1. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-
731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
1
SCHEDULE-A
(See Clause 10.1)
Site of the PROJECT
1 THE SITE
1.1 Site of the Project Highway shall include the land, buildings, structures and road works as
described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees and any other
immovable property on, or attach to, the Site shall be prepared jointly by the Authority
Representative and the Concessionaire, and such inventory shall form part of the memorandum
referred to in Clause 10.3.1 of the Agreement.
1.3 Additional land required for Toll Plazas, Bus Bays/Shelter, Traffic Aid Posts, Medical Aid Posts and
vehicle rescue posts or for construction of works specified in the Change of Scope Order issued
under Clause 16.2.3 of this Agreement shall be acquired in accordance with the provisions of
Clause 10.3.6 of this Agreement. Upon acquisition, such land shall form part of the Site and vest
in the Authority.
2. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-
731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
2
Annex – I
(Schedule-A)
Site for Four Laning
1 Site
The proposed Greenfield alignment commencing from Autarpur Village at km 35.000 in
Pratapgarh District in the State of Uttar Pradesh and ends near Singraur Uparhar Village of
Prayagraj District section NH-731A in the State of Uttar Pradesh at km 49.155.
The start and end chainage coordinates of the package are given below:
Sr. No Easting Northing Remarks
1 562654.556 E 2843498.4942 N Start of Project Road
2 564048.9068 E 2830892.3342 N End of Project Road
The land, carriageway and structures comprising the Site are described below.
The Index Map / location plan of the project highway is given at Appendix A-I of
Schedule-A.
2 Land
The site of the project highway comprises the land (existing right of way) as described below:
Sr. No
Proposed Chainage (km)
Right of Way(m) Remarks
From To
1 35.000 49.155 NIL Greenfield Alignment
3 Carriageway
This Project envisages construction of a 4-lane green field highway with paved shoulder.
4 Major Bridges-
The site includes the following major bridges:
Sr.
No
Existing
Chainage
(km)
Type of Structure No. of Spans
with span
length (m)
Width
(m)
Foundation
Sub-
structure
Super-
structure
NIL
5 Road over-bridges (ROB)/ Road under-bridges (RUB)
The site includes the following ROB (road over railway line)/RUB (road under railway line):
Sr.
No
Existing
Chainage
(km)
Type of Structure No. of Spans
with span
length (m)
Width
(m)
Foundation
Sub-
structure
Super-
structure
NIL
Railway Line / Level Crossings
The Site includes the following Railway Line / Level Crossing:
3. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-
731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
3
Sr. No Location (Chainage, km) Remarks
1 43.560 Railway Crossing
6 Grade Separators
The site includes the following Grade Separators:
Sr. No
Existing
Chainage (km)
Type of Structure No. of Spans with span
length (m)
Width(m)
Foundation Superstructure
NIL
7 Minor Bridges
The Site includes the following Minor Bridges:
Sr.
No
Existing
Chainage
(km)
Type of Structure
No. of Spans with
span length (m)
Width
(m)
Foundation
Sub-
structure
Super-
structure
NIL
8 Cross Drainage Structures / Culverts - NIL
The Site includes the following culverts:
Sr.
No
Existing Chainage
(km)
Type of
Culvert
Span/Opening with
span length (m)
Formation Width
(m)
NIL
9 Total Number of Structures
The total number of structures on the site is indicated below:
(a) No. of Major Bridges –NIL
(b) No. of Railway Over Bridges –NIL
(c) No. of Grade Separators –NIL
(d) No. of Minor Bridges –NIL
(e) No. of Culverts – NIL
10 Bus Shelters and Truck lay-byes
10.1 Bus Shelters
The location of existing bus shelters are given below:
Sr. No
Existing Chainage
(km)
Length(m)
Left Hand
Side
Right Hand
Side
NIL
10.2 Truck Lay-byes
The location of existing truck lay byes are given below:
Sr. No Existing Chainage (km) Length(m)
Left Hand
Side
Right Hand
Side
NIL
4. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-
731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
4
11 Cross Roads
The details of crossroads are as follows:
Major Cross Road:
Sr. No
Location At
grade
Separated
Category of Cross Road
From km to km NH SH MDR Others
1 47.290
NH-24B/New
NH30
2 48.685
NH-2/New
NH 19
Minor Cross Road:
Sr. No Chainage (Km) Junction Cross Road
1 36+230 + BT
2 37+570 + BT
3 42+070 + BT
4 42+740 + BT
5 44+045 + BT
6 49+125 + BT
12 Permanent Bridge, Bye Pass or Tunnel costing Rs. 50 crore or more
The project is a green field project hence there is no existing structures. The new structures shall
be constructed as per Schedules.
5. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid
Annuity Mode (Package – II)
5
13 Details of Existing Utilities
(i) Electrical utilities
The site includes the following electrical utilities: -
Design Chainage (Km)
11KV electrical poles
in nos.
Light Poles in Nos.
132 KV HT
Electric Line
Crossing the
Road
220 KV HT
Electric Line
Crossing the
Road
400 KV HT
Electric Line
Crossing
the Road
800 KV HT
Electric Line
Crossing the
Road
Transformer in nos.
From To LHS RHS LHS RHS LHS RHS
Total 8 14 0 1 1 0 0 0 0 0
35+000 35+500 - - - - - -
35+500 36+000 - - - - - -
36+000 36+500 - - - - - -
36+500 37+000 - - - - - -
37+000 37+500 - - - - - -
37+500 38+000 - - - - - -
38+000 38+500 - - - - - -
38+500 39+000 - - - - - -
39+000 39+500 - - - - - -
39+500 40+000 1 1 - - - -
40+000 40+500 - 1 - - 1 - -
40+500 41+000 - - - - - -
41+000 41+500 - - - - - -
41+500 42+000 - - - - - -
42+000 42+500 - - - - - -
42+500 43+000 - - - - - -
43+000 43+500 - - - - - -
43+500 44+000 1 - - - - -
44+000 44+500 - - - - - -
44+500 45+000 - - - - - -
45+000 45+500 - - - - - -
45+500 46+000 - - - - - -
6. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid
Annuity Mode (Package – II)
6
Design Chainage (Km)
11KV electrical poles
in nos.
Light Poles in Nos.
132 KV HT
Electric Line
Crossing the
Road
220 KV HT
Electric Line
Crossing the
Road
400 KV HT
Electric Line
Crossing
the Road
800 KV HT
Electric Line
Crossing the
Road
Transformer in nos.
From To LHS RHS LHS RHS LHS RHS
Total 8 14 0 1 1 0 0 0 0 0
46+000 46+500 - - - - - -
46+500 47+000 - 2 1 - -
47+000 47+500 2 2 - - - -
47+500 48+000 1 3 - - - -
48+000 48+500 - - - - - -
48+500 49+000 3 5 - - - -
49+000 49+155 - - - - - -
(ii) Public Health utilities (Water/Sewage Pipelines) *
The site includes the following Public Health utilities: -
Design Chainage (Km)
Bore Well with Pump
(Nos.)
Tube well/Handpump
(Nos.)
Water Pipe
Line (Nos.)
Well (Nos.)
Water Tank/Over Head
Tank (Nos.)
From To LHS RHS LHS RHS LHS RHS LHS RHS
Total 0 0 0 0 0 0 0 0 0
35+000 35+500 - - - - - - - - -
35+500 36+000 - - - - - - - - -
36+000 36+500 - - - - - - - - -
36+500 37+000 - - - - - - - - -
37+000 37+500 - - - - - - - - -
37+500 38+000 - - - - - - - - -
38+000 38+500 - - - - - - - - -
38+500 39+000 - - - - - - - - -
39+000 39+500 - - - - - - - - -
39+500 40+000 - - - - - - - - -
40+000 40+500 - - - - - - - - -
7. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid
Annuity Mode (Package – II)
7
Design Chainage (Km)
Bore Well with Pump
(Nos.)
Tube well/Handpump
(Nos.)
Water Pipe
Line (Nos.)
Well (Nos.)
Water Tank/Over Head
Tank (Nos.)
From To LHS RHS LHS RHS LHS RHS LHS RHS
Total 0 0 0 0 0 0 0 0 0
40+500 41+000 - - - - - - - - -
41+000 41+500 - - - - - - - - -
41+500 42+000 - - - - - - - - -
42+000 42+500 - - - - - - - - -
42+500 43+000 - - - - - - - - -
43+000 43+500 - - - - - - - - -
43+500 44+000 - - - - - - - - -
44+000 44+500 - - - - - - - - -
44+500 45+000 - - - - - - - - -
45+000 45+500 - - - - - - - - -
45+500 46+000 - - - - - - - - -
46+000 46+500 - - - - - - - - -
46+500 47+000 - - - - - - - - -
47+000 47+500 - - - - - - - - -
47+500 48+000 - - - - - - - - -
48+000 48+500 - - - - - - - - -
48+500 49+000 - - - - - - - - -
49+000 49+155 - - - - - - - - -
8. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid
Annuity Mode (Package – II)
8
Appendix A-I
(Schedule-A)
INDEX MAP / LOCATION MAP OF PROJECT HIGHWAY
9. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
9
Appendix A-II
(Schedule-A)
PROJECT CENTER LINE COORDINATES
The proposed Greenfield alignment commencing from Autarpur Village at km 35.000 in Pratapgarh
District in the State of Uttar Pradesh and ends near Singraur Uparhar village of Prayagraj District section
NH-731A in the State of Uttar Pradesh at km 49.155.
