMENT
PTG – FMC for 1st Articles Project. HSE Department has proposed HIRADC/JRA issued at yard as
required by client prior to commencement of specific work since All JRA has socialized to all
workers prior execute the job. (See attachment 9 – Job Risk Analysis Record)

9.3 HSE AUDITS
HSE Audit is determined as follow:
1. HSE Internal Audit
2. Internal audit integration Quality and HSE
3. HSE external by Third Party
5. HSE Audit for Subcontractor
PTG was performed HSE Audit for all Sub contractor prior commencement the work. The
external Audit from Sucofindo for SMK3, OHSAS 18001, ISO 14001 also to be held during
execution project. PTG has awarded SMK3, OHSAS 18001, ISO 14001 certification.

9.4 HSE TRACKING RECORDS
HSE Dept has established a system for tracking the status finding of:
• HSE Join inspection (QHSE Management Walkthrough)
• Equipment Inspection
• HSE Audit

9.5 HSE INSPECTION PROGRAM
9.5.1

Join Inspection

FMC and PTG joint inspection on PTG operations and facilities was conducted regularly since
June 2013 to October 2013. The corrective actions/follow up status is submitted to FMC
regularly in weekly basis. The participants were FMC Project Management Team and PTG Project
Management and conducted HSE management review meeting after yard walk around. (See
Attachment 10 – QHSE Management Walkthrough)

14
HSE CLOSE OUT REPORT 2013

9.5.2

Equipments, Tools Inspection

To ensure all equipment & tools is used in safe and proper condition therefore the inspection
has to perform regularly. The equipment & tools inspection is performed by Safety inspector and
yard facility inspector as per schedule, the inspection including:
1. Lifting gears applied as color code.
2. Heavy vehicles such as : Cranes, Loaders, forklift, trailer, excavator
3. Electrical equipments such as : Generator set,
4. Powered tools and hand tools
5. Scaffolding and accessories
6. Equipment such as : Compressor, Air receiver tank
7. Light vehicles
8. Firefighting equipment
9. Gas cylinders and accessories
10. Welding equipment and accessories
11. Over Head Crane
12. Radiography equipments

9.6 HSE COMMUNICATION PROGRAM
9.6.1

Pre Start Job Meeting
Pre start job meeting was conducted by Safety personnel, Supervisors at yard with
the workers in daily basis of each working shift before start work and the foreman
have to fill the Pre job check list.

9.6.2

Tool Box Meeting
Toolbox meeting are conducted by PTG Safety and Supervisors in daily basis. The
agenda was to review the incidents, Near miss cases occurred in the previous week
and other safety issued if any. The main topic is generally decided in the weekly
Safety Coordination Meeting with sub contractors based on the priority of the most
critical and significant incident and/ or Near miss of the week.

9.6.3

Safety Coordination Meeting
This meeting is conducted by PTG in weekly basis attended by AGJV and PTG, in
addition to the discussion of important safety issues, the topics of toolbox meeting in
the coming weekly are decided also in this meeting.

9.6.4

15

Project Management Review Meeting
HSE CLOSE OUT REPORT 2013

Project Management Review Meeting was conducted by PTG Management in monthly basis
and attended by PTG Top Management, Yard Manager, Yard Construction Manager, Corp
HSE Manager or Project HSE Manager.

9.6.5

HSE Internal Meeting
HSE Internal Meeting was conducted by PTG corp HSE Manager in weekly basis and
attended by All HSE personnel (Safety and Medic).

9.7 HEALTH AND HYGIENE
Health and hygiene matters is maintained and inspected by Medical doctor and
Environmental officer with concern:
1. Aqua Maker for drinking water and supply all employee at the Yard.
2. To ensure the process of aqua maker meet the health and hygiene standard, the water
has been sent to third party laboratory for examination every month.
3. Canteen and kitchen.
4. The inspection is performed by PTG Doctor ,PTG GA Officer and Environmental Officer
by monthly basis

9.8 ENVIRONMENTAL IMPROVEMENT
All environmental matters have been improved with concern:
1. Noise mapping
Noise mapping have available as per the result of noise measurement at work place
area.
2. Oil Spill Management
Provide Secondary containment, Oil Absorbent and drip pan to prevent oil spill from
generator set or compressor felt to the ground directly.
3. Hazardous material handling
Give labeling at chemical containers, drums and cans to identify the potential hazard,
provide MSDS box at each work shop and has socialized to workers.
4. Water spraying
Water spraying used water tank was performed to prevent dust pollution impact
when dry season coming at yard.
5. Environmental Awareness
PTG has conducted environmental awareness, hazardous handling material, and
Audit ISO version 14001 to increase the employee’s environmental awareness. A PTG
employee also has attended external training and seminar such as: Oil Spill
Management, Seminar of new environmental regulation of Banten Government.
6. Yard Facility Improvement
PTG has improved yard facility such as: Upgrading Jetty 1, add new Office building,
new access road, Parking area, boundary, new water drainage, TSA Chamber, RT
Chamber, New clinic building, New temporary waste disposal building.

16
HSE CLOSE OUT REPORT 2013

9.9 HSE PROCEDURE DEVELOPED
PTG has improved and issued some HSE procedure and has approved by AGJV such as HSE
Manual. (See attachment 11 – HSE Master Document Register)

9.10

HSE REPORTING SYSTEM
PTG have been implemented HSE Reporting System as required in Daily basis, Weekly basis and
Monthly Basis. The Reporting System that issued to PTG and AGJV as a followed:
 HSE Performance Statistic input report include HSE Training record, HSE Inspection record,
Medical record, PPE stock, reported in Weekly basis.
 Environmental Report (included waste management, Oil spill management, and other
environmental matters) reported in Monthly basis.

17
HSE CLOSE OUT REPORT 2013

ATTACHMENT 1

HSE POLICY

18
HSE CLOSE OUT REPORT 2013

ATTACHMENT 2

YARD HSE ORGANIZATION
CHART

19
HSE CLOSE OUT REPORT 2013

ATTACHMENT 3

SUMMARY WORK PERMIT

20
1st Articles Project

WORK PERMIT REGISTER OVERALL
Period : September 2013 - October 2013

PT. GUNANUSA UTAMA FABRICATORS

Cut Of Date : 24 October 2013

EXECUTION

NO.

WORK PERMIT
NUMBER

ACTIVITY

LOCATION

DESCRIPTION OF WORK

Work
Planned to
start

PERSONNEL IN CHARGE

Actual start
Valid
Date

Finish

REMARKS

STATUS
REQUESTER

Time

Spv./FM

COORD.

SAFETY

1

HPP/HSE/IX/FMC/13/01

High Pressure
Potential

Workshop 1

Pre-Hydrotest for piping

24-Sep-13

24-Sep-13

07:30 - 17:00

25-Sep-13

25-Sep-13

CLOSED

Donny N.

Andy

Siswadi

2

HPP/HSE/IX/FMC/13/02

High Pressure
Potential

Workshop 1

Hyfrojetting 100 bar

25-Sep-13

25-Sep-13

13:30 - 17:00

26-Sep-13

26-Sep-13

CLOSED

Donny N.

Donny N.

Siswadi

3

HPP/HSE/IX/FMC/13/03

High Pressure
Potential

Workshop 1

Hyfrojetting 100 bar

26-Sep-13

26-Sep-13

12:00 - 17:00

27-Sep-13

27-Sep-13

CLOSED

Donny N.

Donny N.

Sobari

4

HPP/HSE/IX/FMC/13/04

High Pressure
Potential

Workshop 1

Hydrotest 1,000 Psi, During 8
hours

31-Sep-2013

31-Sep-2013

11:00 - 17:00

CLOSED

Donny N.

Donny N.

Sobari

5

HPP/HSE/X/FMC/13/05

High Pressure
Potential

Workshop 1

Hydrotest 1,000 Psi,

1-Oct-13

1-Oct-13

07:30 - 17:00

2-Oct-13

2-Oct-13

CLOSED

Donny N.

Donny N.

Sobari

6

HPP/HSE/X/FMC/13/06

High Pressure
Potential

Workshop 1

Hydrotest 1,000 Psi,

2-Oct-13

2-Oct-13

07:30 - 17:00

3-Oct-13

3-Oct-13

CLOSED

Donny N.

Donny N.

Sobari

7

HPP/HSE/X/FMC/13/07

High Pressure
Potential

Workshop 1

Flushing

3-Oct-13

3-Oct-13

07:30 - 17:00

4-Oct-13

4-Oct-13

CLOSED

Donny N.

Donny N.

Sobari

8

LIFT/HSE/X/FMC/13/01

LIFTING

Workshop 5

Lift for test manifold

4-Oct-13

4-Oct-13

07:30 - 17:00

4-Oct-13

4-Oct-13

CLOSED

Donny N.

Donny N.

Sobari

9

LIFT/HSE/X/FMC/13/02

LIFTING

Workshop 1

Load out manifold

24-Oct-13

24-Oct-13

10:00 - 12:00

24-Oct-13

24-Oct-13

CLOSED

M. Zen

Ardan

Sobari

Prepared by,

Fitri Ifony
HSE Engineer

Page 1

31-Sep-2013 31-Sep-2013
HSE CLOSE OUT REPORT 2013

ATTACHMENT 4

JRA RECORD

21
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

1

Work on construction Yard

1.1

Unfamiliar with the
construction work activity,
uncontrolled activities

Risks & Possible
Accidents Scenario
Contact with hot metal
particles, under load swinging
by crane, use of tools
improperly, etc.

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

4

3

12

P

1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8

Ensure all working personnel are qualified and familiar with the
construction activity

HE

IR

2

3

6

Ensure all working personnel have passed the medical examination
prior to first day of work
All working personnel must complete safety induction
Appropriate trainings are conducted for all working personnel
Mandatory PPE (hard hat, eyewear, footwear, long sleeves shirt)
must be worn when entering the construction Yard
Additional PPE is selected and worn as per activity to be performed
Toolbox Meeting is conducted regularly at the first shift and prior to
commencing critical work
Personnel who are going to do critical task such as scaffolder for
work at height shall pass appropriate medical check conducted
regularly

Traffic Management

HR

HR & HSE
HR
Warehouse
Yard Manager
Warehouse
Supervisor

Permit to work established for critical tasks namely confined space
entry, heavy lifting, radiography test, hydrotest, leak test, pressure
test, excavation, working at height, energi isolation
1.1.10 Ensure the lighting is adequate for work at night

Doctor of PTG

2.1

Vehicle movements

Struck by vehicles, collision

1.2.1

4

3

12

Establish the emergency preparedness and response system

HSE

1.2.2
1.2.3

Designated Muster Points for evacuation are established
Emergency drill conducted regularly

HSE
HSE

2.1.1

Provide separate entry and exit gateways for pedestrians and
vehicles

2.1.2

1.2

2

Medium

Responsible Person
for Checking
Implementation

Doctor of PTG

1.1.9

Poor response for emergency
Mass panic, late evacuation
case

Residual
Risk

Ensure that drivers driving out onto public roads can see both ways
along the footways before they move onto it

2

3

6

Yard Manager
Yard Manager

2.1.4
2.1.5
2.1.6
2.1.7
2.1.8

Clear the road access from any obstruction such as material
storage to minimise reversing
Install barrier between the road access and fabrication area
No private or motorbike car allowed to go to site
Provide car parking away from site
Control the gateway from entry and exit vehicle
Apply speed limit at Yard (15 km/hours)

Supervisor
Yard Manager
Yard Manager
Yard Manager
Yard Manager

2.2.1

Place standard road signs in place where appropriate and visible

HSE

2.1.3

2.2

Lack of information

Collision

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Using vehicles and mobile
plant

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

Risks & Possible
Accidents Scenario

P

HE

IR

Failure vehicles, mobile plant

4

3

12

P

3.1

Poor vehicles, mobile plant

3.1.1

Select suitable vehicles or mobile plant for purpose

3.1.2
3.1.3
3.1.4

3

HE

IR

2

3

6

Residual
Risk

The vehicles have adequate visibility for driver/operator
Visibility aids such as mirror and CCTV provided
Effective braking system and steering provided and function
Headlights, horn, windscreen wiper and warning devices such as
reversing alarm and sign lamp provided and function

3.1.5

Medium

Responsible Person
for Checking
Implementation

Yard Manager
Supervisor
Supervisor
Supervisor
Supervisor

3.1.6
3.1.7
3.2.1

Supervisor

Driver/operator conduct inspection of vehicle prior to use (daily
basis)

Driver/Operator

Driver/operator are in fit condition to work and medical examination
will be check prior to commencing critical work

Supervisor

3.2.4

Driver/operator are fully understand the operating procedure of the
vehicle

Supervisor

3.2.5

Driver/operator respect to speed limits

Driver/Operator

3.2.6

Park vehicle on flat ground with engine switched off, handbrake
applied and use wheel chock if necessary

Driver/Operator

3.2.7

Collision

Driver/operator are competent person (trained and certified) as per
class of machine

3.2.3

Unsafe driving

Supervisor
Supervisor

3.2.2

3.2

Seat belt provided and function
Inspection and maintenance conducted regularly

Provide designated turning areas if applicable to minimise vehicle
reversing

Yard Manager

3.2.8 Check the condition behind vehicle prior to reversing
3.2.9 Use signalman to guide vehicles for reverse movement
3.2.10 Signalman in safe position during reversing vehicles
4

Material delivery

4.1

Poor loads arrangement

Material fall from vehicles,
injured person

4

3

12

Driver/Operator
Driver/Operator
Signalman

4.1.1

Load platform, bodywork and anchorage points are appropriate for
for the load

4.1.2

Put the material as per maximum load capacity of vehicle

Supervisor

4.1.3

Load placed on the center of gravity of load platform if applicable to
keep the stability of vehicle

Supervisor

4.1.4

The larger and heavier load placed at the bottom

Supervisor

4.1.5

When a load is stacked, the lower packages should be strong
enough to support the others when the vehicle is braking, cornering
or accelerating

Supervisor

2

3

6

Medium

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

4.1.6

Supervisor

4.2.1

Appropriate securing equipments such as clamps, special bolts,
steel wire ropes, chains, webbing harnesses, sheets, nets, ropes
and shoring barsare available on vehicle

Supervisor

The securing equipment regularly inspected for wear or damage
No misuse for securing equipment

Supervisor
Supervisor

4.2.4

The steel wire rope or other equipment should have safe working
load

Supervisor

4.2.5

The load must be packed tightly before applying the restraints

Supervisor

4.2.6

The load must be checked for security and the lashings tested for
adequate tension

Supervisor

4.2.7

Material fall from vehicles,
injured person

The load should be arranged so that it does not obstruct the driver’s
field of vision including rear view through the driving mirrors

4.2.2
4.2.3

Poor load restraint

Supervisor

4.1.7
4.2

The weight of heavy loads of small dimensions should be distributed
across the vehicle platform by the use of load spreading devices.
(e.g.. pallets, large wooden board etc.)

Check that cargo doors are locked and that locking mechanisms are
in good condition.

