DO’s and DON’Ts for Siting and Design of
Fuel Tank Room for
Emergency Generators
Fire Services Department
January 2007
Table of Content
1. Introduction
2. Siting and Design of Fuel Tank Room
3. Important Notice
1. Introduction
1.1 Objective
The objective of this Guide is to provide general guidance on the siting and
design of Fuel Tank Room(FTR) for emergency generators.
1.2 Scope
The FTR in this Guide refers to a separate room for housing fuel tank with
capacity exceeding 500 litres or fuel tank interconnected with other fuel
tanks through piping. For fuel tank with capacity of 500 litres or below,
reference should be made to Fire Services Standard Requirements of
Emergency Electrical Generator [NP/105(5th
Revision)].
1.3 Legislative Control
1.3.1 Under section 6 of the Dangerous Goods Ordinance, Chapter 295, no person
shall store any dangerous goods in excess of exempted quantity in any
premises or place without a licence issued by the Authority, viz. the Director
of Fire Services. In accordance with the Dangerous Goods (General)
Regulations, Cap. 295B, the exempted quantity of Diesel Oil is 2,500 litres.
1.3.2 Storage tank for diesel oil requires the approval from the Authority in
accordance with regulation 99A of the Dangerous Goods (General)
Regulations, Cap. 295B.
2. Siting and Design of FTR
The DO’s and DON’Ts criteria in respect of siting and design of FTR(s) are
tabulated below:-
2.1 DO’s
1. The FTR(s) should only be installed for the supply of fuel to
emergency generator for Fire Service Installation (FSI) or power
backup for emergency building facilities/essential service, e.g. bank
computer system.
2. Storage of fuel is restricted to Cat. 5 Class 3 DG only.
3. The enclosure walls and the entrance doors of the FTR(s) should have
at least 2-hour and 1-hour Fire Resisting Period (FRP) respectively.
4. The doors of the FTR(s) should be self-closing and opened in the
direction of egress.
5. Individual protected lobby should be provided to each FTR when it
cannot discharge directly to open air.
6. Doors of the protected lobby should be self-closing with at least
1-hour FRP and should be opened in the direction of egress.
7. A door curb of at least 300 mm high with 100% retaining capacity for
the aggregate quantity of fuel should be provided.
8. Natural ventilation to open air should be available otherwise
mechanical ventilation should be provided.
9. FTR(s) of volume less than 44m3
should be provided with
independent fire suppression system in accordance with the scale
stipulated in item 8.3 of FSD Circular Letter No. 4/96 Part VIII.
10. Major Automatic and Fixed Fire Service Installation should be
provided if the cubic volume of the room is greater than 44m3
.
2.2 DON’Ts
1. Siting of FTR(s) shall not jeopardize any means of escape.
2. Aggregate quantity of the fuel oil in FTR(s) on the same floor shall
not exceed 2,500 litres.
3. Piping connecting fuel tank(s) and/or generator set(s) shall not pass
through any means of escape/common area.
4. In domestic building(s) used exclusively for dwelling purpose, FTR(s)
located at level exceeding 30 m in height is not permitted.
Composite building(s) where upper floors being used for dwelling
purpose are considered as domestic building.
5. FTR(s) on different floors shall not overlap with the one immediately
above or below.
6. The running of fuel pipelines inside building and passing through
floors is not desirable. (see Note)
Note : Fuel pipelines running inside building and passing through floors
(i.e. centralized fuel supply design) would most likely create various types of
fire risks e.g. accumulation of flammable vapour in pipe duct, unwanted and
unchecked fire spread laterally and/or horizontally etc. If the centralized
fuel supply design is the only option to be considered, the fuel pipelines
shall as far as possible run on the external wall of the building where natural
ventilation could be achieved. If internal pipe routing is inevitably adopted,
the following fire safety measures to mitigate potential fire risks shall be
observed:-
(i) mechanical ventilation of at least 5 air changes per hour
to be provided;
(ii) flammable gas detectors to detect any formation of
flammable vapour due to failure of ventilating system to
be provided;
(iii) all electrical fitting and fixture within the hazardous
areas to be complied with BS EN 60079;
(iv) the main fuel pipeline not to jeopardize the means of
escape and to be housed within an enclosure having not
less than 4 hours FRP;
(v) access door / opening to enable inspection and
maintenance of the fuel supply line to be provided;
(vi) good management practice of conducting regular
inspections and preventive maintenance to be provided;
(vii) high level and overflow alarm to detect and control
overfilling to be provided;
(viii) manual override to stop the operation of the fuel
pumping system to be provided;
(ix) overfill return pipe to be connected to the storage tank;
(x) leakage sensors to detect fuel leakage to be provided;
and
(xi) emergency cut off switch /stop at the management
office to be provided for suspending fuel supply to the
fuel tank and the main fuel pipeline.
3. Important Notice
This Guide provides general guidance only and all applications will be
considered on a case by case basis in addition to the above Do’s and Don’ts.

