What is Shoring?
Shoring is the construction of a temporary structure to support temporarily an
unsafe structure. These support walls laterally. Shoring can be used when walls
bulge out, when walls crack due to unequal settlement of foundation and repairs
are to be carried out to the cracked wall, when an adjacent structure needs
pulling down, when openings are to be newly made or enlarged in a wall.
Types of shoring
1. Raking shoring
2. Flying shoring
3. Dead shoring
1. Raking Shoring
In this method, inclined members known as rakers are used to give lateral
supports to walls (figure 1 to 3). A raking shore consists of the following
components:
1. Rakers or inclined member
2. Wall plate
3. Needles
4. Cleats
5. Bracing
6. Sole plate
The following points are to be kept in view for the use of the raking shores:
1. Rakers are to be inclined in the ground at 450
. However the angle may be between 450
and 750
.
2. For tall buildings, the length of the raker can be reduced by introducing rider raker.
3. Rakers should be properly braced at intervals.
4. The size of the rakers is to be decided on the basis of anticipated thrust from the wall.
5. The centre line of a raker and the wall should meet at floor level.
6. Shoring may be spaced at 3 to 4.5m spacing to cover longer length of the bar.
7. The sole plate should be properly embedded into the ground on an inclination and should be of
proper section and size.
8. Wedges should not be used on sole plates since they are likely to give way under vibrations that
are likely to occur.
Fig.1: Raking Shores Wall Support
Fig.2: Detail of Head of the Raker Shores
Fig.3: Raking shore for Multistoried Building where inclination of the rakers has to
be limited due to short land width available
2. Flying Shoring
Flying shores is a system of providing temporary supports to the party walls of
the two buildings where the intermediate building is to be pulled down and rebuilt
(figure 4 and 5). All types of arrangements of supporting the unsafe structure in
which the shores do not reach the ground come under this category.
The flying shore consists of wall plates, needles, cleats, horizontal struts
(commonly known as horizontal shores) and inclined struts arranged in different
forms which varies with the situation. In this system also the wall plates are
placed against the wall and secured to it.
A horizontal strut is placed between the wall plates and is supported by a system
of needle and cleats. The inclined struts are supported by the needle at their top
and by straining pieces at their feet. The straining piece is also known as
straining sill and is spiked to the horizontal shore. The width of straining piece is
the same as that of the strut.
When the distance between the walls (to be strutted apart) is considerable, a
horizontal shore can not be safe and a trussed framework of members is
necessary to perform the function of flying shore.
Fig.4: Flying Shore
Fig.5: Flying shore when the distance between two walls is considerable
3. Dead Shoring
Dead shore is the system of shoring which is used to render vertical support to
walls and roofs, floors, etc when the lower part of a wall has been removed for
the purpose of providing an opening in the wall or to rebuild a defective load
bearing wall in a structure (figure 6 and 7).
The dead shore consists of an arrangement of beams and posts which are
required to support the weight of the structure above and transfer same to the
ground on firm foundation below.
Fig.6: Dead Shore
When opening in the wall are to be made, holes are cut in the wall at such a
height as to allow sufficient space for insertion of the beam or girder that will be
provided permanently to carry the weight of the structure above.
Distance at which the holes are cut depends upon the type of masonry and it
varies from 1.2m to 1.8m centre. Beams called needles are placed in the holes
and are supported by vertical props called dead shores at their ends on either
side of the wall. The needles may be of timber or steel and are of sufficient
section to carry the load above.
Fig.7: Section of the elevation showing arrangement of dead shores for making an
opening in an existing wall
The dead shores stand away from wall on either side so as to allow for working
space when the needle and the props are in position. The props are tightened up
by folding wedges provided at their bases while the junction between the prop
and the needle is secured with the help of dogs.
Before the dismantling work is started, all the doors, windows or other openings
are well strutted. In order to relieve the wall of load of floors and roof above, they
are independently supported.
Vibrations and shocks are bound to occur when wall cutting is done as such a
measure of safety raking shores are sometimes erected before commencement
of wall cutting operation.

More Related Content

Similar to Shoring.pdf

Similar to Shoring.pdf (20)

Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
 
L-3 Shear Wall Part-2.ppt
L-3 Shear Wall Part-2.pptL-3 Shear Wall Part-2.ppt
L-3 Shear Wall Part-2.ppt
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Rt wall
Rt wall Rt wall
Rt wall
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1
 
Earthquake resistant buildings
Earthquake resistant buildingsEarthquake resistant buildings
Earthquake resistant buildings
 
Bonding in brickwork (1)
Bonding in brickwork (1)Bonding in brickwork (1)
Bonding in brickwork (1)
 
Wall materials
Wall materialsWall materials
Wall materials
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
shearwall-160814135725-161228164319.pdf
shearwall-160814135725-161228164319.pdfshearwall-160814135725-161228164319.pdf
shearwall-160814135725-161228164319.pdf
 
