Why Companies Need Project Financial Intelligence
Traditional project financial management is flawed.
A smarter alternative - Project Financial Intelligence can bring

relevance and rigor in tracking and evaluating investments.

A growing number of managers today rely on project and portfolio management to help them oversee their
investment portfolio. One of the consequences of this dependence has been the discovery that current financial management practices fall short of their intended goals. Results of a survey we conducted in September
2010 with leading U.S. companies indicated that almost 80 percent of those polled felt some level of dissatisfaction with their current financial management methods. Our initial findings suggest that some of the key
obstacles causing this are rooted in knowledge deficiencies, lack of management support, and use of ineffective software.

Many managers fail to fully understand the impact of such poor financial management. They believe that the
majority of investments don’t require financial evaluation; that intangible benefits provide a more than acceptable metric for success. This can prove a costly mistake, resulting in a poor track record of project selection and mismanagement of company investments.

Further complicating matters are CEOs, CFOs, and boards of trustees, facing a litany of economic challenges
and corporate wrongdoings, finding themselves under an extreme amount of scrutiny as to how they should
allocate their resources. As a result, they are demanding credible evidence of strong and achievable ROI before assigning dollars to projects.

Managers and executives alike would best be served by establishing strong Project Financial Management
(PFM). But what type of PFM offers the most benefits? The richest most comprehensive PFM available in the
marketplace introduces a new term we have created that serves as the basis for this article: Project Financial
Intelligence (PFI). This paper defines PFI and its importance towards project selection and investment management. This paper also explores the cost of PFI illiteracy and the benefits from PFI use going forward. With
a more detailed understanding of PFI, managers can better address their needs to finance the right opportunities and wisely manage their investments. This paper then concludes with recommendations on how to
move forward.
What is Project Financial Intelligence (PFI)?
PFI integrates Project Management, Financial Management, and business intelligence (BI), providing valuable
insight into project financials that significantly improves decision making and insight throughout the project
lifecycle. The union of these different types of information represents a major departure from Project Financial Management (PFM) principles, processes, and practices. That’s because PFI focuses more on the details
of cost and benefits estimating than PFM. The information is thorough, logical, and defensible. PFI also provides more insight into decisions. In addition, PFI integrates project and business domains and helps to improve governance.

How important is PFI?
Management expert Gary Hamel points out that over the course of the past 100 years, management innovation, more than any other kind of innovation, has enabled companies to cross new performance thresholds.
In fact if you look closely at some of America’s leading companies such as General Electric, DuPont, Procter &
Gamble, and Visa you would find management innovation at the core of their success. Interestingly, according to Hamel, almost all of the 20thcenturies most significant management innovations such as strategic planning, capital budgeting, project management, cost accounting and variance analysis, and ROI analysis all fall
within the PFI classification.

PFI impacts most key economic organizational transactions including capital appropriation, capital spending,
tracking, investment justification, cash flow management, funding, resource allocation, and chargeback. Considering that capital spending in the United States for example, equals approximately $1.38 trillion, companies could use PFI to better manage their business investments in projects and create a durable advantage
that can impact the competitive position.

What is the cost of PFI illiteracy?
The Standish Group’s “CHAOS Summary 2009” report revealed that approximately 32 percent of all projects
have successful resolutions (i.e. delivered on time, on budget, and with required features and functions). To
put that figure in a proper perspective close to 140 billion dollars of the $200 billion spent by IT organizations
in 2008 in US (based on US Census bureau) went towards failed projects or projects with unforeseen challenges.
Project Resolution
The CHAOS Summary report also shows a direct correlation
between budget and success. For example, whereas projects
costing between $1 million and $3 million succeeded 38 percent of the time, projects that cost more than $10 million
only had a 2 percent success rate. This correlation between
rising cost and lower success rate provides a clear example of
how flawed financial management contributes to the failure
of so many projects. With the proper use of PFI, organizations have a much better chance of selecting optimum projects and realizing the anticipated benefits from these projects.
Source: 2009 CHAOS Summary

The benefits of PFI
PFI offers a valuable tool for many different aspects of strategic and operations management. Some of these
include project selection and management, operations budgeting and tracking, and governance. The following sections illustrate how managers can best utilize PFI in these scenarios.