Supervisor

Lashings must be properly tensioned at all times using a tensioning
4.2.8
device specified by the manufacturer of the lashing.
4.2.9 The angle of lashing not exceed 60 degree from horizontal position
4.2.10 At least one lashing every 1.5m along the length of the load
Lashings must be protected against abrasion and or cutting by the
4.2.11
use of corner protectors or protective sleeves

Supervisor
Supervisor
Supervisor
Supervisor

4.2.12 Suitable dunnage as additional equipment to restraint load
4.2.13 Beware of crushing when opening the tie of load
5

Loading and unloading
materials

Supervisor
Personnel

5.2

Collision, turning vehicle

Personnel move up and down
Fall from height
the load platform

4

3

12

Load and unload vehicle on level ground away from passing traffic,
overhead hazards.
Positioning vehicle so that it does not effect to vehicle stability
Apply braking system during loading and unloading
Use wheel choke if necessary

Supervisor
Driver/Operator
Driver/Operator

5.1.6

Crowded area

5.1.2
5.1.3
5.1.4
5.1.5

5.1

Determine the exclusion zone during loading unloading activity and
place barricade surround it

Supervisor

5.2.1

Suitable means of access used to move up and down to load
platform

Supervisor

5.2.2

The access facilitates three points contact

Supervisor

2

3

6

Medium

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards
Load positioning, unstable

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

Lifting operations by crane

6.1

Failure of crane/lifting gears

Material fall

Fatality, Property Damage

4

4

16

Check the load from movement prior to unloading
Keep the load on the position until unloading starts

Supervisor
Supervisor

Use appropriate means of unloading if the loads become unstable
during transport

Supervisor

5.3.4
5.3.5
5.3.6
5.3.7
6

5.3.1
5.3.2
5.3.3

5.3

Extended exclusion zone during such unloading activity
No roll off load out of vehicle
No load tied on an object to drag it off by moving the vehicle
Beware of crushing when opening the tie of load

Supervisor
Supervisor
Supervisor
Personnel

6.1.1
6.1.2
6.1.3

Use certified crane & lifting gears
Crane to be checked prior to use by the operator
Visual inspection for sling & shackle to be done prior to use
Control/check and make sure that the weight of the material is not
over the SWL of crane & lifting gears

6.1.4

4

3

12

Medium

Supervisor
Supervisor
Rigger
Rigger

6.1.5

6.2

Load fall down / drop object

6.3

7

Using lifting gears

Pinch point

7.1

Poor lifting gear condition

Failure lifting gear when in
use

Inappropriate lifting gears to

3

12

Ensure that safety signal work properly

Supervisor

Use tag line to control movement of lifted object
No body under the load during lifting
Only competent & experience personnel who operate the crane

Rigger
Rigger
Supervisor

6.3.1
6.3.2
4

Supervisor
Supervisor
Supervisor

6.2.2
6.2.3
6.2.4

Personal injury

Rigger

Only competent & experience personnel who operate the crane
No lifting activity during bad environment such as raining and dark
Clear access of over head crane at workshop

6.2.1

Property damage, Fatality,
Injured person

Nobody under the load during lifting

6.1.6
6.1.7
6.1.8

Pinch bar to be used to remove plate clamp on the ground
Workers to wear rigger gloves for protection

Rigger
Supervisor

7.1.1

Conduct inspection regularly to ensure that lifting gears are in good
condition

7.1.2

Find out the purpose of use for each lifting gears

Supervisor

7.1.3

Find out the correct way of each lifting gears

Supervisor

7.1.4

Ensure that working load limit statement is stamped from
manufacture

Supervisor

3

2

6

Medium

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation
Supervisor

Ensure the load is secured

Supervisor

Avoid sharp bends, pinching and kinks in rigging equipment

Supervisor

7.2.4

Never wrap wire rope sling completely around a hook

Rigger

7.2.5

Make sure the load is balanced in the hook

Supervisor

7.2.6

Never point-load a hook unless it is designed and rated for such use

Supervisor

7.2.7

Never wrap the crane hoist rope around the load

Rigger

7.2.8

Avoid bending the eye section of wire rope sling around corner or
near any attached fitting

Rigger

7.2.9

Load fall down

Consider the best method of slinging relative to weight, shape,
center of gravity, lifting points and load stability

7.2.3

Incorrect sling configuration

7.2.1
7.2.2

7.2

Understand the effect of sling angle on sling load or pull angle on
beam load

Supervisor

7.2.10 Ensure the riggers are able to tie basic knots and hitches
With two or more slings on hook, use shackle as supporting to sling
7.2.11
balance

Supervisor
Supervisor

7.2.12 Use tag line for control, attached to the load
7.2.13 Block loose loads before unhooking

Using lever hoist

Rigger

7.2.14 Stay back when slings are pulled out under the loads

8

Supervisor

Rigger

8.2

Poor lever hoist

Poor application

Failure lever hoist when in use

Chain break, shock pressure,
object fall

4

3

12

8.1.1

Conduct check prior to use

8.1.2

8.1

Do not use deformed hook

Supervisor

8.2.1

Do not overload or perform excessive fixed dragging

Supervisor

8.2.2

Check the position of holder pawl

User

3

2

6

Medium

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

8.2.3

Material falling, forklift over
turn

4

3

12

Supervisor

Do not get the load dragged against floor

User

Avoid using two blocks for suspending a load

User

Do not pull up too far or pull down slamming fast

User

Do not turn around the chain block as loaded

User

Stop pulling when the load is 10 cm above the floor, check for break
action

User

Do not step in under the load

User

9.2.8
Material handling and stacking
10.1 Wrong operation
by forklift truck

Do not overload the chain hoist

9.2.7

10

Supervisor

9.2.6

Overload, load fall, chain
break

Do not use deformed hook

9.2.5

12

Conduct check prior to use

9.2.4

3

9.1.1

9.2.1

4

User

9.2.3

Poor application

Failure chain hoist when in
use

Ensure the chain is free from kink or twist

9.2.2

9.2

Poor chain hoist

User
User
User
User

9.1.2

9.1

Do not unwind or wind the load
Avoid using two blocks for suspending a load
Keep the improper lever hoist in the storage
Keep the chain alignment with both of hooks

8.2.8

Using chain hoist

User

8.2.4
8.2.5
8.2.6
8.2.7

9

Keep the object into the saddle of hook

Keep the chain alignment with both of hooks

User

10.1.1

Forklift completed with load backrest, overhead guard, audible
warning and light

10.1.2 Operator restraint (seat belt) worn all the times
Suitable attachment i.e. fork extension or barrel clamp as per
10.1.3
manufacturer instruction

3

2

2

3

6

6

Medium

Medium

Supervisor

Supervisor
Operator
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

10.1.4 The rate capacity marked on attachment
Nobody allowed to be lifted by forklift truck unless using certified
10.1.5
safe working platform

Supervisor
Supervisor

10.1.6 Lower the fork on the ground when parking
10.1.7 No over reach or over load when loading
10.1.8 Avoid violent braking or sudden change of direction
Where possible, travel with the fork arms lowered to within 150 mm
10.1.9
(6’’) of level ground and mast tilted slightly back
10.1.10

Operator
Operator
Operator
Operator

When loaded, travel down or up slopes with the fork arms facing
uphill

Operator

Before raising a load ensure there is sufficient clearance overhead
10.1.11 to do so and that objects which could fall and injure people nearby
will not be dislodged
10.2 Unstable forklift position

11

Manual Handling

11.1 Wrong position

Back Injury

Operator

Before the mast/boom is raised/lowered or extended, the truck
10.2.1 should be stationary with the parking/handbrake applied and
transmission disengaged before the hydraulics are used.
10.2.2 No stacking or destacking allowed on incline position
10.2.3 Adjust the fork spread to suit the load

Material falling, forklift over
turn

4

2

8

11.1.1 Avoid the need to move loads manually

Operator
Operator
Operator
2

2

4

Low

Fully utilise mechanical handling devices, eg lift trucks, pallet trucks,
11.1.2
trolleys

Material storage at yard

12.1 Flammable liquid (fuel, oil)

Fire, explosion

4

3

12

12.1.1 Keep the flammable liquid in the appropriate tanks
Place the tanks into secured designated area that away from
12.1.2
construction area

Supervisor
Supervisor

11.1.3 Try to avoid heavy lifting especially repetitive lifting over a long
Pay attention for moving heavy objects, awkward load shapes,
strenuous pushing and pulling, stacking above shoulder height,
11.1.4
uncomfortable working positions, repetitive work (eg packing) and
use of excessive force
11.1.5 Use hand handle to lift the load if applicable
11.1.6 Ensure no obstruction of sight when handling
11.1.7 Avoid lifting carrying object with awkward position
11.1.8 Do not lift a load not exceed 20 kg
11.1.9 Apply good handling technique for lifting equipment
12

Responsible Person
for Checking
Implementation

Supervisor
Worker
Worker
Worker
Worker
Worker
Worker
2

3

6

Medium

Supervisor
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

12.1.3
12.1.4
12.1.5
12.1.6

12.3

Tubular steel (pipe,
scaffolding pipe)

Supervisor
Supervisor
Supervisor
Supervisor

12.1.7
12.2 Compressed gas cylinder

Provide adequate suitable fire extinguishers in the storage area
Only authorised person could enter the storage area
Place appropriate warning sign
Maintain the drainage of spillage
Use small locked drum or container and put it away from hot work
activity when it is in use on construction or maintenance activity

Supervisor

Put the cylinder in upright position all the times
Keep the cylinder in appropriate basket
Ensure the basket in stable position
Use lifting lugs to lift the basket otherwise use forklift truck
Keep the basket in safe clear distance from hot work activity
12.2.5
otherwise protect it by fire blanket

Gas leak, fire, explosion

12.2.1
12.2.2
12.2.3
12.2.4

Non tubular steel (beam,
channel)

Stacked material collapse,
material damage

12.5 Garnet mesh

13

Electricity

Put scaffolding pipe on designated rack
Use appropriate stopper under stacked pipes
Use appropriate clamp to lock pipe movements
Place barricade or other barrier surround the stacked pipes

12.4.2
12.4.3
12.5.1
12.5.2
12.6.1
12.6.2
12.6.3
12.6.4
12.6.5
12.6.6

Fire, explosion

Contact with live equipment,
Electric shock, burns, electric
13.1 poor installation, faulty
arc, fire and explosion
equipment, source of ignition

Supervisor
Supervisor
Supervisor
Supervisor
Supervisor

12.4.1 Put the material on appropriate support placed on level ground

Dust

12.6 Paint and solvent

Supervisor

12.3.1 Put the pipes on appropriate support placed on the level ground

Rolling pipe, material damage

12.3.2
12.3.3
12.3.4
12.3.5
12.4

Supervisor
Supervisor
Supervisor
Supervisor

4

3

12

Put small size materials on pallet
Sort the position orderly and tidy
Keep the garnet in the bag prior to use
Put the bag on pallet to make it tidy and orderly
Keep the material in designated room
Ensure the room is well ventilated
No smoking area applied for the room
Personnel wear appropriate masker when work in the room
Keep the paint into designated drum or container prior to use
Provide designated waste bins for contaminated material of paints

13.1.1

Personnel working on electrical equipment or system are competent
person

Supervisor

13.1.2 Ensure the electrical installation is safe as per suitable standard

Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor

2

3

6

Medium

Supervisor
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

13.1.3
13.1.4
13.1.5
13.1.6
13.1.7

Provide adequate socket outlet to prevent overloading socket
Use suitable equipment for working environment
Use wireless equipment to eliminate electrical risk if applicable
Use adequate insulated equipment
Provide clearly marked switch on equipment

Supervisor
Supervisor
Supervisor
Supervisor
Supervisor

13.1.8

For earthing cable, the end of cable firmly clamped to stop wire
pulling out of the terminal

Supervisor

13.1.9 Use proper connector to joint the length of cable
13.1.10 Protect light bulb or other equipment that could be easily damaged
13.1.11 Limit the supply voltage to the lowest needed

Supervisor
Supervisor
Supervisor

Ensure the main switchboard, socket outlet or equipment are
13.1.12 equipped with RCD that have rated current tripping not more than 30
mA

Supervisor

13.1.13 Regular inspection and maintenance conducted
13.1.14 Pre-use check conducted by user
No work on live equipment or installation unless permit to work has
13.1.15
been approved

14

Using powered equipment

14.1 Use improper equipment

14.2 Unsafe electrical supply

Electrocute, electric shock

Overheating, source of
ignition

4

3

12

14.1.1 Check the equipment is in good condition
Check the plug is in good condition and is properly secured with no
14.1.2
internal wire visible
Check the electrical cable is not damaged, not repaired with
14.1.3
insulating tape or unsuitable connector
Position any trailing wires so that it avoid trip hazard or get
14.1.4
damaged

Supervisor
User
Supervisor

2

3

6

Medium

Supervisor
Supervisor
Supervisor
Supervisor

14.2.1 Check that the electrical equipment is suitable for electrical supply

Supervisor

14.2.2 Check the electrical supply is safe to use

Supervisor

14.2.3

Use Residual Current Devices (RCD) on electrical supply with
tripping current < 30 mA

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

15

Working on live equipment

15.1 Unplanned work

Risks & Possible
Accidents Scenario
Contact with energy
(electricity, mechanical,
rotating equipment, stored
energy, pressure)

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

4

4

16

P

15.1.1 Propose appropriate work permit prior to work
15.1.2 Identify the circuit or equipment to be worked
15.1.3

Know the drawing of electrical system for details information and
work to be done

HE

IR

3

2

6

Residual
Risk

Medium

Responsible Person
for Checking
Implementation

Supervisor
Supervisor
Supervisor

15.1.4 Plan and manage the work

Supervisor

15.1.5 Specify correct system of work and its procedures

Supervisor

15.1.6 Only trained person can do this job and specify level of supervision

Supervisor

15.1.7 Provide appropriate protective equipment

Supervisor

15.1.8 Provide appropriate information, tools and instrument

Supervisor

15.1.9 Disconnect the equipment from any source of electrical energy

Supervisor

15.1.10 Isolate the lived equipment or relevant part with it

Supervisor

Ensure the means of disconnection is secured by safety lock having
15.1.11
unique key

Supervisor

15.1.12 If a plug has been withdrawn, ensure that it can not be reconnected

Supervisor

15.1.13 If a fuse has been removed, ensure that it can not be reinserted

Supervisor

15.1.14 Post notice to let everyone knows that work is being done

Supervisor

Completed the notice with name of person working and contact
15.1.15
number

Supervisor

15.1.16 Test the isolated equipment to ensure the power is off

Supervisor

15.1.17 Use earthing devices if necessary

Supervisor

Ensure the equipments have adequate working space, access and
15.1.18
lighting

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Apply a permit to work after all precautions have been taken,
especially for high-voltage system
Remove all safety lock used for securing equipment when work has
15.1.20
finished
15.1.19

Supervisor
Supervisor

15.1.21 Close work permit when work has finished

16

Using hand tools

16.1

Flying debris, broken handle
when using cold chisel

Injury

3

2

6

16.1.1 Used to cut or shape soft metals as well as concrete and brick

Responsible Person
for Checking
Implementation

Supervisor

3

1

4

Low

Supervisor

16.1.2 Avoid using the chisel with mushroom head, it should be ground off
16.1.3 Use hand gloves and eye protection when using chisel
Flying head, broken handle
when using hammer

16.2.1 Ensure that head is secure and tight prior to using it

Injury

User

16.2.2 Replace damaged handle or stem
Hit the target with head of sledgehammer to avoid weakening the
16.2.3
stem and flying head

16.2

User
User

User
User

As with any striking or struck tool, use eye protection when using
16.2.4
sledgehammer
17

Using pneumatic tools
(blasting, painting, chipping)

17.1 High pressure

Personal injury

4

2

8

17.1.1 Only trained person allowed to operate pneumatic tools
17.1.2
17.1.3
17.1.4
17.1.5
17.1.6
17.1.7
17.1.8
17.1.9

18

Cutting by torch

18.1 Sparks, spatter

Fire, burn, explosion

4

4

16

User

2

2

4

Low

Marked capacity of power tools is readible
Keep all tools in good condition with regular maintenance
Use the right tool for the job
Examine each tool from damage before use
Operate according to the manufacturer's instructions
Disconnected the power when replacing anything
Conduct inspection regularly
Proper PPE to be use while working with pneumatic tools.

