UNIT - V
Static Timing Verification &
Physical Design Verification
1
CONTENTS
• Static Timing Verification
• Physical Design Verification
2
Static Timing Verification
• Concept of Static Timing Analysis (STA)
• Cross talk and noise
• Limitations of STA
• Slew of a wave form
• Skew between the signals
• Timing arcs and unateness
• Min. and Max. timing paths
• Clock Domains
• Operating conditions
• Critical path analysis
• False paths
• Timing models
3
Concept of Static Timing Analysis
• Static Timing Analysis (STA) is one of the many
techniques available to verify the timing of a
digital design.
• An alternate approach used to verify the timing is
the timing simulation which can verify the
functionality as well as the timing of the design.
• Timing analysis simply refers to the analysis of
the design for timing issues.
• The purpose of static timing analysis is to validate
if the design can operate at the rated speed.
4
Device Under Analysis (DUA)
5
Static Timing Analysis
• Static timing analysis is a complete and exhaustive
verification of all timing checks of a design.
• To simulate and verify all timing conditions of a
design with 10-100 million gates is very slow and the
timing cannot be verified completely. Thus, it is very
difficult to do exhaustive verification through
simulation.
• Static timing analysis on the other hand provides a
faster and simpler way of checking and analyzing all
the timing paths in a design for any timing violations.
6
Cross talk and noise
• The design functionality and its performance can be
limited by noise.
• The noise occurs due to crosstalk with other signals
or due to noise on primary inputs or the power
supply.
• The noise impact can limit the frequency of
operation of the design and it can also cause
functional failures.
• Verification based upon logic simulation cannot
handle the effects of crosstalk, noise and on-chip
variations.
7
Limitations of STA
• While the timing and noise analysis do an
excellent job of analyzing a design for timing
issues under all possible situations, the state-
of-the-art still does not allow STA to replace
simulation completely.
• This is because there are some aspects of
timing verification that cannot yet be
completely captured and verified in STA.
8
Limitations of STA
• Some of the limitations of STA are:
– 1: Reset sequence: To check if all flip-flops are
reset into their required logical values after an
asynchronous or synchronous reset.
– 2: X-handling: The STA techniques only deal with
the logical domain of logic-0 and logic-1, rise and
fall. An unknown value X in the design causes
indeterminate values to propagate through the
design, which cannot be checked with STA.
– 3: PLL settings: PLL configurations may not be
loaded or set properly.
9
Limitations of STA
– 4: Asynchronous clock domain crossings: STA does
not check if the correct clock synchronizers are
being used.
– 5: IO interface timing: It may not be possible to
specify the IO interface requirements in terms of
STA constraints only.
– 6: Interfaces between analog and digital blocks:
Since STA does not deal with analog blocks, the
verification methodology needs to ensure that the
connectivity between these two kinds of blocks is
correct.
10
Limitations of STA
– 7: False paths: The static timing analysis verifies
that timing through the logic path meets all the
constraints. In many cases, the STA may flag a
logic path as a failing path, even though logic may
never be able to propagate through the path.
Such timing paths are called false paths.
– 8: FIFO pointers out of synchronization: STA
cannot detect the problem when two finite state
machines expected to be synchronous are actually
out of synchronization.
11
Limitations of STA
– 9: Clock synchronization logic: STA cannot detect
the problem of clock generation logic not matching
the clock definition. STA assumes that the clock
generator will provide the waveform as specified
in the clock definition. Alternately, the added logic
may change the duty cycle of the clock. The STA
cannot detect either of these potential conditions.
– 10: Functional behaviour across clock cycles: The
static timing analysis cannot model or simulate
functional behaviour that changes across clock
cycles.
12
Slew of a wave form
• A slew rate is defined as a rate of change.
• In static timing analysis, the rising or falling
waveforms are measured in terms of whether the
transition is slow or fast.
• The slew is typically measured in terms of the
transition time.
• The transition time is actually inverse of the slew
rate – the larger the transition time, the slower the
slew, and vice versa.
• Slew values are specified as a percent of Vdd.
13
Slew of a wave form
• # Falling edge thresholds:
– slew_lower_threshold_pct_fall : 30.0;
– slew_upper_threshold_pct_fall : 70.0;
• # Rising edge thresholds:
– slew_lower_threshold_pct_rise : 30.0;
– slew_upper_threshold_pct_rise : 70.0;
14
Slew of a wave form
15
Slew of a wave form
• # Falling edge thresholds:
– slew_lower_threshold_pct_fall : 20.0;
– slew_upper_threshold_pct_fall : 80.0;
• # Rising edge thresholds:
– slew_lower_threshold_pct_rise : 10.0;
– slew_upper_threshold_pct_rise : 90.0;
16
Slew of a wave form
17
Skew between the signals
• Skew is the difference in timing between two or
more signals.
• Clock latency is the total time it takes from the clock
source to an end point.
• Clock skew is the difference in arrival times at the
end points of the clock tree.
• An ideal clock tree is one where the clock source is
assumed to have an infinite drive, that is, the clock
can drive infinite sources with no delay. In addition,
any cells present in the clock tree are assumed to
have zero delay.
18
Skew between the signals
19
Skew between the signals
• Latency of a clock tree can be explicitly specified
using the set_clock_latency command.
– set_clock_latency 2.2 [get_clocks BZCLK]
– # Both rise and fall latency is 2.2ns.
– # Use options -rise and -fall if different.
• Clock skew for a clock tree can also be implied by
explicitly specifying its value using the
set_clock_uncertainty command:
– set_clock_uncertainty 0.250 -setup [get_clocks BZCLK]
– set_clock_uncertainty 0.100 -hold [get_clocks BZCLK]
20
Timing arcs and unateness
• Every cell has multiple timing arcs. For example, a
combinational logic cell, such as and, or, nand, nor,
adder cell, has timing arcs from each input to each
output of the cell.
