DAVIDE ANSALDI
OPERATIONS (BRIDGE) SUPERVISOR

Born in Torino, Italy. 20th October 1970
live in Palma Mallorca (Spain)
Cell: +34 711771535
email: ansaldi.davide@yahoo.com

Summary
A well-presented and pro-active offshore shift supervisor who has a relentless drive to have a
broad impact rather than just deliver results. Possessing experience of coordinating and
managing all offshore project activities with different WROV/Trenching systems during the
subsea installations and the project planning onshore, directing AHC cranes/winches on board
various DP vessels providing clear guidance and leadership to a team on board (surveyors,
deck foreman/riggers, ROV’s supervisors and DP officers). When on board able to held
operations kick off meeting, JSA assessment, Risk Assessment review, etc. Confident
communicator with strong interpersonal and analytical skills who thrives on social interaction
and client satisfaction. I’m presently looking to join a company where successful results and
hard work are rewarded.

Work experience
from March ’13 to Jan ‘14

Shift Superintendet (bridge) at DeepOcean UK

Assist the OM and act in his behalf when off duty; supervising trenching and survey operations.
Conduct the assigned offshore operations, in strict accordance with equipment operational
procedures, project specific procedures and client written variation instructions. Direct the DPO
officers and Deck leader, surveyor's during trenching ops. Conduct safety briefings, tool box talks
etc, for all assigned personnel and sub contractor personnel, ensure all necessary training is
carried out and recorded in the training logs.

from June ’12 to Jan. ‘13

Shift Supervisor (bridge) at SBM Offshore
Assist the OCM and act in his behalf when off duty; supervise the offshore constructions, jumpers
and XTree’s installations & commissioning, HFL’s EFL’s installation/replacement, Export lines
recovery and positioning, FPSO assistance and IMR & survey, flowline laying & installation.

from Apr. ’10 to May ‘12

Shift Supervisor (bridge) at Bourbon Offshore

Direct & supervise the MPSV during: Jumper Installations (Landing, Tie In/Out), SCM/MCM
replacement, CCV valves monitoring and replacement, HFL's and EFL's installation and
replacement, TH gasket replacement, XTree’s installation and commissioning. MeOH Interventions
by ROV Injection Skid BOP Interventions, FPSO assistance, FPSO fair lead replacement, IMR &
SURF survey.

from Feb. ’09 to January ‘10

Project manager & ROV Superintendent at BDNT Offshore

In charge of project management, planning, documentations, crew logistics and ROV’s systems
(UHD & Saab Seaeye) vessel’s mob/demob and ongoing ROV’s operations, project cost control
estimation and budget management, HQSE planning (JSA/RA) implementation and appliance
during ops, in charge to prepare the required client documentations and to report to the client
office onshore.

from Jan ’08 to Feb ‘09

ROV Superintendent & ROV Supervisor at DNT Offshore
Be responsible of project documentations, the UHD and Saab Seaeye ROV’s systems crew & spare
parts for different project: IMR & survey, NDT, cable and pipe laying assistance, spool installation,
divers assistance, ROV’s preparation and mob & pre-mob working onshore & offshore.

May ‘08

BDNT Offshore Company rep. UHD 025 F.A.T.

Supervise and check the entire test’s at the Davis Schilling premise for the UHD 025 factory
acceptance test prepare and deliver the final report to BDNT Offshore. In charge to identify, list
and buy UHD 025/037 –Dynacon LARS spare parts and control the cost/budget
from Jan ’07 to Dec ‘07

Shipyard manager at Coastal Ltd. Tanzania
In charge of all the mechanics team, company budget goals and cost control, speedboats &
outboard engines maintenance & repair, spare parts purchasing and inventory, outboard engines
selling department.

from July ’03 to Dec ‘06

ROV pilot & ROV supervisor at DNT Offshore

Work as pilot in several projects: inspection & survey, NDT and cable/pipe laying assistance,
divers assistance, responsible of the ROV’s & team when Supervisor

from ’03 to ‘04

Commercial diver at RANA Diving. Italy
Air commercial diver (open bell) operating NDT equipments, performing RINA vessel’s hull
inspection on port onshore and assist saturation system installation offshore.

