TRAINING PORTFOLIO
2016
EDUCATION ABILITY PRACTICEINSTRUCTIONSKILLS
ABOUT US
Vinsys, an ISO 9001:2008 certified organisation, is a Global
Training and Consulting Organisation delivering its services to
enterprise worldwide with a team of 450+ highly
accomplished professionals through robust practises.
Over the years, the company has established itself as a reliable partner
for many organisations in more than 30 countries. Our experience and
expertise lies in executing training and consulting in the area of
Software, Technology, Behavioural and Management solutions, Project
Management, IT Service Management, IT Governance and Enterprise
Architecture for major corporates.
www.vinsys.com
KEY DIFFERENTIATORS
• Expertise and Experience of training more than 1,400,000 professionals from different
industries and on various domains.
• Flexible in terms of schedule and resource availability.
• Your one stop training solution for all your training needs.
• 25+ office locations across the globe.
• 450+ in house highly skilled SME's for training delivery and consultancy.
• An environment that leads to experiential and fun learning.
• Preferred training partner for all major establishments with proven customer track
record.
• Excellent track record of consistent quality in delivery.
• Training more than 100,000 professionals per annum across domains from various
industries.
• Business oriented value driven approach for designing and delivering trainings.
• We have thrived in attaining impeccable quality standards designed by global leaders.
• Facility renting with more than 160+ state of the art training rooms with latest
configuration.
Technology
Business&Process
Framework
SoftSkills
No Description Duration
1 AWSTechnical Essentials 5 days
2 AWS Business Essentials 5 days
3 Big Data on AWS 5 days
4 Systems Operations on AWS 5 days
5 DevOps Engineering on AWS 5 days
6 Developing on AWS 5 days
7 Architecting on AWS 5 days
8 Advanced Architecting on AWS 5 days
9 Java on AWS 3 days
10 JavaScript on AWS 3 days
Amazon Web Services (AWS) is a secure cloud services platform, offering compute power, database
storage, content delivery and other functionality to help businesses scale and grow. Explore how
millions of customers are currently leveraging AWS cloud products and solutions to build
sophisticated applications with increased flexibility, scalability and reliability.
Learn @ Vinsys to lead the Cloud generation.
Cloudera
CISCO
Citrix
Amazon
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Next
Business&Process
Framework
SoftSkills
No Description Duration
11 Mobile on AWS 3 days
12 PHP on AWS 3 days
13 Python on AWS 3 days
14 Ruby on AWS 3 days
15 Windows & .NET on AWS 3 days
16 Big DataTechnology Fundamentals 2 days
17 Security Operations on AWS 2 days
18 AWS Certification Exam Readiness Workshop:AWS Certified Solutions Architect - Associate 5 days
19 AWS Certification Exam Readiness Workshop:AWS Certified Solutions Architect - Professional 5 days
Cloudera
CISCO
Citrix
Amazon
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Technology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 CSE Cisco Sales Essentials 2 days
2 DCUFI Implementing Cisco Data Center Unified Fabric 5.0 5 days
3 DCUCT Troubleshooting Cisco Data Center Unified Computing 3 days
4 DCUFT Troubleshooting Cisco Data Center Unified Fabric 3 days
5 DCASD Designing Cisco Data Center Application Services 5 days
6 DCASI Implementing Cisco Data Center Application Services 5 days
7 DCNI-1 Implementing Cisco Data Center Network Infrastracture 1 5 days
8 DCUCS Configuring Data Center Unified Computing 2.0 4 days
9 DESGN Designing for Cisco Internetwork Solutions 5 days
10 ARCH Designing Cisco Network Service Architectures 5 days
Vinsys enhances its certified Cisco training courses with hands-on exercises and labs designed by
professionals with real-world Cisco networking experience.Training courses for the new CCNA Data
Center and CCNP Data Center certifications are available inVinsys classrooms worldwide or via private
on-site delivery. Cisco Certified Courses are the best bet if you are aiming for a high flying career in
network management.
From entry level credentials for beginners in the industry (CCENT, CCNA) to advanced recognition for
experts (CCIE), Cisco training is for anyone looking for better opportunities in their careers.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
11 DMS Digital Media Systems 3 days
12 CPLMS Implementing Cisco Prime LMS 5 days
13 ICND1 Interconnecting Cisco Networking Devices Part 1 5 days
14 ICND2 Interconnecting Cisco Networking Devices Part 2 5 days
15 ROUTE Implementing Cisco IP Routing 5 days
16 SWITCH Implementing Cisco Switched Networks 5 days
17 TSHOOT Troubleshooting and Maintaining Cisco IP Networks 5 days
18 IINS Implementing Cisco IOS Network Security 5 days
19 SIMOS Implementing Cisco Secure Mobility Solutions 5 days
20 SENSS Implementing Cisco Edge Network Security Solutions 5 days
21 SITCS Implementing CiscoThreat Control Solutions 5 days
22 SASAA Implementing Advanced Cisco ASA Security 5 days
23 SASAC Implementing Core Cisco ASA Security 5 days
24 SISAS Implementing Cisco Secure Access Solutions 5 days
25 SECURE Securing Networks with Cisco Routers and Switches 5 days
26 BGP Configuring BGP on Cisco Routers 5 days
27 MPLS Implementing Cisco MPLS 5 days
28 QoS Implementing Cisco QoS 5 days
29 UCCXA Covering advanced techniques in scripting and overall CRS Functionality 4 days
30 ICOMM Introducing CiscoVoice and Unified Communications Administration 5 days
31 CVOICE Implementing CiscoVoice Communications & QOS 5 days
32 CIPT1 Implementing Cisco Unified Communications Manager Part 1 5 days
33 CIPT2 Implementing Cisco Unified Communications Manager Part 2 5 days
34 CAPPS Integrating Cisco Unified Communications Applications 5 days
35 TVOICE Troubleshooting Cisco Unified Communications 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
36 ACUCM Administering Cisco Unified Communications Manager 3 days
37 CVPI Cisco Unified CustomerVoice Portal Implementation 8.0 5 days
38 IUM Implementing Cisco Unified Messaging 5 days
39 UCAD Cisco Unified Communications Architecture and Design 5 days
40 IAUWS Implementing Advanced Cisco Unified Wireless Security 5 days
41 IUWMS Implementing Cisco Unified Wireless Mobility Services 5 days
42 IUWVN Implementing Cisco Unified WirelessVoice Networks 5 days
Technology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
Citrix CCA Certification &Training Courses
1 CXA-206-2 Implementing Citrix XenApp 6.5 Administration 5 days
2 CXD-202 Citrix XenDesktop 5 Administration 5 days
Citrix CCAA Certification &Training Courses
3 CXA-206 Citrix XenApp 6.5 Administration 5 days
4 CXA-301 Citrix XenApp 6.5 Advanced Administration 5 days
Citrix XenappTraining & Certification Courses
5 CHD-100 HelpDesk Support for Citrix XenDesktop 5.6 and XenApp 6.5 3 days
XenDesktop 7 and XenApp 7.5
6 CXD-203 Managing Citrix XenDesktop 7 Solutions 5 days
Citrix training courses atVinsys comprises of desktop, application and server virtualization, networking
and cloud computing technologies. Most popular Citrix certifications and products include XenApp,
XenDesktop, XenServer, NetScaler etc.
Citrix virtualization courses are in huge demand andVinsys possesses the right mix of technology
expertise, infrastructure and authorization to help you ace in Citrix environments.The array of Citrix
certification courses include courses on Citrix Netscaler 10, Citrix CCA Certification, Citrix Xenmobile,
Citrix Xendesktop 7.x, Citrix Xenserver, Citrix Other Essentials Courses forVirtualization, Citrix Other
Essentials Courses forVirtualization,  Citrix Xenapp and Citrix Certified Advanced Administration.You
can choose from a variety of these courses to keep a pace with the career progression.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
7 CXA-207 Citrix XenApp 7.5 Skills Update 3 days
8 CMB-300 Deploy and Manage Citrix XenApp/XenDesktop 7.6 FastTrack 5 days
9 CXA-301 Advanced Administration for Citrix XenApp 6.5 5 days
Citrix XenserverTraining & Certification Courses
10 CXS-203 Citrix XenServer 6.0 Administration 5 days
11 CXS-300 XenServer 6.5 SP1 Administration 5 days
Citrix Xendesktop 7Training & Certification Courses
12 CXD-205 Citrix XenDesktop 7.5 Skills Update 3 days
13 CXD-105 Citrix XenApp and XenDesktop Helpdesk Support 2 days
14 CXD-203 Managing App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 5 days
15 CXD-300 Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 5 days
16 CXD-400 Designing App and Desktop Solutions with Citrix XenDesktop 7 5 days
Citrix Netscaler 10Training & Certification Courses
17 CNS-204 NetScaler 10 Skills Update 1 days
18 CNS-205 Citrix NetScaler 11 Essentials and Networking 5 days
19 CNS 208 Citrix NetScaler 10.5 Essentials for ACE Migration 5 days
20 CNS-207 Implementing Citrix NetScaler 11 for App and Desktop Solutions 5 days
21 CNS-301 Citrix NetScaler 10.5 Advanced Implementation 5 days
Citrix XenmobileTraining & Certification Courses
22 CXM-303 Deploying Enterprise Mobility Solutions with Citrix XenMobile 5 days
23 CXM-202 Managing and Supporting a Mobility Solution with Citrix XenMobile 3 days
CitrixVirtualizationTraining & Certification Courses
24 Citrix Online 3 days
Career Enabler™ ( CitrixVirtualization )
25 CXA-206-1 Implementing Citrix XenApp 6.5 Administration 8 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
26 CXD-202 Citrix XenDesktop 5 Administration 8 days
27 CXS-203 Citrix XenServer 6.0 Administration 8 days
28 Simulated Internship 6 days
29 Window Essentials 8 days
Career Enabler™ (Virtualization )
30 VMware vSphere: Install, Configure, Manage [V5.5] 5 days
31 CXA-206-1 Implementing Citrix XenApp 6.5 Administration 5 days
32 CXD-202 Citrix XenDesktop 5 Administration 5 days
33 CXA-206 Implementing Citrix XenApp 6.5 Administration 6 days
34 CXD-202 Citrix XenDesktop 5 Administration 6 days
35 Security Essentials for Citrix 4 days
Citrix CloudTraining & Certification Courses
36 CCP-300 Implementing Citrix CloudPlatform 4.3 Powered by Apache CloudStack 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Previous
Technology
Business&Process
Framework
SoftSkills
No Description Duration
1 Cloudera Essentials for Apache Hadoop 5 days
2 Cloudera AdministratorTraining for Apache Hadoop 5 days
3 Cloudera DeveloperTraining for Apache Hadoop 5 days
4 Cloudera Data AnalystTraining: Using Pig, Hive, and Impala with Hadoop 5 days
5 Introduction to Data Science: Building Recommender Systems 5 days
6 DeveloperTraining For Spark and Hadoop 4 days
7 Cloudera AdministratorTraining 4 days
8 Data AnalystTraining 4 days
9 Designing and Developing Big Data Applications 4 days
10 Data Science at Scale using Spark and Hadoop 3 days
Apache Hadoop is transforming the way organizations in every vertical interact with their data, their
markets, and their customers. Gartner predicts massive growth in the big data market, punctuated by
Hadoop's emergence as the platform on which an estimated 65% of all advanced analytics tools will be
built by 2015.These trends point towards continued adoption and the persistent need for trained, certified
professionals to deliver on Hadoop's tremendous promise.
Vinsys with the technical and instructional proficiency to deliver Cloudera training in all geographies will be
critical to the growth and success of the big data market. Our goal is to work with the most respected
organizations in the industry and to create substantial revenue opportunities.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Description Duration
11 ClouderaTraining for Apache Hbase 5 days
12 SearchTraining 3 days
13 HBaseTraining 3 days
14 SparkTraining 3 days
15 MapReduce for Developers 4 days
16 Cloudera DeveloperTraining for Apache Spark 5 days
17 HDP Developer: Java 4 days
18 HDP Developer:Apache Pig and Hive 4 days
19 HDP Developer:Windows 4 days
20 HDP Developer: CustomYARN Applications 2 days
21 HDP Developer: Storm andTrident 2 days
22 HDP Developer:Apache Spark Using Python 3 days
23 HDP Operations: Migrating to the Hortonworks Data Platform 2 days
24 HDP Operations:Hadoop Administration I 4 days
25 HDP Operations:Apache HBase Advanced Management 4 days
26 HDP Analyst: Data Science 3 days
27 HDP Analyst:Apache HBase Essentials 2 days
28 Designing and Building Big Data Applications 5 days
29 Big Data Fundamentals 4 days
30 Big Data Analytics 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 A+ 2012 5 days
2
CompTIA A+
Essential
CompTIA A+ Essentials (2012) 3 days
3
CompTIa A+
Practicals
CompTIA A+ Practical Application (2012) 3 days
4 Network+ 6 days
5 Server+ 5 days
6 SK0-003 CompTIA Server+ Exam 2009 5 days
7 Linux+ 9 days
8 SY0-401 Security+ 5 days
9 CLO-001 CompTIA Cloud Essentials 6 days
10 CV0-001 CompTIA Cloud+ 9 days
11 SGO-001 CompTIA Storage+ Powered by SNIA 6 days
12 CAS-002 CompTIA Advanced Security Practitioner (CASP) 5 days
Launch your IT career with vendor-neutral CompTIA training that’s designed to be universally applicable
to any workplace. CompTIA online training is often where IT professionals begin their careers, including
one of the most highly sought-after certifications, CompTIA Network+. CompTIA training is a
foundation on which to build your IT career.
Learn CompTIA @ Vinsys
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology
Business&Process
Framework
SoftSkills
No Code Description Duration
1 Ethical Hacking Preparation Course 4 days
2 312-93 EC-Council Certified Secure Programmer (ECSP) .NET 3 days
3 ENSA 6 days
4 212-38 EC-Council Project Management in IT Security 2 days
5 312-76 EC-Council Disaster Recovery Professional 5 days
6 212-89 EC-Council Certified Incident Handler 2 days
7 312-49 Computer Hacking Forensic Investigator (CHFI)V8 6 days
8 312-94 EC-Council Certified Secure Programmer-Java 4 days
9 312-50 ANSI Certified Ethical Hacker version 8 6 days
10 Virtual infra Backup WithVeeam 4 days
CEH, ECSA, CHFI, LPT,ECSP – being the most sought after Ethical Hacking course in the industry is by
EC-Council.Vinsys Solutions offers EC-Council certificate security courses on ECSA, Penetration
Testing and CHFI, to help professionals get ahead in the thriving IT security industry.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
11 CCISO 10 days
12 312-50 Certified Ethical Hacker 9 (CEH v9) 5 days
13 ECSA v9 EC-Council Certified System Analyst (ECSA v9) 5 days
14 212-81 EC-Council Certified Encryption Specialist -ECES(PKI) New 3 days
15 CAST 619 Advanced SQLi Attacks and Countermeasures 3 days
16 CAST 618 Designing and Implementing Cloud Security 3 days
17 CAST 611 Advanced Penetration testing 5 days
18 CAST 616 Securing Windows Infrastructure 5 days
19 CAST 613 Hacking and Hardening your Corporate WebApplication 5 days
20 CAST 614 Advanced Network Defense 5 days
21 CAST 612 Advanced Mobile Hacking & Forensics 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
ANALYTICS
1 0A005 Introduction to IBM SPSS Modeler and Data Mining (v16) 2 days
2 0A035 Advanced Predictive Modeling Using IBM SPSS Modeler (v16) 1 day
3 0A045 Clustering and Association Models Using IBM SPSS Modeler (v16) 1 day
4 0A055 Advanced Data Preparation Using IBM SPSS Modeler (v16) 1 day
5 0A0G2 Automated Data Mining with IBM SPSS Modeler - ILT 1 day
6 0A0U5 Classifying Customers Using IBM SPSS Modeler (v16) 1 day
7 0A0V5 Predicting ContinuousTargets Using IBM SPSS Modeler (v16) 1 day
8 0A105 Introduction to IBM SPSSText Analytics for IBM SPSS Modeler (v16) 2 days
9 0D0W4 IBM SPSS Modeler Entity Analytics (V15) - eLearning 2 hours
10 0E002 Introduction to IBM SPSS Modeler and Data Mining SPVC 3 days
With high-quality IBMTraining content and the reach and experience of our SME’s across globe, an
individual can develop a strong skills portfolio to grow your career and stay competitive in an ever-
changing technical marketplace.
Get Trained and certified @ Vinsys
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
11 0E003 Introduction to IBM SPSS Modeler and Data Mining (V14.2) SPVC 2 days
12 0E004 Introduction to IBM SPSS Modeler and Data Mining (V15) SPVC 2 days
13 0E005 Introduction to IBM SPSS Modeler and Data Mining (v16) SPVC 2 days
14 0E032 Predictive Modeling with IBM SPSS Modeler SPVC 3 days
15 0E034 Advanced Predictive Modeling using IBM SPSS Modeler (v15) SPVC 1 day
16 0E035 Advanced Predictive Modeling Using IBM SPSS Modeler (v16) SPVC 1 day
17 0E042 Clustering and Association Models with IBM SPSS Modeler SPVC 1 day
18 0E044 Clustering and Association Models with IBM SPSS Modeler (v15) SPVC 1 day
19 0E045 Clustering and Association Models Using IBM SPSS Modeler (v16) SPVC 1 day
20 0E052 Advanced Data Preparation with IBM SPSS Modeler SPVC 1 day
21 0E054 Advanced Data Preparation Using IBM SPSS Modeler (v15) SPVC 1 day
22 0E055 Advanced Data Preparation Using IBM SPSS Modeler (v16) SPVC 1 day
23 0E0G2 Automated Data Mining with IBM SPSS Modeler SPVC 1 day
24 0E0U3 Classifying Customers Using IBM SPSS Modeler (V14.2) SPVC 1 day
25 0E0U4 Classifying Customers with IBM SPSS Modeler (v15) SPVC 1 day
26 0E0U5 Classifying Customers Using IBM SPSS Modeler (v16) SPVC 1 day
27 0E0V3 Predicting ContinuousTargets Using IBM SPSS Modeler SPVC 1 day
28 0E0V4 Predicting ContinuousTargets Using IBM SPSS Modeler (v15) SPVC 1 day
29 0E0V5 Predicting ContinuousTargets Using IBM SPSS Modeler (v16) SPVC 1 day
30 0E104 Introduction to IBM SPSS ModelerText Analytics (v15) SPVC 2 days
31 0E105 Introduction to IBM SPSSText Analytics for IBM SPSS Modeler (v16) SPVC 2 days
32 0G016 Advanced Statistical Methods for Healthcare Research 2 days
33 0G023 Introduction to IBM SPSS Neural Networks - ILT 1 day
34 0G036 Market Segmentation Using IBM SPSS Statistics - ILT 1 day
35 0G046 Introduction to IBM SPSS Neural Networks - ILT 5 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
36 0G056 Correspondence Analysis and Multidimensional Scaling w/ IBM SPSS Categories -ILT 1 day
37 0G063 AdvancedTechniques:ANOVA 2 days
38 0G073 AdvancedTechniques: Regression 3 days
39 0G093 Advanced Statistical Analysis Using IBM SPSS Statistics (V19) 3 days
40 0G096 Time Series Analysis and Forecasting with IBM SPSS Forecasting - ILT 3 days
41 0G170 Presenting Data with IBM SPSS CustomTables (V20) 2 days
42 0G203 Introduction to Structural Equation Modeling using IBM SPSS Amos (v22) 2 days
43 0G2K9 Introduction to IBM SPSS DecisionTrees (V19) 2 days
44 0G2L3 IntermediateTopics on Structural Equation Modeling Using IBM SPSS Amos (V22) 2 days
45 0G301 Introduction to IBM SPSSText Analytics for Surveys (V4.0.1) 2 days
46 0G317 Survey Analysis Using IBM SPSS Statistics 3 days
47 0G406 IBM SPSS Statistics Syntax I 1 day
48 0G416 IBM SPSS Statistics Syntax II 2 days
49 0G503 Introduction to IBM SPSS Statistics (v22) 2 days
50 0G512 Introduction to Statistical Analysis Using IBM SPSS Statistics (V21) 2 days
51 0G522 Data Management and Manipulation with IBM SPSS Statistics (V21) 2 days
52 0J022 Introduction to IBM SPSS Monte Carlo Simulation (V21) - eLearning 3 hours
53 0J760 Introduction to IBM SPSS Maps (V20) - eLearning 3 hours
54 0K016 Advanced Statistical Methods for Healthcare Research SPVC 2 days
55 0K023 Introduction to IBM SPSS Complex Samples SPVC 1 day
56 0K036 Market Segmentation Using IBM SPSS Statistics SPVC 1 day
57 0K046 Introduction to IBM SPSS Neural Networks SPVC 1 day
58 0K056 Correspondence Analysis and Multidimensional Scaling w/ IBM SPSS Categories SPVC 1 day
59 0K063 AdvancedTechniques:ANOVA SPVC 2 days
60 0K073 AdvancedTechniques: Regression SPVC 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
61 0K093 Advanced Statistical Analysis Using IBM SPSS Statistics (V19) SPVC 3 days
62 0K096 Time Series Analysis and Forecasting with IBM SPSS Forecasting SPVC 3 days
63 0K166 "Viz"-ualizingYour Data - On Demand Recording 1 day
64 0K170 Presenting Data with IBM SPSS CustomTables (V20) SPVC 2 days
65 0K203 Introduction to Structural Equation Modeling Using IBM SPSS Amos (v22) SPVC 2 days
66 0K2K9 Introduction to IBM SPSS DecisionTrees (V19) SPVC 2 days
67 0K2L3 IntermediateTopics on Structural Equation Modeling Using IBM SPSS Amos (v22) SPVC 2 days
68 0K301 Introduction to IBM SPSSText Analytics for SurveysV4.0.1 SPVC 2 days
69 0K317 Survey Analysis Using IBM SPSS Statistics SPVC 3 days
70 0K406 IBM SPSS Statistics Syntax I SPVC 1 day
71 0K416 IBM SPSS Statistics Syntax II SPVC 2 days
72 0K437 Integrating Functions, Procedures and Algorithms with IBM SPSS Statistics SPVC 1 day
73 0K502 Introduction to IBM SPSS Statistics (V21) SPVC 2 days
74 0K503 Introduction to IBM SPSS Statistics (V22) SPVC 2 days
75 0K512 Introduction to Statistical Analysis Using IBM SPSS Statistics (V21) SPVC 2 days
76 0K519 Introduction to Statistical Analysis Using IBM SPSS Statistics SPVC 2 days
77 0K522 Data Management and Manipulation with IBM SPSS Statistics (V21) SPVC 2 days
78 0L009 IBM SPSS Statistics: Exploratory Data AnalysisV19 - ILO 1 day
79 0L019 IBM SPSS Statistics:Adv.Topics in Regression and Discriminant AnalysisV19 ILO 1 day
80 0L2M9 IBM SPSS Statistics: Ordinal Regression, GLM and Hierarchical ModelingV19 - ILO 1 day
81 0M003 Dimensions Administration: Paper - ILT 2 days
82 0M013 Dimensions Administration (Paper) Paper Only - ILT 1 day
83 0M028 IBM SPSS Data Collection Administration (Web) (v7) 1 day
84 0M035 IBM SPSS Data Collection AdministrationTelephone for Supervisors - ILT 2 days
85 0M045 IBM SPSS Data CollectionTelephone Interviewing - ILT 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
86 0M065 IBM SPSS Data Collection Administration Remote Supervisor - ILT 1 day
87 0M075 IBM SPSS Data Collection Server Maintenance - ILT 1 day
88 0M105 IBM SPSS Data Collection Survey Authoring - ILT 2 days
89 0M108 IBM SPSS Data Collection Survey Authoring (Base) (v7) 1 day
90 0M118 IBM SPSS Data Collection Survey Authoring (Web Module) (v7) 1 day
91 0M125 IBM SPSS Data Collection Survey Authoring Sample Functionality - ILT 1 day
92 0M128 IBM SPSS Data Collection Survey Authoring (Data Entry Module) (v7) 1 day
93 0M135 IBM SPSS Data Collection Survey Authoring Quota Functionality - ILT 1 day
94 0M145 IBM SPSS Data Collection Survey AuthoringTranslation Utility - ILT 1 day
95 0M206 IBM SPSS Data Collection Scripting: (Survey Creation) Level I (V6.0) 2 days
96 0M210 Dimensions Scripting: Report Creation - ILT 2 days
97 0M236 IBM SPSS Data Collection Scripting: (Survey Creation) Level II 2 days
98 0M245 IBM SPSS Data Collection Survey Presentation - ILT 1 day
99 0M275 IBM SPSS Data Collection Wizard Creation and Deployment - ILT 1 day
100 0M285 IBM SPSS Data Collection Scripting Survey Creation - Best Practices - ILT 1 day
101 0M295 IBM SPSS Data Collection Scripting (Intro to Data Management) 2 days
102 0M2A5 IBM SPSS Data Collection Scripting (Intermediate Data Management) 2 days
103 0M305 IBM SPSS Reports for Surveys: Level I - ILT 1 day
104 0M307 IBM SPSS Survey Reporter (Base) (v6.0.1) 2 days
105 0M308 IBM SPSS Data Collection Survey Reporter (Base) (v7) 2 days
106 0M311 Dimensions Report Creation - ILT 1 day
107 0M324 Dimensions Survey Analysis II - ILT 1 day
108 0P2B6 IBM SPSS Data Collection: Integrating JavaScript into Surveys (V6) - eLearning 3 hours
109 0P317 IBM SPSS Survey Reporter (Custom Chart Creation) (V6.0.1) - eLearning 2 hours
110 0P327 IBM SPSS Survey Reporter (SyntaxVariable Creation) (V6.0.1) - eLearning 1 hour
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
111 0P337 IBM SPSS Survey Reporter (SyntaxVariable Modification) (V6.0.1) - eLearning 1 hour
112 0P347 IBM SPSS Survey Reporter (Custom Style Sheets) (V6.0.1) - eLearning 2 hours
113 0Q003 Dimensions Administration: Paper SPVC 2 days
114 0Q013 Dimensions Administration (Paper) Paper Only SPVC 1 day
115 0Q026 IBM SPSS Data Collection Administration (Web) (V6.0.1) SPVC 1 day
116 0Q028 IBM SPSS Data Collection Administration (Web) (v7) SPVC 1 day
117 0Q035 IBM SPSS Data Collection AdministrationTelephone for Supervisors SPVC 2 days
118 0Q045 IBM SPSS Data CollectionTelephone Interviewing SPVC 1 day
119 0Q065 IBM SPSS Data Collection Administration Remote Supervisor SPVC 1 day
120 0Q105 IBM SPSS Data Collection Survy Authoring SPVC 2 days
121 0Q108 IBM SPSS Data Collection Survey Authoring (Base) (v7) SPVC 1 day
122 0Q115 IBM SPSS Data Collection Survey Authoring ASP WEB 5 hours
123 0Q118 IBM SPSS Data Collection Survey Authoring (Web Module) (v7) SPVC 1 day
124 0Q125 IBM SPSS Data Collection Survey Authoring Sample Functionality SPVC 1 day
125 0Q128 IBM SPSS Data Collection Survey Authoring (Data Entry Module) (v7) SPVC 1 day
126 0Q135 IBM SPSS Data Collection Survey Authoring Quota Functionality SPVC 1 day
127 0Q145 IBM SPSS Data Collection Survey AuthoringTranslation Utility SPVC 1 day
128 0Q206 IBM SPSS Data Collection Scripting: (Survey Creation) Level I SPVC 2 days
129 0Q236 IBM SPSS Data Collection Scripting: (Survey Creation) Level II SPVC 2 days
130 0Q245 IBM SPSS Data Collection Survey Presentation SPVC 1 day
131 0Q275 IBM SPSS Data Collection Wizard Creation and Deployment SPVC 1 day
132 0Q285 IBM SPSS Data Collection Scripting Survey Creation - Best Practices SPVC 1 day
133 0Q295 IBM SPSS Data Collection Scripting (Intro to Data Management) SPVC 2 days
134 0Q2A5 IBM SPSS Data Collection Scripting (Intermediate Data Management) SPVC 2 days
135 0Q307 IBM SPSS Survey Reporter (Base) (V6.0.1) SPVC 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
136 0Q308 IBM SPSS Data Collection Survey Reporter (Base) (v7) SPVC 2 days
137 0Q311 Dimensions Report Creation SPVC 1 day
138 0S004 Introduction to IBM SPSS Collaboration and Deployment Services (v6) 2 days
139 0V002 IBM SPSS Collaboration and Deployment Services - Content Management - eLearning 8 hours
140 0V092 IBM SPSS Collaboration and Deployment Services - Automation - eLearning 8 hours
141 0V100 IBM SPSS Modeler Advantage and Rules Management 1 day
142 0V101 IBM SPSS Modeler Advantage and Rules Management (v7) WBT 1 day
143 0V110 IBM SPSS Decision Management for Claims and Rules Management 1 day
144 0V120 IBM SPSS Decision Management for Customer Interactions and Rules Management 1 day
145 0W004 Introduction to IBM SPSS Collaboration and Deployment Services (v6) SPVC 2 days
146 0W050 PES Overview and PEMTour - On Demand Recording 1 day
147 0W060 PES - Content Management - On Demand Recording 1 day
148 0W070 PES - Jobs and Scheduling - On Demand Recording 1 day
149 0W080 PES - SPSS Integration - On Demand Recording 1 day
150 1K110 IBM Cognos Disclosure Management (v10.2) 3 days
151 1O160 Using IBM OpenPages (v6.0) - eLearning 3 hours
152 1O162 IBM OpenPages:Administration (v6.0) (single user) - eLearning 1 day
153 1O166 IBM OpenPages:What's New (v6.0) - eLearning 2 hours
154 1O168 IBM OpenPages CoreTeam Fundamentals (v6.0) - eLearning 2 hours
155 1O201 IBM OpenPages:Administration (v7.0) 3 days
156 1O202 IBM OpenPages: Report Authoring (v7.0) 4 days
157 1O205 IBM OpenPages: CoreTeam Fundamentals (v7.0) 1 day
158 1O251 IBM OpenPages:Administration (v7.0) SPVC 3 days
159 1O252 IBM OpenPages: Report Authoring (v7.0) SPVC 4 days
160 1O255 IBM OpenPages: CoreTeam Fundamentals (v7.0) SPVC 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
161 1O260 Using IBM OpenPages (v7.0) eLearning 8 hours
162 1R017 IBM Cognos ICM:Advanced Configuration (v8.0/8.1) 2 days
163 1R027 IBM Cognos ICM: Building the Model (v8.1) 4 days
164 1R029 IBM Cognos ICM: Building Reports (v.8.1) 3 days
165 1R070 IBM Cognos ICM: Fundamentals of Configuration (V8.0) SPVC 4 days
166 1R071 IBM Cognos ICM:Advanced Configuration (v8.0/8.1) SPVC 2 days
167 1R073 IBM Cognos ICM: Build Reports (v8.0) SPVC 3 days
168 1R081 IBM Cognos ICM: Building the Model (v8.1) SPVC 4 days
169 1R083 IBM Cognos ICM: Building Reports (v8.1) SPVC 3 days
170 1R095 IBM Cognos ICM: Use the Admin Client (v8.0/8.1) - eLearning 5 hours
171 1R097 IBM Cognos ICM: System Administration (v8.0/8.1) - eLearning 7 hours
172 1R099 IBM Cognos ICM: Introduction to Discovery (V1.0) - eLearning 5 hours
173 5K000 IBM Clarity: BuildingTemplates and Reports (V6.2) (MSAS) SPVC 5 days
174 5K004 IBM Clarity: BuildingTemplates and Reports (V7) SPVC 5 days
175 5K007 IBM Clarity: BuildingTemplates and Reports Delta (V7) SPVC 3 days
176 5K008 IBM Clarity:AdvancedTemplate and Report Building (V7) SPVC 3 days
177 5K009 IBM Clarity:Visualizer (V7) SPVC 1 day
178 5K012 IBM Clarity: Cube Manager (V6.5) SPVC 5 hours
179 5K013 IBM Clarity: MDM (V7) SPVC 5 hours
180 5K021 IBM Clarity: BuildingTemplates and Reports (V7.2) SPVC 5 days
181 5K023 IBM Clarity: BuildingTemplates and Reports Delta (V7.2) SPVC 3 days
182 5K024 IBM Clarity:AdvancedTemplates and Report Building (V7.2) SPVC 3 days
183 5K025 IBM Clarity:Visualizer (V7.2) SPVC 1 day
184 5K026 IBM Clarity: MDM (V7.2) SPVC 5 hours
185 5K100 IBM Cognos Financial Statement Reporting (FSR) (V6.6) SPVC 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
186 5K105 IBM Cognos FSR: XBRL DetailedTagging (V6.6) SPVC 2 days
187 5K110 IBM Cognos Disclosure Management (V10.2) SPVC 3 days
188 A3001 Overview of IBM Cognos Express (V9.0) - eLearning 5 hours
189 A3024 IBM Cognos Express Advisor: Navigating Data Fundamentals (V9.0) - eLearning 5 hours
190 A3030 IBM Cognos Express Xcelerator: Navigating Data (version 9.0) 8 hours
191 A3502 IBM Cognos Express:What's New (V9.5) - eLearning 5 hours
192 B1602 IBM Cognos Now! Dashboard: Designing Dashboards (V4.6) - eLearning 1 hour
193 B2406 IBM Cognos 8 Go! Search Introduction (V8.4) - eLearning 1 hour
194 B2407 IBM Cognos 8 Analysis for Excel:Analyze Data in Microsoft Excel (V8.4) - eLearning 3 hours
195 B2420 IBM Cognos 8 BI Analysis Studio:Analyze Data (V8.4) - eLearning 8 hours
196 B2424 IBM Cognos 8 BI Report Studio: Express Authoring Mode (V8.4) - eLearning 5 hours
197 B2425 IBM Cognos 8 BI Report Studio: Introduction (V8.4) - eLearning 8 hours
198 B2426 IBM Cognos 8 BI Report Studio: Intermediate (V8.4) - eLearning 8 hours
199 B2427 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4) -eLearning 8 hours
200 B2429 IBM Cognos 8 BI Metric Studio: Manage Business Performance (V8.4) - eLearning 3 hours
201 B2430 IBM Cognos 8 Go! Office: Integrate with Microsoft Office (V8.4) - eLearning 1 hour
202 B2431 IBM Cognos 8 BI Event Studio: Create and Manage Agents (V8.4) - eLearning 3 hours
203 B2440 IBM Cognos 8 Go! Search:Administration (V8.4) - eLearning 1 hour
204 B2442 IBM Cognos 8 Go! Mobile for Consumers Using BlackBerry (V8.4) - eLearning 1 hour
205 B2443 IBM Cognos 8 Go! Mobile Administration (V8.4) - eLearning 1 hour
206 B2444 IBM Cognos 8 Go! Mobile for Consumers Using Windows (V8.4) - eLearning 1 hour
207 B2445 IBM Cognos 8 Go! Mobile for Consumers Using Symbian S60 (V8.4) - eLearning 1 hour
208 B2469 IBM Cognos 8 BITransformer: Creating PowerCubes (V8.4) - eLearning 1 hour
209 B2478 IBM Cognos 8 BI PowerPlay Studio:Web Exploration (V8.4) - eLearning 8 hours
210 B2488 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) -eLearning 3 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
211 B2497 IBM Cognos 8 BI Go! Dashboard (V8.4) - eLearning 1 hour
212 B24F0 IBM Cognos 8 BI Analysis Studio - Analyzing Data (V8.4) - eLearning - French 7 hours
213 B24F7 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4/10.1)-eLearning-French 8 hours
214 B24F8 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) - eLearning - French 3 hours
215 B24G7 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4) - eLearning - German 8 hours
216 B24G8 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) - eLearning - German 3 hours
217 B2A08 Overview of IBM Cognos BI (v10.2.2) 1 day
218 B5A08 Overview of IBM Cognos BI (v10.2.2) 1 day
219 B5102 IBM Cognos Real-time Monitoring: Operational Analytics in Cognos BI (V10.1/10.2) 2 hours
220 B5111 IBM Cognos BI PowerPlay Migrate from Series 7 PowerPlay (V10.1) - eLearning 3 hours
221 B5117 IBM Cognos Business Insight: Create Workspaces (V10.1.1)-eLearning 3 hours
222 B5125 IBM Cognos Report Studio: Introduction (V10.1/10.2) - eLearning 8 hours
223 B5129 IBM Cognos Metric Studio: Manage Business Performance (V10.1/10.2) - eLearning 3 hours
224 B5130 IBM Cognos for Microsoft Office: Integrate with Microsoft Office (V10.1/10.2) 3 hours
225 B5131 IBM Cognos BI Event Studio: Create and Manage Agents (V8.4/10.2) - eLearning 3 hours
226 B5132 IBM Cognos BI: Manage BI Projects (V10.1) 2 days
227 B5142 IBM Cognos Mobile for Consumers Using BlackBerry (V10.1/10.2) - eLearning 3 hours
228 B5143 IBM Cognos Mobile Administration (V10.1) - eLearning 2 hours
229 B5146 IBM Cognos Mobile for Consumers Using iPhone (V10.1/10.2) - eLearning 2 hours
230 B5147 IBM Cognos Mobile for iPadTablets (V10.1.1/10.2) - eLearning 2 hours
231 B5150 IBM Cognos Query Studio: Build Ad Hoc Reports (v10.1/10.2) 1 day
232 B5151 IBM Cognos BI Analysis Studio:Analyze Data (V10.1/10.2) 1 day
233 B5157 IBM Cognos BI Metric Manager: Design Scorecards (V10.1) 3 days
234 B5167 IBM Cognos Statistics: Introduction to Statistics (V10.1) - eLearning 3 hours
235 B5169 IBM CognosTransformer: Create PowerCubes (V10.1) - eLearning 3 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
236 B5173 IBM Cognos PowerPlay Client: Explore and Build Reports (v10.1/10.2) 2 days
237 B5174 IBM Cognos PowerPlay Studio:Web Exploration (v10.1/10.2) 1 day
238 B5178 IBM Cognos PowerPlay Studio:Web Exploration (V8.4/10.1) - eLearning 8 hours
239 B5183 IBM Cognos Business Insight Advanced: Introduction (V10.1) - eLearning 8 hours
240 B5184 IBM Cognos Business Insight Advanced: Intermediate (V10.1) - eLearning 8 hours
241 B5188 IBM Cognos BI for Consumers (V10.1) - eLearning 3 hours
242 B5197 IBM Cognos Business Insight: Create Dashboards (V10.1) - eLearning 3 hours
243 B51F3 IBM Cognos Business Insight Advanced: Introduction (v10.1) - eLearning - French 8 hours
244 B51F4 IBM Cognos Business Insight Advanced: Intermediate (v10.1) - eLearnng - French 8 hours
245 B51F8 IBM Cognos BI for Consumers (V10.1) - eLearning - French 2 hours
246 B51S5 IBM Cognos Report Studio: Introduction (V10.1) - Spanish (WBT) 8 hours
247 B51S8 IBM Cognos BI for Consumers (V10.1) - Spanish 2 hours
248 B5205 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (v10.2) 2 days
249 B5208 Overview of IBM Cognos 8 BI (v10.2) 1 day
250 B5210 IBM Cognos BI:What's New (v10.2) 1 day
251 B5215 IBM Cognos BI What's New: 8.4 to 10.2 (v10.2) 2 days
252 B5217 IBM Cognos Workspace: Create Workspaces (V10.2) - eLearning 5 hours
253 B5218 IBM Cognos Workspace: Create Workspaces (v10.2.1) - eLearning 5 hours
254 B5219 IBM Cognos BI Administration:Architecture and Logging (V10.2) 2 days
255 B5220 IBM Cognos Analysis Studio:Analyze Data (v10.1/10.2) - eLearning 8 hours
256 B5227 IBM Cognos Query Studio: Build Ad Hoc Reports (v10.1/10.2) - eLearning 8 hours
257 B5231 IBM Cognos BI Event Studio: Create and Run Agents (v10.2) - eLearning 4 hours
258 B5252 IBM Cognos Framework Manager: Design Metadata Models (v10.2) 5 days
259 B5255 IBM Cognos BI Administration (v10.2) 3 days
260 B5258 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
261 B5259 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) 2 days
262 B5261 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2) 2 days
263 B5263 IBM Cognos Cube Designer: Design Dynamic Cubes (v10.2) 2 days
264 B5270 Essentials for IBM Cognos BI (V10.2) 5 days
265 B5280 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (v10.2) 5 days
266 B5281 IBM Cognos Workspace Advanced:Author Self-Service Reports (v10.2) 2 days
267 B5282 IBM CognosTransformer: Design OLAP Models (v10.2) 4 days
268 B5283 IBM Cognos Workspace Advanced: Introduction (V10.2) - eLearning 8 hours
269 B5284 IBM Cognos Workspace Advanced: Intermediate (V10.2) - eLearning 8 hours
270 B5288 IBM Cognos BI for Consumers (V10.2) - eLearning 2 hours
271 B5298 IBM Cognos Report Studio:Author Active Reports (V10.2) 1 day
272 B52F0 IBM Cognos BI Analysis Studio:Analyze Data (v10.1/10.2) - eLearning - French 8 hours
273 B5A17 IBM Cognos Workspace: Create Workspaces (v10.2.2) eLearning 5 hours
274 B5A52 IBM Cognos Framework Manager: Design Metadata Models (v10.2.2) 5 days
275 B5A58 IBM Cognos Report Studio:Author Professional Reports Fundamentals (v10.2.2) 3 days
276 B5A59 IBM Cognos Report Studio:Author Professional Reports Advanced (v10.2.2) 2 days
277 B5A61 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2.2) 2 days
278 B5A81 IBM Cognos Workspace Advanced:Author Self-Service Reports (v10.2.2) 2 days
279 B5A83 IBM Cognos Workspace Advanced: Introduction(V10.2.2) - eLearning 8 hours
280 B5A84 IBM Cognos Workspace Advanced: Intermediate (V10.2.2) - eLearning 7 hours
281 J0021 IBM Cognos Express: Manage IBM Cognos Express (V9.0) SPVC 1 day
282 J0102 IBM CognosTM1: Design and Develop Models (V9.5) SPVC 5 days
283 J0105 IBM CognosTM1:Administer theTechnical Environment (V9.5) SPVC 2 days
284 J0107 IBM CognosTM1:Analyze Data (V9.5) SPVC 3 days
285 J0108 IBM CognosTM1: Manage Planning Applications for ExistingTM1 Users (V9.5) SPVC 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
286 J01F2 PowerPlay OLAP Modeling for Series 7V3 and Cognos 8 BI SPVC - French 3 days
287 J01G7 IBM CognosTM1:Analyze Data (V9.4/9.5) SPVC - German 3 days
288 J0302 Series 7Version 3 and 4 - Impromptu Administration SPVC 2 days
289 J0303 Series 7Versions 3 and 4 - Report Building with Impromptu SPVC 2 days