Flash back arrestor/check valve is installed on both cutting torch &
regulator
Secured the connection between hose to cylinders & hose to cutting
18.1.2
torch by proper mechanical clamps

18.1.1

18.1.3 Oxygen & LPG cylinder stored on the rack

Supervisor
User
User
User
User
User
User
Supervisor
User

3

2

6

Medium

Supervisor
User
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

18.1.4 Conduct test to check gas leak by soapy water
Remove flammable materials from work area otherwise protect it by
18.1.5
fire blanket
18.1.6 Provide fire extinguisher and watchman to be stand by
18.1.7 Use appropriate PPE (faceshield and glove)
19

Compressed gas handling

19.1

Flammable gas, oxydizing
Fire, Explosion, Personal
gas, toxic gas, akwark shape Injury

5

3

15

19.1.1 Put cylinders in the appropriate rack/ basket
19.1.2
19.1.3
19.1.4
19.1.5
19.1.6
19.1.7
19.1.8
19.1.9
19.1.10

20

Grinding/ Cutting by grinding
machine

20.1 Electricity

Electric shock

4

3

12

User
User
User
User
2

2

4

Low

Always turn the gas supply off at the cylinder when the gas is not in
use
Regularly check all connections from fault and leaks
Avoid taking gas cylinder in to poorly ventilated rooms or confined
spaces
Store gas cylinders outside whenever possible or in a well ventilated
place
Never allow oil or grease to come into contact with cylinder fittings
Cylinder containing flammable gases, must not be stored in close
proximity to open flames
Cylinders shall be stored protected from direct sunrays
To protect the valve during transportation, the cover cap should be
screwed on hand tight and remain on until the cylinder is in place
Cylinders should never be rolled or dragged when removing

20.1.1 Only trained person that allowed to operate powered tools
20.1.2 Keep all tools in good condition with regular maintenance
20.1.3 Examine each tool from damage before use
20.1.4 Operate according to the manufacturer's instructions
Mandatory PPE + faceshield to be use while working with powered
20.1.5
tools.
20.1.6 Good electrical cable insulation and grounding
20.1.7 The electrical cable has been tested & tagged
20.1.8 Use hand glove for protection
To ensure that all electrical cables & equipments are installed by
20.1.9
designated trained electrician
Turn off/unplugged the power of grinding machines during
20.1.10
replacement the disc
20.1.11 Ensure cable insulation in good condition
20.1.12 Provide ELCB

Responsible Person
for Checking
Implementation

Supervisor
User
User
User
User
User
User
Supervisor
User
User

2

3

6

Medium

Supervisor
Supervisor
User
User

Electrician

User
Supervisor
User
User
Supervisor
User
User
Supervisor

Electrician
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

20.1.13 Inspect equipment prior to use
20.1.14 Use approved grinding disc only
20.1.15 Grinding machine is equipped with dead man switch
20.2

20.2.1 Use proper PPE for grinding activity: safety glass, face shield

User

20.2.2 Limitation access to the work area

Flying small particles from the
Eye injury
activity

User

Supervisor

20.2.3

Use spark shield during grinding activities for protection to other
workers/visitors

User

20.4

21

Welding, Gouging

Sparks come to flammable
material

21.1 Electricity

20.3.1 Use only approved grinding machine that has passed the inspection

Injured personnel

User
User

Remove flammable materials from the area otherwise protect the
20.4.1 materials by fire blanket. Keep the safe distance from the flammable
material and grinding activity
20.4.2 Provide portable fire extinguisher

Fire, burn

Electric shock

User

20.3.2 Make sure grinding machine rotation speed (RPM) less than
grinding disc allowable rotation
20.3.3 Proper replacing/installing/tightening grinding disk

20.3 Grinding disc broken

5

3

15

21.1.1 Always be sure the work cable makes a good connections
21.1.2 Connection shall be close as possible from the welding point
21.1.3 Be certain of a good electrical grounding
Maintain the electrode holder, work clamp, welding cable and
21.1.4
welding machine in good condition
When working at height use full body harness to avoid falling down
21.1.5
in case of electric shock

User
User
5

2

10

Medium

Supervisor
Welder
Welder
Welder
Welder

21.2 UV-IR-Light radiation

Eyes and skin irritation

21.2.1 Use a shield with proper filterand cover plates
21.2.2 Use suitable cloathing made from durable flame resistant material
21.2.3 Protect others by installing an appropriate screening

Welder
Welder
Welder

21.3 Fumes and gas

Ill-health

21.3.1 Weld within a ventilated area
Provide blower when welding in confined space or where there is a
21.3.2 risk that the concentration of fumes and gases could be too high,
welder must wear individual breathing protection

Supervisor
Welder
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards
21.4 Sparks, spatter

21.5 Noise

22

Work in the extreme
environment

22.1 Poor lighting

Risks & Possible
Accidents Scenario

Risk Category
P

HE

IR

P

HE

IR

Residual
Risk

21.4.1 Remove flammable material in the risk zone
21.4.2 Screen off the area
21.4.3 Make sure that sufficient fire extinguisher is available
21.4.4 Welding shields or barriers shall be used to protect workers from
flash
21.4.5 Use appropriate PPE for welding (appron, welding hand glove)

Fire and Burns

Welder
Welder

21.5.1
21.5.2
21.5.3
21.5.4

3

3

9

22.1.1 Provide good light including natural light and avoid glare

Responsible Person
for Checking
Implementation
Supervisor
Welder
Welder

Use individual ear protector
Install noise absorber
Screen off noisy work area
Use quiter tools for grinding and removing slag
Using a suitable welding process and welding technique can
21.5.5
minimise grinding and slag removal

Ill-Health (deft)

Visual fatigue

Acceptable Risk
Additional Risks Reduction Measures

Supervisor
Welder
Welder
Welder
Welder

3

2

6

Medium

Supervisor

22.1.2 Provide a good level of local lighting in place where necessary

Supervisor

22.1.4 Provide special fittings for flammable and explosive atmosphere

Supervisor

22.1.5 Conduct inspection for the luminance
22.2 Exposure of dust, fume or gas Ill-health

Supervisor

22.1.3 Provide suitable form of lighting

Supervisor

22.2.1 Provide proper respiratory protective equipment for employees

Supervisor

22.2.2

Inform all employee the need of using respiratory protective
equipment in some certain workplaces

Supervisor

22.2.3 Look after the respiratory protective equipment given
22.2.4 Conduct inspection for using of respiratory protective equipment
Noise from machine
22.3
operation, gouging activity

Ill-health (deft)

Supervisor
Supervisor

22.3.1 Provide proper hearing protection for employees

Supervisor

22.3.2 Monitor the sound level at workplace

Supervisor

Inform all employee the need of using hearing protection in some
22.3.3
certain workplace

Supervisor

22.3.4 Look after the hearing protection given

Supervisor

22.3.5 Conduct inspection for using of hearing protection

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

23

Working at height

Risks & Possible
Accidents Scenario

Improper access, work area is
23.1 not safe to prevent people
Personnel falling, drop object
from falling

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

4

4

16

P

23.1.1 Avoid working at height
23.1.2
23.1.3
23.1.4
23.1.5
23.1.6

HE

IR

3

2

6

Residual
Risk

Medium

In existing place, provide appropriate permanent access and edge
protection
Provide work equipment with collective fall protection that protect all
those at risk (scaffolding, MEWP)
Provide work equipment with collective fall protection that protect
the individual (fall restrain system)
Minimize distance and consequences of fall and protect all those at
risk (nets, soft landing systems
Minimize distance and consequences of fall and protect the
individual (fall arrest system, rope access)

Responsible Person
for Checking
Implementation

Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor

23.1.7 Provide working at height awareness training
23.1.8 Use podium steps or ladders for light duty

Working at height, personnel
falling

24.2 Scaffolding collapse

Injured person, Fatality
Injured person, Fatality

4

4

16

Supervisor

23.1.11 Use rope and pulley to move material up and down

24.1

Supervisor

23.1.10 Keep materials into the box or secure it

Erecting and Dismantling
scaffolding

Supervisor

23.1.9 Closure or segregate area from unauthorized people

24

Supervisor

Supervisor

24.1.1
24.2.1
24.2.2
24.2.3
24.2.4
24.2.5
24.2.6
24.2.7

Wear safety harness and hand gloves during erecting or dismantling
scaffolding
Only certified and competent scaffolder allowed to erecting or
dismantling scaffolding
Conduct inspection regularly (weekly basis)
To use approved material scaffolding (tubing, wood plank and
clamp)
Applied tagging system
No modification allowed without authorization from
supervisors/inspector concerned
Inspector shall recertified acceptance of the scaffold after
modification (if any)
Scaffolding shall be connected to the permanent structure to prevent
collapse

3

2

6

Medium

Scaffolder
Supervisor
Supervisor
Supervisor
Inspector
Supervisor
Supervisor
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P
24.2.8

HE

IR

Residual
Risk

Scaffolding must be based on firm, level foundation and avoid soft
ground

Responsible Person
for Checking
Implementation
Supervisor

24.2.9 Provide extra support as necessary

25

Working on scaffolding

Material/tools dropped from
height

25.1 Personnel falling from height

Supervisor

To ensure all tools and materials must be tied off and all small
24.3.1 materials shall be stored in the basket and no dropping down any
materials from high level
Barricading system to be applied during erecting and dismantling
24.3.2
scaffolding

Injured person

Injured person

Supervisor

24.2.11 Design duty rating to the scaffolding

24.3

Supervisor

24.2.10 Stabilize by bracing & tightening to permanent structure

4

4

16

25.1.1 Check the tag of scaffolding prior to use

Scaffolder
Scaffolder

3

2

6

Medium

User

25.1.2 No one allowed to make a modification of scafffolding
25.1.3 Contact scaffolder to repair or make modification of scaffolding

16

User

25.1.8 Use rope and pulley to move material up and down

4

User

25.1.7 Keep materials into the box or secure it

4

User

25.1.6 Minimize storage material on work platform

26.1 Use improper safety harness Injured person

User

25.1.5 Do not overload the scaffolding, use scaffold as its duty rating

Wearing safety harness

User

Do not climb on or lean over handrail, work on platform only
25.1.4
otherwise provide fall arrest system

26

User

User

26.1.1 Conduct visual check prior to use
26.1.2 Ensure the hook still function properly
26.1.3

Scaffolder must wear safety harness with double lanyard completed
with shock absorber

2

2

4

Low

User
User
User
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

Using ladder

Incorrect method of using
safety harness

Personnel falling

27.1

Unstable or potential to slip
position

Personnel falling

4

4

16

User
User

26.3.1 Remove snap hooks one by one to move around

Personnel falling

26.3

27

26.2.1 Keep lanyard being connected to safe anchor points
Keep lanyard as high as possible and away from the edge if
26.2.2
possible

26.2 Hook not anchored

User

27.1.1 Conduct visual and functional inspection

3

2

6

Medium

User

27.1.2 Used for light duty & short-duration work
27.1.3 Put ladder on level stable surface

27.2.1 Maintain three point of contacts

28.1 Lack of awareness

People drowning

4

4

16

User
User

27.2.3 Do not use top, second or three rung

Working above water

User

27.2.2 Do not overreach

28

User

27.1.5 Use rule of thumb “one out for every four up” to get the correct angle
Insecure hand, feet and body
Personnel falling
position

User

27.1.4 Secure ladder position – hold it or tie it off at top

27.2

User

User

28.1.1 Provide safe system of work

3

2

6

Medium

Supervisor

28.1.2 Worker must be properly trained

Supervisor

28.1.3 Provide suitable emergency equipment

Supervisor

28.1.4 Provide barrier as guard rail to stop people falling

Supervisor

28.1.5 Provide life jacket (with auto-inflating)

Supervisor

28.1.6 Provide buoyancy aids

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

28.1.7 Arising alarm if anyone has fallen eg. using whistle and light

Working with chemicals or
products contain chemicals/
Activities generate fumes,
dust, mists, vapors

Working with hazardous
substances

29.1

Burn, asphyxiation, ill-health

3

3

9

29.1.1

Checking information that came with the product, eg a safety data
sheet

29.1.2

29

Working personnel

User are trained to understand the information such as the symbols
and hazards

2

2

4

Low

Supervisor
Supervisor

29.1.3 Wear appropriate PPE recommended by the safety data sheet
Ensure control equipments are in place and properly function eg
29.1.4
local exhaust ventilation
29.1.5

Responsible Person
for Checking
Implementation

User
Supervisor

Provide emergency equipment such as eye wash near the
workplace

Supervisor

Provide suitable hygiene facilities for decontaminating skin and
29.1.6
facilities for cleaning personal protective equipment.

30

Blasting/Painting

30.1
30.2
30.3
30.4
30.5
30.6

Dust Exposure
Noise
Broken Hose
Hose realese from extension
Expose by sand stain
Eye Irritation

Contamination air in blasting
hood
30.8 Chemical fire
30.7

Ill-Health
Ill-Health
Personal Injury
Personal Injury
Personal Injury
Ill-Health

4

3

12

Supervisor

Provide suitable means for disposal of the substance and
29.1.7
contaminated materials only

Supervisor

30.1.1
30.2.1
30.3.1
30.4.1
30.5.1
30.6.1
30.6.2
30.7.1
30.8.1
30.8.2
30.8.3
30.8.4

Use suitable masker
Use Ear Protection
Check the hose condition must be good before start to work
Every connection secured with anti whip
Use long forearm uniform
Use safety glass
Provide eye wash
Change the filter breathing carbon periodically (consult to
manufacture instruction)
Prohibited to smoking in painting area
Proper paint storage
No smoking sign and MSDS shall be provided at paint storage and
painting area.
Risk and hazard of painting shall be socialized to crew based on
MSDS recommendation

2

2

4

Low

Worker
Worker
Worker
Worker
Worker
Worker
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task

Risk Category

Hazards
31

Confined Space Entry

Acceptable Risk
Additional Risks Reduction Measures

Risks & Possible
Accidents Scenario

P

HE

IR

Existing of toxic gas, lack of
31.1 oxygen, flammable and toxic
residue

Toxicity, Asphyxiation, Fatality

4

4

16

P
31.1.1 Issued appropriate Permit to Work prior to work
31.1.2
31.1.3
31.1.4
31.1.5
31.1.6
31.1.7
31.1.8
31.1.9
31.1.10
31.1.11
31.1.12
31.1.13
31.1.14
31.1.15
31.1.16

32

Excavation

32.1 Live underground services

Electric shock, explosion

4

3

12

HE

IR

3

2

6

Residual
Risk

Medium

Communicate permit to all affected personnel and posted
All person involved are competent to do the work
All source of energy affecting the space have been isolated
Conduct gas test before entering confined space
Certified gas tester to performed gas test
Check gas content periodically with calibrated gas detector
Control ventilation system
Check electric cable insulation system
Provide DC lighting or pneumatic lamp
Permanently stand by man on the man hole (Attendance) and he
must be identified by hand arm
Provide breathing apparatus if necessary
Provide board for registering time in and out of entering person
Provide rescue kits
Trolley for rescue person must be available at the main hole
Medical examination by doctor or paramedic prior to entering the
confined space

Provide accurate, clear, readable plans showing the locations of
buried service
Any doubt about identification of buried service, cables and pipes
32.1.2 should be treated as if it were electricity cable and gas pipe until
proved otherwise
Pinpoint any buried services by means of locating device to
32.1.3
determine the possible location

32.1.1

32.1.4 Only a well-trained or experienced person can use locating device
Get written confirmation of disconnection from the owner operation
32.1.5
area
Make digging alongside or above the buried service by hand tools
32.1.6
first i.e. spade, shovel

Responsible Person
for Checking
Implementation
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Doctor of PTG

3

2

6

Medium

Supervisor
Supervisor
Supervisor
Supervisor
Supervisor
Supervisor

32.1.7 Use insulated hand tools for digging nearby the power line cable

Supervisor

Do not use buried service as hand or foot hold to climb out of the
32.1.8
excavation

Supervisor
GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
FOR FMC SUBSEA FABRICATION
TRA Ref : TRA-Yard-2013-001
Revision : 0
Date : 10-Jan-12

Location: Construction Yard, Cilegon
PT. Gunanusa Utama
Fabricators

JRA Team :
Leader : M. Natsir
Description of the job : General Fabrication & Erection
Hazards - Risks & Possible Accidents Scenario

Task
Hazards

Risks & Possible
Accidents Scenario

Risk Category

Acceptable Risk
Additional Risks Reduction Measures

P

HE

IR

P

HE

IR

Residual
Risk

Responsible Person
for Checking
Implementation

32.1.9 Avoid large piece of rock or hard core for backfilling

Radiography

33.1 Using isotop

Ionizing, Ill- health

4

4

16

Supervisor

32.1.11 After backfilling, place sign indicating the presence of buried service

33

Supervisor

The backfilling should be suitably compacted, use suitable support
32.1.10
to the buried service if necessary

Supervisor

Keep the source into the locked isotop camera and put it into the
appropriate designated pit (bunker) when not in use
33.1.2 Only appropriate person that handle the camera

33.1.1

3

2

6

Medium

Supervisor
Supervisor

33.1.3 Check the source of isotope regularly

Authorized Person

Supervisor
Supervisor

33.1.8 Issued Permit to Work

Noted :
P : Probability
HE : Hazard Efect
IR : Individual Risk

Authorized Person

33.1.4 Check periodically validity of ID card protection
Check radiography exposure use survey meter before conduct
33.1.5
radiography activity
33.1.6 Warning sign and barricade to be installed
33.1.7 Provide rotary light when operation during night time

Supervisor

Authorized Person
HSE CLOSE OUT REPORT 2013

ATTACHMENT 5

MANAGEMENT WALTHROUGH

22
PT. GUNANUSA UTAMA FABRICATORS
Gunanusa Yard, Cilegon
Telp. : +62254-500088
Fax. : +62254-500091

WEEKLY HSE WALKABOUT
PROJECT: Subsea Manifold

WALKABOUT NO.: 02

DATE/TIME: 18 July 2013 / 09.00 am

Attendees:
FMC – Tey Arn Soon; Hadi Purwanto
PTG – Iman Triwahyudi; Andi S.H; Wahyu Ardi; M. Natsir; Sabrawi;
NO

1

LOCATION

Subsea Manifold
Fabrication
Workshop No. 2

DATE OF
FINDING

Subsea Manifold
Fabrication
Workshop No. 2

TARGET
DATE

REMARKS

19 July 2013

Closed

Data Kususma

18 July 2013

Welding cable:
• Should placed neatly
(S-Shape)

2

RECOMMENDATION

ACTION BY

Sulaiman
Sarman

FINDING

19 July 2013

Closed

• Hanger the provide

18 July 2013
Drilling Workbench:
• At first, it was placed at • Moved to above
unstable place
ground and now
(stacked beam),
stopped work by Mr.
Tey.

