SlideShare a Scribd company logo
1 of 105
Download to read offline
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
1
“An alternative approach towards Costing of denim jeans for Buying House / Export House”
Graduation Project submitted in Partial Fulfilment of the requirements
For the degree of
Bachelor of Fashion Technology (Apparel Production)
NATIONAL INSTITUTE OF FASHION TECHNOLOGY, MUMBAI
Industry Mentor: Mr. Sanjay Achrekar (General Manager, Katmandu Apparel Pvt. Ltd., Mumbai)
College Mentor: Mr. Ranjan K. Saha (Course Co-ordinator, Department of Fashion Technology, NIFT)
Manish Singh Dhakad
M/BFT/10/11
Semester: VIII
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
2
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
3
PREFACE
The “Bachelor of Fashion Technology” programme is well structured and integrated
course of NATIONAL INSTITUTE OF FASHION TECHNOLOGY. The main objective
of B.F.Tech. Programme is to develop skill in student by supplement to the
theoretical study of apparel mass-production. Textile internship helps to gain real life
knowledge about the industrial environment and business practices. B.F.Tech.
programme provides student with a fundamental knowledge of business and
organizational functions and activities, as well as an exposure to strategic thinking of
management.
In every professional course, training is an important factor. Professors give us
theoretical knowledge of various subjects in the college but we are practically
exposed of such subjects when we get the training in the organization. It is only the
training through which I come to know that what an industry is and how it works. I
can learn about various departmental operations being performed in the industry,
which would, in return, help us in the future when I will enter the practical field.
During this whole training I got a lot of experience and came to know about the
practices in real that how it differs from those of theoretical knowledge and the
practically in the real life.
In today‟s globalized world, where cut-throat competition is prevailing in the market,
theoretical knowledge is not sufficient. Beside this one need to have practical
knowledge, which would help an individual in his/her carrier activities and it is true
that
“Experience is best teacher”.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
4
ACKNOWLEDGEMENT
With immense pleasure, I would like to present this report as a part of my Graduation
Project on "Development of company specific costing model for buying house
merchandising". It has been an enriching experience for me to undergo this project,
which would not have possible without the goodwill and support of the people
around. As a student of National Institute of Fashion Technology, Mumbai I would
like to express my sincere thanks to all those who helped me during this period.
I feel my pleasure to extend my sincere thanks and gratitude to my college mentor
Mr. Ranjan k. Saha, (Course-Co-ordinator, DFT, NIFT) & industry mentor Mr. Sanjay
Achrekar, General Manager (KAPL-Mumbai) who genuinely played his role in right
from planning, project framework to guiding me through this project.
I would also like to thank Mr. Lokesh Gutta, Manager (Production & operation) of
Katmandu Apparel Private Limited who gave me all the required information
related to apparel production.
Not to forget, I am also thankful to Mr. Kiran Ramakant Temkar (Director) & Mrs.
Manisha kiran Temkar (CEO) who was quite helpful in providing different facilities
during the project period.
Mr. Mahesh Khopkar, Mr. Jude James, Mr. Sameer Gandhi, Mr. Gautam Kamble,
Mr. Dharmesh Jain, Mrs. Tejal Pallan & Carmen Katke of KAPL also lend their
helping hands in making me understand merchandising concepts & Costing
parameters involved in the process.
I am also grateful to all the HODs and Miss. Vijeshri Kolbekar who led my way and I
am extremely thankful for the help and support of the staff and employees of
Katmandu Apparel Private Limited without which I could not make my project this
much successful.
Here comes the time to say my thanks to my institute NIFT which provided me
this golden opportunity. At last but not the least I‟d like to thank my seniors and
classmates who helped me directly or indirectly through their valuable suggestion.
However, I accept the sole responsibility for any possible error of omission
and would be extremely grateful to the readers of this project report if they bring such
mistakes to my notice.
MANISH SINGH DHAKAD
M/BFT/10/11
NIFT, MUMBAI
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
5
ABSTRACT
Sourcing operations in Garment Buying House are extremely complex due to
the intricacies of a global supply chain. Sourcing decisions should not be made
without an exhaustive analysis of cost structures of resources required for
production. FOB & Landed costs must be analysed for sourcing decisions, but they
must be complemented by information of the effects of supplier lead times and
consumer-retail interactions, which are critical to overall supply chain performance.
To do perfect garment costing, one must know about all these activities
thoroughly about their costs, procedures, advantages and risk factors. Also he must
know how to solve the problems when occurred and to take suitable alternate
decision immediately in time. We must be aware that there are always fluctuations in
the costs of raw materials and accessories, charges of knitting, processing, finishing,
sewing and packing, charges of transport and conveyance. Hence we must have
update knowledge about the latest prices and charges, latest procedures, methods
and quality systems, market prices and availability, transportation (road, sea, air) and
freight charges, etc.
An alternative approach towards Costing of denim jeans in a specific Buying
House has been developed in this study. The model looks at cost structures for the
entire supply chain from raw material sourcing to export of finished goods. The cost
model shows the accrual of costs throughout each processing step within the textile
and apparel industry. It also identifies costs related to international trade, including
transportation costs and other different types of cost.
The study examines the supply chain processes and costs for producing
denim jeans in Asian region of the world. Trade agreement duty provisions, world
cotton market price competitiveness, export tax rebates, and labour rates
significantly affect a countries‟ competitiveness in the textile and apparel industry.
The study helps identify the cost makeup of each process and the resources
consumed.
This model can assist companies to look outside their area of operation and
have an appreciation of costs related to upstream and/or downstream processes
within their supply chain. They can identify broad issues related to their strategic
partnerships with suppliers and customers and investigate these in more detail. By
combining supply chain costs, transportation time, and manufacturing
responsiveness, analyses can be performed to identify scenarios where
responsiveness is more critical than cost effectiveness. This study has found that a
responsive supply chain can outweigh a lower cost but less responsive supply chain
in certain sourcing environments.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
6
TABLE OF CONTENTS
1. INTRODUCTION ......................................................................................................................... 7
1.1. NEED OF THE PROJECT.............................................................................................................. 8
1.2. PROBLEM FORMULATION ........................................................................................................ 9
1.3. IDENTIFICATION OF TOPIC/DEVELOPMENT OF RESEARCH PROPOSAL .................................11
1.4. OBJECTIVE & SUB-OBJECTIVE OF THE PROJECT .....................................................................13
2. REVIEW OF LITERATURE .........................................................................................................14
2.1. COST, COSTING & COST ACCOUNTING ..................................................................................15
2.2. CLASSIFICATION OF COST ON DIFFERENT BASIS ....................................................................15
2.3. ESSENTIALS OF GOOD COSTING SYSTEM ...............................................................................18
2.4. RESEARCH JOURNAL ABSTRACT..............................................................................................18
2.5. COST CALCULATION SOFTWARES AVAILABLE IN MARKET .....................................................20
2.6. COST COMPONENTS ANALYSIS ..............................................................................................21
2.7. COST CALCULATIONS FORMULAS ..........................................................................................22
2.8. DIFFERENT PRICES OF RAW MATERIAL & LABOUR IN MARKET .............................................23
3. METHODOLOGY.......................................................................................................................25
3.1. QUANTITATIVE RESEARCH ......................................................................................................26
3.2. QUALITATIVE RESEARCH.........................................................................................................27
3.3. DATA COLLECTION METHOD ..................................................................................................27
3.4. REPRESENTATION OF DATA ANALYSIS....................................................................................28
3.5. STEPS OF METHODOLOGY ......................................................................................................29
3.6. WEEKLY TIME AND ACTION CALENDER ..................................................................................31
4. DATA COLLECTION & ANALYSIS .............................................................................................32
5. RESULT & EXPECTED OUTCOME ............................................................................................98
6. LIMITATIONS & FUTURE SCOPE OF PROJECT ......................................................................100
7. CONCLUSION .........................................................................................................................102
8. BIBLIOGRAPHY.......................................................................................................................104
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
7
CHAPTER-1
INTRODUCTION
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
8
1. INTRODUCTION:-
I conducted my Graduation Project at KATMANDU APPAREL PRIVATE
LIMITED, MUMBAI from 20 January 2014 to 20 May 2014. During my course of
project, I tried to understand the concepts of garment costing, starting from the
concept sample to the bulk production. I tried to imply the knowledge I have gained
through various Merchandising, Costing & production related subjects I have been
taught at NIFT and from all the knowledge I have gained at our institute and here at
KATMANDU APPAREL PVT. LTD.; I have tried to document it here with my best
efforts.
1.1 NEED OF THE PROJECT:
The Indian textile and apparel industry is very large and diverse,
employing 35 million people and accounting for 27 per cent of the country's
exports. The apparel industry plays a pivotal role as a key driver of the
national economy and has grown to be the most significant contributor to the
country's economy over nearly three decades of its existence.
The industry recorded a remarkable growth in a protected market
environment; it faces a series of challenges notably in areas such as:
 Price competitiveness.
 Faster lead times.
 High raw material base.
 Full service offering.
 Access to market. "A Cost is the value of economic resources used as
a result of producing or doing the things costed".
In order to achieve perfect garment costing, one must know about all
the activities including purchase of fabrics, sewing, packing, transport,
overheads, etc. & one must know about all these activities thoroughly about
their costs, procedures, advantages and risk factors. Also he must know how
to solve the problems when occurred and to take suitable alternate decision
immediately in time.
We must be aware that there are always fluctuations in the costs of raw
materials and accessories, charges of knitting, processing, finishing, sewing
and packing, charges of transport and conveyance. Hence we must have
update knowledge about the latest prices and charges, latest procedures,
methods and quality systems, market prices and availability, transportation
(road, sea, air) and freight charges, etc.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
9
We must remember that the quality depends on price; price depends
on quality. Each product will have different price according to its quality. We
do not manufacture only one quality of garments. Also we manufacture the
garments not only for one customer. While we do the garment costing, the
customer‟s price level, quality & quantity and payment terms, to be taken into
consideration.
1.2 PROBLEM FORMULATION:
1.2.1 INITIAL IDEA
Simplification of Costing of Denim Jeans during concept sample
development stage to generate value for research & development in
new technology by development of cost calculation system.
1.2.2 RESEARCH PROBLEM
During Costing process at the garment sampling stage, there
are certain variances that are not taken into consideration because of
its negligible effect during the production stage; there is a random
variation in costing from concept development stage to production
stage (usually a bit higher). The main problems here in Costing are
given below-
a. Standard operating procedures not followed
b. No fix cost for value added service (embroidery, printing etc.)
c. No check-points for cost components factors (stretch,
Shrinkage etc.)
d. No Calculation of trims (sewing threads etc.) for optimizes
sourcing procedure.
e. A department like sampling takes more time than the usual
because of absence of Research & Development.
1.2.3 OBJECTIVE OF RESEARCH
To develop an alternative approach towards costing of denim
jeans with extrapolation of existing methods which will try to reduce
cost & generate value for investment for Research & Development in
new technical machinery.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
10
1.2.4 APPROCH ADOPTION TO METHODOLOGY
INITIAL IDEA
BACKGROUND
STUDY
REFINEMENT OF
IDEA & PROBLEM
FORMULATION
REVIEW OF
LITERATURE
DESIGN &
DEVELOPMENT
OF
METHODOLOGY
DATA
COLLECTION &
ANALYSIS
EXPECTED
OUTCOME
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
11
1.3 IDENTIFICATION OF TOPIC / DEVELOPMENT OF RESEARCH PROPOSAL:
Project Title: An alternative approach towards Costing of denim
jeans for Buying House Merchandising.
Company Name: Katmandu Apparel Private Limited, Mumbai
Student Name: Manish Singh Dhakad (M/BFT/10/11)
Industry Mentor: Sanjay Archrekar, General Manager,
Kathmandu Apparel Private Limited, Mumbai
College Mentor: Ranjan Kumar Saha, Course-Coordinator
Department of Fashion Technology,
National Institute Of Fashion Technology
Project Idea: Simplification of Costing of Denim Jeans during
concept sample development stage to generate
value for research & development in new
technology by development of cost calculation
system.
Problem Statement: • During costing process at the garment sampling
stage, there are certain variables that are not &
taken into consideration because of its negligible
effect during the production stage, hence there is a
random deviation in the costing from sampling
stage to production stage.
• This project will help the company to find various
dependent variables in garment costing to
minimize the deviation in costing & to find
accuracy in costing at Research & development
stage by involving those variables which are not
there in past researches and previously developed
application/software.
Objective: To develop an alternative approach towards
costing of denim jeans with extrapolation of
existing methods which will try to reduce cost &
generate value for investment for Research &
Development in new technical machinery.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
12
Proposed Methodology: Extrapolation of the existing costing procedure
keeping in mind the changes going to incur to
develop an alternative approach towards costing of
denim jeans which can ensure maximum accuracy
in costing without significant monetary loss. Study
the basic costing at the acceptance stage of the
order and compare it with the production costing, if
there is variance then pinpoint the areas which
were regularly wrongly costed and how this new
system can help to recognise such areas. Find the
cost profitability & cost savings to generate value
for investment for R&D.
Team/Resources: • Style Study to understand flow of company
• People: Accountant, Merchandiser, Production
manager, Buyer, Faculty Members
• Subjects: Costing of Apparel products, Fashion
Merchandizing, RDBMS, Garment Construction,
ERP, Textile & Apparel Internship
• Location: Katmandu Apparel Pvt. Ltd., Dadar,
Mumbai
• Support & Outside Services: Application based
support for software demo.
Expected Outcome: a.) A new way of calculating cost in less time
which will enable us to manage the order flow at
lower margin and to quote the best price to buyers.
b.) Technical enhancement in R&D from total cost
savings & profit margins of company.
Related Documents: (Background Study)
• Costing Techniques in Clothing Industry,
Indian Textile Journal, May, 2009
• Methods of Garment Costing,
Indian Textile Journal, November, 2013
•Factors influencing costing of Woven Fabric,
Indian Textile Journal, January, 2009
•Merchandizing Costing,
Textile Today, Published August, 2013
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
13
1.4 OBJECTIVE OF THE PROJECT:
The objectives of graduation project is firstly to gain practical exposure and
secondly application of knowledge on real life projects and/or assignments.
This graduation project is aimed towards blending the class room principles
with industry application. This project also helps students to learn and improve
their interpersonal communication skills with colleagues, peer group and workers.
The main Objective of this Graduation Project is -
“To develop an alternative approach towards costing of denim jeans
with extrapolation of existing methods which will try to reduce cost &
generate value for investment for Research & Development in new
technology & machinery.”
1.4.1 SUB-OBJECTIVE OF THE PROJECT
Sub-objectives of the project will be all the secondary objectives which
are required for achieving Primary or main objective of the research.
 To find dependent and independent factors of costing which are
not there in past researches & previously developed
applications.
 To minimize the deviation in costing from concept development
stage to production stage for accuracy in Costing.
 To find Cost profitability in implementing new software, this will
also reduce lead time, labour & Cost.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
14
CHAPTER-2
REVIEW OF LITERATURE
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
15
2. REVIEW OF LITERATURE:-
A review of literature may be a self-contained unit -- an end in itself -- or a
preface to and rationale for engaging in primary research. A review is a required
part of research proposals and generally, the purpose of a review is to analyze
critically a segment of a published body of knowledge through summary,
classification, and comparison of prior research studies, reviews of literature, and
theoretical articles or Journals.
2.1 COST, COSTING & COST ACCOUNTING:
Cost can be defined as the expenditure incurred on or attributable to a
given thing. Cost is the amount of resources used for something which must
be measured in terms of money.
Costing is the techniques and processes of ascertaining costs. The
techniques to be followed for the analysis of expenses and the processes of
different products or services differ from industry to industry. The main object
of costing is the analysis of financial records, so as to subdivide expenditure
and to allocate it carefully to selected cost centres, and hence to build up a
total cost for the departments, processes or jobs or contracts of the
undertaking.
Cost Accounting primarily deals with collection, analysis of relevant of
cost data for interpretation and presentation for various problems of
management. It is defined as, „the establishment of budgets, standard costs
and actual costs of operations, processes, activities or products and the
analysis of variances, profitability or the social use of funds‟.
(Source: Managerial and Cost Accounting_2009
Larry M. Walther, Christopher J. Skousen, Free book by Bookboon.com)
2.2 CLASSIFICATION OF COST ON DIFFERENT BASIS
2.2.1 On the Basis of Time:
a. Historical Costs: These costs are ascertained after they are
incurred. Such costs are available only when the production of a
particular thing has already been done.
b. Pre-determined Costs: These costs are calculated before they
are incurred on the basis of a specification of all factors affecting
cost. Such costs may be:
(i) Estimated costs: Costs are estimated before goods
are produced; these are naturally less accurate than
standards.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
16
(ii) Standard costs: This is a particular concept and
technique. This method involves:
2.2.2 On the basis of Nature of Elements:
There are three broad elements of costs which can be illustrated
by the following chart:
2.2.3 On the basis of Association with the Product:
a. Product Costs: Product costs are those which are traceable to
the product and included in inventory values. In a manufacturing
concern it comprises the cost of direct materials, direct labour
and manufacturing overheads.
b. Period Costs: Period costs are incurred on the basis of time
such as rent, salaries, etc., include many selling and
administrative costs essential to keep the business running.
Though they are necessary to generate revenue, they are not
associated with production; therefore, they cannot be assigned
to a product.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
17
2.2.4 On the basis of Functionality:
A company performs a number of functions. Functional costs
may be classified as follows:
a. Manufacturing/production Costs: It is the cost of operating the
manufacturing division of an undertaking.
b. Administration Costs: They are indirect and covers all
expenditure incurred in formulating the policy, directing the
organisation and controlling the operation of a concern, which
is not related to research, development, production, distribution
or selling functions.
c. Selling and Distribution Cost: Selling cost is the cost of seeking
to create and stimulate demand e.g. advertisements, market
research etc. Distribution cost is the expenditure incurred
which begins with making the package produced available for
dispatch and ends with making the reconditioned packages
available for re-use e.g. warehousing, cartage etc.
d. Research and Development Costs: They include the cost of
discovering new ideas, process and products by experiment and
implementing such results on a commercial basis.
e. Pre-production Cost: When a new factory is started or when a
new product is introduced, certain expenses are incurred. There
are trial runs. Such costs are termed as pre-production costs
and treated as deferred revenue expenditure.
2.2.5 On the basis of behaviour:
Costs can also be classified according to their behaviour.
a. Fixed Costs
b. Variable Costs
c. Semi-variable Costs
(Source: Study material: Executive programme
Cost and Management Accounting (Module-1, Paper-2)
The Institute of Company Secretaries of India
In Pursuit of Professional Excellence, Statutory body under an Act of Parliament
ICSI House, 22, Institutional Area, Lodi Road, New Delhi- 110003
Class notes (Sem-VI) : Costing of Apparel Products
By- Rengini Chandramohan (Associate Professor))
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
18
2.3 ESSENTIALS OF GOOD COSTING SYSTEM:
For availing of maximum benefits, a good costing system should
possess the following characteristics.
 Costing system adopted in any organization should be suitable to its
nature and size of the business and its information needs.
 A costing system should be such that it is economical and the benefits
derived from the same should be more than the cost of operating of the
same.
 Costing system should be simple to operate and understand.
Unnecessary complications should be avoided.
 Costing system should ensure proper system of accounting for
material, labour and overheads and there should be proper
classification made at the time of recording of the transaction itself.
 Before designing a costing system, need and objectives of the system
should be identified.
 The costing system should ensure that the final aim of ascertaining of
cost as accurately possible should be achieved.
(Source: Intermediate (Group-II, Paper-8) Cost and Accounting management
The institute of Cost Accountants of India,
12, Sudder Street, KOLKATA- 700016)
2.4 RESEARCH JOURNALS ABSTRACT
Costing is a very complex procedure, with set patterns and guidelines
followed by the industry, and it is difficult to find out costs for every processes
there are some inbuilt costs while costing, elaborate Saroj Bala and Tripti
Gupta.
About 65 - 70% cost of the garment is the cost of the fabric and hence,
it is very crucial to get the right cost of the fabric from fabric manufacturers
and suppliers. Garment manufacturers struggle to get the best possible cost
of the fabric. It would be interesting to know the important points to consider
for getting a comprehensive understanding of costing. Costing seems to be a
complex exercise as it depends on a number of variables.
What are the costs to consider…?
i) Direct cost: Cost of raw material -- 66%. Cost of size and chemicals -
4%. Production cost comprising of running the machine, maintenance, power
fuel, humidification and other utilities -- 8 % and worker wages and salaries --
8% losses incurred due to shrinkage, wastage, grading, and also selling
commissions.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
19
ii) Indirect cost: Interest on investment, loan, working capital,
depreciation, etc. Above 7%, overheads and administrative expenses like
travelling, telephone, couriers, legal issues, taxes comprising of 7%.
iii) Profit: 10 - 20% depending on the order size. In some companies,
70% of the fabric cost will comprise of direct cost, but in corporate selling only
40% cost of the fabric is direct cost and 60% is overheads.
What are the factors which affect the cost …?
Type of raw material
Amount of raw material or GSM of the fabric
Sizing and Chemicals Cost
Production cost or cost of weaving process
Mill-made or power loom made
Wastage and shrinkage
Dyeing costs
Length & Width of fabric
Shade %
Class of dye and quality
Colour
Weight of the fabric
Finishing cost
Shrinkage and wastage
Export terms & Conditions
(Source: Ms Saroj Bala, Associate Professor & Mrs Tripti Gupta, Assistant Professor
Pearl Academy of Fashion, New Delhi
Factors influencing costing of Woven Fabric
Indian Textile Journal, January, 2009)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
20
2.5 COST CALCULATION SOFTWARES AVAILABLE IN MARKET
MerchanNet 6.08 (Cost: $599.00USD)
Software for garment, clothing, apparel, leather, footwear, bags,
luggage, socks, hats, necktie manufacturer, export trading company and
factory in soft line products.
CostingNet 4.38 (Cost: $249.00USD)
CostingNet is used to create a detail product costing sheet. Best for
factory or manufacturer in industry like garment, clothing, apparel, toys, home
textiles, giftware, premium goods, household product, footwear, bags,
luggage, plastic products, electrical & electronics, travel and sporting goods.
SampleNet 4.28 (Cost: $249.00USD)
SampleNet is used to manage all the sample development activity for
your merchandising department. It generates sample orders with YY, trim
parts and size spec., sample invoices, customs invoice, sample history report
and sample status report in different grouping.
(Source: www.softmenu.org
www.ibuyer.hk)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
21
2.6 COST COMPONENTS ANALYSIS
Direct Material:
Fabric Shell (Consumption, Rate, Unit of measurement, Quantity)
Fabric lining (Consumption, Rate, Unit of measurement, Quantity)
Fabric Pocketing (Consumption, Rate, Unit of measurement, Quantity)
Trims & accessories
(Consumption, Rate, Unit of measurement, Quantity)
All sewing trims are taken into consideration like Buttons,
Zipper, Label, Rivet, Velcro, Twill tape, Studs, Hanger, and
Polybags etc. except packaging trims like Carton boxes & stick
tapes.
Direct Labour: (Average manufacturing cost is taken from factory)
Cut, Make (Rate, UOM, Quantity)
Packaging charges (Rate, UOM, Quantity)
Direct expenses: (Average manufacturing cost is taken from factory)
Washing (Rate, UOM, Quantity)
Heat Seal (Rate, UOM, Quantity)
Print (Rate, UOM, Quantity)
Embroidery (Rate, UOM, Quantity)
Profit margin are added as per Buyer`s requirement of Quality,
Quantity & Lead-time.
(Source: Basic Cost sheet and Quotation sheet,
Katmandu Apparel Private Limited)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
22
2.7 COST CALCULATIONS FORMULAS
Warp Cost (cost per yard) =
[{ } ]
Weft Cost (cost per yard) =
[{ } ]
Warp weight =
Weft weight =
Fabric cost = [warp weight × warp yarn cost × weft weight × weft
yarn cost]
Cutting labour cost =
Finishing labour cost =
Cost per minute =
CM cost = SAM of garment x minute cost of labour / line efficiency
Efficiency for styles =
Labor cost (salary paid) = SMV x Labour cost per minute
CM = cutting cost + sewing cost + finishing cost
(Source: www.ocs.com (Online Clothing Study)
Class notes-NIFT (Sem-VI-B.F.Tech.) : Costing of Apparel Products
By- Rengini Chandramohan (Associate Professor))
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
23
2.8 DIFFERENT PRICES OF RAW MATERIAL, LABOUR & OTHER
SERVICES IN MARKET
Cotton seed price: 2.52 Yuan per ton (china)
Seed cotton price: 8.93 Yuan per ton (china)
Cotton Price:
S.No. Month US Cents per pound
1 July 2013 92.62
2 Jun 2013 93.08
3 August 2013 92.71
4 September 2013 90.09
5 October 2013 89.35
6 November 2013 84.65
7 December 2013 87.49
8 Jan 2013 87.21
*Cotton with seed = 3 × cotton without seed
Labour cost in different manufacturing countries by ILO in USD
per hour:
Asian competitors:
S.No. Country USD per hour
1. Bangladesh 0.22
2. Cambodia 0.33
3. Pakistan 0.37
4. Vietnam 0.38
5. Srilanka 0.43
6. Indonesia 0.44
7. India 0.51
8. Remote inland area
China
0.55 - 0.80
9. Other costal & core area
China
0.86 - 0.94
10. Prime costal area China 1.08
11. Malaysia 1.18
12. Thailand 1.29-1.36
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
24
US region supplier:
S.No. Country USD per hour
1. Mexico 2.54
2. Honduras 1.72 - 1.82
3. Dominican Republic 1.55 - 1.95
4. Haiti 0.49 - 0.55
5. US 14.10
African region supplier:
S.No. Country USD per hour
1. Turkey 2.44
2. Morocco 2.24
3. Russia 1.97
4. Tunisia 1.68
5. Bulgaria 1.53
6. Jordan 1.01
7. Egypt 0.83
Energy rates:
S.No. Country USD per kilo watt hour
1. China 0.1000
2. Colombia 0.1070
3. Guatemala 0.1600
4. India 0.1120
5. US 0.0630
6. Vietnam 0.0550
*Water rates, steam, other cost can also be added.
Duty Rates:
S.No. Country Duty % Rebate %
1. China 16.5 15
2. Colombia 16.5 0
3. Guatemala 0 0
4. India 16.5 0
5. US 0 0
6. Vietnam 16.5 0
(Source: International Labour Organisation, ILO)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
25
CHAPTER-3
METHODOLOGY
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
26
3. DESIGN AND DEVELOPMENT OF METHODOLOGY
3.1 Quantitative Research
3.1.1 Descriptive and interpretive approaches to qualitative research
(What
is
the
current
situation?)
Descriptive research seeks to describe the current status of an
identified variable or phenomenon. The researcher does not usually
begin with an hypothesis, but is likely to develop one after collecting
data. Analysis and synthesis of the data provide the test of the
hypothesis. Systematic collection of information requires careful
selection of the units studied and measurement of each variable in
order to demonstrate validity.
3.1.2 Correlation analysis approach
(What
is
the Possible cause?)