• Sequential cells such as flip-flops have timing arcs
from the clock to the outputs and timing constraints
for the data pins with respect to the clock.
• Each timing arc has a timing sense, that is, how the
output changes for different types of transitions on
input.
21
Timing arcs and unateness
• The timing arc is positive unate if a rising transition on an
input causes the output to rise (or not to change) and a falling
transition on an input causes the output to fall (or not to
change).
• The timing arcs for and and or type cells are positive unate.
• A negative unate timing arc is one where a rising transition
on an input causes the output to have a falling transition.
• the timing arcs for nand and nor type cells are negative unate.
• In a non-unate timing arc, the output transition cannot be
determined solely from the direction of change of an input
but also depends upon the state of the other inputs.
• The timing arcs in an xor cell (exclusive-or) are non-unate.
22
Timing arcs and unateness
23
Min. and Max. timing paths
• The total delay for the logic to propagate through a
logic path is referred to as the path delay.
• In general, there are multiple paths through which
the logic can propagate to the required destination
point.
• The actual path taken depends upon the state of the
other inputs along the logic path.
• Since there are multiple paths to the destination, the
maximum and minimum timing to the destination
points can be obtained.
• Launch Flip-flop, Capture Flip-flop.
24
Min. and Max. timing paths
25
Clock Domains
• The set of flip-flops being fed by one clock is
called its clock domain.
• In a typical design, there may be more than
one clock domain.
• Clock domains are dependent if there are any
data paths that start from one clock domain
and end in the other clock domain.
• This means that there is a timing path that
starts from one clock domain and ends in the
other clock domain.
26
Clock Domains
27
Clock Domains
• If there are data paths that cross between
clock domains, a decision has to be made as to
whether the paths are real or not.
• An example of a real path is a flip-flop with a
2x speed clock driving into a flip-flop with a 1x
speed clock.
• An example of a false path is where the
designer has explicitly placed clock
synchronizer logic between the two clock
domains.
28
Clock Domains
• A clock domain crossing can occur both ways, from
USBCLK clock domain to MEMCLK clock domain, and
from MEMCLK clock domain to USBCLK clock domain.
29
Clock Domains
• Figure 2-22 shows another example of clock domains.
A multiplexer selects a clock source - it is either one
or the other depending on the mode of operation of
the design.
30
Operating conditions
• Static timing analysis is typically performed at a
specific operating condition.
• An operating condition is defined as a combination
of Process, Voltage and Temperature (PVT).
• Cell delays and interconnect delays are computed
based upon the specified operating condition.
• There are three kinds of manufacturing process
models:
– slow processmodels, typical process models, and fast
process models.
31
Operating conditions
• The slow and fast process models represent the
extreme corners of the manufacturing process of a
foundry.
• For robust design, the design is validated at the
extreme corners of the manufacturing process as well
as environment extremes for temperature and power
supply.
• Figure 2-23(a) shows how a cell delay changes with
the process corners. Figure 2-23(b) shows how cell
delays vary with power supply voltage, and Figure 2-
23(c) shows how cell delays can vary with
temperature.
32
Operating conditions
33
Operating conditions
• Three standard operating conditions are:
– 1: WCS (Worst-Case Slow): Process is slow,
temperature is highest (say 125C) and voltage is
lowest (say nominal 1.2V minus 10%).
– 2: TYP (Typical): Process is typical, temperature is
nominal (say 25C) and voltage is nominal (say
1.2V).
– 3: BCF (Best-Case Fast): Process is fast,
temperature is lowest (say -40C) and voltage is
highest (say nominal 1.2V plus 10%).
34
Operating conditions
• For power analysis, the operating conditions may be:
– 1: ML (Maximal Leakage): Process is fast, temperature is
highest (say 125C) and the voltage is also the highest (say
1.2V plus 10%).
– 2: TL (Typical Leakage): Process is typical, temperature is
highest (say 125C) and the voltage is nominal (say 1.2V).
• An operating condition can be specified using the
set_operating_conditions command.
– set_operating_conditions “WCCOM” -library mychip.
– # Use the operating condition called WCCOM defined in
the cell library mychip.
35
Critical path analysis
36
False paths
• It is possible that certain timing paths are not real in
the actual functional operation of the design.
• Such paths can be turned off during STA by setting
these as false paths. A false path is ignored by the
STA for analysis.
• set_false_path -from [get_clocks SCAN_CLK]  -to
[get_clocks CORE_CLK]
– # Any path starting from the SCAN_CLK domain to
the CORE_CLK domain is a false path.
• set_false_path -through [get_pins UMUX0/S]
– # Any path going through this pin is false.
37
Timing models
• The cell timing models are intended to provide accurate
timing for various instances of the cell in the design
environment.
• The timing models are specified for each timing arc of the
cell.
– Tr : Output rise delay
– Tf : Output fall delay
• The delay for the timing arc through the inverter cell is
dependent on two factors:
– i. the output load, that is, the capacitance load at the
output pin of the inverter, and
– ii. the transition time of the signal at the input.
38
Timing models
39
Timing Models
40
Timing models
• Linear Timing Model
• Non Linear Delay Model
41
Linear Timing Model
• A simple timing model is a linear delay model,
where the delay and the output transition
time of the cell are represented as linear
functions of the two parameters: input
transition time and the output load
capacitance.
• The general form of the linear model for the
delay, D, through the cell is illustrated below.
– D = D0 + D1 * S + D2 * C
• This model is not suitable for Submicron Tech.
