Weekly Report
Date: from 09/01/16 to 14/01/16 SeniorSite Engineer:Houssam Slika (ID: 1953)
Zone Area: D (Z3B, Z4B) Site Engineer:Md. Shah Faisal (ID: 2747)
Site Supervisor:Talaat Elsherbini (ID: 2607)
Area boundary as highlighted between axes (G-W, 1B-9)
 COMPLETED WORKS:
A- Fire Alarm System
1. Work done and inspectedfor FAS pointon slab of Z4B, B1 , AREA-5 between
axes
(K, L)- (3, 4). Refer:(IR-PDM-B1-T00025-FAS)
2. Work done and inspectedfor extensionPVCconduitfor FAS points on Z3B, B2,
Area-9 betweenaxes(S-U),(3-5).Refer:(IR-PDM-B2-T00042-FAS)
3. Cleaningand preparation slab couplingfoam for FAS work at stair core case in
Z3B, B2, Area-9 betweenaxis(S-U),(3-5)
4. Cleaningand preparation slab coupling foam for FAS work at Ramp core case in
Z4B, B2, part-5 betweenaxes(1A-4), (N-P).
B- Data Network System
1. Workdone andinspectedforDNSpointsonslabofZ4B,B1, AREA-5 betweenaxes
(K, L)-(3, 4). Refer: (IR-PDM-B1-T00026-DNS)
2. Work done and inspectedfor extensionPVCconduitfor DNS points on Z3B, B2,
Area-9 betweenaxes(S-U),(3-5).Refer:(IR-PDM-B2-T00043-DNS)
 Work in Progress:
1. Marking for ELV work on the ramp slab of Z4B, B2, part-5 betweenaxes(1A-4),
(N-P).
 Material installed
PVC 25mm Lm(M) PVC 32mm Lm(M)
51m 0 m
 Look ahead:
1. 1 FAS pointon Concrete core wall in Z3B, B2, part-9 betweenaxes(R-S),(3-4)
2. 1 FAS pointon Concrete column in Z4B, 01, part-5 betweenaxes(K, 3-4).
3. 1 FAS pointon Concrete Column inZ4B, B1M, part-5 betweenaxes(L-5).
4. 6 FAS pointsand 2 DNS points on 2 concrete column in Z4B, B2, part-5 betweenaxes
(N-Q),(7-9).
5. 1 FAS pointon Concrete column in Z4B, B1, part-5 betweenaxes(G-H),(3-5).
6. ELV work on slab in Z4B, GF/UGF/MGF,part-5betweenaxes(G-P),(4-7).

More Related Content

What's hot

Construction update viracopos
Construction update   viracoposConstruction update   viracopos
Construction update viracoposTriunfoRi
 
Variety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleVariety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleSafdar Ali
 
Earthwork notes
Earthwork notesEarthwork notes
Earthwork notesAdilen Del
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localizationhabbang
 
Gradient CSEC Geography
Gradient  CSEC GeographyGradient  CSEC Geography
Gradient CSEC Geographyry_moore
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsSafdar Ali
 
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...GIS in the Rockies
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
40th_csrs&ga_fredericton2019_ndirlarouche
40th_csrs&ga_fredericton2019_ndirlarouche40th_csrs&ga_fredericton2019_ndirlarouche
40th_csrs&ga_fredericton2019_ndirlaroucheP. Medoune Ndir
 
Subsurface utility engineering by Advance Scanning Services
Subsurface utility engineering  by Advance Scanning ServicesSubsurface utility engineering  by Advance Scanning Services
Subsurface utility engineering by Advance Scanning ServicesAdvanceScanningServices
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
Amiina bakunowicz:GC Pedestrian Bridge
Amiina bakunowicz:GC Pedestrian BridgeAmiina bakunowicz:GC Pedestrian Bridge
Amiina bakunowicz:GC Pedestrian BridgeArchiLab 7
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling ManagementMojrian Web
 
Design of earth-retaining structures - Lecture 5
Design of earth-retaining structures - Lecture 5Design of earth-retaining structures - Lecture 5
Design of earth-retaining structures - Lecture 5Chris Bridges
 
Adnan presentation
Adnan presentationAdnan presentation
Adnan presentationAdnan Amjad
 

What's hot (20)

Construction update viracopos
Construction update   viracoposConstruction update   viracopos
Construction update viracopos
 
Variety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleVariety of mine plans and sections & second schedule
Variety of mine plans and sections & second schedule
 
SAP Bill of Material: HALB vs ZKON
SAP Bill of Material: HALB vs ZKONSAP Bill of Material: HALB vs ZKON
SAP Bill of Material: HALB vs ZKON
 
Earthwork notes
Earthwork notesEarthwork notes
Earthwork notes
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localization
 