Correlational research attempts to determine the extent of a
relationship between two or more variables using statistical
data. Relationships between and among a number of facts are sought
and interpreted to recognize trends and patterns in data, but it does not
go so far in its analysis to establish cause and effect for them. Data,
relationships, and distributions of variables are observed only.
Variables are not manipulated; they are only identified and are studied
as they occur in a natural setting.
*Sometimes correlational research is considered a type of descriptive
research, and not as its own type of research, as no variables are
manipulated in the study.
3.1.3Causal-Comparative/Quasi-Experimental
(What
was
the
cause?)
Causal-comparative/quasi-experimental research attempts to
establish cause-effect relationships among the variables. These types
of design are very similar to true experiments, but with some key
differences. An independent variable is identified but not manipulated
by the experimenter, and effects of the independent variable on the
dependent variable are measured. The researcher does not randomly
assign groups and must use ones that are naturally formed or pre-
existing groups. Identified control groups exposed to the treatment
variable are studied and compared to groups who are not.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
27
3.2 Qualitative Research
3.2.1 Historical
 (What
was
the
situation?)
 Description
of
past
events,
problems,
issues,
facts
 Data
gathered from written or oral descriptions of past events,
artifacts, etc.
 Describes
what
was
in
an
attempt
to
reconstruct
the
past involves
much interpretation
of
events
and
its
influence
on
the
present

 

