Oil & Gas Well
Facility Air Quality
Permitting/Registrations
By: Bret Gallo, Bison Engineering, Inc.
Outline
 Introduction
 Potential to Emit
 Registration Process
 Registration Requirements
 Deregistration Process
 Permitting on Tribal Lands
 Permitting/Registering O&G Wells in North Dakota and Wyoming
 Conclusion
Introduction
 Definition of an Oil or Gas Well Facility
 What is a Registration?
 History of rules for MT Registrations
 Who needs a MAQP/Registration?
Oil or Gas Well Facility Defined
Means a well that produces oil or natural gas.
The term includes:
– Equipment associated with the well and used for the purpose of
producing, treating, separating, or storing
oil, natural gas, or other liquids produced by the well;
and
– A group of wells under common ownership or control
that produce oil or natural gas and that share
common equipment used for the purpose of
producing, treating, separating, or storing oil, natural
gas, or other liquids produced by the wells.
What is a Registration?
 Option for O&G well facilities to use rather than obtaining a
Montana Air Quality Permit
– Follow requirements in Rule ARM Title 17, Chapter 8, Subchapter 17
(Registration of Air Contaminant Sources)*
– No public notice
– No BACT analysis
– No need for modification fees, just a 15 day notification
 The process of identifying equipment, processes, and emissions
(PTE and controlled) for the DEQ according to the provisions of
ARM Title 17, Chapter 8, Subchapter 17.
*Note: Registration does not allow facilities to opt out of the Title V Operating
Program if controlled emissions are ≥ 100 tpy or a facility emits ≥ 10 tpy single
HAP or ≥ 25 tpy all HAPs.
History of Rules
 Spring of 2004: DEQ became aware many O&G
well facilities exceeded the PTE threshold
requiring a Montana Air Quality Permit (MAQP).
 Requested operators to analyze their facilities.
 January 2006: DEQ was overrun with hundreds
MAQP applications for existing and proposed
O&G well facilities.
 April 2006: Administrative Rules of Montana
(ARM) Title 17, Chapter 8, Subchapter 17,
Registration of Air Contaminant Sources was
finalized.
Who needs an MAQP/Registration
 Any O&G well facility constructed after
11/23/1968
– If PTE ≥ 25 tpy any criteria pollutant
 Constructed prior to 11/23/1968 if a
modification increases PTE ≥ 25
– More onsite equipment, recompletions, etc.
Determining PTE
What are the emitting units?
 Internal Combustion
Engines (ICEs)
– Lifting unit engine
– Recycling pump engine
– Others???
 Natural Gas Burners
– Heater Treater (Separator)
Heater
 Produced Oil and Water
Storage Tanks
 Emergency flaring/venting
 Flares/Smokeless
Combustors
 Vented Gas
 Truck Loading Losses
 Fugitive Equipment Leaks
– Valves, flanges, pnumatics
 Fugitive Dust Emissions
(Vehicles)
Typical O&G Well Facility
Typical Emitting Units
Emission Calculation Methods for PTE
 Based on max daily operational capacity
– (oil, gas, and water production: previous 6 month max)
 Internal Combustion Engines
– 8,760 hrs and manufacturer’s guaranteed max design capacity (hp)
– AP-42 factors or mfg guaranteed factors
 Nat. Gas Burners
– 8,760 hrs, max size of burner (Btu/hr) and AP-42 factors
 Produced Oil Storage Tanks
– Flashing, working, and breathing losses (accounts for +90% of total facility
emissions)
– E&P Tanks Version 2 Model (Recommended by both federal and state agencies)
 Inputs can be high pressure oil samples, low pressure oil samples, or gas samples
– Use a BTEX low pressure extended hydrocarbon analyses from produced oil
 If not available, may use DEQ provided “representative” analysis from another well.
Emission Calculation Methods Cont…..
 Produced Water Storage Tanks
– Tanks 4.09d (assume it is all oil)
– AP-42 Chapter 7: Liquid Storage Tanks
 (need physical and chemical properties)
– EPA-450/3-85-001a – Volatile Organic Compound Emissions from Petroleum
Refinery Wastewater Systems - Background Information for Proposed Standards
 (1.95E-5 ton VOC/bbl water produced…greatly over predicts)
– EPA WATER9 Program
 (need physical and chemical properties)
 Produced Gas
– If sent to pipeline, must assume a minimum of 500 hrs/yr emergency flaring or
venting
– If all is flared, must assume a minimum of 500 hrs/yr emergency venting
 Truck Loading Losses
– Production rate and AP-42 Chapter 5.2 – Transportation and Marketing of Petroleum
Liquids
 Fugitive Emissions
– AP-42 factors
Requirement for Registering
 Must register within 60 days of well completion date
 Required controls must be installed at time of registration
– Any emitting unit with a PTE ≥ 15 tpy must be controlled
 Captured and sent to pipleline or combusted in flare/smokeless
combustor
– Federal and State required controls
 Catalytic oxidizers, AFR controllers, etc.
 Submit Complete Registration Form
– Emissions inventory, E&P Tanks Summary, Oil and Gas
samples, plot plan, and map
– Currently $500 fee
 Ambient air quality analysis (if H2S is detected)
– Demonstrate compliance with H2S and SO2 standards
 SCREEN3 can be used, lower standards….maybe AERMOD??
General Requirements
Emissions Control:
 Pipeline or flare
control (≥95%) if over
15 tpy emitted
 Loading/unloading
using submerged fill
 Rich Burn Engines
> 85 hp: NSCR
 Lean Burn Engines
> 85 hp: O-Catalyst
Inspection & Repair
 Inspect monthly
 Repair within 5 days
 Shut down after 15 days
and repair
Recordkeeping/Reporting
 Monthly inspection
reports
 Keep for 5 years
Deregistration Process
Typically due to decline in facility production
 Must submit full emissions evaluation
– Same methods of calculation at original
registration
– Must use a BTEX low pressure oil extended
hydrocarbon analysis from the deregistered
facility, not a “representative” analysis
 Must be no older than 3 years
– No fee to deregister a facility

