SlideShare a Scribd company logo
1 of 3
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
WINTER 2013, ASSIGNMENT
DRIVE WINTER 2014
PROGRAM BACHELOR OF COMPUTER APPLICATION
SUBJECT CODE & NAME BC0054 – SOFTWARE PROJECT MANAGEMENT &
QUALITY ASSURANCE
SEMESTER 5TH SEM
CREDITS 4
MAX. MARKS 60
BK ID B0958
Answer all questions
Q.1. Explain Centralized-Control and Decentralized-Control Team Organization. [5+5] =10
ANS:
Centralized-Control Team Organization: Centralized-control team organization is a standard
management technique in well understood disciplines. In this mode of organization, several
workersreport to a supervisor who directly controls their tasks and is responsible for their
Q.2. What is Software Configuration Management? Explain its Goals. [4+6] =10
ANS:
Software Configuration Management: Software configuration management (SCM) is a set of
activities to control change by identifying the products that are likely to change, establish
relationships among them, defining mechanisms for managing different versions of these work
products, controlling the changes imposed and auditing and reporting on the changes made. In short
Q.3. Explain Waterfall life cycle model. [10] =10
ANS:
Waterfall life cycle model: The "waterfall model", documented in 1970 by Royce was the first
publicly documented life cycle model. The model was developed to help cope with the increasing
complexity of aerospace products. The waterfall model followed a documentation driven paradigm.
Q.4. What is Gantt Chart? What are its advantages? [5+5] =10
ANS:
Gantt Chart: Henry Laurence Gantt, A.B., M.E. (1861-23 November 1919) was a mechanical engineer
and management consultant who is most famous for developing the Gantt chart in the 1910s. These
Gantt charts were employed on major infrastructure projects including the Hoover Dam and
Q.5. List the various activities under the risk management. [10] =10
ANS:
Risk Management: There are two stages in the process of Project Risk Management,
Risk Assessment and Risk Control. Risk Assessment can take place at any time during the project,
though the sooner the better. However, Risk Control cannot be effective without a previous Risk
Assessment. Similarly, mostpeople tend to think that having performed a Risk Assessment; they
have done all that is needed. Far too many projects spend a great deal of effort on Risk Assessment
and then ignore Risk
Q.6. Define (a)Software assurance, (b) Software Engineering, (c) Software Management, (d)
Software reviews, (e) Code Reviews [5x2] =10
ANS:
Software Assurance: Software development, like any complex development activity, is a
process full of risks. The risks are both technical and programmatic. that is, risks that the s
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )

More Related Content

What's hot

Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-introKanchana Devi
 
Managing Complexity and Change with Scalable Software Design
Managing Complexity and Change with Scalable Software DesignManaging Complexity and Change with Scalable Software Design
Managing Complexity and Change with Scalable Software Designlbergmans
 
Cis 500 assignment 6 vo ip part 4 (risk register)
Cis 500 assignment 6 vo ip part 4 (risk register)Cis 500 assignment 6 vo ip part 4 (risk register)
Cis 500 assignment 6 vo ip part 4 (risk register)Anakinzs
 
Devry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newDevry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newuopassignment
 
Microsoft project (msp)
Microsoft project (msp)Microsoft project (msp)
Microsoft project (msp)naziakhan123
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
MB0049 Sem 2 MBA Summer 2015 Assignments
MB0049 Sem 2 MBA Summer 2015 AssignmentsMB0049 Sem 2 MBA Summer 2015 Assignments
MB0049 Sem 2 MBA Summer 2015 Assignmentssolved_assignments
 
Cost estimation method
Cost estimation methodCost estimation method
Cost estimation methodFaheem Ullah
 
Project management
Project managementProject management
Project managementKetan Rathod
 
Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pertKanchana Devi
 
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?MirzaNuman1
 

What's hot (16)

Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011
Pm0011Pm0011
Pm0011
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-intro
 
Managing Complexity and Change with Scalable Software Design
Managing Complexity and Change with Scalable Software DesignManaging Complexity and Change with Scalable Software Design
Managing Complexity and Change with Scalable Software Design
 