3.2.2 Grounded Theory (What is grounded theory?)
Grounded theory is probably applied less often in business
research than is either phenomenology or ethnography.
Grounded theory represents an inductive investigation in which the
researcher poses questions about information provided by
respondents or taken from historical records. The researcher asks the
questions to him or herself and repeatedly questions the responses to
derive deeper explanations. Grounded theory is particularly applicable
in highly dynamic situations involving rapid and significant change.
3.2.3 Ethnography (what is self-Observation?)
Ethnography represents ways of studying cultures through
methods that involve becoming highly active within that culture.
Participant Observation involved in ethnography approach means the
researcher becomes immersed within the culture that he or she is
studying and draw data from his or her observation.
(Source: http://www.weber.edu, http://www.bcps.org/ and
CHAPTER 7 QUALITATIVE RESEARCH TOOLS_ http://www.cengage.com/)
3.3 Data collection method:
3.3.1 Primary Data: Extrapolation of Past records, Company Cost
sheets, ERP Software Database, Different Directories of fabric, Trims & other
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
28
Costs. Demonstrations of different cost effective software, Sourcing
Department Records. Analysis of existing system.
3.3.2 Secondary Data: Available researches on costing, Textile
Journals and Books available in Resource Center, Related Internet websites
and previously developed application available on web. Class room Study
Material & Internship reports.
3.4 Representation of data analysis:
3.4.1 Brainstorming:
Brainstorming works by focusing on a problem, and then
deliberately coming up with as many solutions as possible and by pushing the
ideas as far as possible. One of the reasons it is so effective is that the
brainstormers not only come up with new ideas in a session, but also spark off
from associations with other people's ideas by developing and refining them.
 No criticism
 Welcome unusual ideas
 Quantity Wanted
 Combine and improve ideas
3.4.2 Check-sheet (Defect concentration diagram)
A check sheet is a structured, prepared form for collecting and
analyzing data. This is a generic tool that can be adapted for a wide variety of
purposes.
3.4.3 Histogram:
A graphical representation, similar to a bar chart in structure,
that organizes a group of data points into user-specified ranges. The
histogram condenses a data series into an easily interpreted visual by taking
many data points and grouping them into logical ranges or bins.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
29
3.5 Steps of methodology:
To develop an alternative approach towards costing of denim jeans
with extrapolation of existing methods which will try to reduce cost & generate
value for investment for Research & Development in new technical
machinery.
3.5.1 To find dependent and independent factors of costing which are
not there in past researches & previously developed
applications.
 Study the Company flow process & Job of Costing merchant.
 Study the Cost related Journals and Researches for finding
variables.
 Brain-storming for developing check-sheet of Material & Labour
requirement.
 Collection of Check-sheet data of any concept sample for
correction & Improvisation.
 Differentiate dependent & independent factors for each entity.
 Find advantages & disadvantages of including different
dependent & independent variables.
3.5.2 To minimize the deviation in costing from concept development
stage to production stage for accuracy in Costing.
 Study of detailed Costing process & Cost components for
effective Sourcing procedures.
 Study of all Costing formulas in detail for accuracy in Costing.
 Development of cost-sheet formats & other cost absorption
formats in detail.
 Customization of thread calculator as per the company product
type for effective thread consumption calculation.
 Collect data for costing of samples & costs which are followed
by the company during concept sampling stage including
wastages & profit margins to develop cost sheet for a particular
season.
 Compare cost and find variance & total cost savings.
 Develop charts for the total trends followed in fabric prices.
 Calculation of reverse cost for fabric from the data available on
different resources for analysis of increment of cost during a
period & for effective sourcing negotiation.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
30
3.5.3 To find Cost profitability in implementing new software, this will
also reduce lead time, labour & Cost.
 Study of present software used & find advantages &
disadvantages of the system.
 Enquiry, testing and demo of the new software for cost savings
in man-power, time and overheads.
 Comparison of cost profitability in implementing new system.
 Suggestion of new machinery implementation in research and
development from the total cost savings for the future scope of
the research.
 Reasons for investment in technological upgradation.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
31
MONTH(Week)
TOPIC1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th
1DevelopmentofConceptforGP
2IdentificationofTopic
3DevelopmentofResearchProposal
4Studyofcompanyflowprocess
5LiteratureStudy
6BackgroundStudy
7Design&DevelopmentofMethodology
8JobofCostingmerchant
9Studyallcostingformulaindetailforaccuracyincosting
10UnderstandtheCostingprocess&costcomponents
11Developformatsofformsandcheck-sheet
12DevelopformatforCost-sheet
13MidtermReview&Analysisoffeedback
14ExecutionandFieldWork
15DataCollectionandAnalysis
16Developnewcostsheetforconceptsamples
17Studyofconceptdevelopmentsampleforcosting
18Findalldependentandindependentvariables
19Differentiatedependentandindependentfactors
20Datacollectionofstylesforcheck-sheetdirectory
21Findthemarginvariancebetweenquotationofdifferentstyles
22Findadvantagesanddisadvantagesofincludingdependentandindependentvariables
23Findtotalcostsavingsandmarginincrementsduringtheperiod
24Testinganddemoofthenewsoftwareforcostsavingsinman-power,timeandoverheads
25Comparisonofnewapplicationimplementation
26Enquiryofnewmachineryimplementationinresearchanddevelopment
27Thefuturescopeoftheresearch
28ReportWriting
WEEKLYTIMEANDACTIONCALENDER
S.No.
JANUARYFEBRUARYMARCHAPRIL
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
32
CHAPTER-4
DATA COLLECTION &
ANALYSIS
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
33
4.1 To find dependent and independent factors of costing which are not there
in past researches/Journals/Literature & previously developed applications.
4.1.1 Study the Company flow process & Job of Costing merchant.
a) Company flow process of Katmandu Apparel Pvt. Ltd.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
34
b) Job of Costing Merchant:
 Develop standard costs.
 Determine the cost of purchased or manufactured products/services.
 Analyze the variance between costs and standard costs.
 Interact with Production Control to ensure Bills of Materials (BOM) are
accurate and up to date. Review and audit BOM‟s to ensure they
reflect the latest manufacturing practices.
 Analyze actual labor, material, and overhead cost against
standard/Budget.
 Work with the finance department to implement and apply cost
accounting policies and procedures.
 Support Controller‟s efforts for implementing and maintaining internal
controls for operations, sales, engineering, and finance.
 Development of new labor and overhead rates, budget, and forecasts.
(Manufacturing Cost Analyst Job Description, http://www.lewmar.com
Main Duties of Cost Analyst, http://www.jobwings.com)
4.1.2 Study the Cost related Journals and Researches for finding variables.
(
(Source: Factors influencing costing of Woven Fabric,
Indian Textile Journal, January, 2009)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
35
4.1.3 Brain-storming for developing check-sheet of Material & Labor
requirement.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
36
4.1.4 Collection of Check-sheet data of any concept sample for correction &
Improvisation.
Cost_idSM_23_01SM_23_02SM_23_03SM_23_04SM_23_05
Productpackageno.82644
Styleno.KAG_82644
Referenceno.CF14_82644
CollectionSkinnyJeans
SeasonFall2014
ProductGroupDenimJeans
BrandJCP
CategoryChildrens
MaterialWear
BuyerDenim
FactoryJessicaMarple
ProductDescriptionKAG
FabricsupplierAZG(DCM)-SkinnyJeans
AssignedIBOIndia
CostingForSupplier
SizesRegular
FinishDestructive,rinse,Rock
washDestructive,rinse,Rock
DesignerSgill19
StylelineBottomWear
CostingremarkDevelopmentStage
CurrencyforcostingUSD-INR
HandledbyManishDhakad
UOMperGarment
TradetermFOB
STYLEDETAILSBREAKDOWN
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
37
Cost_id
Fabric For Shell_1 Shell_2 Pocketing
Mill Reference_id KAG-13-391 KAG-13-1091 poly-cotton
Buyer Reference_id
Supplier
Fabric Type Denim Denim Pocketing
Composition Cotton, Ramie, Poly, Spandex Cotton, Ramie, Poly, Spandex Poly, Cotton
Sourcing type Yarn dyed yarn dyed Solid
UOM yds yds yds
Quantity
Quality grade
Weave Twill Twill Twill
Color Blue Blue White
Style
Yarn type Ring-spun Ring-spun Ring-spun
Loom
Country of origin China China China
Count 28x28
GSM 120
Payment terms
Shrinkage 4.5 to 8.5 4.5 to 8.5 4.5 to 8.5
Wastage
Size & chemical
Finishing
Cuttable width 57 55 57
Finished width 58/59 56/57 58/59
Dyeing type Indigo Indigo
Lead time 120 Days 120 Days 120 Days
Extra % 3-5 % 3-5 % 3-5 %
Consumption per marker
Number of garments in marker 18 18
Average consumption
SM_23_01
MATERIAL COST BREAKDOWN
Cost_id
Trim_id TS_82644_1 TS_82644_2 TS_82644_3 TS_82644_4 TS_82644_5 TS_82644_6 TS_82644_7 TP_82644_1
Trim type Stitching Stitching Stitching Stitching Stitching Stitching Stitching Packaging
Trim Description AZ Metal logo Shank-27L-6-16
Category Buttons Buttons Zipper Thread Thread Elastic Buttons
Sub-catergory Shank Rivet Metal Sewing Decorative Adjustable 4hole Plastic
Size 27L 14L 3 120-60Tkt 40Tkt 3/4inches 24L
UOM Piece Piece Piece Meter Meter Inche Piece
Price terms
Consumption
Quantity
Extra% 5 5 5 10 10 5 5
Wastage 3 3 3 3 3 3 3
Brand Arizona Arizona YKK Coats Coats Slotted Clear Plastic
Material Metal Metal Metal Cotton Cotton Spandex Plastic
Supplier
Remark/Code JAZ-086AT JAZ-083 #3 Color Contrast Slotted 4hole
Destruction Wash GY22 GY22 Antique Copper C8601 C3950 DTM Clear
Rinse Wash GY22 GY22 Antique Copper C2336 C3950 DTM Clear
Rock Wash GY22 GY22 Antique Copper A&E#45957Tan#3 C3950 DTM Clear
TRIMS COSTBREAKDOWN
SM_23_01
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
38
Cost_id
Packaging Code AZ-01-557-A CPSIA AZ-01-911-A AZ-01-920-B AZ-01-981-C BR-02-330-A 37-30-071-A
Manufacturing Overheads
Type of manufacturing
UOM Piece Piece Piece Piece Piece Piece Piece
Quanity 775000 775000 775000 775000 775000 775000 775000
Extra % 5 5 5 5 5 5 5
Packing Labeling Labeling Labeling Labeling Labeling Ticketing Ticketing
Description Center label Tracking labelWaistband labelFit label Size label Matchbook hangtag
Containers
Transportation mode
From
To
Export term
Warehousing charges
Export/import cost
Interest %
Disocunt %
MANUFACTURING, SUB-CONTRACT, PACKING & TRANSPORTATION COST BREAKDOWN
FOB (FREIGTH ON BOARD)
SM_23_01
Cost_id SM_23_01 SM_23_02 SM_23_03 SM_23_04 SM_23_05
Factory_id
Country China
Port of origin
Factory
Efficiency
Capacity
Lead time 120 Days
SAM 17 Min.
Labour cost 1.55
Cutting 0.2
Stiching 1
Finishing 0.35
Quantity 775000
UOM Piece
VAS Wash
LABOUR & WORKMANSHIP COST BREAKDOWN
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
39
Cost_idSM_23_01SM_23_02SM_23_03SM_23_04SM_23_05SM_23_06SM_23_07
Leadtime
Buildingrent
salaryofstaff
Bills
Utilities
TransportaionExpenses
Administrative
Employeewelfare
Stationary&printing
Pantry
Housekeeping
Overtime
Sales&Distribution
Profit%
R&D
Security&helpers
Training&Recruitment
Repair&Replacement
Depreciation
Newspaper&Magazines
Aftersalesexpenses
BankExpenses
Others
ADMINISTRATIVE,SALES&DISTRIBUTION,PROFIT&OTHERCOSTBREAKDOWN
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
40
4.1.5 Differentiate dependent & independent factors for each entity.
STYLE DETAILS BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Product package no.
3 Style no.
4 Reference no.
5 Collection
6 Season
7 Product Group
8 Brand
9 Category
10 Material Dependent
11 Buyer Dependent
12 Factory Dependent
13 Product Description
14 Fabric supplier
15 Assigned IBO
16 Costing For
17 Sizes
18 Finish Dependent
19 Wash Dependent
20 Designer
21 Style line
22 Costing remark
23 Currency for costing
24 Handled by
25 UOM
26 Trade term Dependent
MATERIAL COST BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Fabric For
3 Mill Reference_id
4 Buyer Reference_id
5 Supplier
6 Fabric Type Dependent
7 Composition Dependent
8 Sourcing type
9 UOM
10 Quantity Dependent
11 Quality grade Dependent
12 Weave Dependent
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
41
13 Color Dependent
14 Style
15 Yarn type Dependent
16 Loom Dependent
17 Country of origin Dependent
18 Count Dependent
19 GSM Dependent
20 Payment terms Dependent
21 Shrinkage Dependent
22 Wastage Dependent
23 Size & chemical Dependent
24 Finishing Dependent
25 Cuttable width Dependent
26 Finished width Dependent
27 Dyeing type Dependent
28 Lead time Dependent
29 Extra %
30 Consumption per
marker
31 Number of garments in
marker
32 Average consumption Dependent
TRIMS COST BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Trim_id
3 Trim type Dependent
4 Trim Description
5 Category Dependent
6 Sub-catergory Dependent
7 Size Dependent
8 UOM
9 Price terms Dependent
10 Consumption Dependent
11 Quantity Dependent
12 Wastage
13 Brand Dependent
14 Material Dependent
15 Supplier
16 Remark/Code
17 Destruction Wash Dependent
18 Rinse Wash Dependent
19 Rock Wash Dependent
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
42
LABOUR & WORKMANSHIP COST BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Factory_id
3 Country Dependent
4 Port of origin Dependent
5 Factory Dependent
6 Efficiency Dependent
7 Capacity
8 Lead time Dependent
9 SAM Dependent
10 Labour cost Dependent
11 Cutting Dependent
12 Stitching Dependent
13 Finishing Dependent
14 Quantity Dependent
15 UOM
16 VAS Dependent
MANUFACTURING, SUB-CONTRACT, PACKING &
TRANSPORTATION COST BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Packaging Code
3 Manufacturing
4 Overheads
5 Type of manufacturing Dependent
6 UOM
7 Quanity Dependent
8 Packing Dependent
9 Description
10 Containers Dependent
11 Transportation mode
From/To
Dependent
12 Export term Dependent
13 Warehousing charges
14 Interest % Dependent
15 Export/import cost
16 Disocunt % Dependent
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
43
ADMINISTRATIVE, SALES & DISTRIBUTION, PROFIT &
OTHER COST BREAKDOWN
S.No. Entity Dependent/Independent
1 Cost_id
2 Lead time
3 Building rent
4 salary of staffBills
5 Utilities
6 Transportation
Expenses
Dependent
7 Administrative Dependent
8 Employee welfare
9 Stationary & printing
10 Pantry
11 House keeping
12 Overtime
13 Sales & Distribution
14 Profit %
15 R & D
16 Security & helpers
17 Training & Recruitment
18 Repair & Replacement
19 Depreciation
20 Newspaper &
Magazines
21 After sales expenses
22 Bank Expenses
23 Others
4.1.6 Find advantages & disadvantages of including different
dependent & independent variables in Cost Accounting.
Advantages Disadvantages
Dependent variables are directly
related to the cost of the entity, as
it is directly linked to value added
service.
Independent variable helps us to
understand & create linkage to
develop directory & also for
reference purpose.
Dependent variables must be
analyzed time to time as; cost
may differ from time to time.
Independent variables are not
directly related to cost; hence
they can be used for referring
material type etc. Not for cost of
material directly.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
44
4.2 To minimize the deviation in costing from concept development stage to
production stage for accuracy in Costing.
4.2.1 Study of detailed Costing process & Cost components for
effective Sourcing procedures.
Material cost is a major cost component of garment
manufacturing costs and a correct cost calculation method will give one
a better projection of garment cost for a style, explains Vishnu Pareek.
To do perfect garment costing, one must know about all these
activities thoroughly about their costs, procedures, advantages and risk
factors. Also he must know how to solve the problems when they occur
and to take suitable alternate decision immediately in time.
There are always fluctuations in the costs of raw materials and
accessories, charges of knitting, processing, finishing, sewing and
packing, charges of transport and conveyance. Hence knowledge
update is required about the latest prices and charges, latest
procedures, methods and quality systems, market prices and
availability, transportation (road, sea, air) and freight charges, etc.
Different Costing methods include:
 Job Costing
 Batch Costing
 Contract or Terminal Costing
 Single or Output Costing
 Process Costing
 Operation Costing
 Operating Costing
 Departmental Costing
 Multiple Costing
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
45
4.2.2 Study of all Costing formulas in detail for accuracy in Costing.
Fabric Cost Breakdown: (No transportation cost involved)
1). Warp Cost (cost per yard) =
[{ } ]
(1Maund ≈ 37 Kilograms)
(1 Oz. = 28.350 grams)
(Denim⟶ 7-10 oz. & Non-denim⟶ 4-6 oz.)
2). Weft Cost (cost per yard) =
[{ } ]
(1 meter = 1.094 yards = 39.3701 inches)
(Fabric width 59" = 1.4986 meters)
3). Wastage = 7 %
4). Miscellaneous = (weaving + Electricity + Maintenance etc.)
5). Fabric weight = [warp weight + weft weight]
6). Weaving Cost per Yard = Warp cost + Weft cost +
Wastage + Miscellaneous
7). Warp weight =
8). Total ends = Fabric width X Ends per inch X Shrinkage %
(Raw Cotton yarn shrinkage = 8 - 10 %)
9). Weft weight
=
10). Fabric cost = [warp weight × warp yarn cost × weft
weight × weft yarn cost]
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
46
Price of fabric depends upon:
a) Raw material cost
b) Weaving cost
c) Processing cost
d) Yarn dyeing cost
e) Packaging cost
f) Grey checking cost
g) Excise & other duties
h) Machine & Land depreciation
i) Manpower cost (Indirect labour)
j) Power & Water cost
k) Profit
For ascertaining turns per inch:
For weft (medium) yarn = √ × 3.25
For warp (medium) yarn = √ × 3.75
GSM ∝ Ends per inch/Picks per inch/Construction ∝
GSM ∝ Cost (for same type of fabric)
Sizing cost ∝
Weight of warp per sq. meter of fabric in grams (A)
=
Weight of weft per sq. meter of fabric in grams (B)
=
GSM = Weight of weft yarn (A) + Weight of warp yarn (B)
GSM = * +
(Ounce/Sq. yard) = (GSM/33.91)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
47
General specification of denim jeans:
GSM = 200 - 400
Yarn density (Tex) = 60 - 100
Density or Count = 10 – 6
GSM = * + ×[ ]
1 Tex = weight of 1000 meter thread in grams.
Tkt. = ( )
(Rs.30) (Rs. 30) (Rs. 10per meter.)
Ginning ⟶ Roving ⟶ Yarn ⟶ weaving
(Rs. 1.5 kg) (1 kg.)
(If order >15,000-20,000 meter then Dyeing Cost lowers by Rs.1-2/-)
Price in China market:
S.No. Process Cost (USD per pound)
1 Washing fiber $ 2.75 per pound
2 Twist $ 3 per pound
3 Carding $ 2.75 per pound
4 Worsted single ply $19 per pound
Average textile processing cost:
S.No. Process Cost Percentage
1 Carding cost $ 1.373 per
pound
19-20 %
2 Filling Spinning
room cost
$ 1.26 per pound 18 %
3 Warping room
cost
$ 0.92 per pound 13 %
4 Spooling cost $0.558 per pound 8 %
5 Warping $ 0.183 per
pound
2.5 %
6 Drawing cost $ 0.239 per
pound
3.5 %
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
48
7 Web drafting $ 0.501 per
pound
7 %
8 Weaving $ 1.267 per
pound
7.5 %
9 Finishing $ 0.639 per
pound
Different types of wastes:
S.No. Item Percentage
1 Invisible loss 1.5 %
2 Sweepings 1.5 %
3 Usable waste 3-4 %
4 Card Sliver 0.5 %
5 Draw frame sliver 0.6 %
6 Speed frame 0.5 %
7 Ring frame 1.0 %
8 Roving end 0.4 %
9 Open end sliver 0.3 %
10 Combing 1 - 1.5 %
11 Waste overall 3-4 % (seeds)
12 Trash 15 % (depending upon
geographical location)
13 Doff conditioning 1-1.5 %
14 Poly Spandex 6-12 % (weaving
performance 100-130 %)
15 Warping & Weaving waste 2-3 %
16 Waste shrinkage 1-1.5 %
17 Value loss 7 % in running cotton
18 3 % in running polyester
Dyeing cost:
Vat Dyes > Reactive Dyes
Finishing Cost:
Flame retardency - 15Rs./meter
Anti-static - 5Rs./meter
Anti-satin - 10Rs./meter
Anti-wrinkle - 5Rs./meter
If added in jigger (softners)- 10Rs./Kg.
Stentering - 20Rs./Kg.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
49
Shrinkage/Wastage:
Cambric / Cotton - 5%
Poly blends - 4.5% - 5%
COST OF FABRIC = COST OF GREY FABRIC+DYEING
CHARGES+FINISHINGING CHARGES+SHRINKAGE/WASTAGE
Weaving costs:
 Mill made loom cost ≈ 125 % Power loom cost
 Twill weave = 12 paisa / pick / inch / sq. meter
 Satin weave = 12 paisa / pick / inch / sq. meter
 P.V. Suiting = 14.2 paisa / pick / inch / sq. meter
 For 1000 meter dobby = 17 paisa / pick / inch / sq. meter
 For 1000 meter Jacquard = 20 paisa / pick / inch / sq. meter
 For 2400 hook Jacquard = 17 paisa / pick / inch / sq. meter
 Double beam fabric = 40 paisa / pick / inch / sq. meter
Rs. 35 per Kg. (approx.) includes steam, power or wages.
Raw material cost per meter for 150 cm fabric width
= [2.3 x Ozs. per sq. yard + 8.4]±4%
RMC (Ring per meter) = RMC OE per meter x [1+Oz. per sq. yard/100]
iNDEX = [ ] x 0.27
UHML=Upper half mean limit
Str.=Strength in grams per tex using HVI mode.
Fabric cost consideration:
a.) Take accurate fabric consumption based upon new marker
ratio and take testing commitment for width, shrinkage & defect
percentage.
b.) Take 2-7% buffer margin on material cost estimation.
c.) Take consumption of pocket lining, shell etc. & all other
different fabric used.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
50
Labour cost breakdown:
Efficiency for styles =
Cutting labour cost =
Finishing labour cost =
Cost per minute =
Labor cost (salary paid) = SMV x Labour cost per minute
CM = cutting cost + sewing cost + finishing cost
CM cost = SAM of garment x minute cost of labour / line efficiency
For accuracy:
Labour cost per minute =
CMT charges will include stitching, cutting, finishing, packing,
embellishment, value added services, trims.
Factory overhead over direct labour wages =
Labour rate variance = (standard rate - actual rate) x actual hour
worked
Cutting SAM = Spreading, Marking, Cutting, Re-layering, Re-
cutting, Sorting, Bundling.
Stitching SAM = m/c time + material handling with allowances +
Bundle time
Total m/c time = [{(A+17B+C) x D} + {(A+17B+C) x D} E
= (1+E %) x {(A+17B+C) x D}
Finishing SAM: Pressing & finishing SAM will be calculated as
per operations.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
51
4.2.3 Development of cost-sheet formats & other cost absorption
formats in detail.
For Pre-production Costing formats:
 Factory expenses sheet
 Administrative expenses sheet
 Selling & Distribution expenses sheet
 Time-study sheet
 Data-base sheet
 Cost-Sheet format
For Post-production Costing formats:
 Sewing Section sheet
 Cutting Section sheet
 Finishing & Packaging Section sheet
 Power consumption in Cutting section
 Power consumption in Sewing section
 Power consumption in finishing & packing section
 Depreciation Sheet
 Insurance Premium sheet
 Consumable goods sheet
 Vehicles sheet
 Mechanic`s purchase form
 Total electricity consumption sheet
 Indirect Labour expenses
 Power consumption sheet
 Cost-sheet format
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
52
EASTERN KNIT WEAR LTD.
EXPENSES INCURRED IN FACTORY
S.NO. ITEMS
PER MONTH PER MONTH ON DENIM JEANS
TAKA USD TAKA USD
1 LESS: CLOSING STOCK
2 Freight & Forwarding
3 Freight inward
4 Electricity Bills
5 Fuel (Diesel & petrol) & Coal
6 Consumables stores
7 Annual maintenance contract
8 Books & Periodicals
9 Conveyance
10 Courier charges
11 Recruitment & Training
12 Insurance premium
13 Staff welfare
14 Miscellaneous expenses
15 Postage & telegram
16 Printing & stationary
17 Rent & Taxes
18 Repair & maintenance (m/c)
19 Repair & maintenance (Vehicles)
20 Repair & maintenance (plant)
21 Telephone & VC
22 Travelling
23 Water charges
24 Depreciation
25 Indirect labor (Managers)
26 Power
27 Waste/normal loss of material
28 Waste for foremen
29 Oil
30 Gases
31 Steam
32 Canteen & recreation
33 Drawing & Office expenses
34 Workers Compensation
35 Research expenses R&D
36 Health & Safety (facilities)
37 Security & House keeping
38 Store supervision expenses
39 Expenses of service department
40 ADD: OPENING WIP
TOTAL
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
53
EASTERN KNIT WEAR LTD.
ADMINISTRATIVE EXPENSES
S.NO. ITEMS
AVG. PER MONTH PER MONTH ON DENIM JEANS
INR USD INR USD
1 LESS: CLOSING STOCK
2 Freight & Forwarding
3 Freight inward
4 Electricity Charges
5 Fuel (Diesel & petrol) & Coal
6 Consumables stores
7 Annual maintenance contract
8 Books & Magazines
9 Conveyance allowances
10 Courier charges
11 Recruitment
12 Insurance premium
13 Salary & Staff welfare
14 Miscellaneous expenses
15 Bonus & Diwali expenses
16 Printing & stationary
17 Rent & Taxes
18 Repair & maintenance (m/c)
19 Repair & maintenance (office, others)
20 Leave encashment
21 Telephone & VC
22 Travelling
23 Water charges
24 Depreciation
25 P.F. employment contribution
26 Advertisement & Promotion
27 Donation
28 Certification, membership & Subscription
29 Oil & Gases
30 Bank Charges
31 Director`s Salary & GM Salary, others
32 Canteen & recreation, Pantry
33 Drawing & Office expenses
34 Overtime
35 Sampling expenses, R&D
36 Repair & Replacement
37 Helpers & House keeping
38 Audit fee & Legal expenses
39 Expenses of service department
40 ADD: OPENING WIP
TOTAL
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
54
EASTERN KNIT WEAR LTD.
SALES & DISTRIBUTION EXPENSES
S.NO. ITEMS
AVG. PER MONTH PER MONTH ON DENIM JEANS
INR USD INR USD
1 LESS: CLOSING STOCK
2 Courier charges
3 EGCC Report
4 Export promotion Council
5 Freight charges
6 Laboratory charges
7 Sales & Promotion
8 Ware housing charges
9 Audit & Quality checking
10 Sales tax
11 Foreign tours
12 Insurance
13 Catalogues
14 Samples
15 Folders
16 Royalties
17 Market research
18 Demonstration expenses
19 Cost of sales
20 Profit
21
22 ADD: OPENING WIP
TOTAL
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
55
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
56
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
57
KATMANDU APPAREL GROUP
PPK No. Date
Cost_id Buyer
Style No. Brand
Product Season
Order Details Remark:
Order Quantity
Sizes
Embroidery/Embellishment
Wash/Finish
Value Addition Service
PRE-PRODUCTION COST-SHEET
DESCRIPTION QUANTITY UOM UNIT PRICE AMOUNT
Direct Material
Direct Labour
Direct Expenses
Prime Cost
Indirect material
Indirect Labour
Indirect Expenses
Manufacturing Cost
Administrative Expenses
Sales & marketing Expenses
Profit Margin
Total Cost of Product
Handled By: Approved By:
Developed by: Manish S. Dhakad, KAG, Mumbai
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
58
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
59
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
60
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
61
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
62
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
63
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
64
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
65
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
66
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
67
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
68
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
69
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
70
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
71
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
72
Date
Buyer
Brand
Season
Remark:
QUANTITY AMOUNT
Direct Material
Direct Labour
Direct Expenses
Indirect material
Indirect Labour
Indirect Expenses
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
Value Addition Service
Order Details
Order Quantity
Sizes
Embroidery/Embellishment
Wash/Finish
Total Cost of Product
Manufacturing Cost
Administrative Expenses
COST-SHEET
ADD: WASTAGE
FINISHING & PACKING
KATMANDU APPAREL GROUP
PPK No.
Cost_id
Style No.
Product
FABRIC
PRINT/EMBROIDERY/WASH/DYEING
TRIMS & ACCESSORIES
CUTTING
SEWING
Prime Cost
DESCRIPTION UOM UNIT PRICE
Sales & marketing Expenses
Handled By: Approved By:
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
73
4.2.4 Customization of thread calculator as per the company product
type for effective thread consumption calculation.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
74
4.2.5 Collect data for costing of samples & costs which are followed by the
company during concept sampling stage including wastages & profit margins
to develop cost sheet for a particular season.
Date 06/03/2014
Buyer J. C. PENNY
Brand ARIZONA BOYS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.80 YDS $2.008 $44,192.064
0.23 YDS $0.207 $4,555.656
$2.326 $51,185.106
135 Meter $0.213 $4,688.364
1 PCS. $0.020 $440.160
1 PCS. $0.050 $1,100.400
1 PCS. $0.036 $792.288
1 PCS. $0.025 $550.200
5 PCS. $0.220 $4,841.760
2 PCS. $0.035 $764.118
0.95 YDS $0.054 $1,191.733
1 PCS. $0.051 $1,122.408
1 PCS. $0.262 $5,766.096
2 PCS. $0.069 $1,509.749
$1.086 $23,905.640
$1.420 $31,251.360
$0.350 $7,702.800
$0.200 $4,401.600
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.057
$0.051
AFTER ADDING WASTAGE (5%)
Handled By: Approved By:
PER PIECE COST (USD)
TOTAL ORDER VALUE (USD)
10.00%
Total Cost of Product
$5.920
$1,30,291.156
Manufacturing Cost $1.970 $43,355.760
$0.034
AFTER ADDING WASTAGE (5%)