290 J0304 Series 7Version 3 and 4 - Advanced Impromptu Reporting SPVC 1 day
291 J0305 Cognos 8 Planning 8.3 Contributor Application Administration SPVC 4 days
292 J0401 IBM Cognos 8 Planning Analyst: Build Models (V8.4) SPVC 5 days
293 J0402 IBM Cognos 8 Planning: Leverage Integration Between Cognos 8 BI andTM1 9.4 SPVC 4 days
294 J0405 IBM Cognos 8 Planning Contributor: Develop Applications (V8.4) SPVC 4 days
295 J0406 IBM Cognos 8 Planning: Overview (V8.4) SPVC 1 day
296 J0407 IBM Cognos 8 Planning:Administer theTechnical Environment (V8.4) SPVC 3 days
297 J0409 IBM Cognos 8 Planning: Essentials for Managing Planning Projects (V8.4) SPVC 2 days
298 J0410 IBM Cognos 8 BI What's New (Version 8.4) SPVC 1 day
299 J0411 IBM Cognos 8 BI PowerPlay: Migrating from Series 7 PowerPlay (Version 8.4) SPVC 1 day
300 J0419 IBM Cognos 8 BI Administration:Adv Architecture andTroubleshooting (V8.4) SPVC 3 days
301 J0421 Cognos Finance 7.4 Application Administration SPVC 3 days
302 J0422 Cognos Finance 7.4 Authoring SPVC 2 days
303 J0432 IBM Cognos 8 BI: Essentials for Managing BI Projects (V8.4) SPVC 2 days
304 J0433 IBM Cognos 8: Configure and Extend Analytic Models (V8.4) - Part 1 SPVC 3 days
305 J0452 IBM Cognos 8 BI Framework Manager: Design Metadata Models (V8.4) SPVC 5 days
306 J0453 Essentials for IBM Cognos 8 BI: Supplement for Metadata Modelers (V8.4) SPVC 2 days
307 J0456 IBM Cognos 8 BI Administration (V8.4) SPVC 3 days
308 J0457 IBM Cognos 8 BI Metrics Manager: Design Scorecards (V8.4) SPVC 3 days
309 J0458 IBM Cognos 8 BI Rep Studio:Author Professional Reports Fundamentals (V8.4) SPVC 3 days
310 J0459 IBM Cognos 8 BI Report Studio:Author Professional Reports Advanced (V8.4) SPVC 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
311 J0461 IBM Cognos 8 BI Report Studio:Author Reports w/Multidimensional DataV8.4-SPVC 2 days
312 J0472 IBM Cognos 8 BI SDK for Developers (V8.4) SPVC 2 days
313 J0473 IBM Cognos 8 PowerPlay Client: Exploration and Reports (V8.4) SPVC 2 days
314 J0475 IBM Cognos 8 BI PowerPlay Administration (V8.4) SPVC 1 day
315 J0480 IBM Cognos 8 BI Data Manager: Build Datamarts with Enterprise Data (V8.4) SPVC 5 days
316 J0482 IBM Cognos 8 BITransformer: Design OLAP Models (V8.4) SPVC 4 days
317 J0492 IBM CognosTM1 9.4: Designing and Developing Applications SPVC 5 days
318 J0495 IBM CognosTM1:Administer theTechnical Environment (V9.4) SPVC 2 days
319 J0497 IBM CognosTM1:Analyzing Data (version 9.4) SPVC 3 days
320 J04C1 IBM Cognos 8 Controller: Develop Applications (V8.4) SPVC 5 days
321 J04F7 IBM CognosTM1:Analyzing Data (version 9.4) SPVC - French 3 days
322 J04F8 IBM Cognos 8 BI Report Studio:Author Prof. Reports Fundamentals 8.4 SPVC-French 3 days
323 J04F9 IBM Cognos 8 BI Report Studio:Author Prof. Reports AdvancedV8.4 SPVC-French 2 days
324 J04G8 IBM Cognos 8 BI Report Studio: Berichtserstellung, GrundlagenV8.4 - SPVC 3 days
325 J04G9 IBM Cognos 8 BI Report Studio:Author Prof. Reports Advanced (V8.4) SPVC - German 2 days
326 J0501 IBM Cognos 8 Controller: Develop Applications (V8.5) SPVC 5 days
327 J0503 IBM Cognos 8 Controller: Create BI with Consolidation Data (V8.5) SPVC 2 days
328 J0741 IBM Cognos 8 BusinessViewpoint: Manage Dimensions (V8.4) SPVC 2 days
329 J0F01 Cognos 8 Planning 8.3 - Création de modèles Analyst SPVC - Francais 5 days
330 J0F61 Cognos 8 BI Report Studio:Author Reports w/Multidimensional Data 8.3 SPVC-French 2 days
331 J1101 IBM Cognos Planning Analyst: Build Models (V10.1) SPVC 5 days
332 J1105 IBM Cognos Planning Contributor: Develop Applications (V10.1) SPVC 4 days
333 J1107 IBM Cognos Planning:Administer theTechnical Environment (V10.1) SPVC 3 days
334 J1110 IBM Cognos BusinessViewpoint 10.1: Manage Dimensions and Data SPVC 2 days
335 J1111 IBM Cognos BusinessViewpoint 10.1:Administer BusinessViewpoint SPVC 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
336 J1120 IBM Cognos Controller:Administer theTechnical Environment (V10.1) SPVC 1 day
337 J1121 IBM Cognos Controller: Develop Applications (V10.1) SPVC 5 days
338 J1122 IBM Cognos Controller:Author Reports (V10.1) SPVC 1 day
339 J1123 IBM Cognos Controller: Create BI with Consolidation Data (V10.1) SPVC 2 days
340 J1152 IBM CognosTM1: Design and Develop Models (V10.1) SPVC 5 days
341 J1155 IBM CognosTM1:Administer theTechnical Environment (V10.1) SPVC 2 days
342 J1157 IBM CognosTM1:Analyze and Share Data (V10.1) SPVC 3 days
343 J1158 IBM CognosTM1:What's New (V10.1) SPVC 2 days
344 J1170 IBM Cognos Express:Analyze Data with Advisor (V10.1) SPVC 1 day
345 J1171 IBM Cognos Express:Analyze Data with Xcelerator (V10.1) SPVC 2 days
346 J1172 IBM Cognos Express:Work with Planner Applications (V10.1) SPVC 1 day
347 J1173 IBM Cognos Express: Essentials for Reporter (V10.1) SPVC 5 days
348 J11F7 IBM CognosTM1:Analyze and Share Data (V10.1) SPVC - French 3 days
349 J11G7 IBM CognosTM1: Daten Analysieren und freigeben (V10.1) SPVC German 3 days
350 J1252 IBM CognosTM1: Design and Develop Models in Performance Modeler (v10.2) SPVC 5 days
351 J1255 IBM CognosTM1:Administer theTechnical Environment (v10.2) SPVC 2 days
352 J1257 IBM CognosTM1:Analyze and Share Data (v10.2) SPVC 3 days
353 J1258 IBM CognosTM1:What's New (v10.2) SPVC 1 day
354 J1259 IBM CognosTM1: Create Scorecards (v10.2) SPVC 1 day
355 J1261 IBM CognosTM1: Design and Develop Models in Architect (v10.2) SPVC 5 days
356 J2105 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (10.1) SPVC 2 days
357 J2108 IBM Cognos BI Overview (V10.1) SPVC 1 day
358 J2110 IBM Cognos BI What's New (V10.1) SPVC 2 days
359 J2119 IBM Cognos BI Administration:Architecture and Logging (V10.1.1) SPVC 2 days
360 J2132 IBM Cognos BI: Manage Projects (V10.1) SPVC 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
361 J2152 IBM Cognos Framework Manager: Design Metadata Models (V10.1) SPVC 5 days
362 J2156 IBM Cognos BI Administration (V10.1) SPVC 3 days
363 J2157 IBM Cognos Metric Studio: Design Scorecards (V10.1/10.2) SPVC 3 days
364 J2158 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.1) SPVC 3 days
365 J2159 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.1) SPVC 2 days
366 J2161 IBM Cognos Report Studio:Author Reports with Multidimensional Data (V10.1) SPVC 2 days
367 J2168 IBM Cognos Statistics:Author Statistical Reports in Report StudioV10.1/2 SPVC 1 day
368 J2173 IBM Cognos PowerPlay Client: Explore and Build Reports (V10.1/10.2) SPVC 2 days
369 J2180 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (V10.1) SPVC 5 days
370 J2182 IBM CognosTransformer: Design OLAP Models (V10.1) SPVC 4 days
371 J2198 IBM Cognos Report Studio:Author Active Reports (V10.1) SPVC 1 day
372 J21F8 IBM Cognos BI Report Studio:Author Prof. Reports Fundamentals 10.1 SPVC-French 3 days
373 J21F9 IBM Cognos BI Report Studio:Author Prof. Reports Advanced 10.1 SPVC-French 2 days
374 J21G1 IBM Cognos Report Studio: Berichtserstellung mit multidim. DatenV10.1 SPVC 2 days
375 J21G8 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.1) SPVC 3 days
376 J21G9 IBM Cognos Report Studio: Berichtserstellung,FortgeschrittenV10.1 SPVC 2 days
377 J2205 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (V10.2) SPVC 2 days
378 J2208 Overview of IBM Cognos BI (v10.2) SPVC 1 day
379 J2210 IBM Cognos BI What's New (V10.2) SPVC 1 day
380 J2215 IBM Cognos BI What's New: 8.4 to 10.2 (v10.2) SPVC 2 days
381 J2219 IBM Cognos BI Administration:Architecture and Logging (V10.2) - SPVC 2 days
382 J2252 IBM Cognos Framework Manager: Design Metadata Models (V10.2) SPVC 5 days
383 J2255 IBM Cognos BI Administration (V10.2) SPVC 3 days
384 J2258 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) SPVC 3 days
385 J2259 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) SPVC 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
386 J2261 IBM Cognos Report Studio:Author Reports with Multidimensional Data (V10.2) SPVC 2 days
387 J2262 IBM Cognos BI: Combined Administration,Architecture, and Logging (V10.2) SPVC 5 days
388 J2263 IBM Cognos Cube Designer: Design Dynamic Cubes (V10.2) SPVC 2 days
389 J2280 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (V10.2) SPVC 5 days
390 J2281 IBM Cognos Workspace Advanced:Author Self-Service Reports (V10.2) SPVC 2 days
391 J2282 IBM CognosTransformer: Design OLAP Models (V10.2) SPVC 4 days
392 J2298 IBM Cognos Report Studio:Author Active Reports (v10.2) SPVC 1 day
393 J22F8 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) SPVC 3 days
394 J22F9 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) SPVC 2 days
395 J22G8 IBM Cognos Report Studio:Author Prof. Reports Fundamentals (V10.2) SPVC German 3 days
396 J22G9 IBM Cognos Report Studio:Author Professional Reports AdvancedV10.2 SPVC German 2 days
397 J2A08 Overview of IBM Cognos BI (v10.2.2) SPVC 1 day
398 J2A52 IBM Cognos Framework Manager: Design Metadata Models (v10.2.2) SPVC 5 days
399 J2A58 IBM Cognos Report Studio:Author Professional Reports Fundamentals (v10.2.2) SPVC 3 days
400 J2A59 IBM Cognos Report Studio:Author Professional Reports Advanced (v10.2.2) SPVC 3 days
401 J2A61 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2.2) SPVC 5 days
402 J2A81 IBM Cognos Workspace Advanced:Author Self-Service Reports (V10.2.2) SPVC 2 days
403 J2F81 IBM Cognos Business Insight Adv.:Author Self-Service ReportsV10.1 SPVC- French 2 days
404 J2F98 IBM Cognos Report Studio:Author Active ReportsV10.1 SPVC - French 1 day
405 J2G81 IBM Cognos Business Insight Adv.:Author Self-Service ReportsV10.1 SPVC German 2 days
406 J2G98 IBM Cognos Report Studio:Author Active Reports (V10.1) SPVC - German 1 day
407 P1403 IBM Cognos 8 Planning: Explore and Contribute to Plans (V8.4) -eLearning 8 hours
408 P1410 IBM Cognos 8 Planning:What's New for Contributors (version 8.4) - eLearning 1 hour
409 P1411 IBM Cognos 8 Planning:What's New for Administrators (version 8.4) - eLearning 1 hour
410 P14F3 IBM Cognos 8 Planning: Explore and Contribute to Plans (V8.4) - eLearning-French 8 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
411 P6503 IBM CognosTM1: Interact with Data (V9.5) - eLearning 8 hours
412 P6506 IBM CognosTM1: Explore Data (V9.5) - eLearning 3 hours
413 P6523 IBM CognosTM1: IntegrateTM1 and Cognos 8 BI (V9.5) - eLearning 1 hour
414 P6524 IBM CognosTM1: Security Cubes and Other Control Objects (V9.5) - eLearning 2 hours
415 P6525 IBM CognosTM1: Import Users and Groups into aTM1 Model (V9.5) - eLearning 1 hour
416 P8101 IBM Cognos Planning Analyst: Build Models (V10.1) 5 days
417 P8103 IBM Cognos Planning: Explore and Contribute to Plans (V8.4/10.1) - eLearning 8 hours
418 P8104 IBM Cognos Planning: Explore and Contribute to Plans (V10.1) 1 day
419 P8105 IBM Cognos 8 Planning Contributor: Develop Applications (V10.1) 4 days
420 P8106 IBM Cognos Planning: Overview (V10.1) 2 days
421 P8107 IBM Cognos Planning:Administer theTechnical Environment (V10.1) 3 days
422 P8117 IBM Cognos Consumer Insight: Overview (V1.1) - eLearning 3 hours
423 P8120 IBM Cognos Controller:Administer theTechnical Environment (V10.1) 1 day
424 P8121 IBM Cognos Controller: Develop Applications (V10.1) 5 days
425 P8122 IBM Cognos Controller:Author Reports (V10.1) 1 day
426 P8123 IBM Cognos Controller: Create BI with Consolidation Data (V10.1) 2 days
427 P8124 IBM Cognos Controller What's New (V10.1) - eLearning 3 hours
428 P8125 IBM Cognos Analysis for Microsoft Excel:Analyze BI Data (V10.1) - eLearning 1 hour
429 P8153 IBM CognosTM1: Interact with Data (V10.1) - eLearning 8 hours
430 P8156 IBM CognosTM1: Explore Data (V10.1) - eLearning 3 hours
431 P8163 IBM CognosTM1: IntegrateTM1 and Cognos BI (V9.5/V10.1) - eLearning 2 hours
432 P8164 IBM CognosTM1: Security Cubes and Other Control Objects (V9.5/V10.1)- eLearning 2 hours
433 P8176 IBM Cognos Insight:Analyze and Share Data (V10.1/10.1.1) - eLearning 8 hours
434 P8218 IBM Cognos Integration Server: Extract Data from Oracle Essbase (v10.2) 2 hours
435 P8219 IBM Cognos Integration Server: Extract Data from Oracle HFM (v10.2) - eLearning 1 hour
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
436 P8252 IBM CognosTM1: Design and Develop Models in Performance Modeler (v10.2) 5 days
437 P8253 IBM CognosTM1: Interact with Data (v10.2) - eLearning 1 day
438 P8254 IBM CognosTM1:Work with IBM Cognos Analysis for Microsoft Excel (v10.2) - eLearning 1 hour
439 P8255 IBM CognosTM1:Administer theTechnical Environment (v10.2) 2 days
440 P8256 IBM CognosTM1: Explore Data (v10.2) - eLearning 3 hours
441 P8257 IBM CognosTM1:Analyze and Share Data (v10.2) 3 days
442 P8258 IBM CognosTM1:What's New (v10.2) 1 day
443 P8259 IBM CognosTM1: Create Scorecards (v10.2) 1 day
444 P8261 IBM CognosTM1: Design and Develop Models in Architect (v10.2) 5 days
445 P8280 IBM Cognos Command Center:Automation Using PluginTasks (v10.2) - eLearning 2 hours
446 Z3302 Impromptu Administration 2 days
447 Z3303 Report Building with Impromptu 2 days
448 Z3304 Advanced Impromptu Reporting 1 day
449 Z5303 IBM Cognos Series 7V3 PowerPlay Web Exploration CBT - eLearning 8 hours
450 F0429 IBM FileNet P8 Platform Administration 5 days
451 F0439 IBM FileNet Content Manager Java API Programming 4.5 5 days
452 F0619 IBM Content Collector 2.1 Installation for P8 Repository 1 day
453 F0639 IBM InfoSphere Content Collector: E-mail Collection 2.1.1 1 day
454 F0659 IBM InfoSphere Content Collector 2.1.1: File System Collection 1 day
455 F0729 IBM FileNet Content Manager: Bulk Operations 4.5 1 day
456 F0739 IBM FileNet Content Manager: Back Up and Restore Data 4.5 1 day
457 F0800 IBM Case Manager 5.1: User Interface Development 5 days
458 F0989 IBM ICC 2.1.1: Content Classification and Record Declaration 1 day
459 F1120 ICC Workshop 2.2: eMail Collection for Lotus Domino, eDiscovery 3 days
460 F1130 ICC Workshop 2.2: eMail Collection for Microsoft Exchange, eDiscovery 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
461 F1150 IBM FileNet Content Manager 5.2: Implementation and Administration 5 days
462 F1200 IBM Content Navigator 2.0.2: Customize and Extend the Features 3 days
463 F1400 IBM FileNet P8 5.0: Prerequisite Skills using Workplace 2 days
464 F1410 IBM FileNet P8 5.0: Prerequisite Skills using Workplace XT 2 days
465 F1420 IBM FileNet P8 Platform 5.0: System Implementation and Administration 5 days
466 F1430 IBM FileNet Content Manager 5.0: Java API Programming 5 days
467 F1440 IBM Case Foundation (formerly IBM FileNet BPM) 5.0:Administration 4 days
468 F1450 IBM Case Foundation (formerly IBM FileNet BPM) 5.0: Process Design 5 days
469 F1560 IBM Case Foundation (formerly IBM FileNet BPM) 5.0: Java API Programming 4 days
470 F1620 IBM Content Collector 2.2: Core Skills 1 day
471 F1640 IBM Content Collector 2.2: Email Collection for P8 and Domino 1 day
472 F1650 IBM Datacap 8.1: Introduction 2 days
473 F1660 IBM Datacap 8.1:Application Builder 2 days
474 F1680 IBM DatacapTaskmaster Capture 8.1: Configuration and Implementation 5 days
475 F1740 IBM Enterprise Records 5.1: Records Management 2 days
476 F1750 IBM Enterprise Records 5.1: System Administration 4 days
477 F1760 IBM DatacapTaskmaster Capture 8.0.1: Implementation and Configuration 5 days
478 F1780 IBM Enterprise Records 5.1: Core Skills 1 day
479 F1790 IBM Enterprise Records 5.1: System Configuration 1 day
480 F1800 IBM Enterprise Records 5.1: System Maintenance 1 day
481 F1810 IBM Enterprise Records 5.1: File Plan Design 1 day
482 F1820 IBM Enterprise Records 5.1:Automate Declaration 1 day
483 F1850 IBM Case Manager 5.1: Build, Deploy, and Monitor a Solution 4 days
484 F1860 IBM Case Manager 5.1: Installation 2 days
485 F1870 IBM Datacap 8.1:Advanced Configuration and Administration 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
486 F1900 IBM FileNet P8 Platform 5.1: Installation 4 days
487 F2019 IBM Content Collector 3.0 Core Skills: Installation and Configuration 1 day
488 F2059 Getting Started with Content Navigator 2.0 (WBT) 3 hours
489 F2078 Atlas eDiscovery Process Management 6.x: Introduction to Defensible Disposal 1 day
490 F2088 IBM Content Collector 3.0: eMail Collection for P8 and Exchange 5 hours
491 F2098 Atlas eDiscovery Process Management 6.x: Paralegal Skills 1 day
492 F2110 IBM FileNet Platform 5.2: Installation 4 days
493 F2120 IBM Case Manager 5.2: Build and Migrate a Solution 2 days
494 F2140 IBM Case Manager 5.2: Integrated Rules 1.5 days
495 F2150 IBM Case Manager 5.2: Introduction to Case Manager 1 day
496 F2160 IBM Case Manager 5.2: Security 2 days
497 F2170 IBM Case Manager 5.2: Customize & Extend the Features 3 days
498 F2180 IBM Case Manager 5.2: Integrating Case AnalyticTools 1.5 days
499 F2190 IBM Case Manager 5.2: Solution Implementation 4.5 days
500 F2200 IBM Datacap 9.0: Introduction 2 days
501 F2309 IBM Case Foundation 5.2.1: Introduction 5 hours
502 IM169 IBM CM OnDemand for Multiplatforms Application Implementation 8.4 5 days
503 IM179 IBM Content Manager OnDemand for Multiplatforms System Administration 8.4 5 days
504 IM180 IBM Content Manager OnDemand for Multiplatforms 8.5:Sys Implementation and Admin 5 days
505 IM520 IBM Content Manager System Administration 8.4 4 days
506 CNW41 Social Computing for Business with IBM Connections 3.0.1 3 days
507 CNW42 IBM Connections 4.0 - Social Software for Business 2 days
508 CNW43 What’s new in IBM Connections 4.5 2 days
509 D8420 Exploring New Features in IBM Lotus Domino Designer 8 1 day
510 D8510 Fundamentals of IBM Lotus Domino 8 Application Development 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
511 D8520 Building Web Applications with IBM Lotus Domino Designer 8 2 days
512 D8530 Developing IBM Lotus Domino 8 Applications - Intermediate Skills 3 days
513 D8550 Developing Composite Applications for IBM Lotus Notes 8 1 day
514 D8720 Exploring New Features in IBM Lotus Domino 8 Administration 2 days
515 D8730 Exploring New Features in IBM Lotus Domino 8.5 Administration 1 day
516 D8750 IBM Lotus Domino 8 System Administration Operating Fundamentals 1 day
517 D8760 Building the IBM Lotus Domino 8 Infrastructure 2 days
518 D8770 Managing IBM Lotus Domino 8 Servers and Users 3 days
519 D8900 IBM Lotus Domino 8 System Administration Bootcamp 5 days
520 D8L36 IBM Lotus Domino 8.5.x Help DeskTroubleshooting 2 days
521 D8L51 Fundamentals of IBM Lotus Domino 8.5.1 Application Development 5 days
522 D8L53 Developing IBM Lotus Domino 8.5.2 Applications: Intermediate XPage Design 3 days
523 D8L54 Developing IBM® Lotus® Domino® 8.5.2 Applications:Advanced XPage Design 2 days
524 D8L56 Modernizing IBM Lotus Domino 8.5.2 Applications 2 days
525 D8L75 IBM Lotus Domino 8.5 System Administration Fundamentals 1 day
526 D8L76 Building the IBM Lotus Domino 8.5 Infrastructure 2 days
527 D8L77 Managing IBM Lotus Domino 8.5 Servers and Users 3 days
528 D8L89 IBM Lotus Domino 8.5 System Administration Bootcamp 5 days
529 D8P36 IBM Lotus Domino 8.5.x Help DeskTroubleshooting 1.5 days
530 D8P51 Fundamentals of IBM Lotus Domino 8.5.1 Application Development  (SPVC) 5 days
531 D8P53 Developing IBM Lotus Domino 8.5.2 Applications: Intermediate XPage Design (SPVC) 3 days
532 D8P54 Fundamentals of IBM Lotus Domino 8.5.1 Application Development  (SPVC) 2 days
533 N8360 Help Desk BasicTroubleshooting for IBM Lotus Notes Domino 8 2 days
534 ND900 IBM Domino 9 Administration Fundamentals 5 days
535 ST850 Implementing an IBM Lotus Sametime 8 Infrastructure 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
536 STL85 Deploying and Administering Lotus Sametime 8.5.1 2 days
537 STW85 Lotus Sametime 8.5: Building Collaborative Communication Solutions 3 days
538 WPP52 Developing Multichannel Applications with IBM Web Experience Factory (SPVC) 3 days
539 9D648 IBM Care Management 6.0 - Functional andTechnical Overview 1 day
540 9I020 IBM i2 Analyst's Notebook Essentials 3 days
541 9I030 IBM i2 Analyst's Notebook Advanced Importing and Analysis 2 days
542 9I040 IBM i2 Analyst's Notebook Customizing and Semantics 2 days
543 9I130 i2 iBase Essentials 2 days
544 9I140 IBM i2 iBase User 3 days
545 9I150 i2 iBase Designer 3 days
546 9I160 i2 Analyst’s Notebook Premium Essentials 2 days
547 9I209 IBM i2 Intelligence Portal Essentials 8 hours
548 9I218 IBM i2 iBase Intellishare Essentials 8 hours
549 9I248 IBM i2 Overview 3 hours
550 9I369 IBM i2 COPLINK Detect Essentials 2 days
551 9J010 IBM Intelligent Operations Center Fundamentals 3 days
552 9J028 IBM IntelligentTransportation Fundamentals (WBT) 5 hours
553 9J030 IBM Intelligent Operations Center Customization and Configuration 2 days
554 9J040 IBM Intelligent Operations forTransportation 1.5 Fundamentals 1.5 days
555 9J050 IBM IntelligentTransit Analytics 1.5 Fundamentals 1 day
556 9J069 Getting Started with Intelligent Operations for Water 1.5 days
557 9J078 IBM® Intelligent Operations Center 1.6 Primer 5 hours
558 9J089 Water Information Hub in Intelligent Operations for Water 1.5.1 - SPVC 1 day
559 9J099 IBM Intelligent Operations forTransportation 1.6Traffic Awareness Configuration 2 days
560 9J109 Advanced Analytics in Intelligent Operations for Water 1.5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
561 9J119 Getting Started with Intelligent Operations Center 1.6 6 hours
562 9J129 Installation and Administration of Intelligent Operations Center 1.6 5 hours
563 9J139 Intelligent Operations Center 1.6 Configuration 3 days
564 9J148 IBM Intelligent City Planning and Operations v1.6 Essentials 5 hours
565 9J159 Data Source Configuration Workshop for Intelligent Operations Center 1.6 1.5 days
566 9J168 IBM Intelligent City Planning and Operations v1.6 Configuration 3 hours
567 9J179 IBM Intelligent City Planning and Operations 1.6 Infrastructure Planning - SPVC 2 days
568 9J188 Getting Started with IntelligentVideo Analytics 3 hours
569 9J208 Getting Started with Intelligent Operations Center 1.6 5 hours
570 9J218 Installation and Administration of Intelligent Operations Center 1.6 5 hours
571 9J228 IntelligentVideo Analytics User Interface Operation 8 hours
572 9J238 User Interface Customization of Intelligent Operations Center 1.6 3 hours
573 9J248 REST Services in Intelligent Operations Center 4 hours
574 9J258 Installation of IBMVideo Analytics 1.6 1 day
575 9J328 Getting Started with Intelligent Operations Center on Cloud 5 hours
576 9K018 IBM Counter Fraud Management Essentials 3 hours
577 9S205 i2 COPLINK Detect Refresher (SPVC) 5 hours
578 9S317 Introduction to IBM Unica Campaign 8.5 (SPVC) 3 days
579 9S318 IBM Unica Campaign Administration 8.5 (SPVC) 2 days
580 9S323 Introduction to IBM Unica Interact (SPVC) 1 day
581 9S324 Introduction to Unica Marketing Operations (SPVC) 2 days
582 9S325 IBM Unica Marketing Operations Administration (SPVC) 2 days
583 9T205 i2 COPLINK Detect Refresher 5 hours
584 9T211 i2 COPLINK Detect 2 days
585 9T239 i2Text Chart 8 User 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
586 9T245 Using iBase with i2 Analyst's Notebook 1 day
587 9T246 i2 iBridge User 2 days
588 1B740 IBM InfoSphere Optim Performance Manager Extended Edition Essentials - WBT 3 days
589 1E031 DB2 Family Fundamentals (WBT) 4 days
590 1E121 SQL Workshop (WBT) 2 days
591 1E131 DB2 SQL for Experienced Users (WBT) 2.5 days
592 1E221 Using SQL Replication (Web Based) 3 days
593 1E231 SQL Replication:AdvancedTopics (Web Based) 2 days
594 1E243 Using Queue Replication - Web Based 4 days
595 1I213IN IBM InfoSphere Identity Insight EssentialsV8 (Web) 4 days
596 1I900 Federation Server Essentials - Web Based 3 days
597 1L121 Query XML data with DB2 9 (Web) 3 days
598 1L131 Query and Manage XML Data with DB2 9 - Web Based 5 days
599 1L141 Manage XML data with DB2 9 (Web) 2 days
600 1L284 Fast Path to DB2 10.1 for Experienced Relational DBAs (WBT) 2 days
601 1L2X3 DB2 10 Administration Workshop for Linux and Windows - WBT 4 days
602 1L312 DB2 9.7 for Linux, UNIX, and Windows New Features (Web-Based) 2 days
603 1L313 DB2 10.1 for LUW New Features and Database Migration Considerations (WBT) 2 days
604 1L314 DB2 10.5 for LUW New Features and Database Migration Considerations - WBT 1 day
605 1L450 Implementation and Use of DB2 BLU Acceleration - WBT 1 day
606 1L463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration - WBT 5 days
607 1L484 DB2 10.1 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs - WBT 4 days
608 1L493 DB2 10 for LUW Advanced Database Recovery - WBT 4 days
609 1L600 Implementing DB2 Connect and Client Connections to DB2 for z/OS - WBT 2 days
610 1L800 DB2 9 pureScale Implementation and Control for DB2 LUW Administrators - WBT 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
611 1M001 Data Replication Essentials - WBT 1 day
612 1M130 IS Overview:Lifecycle of Information Integration w/ Information ServerV8.7-WBT 1 day
613 1M201 IBM InfoSphere DataStage EssentialsV8.7 (WBT) 4 days
614 1M202 IBM InfoSphere DataStage EssentialsV9.1 (WBT) 4 days
615 1M212 IBM InfoSphere QualityStage Essentials 9.1 (WBT) 4 days
616 1M230 Data ClickV10 for Big Insights - WBT 1 day
617 1M402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 - WBT 3 days
618 1M412 IBM InfoSphere Advanced QualityStageV9.1 - WBT 3 days
619 1M422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 - WBT 2 days
620 1M502 IBM InfoSphere Information Server Administration 9.1 (WBT) 4 days
621 1M611 IBM InfoSphere Business Glossary EssentialsV8.7 (WBT) 1 day
622 1M612 IBM InfoSphere Business Glossary EssentialsV9.1 - WBT 1 day
623 1M613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 - WBT 1 day
624 1M621 IBM InfoSphere Metadata Workbench EssentialsV8.7 - WBT 2 days
625 1M622 IBM InfoSphere Metadata Workbench EssentialsV9.1 - WBT 2 days
626 1M623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 - WBT 1.5 days
627 1M631 IBM InfoSphere FastTrack EssentialsV8.7 (WBT) 1 day
628 1M632 IBM InfoSphere FastTrack EssentialsV9.1 - WBT 1.5 days
629 1M801 IBM InfoSphere Information AnalysisV8.7 (WBT) 4 days
630 1M802 IBM InfoSphere Information Analysis 9.1 (WBT) 4 days
631 1T101 IBM InfoSphere Discovery Fundamentals - Web 3 days
632 1T204 Using Optim Data Growth for Archiving on Dist Systems - WBT 3 days
633 1T205G Using Optim Data Growth for Archiving on Dist Systems - WBT 4 days
634 1T215 Using OptimTest Data Management and Data Masking on Distributed Systems - WBT 4 days
635 1T802 InfoSphere Optim Data Growth for Archiving on z/OS - WBT 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
636 1T812 InfoSphere OptimTest Data Management and Data Masking on z/OS - WBT 4 days
637 1U202 InfoSphere GuardiumV9TechnicalTraining - WBT 3 days
638 1V311 DB2 for z/OS New Functions and Features inV10 - WBT 4 days
639 1V722 DB2 11 for z/OS Application Programming Workshop - WBT 3 days
640 1V831 DB2 10 for z/OS Database Administration Workshop Part 1 (WBT) 5 days
641 1W503 IBM PureData System for Analytics Usage - WBT 3 days
642 1W512 IBM PureData System for Analytics Advanced Concepts - WBT 2 days
643 1W522 IBM PureData System for Analytics for Developers and Administrators - WBT 5 days
644 1W530 IBM Netezza 6.0 New Features (Web) 2 days
645 1W531 IBM PureData System for Analytics, NPS 7.0 New Features - WBT 1 day
646 1W580 IBM PureData System for Analytics Programming and Usage - WBT 4 days
647 1W585 IBM PureData System for Analytics Programming and Usage - WBT 4 days
648 1W612 InfoSphere BigInsights Foundation - WBT 2.5 days
649 1W631 IBM BigInsights Big SQL - WBT 2 days
650 1W632 IBM BigInsights Big SQL - WBT 1 day
651 1W642 BigInsights Analytics for Business Analysts - WBT 2 days
652 1W643 BigInsights Analytics for Business Analysts - WBT 1 day
653 1W653 BigInsights Analytics for Programmers - WBT 2 days
654 1W723 Programming for InfoSphere StreamsV3 with SPL (WBT) 4 days
655 1W731 Administration of InfoSphere StreamsV3 (WBT) 1 day
656 1X302 Informix 11.70 New Features (Web) 2 days
657 1X711 IBM Informix Stored Procedures andTriggers - (Web) 2 days
658 1Z031 Using Inspector v9.x - Web Based 0.375 days
659 1Z310 InfoSphere Master Data Management Server Workbench for MDM Server 9.0.2 (Web) 3 days
660 1Z340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 (Web) 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
661 1Z401 Introduction to IBM InfoSphere Master Data Management Standard EditionV10 (WBT) 5 hours
662 1Z450 Administrating InfoSphere MDM Standard Edition v10 - WBT 1 day
663 1Z470 InfoSphere Master Data Policy - WBT 5 hours
664 1Z520 Using InfoSphere MDM Collaborative EditionV10 - WBT 3 days
665 1Z540 Programming with InfoSphere MDM Collaborative Edition - WBT 5 days
666 1Z610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 (WBT) 3 days
667 1Z620 InfoSphere MDM Advanced Edition ArchitectureV10 - WBT 3 days
668 1Z640 Customizing InfoSphere MDM Advanced EditionV10 - WBT 3 days
669 1Z670 InfoSphere MDM Reference Data ManagementV10 (WBT) 2 days
670 1Z780 InfoSphere MDM Algorithms v11 - WBT 3 days
671 1Z800 Introduction to InfoSphere Master Data Management v11 - WBT 5 hours
672 1Z801 Introduction to InfoSphere Master Data Management v11.3 - WBT 1 day
673 1Z820 InfoSphere MDM Architecture v11 - WBT 3 days
674 1Z840 InfoSphere MDM Workbench v11 - WBT 3 days
675 1Z870 InfoSphere MDM ApplicationToolkit v11.3 - WBT N
676 1Z880 Virtual Module Algorithms for InfoSphere MDM v11 - WBT 2 days
677 1Z980 Physical Module Algorithms for InfoSphere MDM v11 - WBT 2 days
678 2B740 IBM InfoSphere Optim Performance Manager Extended Edition Essentials (SPVC) 3 days
679 2E121 SQL Workshop (SPVC) 2 days
680 2E131 DB2 SQL for Experienced Users (SPVC) 2.5 days
681 2E221 Using SQL Replication (SPVC) 3 days
682 2E231 SQL Replication:AdvancedTopics (SPVC) 2 days
683 2I213 IBM InfoSphere Identity Insight EssentialsV8 (SPVC) 4 days
684 2I900 Federation Server Essentials - SPVC 3 days
685 2L100 DB2 9 for Linux, UNIX and Windows Application Programming Fundamentals - SPVC 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
686 2L110 DB2 9 for Linux, UNIX and Windows Application Programming Advanced - SPVC 2 days
687 2L121 Query XML Data with DB2 9 (SPVC) 3 days
688 2L131 Query and Manage XML Data with DB2 9 (SPVC) 5 days
689 2L141 Manage XML data with DB2 9 (SPVC) 2 days
690 2L202 DB2 9 Administration Workshop for Linux (SPVC) 4 days
691 2L203 DB2 10 Administration Workshop for Linux - SPVC 4 days
692 2L232 DB2 9 Administration Workshop for Windows (SPVC) 4 days
693 2L233 DB2 10 Administration Workshop for Windows - SPVC 4 days
694 2L240 DB2 9 for LUW Multiple Partition DBA Workshop - Self PacedVirtual Class 5 days
695 2L250 DB2 9 for LUW Multiple Partition Environment for Single Partition DBAs (SPVC) 3 days
696 2L283 Fast Path to DB2 9.7 for Experienced Relational DBAs - Self PacedVirtual Class 2 days
697 2L284 Fast Path to DB2 10.1 for Experienced Relational DBAs (SPVC) 2 days
698 2L412 DB2 for Linux, UNIX and Windows PerformanceTuning and Monitoring Workshop -SPVC 4 days
699 2L413 DB2 for LUW PerformanceTuning and Monitoring Workshop - SPVC 4 days
700 2L442 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition-SPVC 5 days
701 2L443 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition DBs - SPVC 5 days
702 2L450 Implementation and Use of DB2 BLU Acceleration - SPVC 1 day
703 2L463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration - SPVC 5 days
704 2L483 DB2 9.7 for LUW Quickstart for Experienced Relational DBAs (SPVC) 4 days
705 2L484 DB2 10.1 for Linux, UNIX, and WIN Quickstart for EXP. Relational DBAs (SPVC) 4 days
706 2L493 DB2 10 for LUW Advanced Database Recovery - SPVC 4 days
707 2L711 DB2 Stored Procedures Programming Workshop (SPVC) 2 days
708 2M130 IS Overview:Lifecycle of Information Integration w/ Information ServerV8.7-SPVC 1 day
709 2M201 IBM InfoSphere DataStage EssentialsV8.7 (SPVC) 4 days
710 2M202 IBM InfoSphere DataStage EssentialsV9.1 (SPVC) 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
711 2M212 IBM InfoSphere QualityStage Essentials 9.1 (SPVC) 4 days
712 2M230 Data ClickV10 for Big Insights - SPVC 1 day
713 2M402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 - SPVC 3 days
714 2M412 IBM InfoSphere Advanced QualityStageV9.1 - SPVC 3 days
715 2M422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 - SPVC 2 days
716 2M502 IBM InfoSphere Information Server Administration 9.1 - SPVC 4 days
717 2M611 IBM InfoSphere Business Glossary EssentialsV8.7 (SPVC) 1 day
718 2M612 IBM InfoSphere Business Glossary EssentialsV9.1 - SPVC 1 day
719 2M613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 - SPVC 1 day
720 2M621 IBM InfoSphere Metadata Workbench EssentialsV8.7 - SPVC 2 days
721 2M622 IBM InfoSphere Metadata Workbench EssentialsV9.1 - SPVC 2 days
722 2M623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 - SPVC 1.5 days
723 2M631 IBM InfoSphere FastTrack EssentialsV8.7 (SPVC) 1 day
724 2M632 IBM InfoSphere FastTrack EssentialsV9.1 - SPVC 1 day
725 2M801 IBM InfoSphere Information AnalysisV8.7 (SPVC) 4 days
726 2M802 IBM InfoSphere Information Analysis 9.1 (SPVC) 4 days
727 2T101 IBM InfoSphere Discovery Fundamentals - SPVC 3 days
728 2T204 Using Optim Data Growth for Archiving on Dist Systems - SPVC 3 days
729 2T205 Using Optim Data Growth for Archiving on Dist Systems - SPVC 4 days
730 2T215 Using OptimTest Data Management and Data Masking on Distributed Systems - SPVC 4 days
731 2U202 InfoSphere GuardiumV9TechnicalTraining - SPVC 3 days
732 2W220 InfoSphere Data Explorer AdministratorTraining (SPVC) 5 days
733 2W503 IBM PureData System for Analytics Usage - SPVC 3 days
734 2W512 IBM PureData System for Analytics Advanced Concepts - SPVC 2 days
735 2W522 IBM PureData System for Analytics for Developers and Administrators - SPVC 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
736 2W580 IBM PureData System for Analytics Programming and Usage - SPVC 4 days
737 2W612 InfoSphere BigInsights Foundation - SPVC 2.5 days
738 2W631 IBM BigInsights Big SQL - SPVC 2 days
739 2W632 IBM BigInsights Big SQL - SPVC 1 day
740 2W642 BigInsights Analytics for Business Analysts - SPVC 2 days
741 2W643 BigInsights Analytics for Business Analysts - SPVC 1 day
742 2W653 BigInsights Analytics for Programmers - SPVC 2 days
743 2W723 Programming for InfoSphere StreamsV3 with SPL (SPVC) 4 days
744 2W731 Administration of InfoSphere StreamsV3 (SPVC) 1 day
745 2X101 Developing Applications Using Informix 4GL - SPVC 5 days
746 2X222 Informix 11.7 Database Administration (SPVC) 4 days
747 2X480 Fast Path to Informix for Experienced Relational Database Administrators (SPVC) 4 days
748 2X711 IBM Informix Stored Procedures andTriggers - SPVC 2 days
749 2X812 Informix 11.7 System Administration - SPVC 4 days
750 2Z310 IBM InfoSphere MDM Server Workbench for MDM Server 9.0.2 (SPVC) 3 days
751 2Z340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 (SPVC) 2 days
752 2Z450 Administrating InfoSphere MDM Standard EditionV10 - SPVC 1 day
753 2Z520 Using InfoSphere MDM Collaborative EditionV10 - SPVC 3 days
754 2Z540 Programming with InfoSphere MDM Collaborative Edition - SPVC 4 days
755 2Z610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 (SPVC) 3 days
756 2Z620 InfoSphere MDM Advanced Edition ArchitectureV10 - SPVC 3 days
757 2Z640 Customizing InfoSphere MDM Advanced EditionV10 - SPVC 3 days
758 2Z670 InfoSphere MDM Reference Data ManagementV10 (SPVC) 2 days
759 2Z780 InfoSphere MDM Algorithms v11 - SPVC 3 days
760 2Z820 InfoSphere MDM Architecture v11 - SPVC 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
761 2Z840 InfoSphere MDM Workbench v11 - SPVC 3 days
762 2Z870 InfoSphere MDM ApplicationToolkit v11.3 - WBT 2 days
763 2Z880 Virtual Module Algorithms for InfoSphere MDM v11 - SPVC 2 days
764 2Z980 Physical Module Algorithms for InfoSphere MDM v11 - SPVC 2 days
765 CE031 DB2 Family Fundamentals 2 days
766 CE121 DB2 SQL Workshop 2 days
767 CE131 DB2 SQL Workshop for Experienced Users 2.5 days
768 CL212 DB2 9 Database Administration Workshop for UNIX 4 days
769 CL213 DB2 10 for LUW: Basic Administration for AIX 4 days
770 CL240 DB2 9 for LUW Multiple Partition DBA Workshop 5 days
771 CL250 DB2 9 for LUW Multiple Partition Environment for Single Partition DBAs 3 days
772 CL2X2 DB2 9 Database Administration Workshop for Linux, UNIX, and Windows 4 days
773 CL2X3 DB2 10 for LUW: Basic Administration for Linux and Windows 4 days
774 CL313 DB2 10.1 for LUW New Features and Database Migration Considerations 2 days
775 CL314 DB2 10.5 for LUW New Features and Database Upgrade Considerations 1 day
776 CL412 DB2 for Linux, UNIX, and Windows PerformanceTuning and Monitoring Workshop 4 days
777 CL413 DB2 for LUW PerformanceTuning and Monitoring Workshop 4 days
778 CL442 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition DBs 5 days
779 CL450 Implementation and Use of DB2 BLU Acceleration 1 day
780 CL462 DB2 9 for LUW Advanced Database Administration for Experts 5 days
781 CL463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration 5 days
782 CL483 DB2 9 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days
783 CL484 DB2 10.1 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days
784 CL485 DB2 10 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days
785 CL492 DB2 9 for LUW Advanced Database Recovery 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
786 CL493 DB2 10 for LUW Advanced Database Recovery 4 days
787 CL800 DB2 9.8 pureScale Implementation and Control for DB2 LUW Administrators 2 days