42
Non Linear Delay Model
• Most of the cell libraries include table models
to specify the delays and timing checks for
various timing arcs of the cell.
• The table models are referred to as NLDM
(Non-Linear Delay Model) and are used for
delay, output slew, or other timing checks.
• The table models capture the delay through
the cell for various combinations of input
transition time at the cell input pin and total
output capacitance at the cell output.
43
Non Linear Delay Model
• An inverter cell with an NLDM model has the
following tables:
– Rise delay
– Fall delay
– Rise transition
– Fall transition
44
Physical Design Verification
• Layout Rule checks and Electrical rule checks
• Parasitic extraction
• Antenna
• Cross talk and noise
• Cross talk glitch analysis
• Cross talk delay analysis
• Timing verification
45
Layout Rule checks and Electrical
rule checks
• Design checks are performed on the design after the
placement and routing process is completed to ensure
that the design is error free and ready for fabrication.
• Design rules checking verifies that no errors occurred
in the placement of the logic cells and the routing
process.
• In design rules checking, the focus is to find violations
related to spacing, connections, vias, and so on.
• The chip manufacturer also performs design rules
checking when accepting the design for fabrication.
46
Layout Rule checks and Electrical
rule checks
• Electrical rules verifies that no errors occurred in the
placement of the logic cells and the routing process.
• In electrical rules checking, the focus is to find short
circuits, open circuits, and floating nodes.
• Layout versus schematic is performed on the design
after routing to ensure that the final physical layout
consistent to the input net-list.
• To perform layout versus schematic, an electrical
schematic is extracted from the physical layout and
compared with the input net-list.
47
Parasitic extraction
• In designs, the interconnect parasitics must be accurate
and should be considered early in the chip design process.
• This requires accurate estimation of the parasitics in the
pre-layout stage, and accurate extraction and analysis in
the post-layout stage of a chip design.
• The three methodologies used for parasitics extraction are:
– 2-D: This is a simplest method of extraction. In this method,
it is assumed that the geometries modeled are uniform in
signal propagation direction, and all three dimensional
details are ignored. When it is used for designs, it gives
inaccurate results because the 3-D field effects, such as
capacitive coupling between geometries and non-orthogonal
cross sections, cannot be modeled accurately.
48
Parasitic extraction
– 2.5-D or Quasi 3-D: This method can model 3-D structures
more accurately than 2-D.
– 3-D: This method uses full 3-D field solution for parasitics
capacitance extraction. It is the most accurate method. For
large designs, it requires a long execution time for detailed
extraction.
• The 2-D method is used for simple capacitance
values for all nets. Using the extracted data, the
critical nets are identified based on the length, drive
strength, and loading. The critical nets are further
extracted using the 3-D method for better accuracy.
49
Antenna
• Modern chip technologies use plasma-based manufacturing
processes for etching, ashing, and oxide depositions to achieve
the fine feature size of chips.
• Unfortunately, these processes cause antenna effects, also
known as plasma-induced, gate oxide damage.
• The plasma etchers can induce a voltage into isolated leads,
stressing the thin gate-oxides.
• The metal or poly-silicon leads act like an antenna and collect the
charges.
• The accumulated charges can result in oxide breakdown.
• The process antenna effect directly impacts the reliability of the
chips.
• This is a major manufacturing issue and should be addressed by
the design methodology and process improvements.
50
Cross talk and noise
• Noise refers to undesired or unintentional effects
affecting the proper operation of the chip.
• In nanometer technologies, the noise can impact in
terms of functionality or in terms of timing of the
devices.
• There are several reasons why the noise plays an
important role in the deep submicron technologies:
– Increasing number of metal layers: For example, a
0.25mm or 0.3mm process has four or five metal layers
and it increases to ten or higher metal layers in the
65nm and 45nm process geometries.
51
Cross talk and noise
– Vertically dominant metal aspect ratio: This means that
the wires are thin and tall unlike the wide and thin in the
earlier process geometries. Thus, a greater proportion
of the capacitance is comprised of sidewall coupling
capacitance which maps into wire to wire capacitance
between neighboring wires.
– Higher routing density due to finer geometry: Thus,
more metal wires are packed in close physical proximity.
– Larger number of interacting devices and
interconnects: Thus, greater number of active standard
cells and signal traces are packed in the same silicon
area causing a lot more interactions.
52
Cross talk and noise
– Faster waveforms due to higher frequencies: Fast edge
rates cause more current spikes as well as greater
coupling impact on the neighboring traces and cells.
– Lower supply voltage: The supply voltage reduction
leaves little margin for noise.
• The crosstalk noise is caused by the capacitive
coupling between neighboring signals on the die.
• The affected signal is called the victim, and the
affecting signals are termed as aggressors.
• Note that two coupled nets can affect each other,
and often a net can be a victim as well as an
aggressor.
53
Cross talk glitch analysis
• A steady signal net can have a glitch (positive or
negative) due to charge transferred by the switching
aggressors through the coupling capacitances.
54
Cross talk glitch analysis
• The magnitude of the glitch caused is dependent
upon a variety of factors. Some of these factors are:
– Coupling capacitance between the aggressor net and
victim: The greater the coupling capacitance, the larger
the magnitude of the glitch.
– Slew of the aggressor net: The faster the slew at the
aggressor net, the larger the magnitude of glitch.
– Victim net grounded capacitance: The smaller the
grounded capacitance on the victim net, the larger the
magnitude of the glitch.
– Victim net driving strength: The smaller the output drive
strength of the cell driving the victim net, the larger the
magnitude of the glitch.
55
Cross talk glitch analysis
• While the steady value on the victim net gets
restored, the glitch can affect the functionality of the
circuit for the reasons stated below.
