Exploration Alternatives 
Is human exploration possible 
without U.S. government funding it?
Earth Departure Stage 
• Maximum performance for minimum price 
achieved by launching payload first, then a 
LOX/LH2 departure stage 
– Depots or a “refrigerant module” to avoid boiloff 
changes this order 
– Can “buddy tank” stages together but $/kg gets 
worse 
– Can have a lower kick stage (solid or liquid) but 
$/kg gets worse
Earth escape of existing stages 
Launcher 
“Stage” 
Prop 
(kg) 
MECO 
(kg) 
Thrust 
(lbf) 
Isp 
(s) 
Propellant 
@ zero 
payload 
(250km) 
3.22km/s 
dV 
payload 
No refuel 
$/kg to 
Escape 
(very 
rough) 
Ariane 5 ECA 
“ESC” 
14900 5290 14500 446 14900 13820 $26000 
Atlas 551 
“Centaur” 
20830 2550 22300 451 20400 16170 $11000 
Delta IV-H 
“5m stage” 
27200 3490 27200 462 27200 22720 $15500 
Falcon 9 90000 4900 180000 342 13150 3230 $27000
Light capsule 
• Scaling human missions down to 
current launchers requires 
minimum crew (2), and a 
minimal capsule 
• Helps a lot if there are several 
docking adapters to allow 
flexibility in stacking 
• Mars Curiosity heat shield 4.6m 
diameter with 2600kg entry 
mass to Earth or Mars 
• Can be used in several beyond 
earth missions; has volume for 2 
crew on lunar missions without 
additional hab
LEO to L1/Lunar Surface 
• Long term LOX/LH2 storage needed 
– 10-20kWe, plus radiators of similar capacity 
– Sunshade to keep tanks shaded reduces this 
– Docking ports for Centaurs plus reusable landers 
based on Centaur tanks plus to hab 
• Hab module based on BEAM or Cygnus 
• Can put both hab and refrigerator at L1 with Atlas 
551. Second 551 to place a lander. 
• Including boiloff allowance full Centaur puts 10800kg 
to L1, so can push an F9 payload 
• Light capsule/heatshield allows crew to be brought 
up with enough propellant for a lunar round trip on 
single Atlas 551 
• Total launch cost: $720M for first mission, $270M for 
each following manned round trip, or $450M to soft 
land 5t cargo with one way lander: can just keep 
going for more missions
LEO to Mars Flyby 
• Inspiration Mars studies suggest 12000-13000 
kg for hab, consumables, and SM 
• With light capsule, perhaps 15000-16000kg 
• Delta IV Heavy upper stage pushes ~18500kg 
from LEO to 3.6 km/s delta V 
• Remaining 1.3 km/s provided by electric 
propulsion, <100kw concentrator array (SLA), 
12 XIPS, 670 kg Xenon 
• Atlas 551 for payload, then F9/Dragon for crew 
& cargo, then Delta IV Heavy for departure 
stage: $620M launch 
• This all depends on tolerable GCR hazard; but 
we’d find out
Dealing with Earth-Orbit Rendezvous 
• Challenge for these missions is having time to assemble it all in LEO 
• Centaur can loiter a while, Delta IV cannot 
• 3 launches: A551, F9/Dragon, Delta IV. Reasonable assumption is 80-90% 
likelihood of getting all 3 off succesfully if have time for the launches 
• Launch hab/sm/return capsule first; needs to stay on orbit for a while – say a 
month. 
– Precession of orbit axis reduces launch opportunities 
– Repeated ground track orbit (16 orbit repeat) solves precession but it is a low orbit – 187 km, 
giving launch opportunities every 23.73 hours 
– Electric thrust can do drag makeup – 100kg of propellant keeps hab on orbit for a month 
• Launch crew on F9/Dragon as soon as feasible; 
carry extra consumables– leave any excess in the 
Dragon. Move consumables from Dragon to hab 
• Gives ~12 days to get the Delta off with launch 
opportunity every day. Launch to first-orbit-rendezvous, 
dock using Dragon SM for the 
maneuvering stage, jettison Dragon and TMI 
burn on the next orbit 
• Electric propulsion makes up extra delta-V
Deimos landing & Return 
• Outer edge of current launchers; requires austere hab of Mars Flyby 
to work 
• Put small propulsion module on capsule, 1100m/s storable 
• Max out weight with electric propellant 
• First mission sends hab + SM and electric propulsion to spiral down 
to Deimos 
• Second mission sends crew & hab: capsule and propulsion 
aerobrakes to Mars aerocapture then biellptic transfer to Deimos. 
Hab spirals in to Deimos orbit electrically over months 
• For departure, bring crew & additional Xenon from Deimos up to 
hab in capsule, then spiral out & return to Earth 
• Launch cost $1840M 
• Again, this is pushed right to the edge but if it works – no limit to 
how many supplies you can cache at Deimos (or Phobos) this way. 
In principle, could keep going until had a Mars crewed lander there
Upgrades 
• By far, biggest improvement is a bigger but high mass ratio, high Isp earth 
departure stage with provision for low boiloff and/or plug-in to 
refrigeration module 
• The ACES stage on ULA’s roadmap is just right for this; they’ve estimated 
$1B for that and a funded customer would be a big help 