788 CV020 Introduction to DB2 for z/OS for Systems and Operations Personnel 3 days
789 CV041 z/OS and DB2 Basics for DB2 for z/OS DBA Beginners 5 days
790 CV311 DB2 for z/OS New Functions and Features inV10 4 days
791 CV312 New Functions and Features in DB2 10 for z/OS Workshop 5 days
792 CV320 New Functions and Features in DB2 11 for z/OS 3 days
793 CV722 DB2 11 for z/OS Application Programming Workshop 3 days
794 CV831 DB2 10 for z/OS Database Administration Workshop Part 1 5 days
795 CV832 DB2 11 for z/OS Database Administration Part 1 4 days
796 CV842 DB2 10 for z/OS Database Administration Part 2 3 days
797 CV851 DB2 10 for z/OS System Administration 5 days
798 CV852 DB2 11 for z/OS System Administration 5 days
799 CV861 DB2 10 for z/OS Implementation Workshop 5 days
800 CV871 DB2 10 for z/OS Utilities for Database Administrators 3 days
801 CV951 DB2 10 for z/OS System Performance Analysis andTuning 4 days
802 CV962 DB2 10 for z/OS Application Performance andTuning 5 days
803 DC712 What is New in IBM InfoSphere MDM Server for PIMV9 1 day
804 DC722 Using InfoSphere MDM Server for PIMV9 3 days
805 DC732 Implementing IBM InfoSphere MDM Server for PIMV9 4 days
806 DC742 Programming with IBM InfoSphere MDM Server for PIM 5 days
807 DT101 IBM InfoSphere Discovery Fundamentals 3 days
808 DT205 Using Optim Data Growth for Archiving on Distributed Systems 3 days
809 DT215 Using OptimTest Data Management and Data Masking on Distributed Systems 4 days
810 DT225 Using IBM InfoSphere Optim Solutions on Distributed Platforms 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
811 DT802 InfoSphere Optim Data Growth for Archiving on z/OS 4 days
812 DT812 InfoSphere OptimTest Data Management and Data Masking on z/OS 4 days
813 DW220 InfoSphere Data Explorer AdministratorTraining 5 days
814 DW503 IBM PureData System for Analytics Usage 3 days
815 DW512 IBM PureData System for Analytics Advanced Concepts 2 days
816 DW522 IBM PureData System for Analytics for Developers and Administrators 5 days
817 DW531 IBM PureData System for Analytics, NPS 7.0 New Features 1 day
818 DW580 IBM PureData System for Analytics Programming and Usage 4 days
819 DW585 IBM PureData System for Analytics Programming and Usage 4 days
820 DW612 InfoSphere BigInsights Foundation 2.5 days
821 DW632 IBM BigInsights Big SQL 1 day
822 DW643 BigInsights Analytics for Business Analysts 1 day
823 DW653 BigInsights Analytics for Programmers 2 days
824 DW723 Programming for InfoSphere StreamsV3 with SPL 4 days
825 DW731 Administration of InfoSphere StreamsV3 1 day
826 DX900 Federation Server Essentials 3 days
827 EA214 IBM InfoSphere Identity Insight EssentialsV8 3 days
828 EA313 IBM InfoSphere Identity Insight Advanced ConfigurationV8 3 days
829 GU2Z2 InfoSphere GuardiumV9TechnicalTraining 3 days
830 IX222 Informix 11.7 Database Administration 4 days
831 KM001 Data Replication Essentials 1 day
832 KM020 IBM InfoSphere Data Replication - InfoSphere Change Data Capture Essentials 3 days
833 KM130 IS Overview: Lifecycle of Information Integration with Information Server 1 day
834 KM201 IBM InfoSphere DataStage EssentialsV8.7 4 days
835 KM202 IBM InfoSphere DataStage Essentials 9.1 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
836 KM211 IBM InfoSphere QualityStage EssentialsV8.7 4 days
837 KM212 IBM InfoSphere QualityStage Essentials 9.1 4 days
838 KM230 Data ClickV10 for BigInsights 1 day
839 KM310 IBM InfoSphere QualityStageV8.5 Postal Modules 2 days
840 KM400 IBM InfoSphere Advanced DataStageV8 4 days
841 KM402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 3 days
842 KM411 InfoSphere QualityStage 8.7 Advanced 3 days
843 KM412 IBM InfoSphere Advanced QualityStageV9.1 3 days
844 KM422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 2 days
845 KM502 IBM InfoSphere Information Server AdministrationV9.1 4 days
846 KM611 IBM InfoSphere Business Glossary EssentialsV8.7 1 day
847 KM612 IBM InfoSphere Business Glossary EssentialsV9.1 1 day
848 KM613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 1 day
849 KM621 IBM InfoSphere Metadata Workbench EssentialsV8.7 2 days
850 KM622 IBM InfoSphere Metadata Workbench EssentialsV9.1 2 days
851 KM623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 1.5 days
852 KM631 IBM InfoSphere FastTrack EssentialsV8.7 1 day
853 KM632 IBM InfoSphere FastTrack EssentialsV9.1 1 day
854 KM640 IBM InfoSphere Information Services Director EssentialsV8 1 day
855 KM650 New Features in IBM InfoSphere Data Integration and GovernanceV11.3 1 day
856 KM801 IBM InfoSphere Information AnalysisV8.7 4 days
857 KM802 IBM InfoSphere Information Analysis 9.1 4 days
858 ZZ101 InitiateTechnical Boot CampV10 5 days
859 ZZ121 Implementing Initiate Message Broker Suite 2 days
860 ZZ131 Implementing Initiate HL7 Query Adapter 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
861 ZZ310 InfoSphere Master Data Management Server Workbench for MDM Server 9.0.2 3 days
862 ZZ340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 2 days
863 ZZ401 Introduction to IBM InfoSphere Master Data Management Standard EditionV10 5 hours
864 ZZ420 IBM InfoSphere MDM Standard Edition Architecture and Data Model Design 1 day
865 ZZ430 Initial Load and Data Processing for InfoSphere MDM - Standard EditionV10 2 days
866 ZZ440 Configuring InfoSphere MDM Standard EditionV10 1 day
867 ZZ450 Administrating InfoSphere MDM Standard EditionV10 1 day
868 ZZ520 Using InfoSphere MDM Collaborative Edition 3 days
869 ZZ540 Programming with InfoSphere MDM Collaborative Edition v10.1 4 days
870 ZZ610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 3 days
871 ZZ620 InfoSphere MDM Advanced Edition ArchitectureV10 3 days
872 ZZ640 Customizing the InfoSphere MDM Advanced EditionV10 3 days
873 ZZ670 InfoSphere MDM Reference Data ManagementV10 2 days
874 ZZ780 InfoSphere MDM Algorithms v11 3 days
875 ZZ820 InfoSphere MDM Architecture v11 3 days
876 ZZ840 InfoSphere MDM Workbench v11 3 days
877 ZZ870 InfoSphere MDM ApplicationToolkit v11.3 2 days
878 ZZ880 Virtual Module Algorithms for InfoSphere MDM v11 2 days
879 ZZ980 Physical Module Algorithms for InfoSphere MDM v11 2 days
880 KM203 IBM InfoSphere DataStage Essentials v11.3 2 days
881 QN114 IBM Rational DOORS Practitioner,V9.4 1 day
882 QN118 Customizing DOORS Using DXLV9.3 2 days
883 QN164 IBM Rational DOORS Foundation,V9.4 1 day
884 QN171 Essentials of IBM Rational DOORS Next GenerationV5.0 1 day
885 QQ001 Introduction to IBM Rational Rhapsody 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
886 QQ139 Essentials of IBM Rational RhapsodyV7.6 for Software Engineers 4 days
887 QQ142 Essentials of IBM Rational RhapsodyV7.6 for Software Engineers (no UML) 3 days
888 QQ144 Essentials of IBM Rational Rhapsody v8.1 for System Engineers 3.5 days
889 TA511 IBMTRIRIGA 10.3 Operations and Maintenance 5 days
890 TA521 IBMTRIRIGA 10.3 Capital Projects 3 days
891 TA531 IBMTRIRIGA Leased and Owned Property Contract Management 10.3 3 days
892 TA541 IBMTRIRIGA 10.3 Real Estate -Transaction Management 2 days
893 TA550 IBMTRIRIGA Real Estate Environmental Sustainability (TREES) 10.2 3 days
894 TA561 IBMTRIRIGA Facilities - Space Management 10.3 2 days
895 TA570 TRIRIGA Strategic Facilities Planning 2 days
896 TA611 IBMTRIRIGA 10.3 Application Platform I 5 days
897 TA701 IBMTRIRIGA 10.3 Application Platform II 1 day0
898 TOS25 Tivoli Process Automation Engine 7.5 Fundamentals (SPVC) 5 days
899 TOS26 IBMTRIRIGA 10.3 Portfolio (SPVC) 2 days
900 TOS27 IBM License MetricTool 7.5 (WBT) 2.5 days
901 TOS30 IBM Maximo Asset Configuration Manager 7.5 (SPVC) 2 days
902 TOS36 IBM Maximo Asset Management Scheduler 7.5.1 (SPVC) 75 mins
903 TOS43 IBM Maximo Asset Management 7.5 Fundamentals (SPVC) 3 days
904 TOS44 Scenario Based Problem Solving Using APM: Business Process Modeling (SPVC) 0.75 days
905 TOS64 IBM Maximo Asset Configuration Manager 7.5.1 (SPVC) 2 days
906 TOS66 IBM Maximo Health, Safety and Environment 7.5.1 (SPVC) 1.5 days
907 TOS67 IBM Maximo for Oil and Gas 7.5.1 (SPVC) 1.5 days
908 TR232 Business Intelligence and ReportingTool (BIRT) 3 days
909 TR571 IBM Maximo Asset Management 7.5 Fundamentals 4 days
910 TR632 IBM Maximo Asset Management 7.5.1 Work Management 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
No Code Description Duration
911 TR691 IBM Maximo for Service Providers 7.5.3 3 days
912 TR711 Tivoli's Process Automation Engine 7.5 Fundamentals 5 days
913 ZB307 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 (Self-paced) 5 days
914 ZB308 Capturing and Authoring Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 5 days
915 ZB309 Capturing Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 (Self-paced) 3 days
916 ZB310 Authoring Business Rules in IBM WebSphere ILOG RuleTeam ServerV7.1 (Selfpaced) 3 days
CLOUD
917 TM023 IBMTivoli Monitoring 6.3 Fundamentals 3 days
918 TM063 IBMTivoli Monitoring 6.3 Advanced Administration 2 days
919 TM165 IBMTivoli Application Dependency Discovery Manager 7.2.1 Implementation 5 days
920 TM337 IBMTivoli Business Services Manager 6.1.1 for Administrators 5 days
921 TM393 IBMTivoli Workload Scheduler for z/OS 8.6 Operations 2 days
922 TM404 IBMTivoli Workload Scheduler for z/OS 8.6.0 for Schedulers 4 days
923 TM662 IBMTCAM forTransactions 7.3 Implementation and Administration 4 days
924 TM690 IBMTivoli Composite Application Manager for AD 7.1 Usage 2 days
925 TN013 IBMTivoli Netcool/OMNIbus 7.3 User 2 days
926 TN023 IBMTivoli Netcool/OMNIbus 7.3 Installation and Configuration 3 days
927 TN024 IBMTivoli Netcool/OMNIbus 7.4 - Installation and Configuration 3 days
928 TN025 IBMTivoli Netcool/OMNIbus 8.1 Installation and Configuration 3 days
929 TN033 IBMTivoli Netcool/OMNIbus 7.3 Administration and Maintenance 4 days
930 TN034 IBMTivoli Netcool/OMNIbus 7.4 Administration and Maintenance 4 days
931 TN044 IBMTivoli Netcool/Impact 6.1.1 Administration and Implementation 4 days
932 TN500 IBMTivoli Netcool/Omnibus 7.3 New Features Implementation 3 days
933 TN550 IBMTivoli Netcool Configuration Manager 6.3 Administration and Implementation 5 days
934 TN600 IBM Netcool Network Management 9.2 Fundamentals 2 days
935 TN610 IBM SmartCloud Analytics Predictive Insights 1.2 Implementation, Configuration 2 days
Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
936 TOD26 IBM SmartCloud Analytics Log Analysis 1.2.0.3 Administration 16 hours
937 TOS23 DifferencesTraining: IBMTivoli Workload Scheduler for z/OS 8.5.1 (WBT) 8 hours
938 TOS31 IBM SmartCloud Provisioning 2.1 (WBT) 14 hours
939 TOS33 Tivoli Common Reporting 2.1.1 Fundamentals 3 hours
940 TOS34 IBM SmartCloud Control Desk 7.5 Foundations (SPVC) 2 days
941 TOS35 IBMTivoli Netcool/OMNIbus 7.4 User 2 days
942 TOS38 IBM SmartCloud Control Desk 7.5 IT Asset Management Fundamentals (SPVC) 3 days
943 TOS41 IBMTivoli Netcool Configuration Manager 6.4 Advanced Features (SPVC) 1 day
944 TOS47 IBMTivoli Netcool Configuration Manager 6.4 Operations and Configuration (SPVC) 5 days
945 TOS48 IBM SmartCloud Monitoring 7.2 (SPVC) 1 day
946 TOS52 IBMTivoli Netcool/Impact 6.1.1 Differences 1.5 hours
947 TOS55 Service Health for SmartCloud Provisioning 2.1 4 hours
948 TOS56 Jazz for Service Management Reporting Service Fundamentals 1 day
949 TOS57 IBMTivoli Monitoring 6.3 Fundamentals (SPVC) 3 days
950 TOS59 IBMTivoli Monitoring 6.3 for Implementers (SPVC) 3 days
951 TOS63 IBMTivoli Monitoring 6.3 Advanced Administration (SPVC) 2 days
952 TOS68 IBM SmartCloud Control Desk 7.5.1 Service Request Management Fundamentals (SPVC) 3 days
953 TOS71 IBM SmartCloud Orchestrator Enterprise 2.3 Administration and Operations (WBT) 4 hours
954 TOS79 IBM SmartCloud Analytics Log Analysis 1.2 Administration 1 day
955 TOS81 Jazz for Service Management Advanced Dashboard Implementation - SPVC 8 hours
956 TOS82 Using Jazz for Service Management Dashboard Widgets with Netcool/OMNIbus Data 5 hours
957 TOS86 Using Jazz for Service Management Dashboard Widgets with Netcool/Impact Data 5 hours
958 TOS87 Using Jazz for Service Management Dashboard Widgets withTivoli Monitoring Data 5 hours
959 TOS88 Using Jazz for Service Management Dashboard Widgets withTBSM Service Data 5 hours
960 TOS89 Using Jazz for Service Management Dashboards with IBM Directory Integrator Data 5 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
961 TOS90 Using the Jazz for Service Management Web Widget with Business Dashboards 5 hours
962 TOS94 IBM SmartCloud Orchestrator 2.3 Administration and Operations (WBT) 2 days
963 TP350 IBM SmartCloud Control Desk 7.5 Foundations 2 days
964 TP361 IBM SmartCloud Control Desk 7.5.1 Service Request Management Fundamentals 3 days
965 TP380 IBM SmartCloud Control Desk 7.5 IT Asset Management Fundamentals 3 days
966 TV355 IBMTivoli Monitoring 6.3 for Implementers 3 days
967 TT372 IBMTivoli Monitoring 6.2 Historical Reporting and Data Collection 1 day
968 TV382 IBMTivoli Monitoring 6.2.1 Agent Builder 2 days
969 TX304 IBMTivoli Workload Scheduler 8.6 Operations and Scheduling 3 days
970 TX314 IBMTivoli Workload Scheduler 8.6 Administration 2 days
COMMERCE
971 6D289 Introduction to IBM Emptoris Program Management (V9) 4 hours
972 6D290 IBM® Emptoris® Service Procurement for System Administrators (V9.2) 1 day
973 6D309 Introduction to IBM® Emptoris® Service Procurement 3 hours
974 6D310 IBM® Emptoris® Service Procurement 1 day
975 6D379 IBM® Emptoris® Service Procurement for Contractors (V9.2) 2 hours
976 6D408 IBM® Emptoris® Service ProcurementV9.5 (WBT) 4 hours
977 6D418 IBM® Emptoris® Service Procurement for System Administrators (WBT) 3 hours
978 6D438 Introduction to IBM® Emptoris® Strategic Supply Management (V10.0) (WBT) 1 hour
979 6D478 Introduction to IBM® Emptoris® Contract ManagementV10.0 (WBT) 2 hours
980 6D508 IBM® Emptoris® Contract Management System AdministrationV10.0 (WBT) 4 hours
981 6D518 IBM® Emptoris® Contract Management Reports (V10.0) 1 hour
982 6D538 IBM® Emptoris® Spend Analysis for Power UsersV10.0.2 (WBT) 6 hours
983 6D558 IBM® Emptoris® Strategic Supply Management System Administration (WBT) 2 hours
984 6D568 IBM® Emptoris® Strategic Supply Management User Administration (WBT) 1 hour
985 6D578 IBM® Emptoris® Strategic Supply Management External Party ManagementV10.0 (WB 1 hour
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
986 6D588 IBM Emptoris SSM Organization, Category and Location Management (V10.0) (WBT) 1 hour
987 6D618 IBM® Emptoris® Spend Analysis Supplier and Category MappingV10.0 (WBT) 1 hour
988 6D628 IBM® Emptoris® Contract Management ContractTemplate Creation (V10.0) 2 hours
989 6D630 IBM® Emptoris® Contract Management Contract Lifecycle (V10.0.1) 3 days
990 6D648 IBM® Emptoris® Contract Management Contract Review and Approve (V10.0.1) 2 days
991 6D658 Structure and Design of IBM® Emptoris® Sourcing (V10.0.2) 1 hour
992 6D668 IBM® Emptoris® Sourcing for System Administrators (V10.0.2) (WBT) 1 hour
993 6D688 IBM® Emptoris® Sourcing Auctioning Process (V10.0.2) (WBT) 3 hours
994 6D698 IBM® Emptoris® Sourcing Non Auctioning Process (V10.0.2) (WBT) 3 hours
995 6D708 IBM® Emptoris® Contract Management Contract LifecycleV10.0.1 (WBT) 2 days
996 6D718 IBM® Emptoris® Supplier Lifecycle Management (V10.0.2) (WBT) 1 hour
997 6D728 IBM® Emptoris® Supplier Lifecycle Management Essentials for Purchasers (V10.0. 1 hour
998 6D738 Supplier Qualification in IBM® Emptoris® Supplier Lifecycle Management 6 hours
999 6D748 Supplier Evaluation in IBM Emptoris Supplier Lifecycle Management 5 hours
1000 6D758 Supplier Classification in IBM Emptoris Supplier Lifecycle Management - WBT 2 hours
1001 6D768 Supplier Risk in IBM Emptoris Supplier Lifecycle Management 2 hours
1002 6D778 Supplier Development in IBM Emptoris Supplier Lifecycle Management 2 hours
1003 6D818 IBM Emptoris Spend Analysis for Management UsersV10.0.2 2 hours
1004 6D828 IBM® Emptoris® Spend Analysis Administration (V10.0.2) - WBT 1 day
1005 6D848 IBM Emptoris SSM SuiteV10.0.2 Installation - Expert Arena 5 days
1006 6E216 IBM® WebSphere CommerceV7 Server Expert Arena 5 days
1007 6E217 IBM WebSphere CommerceV7 Development Environment Expert Arena 5 days
1008 6F020 Sterling Selling and Fulfillment Suite Participant Modeling and User Security 2 days
1009 6F030 IBM® Sterling Selling and Fulfillment Foundation Process Modeling 1 day
1010 6F040 IBM® Sterling Selling and Fulfillment Foundation Item and Pricing Configuration 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1011 6F050 IBM Sterling Selling and Fulfillment Inventory and Order Mngmnt Business Rules 2 days
1012 6F080 IBM® Sterling Selling and Fulfillment Foundation Extending the Application 4 days
1013 6F168 Job Aid for IBM® Multi-Enterprise Relationship Management 1 hour
1014 6F19G IBM SSFF Introduction to Sterling Order Management 1 hour
1015 6F20G IBM SSFF Introduction to Applications Manager 25 mins
1016 6F21G IBM SSFF Overview of Participants and Roles 25 mins
1017 6F22G IBM Sterling Selling and Fulfillment Foundation Overview of Users andTeams 25 mins
1018 6F23G IBM Sterling Selling and Fulfillment Foundation Item and Pricing Basics 1 hour
1019 6F24G IBM Sterling Selling and Fulfillment Foundation Business Center Overview 1 hour
1020 6F268 IBM Sterling Selling and Fulfillment Foundation Setting up Customer Definitions 1 hour
1021 6F28G IBM Sterling Selling and Fulfillment Foundation Managing Item Attributes 25 mins
1022 6F298 IBM SSFF Performing Services and Fulfillment Configuration 2 hours
1023 6F398 IBM Sterling Selling and Fulfillment Foundation Call Center for Commerce 1 hour
1024 6G01G Commerce Composer Customization for IBM WebSphere CommerceV7 Feature Pack 7 2 days
1025 6G02G Commerce Composer Functionality for WebSphere CommerceV 7 for Feature Pack 7 1.5 days
1026 6G24G Introduction to IBM WebSphere Commerce Management Center 25 mins
1027 6G25G Introduction to Product Catalog for IBM WebSphere CommerceVersion 7 FEP 7 1 hour
1028 6G27G Product and Category Search Optimization for IBM WebSphere CommerceV7 25 mins
1029 6G288 Marketing with Search for WebSphere Commerce Feature Pack 7 2 hours
1030 6G308 Installments Management for IBM WebSphere CommerceVersion 7 FEP 7 1 hour
1031 6G31G Introduction to IBM WebSphere Commerce Extended Sites 25 mins
1032 6G34G Asset Management for IBM WebSphere CommerceVersion 7 FEP 7 25 mins
1033 6G358 Catalog Upload for IBM WebSphere CommerceV7 1 hour
1034 6G36G Product Information Management for IBM WebSphere CommerceVersion 7 FEP 7 25 mins
1035 6G388 Introduction to Marketing Management for IBM WebSphere CommerceVersion 7 FEP 7 1 hour
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1036 6S221 IBM WebSphere CommerceV7 Foundation 2 days
1037 6S405 IBM XML Essentials (SPVC) 5 hours
1038 6S611 IBM Sterling B2B Integrator Fundamentals (SPVC) 5 days
1039 6S632 IBM Sterling B2B Integrator Advanced Business Process Modeling (SPVC) 2 days
1040 6S656 IBM Sterling B2B Integrator Data Mapping and EDI Processing - X12 (SPVC) 5 days
1041 6T115 WebSphereTransformation Extender System Design 2 days
1042 6T116 WebSphereTransformation Extender System Management 2 days
1043 6T130 IBM WebSphereTransformation ExtenderV8.3 Fundamentals 3 days
1044 6T133 IBM WebSphereTransformation ExtenderV8.3 AdvancedTransformationTechniques 3 days
1045 6T223 IBM WebSphere CommerceV7 System Administration 5 days
1046 6T225 Programming Essentials for IBM WebSphere CommerceV7 Customization 5 days
1047 6T226 Advanced Programming topics for IBM WebSphere CommerceV7 Customization 5 days
1048 6T231 IBM WebSphere CommerceV7 Management Center Functionality for Feature Pack 5 4 days
1049 6T400 IBM Sterling eCommerce Essentials 5 hours
1050 6T405 IBM Sterling XML Essentials 5 hours
1051 6T505 IBM Sterling Gentran:Basic for zSeries Mapping andTranslation 4 days
1052 6T530 IBM Sterling Gentran: Server for Microsoft Windows Mapping andTranslation 4 days
1053 6T605 IBM Sterling B2B Integrator Architectural Overview 1 day
1054 6T611 IBM Sterling B2B Integrator Fundamentals 5 days
1055 6T632 IBM Sterling B2B Integrator Advanced Business Process Modeling 2 days
1056 6T636 IBM Sterling B2B Integrator Administration andTuning 4 days
1057 6T656 IBM Sterling B2B Integrator Data Mapping and EDI Processing 5 days
1058 6T705 IBM Sterling Connect:Direct for UNIX Fundamentals 3 days
1059 6T710 IBM Sterling Connect:Direct for Microsoft Windows Fundamentals 3 days
1060 6T735 IBM Sterling Secure ProxyTechnical Fundamentals 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1061 6T746 IBM Sterling File Gateway - Managing Sterling File Gateway 2 days
1062 6T755 IBM Sterling Connect:Direct Secure+ Configuration for Windows using SSL 1 day
1063 6T816 IBM Sterling Warehouse Management System - Configuring a WMS Solution 5 days
1064 6T836 IBM Sterling Call Center and Sterling Store Administration 1 day
1065 6T841 IBM Sterling Field Sales - Administer Sterling Field Sales 1 day
1066 6T853 IBM Sterling ConfiguratorVisual Modeler Fundamentals 2 days
1067 6T857 IBM Sterling ConfiguratorVisual Modeler - Advanced Concepts 3 days
1068 6W856 IBM Sterling Selling and Fulfillment Suite Supply Chain Concepts 3 hours
1069 6W860 IBM® Sterling Supply ChainVisibility Administering an Inbound Supply Chain 7 hours
1070 6W861 IBM® Sterling Supply ChainVisibility Monitoring an Outbound Supply Chain (WBT) 7 hours
1071 9F068 Introduction to IBM®Tealeaf® Collection - WBTs 4 hours
1072 9F079 IBMTealeaf Administration and Maintenance Workshop 8.8 1 day
1073 9F088 IBMTealeaf cxOverstat 8.8 Usability Analysis and Configuration 3 hours
1074 9F099 IBMTealeaf 8.8 Fundamentals 5 hours
1075 9F109 IBMTealeaf Customer Experience 8.8 Events and Reports 2 days
1076 9F119 IBMTealeaf 8.8 Advanced Reports and Dashboards 1 day
1077 9F139 IBMTealeaf Customer Service Optimization for Representativies 8.8 5 hours
1078 9F156 IBMTealeaf Customer Experience 8.8 Expert Arena 3 days
1079 9F218 IBMTealeaf 9.0 Goal-Based Dimensions and Events 1 hour
1080 9F228 IBMTealeaf cxOverstat 9.0 Usability Analysis and Configuration 3 hours
1081 9F288 IBMTealeaf cxOverstat 9.0.1 Usability Analysis and Configuration 5 hours
1082 9J296 IBM IOC and IntelligentTransportation 1.6.0.2: Expert Arena 1 day
1083 9T319 IBM Unica Campaign 8.5 Architecture and Installation 1 day
1084 9T320 IBM Unica Campaign 8.5 Reports Installation and Administration 1 day
1085 9T326 IBM Unica Marketing Operations 8.5 Architecture and Installation 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1086 9T331 Introduction to IBM Unica Campaign 8.6 3 days
1087 9T332 IBM Unica Campaign 8.6 Administration 2 days
1088 9T335 IBM Unica Campaign AdvancedTechniques 3 days
1089 9U010 IBM Building Campaigns 9x 2 days
1090 9U028 Introduction to IBM eMessage:Video Demo Collection 5 hours
1091 9U040 IBM Building Interactive Campaigns 1 day
1092 9U050 IBM Campaign 9.x Administration 2 days
1093 9U088 IBM Contact Optimization: OptimizingYour Contact Strategy 2 hours
1094 9U110 IBM Marketing Operations 9.x: Marketing Contributor 1 day
1095 9U120 IBM Marketing Operations Project Manager 2 days
1096 9U130 IBM Marketing Operations Administration 2 days
1097 9U148 IBM Building Interactive Campaigns 1 day
1098 9U190 IBM Interact Advanced Course 2 days
1099 9U258 IBM Building Campaigns 9.x 2 days
1100 9U269 IBM® Omni-Channel Marketing Expert Arena - SPVC 1 day
1101 9V038 IBM Mobile Web Push 1 hour
1102 9V048 IBM Xtify Mobile Push Notification Console 2 hours
1103 9W344 IBM eMessage Document Composer 1 hour
1104 9W720 IBM Digital Analytics and Marketing Center On-Demand Learning Modules 1 day
SECURITY
1105 BQ102 IBM Security QRadar SIEM Foundations 2 days
1106 BQ121 IBM Security QRadar SIEM 7.2 Administration and Configuration 3 days
1107 BQ141 IBM Security QRadarVulnerabilty Manager 7.2.2 Usage 5 hours
1108 IS603 IBM Security SiteProtector System: Basic Implementation and Administration 2 days
1109 IS613 IBM Security Network Intrusion Prevention System 4.6 Configuration and Deployment Workshop 2 days
1110 IS670 IBM Security Network Protection: Configuration and Deployment 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1111 RL310 Essentials of IBM Rational AppScan Source Edition for Security v8.5 1 day
1112 RL362 Essentials of IBM Rational PolicyTester v8.0 2 days
1113 RT302 Essentials of Web Application Security 0.5 days
1114 RT305 Essentials of Web Accessibility 0.5 days
1115 TK222 IBM Security zSecure UNIX System Services (USS) Security Overview 1 day
1116 TK231 IBM Security zSecure Auditing and Reporting Language (CARLa) (ILT) 3 days
1117 TK232 IBM Security zSecure CARLa Auditing and Reporting Language 3 days
1118 TK242 IBM Security zSecure RACF and SMF Auditing 2 days
1119 TK252 IBM Security zSecure RACF Management Workshop 2 days
1120 TK262 IBM Security zSecure Admin Basic Administration and Reporting 3 days
1121 TK272 IBM Security zSecure Audit Rule-based Compliance Evaluation and Customization 1 day
1122 TK300 IBM Security AppScan Enterprise Fundamentals 2 days
1123 TK400 IBM Security AppScan Standard Fundamentals 2 days
1124 TOS04 IBMTivoli Identity Manager 5.1 Differences and Migration (SPVC) 3 days
1125 TOS14 IBMTivoli Identity Manager 5.1 Basic Implementation (SPVC) 5 days
1126 TOS17 IBMTivoli Identity Manager 5.1 System Administration (SPVC) 3 days
1127 TW064 IBMTivoli Federated Identity Manager 6.2.2 Deployment and Administration 5 days
1128 TW084 IBM Security Directory Server 6.3.1 System Administration 4 days
1129 TW092 IBMTivoli Directory Integrator 7.1.1 Administration and Deployment 3 days
1130 TW104 IBM Security Access Manager 7.0 for Web 4 days
1131 TW105 IBM Security Access Manager for Web 8.0 4 days
1132 TW115 IBM Security Access Manager for Mobile 8.0 2 days
1133 TW173 IBM Security Access Manager for Enterprise Single Sign-On Administration 4 days
1134 TW220 Introduction to IBM Security Federated Directory Services 1 day
1135 TW233 IBMTivoli Directory Server 6.3 Advanced Deployment 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1136 TW241 IBMTivoli Identity Manager 5.1 Differences and Migration 3 days
1137 TW251 IBMTivoli Identity Manager 5.1 Basic Administration 5 days
1138 TW253 IBM Security Identity Manager 6.0 Basic Administration 5 days
1139 TW261 IBMTivoli Identity Manager 5.1 System Administration 3 days
1140 TW273 IBM Security Role and Policy Modeler 1.1.0.2 Basic Administration 2 days
1141 TW293 IBM Security Privileged Identity Manager 1.0 3 days
1142 XIS01 IBMTivoli Directory Integrator 7.1.1 (SPVC) 3 days
1143 XIS02 IBM Security Network Intrusion Prevention System 4.4 Configuration and Deployment (SPVC) 5 hours
1144 XIS04 IBMTivoli Federated Identity Manager 6.2.2 (SPVC) 5 days
1145 XIS05 IBM Security Identity Manager 6.0 Basic Administration (SPVC) 5 days
1146 XIS07 IBM Security QRadar SIEM 7.2 Foundations (SPVC) 2 days
1147 XIS08 IBM Security QRadar SIEM 7.2 Administration and Configuration (SPVC) 3 days
1148 XIS09 IBM Security Privileged Identity Manager 1.0 (SPVC) 3 days
1149 TOD19 IBM Endpoint Manager 9 for Server Automation - SPVC 1 day
1150 TOS42 IBM Endpoint Manager for Server Automation 8.2 (SPVC) 0.75 days
1151 TOS46 IBM Endpoint Manager for Software Use Analysis 2.1 (SPVC) 1 day
1152 TOS50 IBM Endpoint Manager for Lifecycle Management - Remote Control (SPVC) 5 hours
1153 TOS51 IBM Endpoint Manager 9 Platform Fundamentals (SPVC) 3 days
1154 TOS60 IBM Endpoint Manager 9 Console Operations (SPVC) 1 day
1155 TOS80 IBM Endpoint Manager Software Use Analysis 9.1/IBM License ManagementTool 9.0 1 day
1156 TP403 IBM Endpoint Manager 9 Platform Fundamentals 3 days
1157 TP433 IBM Endpoint Manager 9 Content Development and Customization 3 days
1158 TP451 IBMTivoli Endpoint Manager 8.2 for Security and Compliance Fundamentals 3 days
1159 TR223 Tivoli Process Automation Engine 7.5 Workflow Design and Implementation 3 days
1160 TS113 IBMTivoli Storage Productivity Center 5.2.3 Installation and Configuration 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1161 TS114 IBMTivoli Storage Productivity Center 5.2.3 Daily Operations and Provisioning 2 days
1162 TS115 IBMTivoli Storage Productivity Center 5.2.3 Cognos Reporting 1 day
1163 TS311 IBMTivoli Storage Manager FastBack 6.1.1 Installation, Configuration, Operation 3 days
1164 TS602 IBMTivoli Storage Manager 6.3 Differences 2 days
1165 TS612 IBMTivoli Storage Manager 6.3 Implementation and Administration 5 days
1166 TS613 IBMTivoli Storage Manager 7.1 Implementation and Administration 5 days
1167 TS614 IBMTivoli Storage Manager 7.1.1 Implementation and Administration 5 days
1168 TS622 IBMTSM 6.3 Advanced Administration,Tuning,Troubleshooting 5 days
1169 TS623 IBMTSM 7.1 Advanced Administration,Tuning,Troubleshooting 5 days
1170 TS631 IBMTivoli Storage Manager forVirtual Environments 6.4 1 day
1171 TS632 IBMTivoli Storage Manager forVirtual Environments 7.1 1 day
1172 TSX12 IBMTivoli Storage Manager 6.3 Implementation and Administration for AIX 5 days
1173 TSX22 IBMTivoli Storage Manager 6.3 Advanced Administration for AIX 5 days
SYSTEMS
1174 QB133 Fundamentals of IBM Rational System Architect,V11.4 1 day
1175 QB138G DoDAF 2.0 Modeling with IBM Rational System ArchitectV.11.4 3 days
1176 WRZ14 IBM ITSO POWER8Technology and SystemsTechnical Deep Dive 1 day
1177 H0050 IBM Platform GPFS 4.1 for Linux 3 days
1178 H0100 Platform LSF 9.1 Basic for Linux 3 days
1179 H0230 Platform LSF 9.1 Advanced for Linux 3 days
1180 H0310 Platform Analitics 9.1 Admin (for LSF) 2 days
1181 H0320 Platform Analytics 9.1 End User (for LSF) 3 days
1182 H0420 IBM Platform Application Center (PAC) 9.1.2 1 day
1183 H0430 Platform Process Manager 9.1.2 1 day
1184 H0440 IBM Platform ReportTrack Monitor (RTM) 9.1.2 1 day
1185 H0500 Platform Symphony 6.1 Admin Basic 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1186 H0520 Platform Symphony 6.1 Admin Advanced 2 days
1187 H0620 Platform Symphony 6.1 Application Programming 3 days
1188 H0800 IBM Platform HPC 4.1.1 4 days
1189 AL320 Korn and Bash Shell Programming 5 days
1190 AN080 Power Systems and AIX Differences Workshop 3 days
1191 AN1010 POWER8 and AIX Enhancements 2 days
1192 AN1010 POWER8 and AIX Enhancements Workshop 2.5 days
1193 AN100 AIX Basics 4 days
1194 AN110 Power Systems for AIX I: LPAR Configuration and Planning 3 days
1195 AN120 Power Systems for AIX II:AIX Implementation and Administration 5 days
1196 AN140 AIX Jumpstart for UNIX Professionals 5 days
1197 AN150 Power Systems for AIX III:Advanced Administration and Problem Determination 5 days
1198 AN170 AIX Workload Partitions: Configuration and Management 4 days
1199 AN210 TCPIP for AIX Administrators 4 days
1200 AN220 AIX Network Installation Manager: Concepts and Configuration 2 days
1201 AN301 Power Systems for AIX -Virtualization I: ImplementingVirtualization 5 days
1202 AN310 Power Systems for AIX -Virtualization II:Advanced PowerVM and Performance 4.5 days
1203 AN320 Power Systems for AIX III:Virtualization - Implementing Shared Storage Pools 3 days
1204 AN330 Implementing PowerVM Live Partition Mobility 3 days
1205 AN410 PowerHA SystemMirror 6.1 Planning, Implementation and Administration 5 days
1206 AN420 PowerHA SystemMirror 6.1 Migration, Extended Configuration and PD 5 days
1207 AN490 AIX SAN Management I:Administration 2 days
1208 AN510 Power Systems for AIX IV: Performance Management 5 days
1209 AN520 AdvancedTools for AIX Performance Analysis 4 days
1210 AN570 Implementing AIX Security Features 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1211 AN610 PowerHA SystemMirror 7 Planning, Implementation, Customization and Basic Admininstration 5 days
1212 AN620 PowerHA SystemMirror 7 Advanced Configurations 5 days
1213 AN651 PowerHA SystemMirror 7 and Migration 3 days
1214 AN660 PowerHA SystemMirror 7 Problem Determination 3 days
1215 AN670 PowerHA SystemMirror 7.1 Planning and Implementation 3 days
1216 AN680 PowerHA SystemMirror 7.1: Customization and Basic Administration 2 days
1217 AN720 UNIX / AIX User Essentials 2 days
1218 AN730 UNIX / AIX Additional User Skills 2 days
1219 AT111 AIX Problem Determination I Boot Issues (WBT) 3 days
1220 AT121 AIX Problem Determination II LVM Issues (WBT) 3 days
1221 AT880 PowerVM forVmware Administrators (WBT) 5 hours
1222 AU241 PERL Programming for Open Systems 4 days
1223 AS060 RPG IV Programming Fundamentals Workshop for IBM i 4 days
1224 AS100 RPG IV Programming Advanced Workshop for IBM i 4 days
1225 AS180 IBM i Network and Web Security 3 days
1226 AS240 System Operator Workshop for IBM i 4 days
1227 AS270 Advanced System Operator Workshop for IBM i 3 days
1228 AS280 BRMS for IBM i 5 days
1229 AS2B0 System Operator Workshop using System i Navigator 2 days
1230 AS2C0 System Operator Workshop using IBM Navigator for i 2 days
1231 AS541 IBM Power HA for i, Clustering, and IASP Implementation 4 days
1232 AS5A0 Implementing IASP on IBM i 2 days
1233 AS5B0 HA and Implementing Clusters on IBM i 2 days
1234 AS5E0 PowerVM on IBM i - I: ImplementingVirtualization and LPAR 3 days
1235 AS5F0 PowerVM on IBM i - II:AdvancedTopics and Performance 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1236 OD040 Getting Started with DB2 Web Query 1 day
1237 OD470 IBM i DB2 and SQL School 5 days
1238 OE980 Introduction to IBM i for New Users 1 day
1239 OL190 IBM i System Administration 5 days
1240 OL201 Control Language Programming Workshop for IBM i 4 days
1241 OL230 IBM i PerformanceTuning - I: PerformanceTools and BasicTuning 2 days
1242 OL2A0 Basic CL Programming Workshop for IBM i 2 days
1243 OL2B0 Advanced CL Programming Workshop for IBM i 2 days
1244 OL370 Accessing the IBM i Database Using SQL 2 days
1245 OL380 Developing IBM i Applications Using SQL 2 days
1246 OL4A0 IBM iTechnical Introduction 3 days
1247 OL4B0 ILE Foundation for IBM i 1 day
1248 OL500 IBM i Security Concepts and Implementation 2 days
1249 OL510 IBM i Recovery and Availability Management 2 days
1250 OL520 Hardware Management Console (HMC) for Power Systems with IBM i 2 days
1251 OL620 DB2 for i: DB Coding and Implementation Using DDS and CL Commands 3 days
1252 OL660 IBM i PerformanceTuning - II:Advanced Analysis and CapacityTuning 4 days
1253 OS019 What's new in IBM iVR2 and IBM POWER8 systems 3 days
1254 OS180 What's new inV7R1 and IBM Power Systems 2 days
1255 LX021 Linux Basic and Installation 4 days
1256 LX032 LINUX System Administration I - Implementation 5 days
1257 LX150 Linux Jumpstart for UNIX System Administrators 4 days
1258 LX210 Linux on Power Fundamentals 3 days
1259 LX520 Linux on Power Performance 3 days
1260 LX530 Virtualizing Linux on Power with PowerKVM 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1261 SN712 Storage Area Networking Fundamentals 4 days
1262 SN781 Supporting IBM N series 5 days
1263 SNV10 SANVolume Controller (SVC) Planning and Implementation Workshop 4 days
1264 SS050 Introduction to Data Storage Subsystems 2 days
1265 SS060 Storage Management Fundamentals 2.5 days
1266 SS260 IBMVirtualization EngineTS7700 Planning and Implementation 2 days
1267 SS270 IBMTape Encryption Implementation 2 days
1268 SS280 TS3500Tape Library Architecture and Implementation – Open Systems and System z 2 days
1269 SS291 IBM System StorageTS7650 ProtecTIER 2 days
1270 SS830 z/OSVSAM and Access Method Services 4 days
1271 SS840 DFSMS Implementation 4 days
1272 SS860 DFSMShsm Implementation 4.5 days
1273 SSA00 IBM XIVTechnicalTraining 2 days
1274 SSC100 OpenStack Integration with IBM System Storage 2 days
1275 SSC200 IBM Software-defined Networking forVirtual Environments: Implementation 2 days
1276 SSD00 Scale Out Network Attached Storage (SONAS)TechnicalTraining 3 days
1277 SSE10 IBM StorwizeV7000 Implementation Workshop 4 days
1278 SSF00 IBM DS8000 Implementation Workshop for Open Systems 4 days
1279 SSF10 IBM DS8000 Implementation Workshop for System z 3 days
1280 SSFS1 IBM Flash Storage Fundamentals 1 day
1281 SSG00 IBM StorwizeV7000 Unified Implementation Workshop 4 days
1282 QZ0020 Implementing Cloud Manager with Openstack on Power Systems 3 days
1283 NGT11 IBM PureFlex System Fundamentals 3 days
1284 NGT31 IBM Flex System Power Compute Nodes -Virtualization and Management 3 days
1285 NGT41 IBM Flex System Manager 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1286 NGT61 IBM Flex SystemV7000 Storage Node 3 days
1287 NGTB1 IBM PureFlex Systems Fundamentals & Implementation Services (5 Day) 5 days
1288 NGTB2 IBM PureFlex Systems Implementation Services (2 Day) 2 days
1289 XTR21 IBM System Storage Connectivity Options for System x 2 days
1290 BE870 Effective RACF Administration 4.5 days
1291 CB695 TCP/IP for z/OS Implementation Workshop 5 days
1292 ES050 An Introduction to the z/OS Environment 2 days
1293 ES070 z/OS JCL and Utilities 4.5 days
1294 ES10A Fundamental System Skills in Z/OS 5 days
1295 ES155 z/OS Facilities 4.5 days
1296 ES191 Basics of z/OS RACF Administration 4.5 days
1297 ES200 z/OS System Services Structure 4.5 days
1298 ES240 IBM System z Hardware Management Console (HMC) Operations 2 days
1299 ES261 SMP/E for z/OS Workshop 4.5 days
1300 ES270 z/OS System Operators 3 days
1301 ES281 z/OS JES2 OperatorTraining 2 days
1302 ES311 COBOL Programming Basic 4 days
1303 ES312 PL/I Programming 4 days
1304 ES313 z/OS Basic 4 days
1305 ES314 z/OS Utility 4 days
1306 ES315 z/OS JCL 4 days
1307 ES316 TSO (ISPF) Operation Basic 4 days
1308 ES317 REXX Programming 4 days
1309 ES328 FICON Planning, Operation, Implementation and Problem Determination 3 days