Coordinate System - Universal Transverse Mercator (UTM)-WGS84 (Zone 44R)
Sr. No
Design
Chainage
(km)
Easting Northing
1 35000 562654.6 2843498
2 35020 562639.7 2843485
3 35040 562625 2843472
4 35060 562610.5 2843458
5 35080 562596.7 2843443
6 35100 562583.5 2843428
7 35120 562571.2 2843413
8 35140 562559.8 2843396
9 35160 562549.3 2843379
10 35180 562539.8 2843361
11 35200 562531.3 2843343
12 35220 562523.7 2843325
13 35240 562517.3 2843306
14 35260 562511.9 2843287
15 35280 562507.5 2843267
16 35300 562504.3 2843247
17 35320 562502.1 2843228
18 35340 562500.8 2843208
19 35360 562500.1 2843188
20 35380 562499.7 2843168
21 35400 562499.4 2843148
22 35420 562499.1 2843128
23 35440 562498.8 2843108
24 35460 562498.5 2843088
25 35480 562498.2 2843068
26 35500 562497.8 2843048
27 35520 562497.5 2843028
28 35540 562497.2 2843008
29 35560 562496.9 2842988
30 35580 562496.6 2842968
31 35600 562496.2 2842948
32 35620 562495.9 2842928
Sr. No
Design
Chainage
(km)
Easting Northing
33 35640 562495.6 2842908
34 35660 562495.3 2842888
35 35680 562495 2842868
36 35700 562494.7 2842848
37 35720 562494.3 2842828
38 35740 562494 2842808
39 35760 562493.7 2842788
40 35780 562493.4 2842768
41 35800 562493.1 2842748
42 35820 562492.7 2842728
43 35840 562492.4 2842708
44 35860 562492.1 2842688
45 35880 562491.8 2842668
46 35900 562491.5 2842648
47 35920 562491.1 2842628
48 35940 562490.8 2842608
49 35960 562490.5 2842588
50 35980 562490.2 2842568
51 36000 562489.9 2842548
52 36020 562489.6 2842528
53 36060 562488.9 2842488
54 36080 562488.6 2842468
55 36100 562488.3 2842448
56 36120 562488 2842428
57 36140 562487.7 2842408
58 36160 562487.7 2842388
59 36180 562488.1 2842368
60 36200 562489 2842348
61 36220 562490.6 2842328
62 36240 562492.8 2842308
63 36260 562495.7 2842288
64 36280 562499.3 2842268
18. Schedule - A
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
18
Sr. No
Design
Chainage
(km)
Easting Northing
705 49080 564092.6 2830953
706 49100 564080.9 2830937
707 49120 564069.3 2830921
Sr. No
Design
Chainage
(km)
Easting Northing
708 49140 564057.6 2830905
709 49160 564046 2830888
19. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
19
SCHEDULE – B
(See Clause 2.1)
DEVELOPMENT OF THE PROJECT HIGHWAY
1 Development of the Project Highway
Development of the Project Highway shall include construction of the Project Highway as
described in this Schedule-B and in Schedule-C.
2 Project Highway (Four Lane)
2.1 Four Laning shall include construction of the Four Lane Project Highway as described in Annex-I
of this Schedule-B and Annex-I of Schedule C.
2.2 The Project Highway shall be designed and constructed in conformity with the specifications and
standards set forth in Annex-I of Schedule-D.
20. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
20
ANNEX – I
(Schedule-B)
Description of Four Laning
1. The Project Proposal
1.1 Construction of Four-Lane Greenfield highway with paved shoulders from Chainage Km 35.000
to Km 49.155 of NH-731A shall be undertaken as per Ministry’s Codes & specifications and terms
specified in Schedules.
2. Project Facilities
Project facilities shall be constructed in conformity with Annex-I of Schedule-C.
3. Specifications and Standards
The Project Highways shall be constructed in conformity with the Specifications and Standards
specified in Schedule-D.