• That would give about 1.6x increase in mass for Delta 4 heavy EDS launch 
and would not take many missions to pay off investment 
• Centaur-derived EDS can be aerobraked back to LEO for reuse, which 
reduces cost of each subsequent Lunar mission 
• Once a refrigerator module is at L1, can do better with a full Centaur 
departing from L1 and Earth swingby to high C3 (can do 36000kg with full 
Centaur at L1, but crew then gets three Van Allen passes. Or with 3 A551 
+ 3 F9 ($810M launch), can do Mars flyby from L1 with flexible timing
Financing 
• Hardware and NRE cost not discussed; wide variety in 
what that takes from team to team; swag total mission 
at 2-3x launch costs 
• Like any exploration mission in history, hard to get 
initial expeditions to be profitable 
• But <$2B price tags within philanthropic reach – and, if 
done intelligently, the ventures that do them now have 
a paid off Lunar/Mars transportation system with 
possible other customers 
• Can we really not figure out how to make back the 
media sales of Avatar or Star Wars or E.T from going to 
real life other planets, if privately run and no limit on 
media rights or sponsorship?
Cosmic Radiation Limits 
• Austere Mars missions assume GCR hazard is tolerable. This is not 
currently known to be true or false 
• If GCR is hazardous (high REM/RAD), then what do we do? 
• Takes about 0.2m of polyethylene to reduce GCR to type of radiation we 
are familiar with and is within our experience base for chronic exposures 
on Earth 
• If starting from Cygnus module, as with mars flyby, that cuts habitable 
volume to 450 ft3 and adds 11000 kg of shielding which can be modular 
• Two such modules could then provide long term habitat for two people 
plus life support; and if 20m cable connects them, can do Mars gravity at 
6RPM 
• 5 Atlas + 5 F9 to put this in L1 and electric boost to mars cycler trajectory. 
$1350M launch cost for each cycler 
• May require two cyclers to take advantage of each Mars opportunity
Cycler-based missions 
• No longer need to carry hab on each mission 
– just capsule and consumables and fuel 
• S1L1-B cycler (M-E-E) offers low delta V: 
– 4.7km/s excess leaving earth, 5-6.5km/s mars 
– Real orbital mechanics takes some hab maneuvers 
– Delta-V for hab at most 1 km/s, most orbits nothing 
• 2 A551 to bring up 2 centaurs to go to hab, lofting crew capsule, 
consumables to come on two F9, and about 2.8 km/s storable stage for 
capsule: $540M launch cost 
• Centaurs carry payloads to hab, capsule aerobrakes at mars, bielliptic to 
Deimos, then biellptic to go from Deimos down and out to cycler for 
return, aerobrakes at Earth 
• Again, right on the edge – expensive, but doable. Still, if doing this 
mission would certainly pay to fund ACES stage 
• A successful Mars flyby showing GCR hazards tolerable has huge value
References 
• Delta IV Launch Services User’s Guide, ULA, June 2013, retrieved from 
http://www.ulalaunch.com/uploads/docs/Launch_Vehicles/Delta_IV_Users_Guide_June_2013.pdf 
• D. Tito et. al., “Feasibility Analysis for a Manned Mars Free-Return Mission in 2018”, 2013 IEEE 
Aerospace Conference, March 2013 
• K. Edquist et. al., “Aerothermodynamic Design of the Mars Science Laboratory Backshell and 
Parachute Cone”, and “Aerothermodynamic Design of the Mars Science Laboratory Heatshield”, 
AIAA Paper 2009-4075 
• M O’Neill et. al., “Stretched Lens Array Squarerigger (SLASR): A Unique High-Power Solar Array for 
Exploration Missions”, IAC-05-C3.2.01, International Astronautical Congress, 2005. Retrieved from 
http://www.markoneill.com/IAC-SLASR-2005.pdf 
• M. Lara, “Repeat Ground Track Orbits of the Earth Tesseral Problem as Bifurcations of the Equatorial 
Family of Periodic Orbits”, Celestial Mechanics and Dynamical Astronomy, v 86 p 143-162, 2003 
• J. Hopkins, W. Pratt, “Comparison of Deimos and Phobos as Destinations for Human Exploration and 
Identification of Preferred Landing Sites”, AIAA SPACE 2001, AIAA 2011-7140, September 2011 
• T. McConaghy, J. Longuski, D. Byrnes, “Analysis of a Class of Earth-Mars Cycler Trajectories”, Journal 
of Spacecraft and Rockets, v 41 n4, July-August 2004 
• T. McConaghy, J. Longuski, D. Byrnes, “Analysis of a Broad Class of Earth-Mars Cycler Trajectories”, 
AIAA/AAS Astrodynamics Specialist Conference, Monterey, CA, Aug 2002, retrieved from http://trs-new. 
jpl.nasa.gov/dspace/bitstream/2014/8886/1/02-1454.pdf 
• B. Birckenstaedt, B. Kutter, F. Zegler, “Centaur Application to Robotic and Crewed Lunar Lander 
Evolution”, STAIF 2007, AIP conference proceedings, v 880 p 779ff, 2007 
• W Chen et. al., “Effects of Cobalt-60 Exposure on Health of Taiwan Residents Suggest New 
Approach Needed in Radiation Protection”, Dose-Response, v 5, p 63-75, 2007