3

Subsea Manifold
Fabrication
Workshop No. 1

Herry Budiman

Subsea Manifold
Fabrication
Workshop No. 1

5

Subsea Manifold
Fabrication
Workshop No. 1

Closed

19 July 2013

Closed

Data Kusuma

19 July 2013

Closed

• Lighting is
completed to repair

18 July 2013

Hose:
• At first placed at
passage way

19 July 2013

Ondo Nababan

18 July 2013

Lighting:
• Lack of lighting
• Broken Lamp

4

welded to beam to
have better stability.

• Moved to storage
area to prevent
blockage

18 July 2013
Pallet:
• Found have lost partial • Discarded, then
legs, unstable
replace with the new
condition
one
6

Subsea Manifold
Fabrication
Workshop No. 1

18 July 2013

Siswanto

High Pressure:
• High Pressure without
completed with
antiwipe

19 July 2013

Closed

• Has completed with
antiwipe

Prepared by:

Verified by:

Acknowledgement by:

Witness by:

Alnidi S. Bratanegara
Corporate HSE Secretary

M. Natsir
Corporate HSE Manager

Iman Triwahyudi
Project Manager

Tey Arn Soon
Asst. Fabrication Manager
HSE CLOSE OUT REPORT 2013

ATTACHMENT 6

HSE MASTER DOCUMENT
REGISTER (MDR)

23
PT. GUNANUSA UTAMA FABRICATORS

LIST OF FMC HSE PROCEDURES
Date : 22-May-2013
No.

Title of Documents

Document No.

Rev.

Status

Reviewed
Date

1

HSE Management Plan

ID-GNU-FMC-47688727HSE-0001

A

IFC

22-May-13

2

Personal Protective Equipment (PPE)
Inspection, Controling Program and
Distributuion System Procedure

ID-GNU-FMC-47688727HSE-0002

A

IFC

22-May-13

3

Hazard Identification and Risk
Assessment

A

IFC

22-May-13

4

Generic Risk Assessment

A

IFC

22-May-13

5

Lifting and Rigging Procedure

A

IFC

22-May-13

6

Confined Space Entry Procedure

A

IFC

22-May-13

7

Lifting and Rigging With Categories

A

IFC

22-May-13

8

Permit to Work Procedure

A

IFC

22-May-13

ID-GNU-FMC-47688727HSE-0003
ID-GNU-FMC-47688727HSE-0004
ID-GNU-FMC-47688727HSE-0005
ID-GNU-FMC-47688727HSE-0006
ID-GNU-FMC-47688727HSE-0007
ID-GNU-FMC-47688727HSE-0008

Prepared by:

Acknowledge by:

Alnidi Safarach Bratanegara
Corporate HSE Secretary

M. Natsir
Coprporate HSE Manager
HSE CLOSE OUT REPORT 2013

ATTACHMENT 7

LOAD OUT PICTURE

24
LOAD OUT

Sub Sea Manifold Picture
HSE CLOSE OUT REPORT 2013

ATTACHMENT 8

INSPECTION REPORT

25
SUBSEA MANIFOLD
PROJECT

INSPECTION REPORT
: 2 UnitTruck Trailler

: 6 Unit

Stand by Welding Rectifier (Cable Power
not yet Connected)

Stand by Welding Rectifier (Ready for
used)

Inspection – Welding Rectifier

Green Tag Inspection Welding Rectifier

Inspection Report

1-2
Calibration date welding rectifier

Inspection – Distribution Panel

Inspection – Distribution Panel

Green Tag Inspection Distribution Panel

Inspection – Extension Panel

Inspection – Extension Panel

Inspection Report

2-2

More Related Content

What's hot

New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...vigneshm817927
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaFitri Ifony
 
Safety (Security) Training
Safety (Security) TrainingSafety (Security) Training
Safety (Security) Trainingworksteadc
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
An overview on Behavior Based Safety
An overview on Behavior Based SafetyAn overview on Behavior Based Safety
An overview on Behavior Based SafetyConsultivo
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanFlevy.com Best Practices
 
Office safety
Office safetyOffice safety
Office safetyGPurssell
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Trainingdevan4ru
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Health & safety training
Health & safety trainingHealth & safety training
Health & safety trainingHarvey Allen
 
Terminating Unsafe Employees
Terminating  Unsafe EmployeesTerminating  Unsafe Employees
Terminating Unsafe EmployeesMary Wright
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety AnalysisPraxiom
 

What's hot (20)

Safety Precautions & Emergency Response Plan
Safety Precautions & Emergency Response PlanSafety Precautions & Emergency Response Plan
Safety Precautions & Emergency Response Plan
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit Tua
 
Safety (Security) Training
Safety (Security) TrainingSafety (Security) Training
Safety (Security) Training
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
An overview on Behavior Based Safety
An overview on Behavior Based SafetyAn overview on Behavior Based Safety
An overview on Behavior Based Safety
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management Plan
 
Office safety
Office safetyOffice safety
Office safety
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Training
 
HIRA Manual
HIRA ManualHIRA Manual
HIRA Manual
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Health & safety training
Health & safety trainingHealth & safety training
Health & safety training
 
Terminating Unsafe Employees
Terminating  Unsafe EmployeesTerminating  Unsafe Employees
Terminating Unsafe Employees
 
FIRE MOCK DRILL PPT
FIRE MOCK DRILL PPTFIRE MOCK DRILL PPT
FIRE MOCK DRILL PPT
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 

Viewers also liked

Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan genericfirstpick
 
BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1Dennis J Morgan
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hranshse2
 
EOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionEOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionBimal Chandra Das
 
Fire safety-log-book-2012
Fire safety-log-book-2012Fire safety-log-book-2012
Fire safety-log-book-2012madanhse
 
Bureau Veritas Construction
Bureau Veritas ConstructionBureau Veritas Construction
Bureau Veritas Constructionajaikartik
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklistirhabsyam
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist Rahmat Mohamed
 
Iso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistIso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistPHILIP TEO
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklistimaduddin91
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
20.4 housekeeping checklist
20.4 housekeeping checklist20.4 housekeeping checklist
20.4 housekeeping checklistniteshjoshi
 

Viewers also liked (18)

Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1BHP-RISK ASSESSMENT - DALF R1
BHP-RISK ASSESSMENT - DALF R1
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hr
 
Weekly welding machine checklist
Weekly welding machine checklistWeekly welding machine checklist
Weekly welding machine checklist
 
EOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionEOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspection
 
Weekly generator check list
Weekly generator check listWeekly generator check list
Weekly generator check list
 
Fire safety-log-book-2012
Fire safety-log-book-2012Fire safety-log-book-2012
Fire safety-log-book-2012
 
Fire extinguisher monthly checklist report
Fire extinguisher monthly checklist reportFire extinguisher monthly checklist report
Fire extinguisher monthly checklist report
 
Monthly smoke derector inspection report
Monthly smoke derector inspection reportMonthly smoke derector inspection report
Monthly smoke derector inspection report
 
Bureau Veritas Construction
Bureau Veritas ConstructionBureau Veritas Construction
Bureau Veritas Construction
 
Fire alarm checklist
Fire alarm checklistFire alarm checklist
Fire alarm checklist
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
Iso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistIso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklist
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
20.4 housekeeping checklist
20.4 housekeeping checklist20.4 housekeeping checklist
20.4 housekeeping checklist
 
Introduction to ISO 9001:2015
Introduction to ISO 9001:2015Introduction to ISO 9001:2015
Introduction to ISO 9001:2015
 

Similar to Fmc close out repot hse dept. rev.000

HSE Action Plan - July 2023.pdf
HSE Action Plan - July 2023.pdfHSE Action Plan - July 2023.pdf
HSE Action Plan - July 2023.pdfDariusDsouza2
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management systemeSAT Publishing House
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...eSAT Journals
 
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...IRJET Journal
 
Cv shahid hussain_hse manager
Cv shahid hussain_hse managerCv shahid hussain_hse manager
Cv shahid hussain_hse managershahid Hussain
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
3844 lz-pc-ga000140-is01 rev 02
3844 lz-pc-ga000140-is01 rev 023844 lz-pc-ga000140-is01 rev 02
3844 lz-pc-ga000140-is01 rev 02Franco Tanda
 
CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXPrabu Thangavel
 
TSA 2011 Pipeline Security Guidelines
TSA 2011 Pipeline Security GuidelinesTSA 2011 Pipeline Security Guidelines
TSA 2011 Pipeline Security GuidelinesJennifer Taylor
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryIRJET Journal
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdf
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdfROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdf
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdfLuisRequenaFarfan
 
Hse apex manual
Hse apex manualHse apex manual
Hse apex manualAbid Iqbal
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud EL Bahnsy
 
building service report
building service report building service report
building service report Gary Yeow
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxalutarep1
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxalutarep1
 

Similar to Fmc close out repot hse dept. rev.000 (20)

HSE Action Plan - July 2023.pdf
HSE Action Plan - July 2023.pdfHSE Action Plan - July 2023.pdf
HSE Action Plan - July 2023.pdf
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
 
tm13_project2
tm13_project2tm13_project2
tm13_project2
 
Ports Australia
Ports Australia Ports Australia
Ports Australia
 
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...
IRJET - Development of Transport Emergency Response Plan in the Cement Manufa...
 
Cv shahid hussain_hse manager
Cv shahid hussain_hse managerCv shahid hussain_hse manager
Cv shahid hussain_hse manager
 
Bie 03
Bie 03Bie 03
Bie 03
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
3844 lz-pc-ga000140-is01 rev 02
3844 lz-pc-ga000140-is01 rev 023844 lz-pc-ga000140-is01 rev 02
3844 lz-pc-ga000140-is01 rev 02
 
CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCX
 
TSA 2011 Pipeline Security Guidelines
TSA 2011 Pipeline Security GuidelinesTSA 2011 Pipeline Security Guidelines
TSA 2011 Pipeline Security Guidelines
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement Industry
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdf
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdfROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdf
ROSALES_LUIS_Y_VILCHEZ_DANTE_SEGURIDAD_SALUD_OBRA_CONSTRUCCION.pdf
 
Hse apex manual
Hse apex manualHse apex manual
Hse apex manual
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1
 
building service report
building service report building service report
building service report
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 

More from Fitri Ifony

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Fitri Ifony
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013Fitri Ifony
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Fitri Ifony
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)Fitri Ifony
 
Qhse objective &amp; target 2015
Qhse objective &amp; target 2015Qhse objective &amp; target 2015
Qhse objective &amp; target 2015Fitri Ifony
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectFitri Ifony
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0Fitri Ifony
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Fitri Ifony
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaFitri Ifony
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00Fitri Ifony
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Fitri Ifony
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareFitri Ifony
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okFitri Ifony
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system trainingFitri Ifony
 

More from Fitri Ifony (15)

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)
 
Qhse objective &amp; target 2015
Qhse objective &amp; target 2015Qhse objective &amp; target 2015
Qhse objective &amp; target 2015
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc project
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun Yahya
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_ok
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 

Recently uploaded

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Recently uploaded (20)

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Fmc close out repot hse dept. rev.000