More Related Content

Viewers also liked

Portafolio de presentación
Portafolio de presentaciónPortafolio de presentación
Portafolio de presentaciónteacheryadi
 
Lean start up bootcamp 5 three models to bring focus
Lean start up bootcamp 5   three models to bring focusLean start up bootcamp 5   three models to bring focus
Lean start up bootcamp 5 three models to bring focusJames Cracknell
 
Dhtic diaposotivas con imagenes y bibliografia
Dhtic diaposotivas con imagenes y bibliografiaDhtic diaposotivas con imagenes y bibliografia
Dhtic diaposotivas con imagenes y bibliografiasodreck
 
Humanising-your-data-strategy
Humanising-your-data-strategyHumanising-your-data-strategy
Humanising-your-data-strategyhighgate10
 
Defensa del portafolio individual
Defensa del portafolio individualDefensa del portafolio individual
Defensa del portafolio individualsgc224
 
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...Victor Manuel Agullo Boix
 
buongthangbotangap
buongthangbotangapbuongthangbotangap
buongthangbotangapstanjack99
 
Renascimento cultural (cap.8)
Renascimento cultural (cap.8)Renascimento cultural (cap.8)
Renascimento cultural (cap.8)Wilton Moretto
 
Illegal_fish_leaflet - Final.PDF
Illegal_fish_leaflet - Final.PDFIllegal_fish_leaflet - Final.PDF
Illegal_fish_leaflet - Final.PDFhighgate10
 
Ibm Power Systems with Aix for Oracle’s JD Edwards
Ibm Power Systems with Aix for Oracle’s JD Edwards Ibm Power Systems with Aix for Oracle’s JD Edwards
Ibm Power Systems with Aix for Oracle’s JD Edwards Diego Alberto Tamayo
 
Clipsal control system 2008
Clipsal control system 2008Clipsal control system 2008
Clipsal control system 2008stanjack99
 

Viewers also liked (20)

Portafolio de presentación
Portafolio de presentaciónPortafolio de presentación
Portafolio de presentación
 
Psycho
Psycho Psycho
Psycho
 
Proceso de traducción
Proceso de traducciónProceso de traducción
Proceso de traducción
 
Lean start up bootcamp 5 three models to bring focus
Lean start up bootcamp 5   three models to bring focusLean start up bootcamp 5   three models to bring focus
Lean start up bootcamp 5 three models to bring focus
 
Dhtic diaposotivas con imagenes y bibliografia
Dhtic diaposotivas con imagenes y bibliografiaDhtic diaposotivas con imagenes y bibliografia
Dhtic diaposotivas con imagenes y bibliografia
 
5 katha bunglow brochure
5 katha bunglow brochure5 katha bunglow brochure
5 katha bunglow brochure
 
Presentación sobre los PLE
Presentación sobre los PLEPresentación sobre los PLE
Presentación sobre los PLE
 
Humanising-your-data-strategy
Humanising-your-data-strategyHumanising-your-data-strategy
Humanising-your-data-strategy
 
Competencias laborales
Competencias laboralesCompetencias laborales
Competencias laborales
 
Herramientas 2,0 diapositivas
Herramientas  2,0 diapositivasHerramientas  2,0 diapositivas
Herramientas 2,0 diapositivas
 
Defensa del portafolio individual
Defensa del portafolio individualDefensa del portafolio individual
Defensa del portafolio individual
 
John jairo castañeda.pptx higie
John jairo castañeda.pptx higieJohn jairo castañeda.pptx higie
John jairo castañeda.pptx higie
 
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...
EL CUADRO DE MANDO COMO HERRAMIENTA DE SOPORTE A LA COMUNICACIÓN Y GESTIÓN ES...
 