From 1998 to ‘02

Chief electrician & rigger at Milano Music Service

In charge of power distribution systems during live shows and car exhibitions venues, light &
sound systems installation and testing, rig up the trusses and sound clusters, crew & equipment
management

from 1995 to ‘08

Chief electrician & rigger at P.B.S. service
In charge of the light design & installation supervising, power distribution systems control during
live shows and car exhibitions venues, light & sound systems installation and testing, rig up
trusses and sound clusters, crew & equipment management

Offshore certificates
IMCA Shift Superintendent competency
MTCS no. CC13-0713 Aug. ’13

The National Safety Passport training
EMSS (Essential Minimum Safety Standard) no 10423720 March ‘13

Oilwell Prodution Technology (well completion)
OPITO P.O.L. Jan. ‘13 City & Guilds level III

CAPM (Certified Associated Project Management)
Project Management Institute. No 1503084 Apr. 2012

Construction of subsea pipelines
Jee engineering Feb. 2012

COHSS & MeOH awareness
Falck Nutec onsite Aug. 2011

Oilwell Drilling Technology
OPITO P.O.L. July ‘11 City & Guilds level III

Oil & Gas Electrical Engineering Systems.
OPITO P.O.L. Feb ’11 City & Guilds level III

High Voltage MTSC Windermere. UK.
Nr HV08-1696. August 2008

Schilling Robotics UHD Systems Course.
at Schilling Davis U.S.A. May 2008

Schilling Robotics UHD simulator course.
at Schilling Davis U.S.A. May 2008
Seaeyes: Falcon-Cougar course. July ‘03
Commercial Diver level II. IDSA Hydrolab
Italy August 2003

Instructor CMAS/PADI/NSS-CDS
Diving & BLS-First Aid Instructor from ‘98

BOSIET HUET OPITO exp. 2014

ROV’s & Trenceher’s experience
Seaeye: Cougar XT Deep Water, Falcon
Schilling: UHD
SubAtlantic: Comanche
Oceaneering: Magnum, Millenium
Kyst: Supporter
T2, PT-1, CMROV-3

Languages
Italian: Mother tongue
English: Fluent
French: Basic knowledge
Spanish: Basic knowledge

Computer skills
Good knowledge of: Office package (xls-word-power point & Mac OS)
Basic knowledge of: AutoCAD, Fusion Sonardyne, QINSy

Education
Proficiency in Industrial Photography
ITIS Bodoni. Torino. 1988

References
Available on request
CV and certifications on line at:
www.oilandgaspeople.com/cv/315160484
www.linkedin.com/pub/davide-ansaldi/20/71/663
DAVIDE ANSALDI - CV – Detailed Offshore Employment History

Date

Contractor

Task

Trenchers

Sept-Oct ‘13

DeepOcean UK

Flexible Laying &
Trenching

CMROV 3
Supporter 18

Shift Superint.
(bridge)

CLV
Maersk Responder

Statoil

Snorre
Norway

July ‘13

DeepOcean UK

HVDC-HVAC
trenching

T2 & PT-1
WROV Triton XLS 24

Shift Superint.
(bridge)

TSV Northen Wave

EMAS/ABB

DolWin
Germany

June ‘13

DeepOcean UK

HVDC trenching

T2 & PT-1
WROV Triton XLS 24

Shift Superint.
(bridge)

TSV Northen Wave

EMAS/ABB

DolWin
Germany

May ‘13

DeepOcean UK

Umbilical trenching

T2 & PT-1
WROV Triton XLS 24

Shift Superint.
(bridge)

TSV Northen Wave

BP

BP Andrew. UK

March ’13

DeepOcean UK

HVDC trenching

T2 & PT-1
WROV Triton XLS 24

Shift Superint.
(bridge)