$5.382 $1,18,446.506Prime Cost
Direct Material
Direct Labour
Direct Expenses
Sewing Thread
CPSIA Label
Wash care AZ-01-894
$0.002
$0.020
$0.050
$0.036
Zipper-brass
Wash care AZ-01-548
Match book
Wash care AZ-01-911
Horn Button 24 L
28 L Button Shear Plastic
$0.262
24 L 4 hole Clear Button
3/4 " Button hole elastic
$0.017
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD)
$0.044
KATMANDU APPAREL PRIVATE LIMITED
AZB SU14 BTMYD CARGO SHORT
REGULAR
NO
YES
Order Details
Order Quantity
Sizes
Embroidery/Embellishment
Wash/Finish
22008
90880
9147
Value Addition Service
COST-SHEET
PPK No.
$0.200
CUT, MAKE
PACKAGING CHARGES
$1.420
$0.350
Cost_id
Style No.
Product
WASHING CHARGES
NO
FABRIC SHELL $2.510
$0.025
FABRIC POCKETING
TRIMS & ACCESSORIES
SU-14-AZ-90880-BANG
CARGO SHORT
AMOUNT (USD) TOTAL
$0.900
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
75
Date 01/04/2014
Buyer J. C. PENNY
Brand OKIE-DOKIE
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.38 YDS $0.923 $1,72,252.883
$0.970 $1,80,865.527
0.091 PCS. $0.043 $7,978.401
0.091 PCS. $0.043 $7,978.401
0.52 YDS $0.034 $6,305.120
55 Meter $0.087 $16,189.980
0.52 YDS $0.030 $5,626.107
0.22 YDS $0.012 $2,298.197
1 PCS. $0.036 $6,715.512
1 PCS. $0.024 $4,477.008
$0.324 $60,447.163
$0.660 $1,23,117.720
$0.320 $59,693.440
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $2.501
TOTAL ORDER VALUE (USD) $4,66,536.235
Prime Cost $2.274 $4,24,123.850
Manufacturing Cost $0.980 $1,82,811.160
AFTER ADDING WASTAGE (5%)
Direct Labour
CUT, MAKE $0.660
Direct Material
FABRIC SHELL $2.430
Size Wrap $0.036
Main label with wash care $0.024
$0.065
1 1/4" knitted elastic $0.058
1/2" Twill tape $0.056
Sewing Thread $0.002
1 3/8" Knitted elastic
AFTER ADDING WASTAGE (5%)
TRIMS & ACCESSORIES
Master Polybag $0.470
Carton $0.470
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish NO
Product CHOP POCKET SHORT
Order Details ODITBFA14 COTTON NYLON SHORT
Order Quantity 186542
Style No. FA14-OD-43301
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 43301
Cost_id 9151
$0.320PACKAGING CHARGES
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
76
Date 12/02/2014
Buyer J. C. PENNY
Brand TOTAL GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.48 YDS $1.022 $13,188.960
0.06 YDS $0.052 $673.380
$1.128 $14,555.457
1 PCS. $0.022 $283.800
1 PCS. $0.105 $1,354.500
0.071 PCS. $0.075 $961.695
1 PCS. $0.022 $283.800
100 Meter $0.158 $2,035.620
2 PCS. $0.386 $4,979.400
2 PCS. $0.034 $438.600
0.66 YDS $0.038 $485.298
1 PCS. $0.023 $296.700
2 PCS. $0.044 $567.600
1 PCS. $0.193 $2,489.700
1 PCS. $0.020 $258.000
1 PCS. $0.039 $503.100
$1.216 $15,684.704
$0.870 $11,223.000
$0.350 $4,515.000
$0.200 $2,580.000
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $4.141
TOTAL ORDER VALUE (USD) $53,413.977
Prime Cost $3.764 $48,558.161
Manufacturing Cost $1.420 $18,318.000
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
$0.200
Direct Material
FABRIC SHELL $2.130
FABRIC POCKETING $0.870
27 L button $0.039
Rivets 7.5 mm $0.022
Zipper semi auto $0.193
CPSIA Label $0.020
24 L Button $0.017
3/4 " elastic $0.057
Match book $0.023
$1.050
Sewing thread $0.002
Zipper antique nickle $0.193
Main label with wash care $0.022
Carton
AFTER ADDING WASTAGE (5%)
TRIMS & ACCESSORIES
Sizer $0.022
Hanger $0.105
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Embroidery/Embellishment NO
Wash/Finish YES
Value Addition Service NO
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 99678
Cost_id 9215
$0.870
$0.350
Style No. FA14-TG-99678-REG
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Product DENIMSKIRT
Order Details TGF14 WOVEN COATED DENIMSKIRT
Order Quantity 12900
Sizes REGULAR
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
77
Date 12/02/2014
Buyer J. C. PENNY
Brand TOTAL GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.53 YDS $1.049 $10,265.231
0.07 YDS $0.077 $753.214
$1.183 $11,569.367
0.071 PCS. $0.075 $729.248
1 PCS. $0.220 $2,152.040
1 PCS. $0.105 $1,027.110
3 PCS. $0.066 $645.612
1 PCS. $0.220 $2,152.040
2 PCS. $0.036 $352.152
80 Meter $0.126 $1,234.880
1 Set $0.750 $7,336.500
0.71 YDS $0.040 $395.878
1 PCS. $0.023 $224.986
1 PCS. $0.193 $1,887.926
1 PCS. $0.020 $195.640
1 PCS. $0.039 $381.498
$2.009 $19,651.285
$0.910 $8,901.620
$0.350 $3,423.700
$0.730 $7,140.860
$0.200 $1,956.400
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $5.920
TOTAL ORDER VALUE (USD) $57,907.555
Prime Cost $5.382 $52,643.232
Manufacturing Cost $2.190 $21,422.580
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
HEAT SEAL
$0.910
$0.350
$0.730
Direct Material
FABRIC SHELL $1.980
FABRIC POCKETING $1.100
27 L Logo Button $0.039
Match book $0.023
Antique nickle zipper $0.193
CPSIA Label $0.020
Sewing Thread $0.002
Studs $0.750
3/4" Button hole elastic $0.057
$0.105
Main label with wash care $0.220
24 L Button $0.018
7.5 mm Rivet $0.022
Hanger
AFTER ADDING WASTAGE (5%)
TRIMS & ACCESSORIES
Carton $1.050
Sizer $0.220
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Embroidery/Embellishment NO
Wash/Finish YES
Value Addition Service YES
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 98061
Cost_id 9217
$0.200
Style No. FA14-TG-98061-REG
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Product DENIMSKIRT
Order Details TGF14 WOVEN DENIMSKIRT
Order Quantity 9782
Sizes REGULAR
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
78
Date 14/02/2014
Buyer J. C. PENNY
Brand TOTAL GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.50 YDS $1.265 $29,360.650
0.07 YDS $0.084 $1,949.640
$1.416 $32,875.805
1 PCS. $0.105 $2,437.050
1 PCS. $0.022 $510.620
0.071 PCS. $0.075 $1,730.306
1 PCS. $0.032 $742.720
2 PCS. $0.035 $805.851
80 Meter $0.126 $2,930.030
1 Set $0.850 $19,728.500
0.7 YDS $0.040 $926.079
1 PCS. $0.023 $533.830
1 PCS. $0.193 $4,479.530
1 PCS. $0.021 $487.410
1 PCS. $0.039 $912.153
$1.639 $38,035.283
$0.830 $19,264.300
$0.350 $8,123.500
$0.540 $12,533.400
$0.200 $4,642.000
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.830
$0.350
$0.540
$0.200
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $5.473
TOTAL ORDER VALUE (USD) $1,27,021.716
Prime Cost $4.975 $1,15,474.288
Manufacturing Cost $1.920 $44,563.200
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
HEAT SEAL
Direct Material
FABRIC SHELL $2.530
FABRIC POCKETING $1.200
AFTER ADDING WASTAGE (5%)
Antique nickle Zipper $0.193
CPSIA Label $0.021
27 L logo Button $0.039
4 mm Dome stud $0.850
3/4" elastic $0.057
Match book $0.023
$1.050
24 L Button $0.017
Sewing Thread $0.002
Main label with wash care $0.032
Carton
TRIMS & ACCESSORIES
Hanger $0.105
Sizer $0.022
Value Addition Service YES
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish YES
Product DENIMSKIRT WITH ZIPPER
Order Details TGF14 WOVEN DENIMSKIRT WITH ZIPPER
Order Quantity 23210
Style No. FA14-TG-99866-REG
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 99866
Cost_id 9213
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
79
Date 30/01/2014
Buyer J. C. PENNY
Brand ARIZONA GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.81 YDS $2.325 $61,976.502
0.06 YDS $0.078 $2,079.480
$2.523 $67,258.781
0.091 PCS. $0.074 $1,965.109
0.656 YDS $0.035 $944.404
185 Meter $0.292 $7,782.854
2 PCS. $0.038 $999.750
1 PCS. $0.021 $559.860
1 PCS. $0.193 $5,145.380
1 PCS. $0.049 $1,306.340
1 PCS. $0.020 $533.200
1 PCS. $0.058 $1,546.280
1 PCS. $0.031 $826.460
1 PCS. $0.032 $853.120
3 PCS. $0.077 $2,047.488
1 PCS. $0.039 $1,039.740
$1.006 $26,827.483
$0.940 $25,060.400
$0.350 $9,331.000
$0.460 $12,263.600
$0.210 $5,598.600
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.460
EMBROIDERY $0.210
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $6.038
TOTAL ORDER VALUE (USD) $1,60,973.851
Prime Cost $5.489 $1,46,339.865
Manufacturing Cost $1.960 $52,253.600
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE $0.940
PACKAGING CHARGES $0.350
WASHING CHARGES
Direct Material
FABRIC SHELL $2.870
FABRIC POCKETING $1.300
AFTER ADDING WASTAGE (5%)
27 L logo button $0.039
Wash care $0.031
Main label $0.032
9.5 mm rivet $0.026
Match book $0.049
CPSIA Label $0.020
Size wrap $0.058
$0.002
Label AZ-01-920B $0.021
Antique nickle Zipper $0.193
24 L Button $0.019
Sewing thread
TRIMS & ACCESSORIES
Carton $0.810
3/4 " hole elastic $0.054
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment YES
Wash/Finish YES
Product BOTTOMGIRLS ROLL CUFF
Order Details AZGFA14BTM- PRINTED ROLL CUFF
Order Quantity 26660
Style No. FA14-AZ-99972-REG
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 99972
Cost_id 9196
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
80
Date 22/02/2014
Buyer J. C. PENNY
Brand ARIZONA GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.88 YDS $2.059 $78,126.048
0.03 YDS $0.077 $2,902.410
0.06 YDS $0.084 $3,186.960
$2.331 $88,426.189
1 PCS. $0.021 $796.740
1 PCS. $0.040 $1,517.600
1 PCS. $0.032 $1,214.080
1 PCS. $0.031 $1,176.140
1 PCS. $0.052 $1,972.880
1 PCS. $0.020 $758.800
1 PCS. $0.049 $1,859.060
1 PCS. $0.193 $7,322.420
1 PCS. $0.022 $834.680
2 PCS. $0.035 $1,317.277
3 PCS. $0.077 $2,913.792
0.656 YDS $0.032 $1,219.543
215 Meter $0.339 $12,871.904
0.077 PCS. $0.062 $2,366.318
1 PCS. $1.050 $39,837.000
$2.158 $81,877.145
$0.880 $33,387.200
$0.420 $15,934.800
$0.700 $26,558.000
$0.210 $7,967.400
$0.300 $11,382.000
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
PRINT
$0.880
$0.420
$0.700
$0.210
$0.300
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $7.699
TOTAL ORDER VALUE (USD) $2,92,086.008
Prime Cost $6.999 $2,65,532.734
Manufacturing Cost $2.510 $95,229.400
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
EMBROIDERY
Direct Material
FABRIC SHELL $2.340
FABRIC LINING $2.550
FABRIC POCKETING $1.400
AFTER ADDING WASTAGE (5%)
Sewing thread $0.002
Carton $0.810
Hanger $1.050
24 L Button $0.017
9.5 mm Rivet $0.026
3/4" button hole elastic $0.049
Match book $0.049
Antique nickle Zipper $0.193
Sizer $0.022
$0.032
Size wrap $0.052
CPSIA Label $0.020
wash care $0.031
Main label
TRIMS & ACCESSORIES
Label AZ-01-920B $0.021
27 L logo Button $0.040
Value Addition Service YES
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment YES
Wash/Finish YES
Product SKINNY JEAN
Order Details AZGFA14BTM SKINNY JEAN W PRINTED PATCH
Order Quantity 37940
Style No. FA14-AZ-100010-REG
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 100010
Cost_id 9184
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
81
Date 03/03/2014
Buyer J. C. PENNY
Brand ARIZONA GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.59 YDS $1.174 $43,343.076
0.05 YDS $0.048 $1,771.968
$1.283 $47,370.796
1 PCS. $0.020 $738.320
1 PCS. $0.048 $1,771.968
215 Meter $0.339 $12,524.491
1 PCS. $0.020 $738.320
1 PCS. $0.028 $1,033.648
1 PCS. $0.031 $1,144.396
1 PCS. $0.020 $738.320
1 PCS. $0.042 $1,543.089
1 PCS. $0.062 $2,299.498
$0.641 $23,658.652
$1.030 $38,023.480
$0.420 $15,504.720
$0.500 $18,458.000
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$1.030
$0.420
$0.500
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $4.261
TOTAL ORDER VALUE (USD) $1,57,317.213
Prime Cost $3.874 $1,43,015.648
Manufacturing Cost $1.950 $71,986.200
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Direct Material
FABRIC SHELL $1.990
FABRIC POCKETING $0.960
AFTER ADDING WASTAGE (5%)
Stickers $0.020
24 L Mock Snap button $0.042
24 L Snap button $0.062
$0.002
Hang Tag $0.028
Wash care label $0.031
CPSIA Label $0.020
sewing thread
TRIMS & ACCESSORIES
Sizer $0.020
Hanger $0.048
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish YES
Product DENIMJACKET
Order Details AZLGSP14 WOVEN DENIMJACKET
Order Quantity 36916
Style No. FA14-AZ-57491
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 57491
Cost_id 9327
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
82
Date 14/03/2014
Buyer J. C. PENNY
Brand TOTAL GIRLS
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.91 YDS $2.166 $16,362.619
0.10 YDS $0.120 $906.600
$2.400 $18,132.680
1 PCS. $0.022 $166.210
1 PCS. $0.105 $793.275
1 PCS. $0.032 $241.760
2 PCS. $0.035 $262.310
2 PCS. $0.045 $338.464
1 PCS. $0.020 $151.100
170 Meter $0.268 $2,026.704
1 PCS. $0.022 $166.210
0.7 YDS $0.034 $259.137
1 PCS. $0.193 $1,458.115
1 PCS. $0.039 $296.912
$0.856 $6,468.206
$0.930 $7,026.150
$0.350 $2,644.250
$0.660 $4,986.300
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.930
$0.350
$0.660
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $5.716
TOTAL ORDER VALUE (USD) $43,183.344
Prime Cost $5.196 $39,257.586
Manufacturing Cost $1.940 $14,656.700
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Direct Material
FABRIC SHELL $2.380
FABRIC POCKETING $1.200
AFTER ADDING WASTAGE (5%)
Antique nickle zipper $0.193
27 L logo button $0.039
Sewing Thread $0.002
Match book $0.022
3/4" hole elastic $0.049
$0.032
7.5 mm rivet $0.022
CPSIA Label $0.020
24 L button $0.017
Main label with wash care
TRIMS & ACCESSORIES
Sizer $0.022
Hanger $0.105
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish YES
Product KNEE JAGGING
Order Details TGF14 WOVEN PIECED KNEE JEGGING
Order Quantity 7555
Style No. FA14-TG-98046-REG
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 98046
Cost_id 9317
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
83
Date 22/04/2014
Buyer J. C. PENNY
Brand OKIE-DOKIE
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.33 YDS $0.703 $31,096.999
0.07 YDS $0.069 $3,065.901
$0.811 $35,871.045
0.02 YDS $0.010 $442.410
1 PCS. $0.020 $884.820
70 Meter $0.110 $4,886.861
0.558 YDS $0.036 $1,604.621
1 PCS. $0.036 $1,592.676
1 PCS. $0.024 $1,061.784
$0.249 $10,996.831
$0.590 $26,102.190
$0.330 $14,599.530
$0.220 $9,733.020
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.590
$0.330
$0.220
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $2.419
TOTAL ORDER VALUE (USD) $1,07,032.877
Prime Cost $2.199 $97,302.616
Manufacturing Cost $1.140 $50,434.740
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Direct Material
FABRIC SHELL $2.130
FABRIC POCKETING $0.990
AFTER ADDING WASTAGE (5%)
$0.002
Size wrap $0.036
Main label with wash care $0.024
1 3/8 " elastic $0.065
Sewing thread
TRIMS & ACCESSORIES
Micro dotted inlining $0.500
CPSIA Label $0.020
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish YES
Product DENIMSHORT
Order Details ODITBFA14 PULL-ON DENIMSHORT
Order Quantity 44241
Style No. FA14-OD-97984
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 97984
Cost_id 9331
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
84
Date 24/04/2014
Buyer J. C. PENNY
Brand OKIE-DOKIE
Season FALL_14
EXTRA % 5%
PCS. REMARK:
0.33 YDS $0.782 $48,666.955
$0.821 $51,100.302
65 Meter $0.000 $0.000
1 PCS. $0.000 $0.000
1 PCS. $0.000 $0.000
1 PCS. $0.000 $0.000
0.525 YDS $0.000 $0.000
$0.000 $0.000
$0.770 $47,914.020
$0.380 $0.000
$0.220 $13,689.720
Profit Margin
Developed by: Manish S. Dhakad, KAG, Mumbai
$0.770
$0.380
$0.220
Handled By: Approved By:
10.00%
Total Cost of Product
PER PIECE COST (USD) $2.410
TOTAL ORDER VALUE (USD) $1,23,974.447
Prime Cost $2.191 $1,12,704.042
Manufacturing Cost $1.370 $61,603.740
AFTER ADDING WASTAGE (5%)
Direct Expenses
Direct Labour
CUT, MAKE
PACKAGING CHARGES
WASHING CHARGES
Direct Material
FABRIC SHELL $2.370
AFTER ADDING WASTAGE (5%)
$0.000
1 1/8" Knitted elastic $0.000
Main label with wash care $0.000
CPSIA label
TRIMS & ACCESSORIES
Sewing thread $0.000
Size wrap $0.000
Value Addition Service NO
COST-SHEET
CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL
Sizes REGULAR
Embroidery/Embellishment NO
Wash/Finish YES
Product DENIMPANT
Order Details OD BABY BOY F14 DENIMPANT
Order Quantity 62226
Style No. FA14-OD-104937
KATMANDU APPAREL PRIVATE LIMITED
PPK No. 104937
Cost_id 9414
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
85
4.2.6 Compare cost and find variance & total cost savings.
ORDERFabricFabricCostFabricFabricCostFabricFabricCost
QUANTITYShellShellSavingLiningLiningSavingPocketingPocketingSaving
DifferencePriceShellDifferencePriceShellDifferencePriceShell
90880AZBSP14BTMYDCARGOSHORTS2200802.51$$-00.90$$-
43301
ODITBFA14COTTONNYLONSHORTPORKCHOP
PKTS.
1865420.022.43$$9,065.94
99678TGF-14WOVENCOSTEDDENIMSKIRT129000.022.13$$549.5400.87$$-
98061TGF-14WOVENDENIMWITHZIPPERSKIRT97820.051.98$$968.420.011.10$$107.60
99866TGF-14WOVENDENIMWITHZIPPERSKIRT232100.012.53$$587.210.011.20$$278.52
99972AZGFA14BTM-PRINTEDROLLCUFFCROP2666002.87$$--0.011.30$$-346.58
100010
AZGFA14BTM-FASHIONSKINNYJEANPRINTED
PATCHES
379400.042.34$$3,551.180$2.55$-01.40$$-
97430
AZGFA14BTM-DENIMJACKETWITHKNIT
SLEEVES
0
57491
AZGFA14BTM-FASHIONSKINNYJEANPRINTED
PATCHES
36916-0.011.99$$-734.6300.96$$-
98046TGF-14WOVENPIECEDKNEEJEGGING7555-0.042.38$$-719.24-0.011.20$$-90.66
100014AZGFA14BTM-FASHIONBOOTCUTSCATTERED0
100016
AZGFA14BTM-FASHIONBOOTCUTLUREXAND
EMBELLISMENT
0
100008
AZGFA14BTM-SIDESEAMEMBELLSHEDFASHION
SKINNEYJEANS
0
100017
AZGFA14BTM-FASHIONBOOTCUTWSIDESEAM
PRINT
0
97984ODITBFA14PULLONDENIMSHORT442410.022.13$$1,884.670$0.99$-
104937ODBABYBOYF14DENIMPANTLEGGING622260.022.37$$2,949.51
TOTAL18,051.49$664788$18,102.61$-$-51.12
OrderCancelled
OrderCancelled
OrderCancelled
FALL-14SEASONORDERS(FABRICCOSTSAVINGFROMSAMPLINGTOPRODUCTION)
PPK#TYPE
(Putaverageconsumptioninyardspergarment)
OrderCancelled
OrderCancelled
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
86
S.no.PPKNo.Description
Required
Quantity
TOTAL(m)
Thread
requiredin
mtr.
ByFactoryVariance
Costsaving
per
garment
Totalcostsaving
190880AZBSP14BTMYDCARGOSHORTS22008134.961352891540.09$1,958.98$
243301ODITBFA14COTTONNYLONSHORTPORKCHOPPKTS.18654253.0055119640.04$6,900.56$
399678TGF-14WOVENCOSTEDDENIMSKIRT1290095.12100139390.02$290.79$
498061TGF-14WOVENDENIMWITHZIPPERSKIRT978277.38801801000.06$565.40$
599866TGF-14WOVENDENIMWITHZIPPERSKIRT2321078.0980163830.05$1,113.48$
699972AZGFA14BTM-PRINTEDROLLCUFFCROP26660183.87185227420.02$647.20$
7100010AZGFA14BTM-FASHIONSKINNYJEANPRINTEDPATCHES37940214.83215236210.01$460.52$
897430AZGFA14BTM-DENIMJACKETWITHKNITSLEEVES
957491AZGFA14BTM-FASHIONSKINNYJEANPRINTEDPATCHES36916212.80215236210.01$448.09$
1098046TGF-14WOVENPIECEDKNEEJEGGING7555167.611703271570.09$685.59$
11100014AZGFA14BTM-FASHIONBOOTCUTSCATTERED
12100016AZGFA14BTM-FASHIONBOOTCUTLUREXANDEMBELLISMENT
13100008AZGFA14BTM-SIDESEAMEMBELLSHEDFASHIONSKINNEYJEANS
14100017AZGFA14BTM-FASHIONBOOTCUTWSIDESEAMPRINT
1597984ODITBFA14PULLONDENIMSHORT4424168.4570140700.04$1,789.99$
16104937ODBABYBOYF14DENIMPANTLEGGING6222664.2965140750.04$2,697.50$
17,558.08$TOTALCOSTSAVING
FALL-14SEASON_THREADCOSTSAVING
ORDERCANCELLED
ORDERCANCELLED
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
87
(1Yds=36Inches)BeforeAfterBeforeAfter
Cuttablewidth(Inches)55"55"055"56"57"1"1"
Shrinkage%(weft,warp)4.5to144.5to122%inwarp4.5to8.54.5to8.54.5to8.500
Laylength(Yds)17.2567516.890722-0.36602816.24152815.95647215.661556-0.28506-0.579972
Consumptionpergarment(Yds.)0.958710.93837-0.020340.902310.886470.87009-0.01584-0.03222
Markerefficiency%80.96681.2790.31381.89581.9282.0490.0250.129
Wastepercentage%19.03418.721-0.31318.10518.0817.951-0.025-0.129
Totalfabricrequired(Yds.)743000.25727236.75-15763.5699290.25687014.25674319.75-12276-24970.5
Totalfabricincluding5%extra780150.2625763598.5875-16551.675734254.7625721364.9625708035.7375-12889.8-13329.225
Totalcostoffabric@1.91$peryard14,90,087.00$14,58,473.30$-31613.6992514,02,426.60$13,77,807.08$13,52,348.26$-24619.5-50078.33775
31,613.70$50,078.34$
(-ivesigninvariancecolumnshowsdecreaseintheentity&+ivesignshowstheincrementforaparticularentity.)
FabricType
KAG-13-1091(Shrinkage
problem)
KAG-13-391(BulkCuttable57")
ProductPackageNumber82644(Totalorderquantity=775000)
VarianceVariance@57"
TotalCostSavingsinUSD
Variance
@56"
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
88
4.2.7 Develop chart for the total trends followed in fabric with prices.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
89
4.2.8 Calculation of reverse cost for fabric from the data available on different
resources for analysis of increment of cost during a period & for effective
sourcing negotiation.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
90
4.3 To find Cost profitability in implementing new software, this will also reduce lead
time, labor & Cost.
4.3.1 Study of present system used & write observations based on analysis.
Observations during the study:
1. Targets are given to operators based on time-studies which do not
take work-study into consideration.
2. Operations are not set properly; there is a massive scope to
improve methods & reduce cost in the factory.
3. There are too many helpers in the lines, helpers can be easily
reduced.
4. The current layout is poor and needs improvement.
5. Many Garment parts are marked and in many cases these are
unnecessary.
6. A transportation system will improve productivity considerably.
7. No information on end-bits utilization
8. Splicing should be used and will improve fabric utilization.
9. Fabric reconciliation is not being done; Fabric profit and loss is not
calculated for the orders.
10.Comparison of Costed, Marked and Achieved consumption is not
done.
11.Marker making is done manually, which is time consuming and
fabric is not utilized properly.
4.3.2 Enquiry, testing and demo of the new software for cost savings in man-
power, time and overheads.
Description Enquiry Demo Testing
Optitex-3D   
Pro-Suit   ×
RFID   ×
Mod-sew  × ×
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
91
4.3.3 Comparison of cost profitability in implementing new system.
Section a
The following factors have been identified to have an influence on adoption of
CAD / CAM.
Factors influencing
adoption of IT
Strongly
positive
Moderately
positive
Indifferent Moderately
negative
Strongly
negative
Can’t
say
High Price
Reduces dependence
on people
Failed installation in
other organization
Collaborative working
between various
employees, supplier
and buyer is easier
Ability of supplier to
train the users in our
organization
Saves fabric
The supplier does not
have an office in the
location where my
organization is situated
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
92
Section b
This sheet will help you decide which system is best for your pattern
development department and organization. (Even if you have one)
Criteria RICH-PEACE OPTI-TEX
TUKATEC
H
GERBER ASTER JAIMINI
STUDIO
CAD
Source
How you found out about
them
BANSWARA
APPLICATION SUPPORT ENGG.
(OPTITEX)
KAPL
APPLICATION
SUPPORT ENGG.
(OPTITEX)
APPLICATIO
N
SUPPORT
ENGG.
(OPTITEX)
MR.
PRAMOD
Communications-digitizers
and file import
5 7 6 3 1 4 2
Piece geometry
identifications(points,
lines, notches, orientations
lines, piece rotation line for
3 6 7 4 5 1 2
Improves first pass
quality product
Reduces throughput
time for product
assemble
Requirement of
constant training
Ready availability of
literate professionals
Constant up gradation
of system required
CHANCES OF ERROR
MAY INCREASE
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
93
marker making) GUPTA
Pattern design functions-
measurement capabilities
4 6 5 3 7 2 1
Pattern design functions-
darts, pleats, trace, cut,
combine, shrink, stretch,
flip, rotate patterns.
4 7 6 2 5 3 1
Pattern design functions-
seam allowance definition,
corners, corner insert
5 7 6 2 4 3 1
Removing and adding of
patterns from present files,
printing and redo and undo
functions & keyboard and
mouse hot keys- shortcut
keys
6 7 5 2 3 4 1
APPLICATIO
N
SUPPORT
ENGG.
(OPTITEX)
MR. PRAMOD
GUPTA
Pattern grading functions 7 6 5 2 3 4 1
Maker making functions 5 6 4 3 7 2 1
Automatic marker making
functions
4 6 5 1 7 3 2
Software platforms 3 7 6 5 4 2 1
Outputs and consumables
availability
4 6 5 1 7 3 2
Manuals 6 7 5 1 3 4 2
Communications access
with respect internet
compatibility
3 7 6 2 4 5 1
Warranty and after sales
service
5 7 6 3 4 1 2
CAM and CAS interface 6 7 5 2 4 3 1
Customizing features 4 5 7 6 3 1 2
Cost implications 1 6 7 3 2 5 4
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
94
Interface capabilities with
other design software 1 7 6 2 3 4 5
Plotting facility 7 5 4 6 1 2 3
TOTAL 83 122 96 53 77 56 35
Any remarks: 3D PATTERING IN STYLE CAD IS COMING
OPTITEX- BODY CUSTOMIZATION & LOW PRICE
TUKA-TECH- NO BODY CUSTOMIZATION & HIGH PRICE
4.3.4 Suggestion of new machinery implementation in research and
development from the total cost savings for the future scope of the research.
4.3.4.1 Double Bed Heat Seal (Price: $1281.079)
Heat Transfer Press Machine Model DC 54(Platen size- 15 x 20 with
microprocessor based digital timer and digital temperature controller &
counter.
Features:
 Manually operated heat transfer press
 Ideal machine for plastisol fusing. curing and heat transfer printing
 Easy operation through clamp system.
 Electronic contractor switching for noise free and zero maintenance.
 Anti-static Teflon is use on the upper bed to prevent corrosion.
 Minimum moving parts result in zero maintenance.
Model Size Power Temp M/C Dimensions Weight
DC 44 15"x15" 1500w/hr, 230V 220°C L25" W26" H31" 75Kgs
DC 54 20"x15" 3600w/hr, 230V 220°C L28" W26" H31" 85Kgs
DC 64 22"x17" 3600w/hr, 230V 220°C L30" W28" H31" 105Kgs
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
95
4.3.4.2 Taking-TK-6090-CXLS (Price: $366.865)
Single Needle Large Hook Heavy Duty Machine TK6090LS (Long
Stitch)
Features:
 The standard 1-needle type machine that delivers the basic
functions and performance best suited to the sewing of heavy-
weight materials.
 The maximum stitch length is 10mm. The complete rectangular
feed locus enables accurate feed of extra heavy-weight materials
while preventing stitch gathering.
 With its sufficient needle bar stroke of 38mm and long 190R needle,
the machine supports the sewing of extra heavy-weight materials
 Automatic lubricating mechanism helps improve maintainability
 Equipped with a bottom-feed adjusting mechanism that adjusts the
amount of bottom-feed while keeping the needle feed fixed.
4.3.4.3 AMS-221EN-HS3020/7200 (246mm×200mm)
Computer-controlled Cycle Machine with Input Function (for sewing
pockets on jeans)
Features:
・The machine sews folded pocket cloth on the garment body.
・Maximum stitching range of a pocket that can be sewn is 246mm
(width) × 200mm (length)
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
96
Model name AMS-221EN-HS3020/7200
Application Heavy-weight
Max. sewing
speed
2,000 sti/min
Stitch length 0.1~12.7mm (0.05mm step)
Storage of
pattern
data in the
memory
Main-body memory: Max. 500,000 stitches, 999 patterns (max. 50,000
stitches / pattern)
External media: Max. 49,950,000 stitches, 999 patterns (max. 50,000
stitches / pattern)
Needle DP×17(#19)
4.3.4.4 AP-876 (Full-automatic)
(Automatic Pocket Setter-For jeans)
The machine automatizes a series of pocket setting processes
such as the folding of a pocket,
placement of the pocket on a garment
body, sewing, bar-tacking and
stacking, thereby increasing
productivity and achieving production
without requiring the operator to have
any special skill. This promises
consistent finished quality.
Model name AP-876
Machine head
High-speed, 1-needle, lockstitch, zigzag stitching
machine
(exclusive machine head)
Max. sewing speed 4,000sti/min
Sewing area 250mm (L)×250mm (W)
Stitch length 0.1~6mm
Operation panel IP-420 (large-sized color liquid crystal touch panel)
Strage of pattern data in the memory Max. 999 pattern
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
97
4.3.5 Reasons for investment in technological upgradation.
In this changing business scenario to gain the competitive edge
apparel companies need to upgrade them to meet the fast changing demand
of the market and generating profit margins at the same time.
Under mentioned are some of the reasons strengthening the need of
technological upgradation:
 To meet the fast paced fashion cycle demand Apparel
Companies must be updated with the latest & sophisticated
infrastructure in terms of technical & software abilities. It is
because one cannot easily predict the demand of the overseas
buyer.
 For companies dealing in high volumes, even minor saving in
terms of material, labour & time will yield greater profit.
 Despite the high prices of the machineries break-even point can
be achieved earlier as the volumes are high.
 Technological upgradation can smoothen the sourcing
procedure as samples can be virtually presented even if trims &
other materials are not available. We can develop physical
samples of those styles only which are approved in the virtual
form.
 Conclusively with efficient technology we can quote
comparatively lower cost to the buyers & attract more orders in
the future.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
98
CHAPTER-5
RESULT/EXPECTED OUTCOME
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
99
a.) A new way of calculating cost in less time which will enable us to manage the
order flow at lower margin and to quote the best price to buyers.
 Costing is done on the basis of CIP (Cost Integrated process) which
includes complete breakdown of cost components & cost is calculated
separately for each entity i.e. fabrics cost, trims cost, SAM cost,
Packaging, margin & profits etc.
 Pre-production & Post-production cost can be absorbed during the
actual production & same data can be used further for quotation
purpose during concept development stage.
b.) Technical enhancement in R&D from total cost savings & profit margins of
company.
 Successful enquiry, demo & Implementation of new Industrial
engineering software for easy calculation of SAM & reducing cost of
production planning & control.
 Successful enquiry, demo & Implementation of Optitex virtual 3-D
sampling (CAD software) for cost saving by reducing lead time,
manpower & other needful resources.
Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT
100
CHAPTER-6
LIMITATIONS & FUTURE
SCOPE OF PROJECT
Gp728 2014
Gp728 2014
Gp728 2014
Gp728 2014
Gp728 2014