Shear Wall PPT
Shear Wall PPTShear Wall PPT
Shear Wall PPT
 
Scaffolding, underepinning and shoring
Scaffolding, underepinning and shoringScaffolding, underepinning and shoring
Scaffolding, underepinning and shoring
 
Earthquake resistance in buildings
Earthquake resistance in buildingsEarthquake resistance in buildings
Earthquake resistance in buildings
 
Architectural structures shear-wall.ppt
Architectural structures shear-wall.pptArchitectural structures shear-wall.ppt
Architectural structures shear-wall.ppt
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Wall construction
Wall construction Wall construction
Wall construction
 
Brick Masonry.pptx
Brick Masonry.pptxBrick Masonry.pptx
Brick Masonry.pptx
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 

Recently uploaded

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 

Shoring.pdf

  • 1. What is Shoring? Shoring is the construction of a temporary structure to support temporarily an unsafe structure. These support walls laterally. Shoring can be used when walls bulge out, when walls crack due to unequal settlement of foundation and repairs are to be carried out to the cracked wall, when an adjacent structure needs pulling down, when openings are to be newly made or enlarged in a wall. Types of shoring 1. Raking shoring 2. Flying shoring 3. Dead shoring 1. Raking Shoring In this method, inclined members known as rakers are used to give lateral supports to walls (figure 1 to 3). A raking shore consists of the following components: 1. Rakers or inclined member 2. Wall plate 3. Needles 4. Cleats 5. Bracing 6. Sole plate The following points are to be kept in view for the use of the raking shores: 1. Rakers are to be inclined in the ground at 450 . However the angle may be between 450 and 750 . 2. For tall buildings, the length of the raker can be reduced by introducing rider raker. 3. Rakers should be properly braced at intervals. 4. The size of the rakers is to be decided on the basis of anticipated thrust from the wall. 5. The centre line of a raker and the wall should meet at floor level.
  • 2. 6. Shoring may be spaced at 3 to 4.5m spacing to cover longer length of the bar. 7. The sole plate should be properly embedded into the ground on an inclination and should be of proper section and size. 8. Wedges should not be used on sole plates since they are likely to give way under vibrations that are likely to occur. Fig.1: Raking Shores Wall Support
  • 3. Fig.2: Detail of Head of the Raker Shores
  • 4. Fig.3: Raking shore for Multistoried Building where inclination of the rakers has to be limited due to short land width available 2. Flying Shoring Flying shores is a system of providing temporary supports to the party walls of the two buildings where the intermediate building is to be pulled down and rebuilt (figure 4 and 5). All types of arrangements of supporting the unsafe structure in which the shores do not reach the ground come under this category. The flying shore consists of wall plates, needles, cleats, horizontal struts (commonly known as horizontal shores) and inclined struts arranged in different forms which varies with the situation. In this system also the wall plates are placed against the wall and secured to it.
  • 5. A horizontal strut is placed between the wall plates and is supported by a system of needle and cleats. The inclined struts are supported by the needle at their top and by straining pieces at their feet. The straining piece is also known as straining sill and is spiked to the horizontal shore. The width of straining piece is the same as that of the strut. When the distance between the walls (to be strutted apart) is considerable, a horizontal shore can not be safe and a trussed framework of members is necessary to perform the function of flying shore. Fig.4: Flying Shore
  • 6. Fig.5: Flying shore when the distance between two walls is considerable 3. Dead Shoring Dead shore is the system of shoring which is used to render vertical support to walls and roofs, floors, etc when the lower part of a wall has been removed for the purpose of providing an opening in the wall or to rebuild a defective load bearing wall in a structure (figure 6 and 7). The dead shore consists of an arrangement of beams and posts which are required to support the weight of the structure above and transfer same to the ground on firm foundation below.
  • 7. Fig.6: Dead Shore When opening in the wall are to be made, holes are cut in the wall at such a height as to allow sufficient space for insertion of the beam or girder that will be provided permanently to carry the weight of the structure above. Distance at which the holes are cut depends upon the type of masonry and it varies from 1.2m to 1.8m centre. Beams called needles are placed in the holes and are supported by vertical props called dead shores at their ends on either side of the wall. The needles may be of timber or steel and are of sufficient section to carry the load above.
  • 8. Fig.7: Section of the elevation showing arrangement of dead shores for making an opening in an existing wall The dead shores stand away from wall on either side so as to allow for working space when the needle and the props are in position. The props are tightened up by folding wedges provided at their bases while the junction between the prop and the needle is secured with the help of dogs. Before the dismantling work is started, all the doors, windows or other openings are well strutted. In order to relieve the wall of load of floors and roof above, they are independently supported.
  • 9. Vibrations and shocks are bound to occur when wall cutting is done as such a measure of safety raking shores are sometimes erected before commencement of wall cutting operation.