Cis 500 assignment 6 vo ip part 4 (risk register)
Cis 500 assignment 6 vo ip part 4 (risk register)Cis 500 assignment 6 vo ip part 4 (risk register)
Cis 500 assignment 6 vo ip part 4 (risk register)
 
Devry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 newDevry proj 595 final exam set 2 new
Devry proj 595 final exam set 2 new
 
Microsoft project (msp)
Microsoft project (msp)Microsoft project (msp)
Microsoft project (msp)
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
MB0049 Sem 2 MBA Summer 2015 Assignments
MB0049 Sem 2 MBA Summer 2015 AssignmentsMB0049 Sem 2 MBA Summer 2015 Assignments
MB0049 Sem 2 MBA Summer 2015 Assignments
 
Cost estimation method
Cost estimation methodCost estimation method
Cost estimation method
 
Project management
Project managementProject management
Project management
 
Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pert
 
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
WHAT IS COST ESTIMATION IN PROJECT MANAGEMENT AND THEIR TYPES?
 
Mb0044 summer 2014
Mb0044 summer 2014Mb0044 summer 2014
Mb0044 summer 2014
 

Viewers also liked

Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...
Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...
Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...eVideoTuition
 
Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality SQALab
 
SDPM - Lecture 8 - Software quality assurance
SDPM - Lecture 8 - Software quality assuranceSDPM - Lecture 8 - Software quality assurance
SDPM - Lecture 8 - Software quality assuranceOpenLearningLab
 
Software Estimation Technique
Software Estimation TechniqueSoftware Estimation Technique
Software Estimation TechniqueGeorge Ukkuru
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniqueskamal
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assuranceruth_reategui
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management Ahmad Maharma, PMP,RMP
 
Quality Assurance and Software Testing
Quality Assurance and Software TestingQuality Assurance and Software Testing
Quality Assurance and Software Testingpingkapil
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Editionpankajsh10
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project managementREHMAT ULLAH
 
Software project management
Software project managementSoftware project management
Software project managementR A Akerkar
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management pptAndreea Usatenco
 

Viewers also liked (12)

Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...
Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...
Software Testing : Quality Assurance (QA) v/s Quality Control (QC) : Definiti...
 
Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality Quality Assurance vs. Quality Control, Future of Software Quality
Quality Assurance vs. Quality Control, Future of Software Quality
 
SDPM - Lecture 8 - Software quality assurance
SDPM - Lecture 8 - Software quality assuranceSDPM - Lecture 8 - Software quality assurance
SDPM - Lecture 8 - Software quality assurance
 
Software Estimation Technique
Software Estimation TechniqueSoftware Estimation Technique
Software Estimation Technique
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assurance
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management
 
Quality Assurance and Software Testing
Quality Assurance and Software TestingQuality Assurance and Software Testing
Quality Assurance and Software Testing
 
Project Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th EditionProject Scope Management - PMBOK 5th Edition
Project Scope Management - PMBOK 5th Edition
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project management
 
Software project management
Software project managementSoftware project management
Software project management
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 

Similar to Bc0054 – software project management & quality assurance

Bc0054 – software project management & quality assurance
Bc0054 – software project management & quality assuranceBc0054 – software project management & quality assurance
Bc0054 – software project management & quality assurancesmumbahelp
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Project Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementProject Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementMiles Priar
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)smumbahelp
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk managementsmumbahelp
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineeringsmumbahelp
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project ManagementkarthikeyanC40
 
spm-uniti-201022085737.pdf
spm-uniti-201022085737.pdfspm-uniti-201022085737.pdf
spm-uniti-201022085737.pdfVinoth Kumar
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptxKamranKhan353531
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Managing projects
Managing projectsManaging projects
Managing projectsNovoraj Roy
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project managementsmumbahelp
 
Lecture 9 (02-06-2011)
Lecture 9 (02-06-2011)Lecture 9 (02-06-2011)
Lecture 9 (02-06-2011)love7love
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticDIPESH30
 