More Related Content

What's hot

Marathon Technical Services - CNG Station Primer
Marathon Technical Services - CNG Station PrimerMarathon Technical Services - CNG Station Primer
Marathon Technical Services - CNG Station PrimerETCleanFuels
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Kevin Perry
 
Cambridge Local Emergency Planning Committee Meeting
Cambridge Local Emergency Planning Committee MeetingCambridge Local Emergency Planning Committee Meeting
Cambridge Local Emergency Planning Committee MeetingDavid Horowitz
 
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...GeneAmnuel
 
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluationEurope User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluationKBC (A Yokogawa Company)
 
Fy 2016 budget update october 2016
Fy 2016 budget update october 2016Fy 2016 budget update october 2016
Fy 2016 budget update october 2016Michael V. Hannigan
 
Reporting & confidentiality of coal exploration work
Reporting & confidentiality of coal exploration workReporting & confidentiality of coal exploration work
Reporting & confidentiality of coal exploration workAdi Noegroho
 
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP  Regulations on Oil & Gas IndustryImpact of New NSPS and NESHAP  Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industrybishopcj
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...All4 Inc.
 
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersVarious Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersMohit Dhull
 
Regulatory Briefing | Final Revision To SPCC Rule | Caltha LLP
Regulatory Briefing |  Final Revision To SPCC Rule | Caltha LLPRegulatory Briefing |  Final Revision To SPCC Rule | Caltha LLP
Regulatory Briefing | Final Revision To SPCC Rule | Caltha LLPLoren Larson, CHMM, CSO, CEI
 
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...IRJET Journal
 

What's hot (20)

Marathon Technical Services - CNG Station Primer
Marathon Technical Services - CNG Station PrimerMarathon Technical Services - CNG Station Primer
Marathon Technical Services - CNG Station Primer
 
Greenhouse Gas Reporting Changes
Greenhouse Gas Reporting ChangesGreenhouse Gas Reporting Changes
Greenhouse Gas Reporting Changes
 
Recommend pract cng_
Recommend pract cng_Recommend pract cng_
Recommend pract cng_
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
 
Cambridge Local Emergency Planning Committee Meeting
Cambridge Local Emergency Planning Committee MeetingCambridge Local Emergency Planning Committee Meeting
Cambridge Local Emergency Planning Committee Meeting
 
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...
Requirements for Continuous Emissions Monitoring. Proposed Amended Rules (PAR...
 