– The glitch magnitude may be large enough to be seen as a
different logic value by the fanout cells. This is especially
critical for the sequential cells (flip-flops, latches) or
memories. A glitch on the data signal at the latch input can
cause incorrect data to be latched.
– Even if the victim net does not drive a sequential cell, a
wide glitch may be propagated through the fanouts of the
victim net and reach a sequential cell input with
catastrophic consequences for the design.
56
Cross talk glitch analysis
• Types of Glitches:
– Rise and Fall Glitches
– Overshoot and Undershoot Glitches
57
Cross talk glitch analysis
58
Cross talk glitch analysis
59
Cross talk glitch analysis
• The output glitch height and width is a
function of input glitch width and height as
well as the output load.
60
Cross talk delay analysis
• The capacitance extraction for a typical net in
a nanometer design consists of contributions
from many neighboring conductors. Some of
these are grounded capacitances while many
others are part of other signal nets. The
grounded as well as inter-signal capacitances
are illustrated in Figure 6-12.
• All of these capacitances are considered as
part of the total net capacitance during the
basic delay calculation.
61
Cross talk delay analysis
• When the neighboring nets are steady (or not
switching), the inter-signal capacitances can
be treated as grounded.
• When a neighboring net is switching, the
charging current through the coupling
capacitance impacts the timing of the net.
• The equivalent capacitance seen from a net
can be larger or smaller based upon the
direction of the aggressor net switching.
62
Cross talk delay analysis
63
Cross talk delay analysis
• The capacitive charge required from the driving cell
in various scenarios can be different as described
next.
– 1: Aggressor net steady. In this scenario, the driving cell
for the net N1 provides the charge for Cg and Cc to be
charged to Vdd. The total charge provided by the driving
cell of this net is thus (Cg + Cc) * Vdd.
64
Cross talk delay analysis
– 2: Aggressor switching in same direction. In this scenario,
the driving cell is aided by the aggressor switching in the
same direction. If the aggressor transitions at the same time
with the same slew (identical transition time), the total
charge provided by the driving cell is only (Cg * Vdd). If the
slew of the aggressor net is faster than that of N1, the actual
charge required can be even smaller than (Cg * Vdd) since
the aggressor net can provide charging current for Cg also.
The reduction in delay is labeled as negative crosstalk delay.
65
Cross talk delay analysis
– 3: Aggressor switching in opposite direction. In this
scenario, the coupling capacitance is charged from -Vdd to
Vdd. Thus, the charge on coupling capacitance changes by
(2 * Cc * Vdd) before and after the transitions. This
additional charge is provided by both the driving cell of net
N1 as well as the aggressor net. The increase in delay is
labeled as positive crosstalk delay.
66
Cross talk delay analysis
• Positive and Negative Crosstalk:
– The base delay calculation (without any crosstalk) assumes
that the driving cell provides all the necessary charge for
rail-to-rail transition of the total capacitance of a net,
Ctotal = Cground + Cc.
– The charge required for the coupling capacitance Cc is
larger when the coupled (aggressor) net and victim net are
switching in the opposite directions.
– When the coupled (aggressor) net and the victim net are
switching in the same direction, the charge on Cc remains
the same before and after the transitions of the victim and
aggressor. This reduces the charge required from the
driving cell of the victim net.
67
Cross talk delay analysis
• An example of positive crosstalk delay effect is shown in
Figure 6-16. The aggressor net is rising at the same time
when the victim net has a falling transition. The aggressor
net switching in opposite direction increases the delay for
the victim net.
68
Cross talk delay analysis
• The case of negative crosstalk delay is illustrated in Figure 6-
17. The aggressor net is rising at the same time as the victim
net. The aggressor net switching in the same direction as the
victim reduces the delay of the victim net. The negative
crosstalk affects the timing of the driving cell as well as the
interconnect - the delay for both of these is reduced.
69
Cross talk delay analysis
• Accumulation with Multiple Aggressors:
– The crosstalk delay analysis with multiple
aggressors involves accumulating the
contributions due to crosstalk for each of the
aggressors.
– When multiple nets switch concurrently, the
crosstalk delay effect on the victim gets
compounded due to multiple aggressors.
70
Timing verification
• The following four types of crosstalk delay
contributions are computed for every cell and
interconnect in the design:
– 1: Positive rise delay (rise edge moves forward in
time).
– 2: Negative rise delay (rise edge moves backward in
time).
– 3: Positive fall delay (fall edge moves forward in time).
– 4: Negative fall delay (fall edge moves backward in
time).
71
Timing verification
• The crosstalk delay contributions are then
utilized during timing analysis for the verification
of the max and min paths (setup and hold
checks).
• The clock path for the launch and capture flip-
flops are handled differently.
72
Timing verification
• Setup Analysis:
– Consider the logic shown in Figure 6-19 where
crosstalk can occur at various nets along the data
path and along the clock paths.
– The worst condition for setup check is when both
the launch clock path and the data path have
positive crosstalk and the capture clock path has
negative crosstalk.
73
Timing verification
74
Timing verification
• Based upon above description, the setup
analysis assumes that:
– Launch clock path sees positive crosstalk delay so
that the data is launched late.
– Data path sees positive crosstalk delay so that it
takes longer for the data to reach the destination.
– Capture clock path sees negative crosstalk delay
so that the data is captured by the capture flip-
flop early.
75
Timing verification
• Hold Analysis:
– Based upon the logic shown in Figure 6-19, the
worst condition for hold check occurs when both
the launch clock path and the data path have
negative crosstalk and the capture clock path has
positive crosstalk.
– Based upon the logic shown in Figure 6-19, the
worst condition for hold check occurs when both
the launch clock path and the data path have
negative crosstalk and the capture clock path has
positive crosstalk.