  • 1. CLOSE OUT REPORT HSE DEPARTMENT Period : JUNE 2013 – OCTOBER 2013 1st ARTICLE – SUB SEA MANIFOLD PROJECT PT GUNANUSA UTAMA FABRICATORS
  • 2. HSE CLOSE OUT REPORT 2013 CONTENT 1. INTRODUCTION ................................................................................................. 3 1.1 PURPOSE ..................................................................................................... 3 1.2 SCOPE .......................................................................................................... 3 2. HSE MANAGEMENT SYSTEM ............................................................................. 3 3. HSE POLICY 2013 ............................................................................................... 5 4. PROJECT HSE OBJECTIVE 2013 ........................................................................... 5 4.1 SAFETY OBJECTIVES ..................................................................................... 5 4.2 OCCUPATION HEALTH OBJECTIVES............................................................... 5 4.3 ENVIRONMENTAL OBJECTIVES ..................................................................... 5 5. PROJECT HSE ACHIEVEMENT 2013 ..................................................................... 6 5.1 SAFETY OBJECTIVES ..................................................................................... 6 5.2 OCCUPATION HEALTH OBJECTIVES............................................................... 7 6. HSE ORGANIZATION CHART .............................................................................. 8 7. HSE PERFORMANCE STATISTIC .......................................................................... 8 7.1 MAN HOURS EXPOSURE .............................................................................. 8 7.2 FATALITY (FAT)........................................................................................... 10 7.3 LOSS TIME INJURY (LTI) .............................................................................. 10 7.4 MEDICAL TREATMENT CASE (MTC) ............................................................ 10 7.5 FIRST AID CASES (FAC) ............................................................................... 10 7.6 DAY LOSS ................................................................................................... 10 7.7 NEAR MISS INCIDENT (NMI) ....................................................................... 11 7.8 MEDICAL RECORDS .................................................................................... 11 7.9 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) .......................... 11 7.10 MANAGEMENT QHSE WALKTHROUGH RECORDS .................................... 11 8. AREA OF CONCERN AND FOLLOW UP FOR CORRECTIVE ACTION ..................... 11 8.1 AREA OF CONCERN .................................................................................... 11 8.2 FOLLOW UP FO FOR CORRECTIVE ACTION OF CONCERN AREA ................... 12 9. SUMMARY OF HSE PROGRAM IMPLEMENTATION........................................... 13 9.1 INDUCTION AND TRAINING........................................................................ 13 1
  • 3. HSE CLOSE OUT REPORT 2013 9.2 JOB RISK ASSESSMENT ............................................................................... 14 9.3 HSE AUDITS................................................................................................ 14 9.4 HSE TRACKING RECORDS............................................................................ 14 9.5 HSE INSPECTION PROGRAM ....................................................................... 14 9.6 HSE COMMUNICATION PROGRAM ............................................................ 15 9.7 HEALTH AND HYGIENE ............................................................................... 16 9.8 ENVIRONMENTAL IMPROVEMENT ............................................................. 16 9.9 HSE PROCEDURE DEVELOPED..................................................................... 17 9.10 HSE REPORTING SYSTEM ......................................................................... 17 ATTACHMENT 1 HSE POLICY ATTACHMENT 2 YARD HSE ORGANIZATION CHART ATTACHMENT 3 SUMMARY WORK PERMITS YARD ACTIVITY ATTACHMENT 4 JRA RECORDS ATTACHMENT 5 MANAGEMENT WALKTHROUGH ATTACHMENT 6 HSE MASTER DOCUMENT REGISTERS ATTACHMENT 7 LOAD OUT PICTURE ATTACHMENT 8 INSPECTION REPORT 2
  • 4. HSE CLOSE OUT REPORT 2013 1. INTRODUCTION PT. Gunanusa Utama Fabricators HSE dossier is provided as Close Out Report for measurement of the HSE Management System include HSE Program implementation of FMC Technologies has been awarded 1st article Project for PT Gunanusa Utama Fabricators yard Grenyang – Serang Banten. 1.1 PURPOSE The purpose of this dossier is to report the commitment of PT Gunanusa Utama Fabricator management on managing the implementation of their HSE policy and other HSE issue raised during the execution of Project since the Project activities started until the end of project include the achievement of Project HSE Objectives. 1.2 SCOPE This HSE Close Out Report (Dossier) is covered the implementation all HSE activities during engineering, procurement, fabrication and assembly, materials management, Load out and pre commissioning PTG has completed successfully all fabrications and SDSS Pipe, Structural Steel, SS Tube load out (October 24th, 2013). 2. HSE MANAGEMENT SYSTEM HSE Management System developed based on the integrated of HSE Management System : OHSAS 18001:2007 (HSE Management System) ISO 14001:2004 (Environmental Management System) SMK3 PP No. 5/2012 (OHS Management System of Indonesia) ISO 9001:2008 (Quality Management System) - And also to meet and comply of others requirement both International and National statutory regulations, Industrial Standard Code Practices and client requirement. The Elements of HSE Management System consist of : - Leadership & commitment Policy & strategic objective Organization, responsibility, resources standards and documentation Hazards and effect management Planning and procedures Implementation & performance monitoring Audit & review 3
  • 5. HSE CLOSE OUT REPORT 2013 Key Elements Integrated HSE Management System 4
  • 6. HSE CLOSE OUT REPORT 2013 3. HSE POLICY 2013 This policy statement has been produced in pursuance of CTR statutory and contractual obligations and is designed to promote high standards of Occupational Health and Safety for duration of the Yard & Site Construction. (see the attachment 1) 4. PROJECT HSE OBJECTIVE 2013 The HSE Objective of CTR stipulated for the year 2013 is to improve the behavior of all employees to become habitual by providing more knowledge in understanding the safety aspect of a project as such to prevent the occurrence of accidents. This objectives shall be achieved by maintaining the following targets.(Attachment 2) 4.1 SAFETY OBJECTIVES 4.1.1 Safety Objective # 1 - HUMAN DIMENSION • • • • No fatality, No major accident (including lifting and transport), No major fire, No explosion. 4.1.2 Safety Objective # 2 TRIR – Total Recordable Injury Rate < 1.06, 4.1.3 Safety Objective # 3 LTIF – Lost Time Injury Frequency < 0.28, 4.1.4 Safety Objectives # 4 – HSE Management System and Performance Management • Develop HSE Management System, • Socialization Key Performance Indicator to workforces, • Control of Key Performance Indicator 4.1.5 Safety Objectives # 5 – SAFETY BEHAVIOR 4.2 OCCUPATION HEALTH OBJECTIVES 1. 2. 3. Ensure availability of emergency equipments and maintain medicine stock Reduce occupation illness and sickness Continue improve the implementation of industrial hygiene 4.3 ENVIRONMENTAL OBJECTIVES 1. Improve employees environmental awareness by conduct regular training, displayed label, MSDS hazardous sign. 2. Minimize dust exposure during abrasive blasting and minimize oil spills 3. Improve waste management by waste segregation, storage and regular transportation 5
  • 7. HSE CLOSE OUT REPORT 2013 5. PROJECT HSE ACHIEVEMENT 2013 5.1 SAFETY OBJECTIVES 5.1.1 General Safety Objective # 1 HUMAN DIMENSION Total man-hours achievement of FMC Project since period June 2013 up to October 2013 are 13.244 (COD: 16 October 2013) which : - no fatality, no major accident, no major fire and no explosion was occurred Therefore, General Safety Objective # 1 – HUMAN DIMENSION is achieved. 5.1.2 Safety Objective # 2 During execution of FMC Project period June 2013 up to October 2013, the following HSE performance with total cumulative man hours achieved there were some 13.244 at yard as of closed date October 16 June, 2013 some accident has occurred as follows. a. TRIR (Total Recordable Injury Rate) During execution of FMC Project period June 2013 up to October 2013, Total FAT (Fatality) = 0, LTI (Lost Time Accidents) = 0, RWDC (Restricted Work Day Case) = 0, MTC (Medical Treatment Case) = 0. There for base on formula ANSI version below : TRIR = (FAT+RWDC+MTC+LTI) * 1.000.000 Man Hours TRIR = (0+0+0+0) * 1.000.000 13.244 TRIR = 0,00 Comparing objective TRIR value shall be < 2, 00. it means TRIR archived (0,00 < 2,00) b. LTIF (Lost Time Injury Frequency) During execution of FMC Project period June 2013 up to October 2013, Total FAT (Fatality) = 0, LTI (Lost Time Accidents) = 0 LTIF = (FAT+LTI) * 1.000.000 Man Hours 6
  • 8. HSE CLOSE OUT REPORT 2013 LTIF = (0+0) * 1.000.000 13.244 LTIF = 0 Comparing objective LTIF value shall be < 0, 75. it means LTIF archived (0 < 0, 75) Therefore, Safety Objective # 2 – TRIR = 0,00 and LTIF = 0 are achieved 5.1.3 Safety Objective # 3 During the implementation of fabrication period 2013, there was a significant improvement of safety behavior by proactive all employees and subcontractors on HSE program throughout: 1. Participate regularly on meeting program such as Toolbox Meeting in daily basis, mass meeting in weekly basis, HSE weekly and monthly meeting with client and monthly Safety Committee meeting 2. Implementation housekeeping (5S) program 3. Discipline on wearing PPE and unsafe practices has been reduced due to the implementation of violation card system 4. Conduct HSE inspection and internal & external audit in regular basis 5. Implementation safety communication such as safety poster/banner, barricade, HSE notice board, etc. 6. Management Communication such as management visit / management walkthrough. At meanwhile, HSE has been recognized for the implementation of HSE Management System by external audit as below: 1. We successfully in audit surveillance certified by SICS (Sucofindo International Certification Service) on OHSAS 18001:2007 (HSE Management System), ISO 14001:2004 (Environmental Management System) 2. SMK3 (PERMENAKER No. 5 / 1996 and PP No. 50 / 2012) scored 92 (gold flag) and certificate will issue on March 2009. 3. We certified by LRQA (Lloyd Register Quality Assurance) on ISO 9001:2008 on Quality Management System. 4. We conduct internal HSE audit which held by internal auditor. It makes increase HSE performance. 5. Our corporate HSE manager has been selected as a Chairman of National of Safety Committee and has been selected as a Chairman of Provincial Banten Safety Committee by Banten Governor. Therefore, Safety Objective # 3 – Safety Behavior is achieved 5.2 OCCUPATION HEALTH OBJECTIVES 7
  • 9. HSE CLOSE OUT REPORT 2013 During the project execution contractor has provided adequate of the availability of medicine stock to cover employee and medical check up are completed performed to all employee improved to the project. 1. Ensure availability of emergency equipments and maintain medicine stock Emergency equipments and maintenance facilities has been improve such as New Clinic building complete with ambulance and clinic facilities and ERT Room building complete with emergency equipment, etc and also we maintain medicine stock in regular basis. All documents are recorded and reported to involved parties. Conduct drill regularly in monthly basis. 2. Reduce occupation illness and sickness Based on the clinic statistic reported, there was no occupation illness and sickness occurred. 3. Continue improve the implementation of industrial hygiene The implementation of industrial hygiene program is we conducted regularly such as inspection on canteen, noise level check, emission, illumination, UV Light, radiation, etc. All documents are recorded and reported to involved parties. We achieved Occupational Health objectives 6. HSE ORGANIZATION CHART See attachment 3 – Yard HSE Organization Chart 7. HSE PERFORMANCE STATISTIC 7.1 MAN HOURS EXPOSURE Since FMC Project started from October June 2013 up to October 2013 total cumulative man hours achieved are 13.244 . 8
  • 10. HSE CLOSE OUT REPORT 2013 SUMMARY OF HSE PERFORMANCE STATISTIC 1st article Project PERIOD : June 2013 – October 2013 No A Description WORKED HOURS 1 Total Man Power 2 Total Man Hours INCIDENT 1 Fatality Accident 2 Lost Time Injury (Company) 3 Lost Time Injury(Contractor) 4 Day Lost 5 Restricted Workday Case Performance Statistic Remarks 20 13244 C D E 9 No fatality No Lost Time Injury 6 Medical Treatment Case B 0 0 0 0 0 0 No Restricted Work Case 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No High Potential 1 2 3 4 5 6 7 8 9 10 High Potential (HiPo) Incident First Aid Case (FAC) Occupational Illness Material / Production Loss Pollution / Spill Fire (not HPI) Damage (not HPI) Incident (Near Miss / NC) RTA / Incidents Security External RTA / Road Incidents External (Social) Vehicles Incident Root Cause Analysis HSE ACTIVITIES Safety Tool Box Meeting (Event) Safety Induction (No. of Persons) HSE Walkabout HSE Inspections SubContractors HSE Audits Medical Check up HSE Document Preparation Safety Weekly Meeting Safety Monthly Meeting Weekly Construction Meeting TRIR LTIF 24 20 8 7 5 20 8 15 1 5 1,10 0,26 No Lost Day No Occupational Illness No Material / Production Loss No Vehicle Incident
  • 11. HSE CLOSE OUT REPORT 2013 HSE Objective & HSE Achievement Period : June 2013 - October 20132 1.20 1.00 0.80 0.60 0.40 0.20 0.00 June July August September October Year 2013 TRIR 1.10 1.10 1.10 1.10 1.10 LTIF 0.26 0.26 0.26 0.26 0.26 7.2 FATALITY (FAT) Since project activities started until the end project there was No Fatality case occurred. 7.3 LOSS TIME INJURY (LTI) Since project activities started until the end project there was No Lost Time Injury case occurred. 7.4 MEDICAL TREATMENT CASE (MTC) Total First Aid cases occurred on June 2013 up to October 2013, there were 6 cases that occurred at Yard activities. All corrective action as required by Client has been done. 7.5 FIRST AID CASES (FAC) Total First Aid cases occurred since June 2013 up to October 2013, there were 6 cases that occurred at Yard activities. All corrective action as required by Client has been done. 7.6 DAY LOSS During the yard activity performed until the end of the construction project there was no Day Loss occurred. 10
  • 12. HSE CLOSE OUT REPORT 2013 7.7 NEAR MISS INCIDENT (NMI) Total Near miss cases occurred since June 2013 up to October 2013, there were 2 cases. All corrective action as required by Client has been done (See attachment 12 – HSE Event Log Accident/Incident register) 7.8 MEDICAL RECORDS Since the starting of the project on June 2013 up to October 2013, the total clinic visitor were 20 Reported. (See attachment 9 – Summary Medical Record as Yard Clinic Visitor) 7.9 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) PT. Gunanusa has applied hazard identification and risk assessment with JRA & weekly Management walkthrough. All finding of both program had been closed and corrective action taken. 7.10 MANAGEMENT QHSE WALKTHROUGH RECORDS Total management QHSE walkthrough issued from contractor and company during 2013 up to October 2013. All of management QHSE walkthrough had been corrected and closed out (See attachment 10 - Safety Management QHSE Walkthrough Finding & Close Summary Number) 8. AREA OF CONCERN AND FOLLOW UP FOR CORRECTIVE ACTION 8.1 AREA OF CONCERN Referring to the HSE tracking record there were a lot of HSE issued identified from event log record, issued include findings and comments by Contractor and Client representative during HSE regular inspection. The finding areas of concerns that need to be improved were as follow: a. b. c. d. e. 11 Unsafe work practice & poor safety behavior Lack of PPE/ Fail to wear PPE Poor of Housekeeping Lack & unsafe equipment operation Improper electrical equipment /tools
  • 13. HSE CLOSE OUT REPORT 2013 8.2 FOLLOW UP FO FOR CORRECTIVE ACTION OF CONCERN AREA Almost all event log, SHOC Card, and Violation card reported have been corrected and follow up. Corrective Action & Follow-Up area of concern were as follow: 1. Unsafe work practice and poor safety behavior Finding:  Not followed the correct Standard Operational Procedure (SOP)  The used of equipment and tools with the wrong method Action taken: o Conducted safety behavior training. o Highlight at tool box talk related unsafe work practice by daily basis. o Conducted on the job training such as: Safe to use grinding machine, safe to use body harness, safe to use cutting torch. o Socializing the slogan” Safety is everybody business “, therefore everybody could have contribution encourage them to control each other’s and immediately reported by use SHOC card or correct the unsafe practices before incident occurred. 2. Lack of PPE / Fail to wear PPE Finding:  Undisciplined used of safety glasses although already supplied.  The used improper of Safety shoes  The used incorrect PPE for specific work such as working at height Action taken: o Supply standard PPE as requirement such as : Safety Helmet, safety glasses, dust mask, earplug, full body harness, Safety shoes. o Maintain PPE minimum stock and report the PPE stock by weekly basis. o Performed PPE inspection at entrance gate prior starting the work by daily basis. o Law enforcement wears PPE at work place. o Issue violation card 3. Poor Housekeeping Finding:  The storage of material in the wrong position and subtract to the way  The poor condition of work area waste management  The spread of welding rod Action taken: 12