Please follow the data and description 20)Information richness .pdf
Please follow the data and description 20)Information richness .pdfPlease follow the data and description 20)Information richness .pdf
Please follow the data and description 20)Information richness .pdfapexsports101
 

Similar to Bc0054 – software project management & quality assurance (20)

Bc0054 – software project management & quality assurance
Bc0054 – software project management & quality assuranceBc0054 – software project management & quality assurance
Bc0054 – software project management & quality assurance
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Project Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects ManagementProject Management And The Major Areas Of Projects Management
Project Management And The Major Areas Of Projects Management
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0016 project risk management
Pm0016  project risk managementPm0016  project risk management
Pm0016 project risk management
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 
Computing Project
Computing Project Computing Project
Computing Project
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineering
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
spm-uniti-201022085737.pdf
spm-uniti-201022085737.pdfspm-uniti-201022085737.pdf
spm-uniti-201022085737.pdf
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Managing projects
Managing projectsManaging projects
Managing projects
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project management
 
Lecture 9 (02-06-2011)
Lecture 9 (02-06-2011)Lecture 9 (02-06-2011)
Lecture 9 (02-06-2011)
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7critic
 
Please follow the data and description 20)Information richness .pdf
Please follow the data and description 20)Information richness .pdfPlease follow the data and description 20)Information richness .pdf
Please follow the data and description 20)Information richness .pdf
 

Bc0054 – software project management & quality assurance

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency ) WINTER 2013, ASSIGNMENT DRIVE WINTER 2014 PROGRAM BACHELOR OF COMPUTER APPLICATION SUBJECT CODE & NAME BC0054 – SOFTWARE PROJECT MANAGEMENT & QUALITY ASSURANCE SEMESTER 5TH SEM CREDITS 4 MAX. MARKS 60 BK ID B0958 Answer all questions Q.1. Explain Centralized-Control and Decentralized-Control Team Organization. [5+5] =10 ANS: Centralized-Control Team Organization: Centralized-control team organization is a standard management technique in well understood disciplines. In this mode of organization, several workersreport to a supervisor who directly controls their tasks and is responsible for their Q.2. What is Software Configuration Management? Explain its Goals. [4+6] =10 ANS: Software Configuration Management: Software configuration management (SCM) is a set of activities to control change by identifying the products that are likely to change, establish relationships among them, defining mechanisms for managing different versions of these work products, controlling the changes imposed and auditing and reporting on the changes made. In short
  • 2. Q.3. Explain Waterfall life cycle model. [10] =10 ANS: Waterfall life cycle model: The "waterfall model", documented in 1970 by Royce was the first publicly documented life cycle model. The model was developed to help cope with the increasing complexity of aerospace products. The waterfall model followed a documentation driven paradigm. Q.4. What is Gantt Chart? What are its advantages? [5+5] =10 ANS: Gantt Chart: Henry Laurence Gantt, A.B., M.E. (1861-23 November 1919) was a mechanical engineer and management consultant who is most famous for developing the Gantt chart in the 1910s. These Gantt charts were employed on major infrastructure projects including the Hoover Dam and Q.5. List the various activities under the risk management. [10] =10 ANS: Risk Management: There are two stages in the process of Project Risk Management, Risk Assessment and Risk Control. Risk Assessment can take place at any time during the project, though the sooner the better. However, Risk Control cannot be effective without a previous Risk Assessment. Similarly, mostpeople tend to think that having performed a Risk Assessment; they have done all that is needed. Far too many projects spend a great deal of effort on Risk Assessment and then ignore Risk Q.6. Define (a)Software assurance, (b) Software Engineering, (c) Software Management, (d) Software reviews, (e) Code Reviews [5x2] =10 ANS: Software Assurance: Software development, like any complex development activity, is a process full of risks. The risks are both technical and programmatic. that is, risks that the s Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or
  • 3. Call us at : 08263069601 (Prefer mailing. Call in emergency )