1310 ES340 Assembler Language Coding Workshop (copied) 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1311 ES350 Advanced Assembler Language Coding Workshop 5 days
1312 ES400 z/OS System Programmer Fundamentals 5 days
1313 ES41A z/OS Installation Using ServerPac 4.5 days
1314 ES420 Parallel Sysplex Implementation Workshop 4.5 days
1315 ES52A z/OS REXX Programming Workshop 4.5 days
1316 ES545 Basic z/OSTuning Using the Workload Manager 4.5 days
1317 ES662 Advanced z/OS Security: Crypto, Network, RACF andYour Enterprise 3.5 days
1318 ES685 WebSphere for z/OSVersion 8 Implementation 4.5 days
1319 ES732 IBM System z Parallel Sysplex Operations 3 days
1320 ES820 IBM System z:Technical Overview of HW and SW Mainframe Evolution 2 days
1321 ES840 Implementing RACF Security for CICS/ESA and CICS/TS 4.5 days
1322 ES851 Advanced z/OS Performance:WLM, Sysplex, UNIX Services and Web 4.5 days
1323 ES885 Exploiting the Advanced Features of RACF 4 days
1324 ES900 Advanced Parallel Sysplex Operations and Recovery Workshop 4.5 days
1325 ES962 Hardware Configuration and Definition (HCD) for z/OS 4 days
1326 ESA01 IBM zEnterprise System:ATechnical Introduction 1 day
1327 ESB10 z/OS Management Facility Implementation and Use 3 days
1328 ESB30 z/OS Management Facility Implementation and Use 2.1 3 days
1329 ESC10 z/OSV1R11 Update and Migration 3 days
1330 ESC30 z/OSV1R12 Update 3 days
1331 ESC50 z/OSV1R12 to z/OSV1R13 Update 3 days
1332 ESC60 z/OS 1.13 to z/OS 2.1 Migration 3 days
1333 ESD00 IBM zEnterprise HMC Ensemble Operations 2 days
1334 ESD20 z/OS Health Check andTroubleshooting 3 days
1335 ESG00 IBM zEnterprise System Channel Architecture and I/O Operations 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1336 ESZ00 IBM System z FastTrack 1 day0
1337 MV100 Parallel Sysplex Overview 1 day
1338 NW751 TCP/IP High Availability Solutions for z/OS 4 days
1339 NW791 TCP/IP for z/OS: Diagnostics and Debugging 4 days
1340 OP052 Introducing z/OS UNIX System Services 2.5 days
1341 OP251 z/OS UNIX System Services Implementation 4.5 days
1342 SZ810 z/OS Security Server RACF, Implementing and Customization 3 days
1343 ZL000 zVM and zLinux Bootcamp 5 days
1344 ZL100 Linux Implementation for System z 3 days
1345 ZL120 Linux Basics - A System z Perspective 2 days
1346 ZL150 Advanced Solutions for Linux on System z (SuSE) 4 days
1347 ZV020 z/VM Introduction and Concepts 3 days
1348 ZV062 Installing, Configuring and Servicing z/VM for Linux Guests 5 days
1349 ZV100 z/VM & Linux Connectivity and Management 3.5 days
1350 ZV200 z/VM RACF and DIRMAINT Implementation 4.5 days
1351 ZV220 IBM Wave for z/VM and Linux on System z 3 days
1352 1SM00 Introduction to Cloud Computing Architecture 2 days
1353 1SP00 Implementing Power Infrastructure for Cloud 3 days
1354 1SP20 Implementing IBM SmartCloud Entry on Power Systems 2 days
1355 1SP40 Cloud Administration on Power Systems 3 days
1356 1SS20 Implementing SmartCloud Storage Access 3 days
1357 1SX20 Implementing IBM SmartCloud Entry on System x 2 days
1358 1SX40 Cloud Admininstration on System x 3 days
1359 1SX50 Advanced Cloud Solutions using IBM SmartCloud Orchestrator on x86 Platform 3 days
1360 2SX20 Implementing Cloud Manager with Openstack on x86 Architecture Servers 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1361 AN0D0 IBM Systems Director 6.3 - Power and System x - Planning and Installation (SPVC) 3 days
1362 XTRD0 IBM Systems Director 6.3 - Power and System x - Planning and Installation (SPVC) 3 days
1363 QZ0010 Implementing Power Cloud Infrastructure with PowerVC 2 days
1364 SM926 IBMTivoli System Automation for z/OS 3.4 Introduction and Operations 4 days
1365 SM936 IBMTivoli System Automation for z/OS 3.4 Implementation and Administration 5 days
1366 SM952 IBMTivoli SA for Multiplatforms 3.2.1: Installation and Administration 3 days
1367 TOD15 IBMTivoli Storage Manager 7.1 forVirtual Environments (WBT) 1.5 hours
1368 TOS39 IBMTivoli Storage Manager Suite for Unified Recovery Daily Administration 2.25 days
1369 TOS53 IBM Automation Control for z/OS 1.1 Fundamentals (SPVC) 8 hours
1370 TOS61 IBMTivoli Storage Manager 6.3 Implementation and Administration (SPVC) 5 days
1371 TOS78 IBMTivoli Storage Manager Fundamentals and Daily Operations 3 days
1372 TOS85 IBMTivoli Storage Flashcopy Manager 4.1 for Windows - WBT 5 hours
1373 TZ203 IBMTivoli NetView for z/OS 6.1 Fundamentals 1 day
1374 TZ213 IBMTivoli NetView for z/OS 6.1 Automation 2 days
1375 TZ223 IBMTivoli NetView for z/OS 6.1 REXX 1 day
1376 TZ233 IBMTivoli NetView for z/OS 6.1 PIPEs 1 day
1377 TZ243 IBMTivoli NetView for z/OS 6.1 Fundamentals,Automation, REXX, PIPEs 5 days
1378 RA903 Architecting Services with Rational Software ArchitectV7.5 and SoaML 2 days
1379 RD420 Domain-Specific Modeling with IBM Rational Software Architect,V7.5 1 day
1380 RN110 Developing COBOL with IBM Rational Developer for System zV8.0 2 days
1381 RN111 Developing Mainframe Applications with IBM Rational Developer for System zV9.0 2 days
1382 RN200 Essentials of IBM Rational Asset AnalyzerV6.0 1 day
1383 RR353 Essentials of IBM Rational Requirements Composer,V4.0 2 days
1384 RS727 Configuring Projects in IBM RationalTeam ConcertV4.0 3 days
1385 RS728 Configuring Projects in IBM RationalTeam ConcertV4.0.4 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1386 RS842 Developing Software with IBM RationalTeam ConcertV4.0 1 day
1387 RS843 Developing Software with IBM RationalTeam Concert v4.0.4 1 day
1388 RS860 JazzTeam ServerV4.0 Administration 2 days
1389 RS861 JazzTeam ServerV4.0.4 Administration 2 days
1390 RT273 Test Management with IBM Rational Quality Manager,V4.0 2 days
1391 RT283 Testing with IBM Rational Quality ManagerV4.0 1 day
1392 RT294 Administering IBM Rational Quality ManagerV4.0.4 Projects 1 day
1393 RT525 Essentials of IBM Rational PerformanceTesterV8.2 2 days
1394 RT545 Essentials of IBM Rational FunctionalTester, Java Scripting,V8.0 2 days
1395 RT561 Essentials of IBM Rational IntegrationTesterV8.6 1 day
1396 RT566 Testing with IBM Rational IntegrationTesterV8.6 2 days
1397 RT571 ServiceVirtualization with IBM Rational IntegrationTesterV8.6 2 days
1398 VW009 Technical Introduction to IBM MessageSight Insight and MQTT 3 hours
1399 VW324 Roadmap to Mobile Web Development 1 day
1400 VW328 Push Notification in IBM Worklight Hybrid Apps 5 hours
1401 VW330 Foundations of Mobile Computing and IBM MobileFirst 3 hours
1402 VW406 Technical Introduction to WebSphere DataPowerV5 3 hours
1403 VW410 Using Styles to Create Responsive Mobile Web Experiences (Web-based) 1 day
1404 VW420 API Management Concepts (WBT) 5 hours
1405 VW421 Getting Started with IBM API ManagementV3 5 hours
1406 VW584 WebSphere Application Server Liberty Profile Collective/Cluster Administration 4 hours
1407 VW600 Technical Introduction to WebSphere DataPowerV6 (WBT) 3 hours
1408 VW700 Technical Introduction to IBM WebSphere DataPower Gateway AppliancesV7-WBT 3 hours
1409 VW851 CICS Fundamentals 3 days
1410 VW852 CICSV5 BasicTailoring 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1411 VW865 CICS Command Level Coding - WBT 5 days
1412 VW871 Mobile Access to IBM Business Process Manager with IBM Worklight (WBT) 2 hours
1413 VW901 Understanding Business Process Manager (WBT) 6 hours
1414 VW902 Introducing IBM Business Process Manager 5 hours
1415 VW903 Getting Started with IBM Operational Decision Manager-WBT 2 hours
1416 VW916 IBM PureApplication SystemV1.1Technical Overview (WBT) 1 day
1417 VW917 IBM PureApplication System v1.1 Backup and Recovery 3 hours
1418 VW920 Developing Patterns with IBM PureApplication SystemV2.0 3 hours
1419 VW945 IBM WebSphere Cast IronV7 Configuration (WBT) 1 day
1420 VW946 IBM WebSphere Cast IronV7.0: Database and Salesforce Applications 5 hours
1421 VW955 WebSphere Cast IronV7 Administration 5 hours
1422 VW976 Administering Java Batch in WebSphere Application ServerV8.5.5 (WBT) 1 day
1423 VY102 Developing BlueMix Applications with IBM SDK for Node.js 5 hours
1424 VY103 Working with Liberty Profile on Bluemix (BYOE) 1.5 days
1425 VY329 Developing Server Applications with Node.js (BYOE) - WBT 5 hours
1426 VY583 Working with WebSphere Application ServerV8.5.5.2 Liberty Profile (BYOE) - WBT 1.5 days
1427 WA170 IBM WebSphere Application ServerV7 Administration on AIX 5 days
1428 WA180 WebSphere Application ServerV8 Administration for AIX 5 days
1429 WA370 IBM WebSphere Application ServerV7 Administration on Windows 5 days
1430 WA380 WebSphere Application ServerV8 Administration for Windows 5 days
1431 WA504 Managing Mobile Applications with IBM WorklightV6 2 days
1432 WA505 Mobile Application Administration with IBM Worklight FoundationV6.2 2 days
1433 WA570 IBM WebSphere Application ServerV7 Administration on Linux 5 days
1434 WA580 WebSphere Application ServerV8 Administration for Linux 5 days
1435 WA585 WebSphere Application ServerV8.5 Administration 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1436 WA591 WebSphere Application ServerV8.5.5 Problem Determination 5 days
1437 WA680 WebSphere Application ServerV8.5 Scripting and Automation 5 days
1438 WA715 IBM WebSphere Application ServerV7 PerformanceTuning 3 days
1439 WA815 WebSphere Application ServerV8.5.5 PerformanceTuning 4 days
1440 WA855 WebSphere Application ServerV8.5.5 Administration 5 days
1441 WA870 IBM WebSphere Application ServerV7 Multi-node Administration 3 days
1442 WA880 WebSphere Application ServerV8.5: Using Intelligent Management 3 days
1443 WB001 IBM WebSphere Lombardi Edition 7.1-7.2 Process Modeling 2 days
1444 WB002 IBM WebSphere Lombardi Edition 7.1-7.2 Process Implementation 3 days
1445 WB003 IBM WebSphere Lombardi Edition 7.1-7.2 Process Modeling and Implementation 5 days
1446 WB004 BPM Project Management 2 days
1447 WB005 IBM WebSphere Lombardi EditionV7.1 Process Modeling, Operations,Administration 5 days
1448 WB009 BPM Process Analysis Methods I 3 days
1449 WB010 BPM Process Analysis Methods II 4 days
1450 WB011 BPM Process Analysis Methods III 5 days
1451 WB282 IBM WebSphere Business ModelerV6.2: Process Mapping, Simulation and Analysis 5 days
1452 WB284 IBM WebSphere Business ModelerV6.2: Process Mapping and Analysis 3 days
1453 WB286 IBM WebSphere Business ModelerV6.2: Process Simulation and Analysis 2 days
1454 WB301 Capturing and Authoring Business Rules with IBM WebSphere ILOG JRulesV7.0 5 days
1455 WB307 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 5 days
1456 WB308 Capturing and Authoring Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 5 days
1457 WB309 Capturing Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 3 days
1458 WB310 Authoring Business Rules in IBM WebSphere ILOG RuleTeam ServerV7.1 3 days
1459 WB313 Capturing and Authoring Rules in IBM ILOG JRules BRMSV7.1 – Rule StudioVersi 5 days
1460 WB314 Authoring Business Rules in IBM WebSphere ILOG Rule StudioV7.1 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1461 WB315 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 - II 3 days
1462 WB319 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV7.5 4 days
1463 WB321 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV7.5 5 days
1464 WB324 Managing Decisions in IBM WebSphere Operational Decision ManagementV7.5 5 days
1465 WB325 Authoring Rules in IBM WebSphere Operational Decision ManagementV7.5 3 days
1466 WB380 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV8 4 days
1467 WB381 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV8 5 days
1468 WB383 Developing Rule Solutions in IBM Operational Decision ManagerV8.5 5 days
1469 WB384 Managing Decisions in IBM WebSphere Operational Decision ManagementV8 5 days
1470 WB385 Authoring Rules in IBM WebSphere Operational Decision ManagementV8 3 days
1471 WB386 Managing Decisions in IBM Operational Decision ManagerV8.5 5 days
1472 WB387 Administering IBM WebSphere Operational Decision ManagementV8 4 days
1473 WB389 Administering IBM Operational Decision ManagerV8.5 4 days
1474 WB390 Developing Rule Solutions in IBM Operational Decision ManagerV8.6 5 days
1475 WB391 Managing Decisions in IBM Operational Decision ManagerV8.6 5 days
1476 WB392 Developing Rule Solutions in IBM Operational Decision ManagerV8.7 5 days
1477 WB394 Developing Solutions with IBM Decision Server InsightsV8.7 3 days
1478 WB711 Developing Applications for IBM WebSphere Process ServerV7 - I 5 days
1479 WB712 Developing Applications for IBM WebSphere Process ServerV7 - II 5 days
1480 WB713 Developing Applications for IBM WebSphere Enterprise Service BusV7 5 days
1481 WB715 Developing HumanTask Business Processes for IBM WebSphere Process ServerV7 3 days
1482 WB722 Administration of IBM WebSphere Process ServerV7 5 days
1483 WB723 WebSphere Enterprise Service BusV7.0 Administration 3 days
1484 WB724 IBM WebSphere Process ServerV7 Performance andTuning 3 days
1485 WB725 IBM WebSphere Process ServerV7.0 Problem Determination 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1486 WB731 Process Modeling with IBM Business Process Manager (BPM) 2 days
1487 WB733 Process Modeling and Implementation with IBM Business Process Manager (BPM) 5 days
1488 WB738 Process Implementation II with IBM Business Process ManagerV7.5.1 3 days
1489 WB741 Modeling with IBM Business Process ManagerV7.5.1 2 days
1490 WB743 Modeling and Implementing with IBM Business Process ManagerV7.5.1 5 days
1491 WB745 IBM Business Process ManagerV7.5.1 Process Modeling and Administration 5 days
1492 WB746 Process Center Administration with IBM Business Process ManagerV7.5.1 3 days
1493 WB751 Developing Applications for IBM Business Process Manager AdvancedV7.5 - I 5 days
1494 WB752 Developing Applications for IBM Business Process Manager AdvancedV7.5 - II 5 days
1495 WB753 Developing Applications for IBM WebSphere Enterprise Service BusV7.5 5 days
1496 WB754 Transition to IBM Business Process Manager AdvancedV7.5 for Developers 2 days
1497 WB762 Administration of IBM Business Process Manager AdvancedV7.5 5 days
1498 WB771 Using IBM WebSphereV7 Products for Business Process Management 3 days
1499 WB782 IBM WebSphere Business ModelerV7: Process Mapping, Simulation and Analysis 5 days
1500 WB784 IBM WebSphere Business ModelerV7: Process Mapping and Analysis 3 days
1501 WB786 IBM WebSphere Business ModelerV7: Process Simulation and Analysis 2 days
1502 WB792 IBM WebSphere Business MonitorV7: Implementation and Administration 3 days
1503 WB793 Developing Applications with IBM WebSphere Business MonitorV7 3 days
1504 WB794 Administering IBM WebSphere Business MonitorV7 2 days
1505 WB795 Business Activity Monitoring with IBM WebSphere Business MonitorV7 1 day
1506 WB797 Developing Applications with IBM Business MonitorV7.5 3 days
1507 WB798 Administering IBM Business MonitorV7.5 2 days
1508 WB799 Business Activity Monitoring with IBM Business MonitorV7.5 1 day
1509 WB801 Process Modeling with IBM Business Process Manager StandardV8 2 days
1510 WB802 Modeling and Implementing with IBM Business Process ManagerV8 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1511 WB803 Process Implementation with IBM Business Process Manager StandardV8 - II 5 days
1512 WB804 Administration of IBM Business Process Manager StandardV8 4 days
1513 WB806 Reporting with IBM Business Process Manager StandardV8 2 days
1514 WB807 Process Modeling with IBM Business Process Manager StandardV8.5 2 days
1515 WB808 Process Implementing with IBM Business Process Manager StandardV8.5 - I 5 days
1516 WB809 Process Implementing with IBM Business Process Manager StandardV8.5 - II 5 days
1517 WB811 Reporting with IBM Business Process Manager StandardV8.5 2 days
1518 WB812 Administration of IBM Business Process Manager StandardV8.5 4 days
1519 WB813 Process Modeling with IBM Business Process Manager StandardV8.5.5 2 days
1520 WB814 Process Implementing with IBM Business Process Manager StandardV8.5.5 - I 5 days
1521 WB815 Process Implementing with IBM Business Process Manager StandardV8.5.5 - II 5 days
1522 WB851 Developing Applications in IBM Business Process Manager AdvancedV8 – I 5 days
1523 WB852 Developing Applications in IBM Business Process Manager AdvancedV8 - II 5 days
1524 WB855 Developing Applications in IBM Business Process Manager AdvancedV8.5 -I 5 days
1525 WB857 Developing Applications in IBM Business Process Manager AdvancedV8.5.5 - I 5 days
1526 WB862 Administration of IBM Business Process Manager AdvancedV8 5 days
1527 WB867 Administration of IBM Business Process Manager AdvancedV8.5 5 days
1528 WB868 IBM Business Process ManagerV8.5 Performance andTuning 3 days
1529 WB869 IBM Business Process ManagerV8.5 Problem Determination 5 days
1530 WB870 Administration of IBM Business Process Manager AdvancedV8.5.5 5 days
1531 WB891 Developing Applications with IBM Business MonitorV8 3 days
1532 WB895 Developing Applications with IBM Business MonitorV8.5.5 3 days
1533 WD104 Fundamentals of Enterprise OSGi with IBM WebSphere Application ServerV8.5 1 day
1534 WD150 Introduction to Object-Oriented Programming with Java Examples 3 days
1535 WD154 Java SE 6 Programming Fundamentals 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1536 WD160 Developing Applications with Java Persistence API (JPA) 2 days
1537 WD329 Location Services with IBM Worklight FoundationV6.2 5 hours
1538 WD370 Java EE 5 Development for WebSphere Application ServerV7 4 days
1539 WD470 Developing Mobile Web 2.0 Applications for WebSphere Application ServerV8 3 days
1540 WD506 Web Service Development for IBM WebSphere Application ServerV7 5 days
1541 WD507 REST Service Development with Java 3 days
1542 WD601 Mobile Application Development with IBM WorklightV6.1 4 days
1543 WD602 Mobile Application Development with IBM Worklight FoundationV6.2 3 days
1544 WE601 Accelerate, Secure and Integrate with IBM DataPowerV6 5 days
1545 WE620 Administration of IBM WebSphere DataPower SOA AppliancesV6 3 days
1546 WE701 Accelerate, Secure and Integrate with WebSphere DataPowerV7.0 Web Gateway 5 days
1547 WE702 XML and Web Services Solutions with IBM DataPower Gateway v7 4 days
1548 WE703 REST and Oauth Solutions with IBM DataPower Gateway v7 1 day
1549 WE720 Administration of IBM WebSphere DataPower GatewayV7 3.5 days
1550 WE947 Making APIs Work forYou with IBM API ManagementV3 2 days
1551 WM101 Technical Introduction to IBM WebSphere MQ 1 day
1552 WM102 Technical Introduction to IBM MQ 1 day
1553 WM201 IBM WebSphere MQV7 System Administration (using Windows for labs) 4 days
1554 WM203 IBM WebSphere MQV7 System Administration (Linux labs) 4 days
1555 WM207 IBM MQV8 System Administration (using Windows for labs) 4 days
1556 WM209 IBM MQV8 System Administration (using Linux for labs) 4 days
1557 WM211 IBM WebSphere MQV7.5 Advanced System Administration (Distributed) 4 days
1558 WM212 IBM MQV8 Advanced System Administration (Distributed) 4 days
1559 WM252 Designing, Implementing, and Managing IBM MQV8 Clusters 3 days
1560 WM300 IBM WebSphere MQV7 System Administration for z/OS 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1561 WM310 IBM WebSphere MQV7 Advanced System Administration for z/OS 3.5 days
1562 WM503 IBM WebSphere MQV7 Application Development (using z/OS for labs) 3 days
1563 WM504 IBM WebSphere MQV7.5 Application Development (Windows labs) 3 days
1564 WM505 IBM WebSphere MQV7.5 Application Development (Linux Labs) 3 days
1565 WM515 IBM WebSphere MQV7 Programming Using JMS 3 days
1566 WM644 IBM WebSphere Message BrokerV8.0 System Administration 4 days
1567 WM645 IBM Integration BusV9.0 System Administration 4 days
1568 WM664 IBM WebSphere Message BrokerV8 Application Development I 5 days
1569 WM665 IBM Integration BusV9 Application Development I 5 days
1570 WM674 IBM WebSphere Message BrokerV8 Application Development II 3 days
1571 WM675 IBM Integration BusV9 Application Development II 4 days
1572 WM820 CICSV3 Advanced System ProgrammerTopics Including SOA and Web Services 5 days
1573 WM844 CICSPlex System ManagerV4 Introduction 1 day
1574 WM845 CICSV5 CICSPlex System Manager Introduction 1 day
1575 WM851 CICSV5 Fundamentals 3 days
1576 WM852 CICSV5 BasicTailoring 5 days
1577 WM854 CICSPlex System ManagerV4 Administration 4 days
1578 WM855 CICSV5 CICSPlex System Manager Administration 4 days
1579 WM865 CICS Command Level Coding 5 days
1580 WM875 CICSV5 Advanced Application Development for SOA and Web Services 4 days
1581 WM880 Getting to Know IBMTXSeries 5 days
1582 WPL41 Administering IBM Web Content Manager 2 days
1583 WPL43 Developing websites using IBM Web Content Manager 8 5 days
1584 WPL44 Administering IBM Web Content Manager 8.0 2 days
1585 WPL45 Advanced IBM Web Content Manager 8.0 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1586 WPL51 Developing Applications for IBM WebSphere Portal 7.0 5 days
1587 WPL53 Developing Applications for IBM WebSphere Portal 8.0 using IBM RAD 8.5 5 days
1588 WPL55 Build IBM WebSphere Portal 8.5 Applications Using Rational Application Developer 5 days
1589 WPL56 Developing Multichannel Applications with IBM Web Experience Factory 8.5 3 days
1590 WPL81 Installation and Administration of IBM WebSphere Portal 7.0 on Windows 5 days
1591 WPL82 Essential Websphere Portal 7.0 Administration skills for Developers on Windows 3 days
1592 WPL83 Installation and Administration of IBM WebSphere Portal 8 on Windows 5 days
1593 WPL91 Installation and Administration of IBM WebSphere Portal 7.0 on Linux 5 days
1594 WPL93 Installation and Administration of IBM WebSphere Portal 8 on Linux 5 days
1595 WPL95 Installation and Administration of IBM WebSphere Portal 8.5 on Linux 5 days
1596 WPP41 Administering IBM Web Content Manager (SPVC) 1.5 days
1597 WPP43 Developing Websites with IBM Web Content Manager 8 (SPVC) 5 days
1598 WPP51 Developing Applications for IBM WebSphere Portal 7.0 (SPVC) 5 days
1599 WPP80 Exploring new features of Websphere Portal 7.0 Administration on Windows (SPVC) 2 days
1600 WPP81 Installation and Administration of IBM WebSphere Portal 7.0 on Windows (SPVC) 5 days
1601 WPP82 Essential WS Portal 7.0 Administration skills for Developers on Windows (SPVC) 3 days
1602 WPP90 Exploring new features of Websphere Portal 7.0 Administration on Linux (SPVC) 2.5 days
1603 WPP91 Installation and Administration of IBM WebSphere Portal 7.0 on Linux (SPVC) 5 days
1604 WPW20 IBM Forms 8.0 Workshop 3 days
1605 WS800 IBM WebSphere Service Registry and RepositoryV8 for Developers 3 days
1606 WS811 IBM WebSphere Service Registry and RepositoryV8.0 for Administrators 2 days
1607 WU582 IBM WebSphere Application ServerV8 Problem Determination 4 days
1608 WU611 WebSphere Application ServerV7 Security 3 days
1609 WY583 Working with WebSphere Application ServerV8.5.5.2 Liberty Profile (BYOE) 1.5 days
1610 ZA007 IBM WebSphere Application ServerV7 Architecture (Self-paced) 1 hour
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1611 ZA008 IBM WebSphere Application ServerV7 Installation and Administration (Self-paced) 4 hours
1612 ZA009 IBM WebSphere Application ServerV7 Workload Management 1 day
1613 ZA370 IBM WebSphere Application ServerV7 Administration on Windows (Self-Paced) 5 days
1614 ZA380 WebSphere Application ServerV8 Administration for Windows (Self-paced) 5 days
1615 ZA504 Managing Mobile Applications with IBM WorklightV6 (SPVC) 2 days
1616 ZA505 Mobile Application Administration with IBM WorklightV6.2 2 days
1617 ZA570 IBM WebSphere Application ServerV7 Administration on Linux (Self-paced) 5 days
1618 ZA580 WebSphere Application ServerV8 Administration for Linux (Self-paced) 5 days
1619 ZA585 WebSphere Application ServerV8.5 Administration (Self-paced) 5 days
1620 ZA591 WebSphere Application ServerV8.5.5 Problem Determination (SPVC) 5 days
1621 ZA615 IBM WebSphere Application ServerV7 Scalability and High Availability 1.5 days
1622 ZA680 WebSphere Application ServerV8.5 Scripting and Automation (Self-paced) 5 days
1623 ZA715 IBM WebSphere Application ServerV7 PerformanceTuning (Self-paced) 3 days
1624 ZA815 WebSphere Application ServerV8.5.5 PerformanceTuning (SPVC) 3.5 days
1625 ZA855 IBM WebSphere Application ServerV8.5.5 Administration (Self-paced) 5 days
1626 ZB001 IBM WebSphere Lombardi EditionV7.1 Process Modeling (Self-paced) 2 days
1627 ZB003 IBM WebSphere Lombardi EditionV7.1 Process Modeling and Implementation 5 days
1628 ZB004 BPM Project Management (Self Paced) 2 days
1629 ZB005 IBM WebSphere Lombardi EditionV7.1 Process Modeling, Operations,Administration 5 days
1630 ZB009 BPM Process Analysis Methods I (Self-paced) 3 days
1631 ZB029 Process Discovery and Modeling in IBM Blueworks Live 6 hours
1632 ZB030 IBM Blueworks Live Account Administration (SPVC) 6 hours
1633 ZB031 Process Discovery and Modeling in IBM Blueworks Live 6 hours
1634 ZB040 BPM Change Management 3 hours
1635 ZB282 IBM WebSphere Business ModelerV6.2: Process Mapping, Simulation and Analysis 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1636 ZB284 IBM WebSphere Business ModelerV6.2: Process Mapping and Analysis (Self-Paced) 3 days
1637 ZB286 IBM WebSphere Business ModelerV6.2: Process Simulation and Analysis 2 days
1638 ZB319 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV7.5 4 days
1639 ZB380 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV8 4 days
1640 ZB381 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV8 5 days
1641 ZB383 Developing Rule Solutions in IBM Operational Decision ManagerV8.5 (Self-paced) 5 days
1642 ZB384 Managing Decisions in IBM WebSphere Operational Decision ManagementV8 (SPVC) 5 days
1643 ZB386 Managing Decisions in IBM Operational Decision ManagerV8.5 5 days
1644 ZB389 Administering IBM Operational Decision ManagerV8.5 - SPVC 4 days
1645 ZB390 Developing Rule Solutions in IBM Operational Decision ManagerV8.6 5 days
1646 ZB391 Managing Decisions in IBM Operational Decision ManagerV8.6 5 days
1647 ZB392 Developing Rule Solutions in IBM Operational Decision ManagerV8.7 5 days
1648 ZB394 Developing Solutions with IBM Decision Server InsightsV8.7 3 days
1649 ZB562 WebSphere DataPower Option for Application Optimization (Self-Paced) 5 hours
1650 ZB711 Developing Applications for IBM WebSphere Process ServerV7 - I (Self-paced) 5 days
1651 ZB712 Developing Applications for IBM WebSphere Process ServerV7 – II (Self-paced) 5 days
1652 ZB713 Developing Applications for IBM WebSphere Enterprise Service BusV7 (Self-paced) 5 days
1653 ZB722 Administration of IBM WebSphere Process ServerV7 (Self-paced) 5 days
1654 ZB723 WebSphere Enterprise Service BusV7.0 Administration (Self-paced) 3 days
1655 ZB724 IBM WebSphere Process ServerV7 Performance andTuning (Self-paced) 3 days
1656 ZB725 IBM WebSphere Process ServerV7.0 Problem Determination (Self-paced) 5 days
1657 ZB731 Process Modeling with IBM Business Process Manager (Self-paced) 2 days
1658 ZB733 Process Modeling and Implementation with IBM Business Process Manager (SPVC) 5 days
1659 ZB739 Teamworks 6Transition to IBM Business Process ManagerV7.5.1 1 day
1660 ZB741 Modeling with IBM Business Process ManagerV7.5.1 (self-paced) 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1661 ZB743 Modeling and Implementing with IBM Business Process ManagerV7.5.1 (Self-paced) 5 days
1662 ZB744 WebSphere Lombardi EditionTransition to IBM Business Process ManagerV7.5.1 5 hours
1663 ZB751 Developing Applications for IBM Business Process Manager AdvancedV7.5 - I 5 days
1664 ZB753 Developing Applications for IBM WebSphere Enterprise Service BusV7.5 (SPVC) 5 days
1665 ZB771 Using IBM WebSphereV7 Products for Business Process Management (Self-paced) 3 days
1666 ZB782 IBM WebSphere Business ModelerV7: Process Mapping, Simulation and Analysis 5 days
1667 ZB783 IBM WebSphere Business CompassV7:Administration andTeam Collaboration 1 day
1668 ZB784 IBM WebSphere Business ModelerV7: Process Mapping and Analysis (Self-paced) 3 days
1669 ZB786 IBM WebSphere Business ModelerV7: Process Simulation and Analysis (Self-paced) 2 days
1670 ZB792 IBM WebSphere Business MonitorV7 Implementation and Administration (Self-paced) 3 days
1671 ZB797 Developing Applications with IBM Business MonitorV7.5 (Self-paced) 3 days
1672 ZB801 Process Modeling with IBM Business Process Manager StandardV8 (Self-paced) 2 days
1673 ZB802 Modeling and Implementing with IBM Business Process ManagerV8 (Self-paced) 5 days
1674 ZB803 Process Implementation with IBM Business Process Manager StandardV8 - II (SPVC) 5 days
1675 ZB804 Administration of IBM Business Process Manager StandardV8 (Self-paced) 4 days
1676 ZB806 Reporting with IBM Business Process Manager StandardV8 (Self-paced) 2 days
1677 ZB807 Process Modeling with IBM Business Process Manager StandardV8.5 (SPVC) 2 days
1678 ZB808 Process Implementing with IBM Business Process Manager StandardV8.5 - I 5 days
1679 ZB809 Process Implementing with IBM Business Process Manager StandardV8.5 - II - SPVC 5 days
1680 ZB811 Reporting with IBM Business Process Manager StandardV8.5 - SPVC 2 days
1681 ZB812 Administration of IBM Business Process Manager StandardV8.5 (SPVC) 4 days
1682 ZB813 Process Modeling with IBM Business Process Manager StandardV8.5.5 2 days
1683 ZB814 Process Implementing with IBM Business Process Manager StandardV8.5.5 - I - SPVC 5 days
1684 ZB815 Process Implementing with IBM Business Process Manager StandardV8.5.5 - II 5 days
1685 ZB851 Developing Applications in IBM Business Process Manager AdvancedV8 - I (SPVC) 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1686 ZB852 Developing Applications in IBM Business Process Manager AdvancedV8 - II (SPVC) 5 days
1687 ZB855 Developing Applications in IBM Business Process Manager AdvancedV8.5 - I (SPVC) 5 days
1688 ZB857 Developing Applications in IBM Business Process Manager AdvancedV8.5.5 - I 5 days
1689 ZB862 Administration of IBM Business Process Manager AdvancedV8 (Self-paced) 5 days
1690 ZB867 Administration of IBM Business Process Manager AdvancedV8.5 (SPVC) 5 days
1691 ZB868 IBM Business Process ManagerV8.5 Performance andTuning 3 days
1692 ZB869 IBM Business Process ManagerV8.5 Problem Determination - SPVC 5 days
1693 ZB870 Administration of IBM Business Process Manager AdvancedV8.5.5 5 days
1694 ZB891 Developing Applications with IBM Business MonitorV8 (Self-paced) 3 days
1695 ZD104 Fundamentals of Enterprise OSGi with IBM WebSphere Application ServerV8.5 1 day
1696 ZD154 Java SE 6 Programming Fundamentals (Self-paced) 5 days
1697 ZD160 Developing Applications with Java Persistence API (JPA) (Self-paced) 2 days
1698 ZD325 Developing Mobile Web Applications with Dojo (SPVC) 1 day
1699 ZD326 Rest Web Services for Ajax and Mobile Applications 8 hours
1700 ZD329 Location Services with IBM Worklight FoundationV6.2 5 hours
1701 ZD506 Web Service Development for IBM WebSphere Application ServerV7 (Self-paced) 5 days
1702 ZD511 Introduction to Java EE 5 Web Services (Self-paced) 1 day
1703 ZD512 Developing Java EE 5 Web Service Applications (Self-paced) 2 days
1704 ZD513 AdvancedTopics in Java EE Web Services (Self-paced) 2 days
1705 ZD601 Mobile Application Development with IBM WorklightV6.1 4 days
1706 ZD602
Mobile Application Development with IBM Worklight FoundationV6.2
3 days
1707 ZE436 Enforcing Governance in IBM WebSphere DataPowerV5.0 (SPVC) 5 hours
1708 ZE601 Accelerate, Secure and Integrate with IBM DataPowerV6.0 5 days
1709 ZE942 IBM WebSphere Cast IronV6.1 Configuration (Self-paced) 3 days
1710 ZE952 IBM WebSphere Cast Iron 6.1 Administration 6 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1711 ZM101 Technical Introduction to IBM WebSphere MQ (Self-paced) 1 day
1712 ZM207 IBM MQV8 System Administration (using Windows for Labs) - SPVC 4 days
1713 ZM211 IBM WebSphere MQV7.5 Advanced System Administration (Distributed) (self-paced) 4 days
1714 ZM212 IBM MQV8 Advanced System Administration (Distributed) - SPVC 4 days
1715 ZM251 IBM WebSphere MQV7: Designing and Architecting Clustering Solutions (SPVC) 4 days
1716 ZM501 IBM WebSphere MQV7 Application Development (Windows Labs) (Self-Paced) 3 days
1717 ZM643 IBM WebSphere Message BrokerV7.0 System Administration Workshop (self-paced) 4 days
1718 ZM644 IBM WebSphere Message BrokerV8.0 System Administration (Self-paced) 4 days
1719 ZM645 IBM Integration BusV9.0 System Administration (SPVC) 4 days
1720 ZM663 IBM WebSphere Message BrokerV7.0 Developer Workshop (Self-paced) 5 days
1721 ZM664 IBM WebSphere Message BrokerV8 Application Development I (Self-paced) 5 days
1722 ZM665 IBM Integration BusV9 Application Development I (SPVC) 5 days
1723 ZM674 IBM WebSphere Message BrokerV8 Application Development II (Self-paced) 3 days
1724 ZM675 IBM Integration BusV9 Application Development II (SPVC) 4 days
1725 ZS805 Fundamentals of IBM WebSphere Service Registry and RepositoryV8 (SPVC) 1 day
1726 ZS806 IBM WebSphere Service Registry and RepositoryV8 Administration 1 day
1727 ZU370 Introduction to HTML5 and JavaScript Programming (Self-paced) 6 hours
1728 ZU372 Developing Mobile Web Applications with jQuery Mobile 8 hours
1729 ZU610 WebSphere Default Messaging: Using the SIBus 7 hours
1730 ZU715 WebSphere Application Server for z/OS PerformanceTuning 1 day
1731 ZU802 WebSphere Application Server Liberty Profile for Application Developers 1 day
WATSON HEALTH
1732 9D010 Fundamentals of the Curam Enterprise Framework for Business Analysts 6.0 5 days
1733 9D050 Fundamentals of the Curam Enterprise Framework for Developers 6.0 1 day0
1734 9D070 Curam Solution Architecture Workshop 6.0 2 days
1735 9D310 Fundamentals of the IBM Cúram SPM Platform for Business AnalystsV6.0.4 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1736 9D320 Fundamentals of the IBM Curam SPM Platform for DevelopersV6.0.4 10 days
1737 9D330 Functional Overview of the IBM Curam SPM Platform 6.0.4 (One-Day) 1 day
1738 9D340 Functional Overview of the IBM Curam SPM PlatformV6.0.4 (Two-Day) 2 days
1739 9D350 Fundamentals of IBM Cúram Express Rules 6.0.4 4 days
1740 9D360 Fundamentals of IBM Cúram Express Rules for Developers 6.0.4 5 days
1741 9D370 Functional Overview of IBM Curam Universal Access Entry Edition 6.0.4 1 day
1742 9D409 Fundamentals of the IBM Curam SPM Platform for Developers (ADE) 6.0.4 (SPVC) 5 days
1743 9D419 Fundamentals of the IBM Curam SPM Platform for Developers (Customization) 6.0.4 (SPVC) 5 days
1744 9D420 Fundamentals of IBM Curam Workflow for Developers 6.0.4 4 days
1745 9D438 Functional Overview of Health Care Reform in IBM Cúram SPM 6.0.5 (WBT) 7 hours
1746 9D440 Fundamentals of IBM Cúram SPM Platform for Developers 6.0.5 10 days
1747 9D456 IBM Cúram SPM Platform Runtime Environment 6.0.4 - Expert Arena (SPVC) 1 day
1748 9D466 IBM Cúram SPM Platform Development Environment 6.0.4: Expert Arena (SPVC) 1 day
1749 9D470 Fundamentals of the IBM Cúram SPM Platform for Business Analysts 6.0.5 5 days
1750 9D480 IBM Curam Express Rules for Business Analysts 6.0.5 4 days
1751 9D499 Fundamentals of IBM Cúram SPM Platform for Developers (ADE) 6.0.5 (SPVC) 5 days
1752 9D509 Fundamentals of the IBM Cúram SPM Platform for Developers (Customization) 6.0.5 5 days
1753 9D510 IBM Curam Express Rules for Developers 5 days
1754 9D520 IBM Cúram Workflow for Developers 6.0.5 5 days
1755 9D536 IBM Cúram SPM Platform Development Environment 6.0.5: Expert Arena 1 day
1756 9D559 IBM Curam Intelligence Evidence Gathering (IEG) for Developers 6.x (SPVC) 3 days
1757 9D566 IBM Cúram SPM Platform Runtime Environment 6.0.5 (Expert Arena) 1 day
1758 9D578 Introducing IBM Cúram Universal Access 6.0.5 5 hours
1759 9D588 IBM Curam Child Welfare Solution 6.0.5: Functional Primer 5 hours
1760 9D598 Introduction to IBM Cúram Social Program Management 6.0.5: Functional Overview 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Commerce Security Systems Watson HealthAnalytics
Business&Process
Framework
SoftSkills
No Code Description Duration
1761 9D609 IBM Cúram Express Rules for Developers (ADE) 3 days
1762 9D619 IBM Cúram Express Rules for Developers (Application Integration) 3 days
1763 9D628 Batch Processing in IBM Cúram 6.0.5 5 hours
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Cloud Commerce Security Systems Watson HealthAnalytics
Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 SEC301 Intro to Information Security 5 days
2 SEC401 Security Essentials Bootcamp Style 6 days
3 SEC440 Critical Security Controls: Planning, Implementing and Auditing 2 days
4 SEC464 Cyber SecurityTraining for IT Administrators 2 days
5 SEC480 Top 4 Mitigation Strategies: Implementing & AuditingNew 3 days
6 SEC501 Advanced Security Essentials - Enterprise Defender 6 days
7 SEC502 Perimeter Protection In-Depth 6 days
8 SEC503 Intrusion Detection In-Depth 6 days
9 SEC504 HackerTools,Techniques, Exploits and Incident Handling 6 days
10 SEC505 Securing Windows with PowerShell and the Critical Security Controls 6 days
Advance your career and explore our cyber security training courses and cyber security training
events . Our curriculum span from the core essential technical skills and strategies that every cyber
security professional should know, to advanced topics in penetration testing and ethical hacking,
digital forensics and incident response, defence of critical infrastructure, application development, and
audit, and legal topics.
Vinsys is the best source for high quality information security training.We have been training
Information Security and IT Professionals since 1999 with a diverse line up of relevant training
courses. 