  • 14. HSE CLOSE OUT REPORT 2013 o o o o Assign cleaning team who placed at every work place Perform daily housekeeping lead by supervisor after finish work Highlight at Tool Box Talk related this topic by daily basis Provide adequate fire protection equipment, to cover hazardous area when welding, cutting, grinding and sand blasting work performed 4. Lack and Unsafe Equipment Operation Finding:  Used homemade tools that unsafe  Lack of inspection to all equipment and tool Action taken : o Removed unsafe equipment and tools from work place o Performed all equipments regularly 5. Improper Electrical Equipment/Tools Finding:  Improper connection cable for electrical  Lack of inspection of electrical equipment Action taken: o Performed electrical equipment inspection regularly o Conducted basic electrical training 9. SUMMARY OF HSE PROGRAM IMPLEMENTATION 9.1 INDUCTION AND TRAINING 9.1.1 Induction HSE induction has conducted for all new hire including Visitor. In HSE induction all new hire were given information regarding safety rules and knowledge of HSE matters. During period June 2013 to October 2013, PTG HSE dept has been conducted induction for PTG & subcontractor and visitors. 9.1.2 Training In order to comply the Contractor and client requirement those are project employees are participating. During period June 2013 to October 2013, PTG HSE dept has been conducted training as per training matrix, training syllabus, training schedule and training need analysis. PTG has provided two training room which 20 seat capacity and equipped by computer and LCD projector and audio. (See Attachment 7 – HSE Training Record) 13
  • 15. HSE CLOSE OUT REPORT 2013 PTG also have conducted some safety training with Topic: 1. Acceptance Scaffolding 2. HSE Awareness 3. Lifting and rigging practice 4. Job Risk Assessment 5. Radiography 6. Accident Incident investigation 7. First aid & CPR HSE passport has been implemented and recognized the workers who attended and participated the training. Also the attendances were given a certificate 9.2 JOB RISK ASSESSMENT PTG – FMC for 1st Articles Project. HSE Department has proposed HIRADC/JRA issued at yard as required by client prior to commencement of specific work since All JRA has socialized to all workers prior execute the job. (See attachment 9 – Job Risk Analysis Record) 9.3 HSE AUDITS HSE Audit is determined as follow: 1. HSE Internal Audit 2. Internal audit integration Quality and HSE 3. HSE external by Third Party 5. HSE Audit for Subcontractor PTG was performed HSE Audit for all Sub contractor prior commencement the work. The external Audit from Sucofindo for SMK3, OHSAS 18001, ISO 14001 also to be held during execution project. PTG has awarded SMK3, OHSAS 18001, ISO 14001 certification. 9.4 HSE TRACKING RECORDS HSE Dept has established a system for tracking the status finding of: • HSE Join inspection (QHSE Management Walkthrough) • Equipment Inspection • HSE Audit 9.5 HSE INSPECTION PROGRAM 9.5.1 Join Inspection FMC and PTG joint inspection on PTG operations and facilities was conducted regularly since June 2013 to October 2013. The corrective actions/follow up status is submitted to FMC regularly in weekly basis. The participants were FMC Project Management Team and PTG Project Management and conducted HSE management review meeting after yard walk around. (See Attachment 10 – QHSE Management Walkthrough) 14
  • 16. HSE CLOSE OUT REPORT 2013 9.5.2 Equipments, Tools Inspection To ensure all equipment & tools is used in safe and proper condition therefore the inspection has to perform regularly. The equipment & tools inspection is performed by Safety inspector and yard facility inspector as per schedule, the inspection including: 1. Lifting gears applied as color code. 2. Heavy vehicles such as : Cranes, Loaders, forklift, trailer, excavator 3. Electrical equipments such as : Generator set, 4. Powered tools and hand tools 5. Scaffolding and accessories 6. Equipment such as : Compressor, Air receiver tank 7. Light vehicles 8. Firefighting equipment 9. Gas cylinders and accessories 10. Welding equipment and accessories 11. Over Head Crane 12. Radiography equipments 9.6 HSE COMMUNICATION PROGRAM 9.6.1 Pre Start Job Meeting Pre start job meeting was conducted by Safety personnel, Supervisors at yard with the workers in daily basis of each working shift before start work and the foreman have to fill the Pre job check list. 9.6.2 Tool Box Meeting Toolbox meeting are conducted by PTG Safety and Supervisors in daily basis. The agenda was to review the incidents, Near miss cases occurred in the previous week and other safety issued if any. The main topic is generally decided in the weekly Safety Coordination Meeting with sub contractors based on the priority of the most critical and significant incident and/ or Near miss of the week. 9.6.3 Safety Coordination Meeting This meeting is conducted by PTG in weekly basis attended by AGJV and PTG, in addition to the discussion of important safety issues, the topics of toolbox meeting in the coming weekly are decided also in this meeting. 9.6.4 15 Project Management Review Meeting
  • 17. HSE CLOSE OUT REPORT 2013 Project Management Review Meeting was conducted by PTG Management in monthly basis and attended by PTG Top Management, Yard Manager, Yard Construction Manager, Corp HSE Manager or Project HSE Manager. 9.6.5 HSE Internal Meeting HSE Internal Meeting was conducted by PTG corp HSE Manager in weekly basis and attended by All HSE personnel (Safety and Medic). 9.7 HEALTH AND HYGIENE Health and hygiene matters is maintained and inspected by Medical doctor and Environmental officer with concern: 1. Aqua Maker for drinking water and supply all employee at the Yard. 2. To ensure the process of aqua maker meet the health and hygiene standard, the water has been sent to third party laboratory for examination every month. 3. Canteen and kitchen. 4. The inspection is performed by PTG Doctor ,PTG GA Officer and Environmental Officer by monthly basis 9.8 ENVIRONMENTAL IMPROVEMENT All environmental matters have been improved with concern: 1. Noise mapping Noise mapping have available as per the result of noise measurement at work place area. 2. Oil Spill Management Provide Secondary containment, Oil Absorbent and drip pan to prevent oil spill from generator set or compressor felt to the ground directly. 3. Hazardous material handling Give labeling at chemical containers, drums and cans to identify the potential hazard, provide MSDS box at each work shop and has socialized to workers. 4. Water spraying Water spraying used water tank was performed to prevent dust pollution impact when dry season coming at yard. 5. Environmental Awareness PTG has conducted environmental awareness, hazardous handling material, and Audit ISO version 14001 to increase the employee’s environmental awareness. A PTG employee also has attended external training and seminar such as: Oil Spill Management, Seminar of new environmental regulation of Banten Government. 6. Yard Facility Improvement PTG has improved yard facility such as: Upgrading Jetty 1, add new Office building, new access road, Parking area, boundary, new water drainage, TSA Chamber, RT Chamber, New clinic building, New temporary waste disposal building. 16
  • 18. HSE CLOSE OUT REPORT 2013 9.9 HSE PROCEDURE DEVELOPED PTG has improved and issued some HSE procedure and has approved by AGJV such as HSE Manual. (See attachment 11 – HSE Master Document Register) 9.10 HSE REPORTING SYSTEM PTG have been implemented HSE Reporting System as required in Daily basis, Weekly basis and Monthly Basis. The Reporting System that issued to PTG and AGJV as a followed:  HSE Performance Statistic input report include HSE Training record, HSE Inspection record, Medical record, PPE stock, reported in Weekly basis.  Environmental Report (included waste management, Oil spill management, and other environmental matters) reported in Monthly basis. 17
  • 19. HSE CLOSE OUT REPORT 2013 ATTACHMENT 1 HSE POLICY 18
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. HSE CLOSE OUT REPORT 2013 ATTACHMENT 2 YARD HSE ORGANIZATION CHART 19
  • 25.
  • 26. HSE CLOSE OUT REPORT 2013 ATTACHMENT 3 SUMMARY WORK PERMIT 20
  • 27. 1st Articles Project WORK PERMIT REGISTER OVERALL Period : September 2013 - October 2013 PT. GUNANUSA UTAMA FABRICATORS Cut Of Date : 24 October 2013 EXECUTION NO. WORK PERMIT NUMBER ACTIVITY LOCATION DESCRIPTION OF WORK Work Planned to start PERSONNEL IN CHARGE Actual start Valid Date Finish REMARKS STATUS REQUESTER Time Spv./FM COORD. SAFETY 1 HPP/HSE/IX/FMC/13/01 High Pressure Potential Workshop 1 Pre-Hydrotest for piping 24-Sep-13 24-Sep-13 07:30 - 17:00 25-Sep-13 25-Sep-13 CLOSED Donny N. Andy Siswadi 2 HPP/HSE/IX/FMC/13/02 High Pressure Potential Workshop 1 Hyfrojetting 100 bar 25-Sep-13 25-Sep-13 13:30 - 17:00 26-Sep-13 26-Sep-13 CLOSED Donny N. Donny N. Siswadi 3 HPP/HSE/IX/FMC/13/03 High Pressure Potential Workshop 1 Hyfrojetting 100 bar 26-Sep-13 26-Sep-13 12:00 - 17:00 27-Sep-13 27-Sep-13 CLOSED Donny N. Donny N. Sobari 4 HPP/HSE/IX/FMC/13/04 High Pressure Potential Workshop 1 Hydrotest 1,000 Psi, During 8 hours 31-Sep-2013 31-Sep-2013 11:00 - 17:00 CLOSED Donny N. Donny N. Sobari 5 HPP/HSE/X/FMC/13/05 High Pressure Potential Workshop 1 Hydrotest 1,000 Psi, 1-Oct-13 1-Oct-13 07:30 - 17:00 2-Oct-13 2-Oct-13 CLOSED Donny N. Donny N. Sobari 6 HPP/HSE/X/FMC/13/06 High Pressure Potential Workshop 1 Hydrotest 1,000 Psi, 2-Oct-13 2-Oct-13 07:30 - 17:00 3-Oct-13 3-Oct-13 CLOSED Donny N. Donny N. Sobari 7 HPP/HSE/X/FMC/13/07 High Pressure Potential Workshop 1 Flushing 3-Oct-13 3-Oct-13 07:30 - 17:00 4-Oct-13 4-Oct-13 CLOSED Donny N. Donny N. Sobari 8 LIFT/HSE/X/FMC/13/01 LIFTING Workshop 5 Lift for test manifold 4-Oct-13 4-Oct-13 07:30 - 17:00 4-Oct-13 4-Oct-13 CLOSED Donny N. Donny N. Sobari 9 LIFT/HSE/X/FMC/13/02 LIFTING Workshop 1 Load out manifold 24-Oct-13 24-Oct-13 10:00 - 12:00 24-Oct-13 24-Oct-13 CLOSED M. Zen Ardan Sobari Prepared by, Fitri Ifony HSE Engineer Page 1 31-Sep-2013 31-Sep-2013
  • 28. HSE CLOSE OUT REPORT 2013 ATTACHMENT 4 JRA RECORD 21
  • 29. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards 1 Work on construction Yard 1.1 Unfamiliar with the construction work activity, uncontrolled activities Risks & Possible Accidents Scenario Contact with hot metal particles, under load swinging by crane, use of tools improperly, etc. Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR 4 3 12 P 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 Ensure all working personnel are qualified and familiar with the construction activity HE IR 2 3 6 Ensure all working personnel have passed the medical examination prior to first day of work All working personnel must complete safety induction Appropriate trainings are conducted for all working personnel Mandatory PPE (hard hat, eyewear, footwear, long sleeves shirt) must be worn when entering the construction Yard Additional PPE is selected and worn as per activity to be performed Toolbox Meeting is conducted regularly at the first shift and prior to commencing critical work Personnel who are going to do critical task such as scaffolder for work at height shall pass appropriate medical check conducted regularly Traffic Management HR HR & HSE HR Warehouse Yard Manager Warehouse Supervisor Permit to work established for critical tasks namely confined space entry, heavy lifting, radiography test, hydrotest, leak test, pressure test, excavation, working at height, energi isolation 1.1.10 Ensure the lighting is adequate for work at night Doctor of PTG 2.1 Vehicle movements Struck by vehicles, collision 1.2.1 4 3 12 Establish the emergency preparedness and response system HSE 1.2.2 1.2.3 Designated Muster Points for evacuation are established Emergency drill conducted regularly HSE HSE 2.1.1 Provide separate entry and exit gateways for pedestrians and vehicles 2.1.2 1.2 2 Medium Responsible Person for Checking Implementation Doctor of PTG 1.1.9 Poor response for emergency Mass panic, late evacuation case Residual Risk Ensure that drivers driving out onto public roads can see both ways along the footways before they move onto it 2 3 6 Yard Manager Yard Manager 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 Clear the road access from any obstruction such as material storage to minimise reversing Install barrier between the road access and fabrication area No private or motorbike car allowed to go to site Provide car parking away from site Control the gateway from entry and exit vehicle Apply speed limit at Yard (15 km/hours) Supervisor Yard Manager Yard Manager Yard Manager Yard Manager 2.2.1 Place standard road signs in place where appropriate and visible HSE 2.1.3 2.2 Lack of information Collision Supervisor
  • 30. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Using vehicles and mobile plant Risk Category Acceptable Risk Additional Risks Reduction Measures Risks & Possible Accidents Scenario P HE IR Failure vehicles, mobile plant 4 3 12 P 3.1 Poor vehicles, mobile plant 3.1.1 Select suitable vehicles or mobile plant for purpose 3.1.2 3.1.3 3.1.4 3 HE IR 2 3 6 Residual Risk The vehicles have adequate visibility for driver/operator Visibility aids such as mirror and CCTV provided Effective braking system and steering provided and function Headlights, horn, windscreen wiper and warning devices such as reversing alarm and sign lamp provided and function 3.1.5 Medium Responsible Person for Checking Implementation Yard Manager Supervisor Supervisor Supervisor Supervisor 3.1.6 3.1.7 3.2.1 Supervisor Driver/operator conduct inspection of vehicle prior to use (daily basis) Driver/Operator Driver/operator are in fit condition to work and medical examination will be check prior to commencing critical work Supervisor 3.2.4 Driver/operator are fully understand the operating procedure of the vehicle Supervisor 3.2.5 Driver/operator respect to speed limits Driver/Operator 3.2.6 Park vehicle on flat ground with engine switched off, handbrake applied and use wheel chock if necessary Driver/Operator 3.2.7 Collision Driver/operator are competent person (trained and certified) as per class of machine 3.2.3 Unsafe driving Supervisor Supervisor 3.2.2 3.2 Seat belt provided and function Inspection and maintenance conducted regularly Provide designated turning areas if applicable to minimise vehicle reversing Yard Manager 3.2.8 Check the condition behind vehicle prior to reversing 3.2.9 Use signalman to guide vehicles for reverse movement 3.2.10 Signalman in safe position during reversing vehicles 4 Material delivery 4.1 Poor loads arrangement Material fall from vehicles, injured person 4 3 12 Driver/Operator Driver/Operator Signalman 4.1.1 Load platform, bodywork and anchorage points are appropriate for for the load 4.1.2 Put the material as per maximum load capacity of vehicle Supervisor 4.1.3 Load placed on the center of gravity of load platform if applicable to keep the stability of vehicle Supervisor 4.1.4 The larger and heavier load placed at the bottom Supervisor 4.1.5 When a load is stacked, the lower packages should be strong enough to support the others when the vehicle is braking, cornering or accelerating Supervisor 2 3 6 Medium Supervisor
  • 31. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 4.1.6 Supervisor 4.2.1 Appropriate securing equipments such as clamps, special bolts, steel wire ropes, chains, webbing harnesses, sheets, nets, ropes and shoring barsare available on vehicle Supervisor The securing equipment regularly inspected for wear or damage No misuse for securing equipment Supervisor Supervisor 4.2.4 The steel wire rope or other equipment should have safe working load Supervisor 4.2.5 The load must be packed tightly before applying the restraints Supervisor 4.2.6 The load must be checked for security and the lashings tested for adequate tension Supervisor 4.2.7 Material fall from vehicles, injured person The load should be arranged so that it does not obstruct the driver’s field of vision including rear view through the driving mirrors 4.2.2 4.2.3 Poor load restraint Supervisor 4.1.7 4.2 The weight of heavy loads of small dimensions should be distributed across the vehicle platform by the use of load spreading devices. (e.g.. pallets, large wooden board etc.) Check that cargo doors are locked and that locking mechanisms are in good condition. Supervisor Lashings must be properly tensioned at all times using a tensioning 4.2.8 device specified by the manufacturer of the lashing. 4.2.9 The angle of lashing not exceed 60 degree from horizontal position 4.2.10 At least one lashing every 1.5m along the length of the load Lashings must be protected against abrasion and or cutting by the 4.2.11 use of corner protectors or protective sleeves Supervisor Supervisor Supervisor Supervisor 4.2.12 Suitable dunnage as additional equipment to restraint load 4.2.13 Beware of crushing when opening the tie of load 5 Loading and unloading materials Supervisor Personnel 5.2 Collision, turning vehicle Personnel move up and down Fall from height the load platform 4 3 12 Load and unload vehicle on level ground away from passing traffic, overhead hazards. Positioning vehicle so that it does not effect to vehicle stability Apply braking system during loading and unloading Use wheel choke if necessary Supervisor Driver/Operator Driver/Operator 5.1.6 Crowded area 5.1.2 5.1.3 5.1.4 5.1.5 5.1 Determine the exclusion zone during loading unloading activity and place barricade surround it Supervisor 5.2.1 Suitable means of access used to move up and down to load platform Supervisor 5.2.2 The access facilitates three points contact Supervisor 2 3 6 Medium Supervisor