Breakdown of Eco-Friendly Shipping
Breakdown of Eco-Friendly ShippingBreakdown of Eco-Friendly Shipping
Breakdown of Eco-Friendly Shipping
 
TEPS-TABPJ- HSE- PLN- 001
TEPS-TABPJ- HSE- PLN- 001TEPS-TABPJ- HSE- PLN- 001
TEPS-TABPJ- HSE- PLN- 001
 
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluationEurope User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluation
 
Fy 2016 budget update october 2016
Fy 2016 budget update october 2016Fy 2016 budget update october 2016
Fy 2016 budget update october 2016
 
2004 6.0 l f error de arranque
2004 6.0 l f error de arranque2004 6.0 l f error de arranque
2004 6.0 l f error de arranque
 
Reporting & confidentiality of coal exploration work
Reporting & confidentiality of coal exploration workReporting & confidentiality of coal exploration work
Reporting & confidentiality of coal exploration work
 
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP  Regulations on Oil & Gas IndustryImpact of New NSPS and NESHAP  Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
 
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersVarious Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylinders
 
Regulatory Briefing | Final Revision To SPCC Rule | Caltha LLP
Regulatory Briefing |  Final Revision To SPCC Rule | Caltha LLPRegulatory Briefing |  Final Revision To SPCC Rule | Caltha LLP
Regulatory Briefing | Final Revision To SPCC Rule | Caltha LLP
 
Renovation
RenovationRenovation
Renovation
 
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...
IRJET- Analysis of Reserve Estimation using Volumetric Method on Taq Taq Oil ...
 
TCL Site Services
TCL Site ServicesTCL Site Services
TCL Site Services
 
Regulation of Methane Emissions from Shale Gas Operations by Stephen C. Smith
Regulation of Methane Emissionsfrom Shale Gas Operations by Stephen C. SmithRegulation of Methane Emissionsfrom Shale Gas Operations by Stephen C. Smith
Regulation of Methane Emissions from Shale Gas Operations by Stephen C. Smith
 

Similar to Oil & Gas Well Facility Air Quality Permitting/Registration

October 2015 EHS Regulatory Update
October 2015 EHS Regulatory UpdateOctober 2015 EHS Regulatory Update
October 2015 EHS Regulatory Updatedhuxl
 
Safety Council of Western New England 2011
Safety Council of Western New England 2011Safety Council of Western New England 2011
Safety Council of Western New England 2011David Horowitz
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfchintanraval24
 
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...Marcellus Drilling News
 
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape
 
Regulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsRegulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsBret Gallo
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systemsmichaeljmack
 
John Henderson - How the Environment Agency will Implement the MCPD & Generat...
John Henderson - How the Environment Agency will Implement the MCPD & Generat...John Henderson - How the Environment Agency will Implement the MCPD & Generat...
John Henderson - How the Environment Agency will Implement the MCPD & Generat...IES / IAQM
 
September 2015 EHS Regulatory Update
September 2015 EHS Regulatory UpdateSeptember 2015 EHS Regulatory Update
September 2015 EHS Regulatory Updatedhuxl
 
APIMPMSChapter 18p2-4-15-16.pdf
APIMPMSChapter 18p2-4-15-16.pdfAPIMPMSChapter 18p2-4-15-16.pdf
APIMPMSChapter 18p2-4-15-16.pdfFemi Obiomah
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam Das
 
Integration of Special Purpose Reciprocating Compressors into a Process
Integration of Special Purpose Reciprocating Compressors into a ProcessIntegration of Special Purpose Reciprocating Compressors into a Process
Integration of Special Purpose Reciprocating Compressors into a ProcessGerard B. Hawkins
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Steven Brady
 

Similar to Oil & Gas Well Facility Air Quality Permitting/Registration (20)

October 2015 EHS Regulatory Update
October 2015 EHS Regulatory UpdateOctober 2015 EHS Regulatory Update
October 2015 EHS Regulatory Update
 
Safety Council of Western New England 2011
Safety Council of Western New England 2011Safety Council of Western New England 2011
Safety Council of Western New England 2011
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...
Pennsylvania Bulletin - PA DEP Official Notice of Intent to Approve Shell Cra...
 