More Related Content

What's hot

Isro’s reusable launch vehicle technology demonstrator (rlv-td) – joining t...
Isro’s reusable launch vehicle   technology demonstrator (rlv-td) – joining t...Isro’s reusable launch vehicle   technology demonstrator (rlv-td) – joining t...
Isro’s reusable launch vehicle technology demonstrator (rlv-td) – joining t...hindujudaic
 
Satellite sajith
Satellite sajithSatellite sajith
Satellite sajithsajithguru
 
Conceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar LanderConceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar Landerguinness
 
The Operation Of Space Shuttle
The Operation Of Space ShuttleThe Operation Of Space Shuttle
The Operation Of Space ShuttleGokul Lakshmanan
 
NASA Orion Multi Purpose Crew Vechicle - Full Explanation
NASA Orion Multi Purpose Crew Vechicle - Full ExplanationNASA Orion Multi Purpose Crew Vechicle - Full Explanation
NASA Orion Multi Purpose Crew Vechicle - Full ExplanationGokul Lakshmanan
 
Space Elevator Module
Space Elevator ModuleSpace Elevator Module
Space Elevator ModuleAccessNano
 
Satellites launching procedure and vechicles
Satellites launching procedure and vechiclesSatellites launching procedure and vechicles
Satellites launching procedure and vechiclesMUTHUKUMAR MANIVANNAN
 
A Seminar on Plasma Propelled Rocket Engine
A Seminar on Plasma Propelled Rocket EngineA Seminar on Plasma Propelled Rocket Engine
A Seminar on Plasma Propelled Rocket EngineBHASKAR KULKARNI
 
How will space x send human to mars and reduce cost of space travel
How will space x send human to mars and reduce cost of space travelHow will space x send human to mars and reduce cost of space travel
How will space x send human to mars and reduce cost of space travelvikash kushwaha
 
Tether boostfacilities
Tether boostfacilitiesTether boostfacilities
Tether boostfacilitiesClifford Stone
 
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...Winston Sanks
 

What's hot (20)

Reusable launch vehicle
Reusable launch vehicleReusable launch vehicle
Reusable launch vehicle
 
Isro’s reusable launch vehicle technology demonstrator (rlv-td) – joining t...
Isro’s reusable launch vehicle   technology demonstrator (rlv-td) – joining t...Isro’s reusable launch vehicle   technology demonstrator (rlv-td) – joining t...
Isro’s reusable launch vehicle technology demonstrator (rlv-td) – joining t...
 