Clase 2
Clase 2Clase 2
Clase 2
 
EXPOSICION WEB 2.0
EXPOSICION WEB 2.0 EXPOSICION WEB 2.0
EXPOSICION WEB 2.0
 
buongthangbotangap
buongthangbotangapbuongthangbotangap
buongthangbotangap
 
Renascimento cultural (cap.8)
Renascimento cultural (cap.8)Renascimento cultural (cap.8)
Renascimento cultural (cap.8)
 
Illegal_fish_leaflet - Final.PDF
Illegal_fish_leaflet - Final.PDFIllegal_fish_leaflet - Final.PDF
Illegal_fish_leaflet - Final.PDF
 
Ibm Power Systems with Aix for Oracle’s JD Edwards
Ibm Power Systems with Aix for Oracle’s JD Edwards Ibm Power Systems with Aix for Oracle’s JD Edwards
Ibm Power Systems with Aix for Oracle’s JD Edwards
 
Clipsal control system 2008
Clipsal control system 2008Clipsal control system 2008
Clipsal control system 2008
 

Similar to Fuel tank room_requirements

Bs ii-assignment
Bs ii-assignmentBs ii-assignment
Bs ii-assignmentLwj Welson
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...AnupamaPanoli
 
Building firefighting-pump-guideline
Building firefighting-pump-guidelineBuilding firefighting-pump-guideline
Building firefighting-pump-guidelinesiddharthasenguptaSi
 
13045 fire safety of flour mills
13045 fire safety of flour mills13045 fire safety of flour mills
13045 fire safety of flour millsSHANTNUGUPTA4
 
ASHRAE - Applying Air-to-Air Energy Recovery Ventilators
ASHRAE -  Applying Air-to-Air Energy Recovery VentilatorsASHRAE -  Applying Air-to-Air Energy Recovery Ventilators
ASHRAE - Applying Air-to-Air Energy Recovery VentilatorsJohn Chavez
 
Fire protection facilities for petroleum
Fire protection facilities for petroleumFire protection facilities for petroleum
Fire protection facilities for petroleumVINOTHP24
 
Guidelines hvac India
Guidelines hvac IndiaGuidelines hvac India
Guidelines hvac IndiaRohil Kumar
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionLearnmarine
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2خالد محمود
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Anil Kumar R
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankersjabbar2002pk200
 
Fire Extinguishers Inspection
Fire Extinguishers InspectionFire Extinguishers Inspection
Fire Extinguishers InspectionLearnmarine
 
Methods of Flame-Detection.pdf
Methods of Flame-Detection.pdfMethods of Flame-Detection.pdf
Methods of Flame-Detection.pdfssuser2fc67e
 
Flexible Liners installation instructions
Flexible Liners installation instructionsFlexible Liners installation instructions
Flexible Liners installation instructionsSchiedel UK
 
IRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET Journal
 
The State of the art in Fire Fighting 2013 V1
The State of the art in Fire Fighting 2013 V1The State of the art in Fire Fighting 2013 V1
The State of the art in Fire Fighting 2013 V1Carsten Holbæk
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Thorne & Derrick UK
 
Boiler operation technical information
Boiler operation   technical informationBoiler operation   technical information
Boiler operation technical informationstephen maloba
 
Fire fighting system
Fire fighting systemFire fighting system
Fire fighting systemAmit Kumar
 

Similar to Fuel tank room_requirements (20)

Bs ii-assignment
Bs ii-assignmentBs ii-assignment
Bs ii-assignment
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
 
Building firefighting-pump-guideline
Building firefighting-pump-guidelineBuilding firefighting-pump-guideline
Building firefighting-pump-guideline
 
13045 fire safety of flour mills
13045 fire safety of flour mills13045 fire safety of flour mills
13045 fire safety of flour mills
 
Schedule 4
Schedule 4Schedule 4
Schedule 4
 
ASHRAE - Applying Air-to-Air Energy Recovery Ventilators
ASHRAE -  Applying Air-to-Air Energy Recovery VentilatorsASHRAE -  Applying Air-to-Air Energy Recovery Ventilators
ASHRAE - Applying Air-to-Air Energy Recovery Ventilators
 
Fire protection facilities for petroleum
Fire protection facilities for petroleumFire protection facilities for petroleum
Fire protection facilities for petroleum
 
Guidelines hvac India
Guidelines hvac IndiaGuidelines hvac India
Guidelines hvac India
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants Inspection
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankers
 