76

VLSI Testing & Verification_UNIT - V.ppt

  • 1.
    UNIT - V StaticTiming Verification & Physical Design Verification 1
  • 2.
    CONTENTS • Static TimingVerification • Physical Design Verification 2
  • 3.
    Static Timing Verification •Concept of Static Timing Analysis (STA) • Cross talk and noise • Limitations of STA • Slew of a wave form • Skew between the signals • Timing arcs and unateness • Min. and Max. timing paths • Clock Domains • Operating conditions • Critical path analysis • False paths • Timing models 3
  • 4.
    Concept of StaticTiming Analysis • Static Timing Analysis (STA) is one of the many techniques available to verify the timing of a digital design. • An alternate approach used to verify the timing is the timing simulation which can verify the functionality as well as the timing of the design. • Timing analysis simply refers to the analysis of the design for timing issues. • The purpose of static timing analysis is to validate if the design can operate at the rated speed. 4
  • 5.
  • 6.
    Static Timing Analysis •Static timing analysis is a complete and exhaustive verification of all timing checks of a design. • To simulate and verify all timing conditions of a design with 10-100 million gates is very slow and the timing cannot be verified completely. Thus, it is very difficult to do exhaustive verification through simulation. • Static timing analysis on the other hand provides a faster and simpler way of checking and analyzing all the timing paths in a design for any timing violations. 6
  • 7.
    Cross talk andnoise • The design functionality and its performance can be limited by noise. • The noise occurs due to crosstalk with other signals or due to noise on primary inputs or the power supply. • The noise impact can limit the frequency of operation of the design and it can also cause functional failures. • Verification based upon logic simulation cannot handle the effects of crosstalk, noise and on-chip variations. 7
  • 8.
    Limitations of STA •While the timing and noise analysis do an excellent job of analyzing a design for timing issues under all possible situations, the state- of-the-art still does not allow STA to replace simulation completely. • This is because there are some aspects of timing verification that cannot yet be completely captured and verified in STA. 8
  • 9.
    Limitations of STA •Some of the limitations of STA are: – 1: Reset sequence: To check if all flip-flops are reset into their required logical values after an asynchronous or synchronous reset. – 2: X-handling: The STA techniques only deal with the logical domain of logic-0 and logic-1, rise and fall. An unknown value X in the design causes indeterminate values to propagate through the design, which cannot be checked with STA. – 3: PLL settings: PLL configurations may not be loaded or set properly. 9
  • 10.
    Limitations of STA –4: Asynchronous clock domain crossings: STA does not check if the correct clock synchronizers are being used. – 5: IO interface timing: It may not be possible to specify the IO interface requirements in terms of STA constraints only. – 6: Interfaces between analog and digital blocks: Since STA does not deal with analog blocks, the verification methodology needs to ensure that the connectivity between these two kinds of blocks is correct. 10
  • 11.
    Limitations of STA –7: False paths: The static timing analysis verifies that timing through the logic path meets all the constraints. In many cases, the STA may flag a logic path as a failing path, even though logic may never be able to propagate through the path. Such timing paths are called false paths. – 8: FIFO pointers out of synchronization: STA cannot detect the problem when two finite state machines expected to be synchronous are actually out of synchronization. 11
  • 12.
    Limitations of STA –9: Clock synchronization logic: STA cannot detect the problem of clock generation logic not matching the clock definition. STA assumes that the clock generator will provide the waveform as specified in the clock definition. Alternately, the added logic may change the duty cycle of the clock. The STA cannot detect either of these potential conditions. – 10: Functional behaviour across clock cycles: The static timing analysis cannot model or simulate functional behaviour that changes across clock cycles. 12
  • 13.
    Slew of awave form • A slew rate is defined as a rate of change. • In static timing analysis, the rising or falling waveforms are measured in terms of whether the transition is slow or fast. • The slew is typically measured in terms of the transition time. • The transition time is actually inverse of the slew rate – the larger the transition time, the slower the slew, and vice versa. • Slew values are specified as a percent of Vdd. 13
  • 14.
    Slew of awave form • # Falling edge thresholds: – slew_lower_threshold_pct_fall : 30.0; – slew_upper_threshold_pct_fall : 70.0; • # Rising edge thresholds: – slew_lower_threshold_pct_rise : 30.0; – slew_upper_threshold_pct_rise : 70.0; 14
  • 15.
    Slew of awave form 15
  • 16.
    Slew of awave form • # Falling edge thresholds: – slew_lower_threshold_pct_fall : 20.0; – slew_upper_threshold_pct_fall : 80.0; • # Rising edge thresholds: – slew_lower_threshold_pct_rise : 10.0; – slew_upper_threshold_pct_rise : 90.0; 16
  • 17.
    Slew of awave form 17
  • 18.
    Skew between thesignals • Skew is the difference in timing between two or more signals. • Clock latency is the total time it takes from the clock source to an end point. • Clock skew is the difference in arrival times at the end points of the clock tree. • An ideal clock tree is one where the clock source is assumed to have an infinite drive, that is, the clock can drive infinite sources with no delay. In addition, any cells present in the clock tree are assumed to have zero delay. 18
  • 19.
    Skew between thesignals 19
  • 20.
    Skew between thesignals • Latency of a clock tree can be explicitly specified using the set_clock_latency command. – set_clock_latency 2.2 [get_clocks BZCLK] – # Both rise and fall latency is 2.2ns. – # Use options -rise and -fall if different. • Clock skew for a clock tree can also be implied by explicitly specifying its value using the set_clock_uncertainty command: – set_clock_uncertainty 0.250 -setup [get_clocks BZCLK] – set_clock_uncertainty 0.100 -hold [get_clocks BZCLK] 20
  • 21.