Satellite sajith
Satellite sajithSatellite sajith
Satellite sajith
 
A One Way Trip To Mars
A One Way Trip To MarsA One Way Trip To Mars
A One Way Trip To Mars
 
Conceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar LanderConceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar Lander
 
Expo Poster Final
Expo Poster FinalExpo Poster Final
Expo Poster Final
 
The Operation Of Space Shuttle
The Operation Of Space ShuttleThe Operation Of Space Shuttle
The Operation Of Space Shuttle
 
NASA Orion Multi Purpose Crew Vechicle - Full Explanation
NASA Orion Multi Purpose Crew Vechicle - Full ExplanationNASA Orion Multi Purpose Crew Vechicle - Full Explanation
NASA Orion Multi Purpose Crew Vechicle - Full Explanation
 
Space Elevator Module
Space Elevator ModuleSpace Elevator Module
Space Elevator Module
 
4_Moon_Missions
4_Moon_Missions4_Moon_Missions
4_Moon_Missions
 
Altair: Constellation Returns Humans to the Moon
Altair: Constellation Returns Humans to the MoonAltair: Constellation Returns Humans to the Moon
Altair: Constellation Returns Humans to the Moon
 
Orion
OrionOrion
Orion
 
ELECTRODYANAMIC TETHER
ELECTRODYANAMIC TETHERELECTRODYANAMIC TETHER
ELECTRODYANAMIC TETHER
 
Satellites launching procedure and vechicles
Satellites launching procedure and vechiclesSatellites launching procedure and vechicles
Satellites launching procedure and vechicles
 
A Seminar on Plasma Propelled Rocket Engine
A Seminar on Plasma Propelled Rocket EngineA Seminar on Plasma Propelled Rocket Engine
A Seminar on Plasma Propelled Rocket Engine
 
How will space x send human to mars and reduce cost of space travel
How will space x send human to mars and reduce cost of space travelHow will space x send human to mars and reduce cost of space travel
How will space x send human to mars and reduce cost of space travel
 
Tether boostfacilities
Tether boostfacilitiesTether boostfacilities
Tether boostfacilities
 
Von Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceXVon Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceX
 
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...
Kinetic Energy Transfer of Near-Earth Objects for Interplanetary Manned Missi...
 
satellite launcher
satellite launchersatellite launcher
satellite launcher
 

Similar to XCOR Exploration Alternatives - Jeff Greason

Realistic interstellarexplorer
Realistic interstellarexplorerRealistic interstellarexplorer
Realistic interstellarexplorerClifford Stone
 
1.3.1 newton cannons and satellites
1.3.1   newton cannons and satellites1.3.1   newton cannons and satellites
1.3.1 newton cannons and satellitesJohnPaul Kennedy
 
Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsionClifford Stone
 
Lunar Lavatube AIAA Presentation_Final
Lunar Lavatube AIAA Presentation_FinalLunar Lavatube AIAA Presentation_Final
Lunar Lavatube AIAA Presentation_FinalRohan Deshmukh
 
Satellite Communicationes System mod 1.pdf
Satellite Communicationes System mod 1.pdfSatellite Communicationes System mod 1.pdf
Satellite Communicationes System mod 1.pdfmdiazd3933
 
The space elevator
The space elevatorThe space elevator
The space elevatorNahid Anjum
 
Cold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteCold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteApurva Anand
 
Interstellar Travel
Interstellar TravelInterstellar Travel
Interstellar TravelNic Weissman
 
satellite communication system
satellite communication systemsatellite communication system
satellite communication systemAmjad Khan
 
Senior Design - Europa Mission Proposal
Senior Design - Europa Mission ProposalSenior Design - Europa Mission Proposal
Senior Design - Europa Mission ProposalMatt Bergman
 