TSV Northen Wave

EMAS/ABB

DolWin
Germany

Contractor

Task

Jan – Feb ‘13

SBM Offshore

Laying flowlines

Millennium 30-63

Shift Supervisor
(bridge)

OCV
Normand Installer

PetroSA

South Africa
Ikhwezi

Sept.-Oct ‘12

SBM Offshore

Subsea installations

Millennium 30-63

Shift Supervisor
(bridge)

OCV
Normand Installer

Technip - Tullow

Ghana Jubilee

June-July ’12

SBM Offshore

Millennium 30-63

Shift Supervisor
(bridge)

OCV
Normand Installer

Shell

Date

OOR recovery

ROV

Position

Position

Rig/Vessel

Rig/Vessel

Client

Client

Location

Location

Nigeria Bonga

Oct ’10 – May ‘12

Bourbon Offshore

IMR & Installation

UHD 37 & 57

Shift Supervisor
(bridge)

MSPV
Bourbon Trieste

Total

Nigeria Akpo field

Apr ’10 - Sept ‘10

Bourbon Offshore

IMR & Installation

Magnum 46-75

Shift Supervisor
(bridge)

MSPV
Bourbon Vissolela

Esso

Angola Block 15

Oct. ‘09

Bourbon
DNT Offshore

Pre mob set up

UHD 25

ROV Supervisor

Antwerp port quay

B.Gaia
SubSea services

Antwerp port. Eu

Aug-Sep ‘09

DNT Offshore

Spool Installation.
SSIV

Seaeye Cougar
1401

Project Manager
ROV Supervisor

DSV Texas

Caldive

North Adriatic
DAVIDE ANSALDI - CV – Detailed Offshore Employment History
Date

Contractor

Task

ROV

Position

Rig/Vessel

July ‘09

DNT Offshore

UXO / survey insp.

Seaeye Cougar
1402

Project Manager
ROV Supervisor

MV Odin Finder

Apr ‘09

DNT Offshore

Sea trial & cable
cut

Seaeye Cougar
1407

Project Manager &
Superintendent

Feb ‘09

BlueStream-DNT

Touch down
monitoring

SubAtlantic
Comanche 07

Nov-Dec ‘08

DNT Offshore

Pipeline inspection

Sept ‘08

BlueStream

Agu ‘08

Client

Location

Saipem

North Adriatic

CBL G.Verne

Prysmian cables

Thyrrenian sea

Project Manager &
Superintendent

CBL G.Verne

Prysmian cables

Thyrrenian sea

Seaeye Cougar
1407

Supervisor

MSPV B. Atlas

Touch down
monitor

SubAtlantic
Comanche 07

Superintendent

CBL G.Verne

DNT Offshore

Rig inspection, NDT

Seaeye Falcon
1218

Supervisor

C/B AD3

June ‘08

BlueStream-DNT

Touch down
monitoring

SubAtlantic
Comanche 07

Superintendent

CBL G. Verne

Apr ‘08

DNT Offshore

Ass. Trenching
operation

Seaeye Cougar
1401

Supervisor

M/V Maestrale III

Jan-Feb ‘08

BueStream-DNT

Touch down
monitoring

SubAtlantic
Comanche 07

Pilot

CBL G.Verne

DNT Offshore

Assistance
maintenance

Seaeye Falcon
1218

Supervisor

C/B AD3

July-Agu ‘06

DNT Offshore

Rig survey

Seaeye Cougar
1402

Pilot

M/V Kerob

EDISON spa

South Med.