4. Other Features of Project Highway
4.1 Geometric Design and General Features
Geometric design and General Features of the Project Highway shall be in conformity with the
Specifications and Standards specified in Schedule-D.
4.2 Design Speed
Design Speed of the Project Highway shall be in conformity with the Specifications and Standards
specified in Schedule-D.
4.3 Vertical Gradient
Vertical Gradient of the Project Highway shall be in conformity with the Specifications and
Standards specified in Schedule-D.
4.4 Right of Way (ROW)
Details of the proposed Right of Way are given below:
Sr. No
Proposed Chainage (km)
Right of Way (m) Remarks
From To
1 35.000 49.155 45/ 60* Green field
*60m RoW is proposed at locations of structures including VUPS/ROB & Interchanges.
4.5 Type of Shoulders
Shoulders on the Project Highway shall be in conformity with the Specifications and Standards
specified in Schedule-D.
4.6 Lateral and Vertical Clearances at Flyovers/Underpasses/Interchanges: As per Schedule D.
4.7 Cross Sections
The Project Highway shall be constructed to Four lane with paved shoulder standards. Typical
cross-sections (TCS) have been as given under Appendix B-II. Schedule of applicable cross-
21. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
21
sections are given below. Concessionaire is free to use new/ alternative material & technology in
construction of highway as per Ministry’s circular RW/Nh-33044/18/2020-S&R(P&B) dated
14.12.2020. However, w.r.t TCS-1A Geocell Technology shall be compulsory on pilot basis in the
given section.
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
1 35000 35963 963 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
2 35963 35988 25 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
3 35988 36220 232 6-lane (3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides,
Approach
to VUP
43.5 TCS-2 -
4 36220 36240 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
5 36240 36460 220 6-lane (3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
6 36460 37265 805 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
7 37265 37560 295 6-lane (3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
8 37560 37580 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
22. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
22
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
9 37580 37870 290 6-lane (3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
10 37870 38785 915 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
11 38785 38875 90 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Major
Bridge
28.9 TCS-5 -
12 38875 39648 773 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
13 39648 39673 25 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
14 39673 41840 2167 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m with
Geocell in sub-base
course, Fig 2.4 of
IRC: SP-84 2019
Road 27 TCS-1A Geocell
Technology
is to be used
compulsory.
15 41840 42060 220 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
16 42060 42080 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
17 42080 42870 790 6-lane(3x3)
carriageway 10.5m
width with 3.00m
Approach
to VUP
43.5 TCS-2 -
23. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
23
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
18 42870 42890 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
19 42890 43146 256 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
20 43146 43497 351 9.50m carriageway
width + 1.5m
footpath with 3.0m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to ROB
47.57 TCS-4 -
21 43497 43623 126 As per RDSO 9.50m
carriageway width +
1.5m footpath with
3.0m median
ROB 27 TCS-5A -
22 43623 43840 217 9.50m carriageway
width + 1.5m
footpath with 3.0m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to ROB
47.57 TCS-4 -
23 43840 43850 10 9.50m carriageway
width + 1.5m
footpath with 3.0m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Minor
Bridge on
Approach
of ROB
47.57 TCS-4 -
24 43850 43986 136 9.50m carriageway
width + 1.5m
footpath with 3.0m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to ROB
47.57 TCS-4 -
25 43986 44035 49 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
Approach
to VUP
43.5 TCS-2 -
24. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
24
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
5.5m wide + 1.5m
footpath cum drain
on both sides
26 44035 44055 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
27 44055 44250 195 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to VUP
43.5 TCS-2 -
28 44250 44375 125 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
29 44375 44385 10 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
30 44385 44615 230 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
31 44615 44625 10 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
32 44625 44825 200 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
33 44825 44835 10 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
34 44835 45294 459 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
Road 27 TCS-1 -
25. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
25
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
35 45294 45306 12 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
36 45306 45534 228 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
37 45534 45546 12 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
38 45546 46640 1094 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
39 46640 46660 20 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
40 46660 46920 260 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
41 46920 47260 340 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to Diamond
Interchange
on NH-24B
43.5 TCS-2 -
42 47260 47320 60 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
Flyover 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
43 47320 47645 325 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Approach
to Diamond
Interchange
of NH-24B
43.5 TCS-2 -
26. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
26
Sr.