Gradient CSEC Geography
Gradient  CSEC GeographyGradient  CSEC Geography
Gradient CSEC Geography
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sections
 
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...
2018 GIS in Government: What a Relief Designing Multi-scale Terrain Represent...
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Analisis ctm12 origen nacional
Analisis ctm12 origen nacionalAnalisis ctm12 origen nacional
Analisis ctm12 origen nacional
 
40th_csrs&ga_fredericton2019_ndirlarouche
40th_csrs&ga_fredericton2019_ndirlarouche40th_csrs&ga_fredericton2019_ndirlarouche
40th_csrs&ga_fredericton2019_ndirlarouche
 
Subsurface utility engineering by Advance Scanning Services
Subsurface utility engineering  by Advance Scanning ServicesSubsurface utility engineering  by Advance Scanning Services
Subsurface utility engineering by Advance Scanning Services
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
Drawing And Report
Drawing And Report Drawing And Report
Drawing And Report
 
Amiina bakunowicz:GC Pedestrian Bridge
Amiina bakunowicz:GC Pedestrian BridgeAmiina bakunowicz:GC Pedestrian Bridge
Amiina bakunowicz:GC Pedestrian Bridge
 
Barzan PJ Assignment
Barzan PJ AssignmentBarzan PJ Assignment
Barzan PJ Assignment
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
Resume_Neeraj Nischal
Resume_Neeraj NischalResume_Neeraj Nischal
Resume_Neeraj Nischal
 
Design of earth-retaining structures - Lecture 5
Design of earth-retaining structures - Lecture 5Design of earth-retaining structures - Lecture 5
Design of earth-retaining structures - Lecture 5
 
Adnan presentation
Adnan presentationAdnan presentation
Adnan presentation
 

Viewers also liked

Plantilla para programar ABP en Educación Infantil
Plantilla para programar ABP en Educación InfantilPlantilla para programar ABP en Educación Infantil
Plantilla para programar ABP en Educación InfantilHilos Para Educar
 
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013Aleksa Cavic
 
Monster Farm Design - Marketing Fundamentals
Monster Farm Design - Marketing FundamentalsMonster Farm Design - Marketing Fundamentals
Monster Farm Design - Marketing FundamentalsKevin Hansen
 
5 ways to improve your digital program
5 ways to improve your digital program5 ways to improve your digital program
5 ways to improve your digital programJustin Kerley
 
BARÃO DE INOHAN 128 - 22 de junho de 2016
BARÃO DE INOHAN 128 - 22 de junho de 2016BARÃO DE INOHAN 128 - 22 de junho de 2016
BARÃO DE INOHAN 128 - 22 de junho de 2016Wagner Pires
 
Fish Assemblage in Different Habitats in the Mississippi River
Fish Assemblage in Different Habitats in the Mississippi RiverFish Assemblage in Different Habitats in the Mississippi River
Fish Assemblage in Different Habitats in the Mississippi RiverKelsey Hoffmann
 
Understanding Mind Mastery for Complete Mental Health
Understanding Mind Mastery for Complete Mental HealthUnderstanding Mind Mastery for Complete Mental Health
Understanding Mind Mastery for Complete Mental HealthDr. Gregory Burzynski, MD
 
Manuales administrativos
Manuales administrativosManuales administrativos
Manuales administrativosmarypaulyguzman
 
Hazel Nale's documents
Hazel Nale's documentsHazel Nale's documents
Hazel Nale's documentsHazel Nale
 
Team 3 - Pedal Position - Final Design Review
Team 3 - Pedal Position - Final Design ReviewTeam 3 - Pedal Position - Final Design Review
Team 3 - Pedal Position - Final Design ReviewRuoxin Liu
 
Alternative Treatments and Therapies for Anxiety Disorders
Alternative Treatments and Therapies for Anxiety DisordersAlternative Treatments and Therapies for Anxiety Disorders
Alternative Treatments and Therapies for Anxiety DisordersDr. Gregory Burzynski, MD
 
Blue babies and pink kids copy
Blue babies and pink kids   copyBlue babies and pink kids   copy
Blue babies and pink kids copyRavinarayan999
 

Viewers also liked (20)

Plantilla para programar ABP en Educación Infantil
Plantilla para programar ABP en Educación InfantilPlantilla para programar ABP en Educación Infantil
Plantilla para programar ABP en Educación Infantil
 
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013
TIM-Inzenjering-Sistem-Engleski-sa-izabranim-referencama-27.05.2013
 
Monster Farm Design - Marketing Fundamentals
Monster Farm Design - Marketing FundamentalsMonster Farm Design - Marketing Fundamentals
Monster Farm Design - Marketing Fundamentals
 