    Timing arcs andunateness • Every cell has multiple timing arcs. For example, a combinational logic cell, such as and, or, nand, nor, adder cell, has timing arcs from each input to each output of the cell. • Sequential cells such as flip-flops have timing arcs from the clock to the outputs and timing constraints for the data pins with respect to the clock. • Each timing arc has a timing sense, that is, how the output changes for different types of transitions on input. 21
  • 22.
    Timing arcs andunateness • The timing arc is positive unate if a rising transition on an input causes the output to rise (or not to change) and a falling transition on an input causes the output to fall (or not to change). • The timing arcs for and and or type cells are positive unate. • A negative unate timing arc is one where a rising transition on an input causes the output to have a falling transition. • the timing arcs for nand and nor type cells are negative unate. • In a non-unate timing arc, the output transition cannot be determined solely from the direction of change of an input but also depends upon the state of the other inputs. • The timing arcs in an xor cell (exclusive-or) are non-unate. 22
  • 23.
    Timing arcs andunateness 23
  • 24.
    Min. and Max.timing paths • The total delay for the logic to propagate through a logic path is referred to as the path delay. • In general, there are multiple paths through which the logic can propagate to the required destination point. • The actual path taken depends upon the state of the other inputs along the logic path. • Since there are multiple paths to the destination, the maximum and minimum timing to the destination points can be obtained. • Launch Flip-flop, Capture Flip-flop. 24
  • 25.
    Min. and Max.timing paths 25
  • 26.
    Clock Domains • Theset of flip-flops being fed by one clock is called its clock domain. • In a typical design, there may be more than one clock domain. • Clock domains are dependent if there are any data paths that start from one clock domain and end in the other clock domain. • This means that there is a timing path that starts from one clock domain and ends in the other clock domain. 26
  • 27.
  • 28.
    Clock Domains • Ifthere are data paths that cross between clock domains, a decision has to be made as to whether the paths are real or not. • An example of a real path is a flip-flop with a 2x speed clock driving into a flip-flop with a 1x speed clock. • An example of a false path is where the designer has explicitly placed clock synchronizer logic between the two clock domains. 28
  • 29.
    Clock Domains • Aclock domain crossing can occur both ways, from USBCLK clock domain to MEMCLK clock domain, and from MEMCLK clock domain to USBCLK clock domain. 29
  • 30.
    Clock Domains • Figure2-22 shows another example of clock domains. A multiplexer selects a clock source - it is either one or the other depending on the mode of operation of the design. 30
  • 31.
    Operating conditions • Statictiming analysis is typically performed at a specific operating condition. • An operating condition is defined as a combination of Process, Voltage and Temperature (PVT). • Cell delays and interconnect delays are computed based upon the specified operating condition. • There are three kinds of manufacturing process models: – slow processmodels, typical process models, and fast process models. 31
  • 32.
    Operating conditions • Theslow and fast process models represent the extreme corners of the manufacturing process of a foundry. • For robust design, the design is validated at the extreme corners of the manufacturing process as well as environment extremes for temperature and power supply. • Figure 2-23(a) shows how a cell delay changes with the process corners. Figure 2-23(b) shows how cell delays vary with power supply voltage, and Figure 2- 23(c) shows how cell delays can vary with temperature. 32
  • 33.
  • 34.
    Operating conditions • Threestandard operating conditions are: – 1: WCS (Worst-Case Slow): Process is slow, temperature is highest (say 125C) and voltage is lowest (say nominal 1.2V minus 10%). – 2: TYP (Typical): Process is typical, temperature is nominal (say 25C) and voltage is nominal (say 1.2V). – 3: BCF (Best-Case Fast): Process is fast, temperature is lowest (say -40C) and voltage is highest (say nominal 1.2V plus 10%). 34
  • 35.
    Operating conditions • Forpower analysis, the operating conditions may be: – 1: ML (Maximal Leakage): Process is fast, temperature is highest (say 125C) and the voltage is also the highest (say 1.2V plus 10%). – 2: TL (Typical Leakage): Process is typical, temperature is highest (say 125C) and the voltage is nominal (say 1.2V). • An operating condition can be specified using the set_operating_conditions command. – set_operating_conditions “WCCOM” -library mychip. – # Use the operating condition called WCCOM defined in the cell library mychip. 35
  • 36.
  • 37.
    False paths • Itis possible that certain timing paths are not real in the actual functional operation of the design. • Such paths can be turned off during STA by setting these as false paths. A false path is ignored by the STA for analysis. • set_false_path -from [get_clocks SCAN_CLK] -to [get_clocks CORE_CLK] – # Any path starting from the SCAN_CLK domain to the CORE_CLK domain is a false path. • set_false_path -through [get_pins UMUX0/S] – # Any path going through this pin is false. 37
  • 38.
    Timing models • Thecell timing models are intended to provide accurate timing for various instances of the cell in the design environment. • The timing models are specified for each timing arc of the cell. – Tr : Output rise delay – Tf : Output fall delay • The delay for the timing arc through the inverter cell is dependent on two factors: – i. the output load, that is, the capacitance load at the output pin of the inverter, and – ii. the transition time of the signal at the input. 38
  • 39.
  • 40.
  • 41.
    Timing models • LinearTiming Model • Non Linear Delay Model 41
  • 42.
    Linear Timing Model •A simple timing model is a linear delay model, where the delay and the output transition time of the cell are represented as linear functions of the two parameters: input transition time and the output load capacitance. • The general form of the linear model for the delay, D, through the cell is illustrated below. – D = D0 + D1 * S + D2 * C • This model is not suitable for Submicron Tech. 42
  • 43.