Improving project and portfolio decisions
A leadership team receives hundreds of project proposals to fill a certain strategic or tactical gap. Because of
limited budget and resources, they can only choose a select few. So how do they create the optimal portfolio
from the available options?
First, they must incorporate PFI into the process. Effective PFI drives action to approve, reject, or delay a project. To best utilize PFI, they should consider the following course of action:






Develop project estimates top down or bottom up
Assign cost and benefits to cost and profit centers
Create financial metrics such as NPV or ROI
Link strategic benefits to financials
Optimize investments based on financial and strategic benefits

Once managers receive approval on a project, they can move their project into the execution phase. During
this stage, businesses need to introduce performance controls to ensure the timeliness of a project’s completion, to deliver the project within budget, and to meet the financial benefits estimates.
Performance controls continue to the project’s conclusion. At each review phase, occurring monthly, quarterly, or in stages for example, the leadership team analyzes performance. This analysis helps identify at-risk
projects and their root causes as well as evaluate trends and predictions that assess business impact. Based
on this information, plans can be revised and action taken to rectify any issues.
Aligning project and business accounting
All project selection decisions impact an organization’s budgets and performance. When cost and benefits
are assigned to responsibility centers, the assignments are based on the organization’s structure and needs
for accuracy and granularity.
A vast flow of information exists between the project, the business, and operations domain. Initially, an organization must communicate its business direction. Next, thru a series of negotiations, organizations allocate, approve, and fund initiatives.
More and more organizations today incorporate a philosophy that encourages resource sharing. For example, a company may seek to share IT or marketing and capital investments. Sharing resources however, creates two large challenges: resource allocation and chargeback.
For resource allocation, organizations need to find a way of transferring the cost of shared resources from
the unit that formally manages them to the one that consumes their services. The chargeback mechanism
acts as a horizontal link between different organizational budgets in the company, keeping profit plans accurate and driving accountability.
PFI serves as the key enabler of the chargeback process. Some of the benefits include the following:





Provides the input for fair resource allocation
Enables the business unit that consumes the services to choose between internal or external
sources
Offers an insight into the resources consumed on a periodic basis
Provides the cost basis for enabling to charge the business unit that consumes the services

Finally, with PFI, the organization that consumes the resources can use the chargeback bill to decide
whether they still value the project benefits, if it wants to move faster and invest more, or should it shop
around to find other providers. In this way, the consumer chooses to get the level of investment that they
value the most. Meanwhile the provider aligns their services with what consumers want most.

Enabling better governance
A flood of corporate scandals combined with the recent harsh economic downturn have served to undermine the confidence in current management systems and controls. Despite the fact that information assets
represent more than 50 percent of capital spending, most companies lack effective financial governance.
Governance strives to promote individual creativity within defined limits of freedom by using structural and
control safeguards. Structural safeguards ensure clear definition of authority for individuals handling budgets, optimum processes and workflows and effective standards for managing cost and benefits. In recent
years, auditing has been added to this category as well.
Control safeguards measure and ensure compliance and process effectiveness. Financial compliance
measures the deviation from agreed rules, practices, and standards. PFI uses the project information to
drive three groups of measurements: exceptions from rules, project commitment deviations, and process
effectiveness.
So what should companies do?
This article is meant to serve as a wakeup call to managers that perform project and portfolio management.
As such, managers will need to approach PFI implementation systematically with an action plan, a methodology, and the understanding of the required information technology
Management teams need to take the time to assess their current situation. Identify the processes that use
PFI and assess their criticality and capabilities. Determine the gaps between current realities and needs.
Consider the order in which to close them. When ready to move forward, create a timeline for action.
Equally important is the project financial software that can significantly affect the analytical and collaboration capabilities. Companies can use this software to take complex data and transform it into intuitive information and visuals. Furthermore, when properly deployed, they can create useful collaborative environments to define workflows, deploy rules, and ensure that they are followed. Over time the companies that
master PFI and the tools will come out ahead.
While PFI is not perfect, it’s a huge improvement over unreliable alternatives. The combination of people
and computational power presents unlimited opportunities. The quality of the project financials depends
upon the sum of all project and portfolio financial decisions made by decision makers. The good news is
that the quality of these decisions depends not only on the intelligence of the decision makers, but on project financial processes and methodology that can be improved and successfully deployed in your organization.