Jan-Apr ‘06

DNT Offshore

NDT, visual
inspection

Seaeye Falcon
1218

Supervisor

M/V Grecale

ENI spa-EMA

Adriatic sea

Assistance and
survey

Seaeye Cougar
1401

Pilot

DP Polar Prince

Petrobel

Egypt. Temsah rig

Assistance and
survey

Seaeye Cougar
1401

Pilot

CS Pertinacia

Petrobel

Egypt. Temsah rig

Dec ‘06

DNT Offshore
Jan-March ‘05

Sonsub
DNT Offshore

Aug-Dec ‘04

Sonsub

IOTA survey

West Africa

Prysmian

Thyrrenian sea

ENI E&P EMS spa

South Adriatic

Prysmian cables

Thyrrenian sea

CTC. Exxon

North Adriatic

Prysmian cables

Thyrrenian sea

ENI E&P. EMS spa

Mid Adriatic sea

D.Ansaldi cv

  • 1.
    DAVIDE ANSALDI OPERATIONS (BRIDGE)SUPERVISOR Born in Torino, Italy. 20th October 1970 live in Palma Mallorca (Spain) Cell: +34 711771535 email: ansaldi.davide@yahoo.com Summary A well-presented and pro-active offshore shift supervisor who has a relentless drive to have a broad impact rather than just deliver results. Possessing experience of coordinating and managing all offshore project activities with different WROV/Trenching systems during the subsea installations and the project planning onshore, directing AHC cranes/winches on board various DP vessels providing clear guidance and leadership to a team on board (surveyors, deck foreman/riggers, ROV’s supervisors and DP officers). When on board able to held operations kick off meeting, JSA assessment, Risk Assessment review, etc. Confident communicator with strong interpersonal and analytical skills who thrives on social interaction and client satisfaction. I’m presently looking to join a company where successful results and hard work are rewarded. Work experience from March ’13 to Jan ‘14 Shift Superintendet (bridge) at DeepOcean UK Assist the OM and act in his behalf when off duty; supervising trenching and survey operations. Conduct the assigned offshore operations, in strict accordance with equipment operational procedures, project specific procedures and client written variation instructions. Direct the DPO officers and Deck leader, surveyor's during trenching ops. Conduct safety briefings, tool box talks etc, for all assigned personnel and sub contractor personnel, ensure all necessary training is carried out and recorded in the training logs. from June ’12 to Jan. ‘13 Shift Supervisor (bridge) at SBM Offshore Assist the OCM and act in his behalf when off duty; supervise the offshore constructions, jumpers and XTree’s installations & commissioning, HFL’s EFL’s installation/replacement, Export lines recovery and positioning, FPSO assistance and IMR & survey, flowline laying & installation. from Apr. ’10 to May ‘12 Shift Supervisor (bridge) at Bourbon Offshore Direct & supervise the MPSV during: Jumper Installations (Landing, Tie In/Out), SCM/MCM replacement, CCV valves monitoring and replacement, HFL's and EFL's installation and replacement, TH gasket replacement, XTree’s installation and commissioning. MeOH Interventions by ROV Injection Skid BOP Interventions, FPSO assistance, FPSO fair lead replacement, IMR & SURF survey. from Feb. ’09 to January ‘10 Project manager & ROV Superintendent at BDNT Offshore In charge of project management, planning, documentations, crew logistics and ROV’s systems (UHD & Saab Seaeye) vessel’s mob/demob and ongoing ROV’s operations, project cost control estimation and budget management, HQSE planning (JSA/RA) implementation and appliance during ops, in charge to prepare the required client documentations and to report to the client office onshore. from Jan ’08 to Feb ‘09 ROV Superintendent & ROV Supervisor at DNT Offshore Be responsible