Fire Extinguishers Inspection
Fire Extinguishers InspectionFire Extinguishers Inspection
Fire Extinguishers Inspection
 
Methods of Flame-Detection.pdf
Methods of Flame-Detection.pdfMethods of Flame-Detection.pdf
Methods of Flame-Detection.pdf
 
Flexible Liners installation instructions
Flexible Liners installation instructionsFlexible Liners installation instructions
Flexible Liners installation instructions
 
IRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum Industry
 
The State of the art in Fire Fighting 2013 V1
The State of the art in Fire Fighting 2013 V1The State of the art in Fire Fighting 2013 V1
The State of the art in Fire Fighting 2013 V1
 
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
Heat Tracing - Fire Protection Association's RC38 Recommendation for Frost Pr...
 
Boiler operation technical information
Boiler operation   technical informationBoiler operation   technical information
Boiler operation technical information
 
Fire fighting system
Fire fighting systemFire fighting system
Fire fighting system
 

More from stanjack99

Giao trinh khi_cu_dien_043
Giao trinh khi_cu_dien_043Giao trinh khi_cu_dien_043
Giao trinh khi_cu_dien_043stanjack99
 
Nex way design_ref
Nex way design_refNex way design_ref
Nex way design_refstanjack99
 
Evnnpc kt qđ-01
Evnnpc kt qđ-01Evnnpc kt qđ-01
Evnnpc kt qđ-01stanjack99
 
Compact kiosk transformer
Compact kiosk transformerCompact kiosk transformer
Compact kiosk transformerstanjack99
 
Sgsu ex-203 model (1)
Sgsu ex-203 model (1)Sgsu ex-203 model (1)
Sgsu ex-203 model (1)stanjack99
 
Hitachi elevator, vfi ii (updated oct 2013) full
Hitachi elevator, vfi ii (updated oct 2013) fullHitachi elevator, vfi ii (updated oct 2013) full
Hitachi elevator, vfi ii (updated oct 2013) fullstanjack99
 
Lighting control panel
Lighting control panelLighting control panel
Lighting control panelstanjack99
 
Developingsprinklersystemdesigncriteriadnugentexpa
DevelopingsprinklersystemdesigncriteriadnugentexpaDevelopingsprinklersystemdesigncriteriadnugentexpa
Developingsprinklersystemdesigncriteriadnugentexpastanjack99
 

More from stanjack99 (10)

Giao trinh khi_cu_dien_043
Giao trinh khi_cu_dien_043Giao trinh khi_cu_dien_043
Giao trinh khi_cu_dien_043
 
Nfpa 110
Nfpa 110Nfpa 110
Nfpa 110
 
Nex way design_ref
Nex way design_refNex way design_ref
Nex way design_ref
 
Evnnpc kt qđ-01
Evnnpc kt qđ-01Evnnpc kt qđ-01
Evnnpc kt qđ-01
 
Compact kiosk transformer
Compact kiosk transformerCompact kiosk transformer
Compact kiosk transformer
 
Sgsu ex-203 model (1)
Sgsu ex-203 model (1)Sgsu ex-203 model (1)
Sgsu ex-203 model (1)
 
Hitachi elevator, vfi ii (updated oct 2013) full
Hitachi elevator, vfi ii (updated oct 2013) fullHitachi elevator, vfi ii (updated oct 2013) full
Hitachi elevator, vfi ii (updated oct 2013) full
 
Lighting control panel
Lighting control panelLighting control panel
Lighting control panel
 
App fluke1653
App fluke1653App fluke1653
App fluke1653
 
Developingsprinklersystemdesigncriteriadnugentexpa
DevelopingsprinklersystemdesigncriteriadnugentexpaDevelopingsprinklersystemdesigncriteriadnugentexpa
Developingsprinklersystemdesigncriteriadnugentexpa
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Fuel tank room_requirements