Advance Propulsion System in Space Exploration - Ion Propulsion
Advance Propulsion System in Space Exploration - Ion PropulsionAdvance Propulsion System in Space Exploration - Ion Propulsion
Advance Propulsion System in Space Exploration - Ion PropulsionVINOTHE9
 

Similar to XCOR Exploration Alternatives - Jeff Greason (20)

GSFC_Servicing_Workshop
GSFC_Servicing_WorkshopGSFC_Servicing_Workshop
GSFC_Servicing_Workshop
 
Space update 042411
Space update 042411Space update 042411
Space update 042411
 
Realistic interstellarexplorer
Realistic interstellarexplorerRealistic interstellarexplorer
Realistic interstellarexplorer
 
1.3.1 newton cannons and satellites
1.3.1   newton cannons and satellites1.3.1   newton cannons and satellites
1.3.1 newton cannons and satellites
 
Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsion
 
Lunar Lavatube AIAA Presentation_Final
Lunar Lavatube AIAA Presentation_FinalLunar Lavatube AIAA Presentation_Final
Lunar Lavatube AIAA Presentation_Final
 
Satellite Communicationes System mod 1.pdf
Satellite Communicationes System mod 1.pdfSatellite Communicationes System mod 1.pdf
Satellite Communicationes System mod 1.pdf
 
The space elevator
The space elevatorThe space elevator
The space elevator
 
Space elevator REPORT
Space elevator REPORTSpace elevator REPORT
Space elevator REPORT
 
Orbital Debris Mapping
Orbital Debris MappingOrbital Debris Mapping
Orbital Debris Mapping
 
Space future
Space futureSpace future
Space future
 
Cold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satelliteCold gas thruster to de orbit nano satellite
Cold gas thruster to de orbit nano satellite
 
Visits tomarsjun02
Visits tomarsjun02Visits tomarsjun02
Visits tomarsjun02
 
1298 angel[1]
1298 angel[1]1298 angel[1]
1298 angel[1]
 
Satellite orbit and constellation design
Satellite orbit and constellation designSatellite orbit and constellation design
Satellite orbit and constellation design
 
Interstellar Travel
Interstellar TravelInterstellar Travel
Interstellar Travel
 
Goddard 2015: Greg Williams, NASA
Goddard 2015: Greg Williams, NASAGoddard 2015: Greg Williams, NASA
Goddard 2015: Greg Williams, NASA
 
satellite communication system
satellite communication systemsatellite communication system
satellite communication system
 
Senior Design - Europa Mission Proposal
Senior Design - Europa Mission ProposalSenior Design - Europa Mission Proposal
Senior Design - Europa Mission Proposal
 
Advance Propulsion System in Space Exploration - Ion Propulsion
Advance Propulsion System in Space Exploration - Ion PropulsionAdvance Propulsion System in Space Exploration - Ion Propulsion
Advance Propulsion System in Space Exploration - Ion Propulsion
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