of project documentations, the UHD and Saab Seaeye ROV’s systems crew & spare parts for different project: IMR & survey, NDT, cable and pipe laying assistance, spool installation, divers assistance, ROV’s preparation and mob & pre-mob working onshore & offshore. May ‘08 BDNT Offshore Company rep. UHD 025 F.A.T. Supervise and check the entire test’s at the Davis Schilling premise for the UHD 025 factory acceptance test prepare and deliver the final report to BDNT Offshore. In charge to identify, list and buy UHD 025/037 –Dynacon LARS spare parts and control the cost/budget
  • 2.
    from Jan ’07to Dec ‘07 Shipyard manager at Coastal Ltd. Tanzania In charge of all the mechanics team, company budget goals and cost control, speedboats & outboard engines maintenance & repair, spare parts purchasing and inventory, outboard engines selling department. from July ’03 to Dec ‘06 ROV pilot & ROV supervisor at DNT Offshore Work as pilot in several projects: inspection & survey, NDT and cable/pipe laying assistance, divers assistance, responsible of the ROV’s & team when Supervisor from ’03 to ‘04 Commercial diver at RANA Diving. Italy Air commercial diver (open bell) operating NDT equipments, performing RINA vessel’s hull inspection on port onshore and assist saturation system installation offshore. From 1998 to ‘02 Chief electrician & rigger at Milano Music Service In charge of power distribution systems during live shows and car exhibitions venues, light & sound systems installation and testing, rig up the trusses and sound clusters, crew & equipment management from 1995 to ‘08 Chief electrician & rigger at P.B.S. service In charge of the light design & installation supervising, power distribution systems control during live shows and car exhibitions venues, light & sound systems installation and testing, rig up trusses and sound clusters, crew & equipment management Offshore certificates IMCA Shift Superintendent competency MTCS no. CC13-0713 Aug. ’13 The National Safety Passport training EMSS (Essential Minimum Safety Standard) no 10423720 March ‘13 Oilwell Prodution Technology (well completion) OPITO P.O.L. Jan. ‘13 City & Guilds level III CAPM (Certified Associated Project Management) Project Management Institute. No 1503084 Apr. 2012 Construction of subsea pipelines Jee engineering Feb. 2012 COHSS & MeOH awareness Falck Nutec onsite Aug. 2011 Oilwell Drilling Technology OPITO P.O.L. July ‘11 City & Guilds level III Oil & Gas Electrical Engineering Systems. OPITO P.O.L. Feb ’11 City & Guilds level III High Voltage MTSC Windermere. UK. Nr HV08-1696. August 2008 Schilling Robotics UHD Systems Course. at Schilling Davis U.S.A. May 2008 Schilling Robotics UHD simulator course. at Schilling Davis U.S.A. May 2008
  • 3.
    Seaeyes: Falcon-Cougar course.July ‘03 Commercial Diver level II. IDSA Hydrolab Italy August 2003 Instructor CMAS/PADI/NSS-CDS Diving & BLS-First Aid Instructor from ‘98 BOSIET HUET OPITO exp. 2014 ROV’s & Trenceher’s experience Seaeye: Cougar XT Deep Water, Falcon Schilling: UHD SubAtlantic: Comanche Oceaneering: Magnum, Millenium Kyst: Supporter T2, PT-1, CMROV-3 Languages Italian: Mother tongue English: Fluent French: Basic knowledge Spanish: Basic knowledge Computer skills Good knowledge of: Office package (xls-word-power point & Mac OS) Basic knowledge of: AutoCAD, Fusion Sonardyne, QINSy Education Proficiency in Industrial Photography ITIS Bodoni. Torino. 1988 References Available on request CV and certifications on line at: www.oilandgaspeople.com/cv/315160484 www.linkedin.com/pub/davide-ansaldi/20/71/663
  • 4.