  • 1. DO’s and DON’Ts for Siting and Design of Fuel Tank Room for Emergency Generators Fire Services Department January 2007
  • 2. Table of Content 1. Introduction 2. Siting and Design of Fuel Tank Room 3. Important Notice
  • 3. 1. Introduction 1.1 Objective The objective of this Guide is to provide general guidance on the siting and design of Fuel Tank Room(FTR) for emergency generators. 1.2 Scope The FTR in this Guide refers to a separate room for housing fuel tank with capacity exceeding 500 litres or fuel tank interconnected with other fuel tanks through piping. For fuel tank with capacity of 500 litres or below, reference should be made to Fire Services Standard Requirements of Emergency Electrical Generator [NP/105(5th Revision)]. 1.3 Legislative Control 1.3.1 Under section 6 of the Dangerous Goods Ordinance, Chapter 295, no person shall store any dangerous goods in excess of exempted quantity in any premises or place without a licence issued by the Authority, viz. the Director of Fire Services. In accordance with the Dangerous Goods (General) Regulations, Cap. 295B, the exempted quantity of Diesel Oil is 2,500 litres. 1.3.2 Storage tank for diesel oil requires the approval from the Authority in accordance with regulation 99A of the Dangerous Goods (General) Regulations, Cap. 295B.
  • 4. 2. Siting and Design of FTR The DO’s and DON’Ts criteria in respect of siting and design of FTR(s) are tabulated below:- 2.1 DO’s 1. The FTR(s) should only be installed for the supply of fuel to emergency generator for Fire Service Installation (FSI) or power backup for emergency building facilities/essential service, e.g. bank computer system. 2. Storage of fuel is restricted to Cat. 5 Class 3 DG only. 3. The enclosure walls and the entrance doors of the FTR(s) should have at least 2-hour and 1-hour Fire Resisting Period (FRP) respectively. 4. The doors of the FTR(s) should be self-closing and opened in the direction of egress. 5. Individual protected lobby should be provided to each FTR when it cannot discharge directly to open air. 6. Doors of the protected lobby should be self-closing with at least 1-hour FRP and should be opened in the direction of egress. 7. A door curb of at least 300 mm high with 100% retaining capacity for the aggregate quantity of fuel should be provided. 8. Natural ventilation to open air should be available otherwise mechanical ventilation should be provided. 9. FTR(s) of volume less than 44m3 should be provided with independent fire suppression system in accordance with the scale stipulated in item 8.3 of FSD Circular Letter No. 4/96 Part VIII. 10. Major Automatic and Fixed Fire Service Installation should be provided if the cubic volume of the room is greater than 44m3 .
  • 5. 2.2 DON’Ts 1. Siting of FTR(s) shall not jeopardize any means of escape. 2. Aggregate quantity of the fuel oil in FTR(s) on the same floor shall not exceed 2,500 litres. 3. Piping connecting fuel tank(s) and/or generator set(s) shall not pass through any means of escape/common area. 4. In domestic building(s) used exclusively for dwelling purpose, FTR(s) located at level exceeding 30 m in height is not permitted. Composite building(s) where upper floors being used for dwelling purpose are considered as domestic building. 5. FTR(s) on different floors shall not overlap with the one immediately above or below. 6. The running of fuel pipelines inside building and passing through floors is not desirable. (see Note) Note : Fuel pipelines running inside building and passing through floors (i.e. centralized fuel supply design) would most likely create various types of fire risks e.g. accumulation of flammable vapour in pipe duct, unwanted and unchecked fire spread laterally and/or horizontally etc. If the centralized fuel supply design is the only option to be considered, the fuel pipelines shall as far as possible run on the external wall of the building where natural ventilation could be achieved. If internal pipe routing is inevitably adopted, the following fire safety measures to mitigate potential fire risks shall be observed:- (i) mechanical ventilation of at least 5 air changes per hour to be provided; (ii) flammable gas detectors to detect any formation of flammable vapour due to failure of ventilating system to be provided; (iii) all electrical fitting and fixture within the hazardous areas to be complied with BS EN 60079; (iv) the main fuel pipeline not to jeopardize the means of escape and to be housed within an enclosure having not less than 4 hours FRP; (v) access door / opening to enable inspection and maintenance of the fuel supply line to be provided; (vi) good management practice of conducting regular inspections and preventive maintenance to be provided; (vii) high level and overflow alarm to detect and control overfilling to be provided; (viii) manual override to stop the operation of the fuel pumping system to be provided;
  • 6. (ix) overfill return pipe to be connected to the storage tank; (x) leakage sensors to detect fuel leakage to be provided; and (xi) emergency cut off switch /stop at the management office to be provided for suspending fuel supply to the fuel tank and the main fuel pipeline. 3. Important Notice This Guide provides general guidance only and all applications will be considered on a case by case basis in addition to the above Do’s and Don’ts.