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
11 SEC506 Securing Linux/Unix 6 days
12 SEC511 Continuous Monitoring and Security Operations 6 days
13 SEC524 Cloud Security Fundamentals 2 days
14 SEC542 Web App PenetrationTesting and Ethical Hacking 6 days
15 SEC546 IPv6 Essentials 2 days
16 SEC550 Active Defense, Offensive Countermeasures and Cyber DeceptionNew 5 days
17 SEC560 Network PenetrationTesting and Ethical HackingNew 6 days
18 SEC561 Immersive Hands-On HackingTechniques 6 days
19 SEC562 CyberCity Hands-on Kinetic Cyber Range ExerciseNew 6 days
20 SEC566 Implementing and Auditing the Critical Security Controls - In-Depth 5 days
21 SEC567 Social Engineering for PenetrationTestersNew 2 days
22 SEC573 Python for PenetrationTesters 5 days
23 SEC575 Mobile Device Security and Ethical Hacking 6 days
24 SEC579 Virtualization and Private Cloud Security 6 days
25 SEC580 Metasploit Kung Fu for Enterprise PenTesting 2 days
26 SEC617 Wireless Ethical Hacking, PenetrationTesting, and Defenses 6 days
27 SEC642 Advanced Web App PenetrationTesting and Ethical Hacking 6 days
28 SEC660 Advanced PenetrationTesting, Exploit Writing, and Ethical Hacking 6 days
29 SEC760 Advanced Exploit Development for PenetrationTesters 6 days
30 FOR408 Windows Forensic Analysis 6 days
31 FOR508 Advanced Digital Forensics and Incident Response 6 days
32 FOR518 Mac Forensic Analysis 6 days
33 FOR526 Memory Forensics In-Depth 6 days
34 FOR572 Advanced Network Forensics and Analysis 6 days
35 FOR578 CyberThreat IntelligenceNew 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
36 FOR585 Advanced Smartphone Forensics 6 days
37 FOR610 Reverse-Engineering Malware: Malware AnalysisTools andTechniques 6 days
38 MGT405 Critical Infrastructure Protection 2 days
39 MGT415 A Practical Introduction to Cyber Security Risk ManagementNew 2 days
40 MGT433 SecuringThe Human: How to Build, Maintain and Measure a High-Impact Awareness Program 2 days
41 MGT514 IT Security Strategic Planning, Policy and LeadershipNew 5 days
42 MGT525 IT Project Management, Effective Communication, and PMP® Exam Prep 6 days
43 MGT535 Incident ResponseTeam Management 2 days
44 DEV522 Defending Web Applications Security Essentials 6 days
45 DEV536 Secure Coding: Developing Defensible Applications 2 days
46 DEV541 Secure Coding in Java/JEE: Developing Defensible Applications 4 days
47 DEV543 Secure Coding in C & C++ 2 days
48 DEV544 Secure Coding in .NET: Developing Defensible Applications 4 days
49 AUD440 Critical Security Controls: Planning, Implementing and Auditing 2 days
50 AUD480 Top 4 Mitigation Strategies: Implementing & AuditingNew 3 days
51 AUD507 Auditing & Monitoring Networks, Perimeters & Systems 6 days
52 AUD566 Implementing and Auditing the Critical Security Controls - In-Depth 5 days
53 LEG523 Law of Data Security and Investigations 5 days
54 ICS410 ICS/SCADA Security Essentials 5 days
55 ICS456 Essentials for NERC Critical Infrastructure ProtectionBeta 5 days
56 ICS Active Defense and Incident ResponseNew 5 days
57 SPECIAL: Hacker Guard:Threat Update 2 days
58 SPECIAL: ComplianceTraining and Securing the Human 1 day
59 SPECIAL: Security AwarenessTraining for Electric Entities 1 day
60 SPECIAL: Special for HIMSS - Implementing Healthcare Cyber-Hygiene with the Critical Security ControlsNew 1 day
61 SPECIAL: Introduction to Malware Analysis: Hands-on andTechnicalNew 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 10000AC Skillpipe Evaluation Course 5 days
2 10135BC Configuring, Managing andTroubleshooting Microsoft® Exchange Server 2010 Service Pack 2 5 days
3 10165AC UpdatingYour Skills from Microsoft® Exchange Server 2003 or Exchange Server 2007 to Exchange Server 2010 SP1 5 days
4 10174BC Configuring and Administering Microsoft® SharePoint® 2010 5 days
5 10175AC Microsoft® SharePoint® 2010,Application Development 5 days
6 10215AC Implementing and Managing Microsoft® ServerVirtualization 5 days
7 10231BC Designing a Microsoft® SharePoint® 2010 Infrastructure 5 days
8 10232AC Designing and Developing Microsoft® SharePoint® Server 2010 Applications 5 days
9 10233BC Designing and Deploying Messaging Solutions with Microsoft® Exchange Server 2010 SP2 5 days
10 10262AC Developing Windows® Applications with Microsoft®Visual Studio® 2010 5 days
Vinsys is an eminent Global Learning Partner of Microsoft and offers all major Microsoft certification
courses. Having our own research labs and centre of excellence differentiates us to provide live
learning as well as implementation simulations during the course.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Microsoft being a pioneer in IT technology partnering withVinsys to specialise on project deliveries including
Microsoft Office Applications, business intelligence, virtualisation, enterprise application management, database
management, and many more.These MS certification courses not only assess the technical know-how of the
aspirants but also helps them enhance their technical knowledge on various Microsoft technologies, tools and
products.
IT aspirants from across the globe can register withVinsys for various MS certifications and get their potential
evaluated by achieving Microsoft certifications.
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
No Code Description Duration
11 10263AC Developing Windows® Communication Foundation Solutions with Microsoft®Visual Studio® 2010 5 days
12 10264AC Developing Web Applications with Microsoft®Visual Studio® 2010 5 days
13 10265AC Developing Data Access Solutions with Microsoft®Visual Studio® 2010 5 days
14 10266AC Programming in C# with Microsoft®Visual Studio® 2010 5 days
15 10267AC Introduction to Web Development with Microsoft®Visual Studio® 2010 5 days
16 10324AC Implementing and Managing Microsoft® DesktopVirtualization 5 days
17 10508AC Planning, Deploying, and Managing Microsoft® Exchange Server 2010 Unified Messaging 5 days
18 10533AC Deploying, Configuring, and Administering Microsoft® Lync™ Server 2010 5 days
19 10534AC Planning and Designing a Microsoft® Lync™ Server 2010 Solution 5 days
20 10550AC Programming inVisual Basic with Microsoft®Visual Studio® 2010 5 days
21 10553AC Fundamentals of XAML and Microsoft® Expression Blend® 5 days
22 10554AC Developing Rich Internet Applications Using Microsoft® Silverlight® 4 5 days
23 10747DC Administering System Center 2012 Configuration Manager 5 days
24 10748CC Deploying System Center 2012 Configuration Manager 5 days
25 10802AC Microsoft® Enterprise Search for IT Professionals 5 days
26 10805AC Microsoft® SharePoint® 2010 Search for Application Developers 5 days
27 10806AC Microsoft® FAST Search Server 2010 for SharePoint® for Application Developers 5 days
28 10958BC Programming Fundamentals of Web Applications 5 days
29 10961BC Automating Administration with Windows PowerShell® 5 days
30 10962BC Advanced Automated Administration with Windows PowerShell 5 days
31 10964CC Cloud & Datacenter Monitoring with System Center Operations Manager 5 days
32 10965CC IT Service Management with System Center Service Manager 5 days
33 10967AC Fundamentals of a Windows Server® Infrastructure 5 days
34 10968BC Designing for Office 365® Infrastructure 5 days
35 10969BC Active Directory® Services with Windows Server® 5 days
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
36 10970BC Networking with Windows Server® 5 days
37 10971BC Storage and High Availability with Windows Server 5 days
38 10972BC Administering the Web Server (IIS) Role of Windows Server 5 days
39 10974BC Deploying and Migrating Windows Servers 5 days
40 10975AC Introduction to Programming 5 days
41 10977BC UpgradingYour SQL Server Skills to Microsoft® SQL Server® 2014 5 days
42 10978AC Introduction to Azure for Developers 5 days
43 10979BC Microsoft Azure Fundamentals 5 days
44 10981AC Infrastructure Provisioning with System CenterVirtual Machine Manager 5 days
45 10982AC Supporting andTroubleshooting Windows 10 5 days
46 1846AC Microsoft® Solutions Framework Essentials 5 days
47 1913AC Exchanging andTransforming Data Using XML and XSLT 5 days
48 2011AC Troubleshooting Microsoft® Exchange Server 2003Toolkit 5 days
49 20246DC Monitoring and Operating a Private Cloud 5 days
50 20247DC Configuring and Deploying a Private Cloud 5 days
51 20331BC Core Solutions of Microsoft® SharePoint® Server 2013 5 days
52 20332BC Advanced Solutions of Microsoft® SharePoint® Server 2013 5 days
53 20334AC Core Solutions of Microsoft Skype for Business 2015 5 days
54 20335BC Lync® Network Readiness Assessment 5 days
55 20336BC Core Solutions of Microsoft® Lync® Server 2013 5 days
56 20337BC EnterpriseVoice and Online Services with Microsoft Lync Server 2013 5 days
57 20341BC Core Solutions of Microsoft Exchange Server 2013 5 days
58 20342BC Advanced Solutions of Microsoft Exchange Server 2013 5 days
59 20346DC Managing Office 365 Identities and Services 5 days
60 20409BC ServerVirtualization with Windows Server Hyper-V® and System Center 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
61 20410DC Installing and Configuring Windows Server® 2012 5 days
62 20411DC Administering Windows Server® 2012 5 days
63 20412DC Configuring Advanced Windows Server® 2012 Services 5 days
64 20413CC Designing and Implementing a Server Infrastructure 5 days
65 20414CC Implementing an Advanced Server Infrastructure 5 days
66 20415BC Implementing a Desktop Infrastructure 5 days
67 20416BC Implementing Desktop Application Environments 5 days
68 20417DC UpgradingYour Skills to MCSA Windows Server® 2012 5 days
69 20461CC Querying Microsoft SQL Server® 5 days
70 20462CC Administering Microsoft® SQL Server® Databases 5 days
71 20463CC Implementing a Data Warehouse with Microsoft® SQL Server® 5 days
72 20464CC Developing Microsoft® SQL Server® Databases 5 days
73 20465CC Designing a Data Solution with Microsoft® SQL Server® 2014 5 days
74 20466CC Implementing Data Models and Reports with Microsoft® SQL Server® 5 days
75 20467CC Designing Self-Service Business Intelligence and Big Data Solutions 5 days
76 20480BC Programming in HTML5 with JavaScript and CSS3 5 days
77 20481CC Essentials of Developing Windows® Store Apps Using HTML5 and JavaScript 5 days
78 20482CC Advanced Windows® Store App Development Using HTML5 and JavaScript 5 days
79 20483BC Programming in C# 5 days
80 20484CC Essentials of Developing Windows® Store Apps Using C# 5 days
81 20485CC Advanced Windows® Store App Development Using C# 5 days
82 20486BC Developing ASP.NET MVC 4 Web Applications 5 days
83 20487BC Developing Windows Azure and Web Services 5 days
84 20488BC Developing Microsoft© SharePoint© Server 2013 Core Solutions 5 days
85 20489BC Developing Microsoft® SharePoint® Server 2013 Advanced Solutions 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
86 20497AC SoftwareTesting with MicrosoftVisual Studio® 2013 5 days
87 20532BC Developing Microsoft Azure Solutions 5 days
88 20533BC Implementing Microsoft Azure Infrastructure Solutions 5 days
89 20687DC Configuring Windows® 8.1 5 days
90 20688DC Supporting Windows® 8.1 5 days
91 20689DC UpgradingYour Skills to MCSA Windows® 8 5 days
92 20694BC Virtualizing Enterprise Desktops and Apps 5 days
93 20695BC Deploying Windows Desktops and Enterprise Applications 5 days
94 20696BC Administering System Center Configuration Manager and Intune 5 days
95 20697-1AC Installing and Configuring Windows 10 5 days
96 20697-2AC Deploying and Managing Windows 10 Using Enterprise Services 5 days
97 2261CC Supporting Users Running the Microsoft Windows XP Operating System 5 days
98 2272CC Implementing and Supporting Microsoft® Windows® XP Professional 5 days
99 2274CC Managing a Microsoft® Windows Server™ 2003 Environment 5 days
100 2275CC Maintaining a Microsoft Windows Server 2003 Environment 5 days
101 2276CC Implementing a Microsoft Windows Server 2003 Network Infrastructure: Network Hosts 5 days
102 2277CC Implementing, Managing, and Maintaining a Microsoft Windows Server 2003 Network Infrastructure: Network Services 5 days
103 2285BC Installing, Configuring & Administering Microsoft® Windows® XP Professional 5 days
104 2310DC Developing Web Applications Using Microsoft®Visual Studio® 2008 SP1 5 days
105 2311AC Advanced Web Application Development Using Microsoft® ASP.NET 5 days
106 2349BC Programming with the Microsoft® .NET Framework (MicrosoftVisual C#™ .NET) 5 days
107 2373BC Programming with MicrosoftVisual Basic .NET 5 days
108 2389BC Programming with Microsoft® ADO.NET 5 days
109 2400CC Implementing and Managing Microsoft Exchange Server 2003 5 days
110 2433BC MicrosoftVisual Basic Scripting Edition and Microsoft Windows Script Host Essentials 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
111 2500AC Introduction to XML and the Microsoft® .NET Platform 5 days
112 2541BC Core Data Access with Microsoft®Visual Studio® 2005 5 days
113 2542AC Advanced Data Access With Microsoft®Visual Studio® 2005 5 days
114 2543BC Core Web ApplicationTechnologies With Microsoft®Visual Studio® 2005 5 days
115 2544AC Advanced Web ApplicationTechnologies With Microsoft®Visual Studio® 2005 5 days
116 2546BC Core Windows® FormsTechnologies With Microsoft®Visual Studio® 2005 5 days
117 2547AC Advanced Windows® FormsTechnologies With Microsoft®Visual Studio® 2005 5 days
118 2548BC Core Distributed Application Development With Microsoft®Visual Studio® 2005 5 days
119 2549AC Advanced Distributed Application Development With Microsoft®Visual Studio® 2005 5 days
120 2555AC Developing Microsoft.NET Applications for Windows (Visual C#.NET) 5 days
121 2556AC Developing Mobile Applications Using the Microsoft® .NET Compact Framework 5 days
122 2559BC Introduction toVisual Basic .NET Programming with Microsoft .NET 5 days
123 2576AC Implementing And Administering Microsoft® Internet Information Services IIS) 6.0 5 days
124 2609AC Introduction to C# Programming with Microsoft .NET 5 days
125 2667AC Introduction to Programming 5 days
126 2710BC Analyzing Requirements and Defining Microsoft® .NET Solution Architectures 5 days
127 2717CC Introduction to Microsoft® .NET Development 5 days
128 2730AC Building Microsoft® Content Management Server 2002 Solutions 5 days
129 2778AC Writing Queries Using Microsoft® SQL Server™ 2008Transact-SQL 5 days
130 2810AC Fundamentals of Network Security 5 days
131 2821AC Designing and Managing a Microsoft® Windows® Public Key Infrastructure 5 days
132 2823BC Implementing and Administering Security in a Microsoft® Windows Server™ 2003 Network 5 days
133 2830BC Designing Security for Microsoft® Networks 5 days
134 2933AC Developing Business Process and Integration Solutions Using Microsoft BizTalk Server 2006 5 days
135 2956BC Core Foundations of Microsoft .NET 2.0 Development 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
136 2957BC Advanced Foundations of Microsoft .NET 2.0 Development 5 days
137 3938CC UpdatingYour Skills from Microsoft® Exchange Server 2000 or Microsoft Exchange Server 2003 to Microsoft
Exchange Server 2007 SP1
5 days
138 40008AC Updating your Database Skills to Microsoft® SQL Server® 2012 5 days
139 40009AC Updating your Business Intelligence Skills to Microsoft® SQL Server® 2012 5 days
140 40032AC Networking and Security Fundamentals:Training 2-Pack for MTA Exams 98-366 and 98-367 5 days
141 40033AC Windows Operating System and Windows Server Fundamentals:Training 2-Pack for MTA Exams 98-349 and 98-365 5 days
142 40034AC Software Development Fundamentals with HTML5:Training 2-Pack for MTA Exams 98-361 and 98-375 5 days
143 40035AC Software Development Fundamentals with .NET:Training 2-Pack for MTA Exams 98-361 and 98-372 5 days
144 40043AC Windows® 8 UX Design Workshop 5 days
145 40044AC Search Advertising with Bing Ads 5 days
146 40045AC Microsoft® SQL Server® for Oracle DBAs 5 days
147 40074AC Microsoft® SQL Server® 2014 for Oracle DBAs 5 days
148 40076AC MVA Workshop:Troubleshooting Windows Systems with SysInternalsTools 5 days
149 40332AC Partner Applied Workshop:What's New in Windows 10 5 days
150 40349AC Windows Operating System Fundamentals:Training for MTA Exam 98-349 5 days
151 40361AC Software Development Fundamentals:Training for MTA Exam 98-361 5 days
152 40362AC Windows Development Fundamentals:Training for MTA Exam 98-362 5 days
153 40363AC Web Development Fundamentals:Training for MTA Exam 98-363 5 days
154 40364AC Database Administration Fundamentals:Training for MTA Exam 98-364 5 days
155 40365AC Windows Server Administration Fundamentals:Training for MTA Exam 98-365 5 days
156 40366AC Networking Fundamentals:Training for MTA Exam 98-366 5 days
157 40367AC Security Fundamentals:Training for MTA Exam 98-367 5 days
158 40372AC Microsoft .NET Fundamentals:Training for MTA Exam 98-372 5 days
159 40373AC Mobile Development Fundamentals:Training for MTA Exam 98-373 5 days
160 40374AC Gaming Development Fundamentals: MTA Exam 98-374 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
161 40375AC HTML5 Application Development Fundamentals:Training for MTA Exam 98-375 5 days
162 4994AC Introduction to Programming Microsoft .NET Applications with MicrosoftVisual Studio 2005 5 days
163 4995AC Programming with the Microsoft .NET Framework using MicrosoftVisual Studio 2005 5 days
164 50040AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Access 2007 5 days
165 50041AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Excel 2007 5 days
166 50042AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Outlook 2007 5 days
167 50043AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office PowerPoint 2007 5 days
168 50044AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Word 2007 5 days
169 50045AC Preparing for the Microsoft Certified Application Specialist Exam in WindowsVista 5 days
170 50107AC Learn Microsoft® OfficeVisio® 2007 Step by Step 5 days
171 50123AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 1 5 days
172 50124AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 2 5 days
173 50125AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 3 5 days
174 50126AC Learn Microsoft® Office Word 2007 Step by Step, Level 1 5 days
175 50127AC Learn Microsoft® Office Word 2007 Step by Step, Level 2 5 days
176 50128AC Learn Microsoft® Office Word 2007 Step by Step, Level 3 5 days
177 50129AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 1 5 days
178 50130AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 2 5 days
179 50131AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 3 5 days
180 50132AC Learn Microsoft® Office Outlook® 2007 Step by Step, Level 1 5 days
181 50133AC Learn Microsoft® Office Outlook ® 2007 Step by Step, Level 2 5 days
182 50134AC Learn Microsoft® Office Outlook® 2007 Step by Step, Level 3 5 days
183 50135AC Learn Microsoft® Office Access® 2007 Step by Step, Level 1 5 days
184 50136AC Learn Microsoft® Office Access® 2007 Step by Step, Level 2 5 days
185 50207AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 1 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
186 50208AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 2 5 days
187 50209AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 3 5 days
188 50367AC Learn Windows 7 Step by Step, Level 1 5 days
189 50368AC Learn Windows 7 Step by Step, Level 2 5 days
190 50369AC Learn Windows Internet Explorer 8 Step by Step 5 days
191 50374BC Microsoft ServerVirtualization and Management for the ExperiencedVMware IT Pro 5 days
192 50382BC Implementing Forefront Identity Manager 2010 5 days
193 50383BC Upgrading Identity Lifecycle Manager 2007 to Forefront Identity Manager 2010 5 days
194 50402BC Implementing Forefront Unified Access Gateway 2010 5 days
195 50403BC Implementing Active Directory Rights Management Services with Exchange and SharePoint 5 days
196 50404BC Overview of Active Directory Rights Management Services with Windows Server 2008 R2 5 days
197 50412BC Implementing Active Directory Federation Services 2.0 5 days
198 50430BC AdministeringTeam Foundation Server 2010 5 days
199 50466BC Windows® Azure™ Solutions with Microsoft®Visual Studio® 2010 5 days
200 5047BC Introduction to Installing and Managing Microsoft® Exchange Server 2007 SP1 5 days
201 5049AC Managing Messaging Security Using Microsoft Exchange Server 2007 5 days
202 50509AC Implementing Forefront Endpoint Protection 2010 5 days
203 5050AC Recovering Messaging Servers and Databases using Microsoft® Exchange Server 2007 5 days
204 5051AC Monitoring andTroubleShooting Microsoft Exchange Server 2007 2007 5 days
205 50526AC IT Basics I 5 days
206 50527AC IT Basics II 5 days
207 50528AC IT Basics III 5 days
208 50529AC IT Basics for Advanced Users I 5 days
209 50530AC IT Basics for Advanced Users II 5 days
210 50532AC Learn Microsoft Access 2010 Step by Step, Level 1 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
211 50533AC Learn Microsoft Access 2010 Step by Step, Level 2 5 days
212 50534AC Learn Microsoft Access 2010 Step by Step, Level 3 5 days
213 50535AC Learn Microsoft Outlook 2010 Step by Step, Level 1 5 days
214 50536AC Learn Microsoft Outlook 2010 Step by Step, Level 2 5 days
215 50537AC Learn Microsoft Outlook 2010 Step by Step, Level 3 5 days
216 50538AC Learn Microsoft PowerPoint 2010 Step by Step, Level 1 5 days
217 50539AC Learn Microsoft PowerPoint 2010 Step by Step, Level 2 5 days
218 5053AC Designing a Messaging Infrastructure Using Microsoft Exchange Server 2007 5 days
219 50540AC Learn Microsoft PowerPoint 2010 Step by Step, Level 3 5 days
220 50541AC Learn Microsoft Word 2010 Step by Step, Level 1 5 days
221 50542AC Learn Microsoft Word 2010 Step by Step, Level 2 5 days
222 50543AC Learn Microsoft Word 2010 Step by Step, Level 3 5 days
223 50544AC Learn Microsoft Excel 2010 Step by Step, Level 1 5 days
224 50545AC Learn Microsoft Excel 2010 Step by Step, Level 2 5 days
225 50546AC Learn Microsoft Excel 2010 Step by Step, Level 3 5 days
226 5054AC Designing a High Availability Messaging Solution Using Microsoft Exchange Server 2007 5 days
227 50571AC Partner Lync SupportTraining - Pre-Read Material 5 days
228 50572AC Premier Support for Lync PartnersTier 1 5 days
229 50573AC Premier Support for Lync PartnersTier 2 5 days
230 5058AC Project Series: Deploying Microsoft Office 2007 Professional Edition  5 days
231 5060AC Implementing Microsoft Windows SharePoint Services 3.0 5 days
232 5061AC Implementing Microsoft® Office SharePoint® Server 2007 5 days
233 5105CC Deploying WindowsVista® Business Desktops 5 days
234 5115BC Installing, Configuring, andTroubleshooting WindowsVista® 5 days
235 5117AC Installing, Configuring,Troubleshooting, and Maintaining WindowsVista® 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
236 5118BC Supporting WindowsVista® and Applications in the Enterprise 5 days
237 5177AC Implementing and Maintaining Instant Messaging Using Microsoft Office Communications Server 2007 5 days
238 5178AC Implementing and Maintaining Audio/Visual Conferencing and Web Conferencing Using Microsoft Office
Communications Server 2007
5 days
239 5179AC Implementing and MaintainingTelephony Using Microsoft Office Communications Server 2007 5 days
240 5D4-00001 CoursewareVoucher Product: Digital MOCVoucher 5 days
241 5D4-00002 CoursewareVoucher Product: Digital MLOVoucher 5 days
242 6066AC Developing Managed Applications for Windows Mobile 6 5 days
243 6067AC Developing Native Applications for Microsoft Windows Mobile 6 5 days
244 6158CC UpdatingYour SQL Server® 2005 Skills to SQL Server 2008 5 days
245 6214AC EffectiveTeam Development using Microsoft®Visual Studio®Team System 5 days
246 6215AC Implementing and Administering Microsoft®Visual Studio® 2008Team Foundation Server 5 days
247 6231BC Maintaining a Microsoft® SQL Server® 2008 R2 Database 5 days
248 6232BC Implementing a Microsoft® SQL Server® 2008 R2 Database 5 days
249 6234AC Implementing and Maintaining Microsoft® SQL Server® 2008 Analysis Services 5 days
250 6235AC Implementing and Maintaining Microsoft® SQL Server® 2008 Integration Services 5 days
251 6236AC Implementing and Maintaining Microsoft® SQL Server™ 2008 Reporting Services 5 days
252 6292AC Installing and Configuring Windows® 7 Client 5 days
253 6293AC Troubleshooting and Supporting Windows® 7 in the Enterprise 5 days
254 6294AC Planning and Managing Windows® 7 Desktop Deployments and Environments 5 days
255 6317AC UpgradingYour SQL Server® 2000 Database Administration (DBA) Skills to SQL Server 2008 DBA Skills 5 days
256 6367AC Introduction to Object Oriented Programming using Microsoft®Visual Studio® 2008 5 days
257 6368AC Programming with the Microsoft® .NET Framework Using Microsoft®Visual Studio® 2008 5 days
258 6416DC UpdatingYour Windows Server® 2003Technology Skills to Windows Server® 2008 5 days
259 6418CC Deploying Windows Server® 2008 5 days
260 6419BC Configuring, Managing and Maintaining Windows Server® 2008-based Servers 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
261 6421BC Configuring andTroubleshooting a Windows Server® 2008 Network Infrastructure 5 days
262 6425CC Configuring andTroubleshooting Windows Server® 2008 Active Directory® Domain Services 5 days
263 6426CC Configuring andTroubleshooting Identity and Access Solutions with Windows Server® 2008 Active Directory® 5 days
264 6433AC Planning and Implementing Windows Server® 2008 5 days
265 6435BC Designing Windows Server® 2008 Network and Applications Infrastructure 5 days
266 6436BC Designing Windows Server® 2008 Active Directory® Infrastructure and Services 5 days
267 6438AC Implementing and Administering Windows® SharePoint® Services 3.0 in Windows Server® 2008 5 days
268 6439AC Configuring andTroubleshooting Windows Server® 2008 Application Infrastructure 5 days
269 6445AC Implementing and Administering Windows® Small Business Server 2008 5 days
270 6460AC Visual Studio® 2008:Windows® Presentation Foundation 5 days
271 6461AC Visual Studio® 2008:Windows® Communication Foundation 5 days
272 6462AC Visual Studio® 2008:Windows® Workflow Foundation 5 days
273 7197AC Managing Enterprise Desktops using the Microsoft® Desktop Optimization Pack 5 days
274 7SF-00029 Pearson/VUE MTA CertificationVoucher: Commercial Single-Shot 5 days
275 80229AC Inventory Control in Microsoft Dynamics® GP 2010 5 days
276 80230AC Project Series in Microsoft Dynamics® GP 2010 5 days
277 80231AC Purchase Order Processing in Microsoft Dynamics® GP 2010 5 days
278 80232AC Sales Order Processing in Microsoft Dynamics® GP 2010 5 days
279 80239AC Extender for Microsoft Dynamics® GP 2010 5 days
280 80240AC Using Microsoft® SharePoint®Technology with Microsoft Dynamics® GP 2010 5 days
281 80307AC Enterprise Portal Development in Microsoft Dynamics® AX 2012 5 days
282 80308AC Procurement in Microsoft Dynamics® AX 2012 5 days
283 80310AC LEAN Manufacturing in Microsoft Dynamics® AX 2012 5 days
284 80311BC Service Industries in Microsoft Dynamics® AX 2012 R2 5 days
285 80312AC Development III in Microsoft Dynamics® AX 2012 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
286 80313AC Development IV in Microsoft Dynamics® AX 2012 5 days
287 80314AC Discrete Manufacturing Basics in Microsoft Dynamics® AX 2012 5 days
288 80315AC Discrete Manufacturing Advanced in Microsoft Dynamics® AX 2012 5 days
289 80316BC Project Essentials in Microsoft Dynamics® AX 2012 R2 5 days
290 80317BC Project Advanced in Microsoft Dynamics® AX 2012 R2 5 days
291 80318AC Reporting in Microsoft Dynamics® AX 2012 5 days
292 80338AC Microsoft Dynamics® AX 2012 Public Sector - Financials 5 days
293 80414AC Service Management in Microsoft Dynamics® AX 2012 5 days
294 80415AC Public Sector Procurement and Payables in Microsoft Dynamics® AX 2012 5 days
295 80416AC Application Integration Framework and Services in Microsoft Dynamics® AX 2012 5 days
296 80419AC Manufacturing Execution in Microsoft Dynamics® AX 2012 5 days
297 80420AC Data Upgrade and Code Upgrade to Microsoft Dynamics® AX 2012 5 days
298 80421AC Sales and Marketing in Microsoft Dynamics® AX 2012 5 days
299 80422AC Intercompany Setup and Order Processing in Microsoft Dynamics® AX 2012 5 days
300 80423AC Master Planning in Microsoft Dynamics® AX 2012 5 days
301 80424AC Product Configuration in Microsoft Dynamics® AX 2012 5 days
302 80425AC Intelligent Data Management Framework in Microsoft Dynamics® AX 2012 5 days
303 80427AC Warehouse Management in Microsoft Dynamics® AX 2012 5 days
304 80428AC SQL Optimization for Microsoft Dynamics® 5 days
305 80429AC Travel and Expense Management in Microsoft Dynamics® AX 2012 5 days
306 80430AC Vendor Management and Collaboration in Microsoft Dynamics® AX 2012 5 days
307 80433AC Reporting in Microsoft Dynamics® NAV 2013 5 days
308 80434AC Fixed Assets in Microsoft Dynamics® NAV 2013 5 days
309 80435AC Application Setup in Microsoft Dynamics® NAV 2013 5 days
310 80436AC C/Side Introduction in Microsoft Dynamics® NAV 2013 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
311 80437AC C/Side Solution Development in Microsoft Dynamics® NAV 2013 5 days
312 80438AC Installation and Configuration in Microsoft Dynamics® NAV 2013 5 days
313 80439AC Introduction in Microsoft Dynamics® NAV 2013 5 days
314 80440AC Trade in Microsoft Dynamics® NAV 2013 5 days
315 80450AC Delivering Microsoft Dynamics® Solutions with Sure Step 5 days
316 80534AC Finance Essentials in Microsoft Dynamics® NAV 2013 5 days
317 80535AC Finance Advanced in Microsoft Dynamics® NAV 2013 5 days
318 80537AC Microsoft Dynamics® AX 2012 R2 for Retail in Brick and Mortar Stores: Installation and Configuration 5 days
319 80538AC Human Resource Management in Microsoft Dynamics® AX 2012 R2 5 days
320 80539AC Installation and Deployment in Microsoft Dynamics® CRM 2013 5 days
321 80540AC Installation and Configuration in Microsoft Dynamics® GP 2013 5 days
322 80541AC Payroll in Microsoft Dynamics® AX 2012 R2 5 days
323 80542AC Customization and Configuration in Microsoft Dynamics® CRM 2013 5 days
324 80544AC Warehouse Management System in Microsoft Dynamics® AX 2012 R2 5 days
325 80545AC Customer Service in Microsoft Dynamics® CRM 2013 5 days
326 80546AC Sales Management in Microsoft Dynamics® CRM 2013 5 days
327 80549AC Data Upgrade and Code Upgrade to Microsoft Dynamics® NAV 2013 5 days
328 80550AC Manufacturing in Microsoft Dynamics® NAV 2013 5 days
329 80571AC Introduction to Microsoft Dynamics® GP 2013 5 days
330 80572AC General Ledger in Microsoft Dynamics® GP 2013 5 days
331 80573AC Payables Management in Microsoft Dynamics® GP 2013 5 days
332 80574AC Receivables Management in Microsoft Dynamics® GP 2013 5 days
333 80575AC Bank Reconciliation in Microsoft Dynamics® GP 2013 5 days
334 80576AC Fixed Assets in Microsoft Dynamics® GP 2013 5 days
335 80583AC Microsoft Dynamics® AX 2012 R2 for Retail in eCommerce Stores: Installation and Configuration 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
336 80584AC Microsoft Dynamics® AX 2012 R2 for Retail in eCommerce Stores: Development and Customization 5 days
337 80585AC Microsoft Dynamics® AX 2012 R2 for Retail in Brick and Mortar Stores: Development and Customization 5 days
338 A85-04151 Pearson/VUE MCP ExamVoucher (Second Shot Eligible) 5 days
339 C90-07284 ServerVirtualization Microsoft Official Courseware 20409BC (print version) and Certification 5 days
340 F46-00083 Microsoft® CPLS English Student Certificate (SILVER)- Bundle of 25 units 5 days
341 G73-00142 MCT ProgramVoucher – First-Time (“New”) Information Worker/Microsoft Office Applicant Only 5 days
342 G73-00143 MCT ProgramVoucher - First-Time (“New”) IT Professional/Developer/Dynamics Applicant Only 5 days
343 G73-00144 MCT ProgramVoucher – Renewing/Reinstated Information Worker/Microsoft OfficeTrainer Only 5 days
344 G73-00145 MCT ProgramVoucher - Renewing/Reinstated IT Professional/Developer/DynamicsTrainer Only 5 days
345 G73-00146 MCT Alumni ProgramVoucher – First-Time (“New”) or Renewing MCT Alumni Candidate Only 5 days
346 J7F-00893 ServerVirtualization Microsoft Official Courseware 20409BC (digital version) and Certification 5 days
347 J7F-00980 30 Day 100 USD Azure Pass 5 days
348 OD10747DC Administering System Center 2012 Configuration Manager 5 days
349 OD10961BC Automating Administration with Windows PowerShell® 5 days
350 OD20341BC Core Solutions of Microsoft® Exchange Server 2013 5 days
351 OD20483BC Programming in C# 5 days
352 QS9-00003 PracticeTestVoucher, Courseware Sales - Commercial 5 days
353 QS9-00004 PracticeTestVoucher, ExamVoucher Sales - Commercial 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Previous
Business&Process
Framework
SoftSkills
No Description Duration
1 Android Application Development & Programming 4 days
2 Mobile Application and Device Security 3 days
3 Mobile & Responsive Web Design 3 days
4 iPhone and iPad Application Development Introduction 4 days
5 Swift Programming Introduction 4 days
6 Securing Smartphones with Mobile Apps 1 day
7 Implementing Web Application Security 1 day
8 PhoneGap for Mobile Application 3 days
9 Responsive Web Design with HTML5 & CSS3 4 days
10 SenchaTouch Mobile Framework 3 days
Vinsys is an early adopter of mobile application design and development including native and
HTML5 cross-platform apps.With over 40 apps developed we can share a vast amount of
experience and help you to choose the right technology for your next project.Apple,Android,
Windows, Oracle Mobile being robust and widely used.