References
1. For a comprehensive review of the many usages of the Project Financial Intelligence, including software
detail or demos visit www.projectfinancialserver.com.
2. To learn more about Microsoft Enterprise Project Management and BI solutions see
www.microsoft.com/project.
3. Gary Hamel, The Why, What, and How of Management Innovation, Harvard Business Review February
2006
4. Robert Kaplan and David Norton, Strategy Maps: Converting Intangible Assets into Tangible Outcome,
Harvard Business School Press, 2006.
5. Harvey Levine, Project Portfolio Management, A Practical Guide to Selecting Projects, Managing Portfolios, and Maximizing Benefits.
6. Bryan Maizlish, Robert Handler, IT Portfolio Management: Unlocking the Business Value of Technology,
Wiley April 2005.

1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com

More Related Content

More from UMT

UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
UMT
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and Execution
UMT
 

More from UMT (20)

Baird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentBaird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State Government
 
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and Execution
 
UMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment Status
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
 
IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013
 
Planning with Competencies
Planning with CompetenciesPlanning with Competencies
Planning with Competencies
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
The Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsThe Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management Implementations
 
Optimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project BenefitsOptimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project Benefits
 
Enterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionEnterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the Revolution
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio Selection
 
Project and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance ModelProject and Portfolio Management in a Federated Governance Model
Project and Portfolio Management in a Federated Governance Model
 
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
Pharma Research Labs IT: Taking Hold of Resource Capacity and Demand Across P...
 
Major Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting ProcessMajor Financial Institution Rationlizes Project Budgeting Process
Major Financial Institution Rationlizes Project Budgeting Process
 

Recently uploaded

Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
jual Obat Aborsi Bandung, Wa : 085180626899 Apotik jual Obat Cytotec Di Bandung
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
CaitlinCummins3
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
doktercalysta
 

Recently uploaded (20)

stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdfDaftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
 