XCOR Exploration Alternatives - Jeff Greason

  • 1. Exploration Alternatives Is human exploration possible without U.S. government funding it?
  • 2. Earth Departure Stage • Maximum performance for minimum price achieved by launching payload first, then a LOX/LH2 departure stage – Depots or a “refrigerant module” to avoid boiloff changes this order – Can “buddy tank” stages together but $/kg gets worse – Can have a lower kick stage (solid or liquid) but $/kg gets worse
  • 3. Earth escape of existing stages Launcher “Stage” Prop (kg) MECO (kg) Thrust (lbf) Isp (s) Propellant @ zero payload (250km) 3.22km/s dV payload No refuel $/kg to Escape (very rough) Ariane 5 ECA “ESC” 14900 5290 14500 446 14900 13820 $26000 Atlas 551 “Centaur” 20830 2550 22300 451 20400 16170 $11000 Delta IV-H “5m stage” 27200 3490 27200 462 27200 22720 $15500 Falcon 9 90000 4900 180000 342 13150 3230 $27000
  • 4. Light capsule • Scaling human missions down to current launchers requires minimum crew (2), and a minimal capsule • Helps a lot if there are several docking adapters to allow flexibility in stacking • Mars Curiosity heat shield 4.6m diameter with 2600kg entry mass to Earth or Mars • Can be used in several beyond earth missions; has volume for 2 crew on lunar missions without additional hab
  • 5. LEO to L1/Lunar Surface • Long term LOX/LH2 storage needed – 10-20kWe, plus radiators of similar capacity – Sunshade to keep tanks shaded reduces this – Docking ports for Centaurs plus reusable landers based on Centaur tanks plus to hab • Hab module based on BEAM or Cygnus • Can put both hab and refrigerator at L1 with Atlas 551. Second 551 to place a lander. • Including boiloff allowance full Centaur puts 10800kg to L1, so can push an F9 payload • Light capsule/heatshield allows crew to be brought up with enough propellant for a lunar round trip on single Atlas 551 • Total launch cost: $720M for first mission, $270M for each following manned round trip, or $450M to soft land 5t cargo with one way lander: can just keep going for more missions
  • 6. LEO to Mars Flyby • Inspiration Mars studies suggest 12000-13000 kg for hab, consumables, and SM • With light capsule, perhaps 15000-16000kg • Delta IV Heavy upper stage pushes ~18500kg from LEO to 3.6 km/s delta V • Remaining 1.3 km/s provided by electric propulsion, <100kw concentrator array (SLA), 12 XIPS, 670 kg Xenon • Atlas 551 for payload, then F9/Dragon for crew & cargo, then Delta IV Heavy for departure stage: $620M launch • This all depends on tolerable GCR hazard; but we’d find out
  • 7. Dealing with Earth-Orbit Rendezvous • Challenge for these missions is having time to assemble it all in LEO • Centaur can loiter a while, Delta IV cannot • 3 launches: A551, F9/Dragon, Delta IV. Reasonable assumption is 80-90% likelihood of getting all 3 off succesfully if have time for the launches • Launch hab/sm/return capsule first; needs to stay on orbit for a while – say a month. – Precession of orbit axis reduces launch opportunities – Repeated ground track orbit (16 orbit repeat) solves precession but it is a low orbit – 187 km, giving launch opportunities every 23.73 hours – Electric thrust can do drag makeup – 100kg of propellant keeps hab on orbit for a month • Launch crew on F9/Dragon as soon as feasible; carry extra consumables– leave any excess in the Dragon. Move consumables from Dragon to hab • Gives ~12 days to get the Delta off with launch opportunity every day. Launch to first-orbit-rendezvous, dock using Dragon SM for the maneuvering stage, jettison Dragon and TMI burn on the next orbit • Electric propulsion makes up extra delta-V
  • 8. Deimos landing & Return • Outer edge of current launchers; requires austere hab of Mars Flyby to work • Put small propulsion module on capsule, 1100m/s storable • Max out weight with electric propellant • First mission sends hab + SM and electric propulsion to spiral down to Deimos • Second mission sends crew & hab: capsule and propulsion aerobrakes to Mars aerocapture then biellptic transfer to Deimos. Hab spirals in to Deimos orbit electrically over months • For departure, bring crew & additional Xenon from Deimos up to hab in capsule, then spiral out & return to Earth • Launch cost $1840M • Again, this is pushed right to the edge but if it works – no limit to how many supplies you can cache at Deimos (or Phobos) this way. In principle, could keep going until had a Mars crewed lander there