  • 32. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Load positioning, unstable Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation Lifting operations by crane 6.1 Failure of crane/lifting gears Material fall Fatality, Property Damage 4 4 16 Check the load from movement prior to unloading Keep the load on the position until unloading starts Supervisor Supervisor Use appropriate means of unloading if the loads become unstable during transport Supervisor 5.3.4 5.3.5 5.3.6 5.3.7 6 5.3.1 5.3.2 5.3.3 5.3 Extended exclusion zone during such unloading activity No roll off load out of vehicle No load tied on an object to drag it off by moving the vehicle Beware of crushing when opening the tie of load Supervisor Supervisor Supervisor Personnel 6.1.1 6.1.2 6.1.3 Use certified crane & lifting gears Crane to be checked prior to use by the operator Visual inspection for sling & shackle to be done prior to use Control/check and make sure that the weight of the material is not over the SWL of crane & lifting gears 6.1.4 4 3 12 Medium Supervisor Supervisor Rigger Rigger 6.1.5 6.2 Load fall down / drop object 6.3 7 Using lifting gears Pinch point 7.1 Poor lifting gear condition Failure lifting gear when in use Inappropriate lifting gears to 3 12 Ensure that safety signal work properly Supervisor Use tag line to control movement of lifted object No body under the load during lifting Only competent & experience personnel who operate the crane Rigger Rigger Supervisor 6.3.1 6.3.2 4 Supervisor Supervisor Supervisor 6.2.2 6.2.3 6.2.4 Personal injury Rigger Only competent & experience personnel who operate the crane No lifting activity during bad environment such as raining and dark Clear access of over head crane at workshop 6.2.1 Property damage, Fatality, Injured person Nobody under the load during lifting 6.1.6 6.1.7 6.1.8 Pinch bar to be used to remove plate clamp on the ground Workers to wear rigger gloves for protection Rigger Supervisor 7.1.1 Conduct inspection regularly to ensure that lifting gears are in good condition 7.1.2 Find out the purpose of use for each lifting gears Supervisor 7.1.3 Find out the correct way of each lifting gears Supervisor 7.1.4 Ensure that working load limit statement is stamped from manufacture Supervisor 3 2 6 Medium Supervisor
  • 33. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation Supervisor Ensure the load is secured Supervisor Avoid sharp bends, pinching and kinks in rigging equipment Supervisor 7.2.4 Never wrap wire rope sling completely around a hook Rigger 7.2.5 Make sure the load is balanced in the hook Supervisor 7.2.6 Never point-load a hook unless it is designed and rated for such use Supervisor 7.2.7 Never wrap the crane hoist rope around the load Rigger 7.2.8 Avoid bending the eye section of wire rope sling around corner or near any attached fitting Rigger 7.2.9 Load fall down Consider the best method of slinging relative to weight, shape, center of gravity, lifting points and load stability 7.2.3 Incorrect sling configuration 7.2.1 7.2.2 7.2 Understand the effect of sling angle on sling load or pull angle on beam load Supervisor 7.2.10 Ensure the riggers are able to tie basic knots and hitches With two or more slings on hook, use shackle as supporting to sling 7.2.11 balance Supervisor Supervisor 7.2.12 Use tag line for control, attached to the load 7.2.13 Block loose loads before unhooking Using lever hoist Rigger 7.2.14 Stay back when slings are pulled out under the loads 8 Supervisor Rigger 8.2 Poor lever hoist Poor application Failure lever hoist when in use Chain break, shock pressure, object fall 4 3 12 8.1.1 Conduct check prior to use 8.1.2 8.1 Do not use deformed hook Supervisor 8.2.1 Do not overload or perform excessive fixed dragging Supervisor 8.2.2 Check the position of holder pawl User 3 2 6 Medium Supervisor
  • 34. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 8.2.3 Material falling, forklift over turn 4 3 12 Supervisor Do not get the load dragged against floor User Avoid using two blocks for suspending a load User Do not pull up too far or pull down slamming fast User Do not turn around the chain block as loaded User Stop pulling when the load is 10 cm above the floor, check for break action User Do not step in under the load User 9.2.8 Material handling and stacking 10.1 Wrong operation by forklift truck Do not overload the chain hoist 9.2.7 10 Supervisor 9.2.6 Overload, load fall, chain break Do not use deformed hook 9.2.5 12 Conduct check prior to use 9.2.4 3 9.1.1 9.2.1 4 User 9.2.3 Poor application Failure chain hoist when in use Ensure the chain is free from kink or twist 9.2.2 9.2 Poor chain hoist User User User User 9.1.2 9.1 Do not unwind or wind the load Avoid using two blocks for suspending a load Keep the improper lever hoist in the storage Keep the chain alignment with both of hooks 8.2.8 Using chain hoist User 8.2.4 8.2.5 8.2.6 8.2.7 9 Keep the object into the saddle of hook Keep the chain alignment with both of hooks User 10.1.1 Forklift completed with load backrest, overhead guard, audible warning and light 10.1.2 Operator restraint (seat belt) worn all the times Suitable attachment i.e. fork extension or barrel clamp as per 10.1.3 manufacturer instruction 3 2 2 3 6 6 Medium Medium Supervisor Supervisor Operator Supervisor
  • 35. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk 10.1.4 The rate capacity marked on attachment Nobody allowed to be lifted by forklift truck unless using certified 10.1.5 safe working platform Supervisor Supervisor 10.1.6 Lower the fork on the ground when parking 10.1.7 No over reach or over load when loading 10.1.8 Avoid violent braking or sudden change of direction Where possible, travel with the fork arms lowered to within 150 mm 10.1.9 (6’’) of level ground and mast tilted slightly back 10.1.10 Operator Operator Operator Operator When loaded, travel down or up slopes with the fork arms facing uphill Operator Before raising a load ensure there is sufficient clearance overhead 10.1.11 to do so and that objects which could fall and injure people nearby will not be dislodged 10.2 Unstable forklift position 11 Manual Handling 11.1 Wrong position Back Injury Operator Before the mast/boom is raised/lowered or extended, the truck 10.2.1 should be stationary with the parking/handbrake applied and transmission disengaged before the hydraulics are used. 10.2.2 No stacking or destacking allowed on incline position 10.2.3 Adjust the fork spread to suit the load Material falling, forklift over turn 4 2 8 11.1.1 Avoid the need to move loads manually Operator Operator Operator 2 2 4 Low Fully utilise mechanical handling devices, eg lift trucks, pallet trucks, 11.1.2 trolleys Material storage at yard 12.1 Flammable liquid (fuel, oil) Fire, explosion 4 3 12 12.1.1 Keep the flammable liquid in the appropriate tanks Place the tanks into secured designated area that away from 12.1.2 construction area Supervisor Supervisor 11.1.3 Try to avoid heavy lifting especially repetitive lifting over a long Pay attention for moving heavy objects, awkward load shapes, strenuous pushing and pulling, stacking above shoulder height, 11.1.4 uncomfortable working positions, repetitive work (eg packing) and use of excessive force 11.1.5 Use hand handle to lift the load if applicable 11.1.6 Ensure no obstruction of sight when handling 11.1.7 Avoid lifting carrying object with awkward position 11.1.8 Do not lift a load not exceed 20 kg 11.1.9 Apply good handling technique for lifting equipment 12 Responsible Person for Checking Implementation Supervisor Worker Worker Worker Worker Worker Worker 2 3 6 Medium Supervisor Supervisor
  • 36. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 12.1.3 12.1.4 12.1.5 12.1.6 12.3 Tubular steel (pipe, scaffolding pipe) Supervisor Supervisor Supervisor Supervisor 12.1.7 12.2 Compressed gas cylinder Provide adequate suitable fire extinguishers in the storage area Only authorised person could enter the storage area Place appropriate warning sign Maintain the drainage of spillage Use small locked drum or container and put it away from hot work activity when it is in use on construction or maintenance activity Supervisor Put the cylinder in upright position all the times Keep the cylinder in appropriate basket Ensure the basket in stable position Use lifting lugs to lift the basket otherwise use forklift truck Keep the basket in safe clear distance from hot work activity 12.2.5 otherwise protect it by fire blanket Gas leak, fire, explosion 12.2.1 12.2.2 12.2.3 12.2.4 Non tubular steel (beam, channel) Stacked material collapse, material damage 12.5 Garnet mesh 13 Electricity Put scaffolding pipe on designated rack Use appropriate stopper under stacked pipes Use appropriate clamp to lock pipe movements Place barricade or other barrier surround the stacked pipes 12.4.2 12.4.3 12.5.1 12.5.2 12.6.1 12.6.2 12.6.3 12.6.4 12.6.5 12.6.6 Fire, explosion Contact with live equipment, Electric shock, burns, electric 13.1 poor installation, faulty arc, fire and explosion equipment, source of ignition Supervisor Supervisor Supervisor Supervisor Supervisor 12.4.1 Put the material on appropriate support placed on level ground Dust 12.6 Paint and solvent Supervisor 12.3.1 Put the pipes on appropriate support placed on the level ground Rolling pipe, material damage 12.3.2 12.3.3 12.3.4 12.3.5 12.4 Supervisor Supervisor Supervisor Supervisor 4 3 12 Put small size materials on pallet Sort the position orderly and tidy Keep the garnet in the bag prior to use Put the bag on pallet to make it tidy and orderly Keep the material in designated room Ensure the room is well ventilated No smoking area applied for the room Personnel wear appropriate masker when work in the room Keep the paint into designated drum or container prior to use Provide designated waste bins for contaminated material of paints 13.1.1 Personnel working on electrical equipment or system are competent person Supervisor 13.1.2 Ensure the electrical installation is safe as per suitable standard Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor 2 3 6 Medium Supervisor Supervisor
  • 37. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 13.1.3 13.1.4 13.1.5 13.1.6 13.1.7 Provide adequate socket outlet to prevent overloading socket Use suitable equipment for working environment Use wireless equipment to eliminate electrical risk if applicable Use adequate insulated equipment Provide clearly marked switch on equipment Supervisor Supervisor Supervisor Supervisor Supervisor 13.1.8 For earthing cable, the end of cable firmly clamped to stop wire pulling out of the terminal Supervisor 13.1.9 Use proper connector to joint the length of cable 13.1.10 Protect light bulb or other equipment that could be easily damaged 13.1.11 Limit the supply voltage to the lowest needed Supervisor Supervisor Supervisor Ensure the main switchboard, socket outlet or equipment are 13.1.12 equipped with RCD that have rated current tripping not more than 30 mA Supervisor 13.1.13 Regular inspection and maintenance conducted 13.1.14 Pre-use check conducted by user No work on live equipment or installation unless permit to work has 13.1.15 been approved 14 Using powered equipment 14.1 Use improper equipment 14.2 Unsafe electrical supply Electrocute, electric shock Overheating, source of ignition 4 3 12 14.1.1 Check the equipment is in good condition Check the plug is in good condition and is properly secured with no 14.1.2 internal wire visible Check the electrical cable is not damaged, not repaired with 14.1.3 insulating tape or unsuitable connector Position any trailing wires so that it avoid trip hazard or get 14.1.4 damaged Supervisor User Supervisor 2 3 6 Medium Supervisor Supervisor Supervisor Supervisor 14.2.1 Check that the electrical equipment is suitable for electrical supply Supervisor 14.2.2 Check the electrical supply is safe to use Supervisor 14.2.3 Use Residual Current Devices (RCD) on electrical supply with tripping current < 30 mA Supervisor
  • 38. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards 15 Working on live equipment 15.1 Unplanned work Risks & Possible Accidents Scenario Contact with energy (electricity, mechanical, rotating equipment, stored energy, pressure) Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR 4 4 16 P 15.1.1 Propose appropriate work permit prior to work 15.1.2 Identify the circuit or equipment to be worked 15.1.3 Know the drawing of electrical system for details information and work to be done HE IR 3 2 6 Residual Risk Medium Responsible Person for Checking Implementation Supervisor Supervisor Supervisor 15.1.4 Plan and manage the work Supervisor 15.1.5 Specify correct system of work and its procedures Supervisor 15.1.6 Only trained person can do this job and specify level of supervision Supervisor 15.1.7 Provide appropriate protective equipment Supervisor 15.1.8 Provide appropriate information, tools and instrument Supervisor 15.1.9 Disconnect the equipment from any source of electrical energy Supervisor 15.1.10 Isolate the lived equipment or relevant part with it Supervisor Ensure the means of disconnection is secured by safety lock having 15.1.11 unique key Supervisor 15.1.12 If a plug has been withdrawn, ensure that it can not be reconnected Supervisor 15.1.13 If a fuse has been removed, ensure that it can not be reinserted Supervisor 15.1.14 Post notice to let everyone knows that work is being done Supervisor Completed the notice with name of person working and contact 15.1.15 number Supervisor 15.1.16 Test the isolated equipment to ensure the power is off Supervisor 15.1.17 Use earthing devices if necessary Supervisor Ensure the equipments have adequate working space, access and 15.1.18 lighting Supervisor
  • 39. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Apply a permit to work after all precautions have been taken, especially for high-voltage system Remove all safety lock used for securing equipment when work has 15.1.20 finished 15.1.19 Supervisor Supervisor 15.1.21 Close work permit when work has finished 16 Using hand tools 16.1 Flying debris, broken handle when using cold chisel Injury 3 2 6 16.1.1 Used to cut or shape soft metals as well as concrete and brick Responsible Person for Checking Implementation Supervisor 3 1 4 Low Supervisor 16.1.2 Avoid using the chisel with mushroom head, it should be ground off 16.1.3 Use hand gloves and eye protection when using chisel Flying head, broken handle when using hammer 16.2.1 Ensure that head is secure and tight prior to using it Injury User 16.2.2 Replace damaged handle or stem Hit the target with head of sledgehammer to avoid weakening the 16.2.3 stem and flying head 16.2 User User User User As with any striking or struck tool, use eye protection when using 16.2.4 sledgehammer 17 Using pneumatic tools (blasting, painting, chipping) 17.1 High pressure Personal injury 4 2 8 17.1.1 Only trained person allowed to operate pneumatic tools 17.1.2 17.1.3 17.1.4 17.1.5 17.1.6 17.1.7 17.1.8 17.1.9 18 Cutting by torch 18.1 Sparks, spatter Fire, burn, explosion 4 4 16 User 2 2 4 Low Marked capacity of power tools is readible Keep all tools in good condition with regular maintenance Use the right tool for the job Examine each tool from damage before use Operate according to the manufacturer's instructions Disconnected the power when replacing anything Conduct inspection regularly Proper PPE to be use while working with pneumatic tools. Flash back arrestor/check valve is installed on both cutting torch & regulator Secured the connection between hose to cylinders & hose to cutting 18.1.2 torch by proper mechanical clamps 18.1.1 18.1.3 Oxygen & LPG cylinder stored on the rack Supervisor User User User User User User Supervisor User 3 2 6 Medium Supervisor User Supervisor
  • 40. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk 18.1.4 Conduct test to check gas leak by soapy water Remove flammable materials from work area otherwise protect it by 18.1.5 fire blanket 18.1.6 Provide fire extinguisher and watchman to be stand by 18.1.7 Use appropriate PPE (faceshield and glove) 19 Compressed gas handling 19.1 Flammable gas, oxydizing Fire, Explosion, Personal gas, toxic gas, akwark shape Injury 5 3 15 19.1.1 Put cylinders in the appropriate rack/ basket 19.1.2 19.1.3 19.1.4 19.1.5 19.1.6 19.1.7 19.1.8 19.1.9 19.1.10 20 Grinding/ Cutting by grinding machine 20.1 Electricity Electric shock 4 3 12 User User User User 2 2 4 Low Always turn the gas supply off at the cylinder when the gas is not in use Regularly check all connections from fault and leaks Avoid taking gas cylinder in to poorly ventilated rooms or confined spaces Store gas cylinders outside whenever possible or in a well ventilated place Never allow oil or grease to come into contact with cylinder fittings Cylinder containing flammable gases, must not be stored in close proximity to open flames Cylinders shall be stored protected from direct sunrays To protect the valve during transportation, the cover cap should be screwed on hand tight and remain on until the cylinder is in place Cylinders should never be rolled or dragged when removing 20.1.1 Only trained person that allowed to operate powered tools 20.1.2 Keep all tools in good condition with regular maintenance 20.1.3 Examine each tool from damage before use 20.1.4 Operate according to the manufacturer's instructions Mandatory PPE + faceshield to be use while working with powered 20.1.5 tools. 20.1.6 Good electrical cable insulation and grounding 20.1.7 The electrical cable has been tested & tagged 20.1.8 Use hand glove for protection To ensure that all electrical cables & equipments are installed by 20.1.9 designated trained electrician Turn off/unplugged the power of grinding machines during 20.1.10 replacement the disc 20.1.11 Ensure cable insulation in good condition 20.1.12 Provide ELCB Responsible Person for Checking Implementation Supervisor User User User User User User Supervisor User User 2 3 6 Medium Supervisor Supervisor User User Electrician User Supervisor User User Supervisor User User Supervisor Electrician