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
Regulating Oil and Gas Production Emissions
Regulating Oil and Gas Production EmissionsRegulating Oil and Gas Production Emissions
Regulating Oil and Gas Production Emissions
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systems
 
John Henderson - How the Environment Agency will Implement the MCPD & Generat...
John Henderson - How the Environment Agency will Implement the MCPD & Generat...John Henderson - How the Environment Agency will Implement the MCPD & Generat...
John Henderson - How the Environment Agency will Implement the MCPD & Generat...
 
September 2015 EHS Regulatory Update
September 2015 EHS Regulatory UpdateSeptember 2015 EHS Regulatory Update
September 2015 EHS Regulatory Update
 
APIMPMSChapter 18p2-4-15-16.pdf
APIMPMSChapter 18p2-4-15-16.pdfAPIMPMSChapter 18p2-4-15-16.pdf
APIMPMSChapter 18p2-4-15-16.pdf
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
 
Integration of Special Purpose Reciprocating Compressors into a Process
Integration of Special Purpose Reciprocating Compressors into a ProcessIntegration of Special Purpose Reciprocating Compressors into a Process
Integration of Special Purpose Reciprocating Compressors into a Process
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
 
RANJEET PRAJAPATI-RESUME
RANJEET PRAJAPATI-RESUMERANJEET PRAJAPATI-RESUME
RANJEET PRAJAPATI-RESUME
 
Facility Modification Requirements for Natural Gas Vehicle Maintenance
Facility Modification Requirements for Natural Gas Vehicle MaintenanceFacility Modification Requirements for Natural Gas Vehicle Maintenance
Facility Modification Requirements for Natural Gas Vehicle Maintenance
 
FCC LAB CRAC.pdf
FCC LAB CRAC.pdfFCC LAB CRAC.pdf
FCC LAB CRAC.pdf
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
 

Recently uploaded

Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Bookingtanu pandey
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall girls in Ahmedabad High profile
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 

Recently uploaded (20)

Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 

Oil & Gas Well Facility Air Quality Permitting/Registration

  • 1. Oil & Gas Well Facility Air Quality Permitting/Registrations By: Bret Gallo, Bison Engineering, Inc.
  • 2. Outline  Introduction  Potential to Emit  Registration Process  Registration Requirements  Deregistration Process  Permitting on Tribal Lands  Permitting/Registering O&G Wells in North Dakota and Wyoming  Conclusion
  • 3. Introduction  Definition of an Oil or Gas Well Facility  What is a Registration?  History of rules for MT Registrations  Who needs a MAQP/Registration?
  • 4. Oil or Gas Well Facility Defined Means a well that produces oil or natural gas. The term includes: – Equipment associated with the well and used for the purpose of producing, treating, separating, or storing oil, natural gas, or other liquids produced by the well; and – A group of wells under common ownership or control that produce oil or natural gas and that share common equipment used for the purpose of producing, treating, separating, or storing oil, natural gas, or other liquids produced by the wells.
  • 5. What is a Registration?  Option for O&G well facilities to use rather than obtaining a Montana Air Quality Permit – Follow requirements in Rule ARM Title 17, Chapter 8, Subchapter 17 (Registration of Air Contaminant Sources)* – No public notice – No BACT analysis – No need for modification fees, just a 15 day notification  The process of identifying equipment, processes, and emissions (PTE and controlled) for the DEQ according to the provisions of ARM Title 17, Chapter 8, Subchapter 17. *Note: Registration does not allow facilities to opt out of the Title V Operating Program if controlled emissions are ≥ 100 tpy or a facility emits ≥ 10 tpy single HAP or ≥ 25 tpy all HAPs.
  • 6. History of Rules  Spring of 2004: DEQ became aware many O&G well facilities exceeded the PTE threshold requiring a Montana Air Quality Permit (MAQP).  Requested operators to analyze their facilities.  January 2006: DEQ was overrun with hundreds MAQP applications for existing and proposed O&G well facilities.  April 2006: Administrative Rules of Montana (ARM) Title 17, Chapter 8, Subchapter 17, Registration of Air Contaminant Sources was finalized.
  • 7. Who needs an MAQP/Registration  Any O&G well facility constructed after 11/23/1968 – If PTE ≥ 25 tpy any criteria pollutant  Constructed prior to 11/23/1968 if a modification increases PTE ≥ 25 – More onsite equipment, recompletions, etc.
  • 8. Determining PTE What are the emitting units?  Internal Combustion Engines (ICEs) – Lifting unit engine – Recycling pump engine – Others???  Natural Gas Burners – Heater Treater (Separator) Heater  Produced Oil and Water Storage Tanks  Emergency flaring/venting  Flares/Smokeless Combustors  Vented Gas  Truck Loading Losses  Fugitive Equipment Leaks – Valves, flanges, pnumatics  Fugitive Dust Emissions (Vehicles)
  • 9. Typical O&G Well Facility
  • 11. Emission Calculation Methods for PTE  Based on max daily operational capacity – (oil, gas, and water production: previous 6 month max)  Internal Combustion Engines – 8,760 hrs and manufacturer’s guaranteed max design capacity (hp) – AP-42 factors or mfg guaranteed factors  Nat. Gas Burners – 8,760 hrs, max size of burner (Btu/hr) and AP-42 factors  Produced Oil Storage Tanks – Flashing, working, and breathing losses (accounts for +90% of total facility emissions) – E&P Tanks Version 2 Model (Recommended by both federal and state agencies)  Inputs can be high pressure oil samples, low pressure oil samples, or gas samples – Use a BTEX low pressure extended hydrocarbon analyses from produced oil  If not available, may use DEQ provided “representative” analysis from another well.
  • 12. Emission Calculation Methods Cont…..  Produced Water Storage Tanks – Tanks 4.09d (assume it is all oil) – AP-42 Chapter 7: Liquid Storage Tanks  (need physical and chemical properties) – EPA-450/3-85-001a – Volatile Organic Compound Emissions from Petroleum Refinery Wastewater Systems - Background Information for Proposed Standards  (1.95E-5 ton VOC/bbl water produced…greatly over predicts) – EPA WATER9 Program  (need physical and chemical properties)  Produced Gas – If sent to pipeline, must assume a minimum of 500 hrs/yr emergency flaring or venting – If all is flared, must assume a minimum of 500 hrs/yr emergency venting  Truck Loading Losses – Production rate and AP-42 Chapter 5.2 – Transportation and Marketing of Petroleum Liquids  Fugitive Emissions – AP-42 factors
  • 13. Requirement for Registering  Must register within 60 days of well completion date  Required controls must be installed at time of registration – Any emitting unit with a PTE ≥ 15 tpy must be controlled  Captured and sent to pipleline or combusted in flare/smokeless combustor – Federal and State required controls  Catalytic oxidizers, AFR controllers, etc.  Submit Complete Registration Form – Emissions inventory, E&P Tanks Summary, Oil and Gas samples, plot plan, and map – Currently $500 fee  Ambient air quality analysis (if H2S is detected) – Demonstrate compliance with H2S and SO2 standards  SCREEN3 can be used, lower standards….maybe AERMOD??
  • 14. General Requirements Emissions Control:  Pipeline or flare control (≥95%) if over 15 tpy emitted  Loading/unloading using submerged fill  Rich Burn Engines > 85 hp: NSCR  Lean Burn Engines > 85 hp: O-Catalyst Inspection & Repair  Inspect monthly  Repair within 5 days  Shut down after 15 days and repair Recordkeeping/Reporting  Monthly inspection reports  Keep for 5 years
  • 15. Deregistration Process Typically due to decline in facility production  Must submit full emissions evaluation – Same methods of calculation at original registration – Must use a BTEX low pressure oil extended hydrocarbon analysis from the deregistered facility, not a “representative” analysis  Must be no older than 3 years – No fee to deregister a facility