Why Companies Need Financial Intelligence

  • 1.
  • 2. Why Companies Need Project Financial Intelligence Traditional project financial management is flawed. A smarter alternative - Project Financial Intelligence can bring relevance and rigor in tracking and evaluating investments. A growing number of managers today rely on project and portfolio management to help them oversee their investment portfolio. One of the consequences of this dependence has been the discovery that current financial management practices fall short of their intended goals. Results of a survey we conducted in September 2010 with leading U.S. companies indicated that almost 80 percent of those polled felt some level of dissatisfaction with their current financial management methods. Our initial findings suggest that some of the key obstacles causing this are rooted in knowledge deficiencies, lack of management support, and use of ineffective software. Many managers fail to fully understand the impact of such poor financial management. They believe that the majority of investments don’t require financial evaluation; that intangible benefits provide a more than acceptable metric for success. This can prove a costly mistake, resulting in a poor track record of project selection and mismanagement of company investments. Further complicating matters are CEOs, CFOs, and boards of trustees, facing a litany of economic challenges and corporate wrongdoings, finding themselves under an extreme amount of scrutiny as to how they should allocate their resources. As a result, they are demanding credible evidence of strong and achievable ROI before assigning dollars to projects. Managers and executives alike would best be served by establishing strong Project Financial Management (PFM). But what type of PFM offers the most benefits? The richest most comprehensive PFM available in the marketplace introduces a new term we have created that serves as the basis for this article: Project Financial Intelligence (PFI). This paper defines PFI and its importance towards project selection and investment management. This paper also explores the cost of PFI illiteracy and the benefits from PFI use going forward. With a more detailed understanding of PFI, managers can better address their needs to finance the right opportunities and wisely manage their investments. This paper then concludes with recommendations on how to move forward.
  • 3. What is Project Financial Intelligence (PFI)? PFI integrates Project Management, Financial Management, and business intelligence (BI), providing valuable insight into project financials that significantly improves decision making and insight throughout the project lifecycle. The union of these different types of information represents a major departure from Project Financial Management (PFM) principles, processes, and practices. That’s because PFI focuses more on the details of cost and benefits estimating than PFM. The information is thorough, logical, and defensible. PFI also provides more insight into decisions. In addition, PFI integrates project and business domains and helps to improve governance. How important is PFI? Management expert Gary Hamel points out that over the course of the past 100 years, management innovation, more than any other kind of innovation, has enabled companies to cross new performance thresholds. In fact if you look closely at some of America’s leading companies such as General Electric, DuPont, Procter & Gamble, and Visa you would find management innovation at the core of their success. Interestingly, according to Hamel, almost all of the 20thcenturies most significant management innovations such as strategic planning, capital budgeting, project management, cost accounting and variance analysis, and ROI analysis all fall within the PFI classification. PFI impacts most key economic organizational transactions including capital appropriation, capital spending, tracking, investment justification, cash flow management, funding, resource allocation, and chargeback. Considering that capital spending in the United States for example, equals approximately $1.38 trillion, companies could use PFI to better manage their business investments in projects and create a durable advantage that can impact the competitive position. What is the cost of PFI illiteracy? The Standish Group’s “CHAOS Summary 2009” report revealed that approximately 32 percent of all projects have successful resolutions (i.e. delivered on time, on budget, and with required features and functions). To put that figure in a proper perspective close to 140 billion dollars of the $200 billion spent by IT organizations in 2008 in US (based on US Census bureau) went towards failed projects or projects with unforeseen challenges.
  • 4. Project Resolution The CHAOS Summary report also shows a direct correlation between budget and success. For example, whereas projects costing between $1 million and $3 million succeeded 38 percent of the time, projects that cost more than $10 million only had a 2 percent success rate. This correlation between rising cost and lower success rate provides a clear example of how flawed financial management contributes to the failure of so many projects. With the proper use of PFI, organizations have a much better chance of selecting optimum projects and realizing the anticipated benefits from these projects. Source: 2009 CHAOS Summary The benefits of PFI PFI offers a valuable tool for many different aspects of strategic and operations management. Some of these include project selection and management, operations budgeting and tracking, and governance. The following sections illustrate how managers can best utilize PFI in these scenarios. Improving project and portfolio decisions A leadership team receives hundreds of project proposals to fill a certain strategic or tactical gap. Because of limited budget and resources, they can only choose a select few. So how do they create the optimal portfolio from the available options? First, they must incorporate PFI into the process. Effective PFI drives action to approve, reject, or delay a project. To best utilize PFI, they should consider the following course of action:      Develop project estimates top down or bottom up Assign cost and benefits to cost and profit centers Create financial metrics such as NPV or ROI Link strategic benefits to financials Optimize investments based on financial and strategic benefits Once managers receive approval on a project, they can move their project into the execution phase. During this stage, businesses need to introduce performance controls to ensure the timeliness of a project’s completion, to deliver the project within budget, and to meet the financial benefits estimates. Performance controls continue to the project’s conclusion. At each review phase, occurring monthly, quarterly, or in stages for example, the leadership team analyzes performance. This analysis helps identify at-risk projects and their root causes as well as evaluate trends and predictions that assess business impact. Based on this information, plans can be revised and action taken to rectify any issues.
