MEMBRANE BIOREACTORS
LESSONS LEARNED
Gordon Culp
Smith Culp Consulting
Las Vegas, Nevada
MBR VS CONVENTIONAL
LESSONS LEARNED
Carefully select flux rate
10 gfd vs 25 gfd
Changes in filterability hard to predict
Run pilot tests
RUN PILOT TESTS
LESSONS LEARNED
 Balance MLSS with membrane limits
 7,500 mg/L-10,000 mg/L
 Consider temperature effects
 21C to 12 C, flux decrease of 29% based on temperature
 Consider filterability changes
 21 C to 12 C in practice, flux decrease of 57%
 Run pilot tests!
LESSONS LEARNED
 Equalize Flow
 Cost and space tradeoff between more membranes and
equalization
 10 mgd example – 500,000 sf added membrane area vs
1.5 million gallons of equalization
 Savings in biological process design – no peak loads
and flows
 Ease of operation
LESSONS LEARNED
 Provide right O&M skills
 Lots of moving parts moving all of the time
 Consider DBO?
 Talk to others using the same membranes
 Verify actual flux rates, not just design rates
 Quality of manufacturer support
LESSONS LEARNED
Check State Design Requirements
Flux rate limits – they are limits, not necessarily
achievable
Redundancy requirements
Equalization requirements
LESSONS LEARNED
 Read the fine print
 MLSS limits (7,500-10,000 mg/L)
 Ammonia limits (1 mg/L)
 Minimum influent temperature
 Influent quality specification
 Flux rates - how many trains in service
 Flows – average, max mo, max week, peak hour
 Cleaning regimen
LESSONS LEARNED
 Plan for What Happens When the Membranes
Can’t Keep Up
Seattle
Spokane County
The Sirens bewitch everybody who approaches them. There is no
homecoming for the man who draws near them unawares.
--The advice of Circe, Odyssey, 12:39-47
Be aware of the lessons learned so that the good ship MBR can chart a course
through the rocks and have a happy landing.
MEMBRANE BIOREACTORS
LESSONS LEARNED
Gordon Culp
Smith Culp Consulting
Las Vegas, Nevada
Gordon@smithculp.com

More Related Content

Similar to Membrane Bioreactors (MBR) - Lessons Learned -Gordon Culp

DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSDIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSiQHub
 
Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitationhsiengineering
 
Single-Use-Technologies_revc.pdf-SUS tech
Single-Use-Technologies_revc.pdf-SUS techSingle-Use-Technologies_revc.pdf-SUS tech
Single-Use-Technologies_revc.pdf-SUS techMartinaGj
 
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATION
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATIONFEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATION
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATIONacciona
 
Preliminary Development of Mini-fluidic OFR Technology
Preliminary Development of Mini-fluidic OFR TechnologyPreliminary Development of Mini-fluidic OFR Technology
Preliminary Development of Mini-fluidic OFR TechnologyKirubanandan Shanmugam
 
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...Jennifer Maclachlan
 
Tackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsTackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsMerck Life Sciences
 
Tackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsTackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsMilliporeSigma
 
You can't control me! Throttling blowers and with valves and VFDs
You can't control me! Throttling blowers and with valves and VFDsYou can't control me! Throttling blowers and with valves and VFDs
You can't control me! Throttling blowers and with valves and VFDsBrian Gongol
 
CO2-removal-membranes.pdf
CO2-removal-membranes.pdfCO2-removal-membranes.pdf
CO2-removal-membranes.pdfNaveed Zia
 
Protec zld based on ltd system 2
Protec zld based on ltd system 2Protec zld based on ltd system 2
Protec zld based on ltd system 2mohager4a
 
Parmenter, Brady, Poster
Parmenter, Brady, PosterParmenter, Brady, Poster
Parmenter, Brady, PosterBrady Parmenter
 
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Sergio A. Guerra
 
Evaluation of the Performance of Recycled Bituminous Materials
Evaluation of the Performance of Recycled Bituminous MaterialsEvaluation of the Performance of Recycled Bituminous Materials
Evaluation of the Performance of Recycled Bituminous MaterialsIsraa Hussein
 
Skywork's presentation
Skywork's presentationSkywork's presentation
Skywork's presentationDiana Wu Wong
 
Green Proving Ground Overview - April 2014
Green Proving Ground Overview - April 2014Green Proving Ground Overview - April 2014
Green Proving Ground Overview - April 2014Lourdes Ortega
 
Practical wellbore formation test interpretation; #120009 (2009)
Practical wellbore formation test interpretation; #120009 (2009)Practical wellbore formation test interpretation; #120009 (2009)
Practical wellbore formation test interpretation; #120009 (2009)Tran Dang Sang
 
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...Merck Life Sciences
 

Similar to Membrane Bioreactors (MBR) - Lessons Learned -Gordon Culp (20)

IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
 
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSDIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
 
Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitation
 
Single-Use-Technologies_revc.pdf-SUS tech
Single-Use-Technologies_revc.pdf-SUS techSingle-Use-Technologies_revc.pdf-SUS tech
Single-Use-Technologies_revc.pdf-SUS tech
 
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATION
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATIONFEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATION
FEASIBILITY OF FORWARD OSMOSIS FOR DESALINATION AND WATER RECLAMATION
 
Preliminary Development of Mini-fluidic OFR Technology
Preliminary Development of Mini-fluidic OFR TechnologyPreliminary Development of Mini-fluidic OFR Technology
Preliminary Development of Mini-fluidic OFR Technology
 
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...
Headspace Gas Chromatograph/PID for Onsite Screening of Soil and Water at Haz...
 
Tackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsTackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCs
 
Tackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCsTackling the challenges of single-use manufacturing for ADCs
Tackling the challenges of single-use manufacturing for ADCs
 
You can't control me! Throttling blowers and with valves and VFDs
You can't control me! Throttling blowers and with valves and VFDsYou can't control me! Throttling blowers and with valves and VFDs
You can't control me! Throttling blowers and with valves and VFDs
 
CO2-removal-membranes.pdf
CO2-removal-membranes.pdfCO2-removal-membranes.pdf
CO2-removal-membranes.pdf
 
Protec zld based on ltd system 2
Protec zld based on ltd system 2Protec zld based on ltd system 2
Protec zld based on ltd system 2
 
Parmenter, Brady, Poster
Parmenter, Brady, PosterParmenter, Brady, Poster
Parmenter, Brady, Poster
 
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
Solution to AERMOD/PRIME PM10 Overpredictions for Extremely Short, Long and W...
 
Evaluation of the Performance of Recycled Bituminous Materials
Evaluation of the Performance of Recycled Bituminous MaterialsEvaluation of the Performance of Recycled Bituminous Materials
Evaluation of the Performance of Recycled Bituminous Materials
 
Skywork's presentation
Skywork's presentationSkywork's presentation
Skywork's presentation
 
Green Proving Ground Overview - April 2014
Green Proving Ground Overview - April 2014Green Proving Ground Overview - April 2014
Green Proving Ground Overview - April 2014
 
Twin IPM Approach
Twin IPM ApproachTwin IPM Approach
Twin IPM Approach
 
Practical wellbore formation test interpretation; #120009 (2009)
Practical wellbore formation test interpretation; #120009 (2009)Practical wellbore formation test interpretation; #120009 (2009)
Practical wellbore formation test interpretation; #120009 (2009)
 
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...
High Productivity Membrane Chromatography: Enabling the Next Generation Biopr...
 

Recently uploaded

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Membrane Bioreactors (MBR) - Lessons Learned -Gordon Culp

  • 1. MEMBRANE BIOREACTORS LESSONS LEARNED Gordon Culp Smith Culp Consulting Las Vegas, Nevada
  • 3. LESSONS LEARNED Carefully select flux rate 10 gfd vs 25 gfd Changes in filterability hard to predict Run pilot tests
  • 5. LESSONS LEARNED  Balance MLSS with membrane limits  7,500 mg/L-10,000 mg/L  Consider temperature effects  21C to 12 C, flux decrease of 29% based on temperature  Consider filterability changes  21 C to 12 C in practice, flux decrease of 57%  Run pilot tests!
  • 6. LESSONS LEARNED  Equalize Flow  Cost and space tradeoff between more membranes and equalization  10 mgd example – 500,000 sf added membrane area vs 1.5 million gallons of equalization  Savings in biological process design – no peak loads and flows  Ease of operation
  • 7. LESSONS LEARNED  Provide right O&M skills  Lots of moving parts moving all of the time  Consider DBO?  Talk to others using the same membranes  Verify actual flux rates, not just design rates  Quality of manufacturer support
  • 8. LESSONS LEARNED Check State Design Requirements Flux rate limits – they are limits, not necessarily achievable Redundancy requirements Equalization requirements
  • 9. LESSONS LEARNED  Read the fine print  MLSS limits (7,500-10,000 mg/L)  Ammonia limits (1 mg/L)  Minimum influent temperature  Influent quality specification  Flux rates - how many trains in service  Flows – average, max mo, max week, peak hour  Cleaning regimen
  • 10. LESSONS LEARNED  Plan for What Happens When the Membranes Can’t Keep Up Seattle Spokane County
  • 11. The Sirens bewitch everybody who approaches them. There is no homecoming for the man who draws near them unawares. --The advice of Circe, Odyssey, 12:39-47
  • 12. Be aware of the lessons learned so that the good ship MBR can chart a course through the rocks and have a happy landing.
  • 13. MEMBRANE BIOREACTORS LESSONS LEARNED Gordon Culp Smith Culp Consulting Las Vegas, Nevada Gordon@smithculp.com