    DAVIDE ANSALDI -CV – Detailed Offshore Employment History Date Contractor Task Trenchers Sept-Oct ‘13 DeepOcean UK Flexible Laying & Trenching CMROV 3 Supporter 18 Shift Superint. (bridge) CLV Maersk Responder Statoil Snorre Norway July ‘13 DeepOcean UK HVDC-HVAC trenching T2 & PT-1 WROV Triton XLS 24 Shift Superint. (bridge) TSV Northen Wave EMAS/ABB DolWin Germany June ‘13 DeepOcean UK HVDC trenching T2 & PT-1 WROV Triton XLS 24 Shift Superint. (bridge) TSV Northen Wave EMAS/ABB DolWin Germany May ‘13 DeepOcean UK Umbilical trenching T2 & PT-1 WROV Triton XLS 24 Shift Superint. (bridge) TSV Northen Wave BP BP Andrew. UK March ’13 DeepOcean UK HVDC trenching T2 & PT-1 WROV Triton XLS 24 Shift Superint. (bridge) TSV Northen Wave EMAS/ABB DolWin Germany Contractor Task Jan – Feb ‘13 SBM Offshore Laying flowlines Millennium 30-63 Shift Supervisor (bridge) OCV Normand Installer PetroSA South Africa Ikhwezi Sept.-Oct ‘12 SBM Offshore Subsea installations Millennium 30-63 Shift Supervisor (bridge) OCV Normand Installer Technip - Tullow Ghana Jubilee June-July ’12 SBM Offshore Millennium 30-63 Shift Supervisor (bridge) OCV Normand Installer Shell Date OOR recovery ROV Position Position Rig/Vessel Rig/Vessel Client Client Location Location Nigeria Bonga Oct ’10 – May ‘12 Bourbon Offshore IMR & Installation UHD 37 & 57 Shift Supervisor (bridge) MSPV Bourbon Trieste Total Nigeria Akpo field Apr ’10 - Sept ‘10 Bourbon Offshore IMR & Installation Magnum 46-75 Shift Supervisor (bridge) MSPV Bourbon Vissolela Esso Angola Block 15 Oct. ‘09 Bourbon DNT Offshore Pre mob set up UHD 25 ROV Supervisor Antwerp port quay B.Gaia SubSea services Antwerp port. Eu Aug-Sep ‘09 DNT Offshore Spool Installation. SSIV Seaeye Cougar 1401 Project Manager ROV Supervisor DSV Texas Caldive North Adriatic
  • 5.
    DAVIDE ANSALDI -CV – Detailed Offshore Employment History Date Contractor Task ROV Position Rig/Vessel July ‘09 DNT Offshore UXO / survey insp. Seaeye Cougar 1402 Project Manager ROV Supervisor MV Odin Finder Apr ‘09 DNT Offshore Sea trial & cable cut Seaeye Cougar 1407 Project Manager & Superintendent Feb ‘09 BlueStream-DNT Touch down monitoring SubAtlantic Comanche 07 Nov-Dec ‘08 DNT Offshore Pipeline inspection Sept ‘08 BlueStream Agu ‘08 Client Location Saipem North Adriatic CBL G.Verne Prysmian cables Thyrrenian sea Project Manager & Superintendent CBL G.Verne Prysmian cables Thyrrenian sea Seaeye Cougar 1407 Supervisor MSPV B. Atlas Touch down monitor SubAtlantic Comanche 07 Superintendent CBL G.Verne DNT Offshore Rig inspection, NDT Seaeye Falcon 1218 Supervisor C/B AD3 June ‘08 BlueStream-DNT Touch down monitoring SubAtlantic Comanche 07 Superintendent CBL G. Verne Apr ‘08 DNT Offshore Ass. Trenching operation Seaeye Cougar 1401 Supervisor M/V Maestrale III Jan-Feb ‘08 BueStream-DNT Touch down monitoring SubAtlantic Comanche 07 Pilot CBL G.Verne DNT Offshore Assistance maintenance Seaeye Falcon 1218 Supervisor C/B AD3 July-Agu ‘06 DNT Offshore Rig survey Seaeye Cougar 1402 Pilot M/V Kerob EDISON spa South Med. Jan-Apr ‘06 DNT Offshore NDT, visual inspection Seaeye Falcon 1218 Supervisor M/V Grecale ENI spa-EMA Adriatic sea Assistance and survey Seaeye Cougar 1401 Pilot DP Polar Prince Petrobel Egypt. Temsah rig Assistance and survey Seaeye Cougar 1401 Pilot CS Pertinacia Petrobel Egypt. Temsah rig Dec ‘06 DNT Offshore Jan-March ‘05 Sonsub DNT Offshore Aug-Dec ‘04 Sonsub IOTA survey West Africa Prysmian Thyrrenian sea ENI E&P EMS spa South Adriatic Prysmian cables Thyrrenian sea CTC. Exxon North Adriatic Prysmian cables Thyrrenian sea ENI E&P. EMS spa Mid Adriatic sea