More Related Content

What's hot

Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
Mohammad Akhtar
 
Study on garments Buyeing house merchandising.
Study on garments Buyeing house merchandising. Study on garments Buyeing house merchandising.
Study on garments Buyeing house merchandising.
Muhammad Rahat
 

What's hot (16)

Internship Report on Garments Merchandising
Internship Report on Garments MerchandisingInternship Report on Garments Merchandising
Internship Report on Garments Merchandising
 
Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.
 
Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.
 
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
 
Merchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladeshMerchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladesh
 
Production process & co-ordination
Production process & co-ordinationProduction process & co-ordination
Production process & co-ordination
 
Production process of Shirt
 Production process of Shirt Production process of Shirt
Production process of Shirt
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
 
Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
Acceptable%2 b quality%2blevels%2bin%2bthe%2btextile%2bsector%2band%2btheir%2...
 
Internship report presentation at square fashion ltd by md.shariful islam im...
Internship  report presentation at square fashion ltd by md.shariful islam im...Internship  report presentation at square fashion ltd by md.shariful islam im...
Internship report presentation at square fashion ltd by md.shariful islam im...
 
Industrial attachment of sea moss knitwear ltd
Industrial attachment of sea moss knitwear ltdIndustrial attachment of sea moss knitwear ltd
Industrial attachment of sea moss knitwear ltd
 
Study on garments Buyeing house merchandising.
Study on garments Buyeing house merchandising. Study on garments Buyeing house merchandising.
Study on garments Buyeing house merchandising.
 