No
Design
Chainage (Km)
Length (m) TCS
Description
Provision Total
Width
(m)
TCS
From To
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
44 47645 48240 595 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
45 48240 48260 20 6-lane (3x3) with
10.50m width with
3.0m wide median +
1.5m footpath both
sides, Fig. 7.2A of
IRC: SP-84 2019
Minor
Bridge
28.9 TCS-5 -
46 48260 48643 383 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to Diamond
Interchange
on NH-19
43.5 TCS-2 -
47 48643 48728 85 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
Flyover 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
48 48728 49115 387 6-lane(3x3)
carriageway 10.5m
width with 3.00m
median along with
Service cum slip road
5.5m wide + 1.5m
footpath cum drain
on both sides
Approach
to Diamond
Interchange
on NH-19
43.5 TCS-2 -
49 49115 49135 20 6-lane (3x3) 10.50m
carriageway width
with 3.0m median
VUP 25 TCS-3 Deviation to
Fig. 7.8 of
Manual
50 49135 49155 20 4-lane (2x2)
carriageway +2.5m
paved shoulder+1.5m
earthen shoulder on
either side with
median 5.0m, Fig 2.4
of IRC: SP-84 2019
Road 27 TCS-1 -
TCS-1 6667
TCS-1A 2167
TCS-2 3982
TCS-3 265
TCS-4 714
TCS-5 234
TCS-5A 126
Total 14155
27. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
27
Notes:
(i) Any variation in design length of respective TCS specified in Schedule B shall not constitute a
change of scope, save and except any variations in the design length arising out of a change of
scope expressly undertaken in accordance with the provisions of Article 16.
4.8 Alignment Plan and Longitudinal Section
An alignment Plan and longitudinal section (Plan & Profile) of the project highway are enclosed
at Appendix B-I in soft copy for reference only. Longitudinal profile shall be designed based on
Schedule-D. Finished Road level indicated in the alignment plan is minimum. The Concessionaire
shall design the road profile of the project highway based on site/design requirement specified
in Schedule-D.
5. Bypass and new Realignment
NIL
6 Service cum slip Roads
A. Interchange elements: Ramps/ Loops/ Merged Sections/ Roundabouts
Interchange has been proposed at km 47.290 and km 48.685. A GAD is attached under Appendix-
B-III.
Notes:
(i) Detailed design of all interchange shall be in accordance with Schedule-D.
Service road shall be provided as per para 4.7- Cross-sections of this Schedule.
7. Pavement Design
Design of pavement shall be done for design period of 20 years, in accordance with the Schedule-
D and IRC-37:2018. Concessionaire is free to use new/ alternative material & technology in
construction of highway as per MoRTH circular RW/NH-33044/18/2020-S&R(P&B) dated
14.12.2020
7.1 Design Traffic
Pavement design shall be carried out for the minimum design traffic of 120 MSA for entire project
highway with design life of 20 years as IRC: 37:2018.
7.5 Intersection / Interchanges
Intersection / Interchanges on the Project Highway shall be in conformity with the Specifications
and Standards specified in Schedule-D.
At-Grade Intersections
8.1 Major Junction
S No.
Proposed Chainage
(km) Side(Left/Right) Type of Junction Destination
1 47.290 BHS X- JUNCTION NH – 24B
28. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
28
2 48.685 BHS X-JUNCTION NH-2
8.2 Minor Junction
S
No.
Design Chainage
(km)
Side(Left
/ Right)
Type of
Junction
Destination
1 36+230 BHS X-JUNCTION From Burhepur to Bihar
2 37+570 BHS X-JUNCTION From Bihar to Sakardaha
3 42+070 BHS X-JUNCTION Kurha Village Road
4 42+880 BHS X-JUNCTION From Lalgopalganj to Bendhan Gopalpur
5 44+045 BHS X-JUNCTION From Badupur to Barna
6 49+125 BHS X-JUNCTION From Meerjahapur to Sringverpur
9. Underpasses
A) Vehicular Underpasses (VUP)
Sr. No Location (Chainage) Km Type of Structure Span/ opening (m)
1 36+230 VUP 1 x 20
2 37+570 VUP 1 x 20
3 42+070 VUP 1 x 20
4 42+880 VUP 1 x 20
5 44+045 VUP 1 x 20
6 49+125 VUP 1 x 20
Note: Traffic Impact Attenuators shall be provided be provided at all VUPs as per Schedule-D.
10.1 Interchange structures/Grade Separator
Interchange structure/grade separator structure to be provided as per the details below.
Irrespective of span arrangement indicated, all the structures shall provide lateral and vertical
clearances as per Schedule D.
Sr.
No
Location Salient features
Minimum length of
viaduct to be provided
Road to be carried
over/under the
structures
1 47.290 Diamond Interchange 2 x 30 Over the structure
2 48.685 Diamond Interchange 2 x 42.5 Over the structure
Note: (i)GAD attached at Appendix B-III of Schedule-B.