  • 9. Upgrades • By far, biggest improvement is a bigger but high mass ratio, high Isp earth departure stage with provision for low boiloff and/or plug-in to refrigeration module • The ACES stage on ULA’s roadmap is just right for this; they’ve estimated $1B for that and a funded customer would be a big help • That would give about 1.6x increase in mass for Delta 4 heavy EDS launch and would not take many missions to pay off investment • Centaur-derived EDS can be aerobraked back to LEO for reuse, which reduces cost of each subsequent Lunar mission • Once a refrigerator module is at L1, can do better with a full Centaur departing from L1 and Earth swingby to high C3 (can do 36000kg with full Centaur at L1, but crew then gets three Van Allen passes. Or with 3 A551 + 3 F9 ($810M launch), can do Mars flyby from L1 with flexible timing
  • 10. Financing • Hardware and NRE cost not discussed; wide variety in what that takes from team to team; swag total mission at 2-3x launch costs • Like any exploration mission in history, hard to get initial expeditions to be profitable • But <$2B price tags within philanthropic reach – and, if done intelligently, the ventures that do them now have a paid off Lunar/Mars transportation system with possible other customers • Can we really not figure out how to make back the media sales of Avatar or Star Wars or E.T from going to real life other planets, if privately run and no limit on media rights or sponsorship?
  • 11. Cosmic Radiation Limits • Austere Mars missions assume GCR hazard is tolerable. This is not currently known to be true or false • If GCR is hazardous (high REM/RAD), then what do we do? • Takes about 0.2m of polyethylene to reduce GCR to type of radiation we are familiar with and is within our experience base for chronic exposures on Earth • If starting from Cygnus module, as with mars flyby, that cuts habitable volume to 450 ft3 and adds 11000 kg of shielding which can be modular • Two such modules could then provide long term habitat for two people plus life support; and if 20m cable connects them, can do Mars gravity at 6RPM • 5 Atlas + 5 F9 to put this in L1 and electric boost to mars cycler trajectory. $1350M launch cost for each cycler • May require two cyclers to take advantage of each Mars opportunity
  • 12. Cycler-based missions • No longer need to carry hab on each mission – just capsule and consumables and fuel • S1L1-B cycler (M-E-E) offers low delta V: – 4.7km/s excess leaving earth, 5-6.5km/s mars – Real orbital mechanics takes some hab maneuvers – Delta-V for hab at most 1 km/s, most orbits nothing • 2 A551 to bring up 2 centaurs to go to hab, lofting crew capsule, consumables to come on two F9, and about 2.8 km/s storable stage for capsule: $540M launch cost • Centaurs carry payloads to hab, capsule aerobrakes at mars, bielliptic to Deimos, then biellptic to go from Deimos down and out to cycler for return, aerobrakes at Earth • Again, right on the edge – expensive, but doable. Still, if doing this mission would certainly pay to fund ACES stage • A successful Mars flyby showing GCR hazards tolerable has huge value
  • 13. References • Delta IV Launch Services User’s Guide, ULA, June 2013, retrieved from http://www.ulalaunch.com/uploads/docs/Launch_Vehicles/Delta_IV_Users_Guide_June_2013.pdf • D. Tito et. al., “Feasibility Analysis for a Manned Mars Free-Return Mission in 2018”, 2013 IEEE Aerospace Conference, March 2013 • K. Edquist et. al., “Aerothermodynamic Design of the Mars Science Laboratory Backshell and Parachute Cone”, and “Aerothermodynamic Design of the Mars Science Laboratory Heatshield”, AIAA Paper 2009-4075 • M O’Neill et. al., “Stretched Lens Array Squarerigger (SLASR): A Unique High-Power Solar Array for Exploration Missions”, IAC-05-C3.2.01, International Astronautical Congress, 2005. Retrieved from http://www.markoneill.com/IAC-SLASR-2005.pdf • M. Lara, “Repeat Ground Track Orbits of the Earth Tesseral Problem as Bifurcations of the Equatorial Family of Periodic Orbits”, Celestial Mechanics and Dynamical Astronomy, v 86 p 143-162, 2003 • J. Hopkins, W. Pratt, “Comparison of Deimos and Phobos as Destinations for Human Exploration and Identification of Preferred Landing Sites”, AIAA SPACE 2001, AIAA 2011-7140, September 2011 • T. McConaghy, J. Longuski, D. Byrnes, “Analysis of a Class of Earth-Mars Cycler Trajectories”, Journal of Spacecraft and Rockets, v 41 n4, July-August 2004 • T. McConaghy, J. Longuski, D. Byrnes, “Analysis of a Broad Class of Earth-Mars Cycler Trajectories”, AIAA/AAS Astrodynamics Specialist Conference, Monterey, CA, Aug 2002, retrieved from http://trs-new. jpl.nasa.gov/dspace/bitstream/2014/8886/1/02-1454.pdf • B. Birckenstaedt, B. Kutter, F. Zegler, “Centaur Application to Robotic and Crewed Lunar Lander Evolution”, STAIF 2007, AIP conference proceedings, v 880 p 779ff, 2007 • W Chen et. al., “Effects of Cobalt-60 Exposure on Health of Taiwan Residents Suggest New Approach Needed in Radiation Protection”, Dose-Response, v 5, p 63-75, 2007