Our team
The Kart:
Our Objectives:
- Reassemble last year's go kart and to gain hands on
experience in building complex systems
- Get the Go Kart to run and make it race ready
- Test and drive on the Grand Prix track
- Analyze and improve performance with the materials we
are provided
Beginning of the Semester:
- The kart was very dirty and was missing
numerous parts
- The seatbelt and the transmission wiring needed
to be replaced
- There was difficulty in getting the throttle cable
attached
• To be able to fix these issues, we had to learn more
about go karting as a whole and identify our
constraints
- We learned how to identify parts of the kart and
their functions
- Overall, we were successful in learning how to
identify problem areas on the kart, form ideas on how
to solve issues, and use our hands to rebuild as
needed
Ex. Replacing the transmission wire and connecting it
to the engine
What we accomplished: Building a Go-Kart
Problem Solving to fix issues in the beginning
• Engine Chain
• Clutch
• Driving
Learned more about the major components
• Clutch
• Engine
• Braking System
The track:
Becoming responsible (and fast ) drivers:
Racing flags and how
to be safe members on
the track
Apex theory suggests the quickest way for a
driver to turn a curve
Defensive Driving
When we go to the track, we ran into some
issues...
On the Track:
- When we go to the track, we realized that our
throttle cable was nonfunctional
- After much troubleshooting, we identified a
very worn out spring that was contributing to
malperformance
- The spring was eventually replaced as needed
Overall, we were happy with our performance and
hope to continue improving the kart in the future.
Thank you !

More Related Content

Similar to VIP GoKart group 3.pptx (7)

Final Paper
Final PaperFinal Paper
Final Paper
 
K-Map Solver Circuit
K-Map Solver CircuitK-Map Solver Circuit
K-Map Solver Circuit
 
Engineering Portfolio
Engineering PortfolioEngineering Portfolio
Engineering Portfolio
 
Complete Porfolio
Complete PorfolioComplete Porfolio
Complete Porfolio
 
Garuda 2012
Garuda 2012Garuda 2012
Garuda 2012
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Battery buggy10
Battery buggy10Battery buggy10
Battery buggy10
 

Recently uploaded

1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
AshishSingh1301
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 

Recently uploaded (20)

Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 

VIP GoKart group 3.pptx

  • 1. V I P Go-Kart Meredith Clark, Garrison Thompson, Ellington Mitchell, Alex Janninck December 1st, 2022
  • 2. Agenda - Introduction - Objectives - What we accomplished - What we learned - Closing
  • 5. Our Objectives: - Reassemble last year's go kart and to gain hands on experience in building complex systems - Get the Go Kart to run and make it race ready - Test and drive on the Grand Prix track - Analyze and improve performance with the materials we are provided
  • 6. Beginning of the Semester: - The kart was very dirty and was missing numerous parts - The seatbelt and the transmission wiring needed to be replaced - There was difficulty in getting the throttle cable attached
  • 7. • To be able to fix these issues, we had to learn more about go karting as a whole and identify our constraints - We learned how to identify parts of the kart and their functions - Overall, we were successful in learning how to identify problem areas on the kart, form ideas on how to solve issues, and use our hands to rebuild as needed Ex. Replacing the transmission wire and connecting it to the engine
  • 8. What we accomplished: Building a Go-Kart Problem Solving to fix issues in the beginning • Engine Chain • Clutch • Driving Learned more about the major components • Clutch • Engine • Braking System
  • 10. Becoming responsible (and fast ) drivers: Racing flags and how to be safe members on the track Apex theory suggests the quickest way for a driver to turn a curve
  • 12. When we go to the track, we ran into some issues... On the Track: - When we go to the track, we realized that our throttle cable was nonfunctional - After much troubleshooting, we identified a very worn out spring that was contributing to malperformance - The spring was eventually replaced as needed
  • 13.
  • 14. Overall, we were happy with our performance and hope to continue improving the kart in the future.