  • 41. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 20.1.13 Inspect equipment prior to use 20.1.14 Use approved grinding disc only 20.1.15 Grinding machine is equipped with dead man switch 20.2 20.2.1 Use proper PPE for grinding activity: safety glass, face shield User 20.2.2 Limitation access to the work area Flying small particles from the Eye injury activity User Supervisor 20.2.3 Use spark shield during grinding activities for protection to other workers/visitors User 20.4 21 Welding, Gouging Sparks come to flammable material 21.1 Electricity 20.3.1 Use only approved grinding machine that has passed the inspection Injured personnel User User Remove flammable materials from the area otherwise protect the 20.4.1 materials by fire blanket. Keep the safe distance from the flammable material and grinding activity 20.4.2 Provide portable fire extinguisher Fire, burn Electric shock User 20.3.2 Make sure grinding machine rotation speed (RPM) less than grinding disc allowable rotation 20.3.3 Proper replacing/installing/tightening grinding disk 20.3 Grinding disc broken 5 3 15 21.1.1 Always be sure the work cable makes a good connections 21.1.2 Connection shall be close as possible from the welding point 21.1.3 Be certain of a good electrical grounding Maintain the electrode holder, work clamp, welding cable and 21.1.4 welding machine in good condition When working at height use full body harness to avoid falling down 21.1.5 in case of electric shock User User 5 2 10 Medium Supervisor Welder Welder Welder Welder 21.2 UV-IR-Light radiation Eyes and skin irritation 21.2.1 Use a shield with proper filterand cover plates 21.2.2 Use suitable cloathing made from durable flame resistant material 21.2.3 Protect others by installing an appropriate screening Welder Welder Welder 21.3 Fumes and gas Ill-health 21.3.1 Weld within a ventilated area Provide blower when welding in confined space or where there is a 21.3.2 risk that the concentration of fumes and gases could be too high, welder must wear individual breathing protection Supervisor Welder
  • 42. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards 21.4 Sparks, spatter 21.5 Noise 22 Work in the extreme environment 22.1 Poor lighting Risks & Possible Accidents Scenario Risk Category P HE IR P HE IR Residual Risk 21.4.1 Remove flammable material in the risk zone 21.4.2 Screen off the area 21.4.3 Make sure that sufficient fire extinguisher is available 21.4.4 Welding shields or barriers shall be used to protect workers from flash 21.4.5 Use appropriate PPE for welding (appron, welding hand glove) Fire and Burns Welder Welder 21.5.1 21.5.2 21.5.3 21.5.4 3 3 9 22.1.1 Provide good light including natural light and avoid glare Responsible Person for Checking Implementation Supervisor Welder Welder Use individual ear protector Install noise absorber Screen off noisy work area Use quiter tools for grinding and removing slag Using a suitable welding process and welding technique can 21.5.5 minimise grinding and slag removal Ill-Health (deft) Visual fatigue Acceptable Risk Additional Risks Reduction Measures Supervisor Welder Welder Welder Welder 3 2 6 Medium Supervisor 22.1.2 Provide a good level of local lighting in place where necessary Supervisor 22.1.4 Provide special fittings for flammable and explosive atmosphere Supervisor 22.1.5 Conduct inspection for the luminance 22.2 Exposure of dust, fume or gas Ill-health Supervisor 22.1.3 Provide suitable form of lighting Supervisor 22.2.1 Provide proper respiratory protective equipment for employees Supervisor 22.2.2 Inform all employee the need of using respiratory protective equipment in some certain workplaces Supervisor 22.2.3 Look after the respiratory protective equipment given 22.2.4 Conduct inspection for using of respiratory protective equipment Noise from machine 22.3 operation, gouging activity Ill-health (deft) Supervisor Supervisor 22.3.1 Provide proper hearing protection for employees Supervisor 22.3.2 Monitor the sound level at workplace Supervisor Inform all employee the need of using hearing protection in some 22.3.3 certain workplace Supervisor 22.3.4 Look after the hearing protection given Supervisor 22.3.5 Conduct inspection for using of hearing protection Supervisor
  • 43. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards 23 Working at height Risks & Possible Accidents Scenario Improper access, work area is 23.1 not safe to prevent people Personnel falling, drop object from falling Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR 4 4 16 P 23.1.1 Avoid working at height 23.1.2 23.1.3 23.1.4 23.1.5 23.1.6 HE IR 3 2 6 Residual Risk Medium In existing place, provide appropriate permanent access and edge protection Provide work equipment with collective fall protection that protect all those at risk (scaffolding, MEWP) Provide work equipment with collective fall protection that protect the individual (fall restrain system) Minimize distance and consequences of fall and protect all those at risk (nets, soft landing systems Minimize distance and consequences of fall and protect the individual (fall arrest system, rope access) Responsible Person for Checking Implementation Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor 23.1.7 Provide working at height awareness training 23.1.8 Use podium steps or ladders for light duty Working at height, personnel falling 24.2 Scaffolding collapse Injured person, Fatality Injured person, Fatality 4 4 16 Supervisor 23.1.11 Use rope and pulley to move material up and down 24.1 Supervisor 23.1.10 Keep materials into the box or secure it Erecting and Dismantling scaffolding Supervisor 23.1.9 Closure or segregate area from unauthorized people 24 Supervisor Supervisor 24.1.1 24.2.1 24.2.2 24.2.3 24.2.4 24.2.5 24.2.6 24.2.7 Wear safety harness and hand gloves during erecting or dismantling scaffolding Only certified and competent scaffolder allowed to erecting or dismantling scaffolding Conduct inspection regularly (weekly basis) To use approved material scaffolding (tubing, wood plank and clamp) Applied tagging system No modification allowed without authorization from supervisors/inspector concerned Inspector shall recertified acceptance of the scaffold after modification (if any) Scaffolding shall be connected to the permanent structure to prevent collapse 3 2 6 Medium Scaffolder Supervisor Supervisor Supervisor Inspector Supervisor Supervisor Supervisor
  • 44. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P 24.2.8 HE IR Residual Risk Scaffolding must be based on firm, level foundation and avoid soft ground Responsible Person for Checking Implementation Supervisor 24.2.9 Provide extra support as necessary 25 Working on scaffolding Material/tools dropped from height 25.1 Personnel falling from height Supervisor To ensure all tools and materials must be tied off and all small 24.3.1 materials shall be stored in the basket and no dropping down any materials from high level Barricading system to be applied during erecting and dismantling 24.3.2 scaffolding Injured person Injured person Supervisor 24.2.11 Design duty rating to the scaffolding 24.3 Supervisor 24.2.10 Stabilize by bracing & tightening to permanent structure 4 4 16 25.1.1 Check the tag of scaffolding prior to use Scaffolder Scaffolder 3 2 6 Medium User 25.1.2 No one allowed to make a modification of scafffolding 25.1.3 Contact scaffolder to repair or make modification of scaffolding 16 User 25.1.8 Use rope and pulley to move material up and down 4 User 25.1.7 Keep materials into the box or secure it 4 User 25.1.6 Minimize storage material on work platform 26.1 Use improper safety harness Injured person User 25.1.5 Do not overload the scaffolding, use scaffold as its duty rating Wearing safety harness User Do not climb on or lean over handrail, work on platform only 25.1.4 otherwise provide fall arrest system 26 User User 26.1.1 Conduct visual check prior to use 26.1.2 Ensure the hook still function properly 26.1.3 Scaffolder must wear safety harness with double lanyard completed with shock absorber 2 2 4 Low User User User
  • 45. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation Using ladder Incorrect method of using safety harness Personnel falling 27.1 Unstable or potential to slip position Personnel falling 4 4 16 User User 26.3.1 Remove snap hooks one by one to move around Personnel falling 26.3 27 26.2.1 Keep lanyard being connected to safe anchor points Keep lanyard as high as possible and away from the edge if 26.2.2 possible 26.2 Hook not anchored User 27.1.1 Conduct visual and functional inspection 3 2 6 Medium User 27.1.2 Used for light duty & short-duration work 27.1.3 Put ladder on level stable surface 27.2.1 Maintain three point of contacts 28.1 Lack of awareness People drowning 4 4 16 User User 27.2.3 Do not use top, second or three rung Working above water User 27.2.2 Do not overreach 28 User 27.1.5 Use rule of thumb “one out for every four up” to get the correct angle Insecure hand, feet and body Personnel falling position User 27.1.4 Secure ladder position – hold it or tie it off at top 27.2 User User 28.1.1 Provide safe system of work 3 2 6 Medium Supervisor 28.1.2 Worker must be properly trained Supervisor 28.1.3 Provide suitable emergency equipment Supervisor 28.1.4 Provide barrier as guard rail to stop people falling Supervisor 28.1.5 Provide life jacket (with auto-inflating) Supervisor 28.1.6 Provide buoyancy aids Supervisor
  • 46. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk 28.1.7 Arising alarm if anyone has fallen eg. using whistle and light Working with chemicals or products contain chemicals/ Activities generate fumes, dust, mists, vapors Working with hazardous substances 29.1 Burn, asphyxiation, ill-health 3 3 9 29.1.1 Checking information that came with the product, eg a safety data sheet 29.1.2 29 Working personnel User are trained to understand the information such as the symbols and hazards 2 2 4 Low Supervisor Supervisor 29.1.3 Wear appropriate PPE recommended by the safety data sheet Ensure control equipments are in place and properly function eg 29.1.4 local exhaust ventilation 29.1.5 Responsible Person for Checking Implementation User Supervisor Provide emergency equipment such as eye wash near the workplace Supervisor Provide suitable hygiene facilities for decontaminating skin and 29.1.6 facilities for cleaning personal protective equipment. 30 Blasting/Painting 30.1 30.2 30.3 30.4 30.5 30.6 Dust Exposure Noise Broken Hose Hose realese from extension Expose by sand stain Eye Irritation Contamination air in blasting hood 30.8 Chemical fire 30.7 Ill-Health Ill-Health Personal Injury Personal Injury Personal Injury Ill-Health 4 3 12 Supervisor Provide suitable means for disposal of the substance and 29.1.7 contaminated materials only Supervisor 30.1.1 30.2.1 30.3.1 30.4.1 30.5.1 30.6.1 30.6.2 30.7.1 30.8.1 30.8.2 30.8.3 30.8.4 Use suitable masker Use Ear Protection Check the hose condition must be good before start to work Every connection secured with anti whip Use long forearm uniform Use safety glass Provide eye wash Change the filter breathing carbon periodically (consult to manufacture instruction) Prohibited to smoking in painting area Proper paint storage No smoking sign and MSDS shall be provided at paint storage and painting area. Risk and hazard of painting shall be socialized to crew based on MSDS recommendation 2 2 4 Low Worker Worker Worker Worker Worker Worker Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor
  • 47. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Risk Category Hazards 31 Confined Space Entry Acceptable Risk Additional Risks Reduction Measures Risks & Possible Accidents Scenario P HE IR Existing of toxic gas, lack of 31.1 oxygen, flammable and toxic residue Toxicity, Asphyxiation, Fatality 4 4 16 P 31.1.1 Issued appropriate Permit to Work prior to work 31.1.2 31.1.3 31.1.4 31.1.5 31.1.6 31.1.7 31.1.8 31.1.9 31.1.10 31.1.11 31.1.12 31.1.13 31.1.14 31.1.15 31.1.16 32 Excavation 32.1 Live underground services Electric shock, explosion 4 3 12 HE IR 3 2 6 Residual Risk Medium Communicate permit to all affected personnel and posted All person involved are competent to do the work All source of energy affecting the space have been isolated Conduct gas test before entering confined space Certified gas tester to performed gas test Check gas content periodically with calibrated gas detector Control ventilation system Check electric cable insulation system Provide DC lighting or pneumatic lamp Permanently stand by man on the man hole (Attendance) and he must be identified by hand arm Provide breathing apparatus if necessary Provide board for registering time in and out of entering person Provide rescue kits Trolley for rescue person must be available at the main hole Medical examination by doctor or paramedic prior to entering the confined space Provide accurate, clear, readable plans showing the locations of buried service Any doubt about identification of buried service, cables and pipes 32.1.2 should be treated as if it were electricity cable and gas pipe until proved otherwise Pinpoint any buried services by means of locating device to 32.1.3 determine the possible location 32.1.1 32.1.4 Only a well-trained or experienced person can use locating device Get written confirmation of disconnection from the owner operation 32.1.5 area Make digging alongside or above the buried service by hand tools 32.1.6 first i.e. spade, shovel Responsible Person for Checking Implementation Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor Doctor of PTG 3 2 6 Medium Supervisor Supervisor Supervisor Supervisor Supervisor Supervisor 32.1.7 Use insulated hand tools for digging nearby the power line cable Supervisor Do not use buried service as hand or foot hold to climb out of the 32.1.8 excavation Supervisor
  • 48. GENERIC HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR FMC SUBSEA FABRICATION TRA Ref : TRA-Yard-2013-001 Revision : 0 Date : 10-Jan-12 Location: Construction Yard, Cilegon PT. Gunanusa Utama Fabricators JRA Team : Leader : M. Natsir Description of the job : General Fabrication & Erection Hazards - Risks & Possible Accidents Scenario Task Hazards Risks & Possible Accidents Scenario Risk Category Acceptable Risk Additional Risks Reduction Measures P HE IR P HE IR Residual Risk Responsible Person for Checking Implementation 32.1.9 Avoid large piece of rock or hard core for backfilling Radiography 33.1 Using isotop Ionizing, Ill- health 4 4 16 Supervisor 32.1.11 After backfilling, place sign indicating the presence of buried service 33 Supervisor The backfilling should be suitably compacted, use suitable support 32.1.10 to the buried service if necessary Supervisor Keep the source into the locked isotop camera and put it into the appropriate designated pit (bunker) when not in use 33.1.2 Only appropriate person that handle the camera 33.1.1 3 2 6 Medium Supervisor Supervisor 33.1.3 Check the source of isotope regularly Authorized Person Supervisor Supervisor 33.1.8 Issued Permit to Work Noted : P : Probability HE : Hazard Efect IR : Individual Risk Authorized Person 33.1.4 Check periodically validity of ID card protection Check radiography exposure use survey meter before conduct 33.1.5 radiography activity 33.1.6 Warning sign and barricade to be installed 33.1.7 Provide rotary light when operation during night time Supervisor Authorized Person
  • 49. HSE CLOSE OUT REPORT 2013 ATTACHMENT 5 MANAGEMENT WALTHROUGH 22
  • 50. PT. GUNANUSA UTAMA FABRICATORS Gunanusa Yard, Cilegon Telp. : +62254-500088 Fax. : +62254-500091 WEEKLY HSE WALKABOUT PROJECT: Subsea Manifold WALKABOUT NO.: 02 DATE/TIME: 18 July 2013 / 09.00 am Attendees: FMC – Tey Arn Soon; Hadi Purwanto PTG – Iman Triwahyudi; Andi S.H; Wahyu Ardi; M. Natsir; Sabrawi; NO 1 LOCATION Subsea Manifold Fabrication Workshop No. 2 DATE OF FINDING Subsea Manifold Fabrication Workshop No. 2 TARGET DATE REMARKS 19 July 2013 Closed Data Kususma 18 July 2013 Welding cable: • Should placed neatly (S-Shape) 2 RECOMMENDATION ACTION BY Sulaiman Sarman FINDING 19 July 2013 Closed • Hanger the provide 18 July 2013 Drilling Workbench: • At first, it was placed at • Moved to above unstable place ground and now
  • 51. (stacked beam), stopped work by Mr. Tey. 3 Subsea Manifold Fabrication Workshop No. 1 Herry Budiman Subsea Manifold Fabrication Workshop No. 1 5 Subsea Manifold Fabrication Workshop No. 1 Closed 19 July 2013 Closed Data Kusuma 19 July 2013 Closed • Lighting is completed to repair 18 July 2013 Hose: • At first placed at passage way 19 July 2013 Ondo Nababan 18 July 2013 Lighting: • Lack of lighting • Broken Lamp 4 welded to beam to have better stability. • Moved to storage area to prevent blockage 18 July 2013 Pallet: • Found have lost partial • Discarded, then legs, unstable replace with the new condition one
  • 52. 6 Subsea Manifold Fabrication Workshop No. 1 18 July 2013 Siswanto High Pressure: • High Pressure without completed with antiwipe 19 July 2013 Closed • Has completed with antiwipe Prepared by: Verified by: Acknowledgement by: Witness by: Alnidi S. Bratanegara Corporate HSE Secretary M. Natsir Corporate HSE Manager Iman Triwahyudi Project Manager Tey Arn Soon Asst. Fabrication Manager
  • 53. HSE CLOSE OUT REPORT 2013 ATTACHMENT 6 HSE MASTER DOCUMENT REGISTER (MDR) 23
  • 54. PT. GUNANUSA UTAMA FABRICATORS LIST OF FMC HSE PROCEDURES Date : 22-May-2013 No. Title of Documents Document No. Rev. Status Reviewed Date 1 HSE Management Plan ID-GNU-FMC-47688727HSE-0001 A IFC 22-May-13 2 Personal Protective Equipment (PPE) Inspection, Controling Program and Distributuion System Procedure ID-GNU-FMC-47688727HSE-0002 A IFC 22-May-13 3 Hazard Identification and Risk Assessment A IFC 22-May-13 4 Generic Risk Assessment A IFC 22-May-13 5 Lifting and Rigging Procedure A IFC 22-May-13 6 Confined Space Entry Procedure A IFC 22-May-13 7 Lifting and Rigging With Categories A IFC 22-May-13 8 Permit to Work Procedure A IFC 22-May-13 ID-GNU-FMC-47688727HSE-0003 ID-GNU-FMC-47688727HSE-0004 ID-GNU-FMC-47688727HSE-0005 ID-GNU-FMC-47688727HSE-0006 ID-GNU-FMC-47688727HSE-0007 ID-GNU-FMC-47688727HSE-0008 Prepared by: Acknowledge by: Alnidi Safarach Bratanegara Corporate HSE Secretary M. Natsir Coprporate HSE Manager
  • 55. HSE CLOSE OUT REPORT 2013 ATTACHMENT 7 LOAD OUT PICTURE 24
  • 56. LOAD OUT Sub Sea Manifold Picture
  • 57. HSE CLOSE OUT REPORT 2013 ATTACHMENT 8 INSPECTION REPORT 25
  • 58. SUBSEA MANIFOLD PROJECT INSPECTION REPORT : 2 UnitTruck Trailler : 6 Unit Stand by Welding Rectifier (Cable Power not yet Connected) Stand by Welding Rectifier (Ready for used) Inspection – Welding Rectifier Green Tag Inspection Welding Rectifier Inspection Report 1-2
  • 59. Calibration date welding rectifier Inspection – Distribution Panel Inspection – Distribution Panel Green Tag Inspection Distribution Panel Inspection – Extension Panel Inspection – Extension Panel Inspection Report 2-2