Apparel Promoters ltd. for internship report
Apparel Promoters ltd. for internship report Apparel Promoters ltd. for internship report
Apparel Promoters ltd. for internship report
 
07304011
0730401107304011
07304011
 
Industrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile GroupIndustrial Internship Report on Opex Sinha Textile Group
Industrial Internship Report on Opex Sinha Textile Group
 
Dipu project
Dipu projectDipu project
Dipu project
 

Similar to Gp728 2014

Industrial trainning Keya knitting composite
Industrial trainning Keya knitting compositeIndustrial trainning Keya knitting composite
Industrial trainning Keya knitting composite
ahmed_meraz7
 
Sampling cover (1).....
Sampling cover (1).....Sampling cover (1).....
Sampling cover (1).....
ahad003
 
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
Daffodil International University
 
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
TEXTILE VALUE CHAIN
 
fectory visit done.pdf
fectory visit done.pdffectory visit done.pdf
fectory visit done.pdf
ZNRatul
 

Similar to Gp728 2014 (20)

Industrial_Internship_Report_of_Opex_and.docx
Industrial_Internship_Report_of_Opex_and.docxIndustrial_Internship_Report_of_Opex_and.docx
Industrial_Internship_Report_of_Opex_and.docx
 
Industrial trainning Keya knitting composite
Industrial trainning Keya knitting compositeIndustrial trainning Keya knitting composite
Industrial trainning Keya knitting composite
 
Sampling cover (1).....
Sampling cover (1).....Sampling cover (1).....
Sampling cover (1).....
 
Textile internship report
Textile internship reportTextile internship report
Textile internship report
 
Garment technology
Garment technologyGarment technology
Garment technology
 
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
Industrial attachment at GTA Sports ltd.(Niagara Textiles Ltd.)
 
STUDY ON QUALITY MANAGEMENT SYSTEM AND TECHNICAL
STUDY ON QUALITY MANAGEMENT SYSTEM AND TECHNICAL STUDY ON QUALITY MANAGEMENT SYSTEM AND TECHNICAL
STUDY ON QUALITY MANAGEMENT SYSTEM AND TECHNICAL
 
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
 
Internship Report Md. Shihab Uddin 161-011-45
 Internship Report  Md. Shihab Uddin 161-011-45 Internship Report  Md. Shihab Uddin 161-011-45
Internship Report Md. Shihab Uddin 161-011-45
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
 
Mill visit report about B.Brothers Garment co. Limited
Mill visit report about B.Brothers Garment co. Limited Mill visit report about B.Brothers Garment co. Limited
Mill visit report about B.Brothers Garment co. Limited
 
Kay & Emms Final report
Kay & Emms Final reportKay & Emms Final report
Kay & Emms Final report
 
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
APRIL- JUNE 2014 , 2ND ANNIVERSARY ISSUE
 
fectory visit done.pdf
fectory visit done.pdffectory visit done.pdf
fectory visit done.pdf
 
Study on different international standards
Study on different international standardsStudy on different international standards
Study on different international standards
 
A project report on training & development.
A project report on training & development.A project report on training & development.
A project report on training & development.
 
February 2019 issue
February 2019 issueFebruary 2019 issue
February 2019 issue
 
Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.
 
Paramount textile ltd
Paramount textile ltdParamount textile ltd
Paramount textile ltd
 
Project report of tata tel
Project report of tata telProject report of tata tel
Project report of tata tel
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 

Gp728 2014

  • 1. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 1 “An alternative approach towards Costing of denim jeans for Buying House / Export House” Graduation Project submitted in Partial Fulfilment of the requirements For the degree of Bachelor of Fashion Technology (Apparel Production) NATIONAL INSTITUTE OF FASHION TECHNOLOGY, MUMBAI Industry Mentor: Mr. Sanjay Achrekar (General Manager, Katmandu Apparel Pvt. Ltd., Mumbai) College Mentor: Mr. Ranjan K. Saha (Course Co-ordinator, Department of Fashion Technology, NIFT) Manish Singh Dhakad M/BFT/10/11 Semester: VIII
  • 2. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 2
  • 3. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 3 PREFACE The “Bachelor of Fashion Technology” programme is well structured and integrated course of NATIONAL INSTITUTE OF FASHION TECHNOLOGY. The main objective of B.F.Tech. Programme is to develop skill in student by supplement to the theoretical study of apparel mass-production. Textile internship helps to gain real life knowledge about the industrial environment and business practices. B.F.Tech. programme provides student with a fundamental knowledge of business and organizational functions and activities, as well as an exposure to strategic thinking of management. In every professional course, training is an important factor. Professors give us theoretical knowledge of various subjects in the college but we are practically exposed of such subjects when we get the training in the organization. It is only the training through which I come to know that what an industry is and how it works. I can learn about various departmental operations being performed in the industry, which would, in return, help us in the future when I will enter the practical field. During this whole training I got a lot of experience and came to know about the practices in real that how it differs from those of theoretical knowledge and the practically in the real life. In today‟s globalized world, where cut-throat competition is prevailing in the market, theoretical knowledge is not sufficient. Beside this one need to have practical knowledge, which would help an individual in his/her carrier activities and it is true that “Experience is best teacher”.
  • 4. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 4 ACKNOWLEDGEMENT With immense pleasure, I would like to present this report as a part of my Graduation Project on "Development of company specific costing model for buying house merchandising". It has been an enriching experience for me to undergo this project, which would not have possible without the goodwill and support of the people around. As a student of National Institute of Fashion Technology, Mumbai I would like to express my sincere thanks to all those who helped me during this period. I feel my pleasure to extend my sincere thanks and gratitude to my college mentor Mr. Ranjan k. Saha, (Course-Co-ordinator, DFT, NIFT) & industry mentor Mr. Sanjay Achrekar, General Manager (KAPL-Mumbai) who genuinely played his role in right from planning, project framework to guiding me through this project. I would also like to thank Mr. Lokesh Gutta, Manager (Production & operation) of Katmandu Apparel Private Limited who gave me all the required information related to apparel production. Not to forget, I am also thankful to Mr. Kiran Ramakant Temkar (Director) & Mrs. Manisha kiran Temkar (CEO) who was quite helpful in providing different facilities during the project period. Mr. Mahesh Khopkar, Mr. Jude James, Mr. Sameer Gandhi, Mr. Gautam Kamble, Mr. Dharmesh Jain, Mrs. Tejal Pallan & Carmen Katke of KAPL also lend their helping hands in making me understand merchandising concepts & Costing parameters involved in the process. I am also grateful to all the HODs and Miss. Vijeshri Kolbekar who led my way and I am extremely thankful for the help and support of the staff and employees of Katmandu Apparel Private Limited without which I could not make my project this much successful. Here comes the time to say my thanks to my institute NIFT which provided me this golden opportunity. At last but not the least I‟d like to thank my seniors and classmates who helped me directly or indirectly through their valuable suggestion. However, I accept the sole responsibility for any possible error of omission and would be extremely grateful to the readers of this project report if they bring such mistakes to my notice. MANISH SINGH DHAKAD M/BFT/10/11 NIFT, MUMBAI
  • 5. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 5 ABSTRACT Sourcing operations in Garment Buying House are extremely complex due to the intricacies of a global supply chain. Sourcing decisions should not be made without an exhaustive analysis of cost structures of resources required for production. FOB & Landed costs must be analysed for sourcing decisions, but they must be complemented by information of the effects of supplier lead times and consumer-retail interactions, which are critical to overall supply chain performance. To do perfect garment costing, one must know about all these activities thoroughly about their costs, procedures, advantages and risk factors. Also he must know how to solve the problems when occurred and to take suitable alternate decision immediately in time. We must be aware that there are always fluctuations in the costs of raw materials and accessories, charges of knitting, processing, finishing, sewing and packing, charges of transport and conveyance. Hence we must have update knowledge about the latest prices and charges, latest procedures, methods and quality systems, market prices and availability, transportation (road, sea, air) and freight charges, etc. An alternative approach towards Costing of denim jeans in a specific Buying House has been developed in this study. The model looks at cost structures for the entire supply chain from raw material sourcing to export of finished goods. The cost model shows the accrual of costs throughout each processing step within the textile and apparel industry. It also identifies costs related to international trade, including transportation costs and other different types of cost. The study examines the supply chain processes and costs for producing denim jeans in Asian region of the world. Trade agreement duty provisions, world cotton market price competitiveness, export tax rebates, and labour rates significantly affect a countries‟ competitiveness in the textile and apparel industry. The study helps identify the cost makeup of each process and the resources consumed. This model can assist companies to look outside their area of operation and have an appreciation of costs related to upstream and/or downstream processes within their supply chain. They can identify broad issues related to their strategic partnerships with suppliers and customers and investigate these in more detail. By combining supply chain costs, transportation time, and manufacturing responsiveness, analyses can be performed to identify scenarios where responsiveness is more critical than cost effectiveness. This study has found that a responsive supply chain can outweigh a lower cost but less responsive supply chain in certain sourcing environments.
  • 6. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 6 TABLE OF CONTENTS 1. INTRODUCTION ......................................................................................................................... 7 1.1. NEED OF THE PROJECT.............................................................................................................. 8 1.2. PROBLEM FORMULATION ........................................................................................................ 9 1.3. IDENTIFICATION OF TOPIC/DEVELOPMENT OF RESEARCH PROPOSAL .................................11 1.4. OBJECTIVE & SUB-OBJECTIVE OF THE PROJECT .....................................................................13 2. REVIEW OF LITERATURE .........................................................................................................14 2.1. COST, COSTING & COST ACCOUNTING ..................................................................................15 2.2. CLASSIFICATION OF COST ON DIFFERENT BASIS ....................................................................15 2.3. ESSENTIALS OF GOOD COSTING SYSTEM ...............................................................................18 2.4. RESEARCH JOURNAL ABSTRACT..............................................................................................18 2.5. COST CALCULATION SOFTWARES AVAILABLE IN MARKET .....................................................20 2.6. COST COMPONENTS ANALYSIS ..............................................................................................21 2.7. COST CALCULATIONS FORMULAS ..........................................................................................22 2.8. DIFFERENT PRICES OF RAW MATERIAL & LABOUR IN MARKET .............................................23 3. METHODOLOGY.......................................................................................................................25 3.1. QUANTITATIVE RESEARCH ......................................................................................................26 3.2. QUALITATIVE RESEARCH.........................................................................................................27 3.3. DATA COLLECTION METHOD ..................................................................................................27 3.4. REPRESENTATION OF DATA ANALYSIS....................................................................................28 3.5. STEPS OF METHODOLOGY ......................................................................................................29 3.6. WEEKLY TIME AND ACTION CALENDER ..................................................................................31 4. DATA COLLECTION & ANALYSIS .............................................................................................32 5. RESULT & EXPECTED OUTCOME ............................................................................................98 6. LIMITATIONS & FUTURE SCOPE OF PROJECT ......................................................................100 7. CONCLUSION .........................................................................................................................102 8. BIBLIOGRAPHY.......................................................................................................................104
  • 7. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 7 CHAPTER-1 INTRODUCTION
  • 8. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 8 1. INTRODUCTION:- I conducted my Graduation Project at KATMANDU APPAREL PRIVATE LIMITED, MUMBAI from 20 January 2014 to 20 May 2014. During my course of project, I tried to understand the concepts of garment costing, starting from the concept sample to the bulk production. I tried to imply the knowledge I have gained through various Merchandising, Costing & production related subjects I have been taught at NIFT and from all the knowledge I have gained at our institute and here at KATMANDU APPAREL PVT. LTD.; I have tried to document it here with my best efforts. 1.1 NEED OF THE PROJECT: The Indian textile and apparel industry is very large and diverse, employing 35 million people and accounting for 27 per cent of the country's exports. The apparel industry plays a pivotal role as a key driver of the national economy and has grown to be the most significant contributor to the country's economy over nearly three decades of its existence. The industry recorded a remarkable growth in a protected market environment; it faces a series of challenges notably in areas such as:  Price competitiveness.  Faster lead times.  High raw material base.  Full service offering.  Access to market. "A Cost is the value of economic resources used as a result of producing or doing the things costed". In order to achieve perfect garment costing, one must know about all the activities including purchase of fabrics, sewing, packing, transport, overheads, etc. & one must know about all these activities thoroughly about their costs, procedures, advantages and risk factors. Also he must know how to solve the problems when occurred and to take suitable alternate decision immediately in time. We must be aware that there are always fluctuations in the costs of raw materials and accessories, charges of knitting, processing, finishing, sewing and packing, charges of transport and conveyance. Hence we must have update knowledge about the latest prices and charges, latest procedures, methods and quality systems, market prices and availability, transportation (road, sea, air) and freight charges, etc.
  • 9. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 9 We must remember that the quality depends on price; price depends on quality. Each product will have different price according to its quality. We do not manufacture only one quality of garments. Also we manufacture the garments not only for one customer. While we do the garment costing, the customer‟s price level, quality & quantity and payment terms, to be taken into consideration. 1.2 PROBLEM FORMULATION: 1.2.1 INITIAL IDEA Simplification of Costing of Denim Jeans during concept sample development stage to generate value for research & development in new technology by development of cost calculation system. 1.2.2 RESEARCH PROBLEM During Costing process at the garment sampling stage, there are certain variances that are not taken into consideration because of its negligible effect during the production stage; there is a random variation in costing from concept development stage to production stage (usually a bit higher). The main problems here in Costing are given below- a. Standard operating procedures not followed b. No fix cost for value added service (embroidery, printing etc.) c. No check-points for cost components factors (stretch, Shrinkage etc.) d. No Calculation of trims (sewing threads etc.) for optimizes sourcing procedure. e. A department like sampling takes more time than the usual because of absence of Research & Development. 1.2.3 OBJECTIVE OF RESEARCH To develop an alternative approach towards costing of denim jeans with extrapolation of existing methods which will try to reduce cost & generate value for investment for Research & Development in new technical machinery.
  • 10. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 10 1.2.4 APPROCH ADOPTION TO METHODOLOGY INITIAL IDEA BACKGROUND STUDY REFINEMENT OF IDEA & PROBLEM FORMULATION REVIEW OF LITERATURE DESIGN & DEVELOPMENT OF METHODOLOGY DATA COLLECTION & ANALYSIS EXPECTED OUTCOME
  • 11. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 11 1.3 IDENTIFICATION OF TOPIC / DEVELOPMENT OF RESEARCH PROPOSAL: Project Title: An alternative approach towards Costing of denim jeans for Buying House Merchandising. Company Name: Katmandu Apparel Private Limited, Mumbai Student Name: Manish Singh Dhakad (M/BFT/10/11) Industry Mentor: Sanjay Archrekar, General Manager, Kathmandu Apparel Private Limited, Mumbai College Mentor: Ranjan Kumar Saha, Course-Coordinator Department of Fashion Technology, National Institute Of Fashion Technology Project Idea: Simplification of Costing of Denim Jeans during concept sample development stage to generate value for research & development in new technology by development of cost calculation system. Problem Statement: • During costing process at the garment sampling stage, there are certain variables that are not & taken into consideration because of its negligible effect during the production stage, hence there is a random deviation in the costing from sampling stage to production stage. • This project will help the company to find various dependent variables in garment costing to minimize the deviation in costing & to find accuracy in costing at Research & development stage by involving those variables which are not there in past researches and previously developed application/software. Objective: To develop an alternative approach towards costing of denim jeans with extrapolation of existing methods which will try to reduce cost & generate value for investment for Research & Development in new technical machinery.
  • 12. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 12 Proposed Methodology: Extrapolation of the existing costing procedure keeping in mind the changes going to incur to develop an alternative approach towards costing of denim jeans which can ensure maximum accuracy in costing without significant monetary loss. Study the basic costing at the acceptance stage of the order and compare it with the production costing, if there is variance then pinpoint the areas which were regularly wrongly costed and how this new system can help to recognise such areas. Find the cost profitability & cost savings to generate value for investment for R&D. Team/Resources: • Style Study to understand flow of company • People: Accountant, Merchandiser, Production manager, Buyer, Faculty Members • Subjects: Costing of Apparel products, Fashion Merchandizing, RDBMS, Garment Construction, ERP, Textile & Apparel Internship • Location: Katmandu Apparel Pvt. Ltd., Dadar, Mumbai • Support & Outside Services: Application based support for software demo. Expected Outcome: a.) A new way of calculating cost in less time which will enable us to manage the order flow at lower margin and to quote the best price to buyers. b.) Technical enhancement in R&D from total cost savings & profit margins of company. Related Documents: (Background Study) • Costing Techniques in Clothing Industry, Indian Textile Journal, May, 2009 • Methods of Garment Costing, Indian Textile Journal, November, 2013 •Factors influencing costing of Woven Fabric, Indian Textile Journal, January, 2009 •Merchandizing Costing, Textile Today, Published August, 2013
  • 13. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 13 1.4 OBJECTIVE OF THE PROJECT: The objectives of graduation project is firstly to gain practical exposure and secondly application of knowledge on real life projects and/or assignments. This graduation project is aimed towards blending the class room principles with industry application. This project also helps students to learn and improve their interpersonal communication skills with colleagues, peer group and workers. The main Objective of this Graduation Project is - “To develop an alternative approach towards costing of denim jeans with extrapolation of existing methods which will try to reduce cost & generate value for investment for Research & Development in new technology & machinery.” 1.4.1 SUB-OBJECTIVE OF THE PROJECT Sub-objectives of the project will be all the secondary objectives which are required for achieving Primary or main objective of the research.  To find dependent and independent factors of costing which are not there in past researches & previously developed applications.  To minimize the deviation in costing from concept development stage to production stage for accuracy in Costing.  To find Cost profitability in implementing new software, this will also reduce lead time, labour & Cost.
  • 14. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 14 CHAPTER-2 REVIEW OF LITERATURE
  • 15. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 15 2. REVIEW OF LITERATURE:- A review of literature may be a self-contained unit -- an end in itself -- or a preface to and rationale for engaging in primary research. A review is a required part of research proposals and generally, the purpose of a review is to analyze critically a segment of a published body of knowledge through summary, classification, and comparison of prior research studies, reviews of literature, and theoretical articles or Journals. 2.1 COST, COSTING & COST ACCOUNTING: Cost can be defined as the expenditure incurred on or attributable to a given thing. Cost is the amount of resources used for something which must be measured in terms of money. Costing is the techniques and processes of ascertaining costs. The techniques to be followed for the analysis of expenses and the processes of different products or services differ from industry to industry. The main object of costing is the analysis of financial records, so as to subdivide expenditure and to allocate it carefully to selected cost centres, and hence to build up a total cost for the departments, processes or jobs or contracts of the undertaking. Cost Accounting primarily deals with collection, analysis of relevant of cost data for interpretation and presentation for various problems of management. It is defined as, „the establishment of budgets, standard costs and actual costs of operations, processes, activities or products and the analysis of variances, profitability or the social use of funds‟. (Source: Managerial and Cost Accounting_2009 Larry M. Walther, Christopher J. Skousen, Free book by Bookboon.com) 2.2 CLASSIFICATION OF COST ON DIFFERENT BASIS 2.2.1 On the Basis of Time: a. Historical Costs: These costs are ascertained after they are incurred. Such costs are available only when the production of a particular thing has already been done. b. Pre-determined Costs: These costs are calculated before they are incurred on the basis of a specification of all factors affecting cost. Such costs may be: (i) Estimated costs: Costs are estimated before goods are produced; these are naturally less accurate than standards.
  • 16. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 16 (ii) Standard costs: This is a particular concept and technique. This method involves: 2.2.2 On the basis of Nature of Elements: There are three broad elements of costs which can be illustrated by the following chart: 2.2.3 On the basis of Association with the Product: a. Product Costs: Product costs are those which are traceable to the product and included in inventory values. In a manufacturing concern it comprises the cost of direct materials, direct labour and manufacturing overheads. b. Period Costs: Period costs are incurred on the basis of time such as rent, salaries, etc., include many selling and administrative costs essential to keep the business running. Though they are necessary to generate revenue, they are not associated with production; therefore, they cannot be assigned to a product.
  • 17. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 17 2.2.4 On the basis of Functionality: A company performs a number of functions. Functional costs may be classified as follows: a. Manufacturing/production Costs: It is the cost of operating the manufacturing division of an undertaking. b. Administration Costs: They are indirect and covers all expenditure incurred in formulating the policy, directing the organisation and controlling the operation of a concern, which is not related to research, development, production, distribution or selling functions. c. Selling and Distribution Cost: Selling cost is the cost of seeking to create and stimulate demand e.g. advertisements, market research etc. Distribution cost is the expenditure incurred which begins with making the package produced available for dispatch and ends with making the reconditioned packages available for re-use e.g. warehousing, cartage etc. d. Research and Development Costs: They include the cost of discovering new ideas, process and products by experiment and implementing such results on a commercial basis. e. Pre-production Cost: When a new factory is started or when a new product is introduced, certain expenses are incurred. There are trial runs. Such costs are termed as pre-production costs and treated as deferred revenue expenditure. 2.2.5 On the basis of behaviour: Costs can also be classified according to their behaviour. a. Fixed Costs b. Variable Costs c. Semi-variable Costs (Source: Study material: Executive programme Cost and Management Accounting (Module-1, Paper-2) The Institute of Company Secretaries of India In Pursuit of Professional Excellence, Statutory body under an Act of Parliament ICSI House, 22, Institutional Area, Lodi Road, New Delhi- 110003 Class notes (Sem-VI) : Costing of Apparel Products By- Rengini Chandramohan (Associate Professor))
  • 18. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 18 2.3 ESSENTIALS OF GOOD COSTING SYSTEM: For availing of maximum benefits, a good costing system should possess the following characteristics.  Costing system adopted in any organization should be suitable to its nature and size of the business and its information needs.  A costing system should be such that it is economical and the benefits derived from the same should be more than the cost of operating of the same.  Costing system should be simple to operate and understand. Unnecessary complications should be avoided.  Costing system should ensure proper system of accounting for material, labour and overheads and there should be proper classification made at the time of recording of the transaction itself.  Before designing a costing system, need and objectives of the system should be identified.  The costing system should ensure that the final aim of ascertaining of cost as accurately possible should be achieved. (Source: Intermediate (Group-II, Paper-8) Cost and Accounting management The institute of Cost Accountants of India, 12, Sudder Street, KOLKATA- 700016) 2.4 RESEARCH JOURNALS ABSTRACT Costing is a very complex procedure, with set patterns and guidelines followed by the industry, and it is difficult to find out costs for every processes there are some inbuilt costs while costing, elaborate Saroj Bala and Tripti Gupta. About 65 - 70% cost of the garment is the cost of the fabric and hence, it is very crucial to get the right cost of the fabric from fabric manufacturers and suppliers. Garment manufacturers struggle to get the best possible cost of the fabric. It would be interesting to know the important points to consider for getting a comprehensive understanding of costing. Costing seems to be a complex exercise as it depends on a number of variables. What are the costs to consider…? i) Direct cost: Cost of raw material -- 66%. Cost of size and chemicals - 4%. Production cost comprising of running the machine, maintenance, power fuel, humidification and other utilities -- 8 % and worker wages and salaries -- 8% losses incurred due to shrinkage, wastage, grading, and also selling commissions.
  • 19. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 19 ii) Indirect cost: Interest on investment, loan, working capital, depreciation, etc. Above 7%, overheads and administrative expenses like travelling, telephone, couriers, legal issues, taxes comprising of 7%. iii) Profit: 10 - 20% depending on the order size. In some companies, 70% of the fabric cost will comprise of direct cost, but in corporate selling only 40% cost of the fabric is direct cost and 60% is overheads. What are the factors which affect the cost …? Type of raw material Amount of raw material or GSM of the fabric Sizing and Chemicals Cost Production cost or cost of weaving process Mill-made or power loom made Wastage and shrinkage Dyeing costs Length & Width of fabric Shade % Class of dye and quality Colour Weight of the fabric Finishing cost Shrinkage and wastage Export terms & Conditions (Source: Ms Saroj Bala, Associate Professor & Mrs Tripti Gupta, Assistant Professor Pearl Academy of Fashion, New Delhi Factors influencing costing of Woven Fabric Indian Textile Journal, January, 2009)
  • 20. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 20 2.5 COST CALCULATION SOFTWARES AVAILABLE IN MARKET MerchanNet 6.08 (Cost: $599.00USD) Software for garment, clothing, apparel, leather, footwear, bags, luggage, socks, hats, necktie manufacturer, export trading company and factory in soft line products. CostingNet 4.38 (Cost: $249.00USD) CostingNet is used to create a detail product costing sheet. Best for factory or manufacturer in industry like garment, clothing, apparel, toys, home textiles, giftware, premium goods, household product, footwear, bags, luggage, plastic products, electrical & electronics, travel and sporting goods. SampleNet 4.28 (Cost: $249.00USD) SampleNet is used to manage all the sample development activity for your merchandising department. It generates sample orders with YY, trim parts and size spec., sample invoices, customs invoice, sample history report and sample status report in different grouping. (Source: www.softmenu.org www.ibuyer.hk)
  • 21. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 21 2.6 COST COMPONENTS ANALYSIS Direct Material: Fabric Shell (Consumption, Rate, Unit of measurement, Quantity) Fabric lining (Consumption, Rate, Unit of measurement, Quantity) Fabric Pocketing (Consumption, Rate, Unit of measurement, Quantity) Trims & accessories (Consumption, Rate, Unit of measurement, Quantity) All sewing trims are taken into consideration like Buttons, Zipper, Label, Rivet, Velcro, Twill tape, Studs, Hanger, and Polybags etc. except packaging trims like Carton boxes & stick tapes. Direct Labour: (Average manufacturing cost is taken from factory) Cut, Make (Rate, UOM, Quantity) Packaging charges (Rate, UOM, Quantity) Direct expenses: (Average manufacturing cost is taken from factory) Washing (Rate, UOM, Quantity) Heat Seal (Rate, UOM, Quantity) Print (Rate, UOM, Quantity) Embroidery (Rate, UOM, Quantity) Profit margin are added as per Buyer`s requirement of Quality, Quantity & Lead-time. (Source: Basic Cost sheet and Quotation sheet, Katmandu Apparel Private Limited)
  • 22. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 22 2.7 COST CALCULATIONS FORMULAS Warp Cost (cost per yard) = [{ } ] Weft Cost (cost per yard) = [{ } ] Warp weight = Weft weight = Fabric cost = [warp weight × warp yarn cost × weft weight × weft yarn cost] Cutting labour cost = Finishing labour cost = Cost per minute = CM cost = SAM of garment x minute cost of labour / line efficiency Efficiency for styles = Labor cost (salary paid) = SMV x Labour cost per minute CM = cutting cost + sewing cost + finishing cost (Source: www.ocs.com (Online Clothing Study) Class notes-NIFT (Sem-VI-B.F.Tech.) : Costing of Apparel Products By- Rengini Chandramohan (Associate Professor))
  • 23. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 23 2.8 DIFFERENT PRICES OF RAW MATERIAL, LABOUR & OTHER SERVICES IN MARKET Cotton seed price: 2.52 Yuan per ton (china) Seed cotton price: 8.93 Yuan per ton (china) Cotton Price: S.No. Month US Cents per pound 1 July 2013 92.62 2 Jun 2013 93.08 3 August 2013 92.71 4 September 2013 90.09 5 October 2013 89.35 6 November 2013 84.65 7 December 2013 87.49 8 Jan 2013 87.21 *Cotton with seed = 3 × cotton without seed Labour cost in different manufacturing countries by ILO in USD per hour: Asian competitors: S.No. Country USD per hour 1. Bangladesh 0.22 2. Cambodia 0.33 3. Pakistan 0.37 4. Vietnam 0.38 5. Srilanka 0.43 6. Indonesia 0.44 7. India 0.51 8. Remote inland area China 0.55 - 0.80 9. Other costal & core area China 0.86 - 0.94 10. Prime costal area China 1.08 11. Malaysia 1.18 12. Thailand 1.29-1.36
  • 24. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 24 US region supplier: S.No. Country USD per hour 1. Mexico 2.54 2. Honduras 1.72 - 1.82 3. Dominican Republic 1.55 - 1.95 4. Haiti 0.49 - 0.55 5. US 14.10 African region supplier: S.No. Country USD per hour 1. Turkey 2.44 2. Morocco 2.24 3. Russia 1.97 4. Tunisia 1.68 5. Bulgaria 1.53 6. Jordan 1.01 7. Egypt 0.83 Energy rates: S.No. Country USD per kilo watt hour 1. China 0.1000 2. Colombia 0.1070 3. Guatemala 0.1600 4. India 0.1120 5. US 0.0630 6. Vietnam 0.0550 *Water rates, steam, other cost can also be added. Duty Rates: S.No. Country Duty % Rebate % 1. China 16.5 15 2. Colombia 16.5 0 3. Guatemala 0 0 4. India 16.5 0 5. US 0 0 6. Vietnam 16.5 0 (Source: International Labour Organisation, ILO)
  • 25. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 25 CHAPTER-3 METHODOLOGY
  • 26. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 26 3. DESIGN AND DEVELOPMENT OF METHODOLOGY 3.1 Quantitative Research 3.1.1 Descriptive and interpretive approaches to qualitative research (What
is
the
current
situation?) Descriptive research seeks to describe the current status of an identified variable or phenomenon. The researcher does not usually begin with an hypothesis, but is likely to develop one after collecting data. Analysis and synthesis of the data provide the test of the hypothesis. Systematic collection of information requires careful selection of the units studied and measurement of each variable in order to demonstrate validity. 3.1.2 Correlation analysis approach (What
is
the Possible cause?)