Get Mobile @ Vinsys
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Description Duration
11 AppceleratotTitanium for Mobile Application 3 days
12 Android Security Essentials 3 days
13 Monetize Android Applications 3 days
14 Building iOS 8 Apps with Swift 4 days
15 The Swift Programming Language 5 days
16 iOS 9 using SWIFT 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Description Duration
APPLICATION
1 11i Advanced Supply Chain Planning Fundamentals Ed 3 4 Days
2 11i Payroll Management Fundamentals: Processing Payroll Ed 1 2 Days
3 11i Project Costing Fundamentals Ed 2 4 Days
4 11i/2.6 Implement Oracle Workflow Ed 3 5 Days
5 11i Financials Functional Foundation Ed 3 5 Days
6 11i Asset Management Fundamentals Ed 2 4 Days
7 11i Oracle Receivables Fundamentals Ed 3 3 Days
8 11i Oracle Order Management Fundamentals Ed 2 4 Days
9 11i/2.6 E-Business Functional Workflow Fundamentals Ed 2 2 Days
10 11i10TOI Family Pack E: U.S. Federal Financials Functional Overview 1 Hours
Vinsys, one of the biggest technology training giant in the world, offers Oracle certification as well
as real time hands on sessions on cutting edge Oracle Products. Being an Oracle Approved
Education Centre,Vinsys provides various prestigious and worthy Oracle Certification courses for
professionals who wish to climb the corporate ladder. From database management systems to
enterprise software applications such as ERP, CRM and SCM, Business Intelligence products, Identity
Management products,Application Server products and Collaboration products to name a few.You
can register for OracleTraining and opt from a wide range of OracleTraining Courses atVinsys.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
11 11i10TOI: Family Pack E: OracleTreasury and Oracle Risk Management Functional Overview 1 Hours
12 11i10TOI: Family Pack E: Public Sector Budgeting Product Introduction 1 Hours
13 11i10TOI: Family Pack E:Treasury and Risk Management Product Introduction 1 Hours
14 11i10TOI: Family Pack E: U.S. Federal Financials Functional Overview 1 Hours
15 11i10TOI: OSS - Admissions Functional Overview 1 Hours
16 11i10TOI: OSS - Enrollment Functional Overview 1 Hours
17 11i10TOI: OSS - Financial Aid Functional Overview 1 Hours
18 11i10TOI: OSS - Higher Ed Statistics Agency (HESA) Functional Overview 1 Hours
19 11i10TOI: OSS - Program Structure & Planning Functional Overview 1 Hours
20 11i10TOI: OSS - Records Functional Overview 1 Hours
21 11i10TOI: OSS - Recruiting Functional Overview 1 Hours
22 11i10TOI: OSS - Student Finance Functional Overview 1 Hours
23 11i10TOI: OSS - Student Wide Services Functional Overview 1 Hours
24 11i10TOI: OSS - University & College Admissions Services (UCAS) Functional Overview 1 Hours
25 11i10TOI: Student Systems Product Introduction 1 Hours
26 11i System Administrator Fundamentals Ed 3 5 Days
27 11i Purchasing Fundamentals Ed 1 4 Days
28 11i Inventory Management Fundamentals Ed 2 4 Days
29 11i eBusiness Suite Essentials for Implementers Ed 4 2 Days
30 11i Install, Patch and Maintain Oracle Applications Ed 5.1 5 Days
31 11i General Ledger Management Fundamentals Ed 3.1 5 Days
32 11i Oracle Payables Fundamentals Ed 3.2 4 Days
33 11i Extend Oracle Applications: Building OA Framework Applications Ed 1.1 5 Days
34 11i Financial Applications Overview Ed 2.1 5 Days
35 R12 Oracle Payroll Fundamentals: Earnings and Deductions (UK) Ed 1 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
36 11i Oracle Payables Fundamentals Ed 3.2 LWC 4 Days
37 11i General Ledger Management Fundamentals Ed 3.1 LWC 5 Days
38 11i Oracle Receivables Fundamentals Ed 3 LWC 3 Days
39 11i Procure to Pay Fundamentals Ed 2 LWC 5 Days
40 11i Asset Management Fundamentals Ed 2 LWC 4 Days
41 11i Implement and Use Internet Expenses Ed 2 LVC 3 Days
42 11iTime and Labor Management Fundamentals Ed 1.1 LVC 4 Days
43 11i Project Billing Fundamentals Ed 2 LVC 2 Days
44 11i Advanced Collections Fundamentals Ed 1 LVC 3 Days
45 E R12 Manufacturing Overview Ed 1 PRV 5 Days
46 11i System Administrator Fundamentals Ed 3 LWC 5 Days
47 11i Financial Applications Overview Ed 2.1 LVC 5 Days
48 11i Oracle Order Management Fundamentals Ed 2 LWC 4 Days
49 11i eBusiness Suite Essentials for Implementers Ed 4 LWC 2 Days
50 11i Purchasing Fundamentals Ed 1 LWC 4 Days
51 R12 Oracle Sales Fundamentals Ed 1 LWC 4 Days
52 11i Inventory Management Fundamentals Ed 2 LWC 4 Days
53 11i iProcurement Fundamentals Ed 2 LWC 3 Days
54 11i Use and Implement Incentive Compensation Ed 2 LVC 4 Days
55 R12 Oracle Common Application Components Fundamentals Ed 1 LWC 3 Days
56 11i Project Costing Fundamentals Ed 2 LWC 4 Days
57 R12 Grants Accounting Fundamentals Ed 1 LWC 5 Days
58 11i HRMS People Management Fundamentals Ed 1 LWC 2 Days
59 11i Financials Functional Foundation Ed 3 LWC 5 Days
60 11i Manufacturing Functional Foundation Ed 2 LWC 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
61 E R12 Data Model for P2P (Procurement to Pay) - IBM Graduate Program 1 Days
62 E R12 Data Model for O2C (Order to Cash) - IBM Graduate Program 1 Days
63 E R12 eBusiness Suite Essentials for Implementers - IBM Graduate Program Ed 1 PRV 2 Days
64 E R12 Interfaces and API's - IBM Graduate Program Ed 1 PRV 1 Days
65 R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1 5 Days
66 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1 5 Days
67 S R12.1 Oracle Human Capital Management New Features Ed 1 LVC 2 Days
68 11i Install, Patch and Maintain Oracle Applications Ed 5.1 LWC 5 Days
69 11i/2.6 E-Business Functional Workflow Fundamentals Ed 2 LWC 2 Days
70 R12 Oracle HRMSTalent Management Fundamentals Ed 1 LWC 2 Days
71 11i ImplementTreasury Management Ed 1 LWC 4 Days
72 11i Implement and Use Cost Management Ed 1.1 LWC 3 Days
73 11i Global Order Promising Fundamentals Ed 2 LWC 2 Days
74 R12 Project Resource Management Fundamentals Ed 1 LWC 1 Days
75 R12.x Oracle Manufacturing Functional Foundation Ed 1 LVC 4 Days
76 R12.x Oracle Bills of Material and Engineering Fundamentals Ed 1 LVC 4 Days
77 R12.x Oracle Cost Management Fundamentals Ed 1 LVC 3 Days
78 R12.x Oracle Enterprise Asset Management Fundamentals Ed 1 4 Days
79 R12.x Oracle Enterprise Asset Management Fundamentals Ed 1 LVC 4 Days
80 R12.1 Oracle Product Information Management Fundamentals Ed 1 LVC 4 Days
81 R12.x Oracle Work in Process Fundamentals Ed 1 LVC 4 Days
82 R12.x Oracle Depot Repair Fundamentals Ed 1 LVC 2 Days
83 R12.x Oracle Payables Management Fundamentals Ed 1 4 Days
84 R12.x Oracle Payables Management Fundamentals Ed 1 LVC 4 Days
85 R12.x Oracle Financials New Features Fundamentals Ed 1 LVC 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
86 R12.x Oracle Customer Data Management Ed 1 LVC 3 Days
87 R12.x Oracle Cash Management Fundamentals Ed 1 LVC 2 Days
88 R12.x Oracle Advanced Collections Fundamentals Ed 1 LVC 3 Days
89 R12.x Oracle Financials New Features Fundamentals Ed 1 5 Days
90 R12.x Oracle Project Management Fundamentals Ed 1 LVC 4 Days
91 R12.x Oracle Project Billing Fundamentals Ed 1 LVC 2 Days
92 R12.x Oracle Project Foundation Fundamentals Ed 1 LVC 3 Days
93 R12.x Oracle Implement Configurator Ed 1 LVC 5 Days
94 R12.x Oracle Project Costing Fundamentals Ed 1 4 Days
95 R12.x Oracle Project Costing Fundamentals Ed 1 LVC 4 Days
96 R12.x Oracle Service Fundamentals Ed 1 LVC 4 Days
97 R12.x Oracle Purchasing Fundamentals Ed 1 5 Days
98 R12.x Oracle Purchasing Fundamentals Ed 1 LVC 5 Days
99 R12.x Oracle Advanced Pricing Fundamentals Ed 1 LVC 3 Days
100 R12.x Oracle iProcurement Fundamentals Ed 1 LVC 3 Days
101 R12.x Oracle Sourcing Fundamentals Ed 1 LVC 3 Days
102 R12.x Oracle Service Contracts Fundamentals Ed 1 LVC 3 Days
103 R12.x Oracle iStore Fundamentals Ed 1 LVC 5 Days
104 R12.x Oracle Procurement Contracts Fundamentals Ed 1 LVC 2 Days
105 R12.x Oracle Warehouse Management Fundamentals Ed 1 LVC 4 Days
106 R12.x Oracle Payroll Fundamentals: Configuration (Global) Ed 1 2 Days
107 R12.x Oracle Payroll Fundamentals: Earnings and Deductions Ed 1 2 Days
108 R12.x Oracle Payroll Fundamentals:Administration (Global) Ed 1 3 Days
109 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1 3 Days
110 R12.x Oracle E-Business Suite Personalizations Ed 1 LVC 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
111 R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1 LVC 5 Days
112 R12.x Oracle HRMS People Management Fundamentals Ed 1 LVC 2 Days
113 R12.x Oracle HRMS Self Service Fundamentals Ed 1 LVC 3 Days
114 R12.x Oracle Payroll Fundamentals:Administration (Global) Ed 1 LVC 3 Days
115 R12.x Oracle Payroll Fundamentals: Configuration (Global) Ed 1 LVC 2 Days
116 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1 LVC 3 Days
117 R12.x Oracle HRMS Work Structures Fundamentals Ed 1 LVC 2 Days
118 R12.x Oracle HRMSTotal Compensation Foundations Ed 1 2 Days
119 R12.x Oracle HRMS Learning Management Fundamentals Ed 1 LVC 3 Days
120 R12.x Oracle HRMS System Administration Fundamentals Ed 1 LVC 3 Days
121 R12.x Oracle Payroll Fundamentals: Earnings and Deductions Ed 1 LVC 2 Days
122 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1 LVC 3 Days
123 R12.x Oracle HRMS iRecruitment Fundamentals Ed 1 LVC 2 Days
124 R12.x Oracle HRMSTotal Compensation Foundations Ed 1 LVC 2 Days
125 R12.x Oracle HRMS Compensation Workbench and Salary Configuration Ed 1 LVC 4 Days
126 R12.x Oracle Payroll Fundamentals: Earnings and Deductions (US) Ed 1 2 Days
127 R12.x Oracle Payroll Fundamentals: Earnings and Deductions (US) Ed 1 LVC 2 Days
128 R12.1 Oracle Site Hub Ed 1 LVC 2 Days
129 R12 Oracle HRMS Implement and Use Fast Formula Ed 1 LWC 2 Days
130 R12.x Extend Oracle Applications: Building OA Framework Applications Ed 1 5 Days
131 R12.x Extend Oracle Applications: Customizing OA Framework Applications Ed 1 5 Days
132 OPN R12.1 Oracle FMS Essentials Implementation Boot Camp Ed 1 LVC 15 Days
133 OPN R12.1 Oracle HRMS Essentials Implementation Boot Camp Ed 1 LVC 10 Days
134 OPN Oracle AIA 2.1 Implementation Boot Camp Ed 1 LVC 3 Days
135 R12.x Use and Implement Incentive Compensation Ed 1 LVC 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
136 E Delta 11i / R12 Oracle Application - Finance Ed 2 3 Days
137 OPN Oracle EBS FMS 11i to R12.1 Delta Implementation Boot Camp Ed 1.1 LVC 5 Days
138 R12.x Oracle Quality Fundamentals Ed 1 LVC 2 Days
139 E R12 E-Business XML & BI Publisher Case Study - IBM Graduate Program Ed 1 PRV 2 Days
140 E R12 Interfaces and API's Case Study - IBM Graduate Program Ed 1 PRV 5 Days
141 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1 LVC 5 Days
142 E-Business Suite: BI Publisher 5.6.3 for End Users Ed 1 3 Days
143 E-Business Suite: BI Publisher 5.6.3 for End Users Ed 1 LVC 3 Days
144 OPN R12.1 Process Manufacturing Delta Implementation Boot Camp Ed 1 LVC 3 Days
145 OPN R12.1 Projects Essentials Implementation Boot Camp Ed 1 15 Days
146 OPN R12.1 Projects Essentials Implementation Boot Camp Ed 1 LVC 15 Days
147 OPN R12.1 Discrete Manufacturing Delta Implementation Boot Camp Ed 1 3 Days
148 OPN R12.1 Discrete Manufacturing Delta Implementation Boot Camp Ed 1 LVC 3 Days
149 OPN R12.1 Process Manufacturing Delta Implementation Boot Camp Ed 1 3 Days
150 R12.x Inventory Management/Bill of Material & Engineering Accel Ed 1 5 Days
151 R12.x Inventory Management/Bill of Material & Engineering Accel Ed 1 LVC 5 Days
152 R12.x Oracle Payables Management Fundamentals (NAMER) Ed 1 5 Days
153 R12.x Oracle Payables Management Fundamentals (NAMER) Ed 1 LVC 5 Days
154 OPN Ramp up Bootcamp R12 General Ledger Ed 1 3 Days
155 OPN Ramp up Bootcamp R12 General Ledger Ed 1 LVC 3 Days
156 R12.x Extend Oracle Applications: OA Framework Personalizations Ed 1 LVC 2 Days
157 OPN R12.1 Oracle E-Bus Suite Essentials for Implementers Bootcamp Ed 1 3 Days
158 OPN Oracle EBS R12.1 Accounts Receivable Boot Camp Ed 1 3 Days
159 OPN Oracle EBS R12.1 Accounts Receivable Boot Camp Ed 1 LVC 3 Days
160 OPN R12.1 Oracle E-Bus Suite Essentials for Implementers Bootcamp Ed 1 LVC 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
161 OPN Oracle EBS R12.1 General Ledger Boot Camp Ed 1 LVC 3 Days
162 OPN Oracle EBS R12.1 Payables Boot Camp Ed 1 4 Days
163 OPN Oracle EBS R12.1 General Ledger Boot Camp Ed 1 3 Days
164 OPN Oracle EBS R12.1 Payables Boot Camp Ed 1 LVC 4 Days
165 E Oracle R12 Order Mgmt Fundamentals (OPN APAC only) Ed 1 3 Days
166 E Oracle R12 Order Mgmt Fundamentals (OPN APAC only) Ed 1 LVC 3 Days
167 E Oracle R12 General Ledger Fundamentals (OPN APAC only) Ed 1 3 Days
168 E Oracle R12 General Ledger Fundamentals (OPN APAC only) Ed 1 LVC 3 Days
169 R12.x OracleTime and Labor Fundamentals Ed 1 LVC 4 Days
170 OPN R12.1 Oracle Inventory Implementation Boot Camp Ed 1 5 Days
171 OPN R12.1 Oracle Inventory Implementation Boot Camp Ed 1 LVC 5 Days
172 OPN R12.1 Oracle Purchasing Implementation Boot Camp Ed 1 5 Days
173 OPN R12.1 Oracle Purchasing Implementation Boot Camp Ed 1 LVC 5 Days
174 OPN R12.1 Oracle Order Management Implementation Boot Camp Ed 1 5 Days
175 OPN R12.1 Oracle Order Management Implementation Boot Camp Ed 1 LVC 5 Days
176 R12.x Oracle HRMS Performance Management Fundamentals Ed 1 LVC 2 Days
177 CEL Oracle E-BusinessSuite: Context Files,Autoconfig, Install - Elke Phelps LVC 1 Days
178 CEL Oracle E-Business Suite:Architecture and Filesystems with Elke Phelps LVC 1 Days
179 E R12 Oracle E-Business Specialist - SCMTrack Ed 1 LVC 5 Days
180 CEL Oracle EBS R12 Applications DBA with Elke Phelps Ed 1 LVC 2 Days
181 R12.x Extend Oracle Applications: Building OA Framework Applications Ed 1TOD 5 Days
182 R12.x Oracle E-Business Suite Essentials for Implementers Ed 1TOD 3 Days
183 R12.x Oracle General Ledger Management Fundamentals Ed 1TOD 5 Days
184 R12.x Oracle Applications System Administrator Fundamentals Ed 1TOD 5 Days
185 R12.x Implement Oracle Workflow Ed 1TOD 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
186 R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1TOD 5 Days
187 R12.x Oracle Internet Expenses Fundamentals Ed 1.1 LVC 3 Days
188 11i Extend Apps-Forms Ed 1TOD 5 Days
189 OPN R12.1 Oracle HCM Essentials Implementation Boot Camp Ed 1 LVC 5 Days
190 Flexcube Application for Oracle Financial Services (OFSS) 5 Days
191 R12.x Extend Oracle Applications: Customizing OA Framework Applications Ed 1TOD 5 Days
192 R12.x Oracle Receivables Management Fundamentals Ed 1TOD 4 Days
193 R12.x Oracle Financials Accounting Hub Fundamentals Ed 1 2 Days
194 R12.x Oracle Financials Accounting Hub Fundamentals Ed 1 LVC 2 Days
195 R12.x Oracle Financial Applications Overview Ed 1TOD 5 Days
196 R12.x Oracle Purchasing Fundamentals Ed 1TOD 5 Days
197 R12.2 Oracle Manufacturing New Features Ed 1 5 Days
198 R12.2 Oracle Manufacturing New Features Ed 1 LVC 5 Days
199 E R12 Oracle EBS Suite: Introduction - IBM Graduate Program Ed 1 PRV 7 Days
200 E R12 Oracle EBS - Build OAF - IBM Graduate Program Ed 1 PRV 3 Days
201 E R12 Report & BI integration to Oracle EBS - IBM Graduate Program Ed 1 6 Days
202 E R12 Interfaces and API's - IBM Graduate Program Ed 2 PRV 11 Days
203 E R12 E-Business XML & BI Publisher - IBM Graduate Program Ed 1 LVC 3 Days
204 E R12 E-Business XML & BI Publisher Case Study - IBM Graduate Program Ed 1 LVC 2 Days
205 E R12 eBusiness Suite Essentials for Implementers - IBM Graduate Pgrm Ed 1 LVC 2 Days
206 E R12 Data Model for P2P (Procurement to Pay) - IBM Graduate Program Ed 1 LVC 1 Days
207 E R12 Data Model for O2C (Order to Cash) - IBM Graduate Program LVC 1 Days
208 E R12 Interfaces and API's - IBM Graduate Program Ed 1 LVC 1 Days
209 E R12 Interfaces and API's Case Study - IBM Graduate Program Ed 1 LVC 5 Days
210 R12.1 Oracle Field Service Fundamentals Ed 1.1 LVC 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
211 R12.x Oracle Advanced Global Intercompany System Ed 1 LVC 2 Days
212 E IBM - R12.x Oracle eBusiness Suite: Procure to Pay Ed 1TOD 3 Days
213 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1 2 Days
214 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1 LVC 2 Days
215 E Oracle Product Hub for Communications Solution Foundations Ed 1 PRV 4 Days
216 R12.x Oracle Financials New Features Fundamentals Ed 1TOD 5 Days
217 R12.x Oracle Financials Functional Foundation Ed 1TOD 5 Days
218 R12.x Oracle Order Management Fundamentals Ed 1TOD 4 Days
219 R12.x Oracle Payables Management Fundamentals Ed 1TOD 4 Days
220 R12.x Oracle Project Costing Fundamentals Ed 1TOD 4 Days
221 R12.x Oracle iProcurement Fundamentals Ed 1TOD 3 Days
222 E IBM - R12.x Oracle eBusiness Suite: Order to Cash Ed 1TOD 5 Days
223 E Oracle Product Hub for Communications Solution Foundations Ed 1 LVC 4 Days
224 R12.2 Oracle Applications System Administrator Fundamentals Ed 1 LVC 5 Days
225 R12.2 Oracle Applications System Administrator Fundamentals Ed 1 5 Days
226 R12.2 Implement Oracle Workflow Ed 1 5 Days
227 R12.2 Implement Oracle Workflow Ed 1 LVC 5 Days
228 E R12 Report & BI integration to Oracle EBS - IBM Graduate Program Ed 1 LVC 6 Days
229 E R12 Oracle EBS - Build OAF - IBM Graduate Program Ed 1 LVC 3 Days
230 E R12 Oracle EBS Suite: Introduction - IBM Graduate Program Ed 1 LVC 7 Days
231 E R12 Interfaces and API's - IBM Graduate Program Ed 2 LVC 11 Days
232 R12.2 Oracle Subledger Accounting Fundamentals Ed 1 2 Days
233 R12.2 Oracle Subledger Accounting Fundamentals Ed 1 LVC 2 Days
234 R12.2 Oracle Financial Applications Overview Ed 1 LVC 5 Days
235 R12.2 Oracle Financial Applications Overview Ed 1 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
236 R12.2 Oracle Order Management Fundamentals Ed 1 4 Days
237 R12.2 Oracle Order Management Fundamentals Ed 1 LVC 4 Days
238 R12.2 Oracle Receivables Management Fundamentals Ed 1 4 Days
239 R12.2 Oracle Receivables Management Fundamentals Ed 1 LVC 4 Days
240 R12.2 Oracle Payables Management Fundamentals Ed 1 4 Days
241 R12.2 Oracle Payables Management Fundamentals Ed 1 LVC 4 Days
242 R12.2 Oracle Asset Management Fundamentals Ed 1 4 Days
243 R12.2 Oracle Asset Management Fundamentals Ed 1 LVC 4 Days
244 R12.2 Oracle E-BusinessTax Fundamentals Ed 1 3 Days
245 R12.2 Oracle E-BusinessTax Fundamentals Ed 1 LVC 3 Days
246 R12.2 Oracle Financials Functional Foundation Ed 1 5 Days
247 R12.2 Oracle Financials Functional Foundation Ed 1 LVC 5 Days
248 R12.2 Oracle General Ledger Management Fundamentals Ed 1 5 Days
249 R12.2 Oracle General Ledger Management Fundamentals Ed 1 LVC 5 Days
250 R12.2 Install/Patch/Maintain Oracle E-Business Suite Ed 1 5 Days
251 R12.2 Install/Patch/Maintain Oracle E-Business Suite Ed 1 LVC 5 Days
252 R12.2 Oracle Advanced Supply Chain Planning Fundamentals Ed 1 4 Days
253 R12.2 Oracle Advanced Supply Chain Planning Fundamentals Ed 1 LVC 4 Days
254 R12.2 Oracle E-Business Suite Fundamentals Ed 1 3 Days
255 R12.2 Oracle E-Business Suite Fundamentals Ed 1 LVC 3 Days
256 R12.2 Oracle Inventory Management Fundamentals Ed 2 5 Days
257 R12.2 Oracle Inventory Management Fundamentals Ed 2 LVC 5 Days
258 E IBM R12.x Oracle EBus Suite-Record to Report Process Proj Sim Ed 1 PRV 5 Days
259 R12.x Oracle Production Scheduling Ed 1 LVC 3 Days
260 E IBM R12.x Oracle EBus Suite-Record to Report Process Proj Sim Ed 1 LVC 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
261 R12.2 Oracle Asset Management Fundamentals Ed 1TOD 4 Days
262 E Oracle Product Hub for Communications Solution Foundations Ed 1TOD 4 Days
263 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1TOD 5 Days
264 R12.2 Oracle Subledger Accounting Fundamentals Ed 1TOD 2 Days
265 R12.x Oracle Applications User Management Fundamentals Ed 1TOD 2 Days
266 R12.x Oracle Advanced Collections Fundamentals Ed 1TOD 3 Days
267 R12.x Oracle Project Billing Fundamentals Ed 1TOD 2 Days
268 S OracleValue Chain Planning: Service Parts Planning Ed 1TOD 3 Days
269 S OracleValue Chain Planning: Implement Production Scheduling Ed 1TOD 3 Days
270 R12.2 Oracle Inventory Management Fundamentals Ed 2TOD 5 Days
271 R12.x Oracle Advanced Pricing Fundamentals Ed 1TOD 3 Days
272 R12.x Oracle Warehouse Management Fundamentals Ed 1TOD 4 Days
273 R12.x Oracle Service Contracts Fundamentals Ed 1TOD 3 Days
274 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1TOD 3 Days
275 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1TOD 2 Days
276 OPN Consulting Skills for Partners Ed 1TOD 2 Days
277 OPN Cloud Consulting Skills for Partners Ed 1TOD 2 Days
278 S OracleValue Chain Planning: Implement Inventory Optimization Ed 1TOD 3 Days
279 OPN Documents Cloud Service Bootcamp Ed 1TOD 2 Days
280 R12.2 Oracle Applications System Administrator Fundamentals Ed 1TOD 5 Days
281 S OracleValue Chain Planning: Implement Rapid Planning Ed 1TOD 2 Days
282 R12.x Oracle HRMS Performance Management Fundamentals Ed 1TOD 2 Days
283 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1TOD 3 Days
284 S OracleValue Chain Planning: Implement Adv Plann Command Ctr Ed 1TOD 2 Days
285 R12.2 Oracle Order Management Fundamentals Ed 2 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
286 R12.2 Oracle Order Management Fundamentals Ed 2 LVC 4 Days
287 11i Implement and Use Work in Process Ed 1 4 Days
288 11i Implement and Use Material Requirements Planning Ed 1 4 Days
289 11i Procure to Pay Fundamentals Ed 2 5 Days
290 11i Implement and Use Internet Expenses Ed 2 3 Days
291 11iTrade Management: Implementing Deduction Management 2 Days
292 11iTime & Labor Management Fundamentals Ed 1.1 4 Days
293 11i Project Billing Fundamentals Ed 2 2 Days
294 11i ImplementTreasury Management Ed 1 4 Days
295 11i Extend Oracle Applications: Customizing OA Framework Applications Ed 1 4 Days
296 11i Implement and Use Cash Management Ed 2 1 Days
297 11i Advanced Collections Fundamentals Ed 1 3 Days
298 11i iProcurement Fundamentals Ed 2 3 Days
299 11i Project Foundation Fundamentals Ed 3 3 Days
300 11i Project Management Fundamentals Ed 3 4 Days
301 11i Sourcing Fundamentals Ed 1 3 Days
302 11i Implement Daily Business Intelligence Ed 3 4 Days
303 R12 Project Resource Management Fundamentals Ed 1 1 Days
304 R12 Grants Accounting Fundamentals Ed 1 5 Days
305 R12 Oracle Common Application Components Fundamentals Ed 1 3 Days
306 R12 Oracle Sales Fundamentals Ed 1 4 Days
307 R12 Oracle HRMS Implement and Use Fast Formula Ed 1 2 Days
308 R12 Oracle HRMSTalent Management Fundamentals Ed 1 2 Days
309 11i Oracle Production Scheduling Ed 1 3 Days
310 E R12 Oracle E-Business Specialist - FinancialTrack Ed 1 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
311 E R12 Oracle E-Business Specialist - SCMTrack Ed 1 5 Days
312 R12.x Oracle E-Business Suite Personalizations Ed 1 5 Days
313 S R12.1 Oracle Human Capital Management New Features Ed 1 2 Days
314 R12.x Oracle Manufacturing Functional Foundation Ed 1 4 Days
315 R12.x Oracle Bills of Material and Engineering Fundamentals Ed 1 4 Days
316 R12.x Oracle Cost Management Fundamentals Ed 1 3 Days
317 R12.1 Oracle Product Information Management Fundamentals Ed 1 4 Days
318 R12.x Oracle Work in Process Fundamentals Ed 1 4 Days
319 R12.x Oracle Depot Repair Fundamentals Ed 1 2 Days
320 R12 Oracle Purchasing / Payables Accelerated Ed 1 5 Days
321 R12.x Oracle Customer Data Management Ed 1 3 Days
322 R12.x Oracle Advanced Collections Fundamentals Ed 1 3 Days
323 R12.x Oracle Cash Management Fundamentals Ed 1 2 Days
324 R12.x Oracle Implement Configurator Ed 1 5 Days
325 R12.x Oracle Project Foundation Fundamentals Ed 1 3 Days
326 R12.x Oracle Project Management Fundamentals Ed 1 4 Days
327 R12.x Oracle Project Billing Fundamentals Ed 1 2 Days
328 R12.x Oracle Service Fundamentals Ed 1 4 Days
329 R12.x Oracle Advanced Pricing Fundamentals Ed 1 3 Days
330 R12.x Oracle iProcurement Fundamentals Ed 1 3 Days
331 R12.x Oracle Sourcing Fundamentals Ed 1 3 Days
332 R12.x Oracle Service Contracts Fundamentals Ed 1 3 Days
333 R12.x Oracle iStore Fundamentals Ed 1 5 Days
334 R12.x Oracle Procurement Contracts Fundamentals Ed 1 2 Days
335 R12.x Oracle Warehouse Management Fundamentals Ed 1 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
336 R12.x Oracle HRMS Work Structures Fundamentals Ed 1 2 Days
337 R12.x Oracle HRMS People Management Fundamentals Ed 1 2 Days
338 R12.x Oracle HRMS Self Service Fundamentals Ed 1 3 Days
339 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1 3 Days
340 R12.x Oracle HRMS iRecruitment Fundamentals Ed 1 2 Days
341 R12.x Oracle HRMS Learning Management Fundamentals Ed 1 3 Days
342 R12.x Oracle HRMS Compensation Workbench and Salary Configuration Ed 1 4 Days
343 R12.x Oracle HRMS System Administration Fundamentals Ed 1 3 Days
344 R12.1 Oracle Site Hub Ed 1 2 Days
345 R12.x Extend Oracle Applications: OA Framework Personalizations Ed 1 2 Days
346 OPN Oracle AIA 2.1 Implementation Boot Camp Ed 1 3 Days
347 OPN R12.1 Oracle FMS Essentials Implementation Boot Camp Ed 1 15 Days
348 OPN R12.1 Oracle HRMS Essentials Implementation Boot Camp Ed 1 10 Days
349 OPN R12.1 Oracle SCM Essentials Implementation Boot Camp Ed 1 10 Days
350 R12.x Use and Implement Incentive Compensation Ed 1 4 Days
351 OPN Oracle EBS FMS 11i to R12.1 Delta Implementation Boot Camp Ed 1.1 5 Days
352 R12.x Oracle Quality Fundamentals Ed 1 2 Days
353 E R12 E-Business XML & BI Publisher - IBM Graduate Program Ed 1 PRV 3 Days
354 R12.x Oracle HRMS Performance Management Fundamentals Ed 1 2 Days
355 R12.x OracleTime and Labor Fundamentals Ed 1 4 Days
356 R12.x Oracle Internet Expenses Fundamentals Ed 1.1 3 Days
357 OPN R12.1 Oracle HCM Essentials Implementation Boot Camp Ed 1 5 Days
358 R12.1 Oracle Field Service Fundamentals Ed 1.1 3 Days
359 R12.x Oracle Advanced Global Intercompany System Ed 1 2 Days
360 R12.x Oracle Production Scheduling Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
361 Fusion Applications: Extend Applications with ADF Ed 1 5 Days
362 Fusion Applications: Extend Applications with ADF Ed 1 LVC 5 Days
363 Fusion Applications: Extend Applications with ADFTOD 5 Days
364 Fusion Applications: Install and Configure Identity Management Ed 2 4 Days
365 E IBM - Fusion Applications Executive Overview Ed 1TOD 2 Days
366 E IBM - Oracle Fusion Applications Security Ed 1TOD 2 Days
367 Fusion Applications R8: Installation and Patching Ed 1 5 Days
368 Fusion Applications R8: Provision Identity Management Ed 1 2 Days
369 Fusion Applications R8:Administer using EM12c Cloud Control Ed 1 3 Days
370 E IBM Fusion Applications Executive Overview with R7 New Features Ed 2TOD 3 Days
371 E Fusion ApplicationsTechnical Bootcamp Ed 1 5 Days
372 Oracle HCM Cloud: Global Human Resources Ed 1TOD 5 Days
373 Oracle HCM Cloud:Talent Management Ed 1TOD 5 Days
374 Oracle HCM Cloud: Compensation Ed 1TOD 5 Days
375 Oracle HCM Cloud: Benefits Ed 1TOD 5 Days
376 Oracle HCM Cloud:Absence Management Ed 1TOD 2 Days
377 Oracle HCM Cloud: US Operational Payroll Ed 1TOD 2 Days
378 Oracle HCM Cloud: US Payroll Ed 1TOD 5 Days
379 Oracle HCM Cloud:Time & Labor Ed 1TOD 3 Days
380 Oracle HCM Cloud: Fast Formula Ed 1TOD 2 Days
381 Oracle Financials Cloud: Financials Implementation I Ed 1TOD 5 Days
382 Oracle Procurement Cloud: Procurement Implementation Ed 1TOD 4 Days
383 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 1TOD 3 Days
384 Oracle Financials Cloud: Financials Implementation II Ed 1TOD 5 Days
385 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 1TOD 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
386 Oracle Financials Cloud: Financials Reporting Ed 1TOD 3 Days
387 S Fusion Applications R8: Installation and Patching Ed 1TOD 5 Days
388 OPN Financials Cloud R9 Ed 1TOD 5 Days
389 Oracle Financials Cloud: Financials Implementation I Ed 2 5 Days
390 Oracle Financials Cloud: Financials Implementation I Ed 2 LVC 5 Days
391 Oracle Financials Cloud: Financials Implementation II Ed 2 5 Days
392 Oracle Financials Cloud: Financials Implementation II Ed 2 LVC 5 Days
393 Oracle Financials Cloud: Financials Reporting Ed 2 3 Days
394 Oracle Financials Cloud: Financials Reporting Ed 2 LVC 3 Days
395 Fusion Applications:Accounting Hub Fundamentals Ed 6 4 Days
396 Fusion Applications:Accounting Hub Fundamentals Ed 6 LVC 4 Days
397 Oracle Applications Cloud: Functional Setup Mgr for Imp Ed 2 1 Days
398 Oracle Applications Cloud: Functional Setup Mgr for Imp Ed 2 LVC 1 Days
399 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 2 5 Days
400 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 2 LVC 5 Days
401 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 2 LVC 3 Days
402 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 2 3 Days
403 Oracle SCM Cloud: Product Information Mgmt Implementation Ed 2 4 Days
404 Oracle SCM Cloud: Product Information Mgmt Implementation Ed 2 LVC 4 Days
405 Oracle Procurement Cloud: Procurement Implementation Ed 2 4 Days
406 Oracle Procurement Cloud: Procurement Implementation Ed 2 LVC 4 Days
407 Oracle HCM Cloud:Absence Management Ed 2 2 Days
408 Oracle HCM Cloud:Absence Management Ed 2 LVC 2 Days
409 Oracle HCM Cloud: Benefits Ed 2 5 Days
410 Oracle HCM Cloud: Benefits Ed 2 LVC 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
411 Oracle HCM Cloud: Compensation Ed 2 5 Days
412 Oracle HCM Cloud: Compensation Ed 2 LVC 5 Days
413 Oracle HCM Cloud: Fast Formula Ed 2 2 Days
414 Oracle HCM Cloud: Fast Formula Ed 2 LVC 2 Days
415 Oracle HCM Cloud: Global Human Resources Ed 2 5 Days
416 Oracle HCM Cloud: Global Human Resources Ed 2 LVC 5 Days
417 Oracle HCM Cloud: Security Ed 2 2 Days
418 Oracle HCM Cloud: Security Ed 2 LVC 2 Days
419 Oracle HCM Cloud:Talent Management Ed 2 5 Days
420 Oracle HCM Cloud:Talent Management Ed 2 LVC 5 Days
421 Oracle HCM Cloud:Time & Labor Ed 2 3 Days
422 Oracle HCM Cloud:Time & Labor Ed 2 LVC 3 Days
423 Oracle HCM Cloud: US Operational Payroll Ed 2 2 Days
424 Oracle HCM Cloud: US Operational Payroll Ed 2 LVC 2 Days
425 Oracle HCM Cloud: US Payroll Ed 2 5 Days
426 Oracle HCM Cloud: US Payroll Ed 2 LVC 5 Days
427 Oracle SCM Cloud: Implementing Innovation Mgmt with Agile PLM Ed 2 2 Days
428 Oracle SCM Cloud: Implementing Innovation Mgmt with Agile PLM Ed 2 LVC 2 Days
429 Oracle SCM Cloud: Implementing Product Development Ed 1 2 Days
430 Oracle SCM Cloud: Implementing Product Development Ed 1 LVC 2 Days
431 Oracle HCM Cloud: Security Ed 2TOD 2 Days
432 Oracle HCM Cloud:Talent Management Ed 2TOD 5 Days
433 Fusion Applications:Accounting Hub Fundamentals Ed 6TOD 4 Days
434 OPN Financials Cloud R9 LS Ed 1TOD 5 Days
435 Oracle Financials Cloud: General Ledger Fundamentals Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
436 Oracle Financials Cloud: General Ledger Fundamentals Ed 1 LVC 3 Days
437 Oracle Financials Cloud: Payables Fundamentals Ed 1 2 Days
438 Oracle Financials Cloud: Payables Fundamentals Ed 1 LVC 2 Days
439 Oracle Financials Cloud: Receivables Fundamentals Ed 1 2 Days
440 Oracle Financials Cloud: Receivables Fundamentals Ed 1 LVC 2 Days
441 Oracle Financials Cloud: Cash Management Fundamentals Ed 1 1 Days
442 Oracle Financials Cloud: Fixed Assets Fundamentals Ed 2 2 Days
443 Oracle Financials Cloud: Fixed Assets Fundamentals Ed 2 LVC 2 Days
444 Oracle Financials Cloud: Cash Management Fundamentals Ed 1 LVC 1 Days
445 Siebel 8.0 Essentials Ed 1 10 Days
446 Siebel 8.0 New Features Ed 1 3 Days
447 Siebel 8.0 New Features LWC Ed 1 3 Days
448 Siebel 8.0 Customer Order Management: Product Admin. Ed 1 3 Days
449 Application Administration (Siebel 8.0) Ed 1 3 Days
450 Siebel 8.0 Marketing: Marketing Manager Ed 1 3 Days
451 Siebel 8.0 Fundamentals Ed 2 LWC 2 Days
452 Application Administration (Siebel 8.0) Ed 1 LWC 3 Days
453 Siebel 8.0 Fundamentals Ed 2 2 Days
454 Fundamentals for Business Analysts (Siebel 8.0) Ed 2 5 Days
455 CDT Siebel CRM OnDemand Overview Seminar (JP) PRV 2 Days
456 Siebel 8.1.x Enterprise Integration Manager Ed 1 LVC 2 Days
457 Siebel 8.0 Marketing: Marketing Manager Ed 1 LVC 3 Days
458 Fundamentals for Business Analysts (Siebel 8.0) Ed 2 LWC 5 Days
459 Siebel 8.1 Loyalty Ed 1 LVC 2 Days
460 Siebel 8.0 Customer Order Management: Product Admin. Ed 1 LWC 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
461 Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1 LWC 3 Days
462 Siebel 8.0 Customer Order Management Accelerated Ed 1 LWC 5 Days
463 Siebel 8.1.x Scripting Ed 1 LVC 3 Days
464 Siebel 8.1.x Scripting Ed 1 3 Days
465 Siebel 8.1.x Application Administration Ed 1 5 Days
466 Siebel 8.1.xTools Ed 1 5 Days
467 Siebel 8.1.xTools Ed 1 LVC 5 Days
468 Siebel 8.1.x Business Analyst Ed 1 5 Days
469 Siebel 8.1.x Business Analyst Ed 1 LVC 5 Days
470 Siebel 8.1.x Application Administration Ed 1 LVC 5 Days
471 Siebel 8.1.x BI Publisher Reports Ed 1 3 Days
472 Siebel 8.1.x BI Publisher Reports Ed 1 LVC 3 Days
473 Siebel 8.1.x Business Automation Ed 1 5 Days
474 Siebel 8.1.x Business Automation Ed 1 LVC 5 Days
475 Siebel 8.1.xTechnical Foundations Ed 1 LVC 3 Days
476 Siebel 8.1.x Integration Ed 1 LVC 5 Days
477 Siebel 8.1.x Integration Ed 1 5 Days
478 Siebel 8.1.xTechnical Foundations Ed 1 3 Days
479 Oracle CRM On Demand Advanced Analytics Workshop Ed 4 3 Days
480 Oracle CRM On Demand Advanced Analytics Workshop Ed 4 LVC 3 Days
481 Oracle CRM On Demand Data Import Workshop Ed 3 LVC 1 Days
482 Siebel 8.1.x Fundamentals Ed 1 LVC 2 Days
483 Siebel 8.1.x Fundamentals Ed 1 2 Days
484 E Siebel 8.1.xTools (OPN APAC only) Ed 1 LVC 3 Days
485 E Siebel 8.1.xTools (OPN APAC only) Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
486 Siebel 8.2.2 Case Management for Public Sector Ed 1 5 Days
487 Siebel 8.2.2 Case Management for Public Sector Ed 1 LVC 5 Days
488 Oracle Policy Automation (OPA) Connector for Siebel Ed 1 LVC 3 Days
489 Siebel 8.1.x Business Analyst Ed 1TOD 5 Days
490 Siebel 8.1.x Integration Ed 1TOD 5 Days
491 Siebel 8.1.x System AdministrationTOD 3 Days
492 Siebel 8.0 Essentials ITOD 5 Days
493 Siebel 8.0 Essentials IITOD 5 Days
494 Siebel 8.1.xToolsTOD 5 Days
495 E Scripting for Siebel - IBM Graduate Program Ed 1 LVC 2 Days
496 E Designing a Siebel Project - IBM Graduate Program Ed 1 LVC 1 Days
497 E Building a Siebel Project - IBM Graduate Program Ed 1 LVC 6 Days
498 E Workflow for Siebel - IBM Graduate Program Ed 1 LVC 2 Days
499 E Siebel Case Study - IBM Graduate Program Ed 1 LVC 5 Days
500 Oracle CRM On Demand Advanced Analytics Workshop Ed 4TOD 3 Days
501 Oracle CRM On Demand Administration Essentials Ed 4TOD 4 Days
502 E IBM Oracle CRM OnDemand Workshop Ed 1TOD 3 Days
503 Siebel 8.1.x Installation Ed 3 2 Days
504 Siebel 8.1.x Installation Ed 3 LVC 2 Days
505 E IBM Siebel Upgrade Process (7.7 to 8.1.x) Ed 1 LVC 4 Days
506 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 1 4 Days
507 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 1 LVC 4 Days
508 E IBM Siebel Upgrade Process (7.7 to 8.1.x) Ed 1 4 Days
509 E IBM Siebel Application COM webservices forTELCO Ed 1 2 Days
510 E IBM Siebel Application COM webservices forTELCO Ed 1 LVC 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
511 Siebel 8.1.x Installation and System Administration Ed 2.1 5 Days
512 Siebel 8.1.x Installation and System Administration Ed 2.1 LVC 5 Days
513 Oracle CRM On Demand Administration Essentials Ed 4.1 4 Days
514 Oracle CRM On Demand Administration Essentials Ed 4.1 LVC 4 Days
515 Oracle CRM On Demand Data Import Workshop Ed 4.1 LVC 1 Days
516 Siebel 8.1.x System Administration Ed 2.1 3 Days
517 Siebel 8.1.x System Administration Ed 2.1 LVC 3 Days
518 Siebel 8.1.x BI Publisher Reports Ed 1TOD 3 Days
519 Siebel Open UI Essentials Ed 1.1 LVC 5 Days
520 Siebel Open UI Foundations Ed 2.1 LVC 2 Days
521 Siebel Open UI Adv JavaScript API Ed 1.1 3 Days
522 Siebel Open UI Adv JavaScript API Ed 1.1 LVC 3 Days
523 Siebel Open UI Essentials Ed 1.1 5 Days
524 Siebel Open UI Foundations Ed 2.1 2 Days
525 Siebel Open UI Essentials Ed 1TOD 5 Days
526 Siebel 8.1.x Core Consultant Course Ed 2.1 15 Days
527 Siebel 8.1.x Core Consultant Course Ed 2.1 LVC 15 Days
528 Siebel 8.1 Loyalty Ed 1TOD 2 Days
529 Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1TOD 3 Days
530 Siebel 8.0 Customer Order Management: Product Admin. Ed 1TOD 3 Days
531 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 2 4 Days
532 Siebel 8.1.x Scripting Ed 1TOD 3 Days
533 Siebel 8.1.x Enterprise Integration Manager Ed 1TOD 2 Days
534 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 2 LVC 4 Days
535 E IBM Siebel CRM Innovation Pack 2015: OverviewTOD 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
536 SiebelTools Rel 15.5 Ed 2 5 Days
537 SiebelTools Rel 15.5 Ed 2 LVC 5 Days
538 SiebelTechnical Foundations Rel 15.5 Ed 1 3 Days
539 SiebelTechnical Foundations Rel 15.5 Ed 1 LVC 3 Days
540 Siebel Business Analyst Rel 15.5 Ed 1 5 Days
541 Siebel Fundamentals Rel 15.5 Ed 1 2 Days
542 Siebel Business Automation Rel 15.5 Ed 1 5 Days
543 Siebel Business Analyst Rel 15.5 Ed 1 LVC 5 Days
544 Siebel Fundamentals Rel 15.5 Ed 1 LVC 2 Days
545 Siebel Open UI Adv JavaScript API Ed 2 3 Days