(ii)Noise Barrier shall be provided at both the interchanges as per Schedule-D.
(iii) Traffic Impact Attenuators shall be provided be provided at both the interchanges as per Schedule-D.
10.2 Road Over Bridges (ROB)
The Road Over Bridges (ROB) shall be provided as per the details below:
Sr.
No
Chainage
Road
category
Span Arrangement
Skew
Angle
Structure
Width
Lateral clearance
29. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
29
km (m) deg (m)
1 43.560 - 3X36+1X18 21 As per TCS-5A As per GAD Attached
Note: Traffic Impact Attenuators shall be provided at the ROB as per Schedule-D.
10.3 Major Bridges
(A) Widening / Repair / Rehabilitation of Existing Major Bridges
NIL
(B) Reconstruction of Existing Major Bridges
NIL
(C) Construction of New Major Bridges on Main Carriageway (Over River / Streams /Nallah)
Sr.
No
Chainage Category
Span
Arrangement
Skew
Angle
Structure Width
km (m) deg (m)
1 38.830 Canal 3 x 30 0 As per TCS-5
10.4 Minor Bridges
(A) Widening / Repair / Rehabilitation of Existing Minor Bridges
NIL
(B) Reconstruction of Existing Minor Bridges
NIL
(C) Construction of New Minor Bridges on Main Carriageway
Sr. No Chainage Span Arrangement Structure Width
Km (m) (m)
1 35+975 1X25 As per TCS-5
2 39+660 1x25 As per TCS-5
3 43+845 1X10 As per TCS-5
4 44+380 1X10 As per TCS-5
5 44+620 1X10 As per TCS-5
6 44+830 1X10 As per TCS-5
7 45+300 1X12 As per TCS-5
8 45+540 1X12 As per TCS-5
9 46+650 1X20 As per TCS-5
10 48+250 1X20 As per TCS-5
6. Culverts
(A) Widening of Existing Culverts – NIL
(B) Reconstruction of Existing Culverts – NIL
30. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
30
(C) Construction of New Culverts
Sr. No
Proposed Chainage
(km)
Type of Culvert Span Arrangement (m)
1 35+380 BOX 1x2
2 35+880 BOX 1x2
3 36+600 BOX 1x2
4 36+990 BOX 1x2
5 37+370 BOX 1x2
6 38+315 BOX 1x2
7 38+555 BOX 1X4
8 39+300 BOX 1X4
9 39+540 BOX 1x2
10 40+100 BOX 1X4
11 40+220 BOX 1x2
12 40+760 BOX 1X4
13 40+975 BOX 1X4
14 41+500 BOX 1X4
15 41+800 BOX 1x2
16 42+400 BOX 1x2
17 43+070 BOX 1x2
18 43+315 BOX 1x4
19 44+800 BOX 1x4
20 45+090 BOX 1x2
21 45+390 BOX 1x4
22 45+720 BOX 1X4
23 46+185 BOX 1X4
24 47+100 BOX 1X4
25 47+800 BOX 1X4
26 48+550 BOX 1X4
7. ROAD SIDE DRAINAGE
Drainage system including surface and subsurface drains for the Project Highway shall
be provided as per the Manual.
Unlined Drain
Sr. No
CHAINAGE (m)
Length (m) Side Total Length (m)
From To
1 35000 35963 963 BHS 1926
2 36460 37265 805 BHS 1610
3 37870 38785 915 BHS 1830
4 38875 39648 773 BHS 1546
5 39673 41840 2167 BHS 4334
6 44250 44375 125 BHS 250
7 44385 44615 230 BHS 460
8 44625 44825 200 BHS 400
9 44835 45294 459 BHS 918
10 45306 45534 228 BHS 456
11 45546 46640 1094 BHS 2188
31. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
31
Unlined Drain
Sr. No
CHAINAGE (m)
Length (m) Side Total Length (m)
From To
12 46660 46920 260 BHS 520
13 47645 48240 595 BHS 1190
14 49135 49155 20 BHS 40
TOTAL LENGTH (m) 17668
Lined Drain
Sr.