    Non Linear DelayModel • Most of the cell libraries include table models to specify the delays and timing checks for various timing arcs of the cell. • The table models are referred to as NLDM (Non-Linear Delay Model) and are used for delay, output slew, or other timing checks. • The table models capture the delay through the cell for various combinations of input transition time at the cell input pin and total output capacitance at the cell output. 43
  • 44.
    Non Linear DelayModel • An inverter cell with an NLDM model has the following tables: – Rise delay – Fall delay – Rise transition – Fall transition 44
  • 45.
    Physical Design Verification •Layout Rule checks and Electrical rule checks • Parasitic extraction • Antenna • Cross talk and noise • Cross talk glitch analysis • Cross talk delay analysis • Timing verification 45
  • 46.
    Layout Rule checksand Electrical rule checks • Design checks are performed on the design after the placement and routing process is completed to ensure that the design is error free and ready for fabrication. • Design rules checking verifies that no errors occurred in the placement of the logic cells and the routing process. • In design rules checking, the focus is to find violations related to spacing, connections, vias, and so on. • The chip manufacturer also performs design rules checking when accepting the design for fabrication. 46
  • 47.
    Layout Rule checksand Electrical rule checks • Electrical rules verifies that no errors occurred in the placement of the logic cells and the routing process. • In electrical rules checking, the focus is to find short circuits, open circuits, and floating nodes. • Layout versus schematic is performed on the design after routing to ensure that the final physical layout consistent to the input net-list. • To perform layout versus schematic, an electrical schematic is extracted from the physical layout and compared with the input net-list. 47
  • 48.
    Parasitic extraction • Indesigns, the interconnect parasitics must be accurate and should be considered early in the chip design process. • This requires accurate estimation of the parasitics in the pre-layout stage, and accurate extraction and analysis in the post-layout stage of a chip design. • The three methodologies used for parasitics extraction are: – 2-D: This is a simplest method of extraction. In this method, it is assumed that the geometries modeled are uniform in signal propagation direction, and all three dimensional details are ignored. When it is used for designs, it gives inaccurate results because the 3-D field effects, such as capacitive coupling between geometries and non-orthogonal cross sections, cannot be modeled accurately. 48
  • 49.
    Parasitic extraction – 2.5-Dor Quasi 3-D: This method can model 3-D structures more accurately than 2-D. – 3-D: This method uses full 3-D field solution for parasitics capacitance extraction. It is the most accurate method. For large designs, it requires a long execution time for detailed extraction. • The 2-D method is used for simple capacitance values for all nets. Using the extracted data, the critical nets are identified based on the length, drive strength, and loading. The critical nets are further extracted using the 3-D method for better accuracy. 49
  • 50.
    Antenna • Modern chiptechnologies use plasma-based manufacturing processes for etching, ashing, and oxide depositions to achieve the fine feature size of chips. • Unfortunately, these processes cause antenna effects, also known as plasma-induced, gate oxide damage. • The plasma etchers can induce a voltage into isolated leads, stressing the thin gate-oxides. • The metal or poly-silicon leads act like an antenna and collect the charges. • The accumulated charges can result in oxide breakdown. • The process antenna effect directly impacts the reliability of the chips. • This is a major manufacturing issue and should be addressed by the design methodology and process improvements. 50
  • 51.
    Cross talk andnoise • Noise refers to undesired or unintentional effects affecting the proper operation of the chip. • In nanometer technologies, the noise can impact in terms of functionality or in terms of timing of the devices. • There are several reasons why the noise plays an important role in the deep submicron technologies: – Increasing number of metal layers: For example, a 0.25mm or 0.3mm process has four or five metal layers and it increases to ten or higher metal layers in the 65nm and 45nm process geometries. 51
  • 52.
    Cross talk andnoise – Vertically dominant metal aspect ratio: This means that the wires are thin and tall unlike the wide and thin in the earlier process geometries. Thus, a greater proportion of the capacitance is comprised of sidewall coupling capacitance which maps into wire to wire capacitance between neighboring wires. – Higher routing density due to finer geometry: Thus, more metal wires are packed in close physical proximity. – Larger number of interacting devices and interconnects: Thus, greater number of active standard cells and signal traces are packed in the same silicon area causing a lot more interactions. 52
  • 53.
    Cross talk andnoise – Faster waveforms due to higher frequencies: Fast edge rates cause more current spikes as well as greater coupling impact on the neighboring traces and cells. – Lower supply voltage: The supply voltage reduction leaves little margin for noise. • The crosstalk noise is caused by the capacitive coupling between neighboring signals on the die. • The affected signal is called the victim, and the affecting signals are termed as aggressors. • Note that two coupled nets can affect each other, and often a net can be a victim as well as an aggressor. 53
  • 54.
    Cross talk glitchanalysis • A steady signal net can have a glitch (positive or negative) due to charge transferred by the switching aggressors through the coupling capacitances. 54
  • 55.
    Cross talk glitchanalysis • The magnitude of the glitch caused is dependent upon a variety of factors. Some of these factors are: – Coupling capacitance between the aggressor net and victim: The greater the coupling capacitance, the larger the magnitude of the glitch. – Slew of the aggressor net: The faster the slew at the aggressor net, the larger the magnitude of glitch. – Victim net grounded capacitance: The smaller the grounded capacitance on the victim net, the larger the magnitude of the glitch. – Victim net driving strength: The smaller the output drive strength of the cell driving the victim net, the larger the magnitude of the glitch. 55
  • 56.