546 Siebel Open UI Adv JavaScript API Ed 2 LVC 3 Days
547 Siebel Open UI Essentials Ed 2 LVC 5 Days
548 Siebel Open UI Essentials Ed 2 5 Days
549 Siebel Open UI Foundations Ed 3 2 Days
550 Siebel Open UI Foundations Ed 3 LVC 2 Days
551 Siebel Business Automation Rel 15.5 Ed 1 LVC 5 Days
552 Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1 3 Days
553 Siebel 8.1 Loyalty Ed 1 2 Days
554 Siebel 8.0 Customer Order Management Accelerated Ed 1 5 Days
555 Siebel 8.1.x Enterprise Integration Manager Ed 1 2 Days
556 E Designing a Siebel Project - IBM Graduate Program Ed 1 PRV 1 Days
557 E Building a Siebel Project - IBM Graduate Program Ed 1 PRV 7 Days
558 E Scripting for Siebel - IBM Graduate Program Ed 1 PRV 2 Days
559 E Workflow for Siebel - IBM Graduate Program Ed 1 PRV 2 Days
560 test_virtual_dates 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
561 E Siebel Case Study - IBM Graduate Program Ed 1 PRV 5 Days
562 Oracle Policy Automation (OPA) Connector for Siebel Ed 1 3 Days
563 Oracle CRM On Demand Data Import Workshop Ed 4.1 1 Days
564 PS/nVision for GL Reporting Foundation Accelerated Rel 8.9 Ed 2 5 Days
565 PS / nVision for General Ledger Rel 8.9 Ed 2 5 Days
566 Enterprise Expenses 8.8 to 8.9 Delta (minus the extras on Enterprise) 1 Hours
567 Enterprise Billing and eBill Payment 8.9 to 8.9 Delta Presentation (PSft) 1 Hours
568 Enterprise Pricer Delta Seminar On Demand -V8.8 -V8.9 (Psft) 1 Hours
569 Enterprise Strategic Sourcing 8.9 Delta(PSft) 1 Hours
570 PeopleSoft Enterprise Inventory and Cost Management - 8.9 DeltaTraining 1 Hours
571 PeopleSoft Enterprise Services Procurement 8.9 Delta 1 Hours
572 PeopleSoft Enterprise Supplier Contract Management 8.9 (PSft) 1 Hours
573 PeopleSoft Order Management 8.9 Delta Seminar On Demand (PSft) 1 Hours
574 Promotions Management Delta Seminar On Demand - Between Release 8.8 and Release 8.9 1 Hours
575 SRM Purchasing 8.8 to 8.9 Delta 1 Hours
576 PeopleSoft Enterprise eProcurement Release 8.9 (PSft) 1 Hours
577 PeopleSoft PeopleTools I Rel 8.50 Ed 1 5 Days
578 PeopleSoft PeopleTools II Rel 8.50 Ed 1 5 Days
579 PeopleSoft PeopleTools I / II Rel 8.50 Accelerated Ed 1 5 Days
580 PeopleSoft IntegrationTools Rel 8.50 Ed 1 5 Days
581 PeopleSoft PeopleTools Installation & Server Admin. Rel 8.50 Ed 1 5 Days
582 PeopleSoft Security Rel 8.50 Ed 1 4 Days
583 PeopleSoft SQR Rel 8.50 Ed 1 5 Days
584 PeopleSoft Query Reporting Rel 8.50 Ed 1 2 Days
585 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50 Ed 1 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
586 PeopleSoft Query/XMLP Power Combo Rel 8.50 Ed 1 4 Days
587 PeopleSoft Workflow Rel 8.50 Ed 1 5 Days
588 PeopleSoft PeopleTools II Rel 8.50 Ed 1 LVC 5 Days
589 PeopleSoft Security Rel 8.50 Ed 1 LVC 4 Days
590 PeopleSoft PeopleTools I Rel 8.50 Ed 1 LVC 5 Days
591 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50 Ed 1 LVC 2 Days
592 PeopleSoft IntegrationTools Rel 8.50 Ed 1 LVC 5 Days
593 PeopleSoft SQR Rel 8.50 Ed 1 LVC 5 Days
594 PeopleSoft Query Reporting Rel 8.50 Ed 1 LVC 2 Days
595 PeopleSoft Workflow Rel 8.50 Ed 1 LVC 5 Days
596 E Application Engine Rel 8.48 - IBM Graduate Program Ed 1 3 Days
597 E Workflow Rel 8.48 - IBM Graduate Program Ed 1 1 Days
598 E IntegrationTools Rel 8.48 - IBM Graduate Program Ed 1 2 Days
599 E Reporting Options: XML & BI Publisher - IBM Graduate Program Ed 1 3 Days
600 E PeopleSoft Case Studies - IBM Graduate Program Ed 1 10 Days
601 Introduction to PeopleSoft for HRMS Rel 9.1 Ed 1 1 Days
602 PeopleSoft Base Benefits - U.S. Rel 9.1 Ed 1 2 Days
603 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.1 Ed 1 4 Days
604 General Ledger Rel 9.1 Ed 4 4 Days
605 Billing / Receivables Accelerated Rel 9.1 Ed 4 5 Days
606 Receivables Rel 9.1 Ed 4 5 Days
607 Asset Management Rel 9.1 Ed 4 4 Days
608 Project Costing Rel 9.1 Ed 2 5 Days
609 Inventory Rel 9.1 Ed 4 4 Days
610 eProcurement Rel 9.1 Ed 4 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
611 General Ledger Foundation Accelerated Rel 9.1 Ed 4 5 Days
612 Financial Consolidations Rel 9.1 Ed 4 1 Days
613 PS / nVision for General Ledger Rel 9.1 Ed 3 5 Days
614 Payables Rel 9.1 Ed 4 4 Days
615 Purchasing Rel 9.1 Ed 4 4 Days
616 PS/nVision for GL Reporting Foundation Accelerated Rel 9.1 Ed 3 5 Days
617 PeopleSoft PeopleTools Installation & Server Admin. Rel 8.50 Ed 1 LVC 5 Days
618 PeopleSoft Recruiting Solutions Rel 9.1 Ed 1 4 Days
619 PeopleSoft Global Payroll Rel 9.1 Ed 1 5 Days
620 PeopleSoft ePerformance Rel 9.1 Ed 1 4 Days
621 PeopleSoft Base Benefits - U.S. Rel 9.1 Ed 1 LVC 2 Days
622 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.1 Ed 1 LVC 4 Days
623 Introduction to PeopleSoft for HRMS Rel 9.1 Ed 1 LVC 1 Days
624 PeopleSoft Global Payroll: Core Absence Rel. 9.1 Ed 1 3 Days
625 PeopleSoft Global Payroll & Absence Accelerated Rel 9.1 Ed 1 5 Days
626 PeopleSoft PeopleTools I / II Rel 8.50 Accelerated Ed 1 LVC 5 Days
627 PeopleSoft Query/XMLP Power Combo Rel 8.5 Ed 1 LVC 4 Days
628 Receivables Rel 9.1 Ed 4 LVC 5 Days
629 Payables Rel 9.1 Ed 4 LVC 4 Days
630 Purchasing Rel 9.1 Ed 4 LVC 4 Days
631 Purchasing / Payables Accelerated Rel 9.1 Ed 4 LVC 5 Days
632 General Ledger Foundation Accelerated Rel 9.1 Ed 4 LVC 5 Days
633 Billing Rel 9.1 Ed 4 LVC 4 Days
634 Asset Management Rel 9.1 Ed 4 LVC 4 Days
635 Project Costing Rel 9.1 Ed 2 LVC 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
636 Inventory Rel 9.1 Ed 4 LVC 4 Days
637 Purchasing / eProcurement Accelerated Rel 9.1 Ed 2 LVC 5 Days
638 eProcurement Rel 9.1 Ed 4 LVC 4 Days
639 Purchasing/Inventory Accelerated Rel 9.1 Ed 4 LVC 5 Days
640 CRM Automation and Configuration Rel 9.1 Ed 3 LVC 5 Days
641 CRM Fundamentals Rel 9.1 Ed 3 LVC 2 Days
642 CRM Fundamentals for Higher Education Rel 9.1 Ed 1 LVC 1 Days
643 PeopleSoft PeopleTools Rel 8.50 Delta Ed 1 LVC 2 Days
644 PeopleSoft Global Payroll Rel 9.1 Ed 1 LVC 5 Days
645 PeopleSoft Global Payroll: Core Absence Rel. 9.1 Ed 1 LVC 3 Days
646 PeopleSoft Global Payroll & Absence Accelerated Rel 9.1 Ed 1 LVC 5 Days
647 Expenses Rel 9.1 Ed 3 LVC 4 Days
648 PeopleSoft Approval Framework Rel 9.1 Ed 1 1 Days
649 PeopleSoft Approval Framework Rel 9.1 Ed 1 LVC 1 Days
650 Support and HelpDesk Rel 9.1 Ed 3 LVC 2 Days
651 Implementing HRMS Self-Service Applications Rel 9.1 Ed 1 LVC 3 Days
652 PeopleSoft ePerformance Rel 9.1 Ed 1 LVC 4 Days
653 PeopleSoft Application Engine Rel 8.50 Ed 1 4 Days
654 PeopleSoft Application Engine Rel 8.50 Ed 1 LVC 4 Days
655 Transfer Credit Rel 9.0 Ed 3 LVC 1 Days
656 PeopleSoft Benefits Administration Rel 9.1 Ed 1 LVC 5 Days
657 XML Publisher for Campus Solutions Ed 1 LVC 1 Days
658 PeopleSoft Absence Management Rel 9.1 Ed 1 LVC 5 Days
659 PeopleSoft Absence Management Rel 9.1 Ed 1 5 Days
660 Online Marketing Rel 9.1 Ed 1 LVC 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
661 PeopleSoft Applications Portal Rel 9.1 Ed 1 3 Days
662 PeopleSoft Applications Portal Rel 9.1 Ed 1 LVC 3 Days
663 PeopleSoft Human Resources Rel 9.1 Ed 2 2 Days
664 PeopleSoft Human Resources Rel 9.1 Ed 2 LVC 2 Days
665 PeopleSoftTest Framework Rel 8.52 Ed 1 3 Days
666 PeopleSoftTest Framework Rel 8.52 Ed 1 LVC 3 Days
667 PeopleSoft IntegrationTools Rel 8.50 Ed 1TOD 5 Days
668 PeopleSoft PeopleTools II Rel 8.50 Ed 1TOD 5 Days
669 PeopleSoft PeopleTools I Rel 8.50 Ed 1TOD 5 Days
670 PeopleSoft Recruiting Solutions Rel 9.1TOD 4 Days
671 PeopleSoft PeopleCode Rel 8.50 Ed 1 5 Days
672 PeopleSoft PeopleCode Rel 8.50 Ed 1 LVC 5 Days
673 PeopleSoft Benefits Administration Rel 9.1TOD 5 Days
674 PeopleSoft Payroll - US Rel 9.1 Ed 1TOD 5 Days
675 PeopleSoft ePerformance Rel 9.1TOD 4 Days
676 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.50 Ed 1 LVC 5 Days
677 Student Financials Fundamentals Rel 9 Ed 4 LVC 4 Days
678 PeopleSoft Workflow Rel 8.50TOD 5 Days
679 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50TOD 2 Days
680 PeopleSoft Query Reporting Rel 8.50TOD 2 Days
681 PeopleSoftYear-End Payroll - Canada Ed 1 LVC 1 Days
682 PeopleSoftYear-End Payroll - U.S. Ed 1 LVC 1 Days
683 PeopleTools Delta Rel 8.50 - 8.52 Ed 2 4 Days
684 PeopleTools Delta Rel 8.50 - 8.52 Ed 2 LVC 4 Days
685 PeopleSoft IntegrationTools New Features for 8.52 Ed 2 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
686 PeopleSoft IntegrationTools New Features for 8.52 Ed 2 LVC 5 Days
687 PeopleSoft PeopleTools PortalTechnologies Rel 8.52 Ed 1 3 Days
688 PeopleSoft PeopleTools PortalTechnologies Rel 8.52 Ed 1 LVC 3 Days
689 PeopleSoft PeopleTools Upgrade & Data Management Rel 8.50 Ed 2 LVC 5 Days
690 PeopleSoft PeopleTools Upgrade & Data Management Rel 8.50 Ed 2 5 Days
691 PeopleSoft IntegrationTools New Features for 8.52 Ed 2TOD 5 Days
692 PeopleSoft Applications Portal Rel 9.1 Accelerated Ed 1 LVC 2 Days
693 PeopleSoft Applications Portal Rel 9.1 Accelerated Ed 1 2 Days
694 PeopleSoft Application Engine Rel 8.53 Ed 1 4 Days
695 PeopleSoft PeopleTools I Rel 8.53 Ed 1 5 Days
696 PeopleSoft PeopleTools SQR Rel 8.53 Ed 1 5 Days
697 PeopleSoft PeopleCode Rel 8.53 Ed 1 5 Days
698 PeopleSoft PeopleTools II Rel 8.53 Ed 1 5 Days
699 PeopleSoft PeopleTools I / II Rel 8.53 Accelerated Ed 1 5 Days
700 PeopleSoft PeopleCode Rel 8.53 Ed 1TOD 5 Days
701 PeopleSoft Application Engine Rel 8.53 Ed 1 LVC 4 Days
702 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.53 Ed 1 LVC 5 Days
703 PeopleSoft PeopleCode Rel 8.53 Ed 1 LVC 5 Days
704 PeopleSoft PeopleTools I / II Rel 8.53 Accelerated Ed 1 LVC 5 Days
705 PeopleSoft PeopleTools I Rel 8.53 Ed 1 LVC 5 Days
706 PeopleSoft PeopleTools II Rel 8.53 Ed 1 LVC 5 Days
707 PeopleSoft PeopleTools SQR Rel 8.53 Ed 1 LVC 5 Days
708 PeopleSoft Human Resources Rel 9.2 Ed 1 3 Days
709 PeopleSoft Human Resources Rel 9.2 Ed 1 LVC 3 Days
710 PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
711 PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1 LVC 2 Days
712 PeopleSoft Base Benefits - Canada Rel 9.2 Ed 1 2 Days
713 PeopleSoft Base Benefits - Canada Rel 9.2 Ed 1 LVC 2 Days
714 PeopleSoft Benefits Administration Rel 9.2 Ed 1 5 Days
715 PeopleSoft Benefits Administration Rel 9.2 Ed 1 LVC 5 Days
716 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.2 Ed 1 5 Days
717 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.2 Ed 1 LVC 5 Days
718 Intro to PeopleSoft/HR/Benefits Accelerated - Canada Rel 9.2 Ed 1 5 Days
719 Intro to PeopleSoft/HR/Benefits Accelerated - Canada Rel 9.2 Ed 1 LVC 5 Days
720 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1 1 Days
721 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1 LVC 1 Days
722 PeopleSoft Payroll - US Rel 9.2 Ed 1 5 Days
723 PeopleSoft Payroll - US Rel 9.2 Ed 1 LVC 5 Days
724 PeopleSoft Payroll - Canada Rel 9.2 Ed 1 5 Days
725 PeopleSoft Payroll - Canada Rel 9.2 Ed 1 LVC 5 Days
726 PeopleSoftTime & LaborTechnical Rules Ed 1 3 Days
727 PeopleSoftTime & LaborTechnical Rules Ed 1 LVC 3 Days
728 PeopleSoft Global Payroll: Core Absence Ed 1 3 Days
729 PeopleSoft Global Payroll: Core Absence Ed 1 LVC 3 Days
730 S PeopleSoft HCM Security Overview Ed 1 1 Days
731 S PeopleSoft HCM Security Overview Ed 1 LVC 1 Days
732 PeopleSoft Career and Succession Planning Ed 1 LVC 1 Days
733 PeopleSoft PeopleTools Delta Rel 8.52 - 8.53 Ed 1 2 Days
734 PeopleSoft PeopleTools Delta Rel 8.52 - 8.53 Ed 1 LVC 2 Days
735 PeopleSoft Asset Management Rel 9.2 Ed 1 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
736 PeopleSoft Asset Management Rel 9.2 Ed 1 LVC 4 Days
737 PeopleSoft General Ledger Foundation Accel Rel 9.2 Ed 1 5 Days
738 PeopleSoft General Ledger Foundation Accel Rel 9.2 Ed 1 LVC 5 Days
739 PeopleSoft Billing / Receivables Accelerated Rel 9.2 Ed 1 5 Days
740 PeopleSoft Billing / Receivables Accelerated Rel 9.2 Ed 1 LVC 5 Days
741 PeopleSoft Payables Rel 9.2 Ed 1 4 Days
742 PeopleSoft Payables Rel 9.2 Ed 1 LVC 4 Days
743 PeopleSoft Purchasing Rel 9.2 Ed 1 4 Days
744 PeopleSoft Purchasing Rel 9.2 Ed 1 LVC 4 Days
745 PeopleSoft General Ledger Rel 9.2 Ed 1 4 Days
746 PeopleSoft General Ledger Rel 9.2 Ed 1 LVC 4 Days
747 PeopleSoft Receivables Rel 9.2 Ed 1 5 Days
748 PeopleSoft Receivables Rel 9.2 Ed 1 LVC 5 Days
749 PeopleSoft Project Costing Rel 9.2 Ed 1 5 Days
750 PeopleSoft Project Costing Rel 9.2 Ed 1 LVC 5 Days
751 PeopleSoft Billing Rel 9.2 Ed 1 LVC 4 Days
752 PeopleSoft Purchasing/Payables Accelerated Rel 9.2 Ed 1 5 Days
753 PeopleSoft Purchasing/Payables Accelerated Rel 9.2 Ed 1 LVC 5 Days
754 PeopleSoft Expenses Rel 9.2 Ed 1 LVC 4 Days
755 PeopleSoft Contracts Ed 1 LVC 4 Days
756 PeopleSoftTreasury Ed 1 LVC 4 Days
757 Intro to PeopleSoft for FMS and SCM Ed 1 LVC 1 Days
758 PeopleSoft Commitment Control Ed 1 LVC 3 Days
759 PeopleSoft Grants Ed 1 LVC 5 Days
760 S PeopleSoft Financial Solutions Rel 9.2 New Features Ed 1 LVC 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
761 S PeopleSoft Supply Chain Solutions Rel 9.2 New Features Ed 1 LVC 1 Days
762 PeopleSoft eProcurement Rel 9.2 Ed 1 4 Days
763 PeopleSoft eProcurement Rel 9.2 Ed 1 LVC 4 Days
764 PeopleSoft PS / nVision for General Ledger Rel 9.2 Ed 1 5 Days
765 PeopleSoft Inventory Rel 9.2 Ed 1 4 Days
766 PeopleSoft Inventory Rel 9.2 Ed 1 LVC 4 Days
767 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1 2 Days
768 PeopleSoft Lifecycle Management Rel 8.53 Ed 1 4 Days
769 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1 LVC 2 Days
770 PeopleSoft Lifecycle Management Rel 8.53 Ed 1 LVC 4 Days
771 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1 5 Days
772 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1 LVC 5 Days
773 PeopleSoft Security Rel 8.53 Ed 1 4 Days
774 PeopleSoft Security Rel 8.53 Ed 1 LVC 4 Days
775 PeopleSoft Purchasing / eProcurement Accelerated Rel 9.2 Ed 1 5 Days
776 PeopleSoft Purchasing / eProcurement Accelerated Rel 9.2 Ed 1 LVC 5 Days
777 PeopleSoft Purchasing/Inventory Accelerated Rel 9.2 Ed 1 LVC 5 Days
778 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1 5 Days
779 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1 4 Days
780 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1 LVC 4 Days
781 PeopleSoft ePerformance Rel 9.2 Ed 1 LVC 4 Days
782 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1 LVC 4 Days
783 PeopleSoft Absence Management Rel 9.2 Ed 1 5 Days
784 PeopleSoft Absence Management Rel 9.2 Ed 1 LVC 5 Days
785 PeopleSoft Global Payroll Rel 9.2 Ed 1 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
786 PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1 3 Days
787 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1 LVC 5 Days
788 PeopleSoft ePerformance Rel 9.2 Ed 1 4 Days
789 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1 4 Days
790 PeopleSoft Global Payroll Rel 9.2 Ed 1 LVC 5 Days
791 PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1 LVC 3 Days
792 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1 5 Days
793 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1 LVC 5 Days
794 S PeopleSoft CRM Solutions Rel 9.2 New Features Ed 1 1 Days
795 S PeopleSoft CRM Solutions Rel 9.2 New Features Ed 1 LVC 1 Days
796 PeopleSoft CRM Fundamentals Ed 1 2 Days
797 PeopleSoft CRM Fundamentals Ed 1 LVC 2 Days
798 PeopleSoft CRM HelpDesk for Human Resources Ed 1 4 Days
799 PeopleSoft CRM HelpDesk for Human Resources Ed 1 LVC 4 Days
800 PeopleSoft CRM Automation and Configuration Ed 1 5 Days
801 PeopleSoft CRM Automation and Configuration Ed 1 LVC 5 Days
802 PeopleSoft PS / nVision for General Ledger Rel 9.2 Ed 1 LVC 5 Days
803 PeopleTools Server Admin Rel 8.53 Delta/Oracle SES Config Ed 1 LVC 1 Days
804 PeopleTools Server Admin Rel 8.53 Delta/Oracle SES Config Ed 1 1 Days
805 PeopleSoft PeopleTools & Server Admin Delta Combo Rel 8.53 Ed 1 3 Days
806 PeopleSoft PeopleTools & Server Admin Delta Combo Rel 8.53 Ed 1 LVC 3 Days
807 PS / nVision for General Ledger Rel 9.1 Ed 3TOD 5 Days
808 Payables Rel 9.1 Ed 4TOD 4 Days
809 eProcurement Rel 9.1 Ed 4TOD 4 Days
810 Purchasing Rel 9.1 Ed 4TOD 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
811 Asset Management Rel 9.1 Ed 4TOD 4 Days
812 PeopleSoftYear-End Payroll - Canada Ed 1TOD 1 Days
813 PeopleSoftYear-End Payroll - U.S. Ed 1TOD 1 Days
814 PeopleSoft IntegrationTools I Rel 8.53 Ed 1 5 Days
815 PeopleSoft IntegrationTools I Rel 8.53 Ed 1 LVC 5 Days
816 PeopleSoft PeopleTools II Rel 8.53 Ed 1TOD 5 Days
817 PeopleSoft IntegrationTools II Rel 8.53 Ed 1 4 Days
818 PeopleSoft IntegrationTools II Rel 8.53 Ed 1 LVC 4 Days
819 PeopleSoft Integration Broker Administration Rel 8.53 Ed 1 1 Days
820 PeopleSoft Integration Broker Administration Rel 8.53 Ed 1 LVC 1 Days
821 PeopleSoft PeopleTools I Rel 8.53 Ed 1TOD 5 Days
822 PeopleTools Portal AdvancedTopics Ed 1 1 Days
823 PeopleTools Portal AdvancedTopics Ed 1 LVC 1 Days
824 PeopleSoft Absence Management Rel 9.2 Ed 1TOD 5 Days
825 PeopleSoft Receivables Rel 9.2 Ed 1TOD 5 Days
826 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1TOD 4 Days
827 PeopleSoftTime & LaborTechnical Rules Ed 1TOD 3 Days
828 PeopleSoft Human Resources Rel 9.2 Ed 1TOD 3 Days
829 PeopleSoft Lifecycle Mgmt & Update Manager Combo Rel 8.53 Ed 2 5 Days
830 PeopleSoft Update Manager Rel 8.53 Ed 2 1 Days
831 PeopleSoft Lifecycle Mgmt & Update Manager Combo Rel 8.53 Ed 2 LVC 5 Days
832 PeopleSoft Update Manager Rel 8.53 Ed 2 LVC 1 Days
833 PeopleTools Portal & Interaction Hub Admin/AdvTopics Accel Ed 1 5 Days
834 PeopleTools Portal & Interaction Hub Admin/AdvTopics Accel Ed 1 LVC 5 Days
835 PeopleSoft Asset Management Rel 9.2 Ed 1TOD 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
836 PeopleSoft General Ledger Rel 9.2 Ed 1TOD 4 Days
837 E IBM - PSFT HCM 9.2 New Features & PeopleTools 8.53 Ed 1TOD 2 Days
838 E IntegrationTools Rel 8.48 - IBM Graduate Program Ed 1 LVC 2 Days
839 E Reporting Options: XML & BI Publisher - IBM Graduate Program Ed 1 LVC 3 Days
840 E PeopleSoft Case Studies - IBM Graduate Program Ed 1 LVC 10 Days
841 E Workflow Rel 8.48 - IBM Graduate Program Ed 1 LVC 1 Days
842 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1TOD 1 Days
843 PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1TOD 2 Days
844 PeopleSoft Update Manager Rel 8.54 Ed 1 2 Days
845 PeopleSoft Update Manager Rel 8.54 Ed 1 LVC 2 Days
846 PeopleSoft Pivot Grids Rel 8.54 Ed 1 2 Days
847 PeopleSoft Pivot Grids Rel 8.54 Ed 1 LVC 2 Days
848 PeopleSoft Lifecycle Mgmt & Update Manager Accelerated Rel 8.54 Ed 1 5 Days
849 PeopleSoft Lifecycle Mgmt & Update Manager Accelerated Rel 8.54 Ed 1 LVC 5 Days
850 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1TOD 5 Days
851 PeopleSoft Payables Rel 9.2 Ed 1TOD 4 Days
852 PeopleSoft Purchasing Rel 9.2 Ed 1TOD 4 Days
853 PeopleSoft HCM Security Overview Ed 1TOD 1 Days
854 PeopleSoft Fluid User Interface Rel 8.54 Ed 1 2 Days
855 PeopleSoft Fluid User Interface Rel 8.54 Ed 1 LVC 2 Days
856 PeopleSoft Benefits Administration Rel 9.2 Ed 1TOD 5 Days
857 PeopleSoft Payroll - Canada Rel 9.2 Ed 1TOD 5 Days
858 PeopleSoft Payroll - US Rel 9.2 Ed 1TOD 5 Days
859 PeopleSoft Financial Allocations Rel 9.2 Ed 1TOD 1 Days
860 PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1TOD 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
861 PeopleSoft eProcurement Rel 9.2 Ed 1TOD 4 Days
862 PeopleSoft Inventory Rel 9.2 Ed 1TOD 4 Days
863 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1TOD 4 Days
864 PeopleSoft Commitment Control Ed 1TOD 3 Days
865 PeopleSoft ePerformance Rel 9.2 Ed 1TOD 4 Days
866 PeopleSoft Financial Consolidations Rel 9.2 Ed 1TOD 1 Days
867 Intro to PeopleSoft for FMS and SCM Ed 1TOD 1 Days
868 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1TOD 2 Days
869 PeopleSoft Career and Succession Planning Ed 1TOD 1 Days
870 PeopleSoft Security Rel 8.53 Ed 1TOD 4 Days
871 PeopleSoft Application Engine Rel 8.53 Ed 1TOD 4 Days
872 S PeopleSoft Financial Solutions New Features Ed 2 3 Days
873 S PeopleSoft Supply Chain Solutions New Features Ed 2 1 Days
874 S PeopleSoft Financial Solutions New Features Ed 2 LVC 3 Days
875 S PeopleSoft Supply Chain Solutions New Features Ed 2 LVC 1 Days
876 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1TOD 5 Days
877 PeopleSoft IntegrationTools I Rel 8.53 Ed 1TOD 5 Days
878 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1TOD 5 Days
879 PeopleTools Portal AdvancedTopics Ed 1TOD 1 Days
880 PeopleSoft IntegrationTools II Rel 8.53 Ed 1TOD 4 Days
881 PeopleSoft Update Manager Rel 8.54 Ed 1TOD 2 Days
882 PeopleSoft Lifecycle Management Rel 8.53 Ed 1TOD 4 Days
883 PeopleSoft Query Reporting Rel 8.53 Ed 1.1 3 Days
884 PeopleTools Server Admin Rel 8.54 Delta/Oracle SES Config Ed 2 1 Days
885 PeopleTools Server Admin Rel 8.54 Delta/Oracle SES Config Ed 2 LVC 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
886 PeopleSoft Query Reporting Rel 8.53 Ed 1.1 LVC 3 Days
887 PeopleSoft Fluid User Interface Rel 8.54 Ed 1TOD 2 Days
888 PeopleSoft Pivot Grids Rel 8.54 Ed 1TOD 2 Days
889 PeopleSoft Query/BI Publisher Power Combo Rel 8.53 Ed 1.1 5 Days
890 PeopleSoft Query/BI Publisher Power Combo Rel 8.53 Ed 1.1 LVC 5 Days
891 PeopleSoft Query Reporting Rel 8.53 Ed 1.1TOD 3 Days
892 PeopleSoft HCM Rel 9.0 - 9.2 Delta Ed 1.1 LVC 3 Days
893 PeopleSoft HCM Rel 9.0 - 9.2 Delta Ed 1.1 3 Days
894 PeopleSoft Project Costing Rel 9.2 Ed 1TOD 5 Days
895 PeopleSoftTest Framework Rel 8.52 Ed 1TOD 3 Days
896 PeopleSoft eProcurement/Payables Accelerated Rel 9.2 Ed 1 5 Days
897 PeopleSoft eProcurement/Payables Accelerated Rel 9.2 Ed 1 LVC 5 Days
898 PeopleSoft HCM Core HR and Benefits New Features Ed 1 1 Days
899 PeopleSoft HCM Core HR and Benefits New Features Ed 1 LVC 1 Days
900 PeopleSoft HCMTime and Pay New Features Ed 1 1 Days
901 PeopleSoft HCMTalent Management New Features Ed 1 1 Days
902 PeopleSoft HCMTime and Pay New Features Ed 1 LVC 1 Days
903 PeopleSoft HCMTalent Management New Features Ed 1 LVC 1 Days
904 Academic Structure Rel 9 Ed 3 2 Days
905 Equations Engine Rel 9 Ed 2 2 Days
906 Financial Aid Advanced Packaging Rel 9 Ed 2 3 Days
907 Financial Aid Fundamentals Rel 9 Ed 3 4 Days
908 Contributor Relations Rel 9 Ed 2 4 Days
909 Academic Advisement Fundamentals Rel 9 Ed 3 3 Days
910 Academic Records Maintenance Rel 9 Ed 3 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
911 Recruiting and Admissions Rel 9 Ed 1 3 Days
912 Student Enrollment Rel 9 Ed 2 4 Days
913 Introduction to PS for Campus Solutions Ed 1 1 Days
914 3Cs - Communications, Checklists and Comments Rel 9 Ed 3 2 Days
915 3Cs - Communications, Checklists and Comments Rel 9 Ed 3 LWC 2 Days
916 Recruiting and Admissions Rel 9 Ed 1 LWC 3 Days
917 Student Enrollment Rel 9 Ed 2 LWC 4 Days
918 Academic Structure Rel 9 Ed 3 LWC 2 Days
919 Equations Engine Rel 9 Ed 2 LWC 2 Days
920 Financial Aid Fundamentals Rel 9 Ed 3 LWC 4 Days
921 Academic Records Maintenance Rel 9 Ed 3 LWC 2 Days
922 Academic Advisement Fundamentals Rel 9 Ed 3 LWC 3 Days
923 Contributor Relations Rel 9 Ed 2 LWC 4 Days
924 Financial Aid Advanced Packaging Rel 9 Ed 2 LWC 3 Days
925 Financial Allocations Rel 9.1 Ed 4 1 Days
926 Purchasing / Payables Accelerated Rel 9.1 Ed 4 5 Days
927 CRM Automation and Configuration Rel 9.1 Ed 3 5 Days
928 CRM Fundamentals Rel 9.1 Ed 3 2 Days
929 Billing Rel 9.1 Ed 4 4 Days
930 Purchasing / eProcurement Accelerated Rel 9.1 Ed 2 5 Days
931 Purchasing/Inventory Accelerated Rel 9.1 Ed 4 5 Days
932 CRM Fundamentals for Higher Education Rel 9.1 Ed 1 1 Days
933 Implementing HRMS Self-Service Applications Rel 9.1 Ed 1 3 Days
934 PeopleSoft PeopleTools Rel 8.50 Delta Ed 1 2 Days
935 Expenses Rel 9.1 Ed 3 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
936 Support and HelpDesk Rel 9.1 Ed 3 2 Days
937 Transfer Credit Rel 9.0 Ed 3 1 Days
938 XML Publisher for Campus Solutions Ed 1 1 Days
939 Online Marketing Rel 9.1 Ed 1 2 Days
940 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.50 Ed 1 5 Days
941 Student Financials Fundamentals Rel 9 Ed 4 4 Days
942 PeopleSoftYear-End Payroll - Canada Ed 1 1 Days
943 PeopleSoftYear-End Payroll - U.S. Ed 1 1 Days
944 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.53 Ed 1 5 Days
945 PeopleSoft Career and Succession Planning Ed 1 1 Days
946 PeopleSoft Billing Rel 9.2 Ed 1 4 Days
947 PeopleSoft Financial Allocations Rel 9.2 Ed 1 1 Days
948 PeopleSoft Financial Consolidations Rel 9.2 Ed 1 1 Days
949 PeopleSoft Expenses Rel 9.2 Ed 1 4 Days
950 PeopleSoft Contracts Ed 1 4 Days
951 PeopleSoftTreasury Ed 1 4 Days
952 Intro to PeopleSoft for FMS and SCM Ed 1 1 Days
953 PeopleSoft Commitment Control Ed 1 3 Days
954 PeopleSoft Grants Ed 1 5 Days
955 PeopleSoft Purchasing/Inventory Accelerated Rel 9.2 Ed 1 5 Days
956 PeopleSoft Financial Allocations Rel 9.2 Ed 1 LVC 1 Days
957 PeopleSoft Financial Consolidations Rel 9.2 Ed 1 LVC 1 Days
CLOUD
958 Oracle CPQ Cloud Blue Belt Advanced Document Engine Ed 1 LVC 1 Days
959 Oracle CPQ Cloud: Document Designer Administration Ed 1 1 Days
960 Oracle CPQ Cloud: Document Designer Administration Ed 1 LVC 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
961 Oracle CPQ CloudYellow Belt Ed 1.1 4 Days
962 Oracle CPQ CloudYellow Belt Ed 1.1 LVC 4 Days
963 Oracle CPQ CloudYellow Belt Ed 1.1TOD 4 Days
964 S Oracle CPQ CloudYellow Belt for the Business User Ed 1.1 1 Days
965 S Oracle CPQ CloudYellow Belt for the Business User Ed 1.1 LVC 1 Days
966 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1TOD 1 Days
967 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1TOD 1 Days
968 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1TOD 1 Days
969 Oracle CPQ Cloud: Document Designer Administration Ed 1TOD 1 Days
970 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1 1 Days
971 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1 LVC 1 Days
972 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1 1 Days
973 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1 LVC 1 Days
974 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1 1 Days
975 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1 LVC 1 Days
976 Oracle CPQ Cloud Blue Belt Ed 1 4 Days
977 Oracle CPQ Cloud Blue Belt Ed 1 LVC 4 Days
978 Oracle Sales Cloud Workshop Ed 1TOD 5 Days
979 Oracle Sales Cloud Workshop Ed 2 5 Days
980 Oracle Sales Cloud Workshop Ed 2 LVC 5 Days
981 Oracle Sales Cloud Workshop Ed 2TOD 5 Days
DATABASE
982 Oracle Database 11g: Oracle Certified Master Upgrade (OCM) Ed 1 1 Days
983 S Oracle Enterprise Manager 10g: Grid Control R5 New Features Seminar Ed 1 2 Days
984 S Implement Oracle Data Warehousing Best Practices Ed 1 1 Days
985 Oracle SQLTuning for Developers Workshop Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
986 S Introduction to Big Data Ed 1 1 Days
987 Introduction to Oracle NoSQL Database Ed 1 1 Days
988 ITIL Foundation in IT Service Management Ed 2 - Internal Only 3 Days
989 Oracle NoSQL Database for Developers Ed 1 2 Days
990 S Oracle Real-World PerformanceTOD 1 Days
991 Certification Exam Prep Seminar: Upgrade OCP to Oracle Database 11gTOD 1 Days
992 Using Oracle NoSQL Database Ed 1 4 Days
993 CEL Advanced SQLTuningTips andTechniques with Dan Hotka Ed 1 2 Days
994 E Oracle Database: Intro to SQL & PL/SQL- IBM Graduate Program Ed 1 PRV 6 Days
995 E Oracle Database:Oracle Developer:Reports & BI publisher- IBM Program Ed 1 PRV 5 Days
996 Certification Exam Prep Seminar: Upgrade to Oracle Database 12cTOD 1 Days
997 Certification Exam Prep Seminar: Oracle Database 12c: Install and AdminTOD 1 Days
998 S Oracle Cloud OverviewTOD 1 Days
999 S Oracle Big Data OverviewTOD 1 Days
1000 S Oracle Security OverviewTOD 1 Days
1001 Using Oracle NoSQL Database Workshop Ed 1 4 Days
1002 Cert Exam Prep Seminar: Upgrade 9i/10g/11g OCA to Oracle 12c OCPTOD 1 Days
1003 Certification Exam Prep Seminar: Database 12c:Advanced AdministrationTOD 1 Days
1004 Oracle Big Data Fundamentals Ed 1 5 Days
1005 Oracle NoSQL Database for Administrators Ed 1TOD 2 Days
1006 S ProcessingYour Big Data with Oracle Ed 1 1 Days
1007 Oracle Database 11g: Data MiningTechniques Ed 1TOD 2 Days
1008 Oracle ApplicationTesting Suite: Essentials Ed 3 3 Days
1009 CEL Optimizer Master Class withTom Kyte Ed 1 1 Days
1010 Oracle NoSQL Database for Administrators Ed 1 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1011 Oracle Big Data Fundamentals Ed 1TOD 5 Days
1012 Oracle GoldenGate 11g: Fundamentals forTeradata Ed 1 3 Days
1013 Oracle GoldenGate 11g Fundamentals for HP NonStop Ed 1 3 Days
1014 Oracle GoldenGate 11g: Fundamentals for DB2 Ed 1 3 Days
1015 Oracle GoldenGate 11g: Fundamentals for Oracle Ed 2 4 Days
1016 Oracle GoldenGate 11g:Advanced Configuration for Oracle Ed 1 4 Days
1017 Oracle GoldenGate 11g Fundamentals for OracleTOD 4 Days
1018 Oracle GoldenGate 11gTroubleshooting andTuningTOD 3 Days
1019 Oracle GoldenGate 11g: Fundamentals for SQL Server Ed 2 3 Days
1020 Oracle GoldenGate 12c: Fundamentals for Oracle Ed 1 4 Days
1021 Oracle GoldenGate 12c:Troubleshooting andTuning Ed 1 4 Days
1022 Oracle GoldenGate 12c: Fundamentals for Oracle Ed 1TOD 4 Days
1023 Oracle GoldenGate 12c: Management Pack Overview Ed 1 2 Days
1024 Oracle GoldenGate 12c:Advanced Configuration for Oracle Ed 1 4 Days
1025 Oracle GoldenGate 12c:Troubleshooting andTuning Ed 1TOD 4 Days
1026 Oracle GoldenGate 11g:Advanced Configuration for Oracle Ed 1TOD 4 Days
1027 Oracle GoldenGateVeridata 12c: Essentials Ed 1 1 Days
1028 Oracle GoldenGate 12c:Advanced Configuration for Oracle Ed 1TOD 4 Days
1029 Oracle GoldenGateVeridata 12c: Essentials Ed 1TOD 1 Days
1030 Oracle Database 12c: Install and Upgrade Workshop Ed 1 2 Days
1031 Oracle Database 12c:Admin, Install and Upgrade Accelerated Ed 1 5 Days
1032 Oracle Database 12c: Managing Multitenant Architecture Ed 1 2 Days
1033 Oracle Database 12c: Fundamentals for Devs and SysAdmins Ed 1 2 Days
1034 Oracle Database 12c: Data Guard Administration Ed 1 4 Days
1035 Oracle Database 12c: Performance Management andTuning Ed 1 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1036 Oracle Database 12c: Global Data Services Ed 1 1 Days
1037 Oracle Database 12c: SQLTuning for Developers Ed 1 3 Days
1038 Oracle Database 12c:Analytic SQL for Data Warehousing Ed 1 2 Days
1039 Oracle Database 12c:Advanced PL/SQL Ed 1 3 Days
1040 Oracle Database 12c: Install and Upgrade Workshop Ed 1TOD 2 Days
1041 Oracle Database 12c: Backup and Recovery Workshop Ed 1TOD 5 Days
1042 Oracle Database 12c: Fundamentals for Devs and SysAdmins Ed 1TOD 2 Days
1043 Oracle Database 12c: Performance Management andTuning Ed 1TOD 5 Days
1044 Oracle Database 12c: Data Guard Administration Ed 1TOD 4 Days
1045 Oracle Database 12c: Managing Multitenant Architecture Ed 1TOD 2 Days
1046 S Oracle Database 12c: Global Data Services Ed 1TOD 1 Days
1047 Oracle Database 12c: High Availability New Features Ed 1.1TOD 3 Days
1048 Oracle Database 12c: Security Ed 1 5 Days
1049 Certification Exam Prep Seminar: Upgrade to Oracle Database 12cTOD 1 Days
1050 Certification Exam Prep Seminar: Oracle Database 12c: Install and AdminTOD 1 Days
1051 Oracle Database 12c: High Availability New Features Ed 1.1 3 Days
1052 Oracle Database 12c: New Features for Administrators Ed 2 5 Days
1053 Oracle Database 12c: Security Ed 1TOD 5 Days
1054 Oracle Database 12c: Implement Partitioning Ed 1 2 Days
1055 Oracle Database 12c: SQL Workshop I Ed 1.1 3 Days
1056 Oracle Database 12c: SQL Workshop II Ed 1.1 2 Days
1057 Oracle Database 12c: Develop PL/SQL Program Units Ed 1.1 3 Days
1058 Oracle Database 12c: Introduction to SQL/PLSQL Accelerated Ed 1.1 5 Days
1059 Oracle Database 12c: Introduction to SQL Ed 1.1 5 Days
1060 Oracle Database 12c: PL/SQL Fundamentals Ed 1.1 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1061 Oracle Database 12c: Program with PL/SQL Ed 1.1 5 Days
1062 Oracle Database 12c: SQL and PL/SQL Fundamentals Ed 1.1 5 Days
1063 Oracle Database 12c: Introduction to SQL Ed 1.1TOD 5 Days
1064 Oracle Database 12c:Advanced PL/SQL Ed 1TOD 3 Days
1065 Using Oracle DatabaseVault with Oracle Database 12c Ed 1TOD 2 Days
1066 Oracle Database 12c: RAC and Grid Infra Deployment Workshop Ed 1 4 Days
1067 S Parallel Processing in Oracle Database 12c Ed 1 1 Days
1068 Oracle Database 12c: Program with PL/SQL Ed 1.1TOD 5 Days
1069 Oracle Database 12c: Clusterware & ASM Admin Accelerated Ed 1 5 Days
1070 Oracle Database 12c: Clusterware & RAC Admin Accelerated Ed 1 5 Days
1071 E Oracle Database 12c Administration (Spain Only) Ed 1 PRV 19 Days
1072 Oracle Database 12c:ASM Administration Ed 1.1 2 Days
1073 Oracle Database 12c: RAC Administration Ed 1.1 4 Days
1074 Oracle Database 12c: Clusterware Administration Ed 1.1 4 Days
1075 Oracle Database 12c:Administration Workshop Ed 2 5 Days
1076 Oracle Database 12c: New Features for Administrators Ed 2TOD 5 Days
1077 Oracle Database 12c: Clusterware Administration Ed 1.1TOD 4 Days
1078 Oracle Database 12c:ASM Administration Ed 1.1TOD 2 Days
1079 Oracle Database 12c: RAC Administration Ed 1.1TOD 4 Days
1080 Oracle Database 12c: SQL and PL/SQL New Features Ed 1TOD 2 Days
1081 Oracle Database 12c: Backup and Recovery Workshop Ed 2 5 Days
1082 Oracle Database 12c: SQLTuning for Developers Ed 1TOD 3 Days
1083 Oracle Database 12c: SQL and PL/SQL New Features Ed 1 2 Days
1084 Oracle Database 12c:Administration Workshop Ed 2TOD 5 Days
1085 Oracle Database 12c:Analytic SQL for Data Warehousing Ed 1TOD 2 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1086 Oracle Database 12c: Oracle Certified Master Upgrade (OCM) Ed 1.1 1 Days
IDM
1087 Oracle Unified Directory 11g: Services Deployment Essentials Ed 1 2 Days
1088 Oracle Directory Services 11g:Administration Ed 2 5 Days
1089 Oracle Identity Manager 11g R2: Essentials Ed 2 5 Days
1090 Oracle Identity Manager 11g R2: Develop Identity Provisioning Ed 2 5 Days
1091 Oracle Identity Manager 11g: Develop Identity Provisioning Ed 1TOD 5 Days
1092 Oracle Identity Federation 11g R2:Administration Ed 1 4 Days
1093 Oracle Identity Manager 11g: Essentials Ed 1TOD 4 Days
1094 Oracle Access Manager 11g R2:Advanced Administration Workshop Ed 1 5 Days
1095 LDAP and Directory Services: Essentials Ed 1 2 Days
1096 OracleVirtual Directory 11g:Administration Ed 1 2 Days
1097 Oracle Identity Governance 11g R2: Essentials Ed 3TOD 5 Days
1098 Oracle Unified Directory 11g R2:Administration Ed 1 4 Days
1099 Oracle Identity Governance 11g R2: System Admin Workshop Ed 1 3 Days
1100 Oracle Identity Governance 11g R2: Essentials Ed 2 5 Days
1101 Oracle Identity Governance 11g R2: Develop Identity Provisioning Ed 2 5 Days
1102 Oracle Identity Federation 11g R2:Administration Ed 1TOD 4 Days
1103 Oracle Access Manager 11g R2:Administration Essentials Ed 2 5 Days
1104 Oracle Identity Governance 11g R2: Privileged Acc Mgmt Ed 2 4 Days
1105 S Getting Started with Oracle's Access Portal Ed 1 LVC 1 Days
1106 S Oracle Access Management Suite 11g R2 for Mobile and Social LVC 1 Days
1107 Oracle Identity Governance 11g R2: Essentials Ed 3 5 Days
1108 Oracle Identity Governance 11g R2: Develop Identity Provisioning Ed 3 5 Days
1109 Oracle Access Manager 11g R2:Administration Essentials Ed 3 5 Days
1110 Oracle Access Manager 11g R2:Advanced Administration Workshop Ed 2 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1111 Oracle Identity Governance 11g R2: Privileged Acc Mgmt Ed 2TOD 4 Days
1112 Oracle Identity Governance 11g R2: Essentials Ed 2TOD 5 Days
1113 Oracle Identity Manager 11.1.2.3: New Features and Enhancements Ed 1 2 Days
OS
1114 Oracle Linux System Administration Ed 2TOD 5 Days
1115 Oracle Linux 5 & 6 Advanced Administration Ed 1 5 Days
1116 Oracle Linux Advanced Administration Ed 1TOD 5 Days
1117 Oracle Linux 5 & 6 System Administration Ed 2 5 Days
1118 Oracle Linux 7: System Administration Ed 1 5 Days
1119 Oracle Linux 7:Advanced Administration Ed 1 5 Days
1120 OPN - Oracle Linux 6 Implementation Specialists Boot Camp Ed 1TOD 2 Days
1121 Oracle Solaris 10 Operating System Essentials Ed 2.1 4 Days
1122 S What's New in Oracle Solaris 11 Ed 1 1 Days
1123 S What's New in Oracle Solaris 11 Ed 1 LVC 1 Days
1124 Transition to Oracle Solaris 11 Ed 1TOD 5 Days
1125 Oracle Solaris 11 ZFS Administration Ed 1 4 Days
1126 Oracle Solaris 11 Security Administration Ed 1 5 Days
1127 Oracle Solaris Cluster 4.x Advanced Administration Ed 1 5 Days
1128 Oracle Solaris 11 Performance Management Ed 1 5 Days
1129 Oracle Solaris 11 Advanced System Administration Ed 4TOD 5 Days
1130 How to Build a Private Cloud Using Oracle Solaris 11 Ed 1 3 Days
1131 System Administration for the Oracle Solaris 10 OS Part 1 Ed 4 5 Days
1132 System Administration for the Oracle Solaris 10 OS Part 2 Ed 4 5 Days
1133 Oracle Solaris 11 Fault Analysis andTroubleshooting Ed 1 5 Days
1134 Oracle Solaris 11 ZFS Administration Ed 2TOD 3 Days
1135 PTR/INT SPARC M5-32 Installation and Maintenance Ed 1 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1136 Oracle Solaris Cluster Administration Ed 4 5 Days
1137 Oracle Solaris Cluster Advanced Administration Ed 4 5 Days
1138 Oracle Solaris 11 Sys Admin for Experienced UNIX/Linux Admins Ed 1 5 Days