  • 5. Aligning project and business accounting All project selection decisions impact an organization’s budgets and performance. When cost and benefits are assigned to responsibility centers, the assignments are based on the organization’s structure and needs for accuracy and granularity. A vast flow of information exists between the project, the business, and operations domain. Initially, an organization must communicate its business direction. Next, thru a series of negotiations, organizations allocate, approve, and fund initiatives. More and more organizations today incorporate a philosophy that encourages resource sharing. For example, a company may seek to share IT or marketing and capital investments. Sharing resources however, creates two large challenges: resource allocation and chargeback. For resource allocation, organizations need to find a way of transferring the cost of shared resources from the unit that formally manages them to the one that consumes their services. The chargeback mechanism acts as a horizontal link between different organizational budgets in the company, keeping profit plans accurate and driving accountability. PFI serves as the key enabler of the chargeback process. Some of the benefits include the following:     Provides the input for fair resource allocation Enables the business unit that consumes the services to choose between internal or external sources Offers an insight into the resources consumed on a periodic basis Provides the cost basis for enabling to charge the business unit that consumes the services Finally, with PFI, the organization that consumes the resources can use the chargeback bill to decide whether they still value the project benefits, if it wants to move faster and invest more, or should it shop around to find other providers. In this way, the consumer chooses to get the level of investment that they value the most. Meanwhile the provider aligns their services with what consumers want most. Enabling better governance A flood of corporate scandals combined with the recent harsh economic downturn have served to undermine the confidence in current management systems and controls. Despite the fact that information assets represent more than 50 percent of capital spending, most companies lack effective financial governance. Governance strives to promote individual creativity within defined limits of freedom by using structural and control safeguards. Structural safeguards ensure clear definition of authority for individuals handling budgets, optimum processes and workflows and effective standards for managing cost and benefits. In recent years, auditing has been added to this category as well. Control safeguards measure and ensure compliance and process effectiveness. Financial compliance measures the deviation from agreed rules, practices, and standards. PFI uses the project information to drive three groups of measurements: exceptions from rules, project commitment deviations, and process effectiveness.
  • 6. So what should companies do? This article is meant to serve as a wakeup call to managers that perform project and portfolio management. As such, managers will need to approach PFI implementation systematically with an action plan, a methodology, and the understanding of the required information technology Management teams need to take the time to assess their current situation. Identify the processes that use PFI and assess their criticality and capabilities. Determine the gaps between current realities and needs. Consider the order in which to close them. When ready to move forward, create a timeline for action. Equally important is the project financial software that can significantly affect the analytical and collaboration capabilities. Companies can use this software to take complex data and transform it into intuitive information and visuals. Furthermore, when properly deployed, they can create useful collaborative environments to define workflows, deploy rules, and ensure that they are followed. Over time the companies that master PFI and the tools will come out ahead. While PFI is not perfect, it’s a huge improvement over unreliable alternatives. The combination of people and computational power presents unlimited opportunities. The quality of the project financials depends upon the sum of all project and portfolio financial decisions made by decision makers. The good news is that the quality of these decisions depends not only on the intelligence of the decision makers, but on project financial processes and methodology that can be improved and successfully deployed in your organization. References 1. For a comprehensive review of the many usages of the Project Financial Intelligence, including software detail or demos visit www.projectfinancialserver.com. 2. To learn more about Microsoft Enterprise Project Management and BI solutions see www.microsoft.com/project. 3. Gary Hamel, The Why, What, and How of Management Innovation, Harvard Business Review February 2006 4. Robert Kaplan and David Norton, Strategy Maps: Converting Intangible Assets into Tangible Outcome, Harvard Business School Press, 2006. 5. Harvey Levine, Project Portfolio Management, A Practical Guide to Selecting Projects, Managing Portfolios, and Maximizing Benefits. 6. Bryan Maizlish, Robert Handler, IT Portfolio Management: Unlocking the Business Value of Technology, Wiley April 2005. 1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com