    Cross talk glitchanalysis • While the steady value on the victim net gets restored, the glitch can affect the functionality of the circuit for the reasons stated below. – The glitch magnitude may be large enough to be seen as a different logic value by the fanout cells. This is especially critical for the sequential cells (flip-flops, latches) or memories. A glitch on the data signal at the latch input can cause incorrect data to be latched. – Even if the victim net does not drive a sequential cell, a wide glitch may be propagated through the fanouts of the victim net and reach a sequential cell input with catastrophic consequences for the design. 56
  • 57.
    Cross talk glitchanalysis • Types of Glitches: – Rise and Fall Glitches – Overshoot and Undershoot Glitches 57
  • 58.
    Cross talk glitchanalysis 58
  • 59.
    Cross talk glitchanalysis 59
  • 60.
    Cross talk glitchanalysis • The output glitch height and width is a function of input glitch width and height as well as the output load. 60
  • 61.
    Cross talk delayanalysis • The capacitance extraction for a typical net in a nanometer design consists of contributions from many neighboring conductors. Some of these are grounded capacitances while many others are part of other signal nets. The grounded as well as inter-signal capacitances are illustrated in Figure 6-12. • All of these capacitances are considered as part of the total net capacitance during the basic delay calculation. 61
  • 62.
    Cross talk delayanalysis • When the neighboring nets are steady (or not switching), the inter-signal capacitances can be treated as grounded. • When a neighboring net is switching, the charging current through the coupling capacitance impacts the timing of the net. • The equivalent capacitance seen from a net can be larger or smaller based upon the direction of the aggressor net switching. 62
  • 63.
    Cross talk delayanalysis 63
  • 64.
    Cross talk delayanalysis • The capacitive charge required from the driving cell in various scenarios can be different as described next. – 1: Aggressor net steady. In this scenario, the driving cell for the net N1 provides the charge for Cg and Cc to be charged to Vdd. The total charge provided by the driving cell of this net is thus (Cg + Cc) * Vdd. 64
  • 65.
    Cross talk delayanalysis – 2: Aggressor switching in same direction. In this scenario, the driving cell is aided by the aggressor switching in the same direction. If the aggressor transitions at the same time with the same slew (identical transition time), the total charge provided by the driving cell is only (Cg * Vdd). If the slew of the aggressor net is faster than that of N1, the actual charge required can be even smaller than (Cg * Vdd) since the aggressor net can provide charging current for Cg also. The reduction in delay is labeled as negative crosstalk delay. 65
  • 66.
    Cross talk delayanalysis – 3: Aggressor switching in opposite direction. In this scenario, the coupling capacitance is charged from -Vdd to Vdd. Thus, the charge on coupling capacitance changes by (2 * Cc * Vdd) before and after the transitions. This additional charge is provided by both the driving cell of net N1 as well as the aggressor net. The increase in delay is labeled as positive crosstalk delay. 66
  • 67.
    Cross talk delayanalysis • Positive and Negative Crosstalk: – The base delay calculation (without any crosstalk) assumes that the driving cell provides all the necessary charge for rail-to-rail transition of the total capacitance of a net, Ctotal = Cground + Cc. – The charge required for the coupling capacitance Cc is larger when the coupled (aggressor) net and victim net are switching in the opposite directions. – When the coupled (aggressor) net and the victim net are switching in the same direction, the charge on Cc remains the same before and after the transitions of the victim and aggressor. This reduces the charge required from the driving cell of the victim net. 67
  • 68.
    Cross talk delayanalysis • An example of positive crosstalk delay effect is shown in Figure 6-16. The aggressor net is rising at the same time when the victim net has a falling transition. The aggressor net switching in opposite direction increases the delay for the victim net. 68
  • 69.
    Cross talk delayanalysis • The case of negative crosstalk delay is illustrated in Figure 6- 17. The aggressor net is rising at the same time as the victim net. The aggressor net switching in the same direction as the victim reduces the delay of the victim net. The negative crosstalk affects the timing of the driving cell as well as the interconnect - the delay for both of these is reduced. 69
  • 70.
    Cross talk delayanalysis • Accumulation with Multiple Aggressors: – The crosstalk delay analysis with multiple aggressors involves accumulating the contributions due to crosstalk for each of the aggressors. – When multiple nets switch concurrently, the crosstalk delay effect on the victim gets compounded due to multiple aggressors. 70
  • 71.
    Timing verification • Thefollowing four types of crosstalk delay contributions are computed for every cell and interconnect in the design: – 1: Positive rise delay (rise edge moves forward in time). – 2: Negative rise delay (rise edge moves backward in time). – 3: Positive fall delay (fall edge moves forward in time). – 4: Negative fall delay (fall edge moves backward in time). 71
  • 72.
    Timing verification • Thecrosstalk delay contributions are then utilized during timing analysis for the verification of the max and min paths (setup and hold checks). • The clock path for the launch and capture flip- flops are handled differently. 72
  • 73.
    Timing verification • SetupAnalysis: – Consider the logic shown in Figure 6-19 where crosstalk can occur at various nets along the data path and along the clock paths. – The worst condition for setup check is when both the launch clock path and the data path have positive crosstalk and the capture clock path has negative crosstalk. 73
  • 74.
  • 75.
    Timing verification • Basedupon above description, the setup analysis assumes that: – Launch clock path sees positive crosstalk delay so that the data is launched late. – Data path sees positive crosstalk delay so that it takes longer for the data to reach the destination. – Capture clock path sees negative crosstalk delay so that the data is captured by the capture flip- flop early. 75
  • 76.
    Timing verification • HoldAnalysis: – Based upon the logic shown in Figure 6-19, the worst condition for hold check occurs when both the launch clock path and the data path have negative crosstalk and the capture clock path has positive crosstalk. – Based upon the logic shown in Figure 6-19, the worst condition for hold check occurs when both the launch clock path and the data path have negative crosstalk and the capture clock path has positive crosstalk. 76