Huntington Review
Huntington ReviewHuntington Review
Huntington Review
 
5 ways to improve your digital program
5 ways to improve your digital program5 ways to improve your digital program
5 ways to improve your digital program
 
bule
bulebule
bule
 
DDOT SUMMER 2014
DDOT SUMMER 2014DDOT SUMMER 2014
DDOT SUMMER 2014
 
BARÃO DE INOHAN 128 - 22 de junho de 2016
BARÃO DE INOHAN 128 - 22 de junho de 2016BARÃO DE INOHAN 128 - 22 de junho de 2016
BARÃO DE INOHAN 128 - 22 de junho de 2016
 
Multi Product Ads na Facebook
Multi Product Ads na FacebookMulti Product Ads na Facebook
Multi Product Ads na Facebook
 
Fish Assemblage in Different Habitats in the Mississippi River
Fish Assemblage in Different Habitats in the Mississippi RiverFish Assemblage in Different Habitats in the Mississippi River
Fish Assemblage in Different Habitats in the Mississippi River
 
Understanding Mind Mastery for Complete Mental Health
Understanding Mind Mastery for Complete Mental HealthUnderstanding Mind Mastery for Complete Mental Health
Understanding Mind Mastery for Complete Mental Health
 
Task 7
Task 7Task 7
Task 7
 
31673-A
31673-A31673-A
31673-A
 
31653
3165331653
31653
 
Manuales administrativos
Manuales administrativosManuales administrativos
Manuales administrativos
 
Hazel Nale's documents
Hazel Nale's documentsHazel Nale's documents
Hazel Nale's documents
 
Team 3 - Pedal Position - Final Design Review
Team 3 - Pedal Position - Final Design ReviewTeam 3 - Pedal Position - Final Design Review
Team 3 - Pedal Position - Final Design Review
 
Email Spam Project
Email Spam ProjectEmail Spam Project
Email Spam Project
 
Alternative Treatments and Therapies for Anxiety Disorders
Alternative Treatments and Therapies for Anxiety DisordersAlternative Treatments and Therapies for Anxiety Disorders
Alternative Treatments and Therapies for Anxiety Disorders
 
Blue babies and pink kids copy
Blue babies and pink kids   copyBlue babies and pink kids   copy
Blue babies and pink kids copy
 

Weekly Report-8new

  • 1. Weekly Report Date: from 09/01/16 to 14/01/16 SeniorSite Engineer:Houssam Slika (ID: 1953) Zone Area: D (Z3B, Z4B) Site Engineer:Md. Shah Faisal (ID: 2747) Site Supervisor:Talaat Elsherbini (ID: 2607) Area boundary as highlighted between axes (G-W, 1B-9)
  • 2.  COMPLETED WORKS: A- Fire Alarm System 1. Work done and inspectedfor FAS pointon slab of Z4B, B1 , AREA-5 between axes (K, L)- (3, 4). Refer:(IR-PDM-B1-T00025-FAS) 2. Work done and inspectedfor extensionPVCconduitfor FAS points on Z3B, B2, Area-9 betweenaxes(S-U),(3-5).Refer:(IR-PDM-B2-T00042-FAS)
  • 3. 3. Cleaningand preparation slab couplingfoam for FAS work at stair core case in Z3B, B2, Area-9 betweenaxis(S-U),(3-5) 4. Cleaningand preparation slab coupling foam for FAS work at Ramp core case in Z4B, B2, part-5 betweenaxes(1A-4), (N-P).
  • 4. B- Data Network System 1. Workdone andinspectedforDNSpointsonslabofZ4B,B1, AREA-5 betweenaxes (K, L)-(3, 4). Refer: (IR-PDM-B1-T00026-DNS) 2. Work done and inspectedfor extensionPVCconduitfor DNS points on Z3B, B2, Area-9 betweenaxes(S-U),(3-5).Refer:(IR-PDM-B2-T00043-DNS)
  • 5.  Work in Progress: 1. Marking for ELV work on the ramp slab of Z4B, B2, part-5 betweenaxes(1A-4), (N-P).
  • 6.  Material installed PVC 25mm Lm(M) PVC 32mm Lm(M) 51m 0 m  Look ahead: 1. 1 FAS pointon Concrete core wall in Z3B, B2, part-9 betweenaxes(R-S),(3-4) 2. 1 FAS pointon Concrete column in Z4B, 01, part-5 betweenaxes(K, 3-4). 3. 1 FAS pointon Concrete Column inZ4B, B1M, part-5 betweenaxes(L-5). 4. 6 FAS pointsand 2 DNS points on 2 concrete column in Z4B, B2, part-5 betweenaxes (N-Q),(7-9). 5. 1 FAS pointon Concrete column in Z4B, B1, part-5 betweenaxes(G-H),(3-5). 6. ELV work on slab in Z4B, GF/UGF/MGF,part-5betweenaxes(G-P),(4-7).