 Correlational research attempts to determine the extent of a relationship between two or more variables using statistical data. Relationships between and among a number of facts are sought and interpreted to recognize trends and patterns in data, but it does not go so far in its analysis to establish cause and effect for them. Data, relationships, and distributions of variables are observed only. Variables are not manipulated; they are only identified and are studied as they occur in a natural setting. *Sometimes correlational research is considered a type of descriptive research, and not as its own type of research, as no variables are manipulated in the study. 3.1.3Causal-Comparative/Quasi-Experimental (What
was
the
cause?) Causal-comparative/quasi-experimental research attempts to establish cause-effect relationships among the variables. These types of design are very similar to true experiments, but with some key differences. An independent variable is identified but not manipulated by the experimenter, and effects of the independent variable on the dependent variable are measured. The researcher does not randomly assign groups and must use ones that are naturally formed or pre- existing groups. Identified control groups exposed to the treatment variable are studied and compared to groups who are not.
  • 27. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 27 3.2 Qualitative Research 3.2.1 Historical
 (What
was
the
situation?)  Description
of
past
events,
problems,
issues,
facts  Data
gathered from written or oral descriptions of past events, artifacts, etc.  Describes
what
was
in
an
attempt
to
reconstruct
the
past involves much interpretation
of
events
and
its
influence
on
the
present