No
Chainage (m)
Length (m)
Length of Lined Drain
on both side (m)
From To
1 35988 36220 232 464
2 36240 36460 220 440
3 37265 37560 295 590
4 37580 37870 290 580
5 41840 42060 220 440
6 42080 42870 790 1580
7 42890 43146 256 512
8 43146 43506 360 720
9 43614 43840 226 452
10 43850 43986 136 272
11 43986 44035 49 98
12 44055 44250 195 390
13 46920 47260 340 680
14 47320 47645 325 650
15 48260 48643 383 766
16 48728 49115 387 774
TOTAL LENGTH (m) 9408
8. RAINWATER HARVESTING & DRAINAGE
The provision of rainwater harvesting & drainage work shall be executed as per requirement of
IRC: SP: 42-2017 and IRC: SP: 50-2013 & as per Ministry’s circular RW/NH-33044/14/2003-
S&R(R)pt-II dated 03.09.2021.
9. UTILITY SHIFTING
Shifting of obstructing utilities shall be done as per Ministry’s circular RW/NH-33044/29/2015-
S&R(R)pt dated 11.02.2021. The Concessionaire shall be responsible for getting the utilities
shifted as per approval of the concerned utility department. The assistance of the Authority is
limited to giving forwarding letter on the proposal of Concessionaire to utility owning department
whenever asked by the Concessionaire. The decision/approval of utility owning department shall
be binding on the Concessionaire.
Notes:
(a) The supervision charges at the rates/charges applicable of the utility owning department
shall be paid directly by the Authority to the Utility Owning department as and when
Concessionaire furnishes demand of Utility Owning Department along with a copy of
estimated cost given by the latter.
32. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
32
(b) The dismantled materials / scrap of the existing utilities to be shifted / dismantled shall
belong to the Concessionaire who would be free to dispose-off the dismantled material as
deemed fit by them unless the concessionaire is required to deposit the dismantled material
to utility owning department as per the norms and practice and, in that case the amount of
credit for dismantled material may be availed by the Concessionaire as per estimates agreed
between them.
(c) The utilities shall be handed over after shifting work is completed to Utility Owning
Department up to their entire satisfaction. The maintenance liability shall rest with the Utility
Owning Department after handing over process is complete as far as utility shifting works are
concerned.
10. CHANGE OF SCOPE
The length of Structures and bridges specified herein above shall be treated as an approximate
assessment. The actual lengths as required on the basis of detailed investigations shall be
determined by the Concessionaire in accordance with the Specifications and Standards. Any
variations in the lengths specified in this Schedule-B shall not constitute a Change of Scope, save
and except any variations in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 16.
33. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
33
Appendix B-I (Schedule-B)
Alignment Plan and longitudinal Section are enclosed as Appendix B-I (Schedule-B).
34. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
34
Appendix B-II (Schedule-B)
Typical Cross Section are enclosed as Appendix B-II (Schedule-B).
35. Schedule - B
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
35
Appendix B-III (Schedule-B)
Interchange at design chainage km 47.290 (junction with existing NH-24B) and 48.685 (junction with
existing NH-2) are enclosed as Appendix B-III (Schedule-B).
36. Schedule - C
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
36
Appendix B-IV (Schedule-B)
Traffic Signage Plan of the Project Highway enclosed as Appendix B-IV (Schedule-B).
37. Schedule - C
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
37
Appendix B-V (Schedule-B)
Drainage Plan of the Project Highway enclosed as Appendix B-V (Schedule-B).
38. Schedule - C
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
38
Appendix B-VI (Schedule-B)
GAD and Miscellaneous Drawings enclosed as Appendix B-VI (Schedule-B).
39. Schedule - C
Construction of 4-lane green field highway from Km 35.000 to Km 49.155 (Autarpur to Singraur Uparhar) of
NH-731A with paved shoulders in the state of Uttar Pradesh on Hybrid Annuity Mode (Package – II)
39
SCHEDULE – C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The Concessionaire shall construct the Project Facilities in accordance with the provisions of this
Agreement. Such Project Facilities shall include:
(a) Toll plaza
(b) Road side furniture;
(c) Pedestrian facilities;
(d) Tree plantation
(e) Truck lay-byes;
(f) Bus stop and bus shelters;
(g) Rest areas;
(h) Highway Lighting;
(i) Transportation Art.
2 Project Facilities for Project Highway
Project Facilities forming part of Project Highway and to be completed on or before the scheduled
date have been described in Annex‐I of this Schedule‐C.
40. Annex – I
SCHEDULE – C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annex-1 to form part of
the Four-Lane Project. The project facilities shall include:
(a) Toll plaza
(b) Road side furniture;
(c) Pedestrian facilities;
(d) Tree plantation
(e) Truck lay-byes;
(f) Bus stop and bus shelters;
(g) Rest areas;
(h) Highway Lighting and
(i) Transportation Art.