 
 3.2.2 Grounded Theory (What is grounded theory?) Grounded theory is probably applied less often in business research than is either phenomenology or ethnography. Grounded theory represents an inductive investigation in which the researcher poses questions about information provided by respondents or taken from historical records. The researcher asks the questions to him or herself and repeatedly questions the responses to derive deeper explanations. Grounded theory is particularly applicable in highly dynamic situations involving rapid and significant change. 3.2.3 Ethnography (what is self-Observation?) Ethnography represents ways of studying cultures through methods that involve becoming highly active within that culture. Participant Observation involved in ethnography approach means the researcher becomes immersed within the culture that he or she is studying and draw data from his or her observation. (Source: http://www.weber.edu, http://www.bcps.org/ and CHAPTER 7 QUALITATIVE RESEARCH TOOLS_ http://www.cengage.com/) 3.3 Data collection method: 3.3.1 Primary Data: Extrapolation of Past records, Company Cost sheets, ERP Software Database, Different Directories of fabric, Trims & other
  • 28. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 28 Costs. Demonstrations of different cost effective software, Sourcing Department Records. Analysis of existing system. 3.3.2 Secondary Data: Available researches on costing, Textile Journals and Books available in Resource Center, Related Internet websites and previously developed application available on web. Class room Study Material & Internship reports. 3.4 Representation of data analysis: 3.4.1 Brainstorming: Brainstorming works by focusing on a problem, and then deliberately coming up with as many solutions as possible and by pushing the ideas as far as possible. One of the reasons it is so effective is that the brainstormers not only come up with new ideas in a session, but also spark off from associations with other people's ideas by developing and refining them.  No criticism  Welcome unusual ideas  Quantity Wanted  Combine and improve ideas 3.4.2 Check-sheet (Defect concentration diagram) A check sheet is a structured, prepared form for collecting and analyzing data. This is a generic tool that can be adapted for a wide variety of purposes. 3.4.3 Histogram: A graphical representation, similar to a bar chart in structure, that organizes a group of data points into user-specified ranges. The histogram condenses a data series into an easily interpreted visual by taking many data points and grouping them into logical ranges or bins.
  • 29. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 29 3.5 Steps of methodology: To develop an alternative approach towards costing of denim jeans with extrapolation of existing methods which will try to reduce cost & generate value for investment for Research & Development in new technical machinery. 3.5.1 To find dependent and independent factors of costing which are not there in past researches & previously developed applications.  Study the Company flow process & Job of Costing merchant.  Study the Cost related Journals and Researches for finding variables.  Brain-storming for developing check-sheet of Material & Labour requirement.  Collection of Check-sheet data of any concept sample for correction & Improvisation.  Differentiate dependent & independent factors for each entity.  Find advantages & disadvantages of including different dependent & independent variables. 3.5.2 To minimize the deviation in costing from concept development stage to production stage for accuracy in Costing.  Study of detailed Costing process & Cost components for effective Sourcing procedures.  Study of all Costing formulas in detail for accuracy in Costing.  Development of cost-sheet formats & other cost absorption formats in detail.  Customization of thread calculator as per the company product type for effective thread consumption calculation.  Collect data for costing of samples & costs which are followed by the company during concept sampling stage including wastages & profit margins to develop cost sheet for a particular season.  Compare cost and find variance & total cost savings.  Develop charts for the total trends followed in fabric prices.  Calculation of reverse cost for fabric from the data available on different resources for analysis of increment of cost during a period & for effective sourcing negotiation.
  • 30. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 30 3.5.3 To find Cost profitability in implementing new software, this will also reduce lead time, labour & Cost.  Study of present software used & find advantages & disadvantages of the system.  Enquiry, testing and demo of the new software for cost savings in man-power, time and overheads.  Comparison of cost profitability in implementing new system.  Suggestion of new machinery implementation in research and development from the total cost savings for the future scope of the research.  Reasons for investment in technological upgradation.
  • 31. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 31 MONTH(Week) TOPIC1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th 1DevelopmentofConceptforGP 2IdentificationofTopic 3DevelopmentofResearchProposal 4Studyofcompanyflowprocess 5LiteratureStudy 6BackgroundStudy 7Design&DevelopmentofMethodology 8JobofCostingmerchant 9Studyallcostingformulaindetailforaccuracyincosting 10UnderstandtheCostingprocess&costcomponents 11Developformatsofformsandcheck-sheet 12DevelopformatforCost-sheet 13MidtermReview&Analysisoffeedback 14ExecutionandFieldWork 15DataCollectionandAnalysis 16Developnewcostsheetforconceptsamples 17Studyofconceptdevelopmentsampleforcosting 18Findalldependentandindependentvariables 19Differentiatedependentandindependentfactors 20Datacollectionofstylesforcheck-sheetdirectory 21Findthemarginvariancebetweenquotationofdifferentstyles 22Findadvantagesanddisadvantagesofincludingdependentandindependentvariables 23Findtotalcostsavingsandmarginincrementsduringtheperiod 24Testinganddemoofthenewsoftwareforcostsavingsinman-power,timeandoverheads 25Comparisonofnewapplicationimplementation 26Enquiryofnewmachineryimplementationinresearchanddevelopment 27Thefuturescopeoftheresearch 28ReportWriting WEEKLYTIMEANDACTIONCALENDER S.No. JANUARYFEBRUARYMARCHAPRIL
  • 32. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 32 CHAPTER-4 DATA COLLECTION & ANALYSIS
  • 33. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 33 4.1 To find dependent and independent factors of costing which are not there in past researches/Journals/Literature & previously developed applications. 4.1.1 Study the Company flow process & Job of Costing merchant. a) Company flow process of Katmandu Apparel Pvt. Ltd.
  • 34. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 34 b) Job of Costing Merchant:  Develop standard costs.  Determine the cost of purchased or manufactured products/services.  Analyze the variance between costs and standard costs.  Interact with Production Control to ensure Bills of Materials (BOM) are accurate and up to date. Review and audit BOM‟s to ensure they reflect the latest manufacturing practices.  Analyze actual labor, material, and overhead cost against standard/Budget.  Work with the finance department to implement and apply cost accounting policies and procedures.  Support Controller‟s efforts for implementing and maintaining internal controls for operations, sales, engineering, and finance.  Development of new labor and overhead rates, budget, and forecasts. (Manufacturing Cost Analyst Job Description, http://www.lewmar.com Main Duties of Cost Analyst, http://www.jobwings.com) 4.1.2 Study the Cost related Journals and Researches for finding variables. ( (Source: Factors influencing costing of Woven Fabric, Indian Textile Journal, January, 2009)
  • 35. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 35 4.1.3 Brain-storming for developing check-sheet of Material & Labor requirement.
  • 36. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 36 4.1.4 Collection of Check-sheet data of any concept sample for correction & Improvisation. Cost_idSM_23_01SM_23_02SM_23_03SM_23_04SM_23_05 Productpackageno.82644 Styleno.KAG_82644 Referenceno.CF14_82644 CollectionSkinnyJeans SeasonFall2014 ProductGroupDenimJeans BrandJCP CategoryChildrens MaterialWear BuyerDenim FactoryJessicaMarple ProductDescriptionKAG FabricsupplierAZG(DCM)-SkinnyJeans AssignedIBOIndia CostingForSupplier SizesRegular FinishDestructive,rinse,Rock washDestructive,rinse,Rock DesignerSgill19 StylelineBottomWear CostingremarkDevelopmentStage CurrencyforcostingUSD-INR HandledbyManishDhakad UOMperGarment TradetermFOB STYLEDETAILSBREAKDOWN
  • 37. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 37 Cost_id Fabric For Shell_1 Shell_2 Pocketing Mill Reference_id KAG-13-391 KAG-13-1091 poly-cotton Buyer Reference_id Supplier Fabric Type Denim Denim Pocketing Composition Cotton, Ramie, Poly, Spandex Cotton, Ramie, Poly, Spandex Poly, Cotton Sourcing type Yarn dyed yarn dyed Solid UOM yds yds yds Quantity Quality grade Weave Twill Twill Twill Color Blue Blue White Style Yarn type Ring-spun Ring-spun Ring-spun Loom Country of origin China China China Count 28x28 GSM 120 Payment terms Shrinkage 4.5 to 8.5 4.5 to 8.5 4.5 to 8.5 Wastage Size & chemical Finishing Cuttable width 57 55 57 Finished width 58/59 56/57 58/59 Dyeing type Indigo Indigo Lead time 120 Days 120 Days 120 Days Extra % 3-5 % 3-5 % 3-5 % Consumption per marker Number of garments in marker 18 18 Average consumption SM_23_01 MATERIAL COST BREAKDOWN Cost_id Trim_id TS_82644_1 TS_82644_2 TS_82644_3 TS_82644_4 TS_82644_5 TS_82644_6 TS_82644_7 TP_82644_1 Trim type Stitching Stitching Stitching Stitching Stitching Stitching Stitching Packaging Trim Description AZ Metal logo Shank-27L-6-16 Category Buttons Buttons Zipper Thread Thread Elastic Buttons Sub-catergory Shank Rivet Metal Sewing Decorative Adjustable 4hole Plastic Size 27L 14L 3 120-60Tkt 40Tkt 3/4inches 24L UOM Piece Piece Piece Meter Meter Inche Piece Price terms Consumption Quantity Extra% 5 5 5 10 10 5 5 Wastage 3 3 3 3 3 3 3 Brand Arizona Arizona YKK Coats Coats Slotted Clear Plastic Material Metal Metal Metal Cotton Cotton Spandex Plastic Supplier Remark/Code JAZ-086AT JAZ-083 #3 Color Contrast Slotted 4hole Destruction Wash GY22 GY22 Antique Copper C8601 C3950 DTM Clear Rinse Wash GY22 GY22 Antique Copper C2336 C3950 DTM Clear Rock Wash GY22 GY22 Antique Copper A&E#45957Tan#3 C3950 DTM Clear TRIMS COSTBREAKDOWN SM_23_01
  • 38. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 38 Cost_id Packaging Code AZ-01-557-A CPSIA AZ-01-911-A AZ-01-920-B AZ-01-981-C BR-02-330-A 37-30-071-A Manufacturing Overheads Type of manufacturing UOM Piece Piece Piece Piece Piece Piece Piece Quanity 775000 775000 775000 775000 775000 775000 775000 Extra % 5 5 5 5 5 5 5 Packing Labeling Labeling Labeling Labeling Labeling Ticketing Ticketing Description Center label Tracking labelWaistband labelFit label Size label Matchbook hangtag Containers Transportation mode From To Export term Warehousing charges Export/import cost Interest % Disocunt % MANUFACTURING, SUB-CONTRACT, PACKING & TRANSPORTATION COST BREAKDOWN FOB (FREIGTH ON BOARD) SM_23_01 Cost_id SM_23_01 SM_23_02 SM_23_03 SM_23_04 SM_23_05 Factory_id Country China Port of origin Factory Efficiency Capacity Lead time 120 Days SAM 17 Min. Labour cost 1.55 Cutting 0.2 Stiching 1 Finishing 0.35 Quantity 775000 UOM Piece VAS Wash LABOUR & WORKMANSHIP COST BREAKDOWN
  • 39. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 39 Cost_idSM_23_01SM_23_02SM_23_03SM_23_04SM_23_05SM_23_06SM_23_07 Leadtime Buildingrent salaryofstaff Bills Utilities TransportaionExpenses Administrative Employeewelfare Stationary&printing Pantry Housekeeping Overtime Sales&Distribution Profit% R&D Security&helpers Training&Recruitment Repair&Replacement Depreciation Newspaper&Magazines Aftersalesexpenses BankExpenses Others ADMINISTRATIVE,SALES&DISTRIBUTION,PROFIT&OTHERCOSTBREAKDOWN
  • 40. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 40 4.1.5 Differentiate dependent & independent factors for each entity. STYLE DETAILS BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Product package no. 3 Style no. 4 Reference no. 5 Collection 6 Season 7 Product Group 8 Brand 9 Category 10 Material Dependent 11 Buyer Dependent 12 Factory Dependent 13 Product Description 14 Fabric supplier 15 Assigned IBO 16 Costing For 17 Sizes 18 Finish Dependent 19 Wash Dependent 20 Designer 21 Style line 22 Costing remark 23 Currency for costing 24 Handled by 25 UOM 26 Trade term Dependent MATERIAL COST BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Fabric For 3 Mill Reference_id 4 Buyer Reference_id 5 Supplier 6 Fabric Type Dependent 7 Composition Dependent 8 Sourcing type 9 UOM 10 Quantity Dependent 11 Quality grade Dependent 12 Weave Dependent
  • 41. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 41 13 Color Dependent 14 Style 15 Yarn type Dependent 16 Loom Dependent 17 Country of origin Dependent 18 Count Dependent 19 GSM Dependent 20 Payment terms Dependent 21 Shrinkage Dependent 22 Wastage Dependent 23 Size & chemical Dependent 24 Finishing Dependent 25 Cuttable width Dependent 26 Finished width Dependent 27 Dyeing type Dependent 28 Lead time Dependent 29 Extra % 30 Consumption per marker 31 Number of garments in marker 32 Average consumption Dependent TRIMS COST BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Trim_id 3 Trim type Dependent 4 Trim Description 5 Category Dependent 6 Sub-catergory Dependent 7 Size Dependent 8 UOM 9 Price terms Dependent 10 Consumption Dependent 11 Quantity Dependent 12 Wastage 13 Brand Dependent 14 Material Dependent 15 Supplier 16 Remark/Code 17 Destruction Wash Dependent 18 Rinse Wash Dependent 19 Rock Wash Dependent
  • 42. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 42 LABOUR & WORKMANSHIP COST BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Factory_id 3 Country Dependent 4 Port of origin Dependent 5 Factory Dependent 6 Efficiency Dependent 7 Capacity 8 Lead time Dependent 9 SAM Dependent 10 Labour cost Dependent 11 Cutting Dependent 12 Stitching Dependent 13 Finishing Dependent 14 Quantity Dependent 15 UOM 16 VAS Dependent MANUFACTURING, SUB-CONTRACT, PACKING & TRANSPORTATION COST BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Packaging Code 3 Manufacturing 4 Overheads 5 Type of manufacturing Dependent 6 UOM 7 Quanity Dependent 8 Packing Dependent 9 Description 10 Containers Dependent 11 Transportation mode From/To Dependent 12 Export term Dependent 13 Warehousing charges 14 Interest % Dependent 15 Export/import cost 16 Disocunt % Dependent
  • 43. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 43 ADMINISTRATIVE, SALES & DISTRIBUTION, PROFIT & OTHER COST BREAKDOWN S.No. Entity Dependent/Independent 1 Cost_id 2 Lead time 3 Building rent 4 salary of staffBills 5 Utilities 6 Transportation Expenses Dependent 7 Administrative Dependent 8 Employee welfare 9 Stationary & printing 10 Pantry 11 House keeping 12 Overtime 13 Sales & Distribution 14 Profit % 15 R & D 16 Security & helpers 17 Training & Recruitment 18 Repair & Replacement 19 Depreciation 20 Newspaper & Magazines 21 After sales expenses 22 Bank Expenses 23 Others 4.1.6 Find advantages & disadvantages of including different dependent & independent variables in Cost Accounting. Advantages Disadvantages Dependent variables are directly related to the cost of the entity, as it is directly linked to value added service. Independent variable helps us to understand & create linkage to develop directory & also for reference purpose. Dependent variables must be analyzed time to time as; cost may differ from time to time. Independent variables are not directly related to cost; hence they can be used for referring material type etc. Not for cost of material directly.
  • 44. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 44 4.2 To minimize the deviation in costing from concept development stage to production stage for accuracy in Costing. 4.2.1 Study of detailed Costing process & Cost components for effective Sourcing procedures. Material cost is a major cost component of garment manufacturing costs and a correct cost calculation method will give one a better projection of garment cost for a style, explains Vishnu Pareek. To do perfect garment costing, one must know about all these activities thoroughly about their costs, procedures, advantages and risk factors. Also he must know how to solve the problems when they occur and to take suitable alternate decision immediately in time. There are always fluctuations in the costs of raw materials and accessories, charges of knitting, processing, finishing, sewing and packing, charges of transport and conveyance. Hence knowledge update is required about the latest prices and charges, latest procedures, methods and quality systems, market prices and availability, transportation (road, sea, air) and freight charges, etc. Different Costing methods include:  Job Costing  Batch Costing  Contract or Terminal Costing  Single or Output Costing  Process Costing  Operation Costing  Operating Costing  Departmental Costing  Multiple Costing
  • 45. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 45 4.2.2 Study of all Costing formulas in detail for accuracy in Costing. Fabric Cost Breakdown: (No transportation cost involved) 1). Warp Cost (cost per yard) = [{ } ] (1Maund ≈ 37 Kilograms) (1 Oz. = 28.350 grams) (Denim⟶ 7-10 oz. & Non-denim⟶ 4-6 oz.) 2). Weft Cost (cost per yard) = [{ } ] (1 meter = 1.094 yards = 39.3701 inches) (Fabric width 59" = 1.4986 meters) 3). Wastage = 7 % 4). Miscellaneous = (weaving + Electricity + Maintenance etc.) 5). Fabric weight = [warp weight + weft weight] 6). Weaving Cost per Yard = Warp cost + Weft cost + Wastage + Miscellaneous 7). Warp weight = 8). Total ends = Fabric width X Ends per inch X Shrinkage % (Raw Cotton yarn shrinkage = 8 - 10 %) 9). Weft weight = 10). Fabric cost = [warp weight × warp yarn cost × weft weight × weft yarn cost]
  • 46. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 46 Price of fabric depends upon: a) Raw material cost b) Weaving cost c) Processing cost d) Yarn dyeing cost e) Packaging cost f) Grey checking cost g) Excise & other duties h) Machine & Land depreciation i) Manpower cost (Indirect labour) j) Power & Water cost k) Profit For ascertaining turns per inch: For weft (medium) yarn = √ × 3.25 For warp (medium) yarn = √ × 3.75 GSM ∝ Ends per inch/Picks per inch/Construction ∝ GSM ∝ Cost (for same type of fabric) Sizing cost ∝ Weight of warp per sq. meter of fabric in grams (A) = Weight of weft per sq. meter of fabric in grams (B) = GSM = Weight of weft yarn (A) + Weight of warp yarn (B) GSM = * + (Ounce/Sq. yard) = (GSM/33.91)
  • 47. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 47 General specification of denim jeans: GSM = 200 - 400 Yarn density (Tex) = 60 - 100 Density or Count = 10 – 6 GSM = * + ×[ ] 1 Tex = weight of 1000 meter thread in grams. Tkt. = ( ) (Rs.30) (Rs. 30) (Rs. 10per meter.) Ginning ⟶ Roving ⟶ Yarn ⟶ weaving (Rs. 1.5 kg) (1 kg.) (If order >15,000-20,000 meter then Dyeing Cost lowers by Rs.1-2/-) Price in China market: S.No. Process Cost (USD per pound) 1 Washing fiber $ 2.75 per pound 2 Twist $ 3 per pound 3 Carding $ 2.75 per pound 4 Worsted single ply $19 per pound Average textile processing cost: S.No. Process Cost Percentage 1 Carding cost $ 1.373 per pound 19-20 % 2 Filling Spinning room cost $ 1.26 per pound 18 % 3 Warping room cost $ 0.92 per pound 13 % 4 Spooling cost $0.558 per pound 8 % 5 Warping $ 0.183 per pound 2.5 % 6 Drawing cost $ 0.239 per pound 3.5 %
  • 48. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 48 7 Web drafting $ 0.501 per pound 7 % 8 Weaving $ 1.267 per pound 7.5 % 9 Finishing $ 0.639 per pound Different types of wastes: S.No. Item Percentage 1 Invisible loss 1.5 % 2 Sweepings 1.5 % 3 Usable waste 3-4 % 4 Card Sliver 0.5 % 5 Draw frame sliver 0.6 % 6 Speed frame 0.5 % 7 Ring frame 1.0 % 8 Roving end 0.4 % 9 Open end sliver 0.3 % 10 Combing 1 - 1.5 % 11 Waste overall 3-4 % (seeds) 12 Trash 15 % (depending upon geographical location) 13 Doff conditioning 1-1.5 % 14 Poly Spandex 6-12 % (weaving performance 100-130 %) 15 Warping & Weaving waste 2-3 % 16 Waste shrinkage 1-1.5 % 17 Value loss 7 % in running cotton 18 3 % in running polyester Dyeing cost: Vat Dyes > Reactive Dyes Finishing Cost: Flame retardency - 15Rs./meter Anti-static - 5Rs./meter Anti-satin - 10Rs./meter Anti-wrinkle - 5Rs./meter If added in jigger (softners)- 10Rs./Kg. Stentering - 20Rs./Kg.
  • 49. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 49 Shrinkage/Wastage: Cambric / Cotton - 5% Poly blends - 4.5% - 5% COST OF FABRIC = COST OF GREY FABRIC+DYEING CHARGES+FINISHINGING CHARGES+SHRINKAGE/WASTAGE Weaving costs:  Mill made loom cost ≈ 125 % Power loom cost  Twill weave = 12 paisa / pick / inch / sq. meter  Satin weave = 12 paisa / pick / inch / sq. meter  P.V. Suiting = 14.2 paisa / pick / inch / sq. meter  For 1000 meter dobby = 17 paisa / pick / inch / sq. meter  For 1000 meter Jacquard = 20 paisa / pick / inch / sq. meter  For 2400 hook Jacquard = 17 paisa / pick / inch / sq. meter  Double beam fabric = 40 paisa / pick / inch / sq. meter Rs. 35 per Kg. (approx.) includes steam, power or wages. Raw material cost per meter for 150 cm fabric width = [2.3 x Ozs. per sq. yard + 8.4]±4% RMC (Ring per meter) = RMC OE per meter x [1+Oz. per sq. yard/100] iNDEX = [ ] x 0.27 UHML=Upper half mean limit Str.=Strength in grams per tex using HVI mode. Fabric cost consideration: a.) Take accurate fabric consumption based upon new marker ratio and take testing commitment for width, shrinkage & defect percentage. b.) Take 2-7% buffer margin on material cost estimation. c.) Take consumption of pocket lining, shell etc. & all other different fabric used.
  • 50. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 50 Labour cost breakdown: Efficiency for styles = Cutting labour cost = Finishing labour cost = Cost per minute = Labor cost (salary paid) = SMV x Labour cost per minute CM = cutting cost + sewing cost + finishing cost CM cost = SAM of garment x minute cost of labour / line efficiency For accuracy: Labour cost per minute = CMT charges will include stitching, cutting, finishing, packing, embellishment, value added services, trims. Factory overhead over direct labour wages = Labour rate variance = (standard rate - actual rate) x actual hour worked Cutting SAM = Spreading, Marking, Cutting, Re-layering, Re- cutting, Sorting, Bundling. Stitching SAM = m/c time + material handling with allowances + Bundle time Total m/c time = [{(A+17B+C) x D} + {(A+17B+C) x D} E = (1+E %) x {(A+17B+C) x D} Finishing SAM: Pressing & finishing SAM will be calculated as per operations.
  • 51. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 51 4.2.3 Development of cost-sheet formats & other cost absorption formats in detail. For Pre-production Costing formats:  Factory expenses sheet  Administrative expenses sheet  Selling & Distribution expenses sheet  Time-study sheet  Data-base sheet  Cost-Sheet format For Post-production Costing formats:  Sewing Section sheet  Cutting Section sheet  Finishing & Packaging Section sheet  Power consumption in Cutting section  Power consumption in Sewing section  Power consumption in finishing & packing section  Depreciation Sheet  Insurance Premium sheet  Consumable goods sheet  Vehicles sheet  Mechanic`s purchase form  Total electricity consumption sheet  Indirect Labour expenses  Power consumption sheet  Cost-sheet format
  • 52. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 52 EASTERN KNIT WEAR LTD. EXPENSES INCURRED IN FACTORY S.NO. ITEMS PER MONTH PER MONTH ON DENIM JEANS TAKA USD TAKA USD 1 LESS: CLOSING STOCK 2 Freight & Forwarding 3 Freight inward 4 Electricity Bills 5 Fuel (Diesel & petrol) & Coal 6 Consumables stores 7 Annual maintenance contract 8 Books & Periodicals 9 Conveyance 10 Courier charges 11 Recruitment & Training 12 Insurance premium 13 Staff welfare 14 Miscellaneous expenses 15 Postage & telegram 16 Printing & stationary 17 Rent & Taxes 18 Repair & maintenance (m/c) 19 Repair & maintenance (Vehicles) 20 Repair & maintenance (plant) 21 Telephone & VC 22 Travelling 23 Water charges 24 Depreciation 25 Indirect labor (Managers) 26 Power 27 Waste/normal loss of material 28 Waste for foremen 29 Oil 30 Gases 31 Steam 32 Canteen & recreation 33 Drawing & Office expenses 34 Workers Compensation 35 Research expenses R&D 36 Health & Safety (facilities) 37 Security & House keeping 38 Store supervision expenses 39 Expenses of service department 40 ADD: OPENING WIP TOTAL
  • 53. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 53 EASTERN KNIT WEAR LTD. ADMINISTRATIVE EXPENSES S.NO. ITEMS AVG. PER MONTH PER MONTH ON DENIM JEANS INR USD INR USD 1 LESS: CLOSING STOCK 2 Freight & Forwarding 3 Freight inward 4 Electricity Charges 5 Fuel (Diesel & petrol) & Coal 6 Consumables stores 7 Annual maintenance contract 8 Books & Magazines 9 Conveyance allowances 10 Courier charges 11 Recruitment 12 Insurance premium 13 Salary & Staff welfare 14 Miscellaneous expenses 15 Bonus & Diwali expenses 16 Printing & stationary 17 Rent & Taxes 18 Repair & maintenance (m/c) 19 Repair & maintenance (office, others) 20 Leave encashment 21 Telephone & VC 22 Travelling 23 Water charges 24 Depreciation 25 P.F. employment contribution 26 Advertisement & Promotion 27 Donation 28 Certification, membership & Subscription 29 Oil & Gases 30 Bank Charges 31 Director`s Salary & GM Salary, others 32 Canteen & recreation, Pantry 33 Drawing & Office expenses 34 Overtime 35 Sampling expenses, R&D 36 Repair & Replacement 37 Helpers & House keeping 38 Audit fee & Legal expenses 39 Expenses of service department 40 ADD: OPENING WIP TOTAL
  • 54. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 54 EASTERN KNIT WEAR LTD. SALES & DISTRIBUTION EXPENSES S.NO. ITEMS AVG. PER MONTH PER MONTH ON DENIM JEANS INR USD INR USD 1 LESS: CLOSING STOCK 2 Courier charges 3 EGCC Report 4 Export promotion Council 5 Freight charges 6 Laboratory charges 7 Sales & Promotion 8 Ware housing charges 9 Audit & Quality checking 10 Sales tax 11 Foreign tours 12 Insurance 13 Catalogues 14 Samples 15 Folders 16 Royalties 17 Market research 18 Demonstration expenses 19 Cost of sales 20 Profit 21 22 ADD: OPENING WIP TOTAL
  • 55. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 55
  • 56. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 56
  • 57. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 57 KATMANDU APPAREL GROUP PPK No. Date Cost_id Buyer Style No. Brand Product Season Order Details Remark: Order Quantity Sizes Embroidery/Embellishment Wash/Finish Value Addition Service PRE-PRODUCTION COST-SHEET DESCRIPTION QUANTITY UOM UNIT PRICE AMOUNT Direct Material Direct Labour Direct Expenses Prime Cost Indirect material Indirect Labour Indirect Expenses Manufacturing Cost Administrative Expenses Sales & marketing Expenses Profit Margin Total Cost of Product Handled By: Approved By: Developed by: Manish S. Dhakad, KAG, Mumbai
  • 58. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 58
  • 59. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 59
  • 60. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 60
  • 61. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 61
  • 62. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 62
  • 63. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 63
  • 64. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 64
  • 65. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 65
  • 66. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 66
  • 67. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 67
  • 68. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 68
  • 69. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 69
  • 70. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 70
  • 71. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 71
  • 72. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 72 Date Buyer Brand Season Remark: QUANTITY AMOUNT Direct Material Direct Labour Direct Expenses Indirect material Indirect Labour Indirect Expenses Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai Value Addition Service Order Details Order Quantity Sizes Embroidery/Embellishment Wash/Finish Total Cost of Product Manufacturing Cost Administrative Expenses COST-SHEET ADD: WASTAGE FINISHING & PACKING KATMANDU APPAREL GROUP PPK No. Cost_id Style No. Product FABRIC PRINT/EMBROIDERY/WASH/DYEING TRIMS & ACCESSORIES CUTTING SEWING Prime Cost DESCRIPTION UOM UNIT PRICE Sales & marketing Expenses Handled By: Approved By:
  • 73. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 73 4.2.4 Customization of thread calculator as per the company product type for effective thread consumption calculation.
  • 74. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 74 4.2.5 Collect data for costing of samples & costs which are followed by the company during concept sampling stage including wastages & profit margins to develop cost sheet for a particular season. Date 06/03/2014 Buyer J. C. PENNY Brand ARIZONA BOYS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.80 YDS $2.008 $44,192.064 0.23 YDS $0.207 $4,555.656 $2.326 $51,185.106 135 Meter $0.213 $4,688.364 1 PCS. $0.020 $440.160 1 PCS. $0.050 $1,100.400 1 PCS. $0.036 $792.288 1 PCS. $0.025 $550.200 5 PCS. $0.220 $4,841.760 2 PCS. $0.035 $764.118 0.95 YDS $0.054 $1,191.733 1 PCS. $0.051 $1,122.408 1 PCS. $0.262 $5,766.096 2 PCS. $0.069 $1,509.749 $1.086 $23,905.640 $1.420 $31,251.360 $0.350 $7,702.800 $0.200 $4,401.600 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.057 $0.051 AFTER ADDING WASTAGE (5%) Handled By: Approved By: PER PIECE COST (USD) TOTAL ORDER VALUE (USD) 10.00% Total Cost of Product $5.920 $1,30,291.156 Manufacturing Cost $1.970 $43,355.760 $0.034 AFTER ADDING WASTAGE (5%) $5.382 $1,18,446.506Prime Cost Direct Material Direct Labour Direct Expenses Sewing Thread CPSIA Label Wash care AZ-01-894 $0.002 $0.020 $0.050 $0.036 Zipper-brass Wash care AZ-01-548 Match book Wash care AZ-01-911 Horn Button 24 L 28 L Button Shear Plastic $0.262 24 L 4 hole Clear Button 3/4 " Button hole elastic $0.017 CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) $0.044 KATMANDU APPAREL PRIVATE LIMITED AZB SU14 BTMYD CARGO SHORT REGULAR NO YES Order Details Order Quantity Sizes Embroidery/Embellishment Wash/Finish 22008 90880 9147 Value Addition Service COST-SHEET PPK No. $0.200 CUT, MAKE PACKAGING CHARGES $1.420 $0.350 Cost_id Style No. Product WASHING CHARGES NO FABRIC SHELL $2.510 $0.025 FABRIC POCKETING TRIMS & ACCESSORIES SU-14-AZ-90880-BANG CARGO SHORT AMOUNT (USD) TOTAL $0.900
  • 75. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 75 Date 01/04/2014 Buyer J. C. PENNY Brand OKIE-DOKIE Season FALL_14 EXTRA % 5% PCS. REMARK: 0.38 YDS $0.923 $1,72,252.883 $0.970 $1,80,865.527 0.091 PCS. $0.043 $7,978.401 0.091 PCS. $0.043 $7,978.401 0.52 YDS $0.034 $6,305.120 55 Meter $0.087 $16,189.980 0.52 YDS $0.030 $5,626.107 0.22 YDS $0.012 $2,298.197 1 PCS. $0.036 $6,715.512 1 PCS. $0.024 $4,477.008 $0.324 $60,447.163 $0.660 $1,23,117.720 $0.320 $59,693.440 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $2.501 TOTAL ORDER VALUE (USD) $4,66,536.235 Prime Cost $2.274 $4,24,123.850 Manufacturing Cost $0.980 $1,82,811.160 AFTER ADDING WASTAGE (5%) Direct Labour CUT, MAKE $0.660 Direct Material FABRIC SHELL $2.430 Size Wrap $0.036 Main label with wash care $0.024 $0.065 1 1/4" knitted elastic $0.058 1/2" Twill tape $0.056 Sewing Thread $0.002 1 3/8" Knitted elastic AFTER ADDING WASTAGE (5%) TRIMS & ACCESSORIES Master Polybag $0.470 Carton $0.470 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish NO Product CHOP POCKET SHORT Order Details ODITBFA14 COTTON NYLON SHORT Order Quantity 186542 Style No. FA14-OD-43301 KATMANDU APPAREL PRIVATE LIMITED PPK No. 43301 Cost_id 9151 $0.320PACKAGING CHARGES
  • 76. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 76 Date 12/02/2014 Buyer J. C. PENNY Brand TOTAL GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.48 YDS $1.022 $13,188.960 0.06 YDS $0.052 $673.380 $1.128 $14,555.457 1 PCS. $0.022 $283.800 1 PCS. $0.105 $1,354.500 0.071 PCS. $0.075 $961.695 1 PCS. $0.022 $283.800 100 Meter $0.158 $2,035.620 2 PCS. $0.386 $4,979.400 2 PCS. $0.034 $438.600 0.66 YDS $0.038 $485.298 1 PCS. $0.023 $296.700 2 PCS. $0.044 $567.600 1 PCS. $0.193 $2,489.700 1 PCS. $0.020 $258.000 1 PCS. $0.039 $503.100 $1.216 $15,684.704 $0.870 $11,223.000 $0.350 $4,515.000 $0.200 $2,580.000 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $4.141 TOTAL ORDER VALUE (USD) $53,413.977 Prime Cost $3.764 $48,558.161 Manufacturing Cost $1.420 $18,318.000 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour $0.200 Direct Material FABRIC SHELL $2.130 FABRIC POCKETING $0.870 27 L button $0.039 Rivets 7.5 mm $0.022 Zipper semi auto $0.193 CPSIA Label $0.020 24 L Button $0.017 3/4 " elastic $0.057 Match book $0.023 $1.050 Sewing thread $0.002 Zipper antique nickle $0.193 Main label with wash care $0.022 Carton AFTER ADDING WASTAGE (5%) TRIMS & ACCESSORIES Sizer $0.022 Hanger $0.105 COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Embroidery/Embellishment NO Wash/Finish YES Value Addition Service NO KATMANDU APPAREL PRIVATE LIMITED PPK No. 99678 Cost_id 9215 $0.870 $0.350 Style No. FA14-TG-99678-REG CUT, MAKE PACKAGING CHARGES WASHING CHARGES Product DENIMSKIRT Order Details TGF14 WOVEN COATED DENIMSKIRT Order Quantity 12900 Sizes REGULAR
  • 77. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 77 Date 12/02/2014 Buyer J. C. PENNY Brand TOTAL GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.53 YDS $1.049 $10,265.231 0.07 YDS $0.077 $753.214 $1.183 $11,569.367 0.071 PCS. $0.075 $729.248 1 PCS. $0.220 $2,152.040 1 PCS. $0.105 $1,027.110 3 PCS. $0.066 $645.612 1 PCS. $0.220 $2,152.040 2 PCS. $0.036 $352.152 80 Meter $0.126 $1,234.880 1 Set $0.750 $7,336.500 0.71 YDS $0.040 $395.878 1 PCS. $0.023 $224.986 1 PCS. $0.193 $1,887.926 1 PCS. $0.020 $195.640 1 PCS. $0.039 $381.498 $2.009 $19,651.285 $0.910 $8,901.620 $0.350 $3,423.700 $0.730 $7,140.860 $0.200 $1,956.400 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $5.920 TOTAL ORDER VALUE (USD) $57,907.555 Prime Cost $5.382 $52,643.232 Manufacturing Cost $2.190 $21,422.580 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour HEAT SEAL $0.910 $0.350 $0.730 Direct Material FABRIC SHELL $1.980 FABRIC POCKETING $1.100 27 L Logo Button $0.039 Match book $0.023 Antique nickle zipper $0.193 CPSIA Label $0.020 Sewing Thread $0.002 Studs $0.750 3/4" Button hole elastic $0.057 $0.105 Main label with wash care $0.220 24 L Button $0.018 7.5 mm Rivet $0.022 Hanger AFTER ADDING WASTAGE (5%) TRIMS & ACCESSORIES Carton $1.050 Sizer $0.220 COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Embroidery/Embellishment NO Wash/Finish YES Value Addition Service YES KATMANDU APPAREL PRIVATE LIMITED PPK No. 98061 Cost_id 9217 $0.200 Style No. FA14-TG-98061-REG CUT, MAKE PACKAGING CHARGES WASHING CHARGES Product DENIMSKIRT Order Details TGF14 WOVEN DENIMSKIRT Order Quantity 9782 Sizes REGULAR
  • 78. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 78 Date 14/02/2014 Buyer J. C. PENNY Brand TOTAL GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.50 YDS $1.265 $29,360.650 0.07 YDS $0.084 $1,949.640 $1.416 $32,875.805 1 PCS. $0.105 $2,437.050 1 PCS. $0.022 $510.620 0.071 PCS. $0.075 $1,730.306 1 PCS. $0.032 $742.720 2 PCS. $0.035 $805.851 80 Meter $0.126 $2,930.030 1 Set $0.850 $19,728.500 0.7 YDS $0.040 $926.079 1 PCS. $0.023 $533.830 1 PCS. $0.193 $4,479.530 1 PCS. $0.021 $487.410 1 PCS. $0.039 $912.153 $1.639 $38,035.283 $0.830 $19,264.300 $0.350 $8,123.500 $0.540 $12,533.400 $0.200 $4,642.000 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.830 $0.350 $0.540 $0.200 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $5.473 TOTAL ORDER VALUE (USD) $1,27,021.716 Prime Cost $4.975 $1,15,474.288 Manufacturing Cost $1.920 $44,563.200 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES HEAT SEAL Direct Material FABRIC SHELL $2.530 FABRIC POCKETING $1.200 AFTER ADDING WASTAGE (5%) Antique nickle Zipper $0.193 CPSIA Label $0.021 27 L logo Button $0.039 4 mm Dome stud $0.850 3/4" elastic $0.057 Match book $0.023 $1.050 24 L Button $0.017 Sewing Thread $0.002 Main label with wash care $0.032 Carton TRIMS & ACCESSORIES Hanger $0.105 Sizer $0.022 Value Addition Service YES COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish YES Product DENIMSKIRT WITH ZIPPER Order Details TGF14 WOVEN DENIMSKIRT WITH ZIPPER Order Quantity 23210 Style No. FA14-TG-99866-REG KATMANDU APPAREL PRIVATE LIMITED PPK No. 99866 Cost_id 9213
  • 79. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 79 Date 30/01/2014 Buyer J. C. PENNY Brand ARIZONA GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.81 YDS $2.325 $61,976.502 0.06 YDS $0.078 $2,079.480 $2.523 $67,258.781 0.091 PCS. $0.074 $1,965.109 0.656 YDS $0.035 $944.404 185 Meter $0.292 $7,782.854 2 PCS. $0.038 $999.750 1 PCS. $0.021 $559.860 1 PCS. $0.193 $5,145.380 1 PCS. $0.049 $1,306.340 1 PCS. $0.020 $533.200 1 PCS. $0.058 $1,546.280 1 PCS. $0.031 $826.460 1 PCS. $0.032 $853.120 3 PCS. $0.077 $2,047.488 1 PCS. $0.039 $1,039.740 $1.006 $26,827.483 $0.940 $25,060.400 $0.350 $9,331.000 $0.460 $12,263.600 $0.210 $5,598.600 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.460 EMBROIDERY $0.210 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $6.038 TOTAL ORDER VALUE (USD) $1,60,973.851 Prime Cost $5.489 $1,46,339.865 Manufacturing Cost $1.960 $52,253.600 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE $0.940 PACKAGING CHARGES $0.350 WASHING CHARGES Direct Material FABRIC SHELL $2.870 FABRIC POCKETING $1.300 AFTER ADDING WASTAGE (5%) 27 L logo button $0.039 Wash care $0.031 Main label $0.032 9.5 mm rivet $0.026 Match book $0.049 CPSIA Label $0.020 Size wrap $0.058 $0.002 Label AZ-01-920B $0.021 Antique nickle Zipper $0.193 24 L Button $0.019 Sewing thread TRIMS & ACCESSORIES Carton $0.810 3/4 " hole elastic $0.054 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment YES Wash/Finish YES Product BOTTOMGIRLS ROLL CUFF Order Details AZGFA14BTM- PRINTED ROLL CUFF Order Quantity 26660 Style No. FA14-AZ-99972-REG KATMANDU APPAREL PRIVATE LIMITED PPK No. 99972 Cost_id 9196
  • 80. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 80 Date 22/02/2014 Buyer J. C. PENNY Brand ARIZONA GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.88 YDS $2.059 $78,126.048 0.03 YDS $0.077 $2,902.410 0.06 YDS $0.084 $3,186.960 $2.331 $88,426.189 1 PCS. $0.021 $796.740 1 PCS. $0.040 $1,517.600 1 PCS. $0.032 $1,214.080 1 PCS. $0.031 $1,176.140 1 PCS. $0.052 $1,972.880 1 PCS. $0.020 $758.800 1 PCS. $0.049 $1,859.060 1 PCS. $0.193 $7,322.420 1 PCS. $0.022 $834.680 2 PCS. $0.035 $1,317.277 3 PCS. $0.077 $2,913.792 0.656 YDS $0.032 $1,219.543 215 Meter $0.339 $12,871.904 0.077 PCS. $0.062 $2,366.318 1 PCS. $1.050 $39,837.000 $2.158 $81,877.145 $0.880 $33,387.200 $0.420 $15,934.800 $0.700 $26,558.000 $0.210 $7,967.400 $0.300 $11,382.000 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai PRINT $0.880 $0.420 $0.700 $0.210 $0.300 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $7.699 TOTAL ORDER VALUE (USD) $2,92,086.008 Prime Cost $6.999 $2,65,532.734 Manufacturing Cost $2.510 $95,229.400 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES EMBROIDERY Direct Material FABRIC SHELL $2.340 FABRIC LINING $2.550 FABRIC POCKETING $1.400 AFTER ADDING WASTAGE (5%) Sewing thread $0.002 Carton $0.810 Hanger $1.050 24 L Button $0.017 9.5 mm Rivet $0.026 3/4" button hole elastic $0.049 Match book $0.049 Antique nickle Zipper $0.193 Sizer $0.022 $0.032 Size wrap $0.052 CPSIA Label $0.020 wash care $0.031 Main label TRIMS & ACCESSORIES Label AZ-01-920B $0.021 27 L logo Button $0.040 Value Addition Service YES COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment YES Wash/Finish YES Product SKINNY JEAN Order Details AZGFA14BTM SKINNY JEAN W PRINTED PATCH Order Quantity 37940 Style No. FA14-AZ-100010-REG KATMANDU APPAREL PRIVATE LIMITED PPK No. 100010 Cost_id 9184
  • 81. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 81 Date 03/03/2014 Buyer J. C. PENNY Brand ARIZONA GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.59 YDS $1.174 $43,343.076 0.05 YDS $0.048 $1,771.968 $1.283 $47,370.796 1 PCS. $0.020 $738.320 1 PCS. $0.048 $1,771.968 215 Meter $0.339 $12,524.491 1 PCS. $0.020 $738.320 1 PCS. $0.028 $1,033.648 1 PCS. $0.031 $1,144.396 1 PCS. $0.020 $738.320 1 PCS. $0.042 $1,543.089 1 PCS. $0.062 $2,299.498 $0.641 $23,658.652 $1.030 $38,023.480 $0.420 $15,504.720 $0.500 $18,458.000 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $1.030 $0.420 $0.500 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $4.261 TOTAL ORDER VALUE (USD) $1,57,317.213 Prime Cost $3.874 $1,43,015.648 Manufacturing Cost $1.950 $71,986.200 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES Direct Material FABRIC SHELL $1.990 FABRIC POCKETING $0.960 AFTER ADDING WASTAGE (5%) Stickers $0.020 24 L Mock Snap button $0.042 24 L Snap button $0.062 $0.002 Hang Tag $0.028 Wash care label $0.031 CPSIA Label $0.020 sewing thread TRIMS & ACCESSORIES Sizer $0.020 Hanger $0.048 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish YES Product DENIMJACKET Order Details AZLGSP14 WOVEN DENIMJACKET Order Quantity 36916 Style No. FA14-AZ-57491 KATMANDU APPAREL PRIVATE LIMITED PPK No. 57491 Cost_id 9327
  • 82. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 82 Date 14/03/2014 Buyer J. C. PENNY Brand TOTAL GIRLS Season FALL_14 EXTRA % 5% PCS. REMARK: 0.91 YDS $2.166 $16,362.619 0.10 YDS $0.120 $906.600 $2.400 $18,132.680 1 PCS. $0.022 $166.210 1 PCS. $0.105 $793.275 1 PCS. $0.032 $241.760 2 PCS. $0.035 $262.310 2 PCS. $0.045 $338.464 1 PCS. $0.020 $151.100 170 Meter $0.268 $2,026.704 1 PCS. $0.022 $166.210 0.7 YDS $0.034 $259.137 1 PCS. $0.193 $1,458.115 1 PCS. $0.039 $296.912 $0.856 $6,468.206 $0.930 $7,026.150 $0.350 $2,644.250 $0.660 $4,986.300 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.930 $0.350 $0.660 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $5.716 TOTAL ORDER VALUE (USD) $43,183.344 Prime Cost $5.196 $39,257.586 Manufacturing Cost $1.940 $14,656.700 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES Direct Material FABRIC SHELL $2.380 FABRIC POCKETING $1.200 AFTER ADDING WASTAGE (5%) Antique nickle zipper $0.193 27 L logo button $0.039 Sewing Thread $0.002 Match book $0.022 3/4" hole elastic $0.049 $0.032 7.5 mm rivet $0.022 CPSIA Label $0.020 24 L button $0.017 Main label with wash care TRIMS & ACCESSORIES Sizer $0.022 Hanger $0.105 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish YES Product KNEE JAGGING Order Details TGF14 WOVEN PIECED KNEE JEGGING Order Quantity 7555 Style No. FA14-TG-98046-REG KATMANDU APPAREL PRIVATE LIMITED PPK No. 98046 Cost_id 9317
  • 83. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 83 Date 22/04/2014 Buyer J. C. PENNY Brand OKIE-DOKIE Season FALL_14 EXTRA % 5% PCS. REMARK: 0.33 YDS $0.703 $31,096.999 0.07 YDS $0.069 $3,065.901 $0.811 $35,871.045 0.02 YDS $0.010 $442.410 1 PCS. $0.020 $884.820 70 Meter $0.110 $4,886.861 0.558 YDS $0.036 $1,604.621 1 PCS. $0.036 $1,592.676 1 PCS. $0.024 $1,061.784 $0.249 $10,996.831 $0.590 $26,102.190 $0.330 $14,599.530 $0.220 $9,733.020 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.590 $0.330 $0.220 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $2.419 TOTAL ORDER VALUE (USD) $1,07,032.877 Prime Cost $2.199 $97,302.616 Manufacturing Cost $1.140 $50,434.740 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES Direct Material FABRIC SHELL $2.130 FABRIC POCKETING $0.990 AFTER ADDING WASTAGE (5%) $0.002 Size wrap $0.036 Main label with wash care $0.024 1 3/8 " elastic $0.065 Sewing thread TRIMS & ACCESSORIES Micro dotted inlining $0.500 CPSIA Label $0.020 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish YES Product DENIMSHORT Order Details ODITBFA14 PULL-ON DENIMSHORT Order Quantity 44241 Style No. FA14-OD-97984 KATMANDU APPAREL PRIVATE LIMITED PPK No. 97984 Cost_id 9331
  • 84. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 84 Date 24/04/2014 Buyer J. C. PENNY Brand OKIE-DOKIE Season FALL_14 EXTRA % 5% PCS. REMARK: 0.33 YDS $0.782 $48,666.955 $0.821 $51,100.302 65 Meter $0.000 $0.000 1 PCS. $0.000 $0.000 1 PCS. $0.000 $0.000 1 PCS. $0.000 $0.000 0.525 YDS $0.000 $0.000 $0.000 $0.000 $0.770 $47,914.020 $0.380 $0.000 $0.220 $13,689.720 Profit Margin Developed by: Manish S. Dhakad, KAG, Mumbai $0.770 $0.380 $0.220 Handled By: Approved By: 10.00% Total Cost of Product PER PIECE COST (USD) $2.410 TOTAL ORDER VALUE (USD) $1,23,974.447 Prime Cost $2.191 $1,12,704.042 Manufacturing Cost $1.370 $61,603.740 AFTER ADDING WASTAGE (5%) Direct Expenses Direct Labour CUT, MAKE PACKAGING CHARGES WASHING CHARGES Direct Material FABRIC SHELL $2.370 AFTER ADDING WASTAGE (5%) $0.000 1 1/8" Knitted elastic $0.000 Main label with wash care $0.000 CPSIA label TRIMS & ACCESSORIES Sewing thread $0.000 Size wrap $0.000 Value Addition Service NO COST-SHEET CATEGORY DESCRIPTION CONSUMPTION UOM RATE (USD) AMOUNT (USD) TOTAL Sizes REGULAR Embroidery/Embellishment NO Wash/Finish YES Product DENIMPANT Order Details OD BABY BOY F14 DENIMPANT Order Quantity 62226 Style No. FA14-OD-104937 KATMANDU APPAREL PRIVATE LIMITED PPK No. 104937 Cost_id 9414
  • 85. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 85 4.2.6 Compare cost and find variance & total cost savings. ORDERFabricFabricCostFabricFabricCostFabricFabricCost QUANTITYShellShellSavingLiningLiningSavingPocketingPocketingSaving DifferencePriceShellDifferencePriceShellDifferencePriceShell 90880AZBSP14BTMYDCARGOSHORTS2200802.51$$-00.90$$- 43301 ODITBFA14COTTONNYLONSHORTPORKCHOP PKTS. 1865420.022.43$$9,065.94 99678TGF-14WOVENCOSTEDDENIMSKIRT129000.022.13$$549.5400.87$$- 98061TGF-14WOVENDENIMWITHZIPPERSKIRT97820.051.98$$968.420.011.10$$107.60 99866TGF-14WOVENDENIMWITHZIPPERSKIRT232100.012.53$$587.210.011.20$$278.52 99972AZGFA14BTM-PRINTEDROLLCUFFCROP2666002.87$$--0.011.30$$-346.58 100010 AZGFA14BTM-FASHIONSKINNYJEANPRINTED PATCHES 379400.042.34$$3,551.180$2.55$-01.40$$- 97430 AZGFA14BTM-DENIMJACKETWITHKNIT SLEEVES 0 57491 AZGFA14BTM-FASHIONSKINNYJEANPRINTED PATCHES 36916-0.011.99$$-734.6300.96$$- 98046TGF-14WOVENPIECEDKNEEJEGGING7555-0.042.38$$-719.24-0.011.20$$-90.66 100014AZGFA14BTM-FASHIONBOOTCUTSCATTERED0 100016 AZGFA14BTM-FASHIONBOOTCUTLUREXAND EMBELLISMENT 0 100008 AZGFA14BTM-SIDESEAMEMBELLSHEDFASHION SKINNEYJEANS 0 100017 AZGFA14BTM-FASHIONBOOTCUTWSIDESEAM PRINT 0 97984ODITBFA14PULLONDENIMSHORT442410.022.13$$1,884.670$0.99$- 104937ODBABYBOYF14DENIMPANTLEGGING622260.022.37$$2,949.51 TOTAL18,051.49$664788$18,102.61$-$-51.12 OrderCancelled OrderCancelled OrderCancelled FALL-14SEASONORDERS(FABRICCOSTSAVINGFROMSAMPLINGTOPRODUCTION) PPK#TYPE (Putaverageconsumptioninyardspergarment) OrderCancelled OrderCancelled
  • 86. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 86 S.no.PPKNo.Description Required Quantity TOTAL(m) Thread requiredin mtr. ByFactoryVariance Costsaving per garment Totalcostsaving 190880AZBSP14BTMYDCARGOSHORTS22008134.961352891540.09$1,958.98$ 243301ODITBFA14COTTONNYLONSHORTPORKCHOPPKTS.18654253.0055119640.04$6,900.56$ 399678TGF-14WOVENCOSTEDDENIMSKIRT1290095.12100139390.02$290.79$ 498061TGF-14WOVENDENIMWITHZIPPERSKIRT978277.38801801000.06$565.40$ 599866TGF-14WOVENDENIMWITHZIPPERSKIRT2321078.0980163830.05$1,113.48$ 699972AZGFA14BTM-PRINTEDROLLCUFFCROP26660183.87185227420.02$647.20$ 7100010AZGFA14BTM-FASHIONSKINNYJEANPRINTEDPATCHES37940214.83215236210.01$460.52$ 897430AZGFA14BTM-DENIMJACKETWITHKNITSLEEVES 957491AZGFA14BTM-FASHIONSKINNYJEANPRINTEDPATCHES36916212.80215236210.01$448.09$ 1098046TGF-14WOVENPIECEDKNEEJEGGING7555167.611703271570.09$685.59$ 11100014AZGFA14BTM-FASHIONBOOTCUTSCATTERED 12100016AZGFA14BTM-FASHIONBOOTCUTLUREXANDEMBELLISMENT 13100008AZGFA14BTM-SIDESEAMEMBELLSHEDFASHIONSKINNEYJEANS 14100017AZGFA14BTM-FASHIONBOOTCUTWSIDESEAMPRINT 1597984ODITBFA14PULLONDENIMSHORT4424168.4570140700.04$1,789.99$ 16104937ODBABYBOYF14DENIMPANTLEGGING6222664.2965140750.04$2,697.50$ 17,558.08$TOTALCOSTSAVING FALL-14SEASON_THREADCOSTSAVING ORDERCANCELLED ORDERCANCELLED
  • 87. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 87 (1Yds=36Inches)BeforeAfterBeforeAfter Cuttablewidth(Inches)55"55"055"56"57"1"1" Shrinkage%(weft,warp)4.5to144.5to122%inwarp4.5to8.54.5to8.54.5to8.500 Laylength(Yds)17.2567516.890722-0.36602816.24152815.95647215.661556-0.28506-0.579972 Consumptionpergarment(Yds.)0.958710.93837-0.020340.902310.886470.87009-0.01584-0.03222 Markerefficiency%80.96681.2790.31381.89581.9282.0490.0250.129 Wastepercentage%19.03418.721-0.31318.10518.0817.951-0.025-0.129 Totalfabricrequired(Yds.)743000.25727236.75-15763.5699290.25687014.25674319.75-12276-24970.5 Totalfabricincluding5%extra780150.2625763598.5875-16551.675734254.7625721364.9625708035.7375-12889.8-13329.225 Totalcostoffabric@1.91$peryard14,90,087.00$14,58,473.30$-31613.6992514,02,426.60$13,77,807.08$13,52,348.26$-24619.5-50078.33775 31,613.70$50,078.34$ (-ivesigninvariancecolumnshowsdecreaseintheentity&+ivesignshowstheincrementforaparticularentity.) FabricType KAG-13-1091(Shrinkage problem) KAG-13-391(BulkCuttable57") ProductPackageNumber82644(Totalorderquantity=775000) VarianceVariance@57" TotalCostSavingsinUSD Variance @56"
  • 88. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 88 4.2.7 Develop chart for the total trends followed in fabric with prices.
  • 89. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 89 4.2.8 Calculation of reverse cost for fabric from the data available on different resources for analysis of increment of cost during a period & for effective sourcing negotiation.
  • 90. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 90 4.3 To find Cost profitability in implementing new software, this will also reduce lead time, labor & Cost. 4.3.1 Study of present system used & write observations based on analysis. Observations during the study: 1. Targets are given to operators based on time-studies which do not take work-study into consideration. 2. Operations are not set properly; there is a massive scope to improve methods & reduce cost in the factory. 3. There are too many helpers in the lines, helpers can be easily reduced. 4. The current layout is poor and needs improvement. 5. Many Garment parts are marked and in many cases these are unnecessary. 6. A transportation system will improve productivity considerably. 7. No information on end-bits utilization 8. Splicing should be used and will improve fabric utilization. 9. Fabric reconciliation is not being done; Fabric profit and loss is not calculated for the orders. 10.Comparison of Costed, Marked and Achieved consumption is not done. 11.Marker making is done manually, which is time consuming and fabric is not utilized properly. 4.3.2 Enquiry, testing and demo of the new software for cost savings in man- power, time and overheads. Description Enquiry Demo Testing Optitex-3D    Pro-Suit   × RFID   × Mod-sew  × ×
  • 91. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 91 4.3.3 Comparison of cost profitability in implementing new system. Section a The following factors have been identified to have an influence on adoption of CAD / CAM. Factors influencing adoption of IT Strongly positive Moderately positive Indifferent Moderately negative Strongly negative Can’t say High Price Reduces dependence on people Failed installation in other organization Collaborative working between various employees, supplier and buyer is easier Ability of supplier to train the users in our organization Saves fabric The supplier does not have an office in the location where my organization is situated
  • 92. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 92 Section b This sheet will help you decide which system is best for your pattern development department and organization. (Even if you have one) Criteria RICH-PEACE OPTI-TEX TUKATEC H GERBER ASTER JAIMINI STUDIO CAD Source How you found out about them BANSWARA APPLICATION SUPPORT ENGG. (OPTITEX) KAPL APPLICATION SUPPORT ENGG. (OPTITEX) APPLICATIO N SUPPORT ENGG. (OPTITEX) MR. PRAMOD Communications-digitizers and file import 5 7 6 3 1 4 2 Piece geometry identifications(points, lines, notches, orientations lines, piece rotation line for 3 6 7 4 5 1 2 Improves first pass quality product Reduces throughput time for product assemble Requirement of constant training Ready availability of literate professionals Constant up gradation of system required CHANCES OF ERROR MAY INCREASE
  • 93. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 93 marker making) GUPTA Pattern design functions- measurement capabilities 4 6 5 3 7 2 1 Pattern design functions- darts, pleats, trace, cut, combine, shrink, stretch, flip, rotate patterns. 4 7 6 2 5 3 1 Pattern design functions- seam allowance definition, corners, corner insert 5 7 6 2 4 3 1 Removing and adding of patterns from present files, printing and redo and undo functions & keyboard and mouse hot keys- shortcut keys 6 7 5 2 3 4 1 APPLICATIO N SUPPORT ENGG. (OPTITEX) MR. PRAMOD GUPTA Pattern grading functions 7 6 5 2 3 4 1 Maker making functions 5 6 4 3 7 2 1 Automatic marker making functions 4 6 5 1 7 3 2 Software platforms 3 7 6 5 4 2 1 Outputs and consumables availability 4 6 5 1 7 3 2 Manuals 6 7 5 1 3 4 2 Communications access with respect internet compatibility 3 7 6 2 4 5 1 Warranty and after sales service 5 7 6 3 4 1 2 CAM and CAS interface 6 7 5 2 4 3 1 Customizing features 4 5 7 6 3 1 2 Cost implications 1 6 7 3 2 5 4
  • 94. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 94 Interface capabilities with other design software 1 7 6 2 3 4 5 Plotting facility 7 5 4 6 1 2 3 TOTAL 83 122 96 53 77 56 35 Any remarks: 3D PATTERING IN STYLE CAD IS COMING OPTITEX- BODY CUSTOMIZATION & LOW PRICE TUKA-TECH- NO BODY CUSTOMIZATION & HIGH PRICE 4.3.4 Suggestion of new machinery implementation in research and development from the total cost savings for the future scope of the research. 4.3.4.1 Double Bed Heat Seal (Price: $1281.079) Heat Transfer Press Machine Model DC 54(Platen size- 15 x 20 with microprocessor based digital timer and digital temperature controller & counter. Features:  Manually operated heat transfer press  Ideal machine for plastisol fusing. curing and heat transfer printing  Easy operation through clamp system.  Electronic contractor switching for noise free and zero maintenance.  Anti-static Teflon is use on the upper bed to prevent corrosion.  Minimum moving parts result in zero maintenance. Model Size Power Temp M/C Dimensions Weight DC 44 15"x15" 1500w/hr, 230V 220°C L25" W26" H31" 75Kgs DC 54 20"x15" 3600w/hr, 230V 220°C L28" W26" H31" 85Kgs DC 64 22"x17" 3600w/hr, 230V 220°C L30" W28" H31" 105Kgs
  • 95. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 95 4.3.4.2 Taking-TK-6090-CXLS (Price: $366.865) Single Needle Large Hook Heavy Duty Machine TK6090LS (Long Stitch) Features:  The standard 1-needle type machine that delivers the basic functions and performance best suited to the sewing of heavy- weight materials.  The maximum stitch length is 10mm. The complete rectangular feed locus enables accurate feed of extra heavy-weight materials while preventing stitch gathering.  With its sufficient needle bar stroke of 38mm and long 190R needle, the machine supports the sewing of extra heavy-weight materials  Automatic lubricating mechanism helps improve maintainability  Equipped with a bottom-feed adjusting mechanism that adjusts the amount of bottom-feed while keeping the needle feed fixed. 4.3.4.3 AMS-221EN-HS3020/7200 (246mm×200mm) Computer-controlled Cycle Machine with Input Function (for sewing pockets on jeans) Features: ・The machine sews folded pocket cloth on the garment body. ・Maximum stitching range of a pocket that can be sewn is 246mm (width) × 200mm (length)
  • 96. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 96 Model name AMS-221EN-HS3020/7200 Application Heavy-weight Max. sewing speed 2,000 sti/min Stitch length 0.1~12.7mm (0.05mm step) Storage of pattern data in the memory Main-body memory: Max. 500,000 stitches, 999 patterns (max. 50,000 stitches / pattern) External media: Max. 49,950,000 stitches, 999 patterns (max. 50,000 stitches / pattern) Needle DP×17(#19) 4.3.4.4 AP-876 (Full-automatic) (Automatic Pocket Setter-For jeans) The machine automatizes a series of pocket setting processes such as the folding of a pocket, placement of the pocket on a garment body, sewing, bar-tacking and stacking, thereby increasing productivity and achieving production without requiring the operator to have any special skill. This promises consistent finished quality. Model name AP-876 Machine head High-speed, 1-needle, lockstitch, zigzag stitching machine (exclusive machine head) Max. sewing speed 4,000sti/min Sewing area 250mm (L)×250mm (W) Stitch length 0.1~6mm Operation panel IP-420 (large-sized color liquid crystal touch panel) Strage of pattern data in the memory Max. 999 pattern
  • 97. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 97 4.3.5 Reasons for investment in technological upgradation. In this changing business scenario to gain the competitive edge apparel companies need to upgrade them to meet the fast changing demand of the market and generating profit margins at the same time. Under mentioned are some of the reasons strengthening the need of technological upgradation:  To meet the fast paced fashion cycle demand Apparel Companies must be updated with the latest & sophisticated infrastructure in terms of technical & software abilities. It is because one cannot easily predict the demand of the overseas buyer.  For companies dealing in high volumes, even minor saving in terms of material, labour & time will yield greater profit.  Despite the high prices of the machineries break-even point can be achieved earlier as the volumes are high.  Technological upgradation can smoothen the sourcing procedure as samples can be virtually presented even if trims & other materials are not available. We can develop physical samples of those styles only which are approved in the virtual form.  Conclusively with efficient technology we can quote comparatively lower cost to the buyers & attract more orders in the future.
  • 98. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 98 CHAPTER-5 RESULT/EXPECTED OUTCOME
  • 99. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 99 a.) A new way of calculating cost in less time which will enable us to manage the order flow at lower margin and to quote the best price to buyers.  Costing is done on the basis of CIP (Cost Integrated process) which includes complete breakdown of cost components & cost is calculated separately for each entity i.e. fabrics cost, trims cost, SAM cost, Packaging, margin & profits etc.  Pre-production & Post-production cost can be absorbed during the actual production & same data can be used further for quotation purpose during concept development stage. b.) Technical enhancement in R&D from total cost savings & profit margins of company.  Successful enquiry, demo & Implementation of new Industrial engineering software for easy calculation of SAM & reducing cost of production planning & control.  Successful enquiry, demo & Implementation of Optitex virtual 3-D sampling (CAD software) for cost saving by reducing lead time, manpower & other needful resources.
  • 100. Katmandu Apparel Pvt. Ltd. | Manish Singh Dhakad, BFT, NIFT 100 CHAPTER-6 LIMITATIONS & FUTURE SCOPE OF PROJECT