2. Description of Project Facilities
Each of the project facilities is described below:
(a) Toll Plazas NIL
(b) Roadside Furniture
(i) Traffic Signs and Pavement Markings
Traffic signs and pavement markings shall be provided as per Schedule D.
(a) Overhead Gantry Signs shall be provided at locations mentioned below
Sr. No Chainage
Name of Sign/Road
Marking
Numbers Fig.no as per IRC 67
2012
LHS RHS
1 35+000 Gantry Mounted Sign 1 16.11
2 47+260 Gantry Mounted Sign 1 16.11
3 48+320 Gantry Mounted Sign 1 16.11
4 48+643 Gantry Mounted Sign 1 16.11
5 48+727 Gantry Mounted Sign 1 16.11
Note: The above location is indicative and minimum. The exact location of the overhead gantry
finalized after approval from the Independent Engineer.
ii. Safety Barrier: Thrie beam type steel barrier shall be provided in a minimum length of 19,112 metre
at locations finalized after review by Independent Engineer under clause 9.7 of the Manual referred
in Schedule D.
(c) Pedestrian Facilities
Pedestrian facilities shall be provided as per Schedule-D.
41. (d) Landscaping & Tree plantation
(j) Minimum of 3000 trees shall be planted as per Schedule-D.
(ii) Landscaping Treatment shall be provided at all grade separators, viaducts, traffic
islands, bus-bays as per Schedule-D.
(e) Truck Lay Bye
Sr. No Design Chainage (Km) LHS/RHS Village name
Nil
(f) Bus Bay – Bus Shelter
Sr.
No
Design Chainage (Km)
LEFT RIGHT
1 36.750 36.850
2 39.100 39.200
3 41.130 41.250
4 44.450 44.550
5 45.430 45.700
6 47.870 48.000
Note: The Bus shelters shall be aesthetically pleasing duly designed by qualified and experienced
Architect.
(g) Rest Areas
Nil
(h) Highway Lighting: Shall be provided as per Schedule-D.
(i) Transportation Art: Shall be provided on all grade-separators, VUPs and ROB to enhance the
overall aesthetics, the graphics/visuals shall be designed by fine arts department of an institute of
repute.
4. Rainwater Harvesting
As per Ministry of Environment and Forests Notification, New Delhi dated 14/01/1997 (as amended on
13/01/1998, 05/01/1999 & 6/11/2000), the construction of Rain water, harvesting structure is mandatory
in and around Water Crisis area, notified by the Central Ground Water Board.
42. Schedule - D
SCHEDULE – D
(See Clause 2.1)
SPECIFICATIONS AND STANDARDS
1. Four-Laning
The Concessionaire shall comply with the Specifications and Standards set forth in Annex-I of this
Schedule-D for construction of the Four Lane Project Highway.
43. Schedule - D
Annex - I
(Schedule-D)
SPECIFICATIONS AND STANDARDS
1 Specifications and Standards
All Materials works and construction operations shall conform to the Manual of Specifications
and Standards for Four-Lane Highways (IRC: SP: 84-2019) published by IRC (referred to as
“Manual” in this Schedule) and MORTH Specifications for Road and Bridge Works. Where the
specification for a work is not given, Good Industry Practice shall be adopted to the satisfaction
of the Independent Engineer. Further the specifications & standards shall comply to Ministry’s
specifications & applicable IRC Codes.
2 Deviations from the Specifications and Standards
2.1 Notwithstanding anything to the contrary contained in the aforesaid Manual, the following
Specifications and Standards shall apply to the Four-Lane Project Highway, and for purposes of
this Agreement, the aforesaid Manual shall be deemed to be amended to the extent set forth
below:
Sr.
No
Clause as per
Manual
Provision as per Manual
Deviation/
Modified Provision
1 2.12.2 Service Road
Width of service/slip road
shall be 5.5m at all locations.
No parking Bays are to be
provided.
2 5.4.1 (i) Flexible pavement: design period and strategy
The design period shall be as
specified in Schedule-B.
3 7.1
All bridges and grade separated structures shall
have independent superstructure for each
direction of travel unless specified otherwise in
Schedule ‘B’. Culverts may have single or
independent superstructure.
As per Schedule-B.
4 7.19
Grade Separated Road Structures: Carriageway
width 14.00m.
The Carriageway width shall
be as specified in Schedule-
B; TCS-3.
5 7.21 Structures in Marine Environment Deleted.
6 Nil -
Transportation Art: The
specification and standards
shall be as provided by fine