1139 Managing Oracle Database on Oracle Solaris 11 Ed 1 4 Days
1140 Oracle Solaris 11 DynamicTracing (DTrace) Ed 1 3 Days
1141 S Oracle SuperCluster Administration and Maintenance Seminar Ed 1 2 Days
1142 S Oracle SuperCluster Administration and Maintenance Seminar Ed 1 LVC 2 Days
1143 Oracle Solaris 11 System Administration Ed 4 5 Days
1144 Oracle Solaris 11 Advanced System Administration Ed 4 5 Days
1145 PTR/INT SPARC M6/M5-32 Server Installation for OPN Partners Ed 1 4 Days
1146 Oracle Solaris 11 System Administration Ed 3TOD 5 Days
1147 Transition to Oracle Solaris 11 Ed 3 5 Days
1148 Oracle Solaris 11 Network Administration Ed 2 5 Days
1149 Oracle Solaris 11 ZFS Administration Ed 2 3 Days
1150 Oracle Hierarchical Storage Manager and QFS 6.0 Admin Ed 1 4 Days
1151 Oracle Solaris 11 Security Administration Ed 2 5 Days
1152 Oracle Solaris 11 System Administration Ed 5 5 Days
1153 Transition to Oracle Solaris 11 Ed 4 5 Days
1154 Oracle Solaris 11 Zones Administration Ed 3 4 Days
1155 Oracle Solaris Cluster 4.x Administration Ed 4 5 Days
1156 Oracle Solaris 11 Zones Administration Ed 3TOD 4 Days
1157 S Oracle Solaris 11 Fault Analysis andTroubleshooting Ed 1TOD 5 Days
1158 S Oracle SuperCluster for System Administrators Ed 1TOD 1 Days
1159 S Oracle SuperCluster for System Administrators Ed 1 1 Days
1160 S Oracle SuperCluster for System Administrators Ed 1 LVC 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
JAVA & MIDDLEWARE
1161 Sun Systems Fault Analysis Workshop Ed 1 5 Days
1162 SolarisVolume Manager Administration Ed 1 3 Days
1163 MySQL High Availability Ed 1 3 Days
1164 MySQL Advanced Stored Procedures Ed 1 2 Days
1165 MySQL and PHP - Developing Dynamic Web Applications Ed 1 4 Days
1166 SL500 Operations Overview Ed 1 1 Days
1167 MySQL DeveloperTechniques Ed 1 3 Days
1168 PTR/INT SL500 Field Service and FrontlineTraining Ed 1 2 Days
1169 S Oracle Exadata Storage ServerV2 Overview Seminar Ed 1 1 Days
1170 S Oracle Exadata Storage ServerV2 Overview Seminar Ed 1 LVC 1 Days
1171 Solaris System Administration for Experienced UNIX Administrators Ed 2 5 Days
1172 Object-Oriented Analysis and Design Using UML Ed 2 5 Days
1173 Java SE 7: Develop Rich Client Applications Ed 1 5 Days
1174 Oracle Solaris Containers Administration Ed 2 3 Days
1175 Oracle Directory Server EE 11gR1: Maintenance and Operations Ed 1 4 Days
1176 Oracle Solaris 10 ZFS Administration Ed 3 3 Days
1177 Oracle Solaris 10 Performance Management Ed 3 5 Days
1178 Network Administration for the Oracle Solaris 10 Operating System Ed 2 5 Days
1179 S Exadata and Database Machine Administration Seminar Ed 1 2 Days
1180 S Exadata and Database Machine Administration Seminar Ed 1 LVC 2 Days
1181 Java PerformanceTuning and Optimization Ed 1 3 Days
1182 Oracle GlassFish Server 3.1:Administration and Deployment Ed 1 4 Days
1183 Developing Applications for the Java EE 6 Platform Ed 2 5 Days
1184 Oracle Solaris DTrace for System Administrators Ed 1 3 Days
1185 S Introduction to MySQL 5.5 Ed 1 LVC 1 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1186 PTR/INT Sun ZFS Storage 7000 Appliance Install and Admin Ed 1 4 Days
1187 S Introduction to MySQL 5.5 Ed 1 1 Days
1188 Java Design Patterns Ed 1 4 Days
1189 PTR/INT SPARC M-series Support ReadinessTraining Ed 1 5 Days
1190 SPARC M-series Administration Ed 1.1 4 Days
1191 PTR/INT Oracle Exadata Database Machine X2-2, X2-8: Install and Maint. Ed 1 5 Days
1192 Java ME: Develop Applications for Mobile Phones Ed 1 5 Days
1193 Java ME: Develop Applications for Mobile Phones Ed 1 LVC 5 Days
1194 PTR/INT StorageTek SL3000 Modular Library System Install and Maint Ed 1 3 Days
1195 PTR/INT StorageTek SL8500 Modular Library System Install and Maint Ed 1 5 Days
1196 Developing Applications with Java EE 6 on WebLogic Server 12c Ed 3 LVC 5 Days
1197 Developing Applications with Java EE 6 on WebLogic Server 12c Ed 3 5 Days
1198 Java SE 7 New Features Ed 1TOD 2 Days
1199 Certification Exam Preparation Seminar: Java SE 6 ProgrammerTOD 1 Days
1200 MySQL for Developers with DeveloperTechniques Accelerated Ed 1 5 Days
1201 MySQL for Developers with DeveloperTechniques Accelerated Ed 1 LVC 5 Days
1202 MySQL DeveloperTechniques with Advanced Stored Procedures Ed 1 5 Days
1203 MySQL DeveloperTechniques with Advanced Stored Procedures Ed 1 LVC 5 Days
1204 UNIX and Linux Essentials Ed 1 3 Days
1205 UNIX and Linux Essentials Ed 1 LVC 3 Days
1206 Java EE 7: New Features Ed 1 2 Days
1207 Java EE 7: New Features Ed 1 LVC 2 Days
1208 SL8500 OperatorTraining Ed 1 1 Days
1209 Java EE 6: Develop Web Applications with JSF Ed 1 4 Days
1210 Java EE 6: Develop Web Applications with JSF Ed 1 LVC 4 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1211 Java EE 6: Develop Business Components with JMS & EJBs Ed 1 4 Days
1212 Java EE 6: Develop Business Components with JMS & EJBs Ed 1 LVC 4 Days
1213 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1 5 Days
1214 Java EE 6: Develop Database Applications with JPA Ed 1 4 Days
1215 Java EE 6: Develop Web Components with Servlets & JSPs Ed 1 5 Days
1216 Java EE 6: Develop Web Components with Servlets & JSPs Ed 1 LVC 5 Days
1217 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1 LVC 5 Days
1218 Java EE 6: Develop Database Applications with JPA Ed 1 LVC 4 Days
1219 PTR/INT Sun ZFS Storage Appliance Hands On Lab Ed 1 1 Days
1220 PTR/INT Oracle Exalogic Elastic Cloud Installation & Maint Ed 1 5 Days
1221 OPN SparcT4-Based Servers Installation Boot Camp Ed 1 LVC 1 Days
1222 PTR/INT Sun ZFS Storage 7000 Appliance Install,Admin & Hands On Lab Ed 1 5 Days
1223 OracleVM Server for SPARC: Installation and Configuration Ed 1 2 Days
1224 OracleVM Server for SPARC: Installation and Configuration Ed 1 LVC 2 Days
1225 Certification Exam Prep Seminar: Java SE 7 Programmer ITOD 1 Days
1226 Certification Exam Prep Seminar: Java SE 7 Programmer IITOD 1 Days
1227 Certification Exam Prep Seminar: Java EE 5/6 Web Component DeveloperTOD 1 Days
1228 Architect Enterprise Applications with Java EETOD 5 Days
1229 SL3000 Operators Course for Customers Ed 1.1 1 Days
1230 PTR/INTTape and Modular Library Field Service Bootcamp Ed 1 4 Days
1231 Java SE 8 New Features Ed 1 2 Days
1232 Java SE 8 New Features Ed 1 LVC 2 Days
1233 MySQL for Beginners Ed 3 4 Days
1234 MySQL for Beginners Ed 3 LVC 4 Days
1235 MySQL for Database Administrators Ed 3TOD 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1236 MySQL Cluster Ed 2 4 Days
1237 MySQL Cluster Ed 2 LVC 4 Days
1238 OPN SPARC Enterprise M-Series Servers Installation Bootcamp Ed 1 1 Days
1239 OPN SPARC Enterprise M-Series Servers Installation Bootcamp Ed 1 LVC 1 Days
1240 OPN SPARCT-Series Servers Installation (IDO) Boot Camp Ed 1 LVC 1 Days
1241 OPN SPARCT-Series Servers Installation (IDO) Boot Camp Ed 1 1 Days
1242 Java PerformanceTuning with Mission Control & Flight Recorder Ed 1 3 Days
1243 Java PerformanceTuning with Mission Control & Flight Recorder Ed 1 LVC 3 Days
1244 Java ME Embedded: Develop Applications for Embedded Devices Ed 1 LVC 2 Days
1245 Java ME Embedded: Develop Applications for Embedded Devices Ed 1 2 Days
1246 MySQL for Developers Ed 3 5 Days
1247 MySQL for Developers Ed 3 LVC 5 Days
1248 Java EE 6: Develop Business Components with JMS & EJBs Ed 1TOD 4 Days
1249 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1TOD 5 Days
1250 Java EE 6: Develop Web Applications with JSF Ed 1TOD 4 Days
1251 Java SE 8 Fundamentals Ed 1 5 Days
1252 Java SE 8 Fundamentals Ed 1 LVC 5 Days
1253 PTR/INT SPARC M5/M6-32 Installation and Maintenance Ed 1 5 Days
1254 (WDPIN) S -Java SE 7 Programming Ed 2 5 Days
1255 (WDPIN) S - Fundamentals of the Java Programming Language, Java SE 6 Ed 1 5 Days
1256 (WDPIN) S - Java Programming Language, Java SE 6 Ed 1 5 Days
1257 Oracle Enterprise Manager Ops Center 12c R2Virtualizing Systems Ed 2 4 Days
1258 Oracle Enterprise Manager Ops Center 12c R2Virtualizing Systems Ed 2 LVC 4 Days
1259 Java SE 7 Programming Ed 2TOD 5 Days
1260 Java SE 7 Fundamentals Ed 2TOD 5 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1261 MySQL PerformanceTuning Ed 2TOD 4 Days
1262 MySQL for Beginners Ed 3TOD 4 Days
1263 MySQL for Database Administrators Ed 3.1 5 Days
1264 MySQL for Database Administrators Ed 3.1 LVC 5 Days
1265 Java SE 8 Programming Ed 1 5 Days
1266 JavaScript and HTML5: Develop Web Applications Ed 1 LVC 4 Days
1267 Java SE 8 Programming Ed 1 LVC 5 Days
1268 JavaScript and HTML5: Develop Web Applications Ed 1 4 Days
1269 Object-Oriented Analysis and Design Using UML Ed 2TOD 5 Days
1270 Java EE 7: Back-end Server Application Development Ed 1 5 Days
1271 Java EE 7: Front-end Web Application Development Ed 1 5 Days
1272 Java EE 7: Front-end Web Application Development Ed 1 LVC 5 Days
1273 Java EE 7: Back-end Server Application Development Ed 1 LVC 5 Days
1274 Shell Programming Ed 1 5 Days
1275 Shell Programming Ed 1 LVC 5 Days
1276 S OPN StorageTekTape Libraries Implementation Specialist Boot Camp Ed 1 1 Days
1277 S OPN StorageTekTape Libraries Implementation Specialist Boot Camp Ed 1 LVC 1 Days
1278 S OPN SPARCT5 andT4-Based Servers Installation Boot Camp Ed 1 1 Days
1279 S OPN SPARCT5 andT4-Based Servers Installation Boot Camp Ed 1 LVC 1 Days
1280 MySQL PerformanceTuning Ed 3 4 Days
1281 MySQL PerformanceTuning Ed 3 LVC 4 Days
1282 Oracle Enterprise Manager Ops Center 12c Administration Ed 2 LVC 5 Days
1283 Oracle Enterprise Manager Ops Center 12c Administration Ed 2 5 Days
1284 SPARC M6-32/M5-32 Server Administration Ed 1 4 Days
1285 S StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1286 S StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 LVC 3 Days
1287 UNIX and Linux Essentials Ed 1TOD 3 Days
1288 MySQL for Developers Ed 3TOD 5 Days
1289 Java SE 8 Fundamentals Ed 1TOD 5 Days
1290 Java SE 8 New Features Ed 1TOD 2 Days
1291 SPARC M6-32/M5-32 Server Administration Ed 1 LVC 4 Days
1292 Oracle ZFS Storage Appliance Administration Ed 1 LVC 4 Days
1293 Oracle ZFS Storage Appliance Administration Ed 1 4 Days
1294 S PTR/INT SPARC Supercluster Install,Admin. &Troubleshooting Ed 1TOD 2 Days
1295 Oracle Solaris Cluster 4.x Administration Ed 3 5 Days
1296 Oracle Solaris Cluster 4.x Administration Ed 3 LVC 5 Days
1297 Java SE 8 Programming Ed 1TOD 5 Days
1298 E Developing Web Application with PHP and MySQL (Spain Only) Ed 1 PRV 8 Days
1299 E MySQL Database Administration (Spain Only) Ed 1 PRV 9 Days
1300 Java SE 7 Fundamentals Ed 2 5 Days
1301 Java SE 7 Fundamentals Ed 2 LVC 5 Days
1302 Perl Programming Ed 3 5 Days
1303 Perl Programming Ed 3 LVC 5 Days
1304 Java SE 7 Programming Ed 2.1 5 Days
1305 Java SE 7 Programming Ed 2.1 LVC 5 Days
1306 S Oracle Exadata Database Machine: One-Day Overview Ed 1 1 Days
1307 S Oracle Exadata Database Machine: One-Day Overview Ed 1 LVC 1 Days
1308 Oracle Solaris Cluster 4.x Advanced Administration Ed 2 5 Days
1309 Oracle Solaris Cluster 4.x Advanced Administration Ed 2 LVC 5 Days
1310 OpenStack Administration Using Oracle Solaris 11 Ed 1 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1311 OPN ZFS Appliance Implementation Boot Camp Ed 1TOD 2 Days
1312 OpenStack Administration Using Oracle Solaris 11 Ed 1 LVC 3 Days
1313 Oracle Hierarchical Storage Manager and QFS 6.0 Admin Ed 1 LVC 4 Days
1314 Exadata Database Machine Administration Workshop Ed 3.1 LVC 5 Days
1315 Exadata Database Machine Administration Workshop Ed 3.1 5 Days
1316 PTR/INT Oracle Solaris 11 Internals Ed 1 5 Days
1317 PTR/INT Oracle Solaris 11 Internals Ed 1 LVC 5 Days
1318 S Oracle Enterprise Manager Ops Center 12c Administration Ed 2TOD 5 Days
1319 OPN Oracle Solaris 11 Implementation Specialist Boot Camp Ed 1TOD 2 Days
1320 Architect Enterprise Applications with Java EE Ed 2 5 Days
1321 Architect Enterprise Applications with Java EE Ed 2 LVC 5 Days
1322 Oracle Enterprise Manager Ops Center 12c Administration Ed 3 5 Days
1323 Oracle Enterprise Manager Ops Center 12c Administration Ed 3 LVC 5 Days
1324 E HSBC - Oracle EM Ops Center 12c Administration andVirtualization Ed 1TOD 5 Days
1325 Exadata Database Machine Administration Workshop Ed 3.1TOD 5 Days
1326 Perl Programming Ed 3TOD 5 Days
1327 Shell Programming Ed 1TOD 5 Days
1328 Java EE 7: Front-end Web Application Development Ed 1TOD 5 Days
1329 Managing Storage Area Networks Ed 1 5 Days
1330 ACSLS Systems Administration Ed 2 3 Days
1331 Architect Enterprise Applications with Java EE Ed 1 5 Days
1332 Architect Enterprise Applications with Java EE Ed 1 LVC 5 Days
1333 Configuring Security on the Oracle Solaris 10 Operating System Ed 2 5 Days
1334 StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 4 Days
1335 Oracle Identity Analytics 11gR1:Administration Ed 3 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
Business&Process
Framework
SoftSkills
No Description Duration
1336 StorageTek Enterprise Library Software (ELS) -VTCS Ed 2 4 Days
Virtulisation
1337 S OracleVM Essentials Overview Ed 1 LVC 1 Days
1338 S OracleVM with OracleVM Server for x86 Seminar Ed 1 LVC 1 Days
1339 S OracleVM with OracleVM Server for x86 Seminar Ed 1 1 Days
1340 S OPN OracleVM 2 Overview & Implementation Boot Camp Ed 1 1 Days
1341 S OPN OracleVM 2 Overview & Implementation Boot Camp Ed 1 LVC 1 Days
1342 OracleVM Server for x86: Implementation Ed 1 3 Days
1343 OracleVM Server for x86:Administration Ed 1 3 Days
1344 OracleVM Server for x86:Administration Ed 1TOD 3 Days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
CLOUD
1 CL210 Red Hat OpenStack Administration 4 days
2 CL216 Red Hat CloudForms Hybrid Cloud Administration 2 days
3 CL218 Red Hat CloudForms Hybrid Cloud Operations 2 days
4 CL220 Red Hat CloudForms Hybrid Cloud Management 4 days
5 CL275 OpenShift Enterprise Application Development 2 days
6 CL280 OpenShift Enterprise Administration 3 days
7 CL306 Neutron Networking with Red Hat Enterprise Linux OpenStack Platform 2 days
8 CL314 Apache Qpid Messaging with Red Hat Enterprise Linux OpenStack Platform 2 days
9 CL315 RabbitMQ Messaging with Red Hat 2 days
10 CL332 High Availability with Red Hat Enterprise Linux OpenStack Platform 2 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Red Hat training courses fromVinsys have been considered to be the best certifications in
acquiring skills for the open source Linux operating system. Knowledge of operating and managing
a Linux system, helps professionals gain an edge over others. In addition to preparing for
certification dedicated centre of excellence atVinsys provides an insight to positive R&D and
deployment.
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
MIDDLEWARE
11 JB248 Red Hat JBoss Application Administration I 4 days
12 JB348 Red Hat JBoss Application Administration II 4 days
13 JB225 Red Hat JBoss Enterprise Application Development I 4 days
14 JB325 Red Hat JBoss Enterprise Application Development II 4 days
15 JB297 Red Hat JBoss Development: Persistence with Hibernate 4 days
16 JB232 Monitoring with Red Hat JBoss Operations Network 1 day
17 JB234 Systems Management with Red Hat JBoss Operations Network 3 days
18 JB417 SwitchYard Development with Red Hat JBoss Fuse Service Works 2 days
19 JB421 Camel Development with Red Hat JBoss Fuse 3 days
20 JB435 Enterprise Service Bus Deployment with Red Hat JBoss Fuse 2 days
21 Jb437 Red Hat JBoss A-MQ Development and Deployment 2 days
22 JB439 Red Hat JBoss Fuse with Red Hat JBoss A-MQ and Camel 5 days
23 JB450 Red Hat JBoss DataVirtualization Development 3 days
24 JB431 Jboss SOA: ESB Service Implementation 2 days
25 JB461 Authoring Rules with Red Hat JBoss BRMS 2 days
26 JB463 Developing Rules Applications with Red Hat JBoss BRMS 2 days
27 JB465 Implementing with Red Hat JBoss BRMS 4 days
28 JB427 Developing Workflow Applications with Red Hat JBoss BPM Suite 2 days
PLATFORM
29 RH124 Red Hat System Administration I 5 days
30 RH134 Red Hat System Administration II 4 days
31 RH199 RHCSA RapidTrack Course 4 days
32 RH236 Red Hat Enterprise PerformanceTuning 2 days
33 RH242 Red Hat LinuxTroubleshooting 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
34 RH254 Red Hat System Administration III 4 days
35 RH270 Managing Containers with Red Hat Enterprise Linux Atomic Host 3 days
36 RH299 RHCE Certification lab 4 days
37 RH318 Red Hat EnterpriseVirtualization 4 days
38 RH401 Red Hat Enterprise Deployment and Systems Management 4 days
39 RH403 Red Hat Satellite 6 Administration 4 days
40 RH413 Red Hat Server Hardening 4 days
41 RH436 Red Hat Enterprise Clustering and Storage Management 4 days
42 RH442 Red Hat Enterprise PerformanceTuning 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 NPO101 Get Started with Salesforce and the Nonprofit Starter Pack 2 days
2 ADM201 Administration Essentials for New Admins 5 days
3 ADM201C Administration Essentials for New Admins plus Certification 5 days
4 ADM202 Administration Essentials for New Admins (Professional Edition) 2 days
5 ADM211 Administration Essentials for Experienced Admins 4 days
6 CRT101 Preparing forYour Salesforce Administrator Certification 1 day
7 ADM214 Customizing Salesforce1 with Clicks 1 day
8 ADM231 Introduction to Object-Oriented Programming with Force.com Code 5 days
9 ADM251 Sales Cloud Administration: Products, Quotes, Orders and Collaborative Forecasts 1 day
10 ADM261 Service Cloud Administration 2 days
If you want to maximize your Salesforce investment, there’s no better way than giving your people
the skills to use Salesforce to its fullest extent.That’s why we atVinsys offer a wide range of training
options, from in-person classes featuring hands-on instruction, to virtual training, self-led courses,
private workshops, and more.
Learn Salesforce @ Vinsys
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Code Description Duration
11 ADM271 Get Started with Communities .5 days
12 STR301 Implementing a Reporting Strategy for the Sales Cloud 3 days
13 DEV401 Building Applications with Force.com 5 days
14 DEV450 Programmatic Development using Apex andVisualforce 5 days
15 DEV502 Integrating with Force.com 4 days
16 DEV601 Programming Lightning Components 5 days
17 STR101 What’s Possible: Salesforce Fundamentals 3 days
18 STR301 Implementing a Reporting Strategy for the Sales Cloud 3 days
19 CRT251 Preparing forYour Salesforce.com Sales Cloud Consultant Certification 1 day
20 CRT261 Preparing forYour Salesforce Service Cloud Consultant Certification 1 day
21 RPT101 Reporting Fundamentals 1 day
22 SLS101 Sales CloudTraining for Sales Reps 1 day
23 SLX101 Sales CloudTraining for Sales Reps Using Lightning 1 day
24 SLS201 Sales CloudTraining for Sales Managers 1 day
25 SVC101 Service Cloud Essentials for Agents 2 days
26 SVC201 Service Cloud Essentials for Managers 2 days
27 SVC301 Service Cloud Essentials for Executives .5 days
28 ANC101 Mobile and Desktop Exploration in Wave Analytics 1 day
29 ANC201 Building Lenses, Dashboards and Apps in Wave Analytics 1 day
30 MCC102 Execute and Automate Marketing Cloud Email in the Sales and Service Clouds 1 day
31 EEB101 Email Essentials 3 days
32 JB101 Journey Builder 101 1 day
33 MBC101 Mobile Messages 101 1 day
34 PDI101 Predictive Intelligence 101 .5 days
35 SS101 Social Studio 101 1 day
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
Business&Process
Framework
SoftSkills
No Code Description Duration
1 AC010 Business Processes in Financial Accounting 5 days
2 AC020 Business Processes in Investment Management 3 days
3 AC040 Business Processes in Management Account 5 days
4 AC050 Financial & Mgnt Acct for Service Industries 5 days
5 AC100 SAP Simple Finance add-on for SAP Business Suite powered by SAP HANA 1.0 - Migration 2 days
6 AC200 Accounting Customizing Fundamentals - G/L,AP,AR 5 days
7 AC201 Accounting Customizing I 2 days
8 AC202 Accounting Customizing II 2 days
9 AC205 Individual Account Closing 4 days
10 AC207 Parallel Accounting Standards / New GL 3 days
Empower your SAP end users, from developers to marketers – with our suite of SAP training
courses and certification programs. Create a comprehensive training plan, choose from live,
mobile, or online courses – and ultimately boost technology proficiency across your organization.
Our software training covers SAP S/4HANA, SAP HANA, SAP Success Factors, SAP Business
Objects, and more. 
Explore SAP @ Vinsys
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
11 AC210 New General Ledger 5 days
12 AC212 Migration to the New General Ledger  5 days
13 AC235 SAP Convergent Charging 4.1 5 days
14 AC236 SAP Convergent Charging – Functional Foundations 2 days
15 AC240 Business Processes in Contract Accounting 5 days
16 AC245 SAP Convergent Invoicing 3 days
17 AC270 Travel Management 5 days
18 AC280 Reporting in Financial Accounting 3 days
19 AC305 Asset Accounting 5 days
20 AC350 Configuration for Investment Management 2 days
21 AC405 Cost Center & Internal Order Accounting 5 days
22 AC410 Cost Center Accounting 3 days
23 AC415 Internal Orders 2 days
24 AC505 Product Cost Planning 5 days
25 AC506 Basics of Product Cost Planning 3 days
26 AC507 Additional Functions of Product Cost Planning 2 days
27 AC520 Cost Object Controlling for Make-To-Stock Manufacturing and Sales-Order- Related Production 5 days
28 AC521 Cost Object Controlling for Make-to-Stock 4 days
29 AC522 Cost Object Controlling for Make-To-Order, Production Industries 1 day
30 AC523 Cost Object Controlling for Make-to-Orde 1 day
31 AC530 Actual Costing / Material Ledger 3 days
32 AC605 Profitability Analysis 5 days
33 AC612 Profit Center Accounting in New General Ledger Accounting 3 days
34 AC710 SAP Commodity Procurement and Sales 2 days
35 AC712 SAP Commodity Risk Management 2 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
36 AC805 Cash Management 3 days
37 ADM100 AS ABAP - Administration 5 days
38 ADM102 AS ABAP - Administration II 3 days
39 ADM103 AS ABAP - Advanced Administration 3 days
40 ADM106 SAP SYSTEM MONITORING USING CCMS I 2 days
41 ADM107 SAP SYSTEM MONITORING USING CCMS II 2 days
42 ADM110 SAP System Installation and Patching 4 days
43 ADM200 AS Java 7.0 – Administration 5 days
44 ADM225 SAP SOFTWARE LOGISTICS FOR JAVA 5 days
45 ADM315 Workload Analysis AS ABAP 3 days
46 ADM325 AS ABAP – Software Logistics 4 days
47 ADM326 SAP ECC Upgrade 5 days
48 ADM327 Enhancement Package Installation 2 days
49 ADM328 Upgrade and EHP installation 5 days
50 ADM340 AS ABAP – Software Logistics NW 5 days
51 ADM505 DATABASE ADMINISTRATION ORACLE I 3 days
52 ADM506 DATABASE ADMINISTRATION ORACLE II 2 days
53 ADM515 Database Administration SAP MaxDB 3 days
54 ADM520 DATABASE ADMINISTRATION MS SQL SERVER 3 days
55 ADM535 Database Administration DB2 3 days
56 ADM540 Sybase ASE administration 3 days
57 ADM542 Sybase ASE database : Performance andTuning for SAP systems 1 day
58 ADM545 Database Migration to Sybase ASE (for SAP systems) 3 days
59 ADM546 Database Migration to Sybase ASE (for SAP systems) 3 days
60 ADM800 AS Java - Administration 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
61 ADM900 SAP Security - Fundamentals 2 days
62 ADM920 max. 14 part per course, NW Identity Man 5 days
63 ADM940 ABAP AS Authorization Concept 3 days
64 ADM950 Secure SAP System Management 2 days
65 ADM960 SAP NetWeaver AS - Security 5 days
66 AII100 SAP Auto-ID Infrastructure (SAP AII) and 3 days
67 BC100 Introduction to Programming (with ABAP) 2 days
68 BC400 ABAP Workbench Foundations 5 days
69 BC401 ABAP Objects 5 days
70 BC402 Advanced ABAP 5 days
71 BC403 Advanced ABAP debugging and analysis 3 days
72 BC404 ABAP in Eclipse 3 days
73 BC405 Programming ABAP Reports 5 days
74 BC407 Reporting: QuickViewer, InfoSet Query, and SAP Query 2 days
75 BC410 Developing Screen-Based User Dialogs 3 days
76 BC412 ABAP Dialog Programming Using EnjoySAP Controls 5 days
77 BC414 Programming Database Changes 2 days
78 BC420 DataTransfer 5 days
79 BC425 Enhancements and Modifications including enhancement framework 5 days
80 BC427 Enhancement Framework 2 days
81 BC430 ABAP Dictionary 3 days
82 BC450 ABAP Performance:Analysis and Optimizat 5 days
83 BC470 Form Printing with SAP Smart Forms 2 days
84 BC480 PDF-Based Print Forms 3 days
85 BC481 SAP Interactive Forms by Adobe 2 days
NextPrevious
Technology
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
86 BIT100 SAPNW IntegrationTechnology - Overview 3 days
87 BIT400 SAP NetWeaver Process Integration 5 days
88 BIT420 PI - Proxy Dev&Ser Provision with ESR 5 days
89 BIT430 PI - Business Process Management 3 days
90 BIT460 PI Message Mapping 2 days
91 BIT480 Process Integration & Business IntegrationTechnologies 3 days
92 BIT600 SAP Business Workflow - Concepts, Inbox andTemplate Usage 3 days
93 BIT601 SAP Business Workflow - Build and Use 5 days
94 BIT665 Information Lifecycle Management 2 days
95 BIT800 SAP NetWeaver Process Orchestration 3 days
96 BIT900 SAP HANA Cloud Integration 3 days
97 BO100 Reporting with SAP BusinessObjects BI solutions for SAP NetWeaver BW 5 days
98 BOA340 SAP BusinessObjects Profitability and Cost Management: Fundamentals in Model Building 3 days
99 BOAN10 SAP BusinessObjects Analysis, edition for Microsoft Office 2 days
100 BOAN20 Planning with BusinessObjects Analysis 1 day
101 BOC310 SAP Crystal Reports: Fundamentals of Report Design 2 days
102 BOC320 SAP Crystal Reports: Business Reporting & Report Processing Strategies 3 days
103 BOCE10 Crystal Reports Enterprise: Fundamentals of Report Design 2 days
104 BOCE20 Crystal Reports Enterprise:Advanced Report Design 3 days
105 BOD310 SAP BusinessObjects Design Studio 1.4 3 days
106 BODS10 Data Services - Platform andTransforms 3 days
107 BODS30 Data Services - Data Quality Management 2 days
108 BOE310 SAP BusinessObjects Business Intelligence Platform:Administration & Security 2 days
109 BOE320 SAP BusinessObjects Business Intelligenc 3 days
110 BOE330 SAP BusinessObjects BI Platform DesigDev 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
111 BOF202 SAP BOBJ Financial Consolidation: Using the Starter Kit for IFRS 1 day
112 BOF203 SAP BOBJ Financial Consolidation: Enhancing the Starter Kit for IFRS 2 days
113 BOF210 SAP BusinessObjects Financial Consolidation - XL Link / PivotTable 1 day
114 BOF250 SAP Business OBjects Planning and Consolidation - Consolidation 5 days
115 BOF360 BO Financial Consolidation - Rollup Config. 1 day
116 BOF370 SAP BusinessObjects Financial Consolidatoin:Advanced Category Scenario Configuration 1 day
117 BOF390 SAP BusinessObjects Financial Information Management 1 day
118 BOID10 SAP BusinessObjects Information DesignTool 5 days
119 BOID20 Information DesignTool II 2 days
120 BOII10 SAP InfiniteInsight 3 days
121 BOINTI Technical Integration with SAP BusinessObjects BI solutions for SAP NetWeaver BW 2 days
122 BOW310 SAP BusinessObjects Web Intelligence: Report Design I 2 days
123 BOW320 SAP BusinessObjects Web Intelligence: Report Design II 2 days
124 BOX310 SAP BusinessObjects Dashboards: Core and 3 days
125 BPC410 SAP Planning and Consolidation (10.0), version for the Microsoft Platform:Administration 3 days
126 BPC420 SAP Planning and Consolidation (10.0), version for SAPNetWeaver:Administration 5 days
127 BPC430 SAP Planning and Consolidation (10.0): Reporting and Planning 5 days
128 BPC440 SAP Planning and Consolidation (10.0): Consolidation 5 days
129 BW305 BW - Query Design and Analysis 5 days
130 BW306 BI - Ent. Reporting,Query&Analysis II 5 days
131 BW307 Web Application Designer 2 days
132 BW310 BW - Enterprise Data Warehousing 5 days
133 BW330 BI - Modeling & Implementation 5 days
134 BW350 BW - Data Acquisition 5 days
135 BW360 BW - Operations & Performance 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
136 BW362 SAP BW on SAP HANA 5 days
137 BW365 BW - User Management & Authorizations 3 days
138 BW370 BW - Integrated Planning 5 days
139 BW380 BI - Analysis Processes & Data Mining 2 days
140 C4C10 SAP Cloud for Customer - Project Implementation 4 days
141 C4C30 SAP Cloud Applications Studio 4 days
142 C4C50 SAP Cloud for Customer – Integration with On-premise SAP Solutions 4 days
143 CA611 Web Dynpro ABAP (2 clients of 1system) 5 days
144 CA700 Reporting in Financials 4 days
145 CA705 Report Painter 2 days
146 CA710 Report Writer 3 days
147 CR100 CRM Base Customizing 5 days
148 CR300 CRM Sales 5 days
149 CR410 CRM Interaction Center WebClient 3 days
150 CR500 CRM Middleware 2 days
151 CR580 CRM User Interface 4 days
152 CR600 CRM Marketing 5 days
153 CR700 CRM Service 5 days
154 CRMFUN SAP All-in-One CRM Fundamentals 7 days
155 CRMTEC SAP All-in-One CRMTechnology 3 days
156 DADJ73 AS Java – Administration Delta 7.3 3 days
157 DBW73 BW - Delta BW 7.0 => BW 7.3 3 days
158 DBW74 Delta BW 7.0 to BW 7.4 (non-HANA) 3 days
159 DCO66 Enhancements in Management Accounting SAP ERP 6.0 EhP6 1 day
160 DERP Delta MM 4.7 to BS7 based on ERP 6.4 1 day
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
161 DERP65 Enhanc. Overview in SAP ERP 6.0 (up to EHP5) 1 day
162 DERPMM Delta MM 4.7 to BS7 based on ERP 6.4 1 day
163 DEV134 Introduction to SAP PowerBuilder 12.5.1 5 days
164 DEV355 Data Modeling with PowerDesigner 16.5 4 days
165 DEV523 Customizing and Extending PowerDesigner 16.5 2 days
166 DEV524 PowerDesigner Adminstration 16.5 2 days
167 DEV621 Modeling for Enterprise Architecture using PowerDesigner 16.5 2 days
168 DFI65 Enhancements in Financial Accounting SAPERP6.0 EHP1.05 2 days
169 DFI66 Enhancements in Financial Accounting SAP ERP 6.0 EhP6 1 day
170 DFPS60 Basics of Defense & Security 3 days
171 DFPS66 Defense & Security Workshop Organizational Flexibility Part 1 4 days
172 DFPS67 Defense & Security Workshop Organizational Flexibility Part 2 5 days
173 DFPS68 Defense & Security Workshop :Technology 5 days
174 DHCM Enhancements HCM SAP ERP EhP1-6 2 days
175 DHCM65 Enhancements in HCM SAP ERP 6.0 EHP1-5 2 days
176 DLDM65 Enhancements in LDM SAP ERP 6.0 EHP1-5 2 days
177 DM100 SAP Disclosure Management 10.0 SP4 3 days
178 DMM65 Materials Manag SAP ERP 6.0 EHP1-5 1 day
179 DMM66 Enhancements in Materials Management SAP 1 day
180 DPI73 SAP NetWeaver Process Integration - Delta PI 7.3 1 day
181 DPI74 SAP NetWeaver Process Integration - Delta PI 7.4 1 day
182 DPM65 Enterp.Asset Manag SAP ERP 6.0 EHP1-5 2 days
183 DPP65 Enhancements in Production Planning SAP ERP 6.0 EHP1-5 1 day
184 DS10 Data Services - Platform andTransforms 3 days
185 DS30 Data Services - Data Quality Management 2 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
186 DS50 SAP BusinessObjects Information Steward 4.0 2 days
187 DSCM7P Delta SAPSCM 7.0 Production Planning 2 days
188 DSCM7S Delta APO SNP & DP 2 days
189 DSD65 Ehm in Sales Order Mgt. ERP 6.0 EHP1-5 1 day
190 DSRM71 Delta SRM7.01 2 days
191 DSRM72 Delta SRM7.02 2 days
192 DWD702 Web Dynpro for ABAP - Delta 7.0 => 7.02 3 days
193 E2E040 Run SAP End-to-End Solution Operations Overview 3 days
194 E2E060 Customer Center of Expertise 3 days
195 E2E100 E2E Root Cause Analysis 5 days
196 E2E120 Technical Monitoring in SAP Solution Manager 7.1 5 days
197 E2E140 DataVolume Management 3 days
198 E2E200 Change Control Management 5 days
199 E2E220 SAPTest Management 3 days
200 E2E300 Business Process Operations 5 days
201 E2E400 Technical Upgrade Management 3 days
202 E2E500 Custom Code Management 3 days
203 EDB116 FastTrack to Adaptive Server Enterprise 5 days
204 EDB358 System and Database Administration:Adaptive Server Enterprise 15.7 5 days
205 EDB367 Powering Up with ASE 15.7 2 days
206 EDB377 FastTrack to Replication Server Administration 15.7 5 days
207 EDB553 Configuring Adaptive Server Enterprise 15.7 5 days
208 EDB634 Performance andTuning:Adaptive Server Enterprise 15.7 Query Optimization 5 days
209 EDB785 SAP IQ Administration 5 days
210 EDB795 SAP IQ Administration 4 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
211 EP120 Java development for NetWeaver Portal 7.31 3 days
212 EP200 SAP NetWeaver Portal System Administration 5 days
213 EP300 Configuration of Knowledge Mngmt and Collaboration 5 days
214 EP350 Innovated Content Management and Collabo 5 days
215 EP360 Enterprise Workspaces 1 day
216 EWM100 Processes in SAP Extended Warehouse Mang 5 days
217 EWM110 Customizing (1) in SAP Extended Warehouse Mangement (SAP EWM) 5 days
218 EWM120 Customizing (2) in SAP Extended Warehous 5 days
219 EWM125 Labor Management in SAP Extended Warehouse Management (EWM) 1 day
220 FIN900 Auditing of Financial Business Processes in SAP 5 days
221 FS225 Collateral Management System Functional Overview 3 days
222 FS240 Shared Processes for Loans and Deposits Management in Banking Services from SAP 8.0 5 days
223 FS241 Loans Management in Banking Services from SAP 8.0 3 days
224 FS242 Deposits Management in Banking Services from SAP 8.0 4 days
225 FS244 SAP CRM Account Origination 3 days
226 FS245 SAP Payment Engine 4 days
227 FS250 Bank Analyzer Overview in Banking Services from SAP 8.0 1 day
228 FS251 Accounting for Fin.Instr.Bank.Serv SAP8. 5 days
229 FS252 Risk Mngmnt in Banki.Servi. from SAP8.0 3 days
230 FS253 Bank Analyzer Infrastructure in Banking Services from SAP 8.0 3 days
231 FS270 SAP Leasing Overview 2 days
232 FS271 SAP Leasing ERP Customizing 2 days
233 FS272 SAP Leasing CRM Customizing 3 days
234 FS290 SAP Financial Database Overview 1 day
235 FS291 SAP Accounting for Financial Instru Overview 1 day
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
236 FS292 Processes with SAP Financial DB 2 days
237 FS293 Processes in SAP Accounting for Financial Instruments 2 days
238 FS295 SAP Accounting for Financial Instru Configuration 2 days
239 FS296 Integrated Financial & Mngmt Accounting Overview 1 day
240 FS297 SAP PA & IFMA Processes 2 days
241 FS299 SAP PA&IFMA:CostTypeDetails&Customizing 2 days
242 FS300 SAP for Insurance Overview 2 days
243 FS310 SAP Collections & Disbursements Overview 2 days
244 FS315 SAP Collections & Disbursements - Customizing 3 days
245 FS320 Incentive & Commission Management 3 days
246 FS320 Incentive & Commission Management 3 days
247 FS325 Incentive&Commission Manag. for Insurance 2 days
248 FS325 Incentive & Commission Management - Customizing 2 days
249 FS330 SAP Claims Management 2 days
250 FS335 SAP Claims Management - Customizing 3 days
251 FS340 SAP Policy Management 3 days
252 FS345 SAP Policy Management - Customizing 4 days
253 FSC010 Processes inTreasury & Risk Management 5 days
254 FSC020 Processes in SAP Credit Mngmt, SAP Biller Direct, SAP Dispute & SAP Collections Mngmt  3 days
255 FSC110 Customizing inTreasury & Risk Management 5 days
256 FSC120 SAP Inhouse Cash 3 days
257 FSC130 SAP Bank Communication Mgt. 2 days
258 FSC200 Customizing SAP Dispute & SAP Collections 2 days
259 GRC100 SAP BusinessObjects GRC - Compliance Principles and Harmonization 2 days
260 GRC300 SAP Access Control 10.0 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
261 GRC330 SAP BusinessObjects Process Control 10.0 5 days
262 GRC340 SAP BusinessObjects Risk Management 3.0 3 days
263 GTS100 SAP GlobalTrade Services -Two clients 3 days
264 GTS200 Configuration of SAP GlobalTrade Services 8.0 1 day
265 GW100 Building OData Services Using SAP NetWea 3 days
266 HA100 SAP HANA - Introduction 2 days
267 HA150 SQL Basics for SAP HANA 2 days
268 HA200 SAP HANA – Installation and Operations 5 days
269 HA240 SAP HANA Security & Authorization 2 days
270 HA250 SAP HANA - Database Migration 2 days
271 HA300 SAP HANA - Implementation & Modeling 3 days
272 HA350 SAP HANA - Data Provisioning 2 days
273 HA400 ABAP Programming for SAP HANA 3 days
274 HA900 SAP HANA Live 2 days
275 HABS1 SAP Business Suite on SAP HANA 3 days
276 HR050 Business Processes in Human Capital Management 5 days
277 HR110 Business Processes in HCM Payroll 2 days
278 HR250 Employee Self-Service 5 days
279 HR260 Employee Self-Service 3 days
280 HR270 SAP Enterprise Learning 3 days
281 HR272 SAP Enterprise Learning - E-Learning Dev 2 days
282 HR280 SAP HCM Processes and Forms 4 days
283 HR290 System Configuration for ESS/MSS 3 days
284 HR305 Master Data Configuration 5 days
285 HR306 Configuration ofTime Recording 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
286 HR310 Time Evaluation 5 days
287 HR316 SAP E-Recruiting 3 days
288 HR325 Benefits Administration 3 days
289 HR350 Programming in Human Capital Management 5 days
290 HR400 Payroll Configuration 5 days
291 HR505 Organizational Management 5 days
292 HR510 Personnel Development and Performance Management 5 days
293 HR515 Training and Event Management 3 days
294 HR540 Enterprise Compensation Management 3 days
295 HR580 Analytics and Reporting in HCM 3 days
296 HR600 SAP HR Renewal 1.0, FP1-4 3 days
297 HR940 Authorizations in HCM 3 days
298 HY600 hybris-SAP Solution Integration 3 days
299 IAU210 Automotive: Processes in the Supplier Industry 5 days
300 IAU240 SAP for Automotive: JIT-Processes 3 days
301 IAU260 SAP for Automotive:Ope. Pro Material Flow 3 days
302 IAU270 SAP for Automotive:Vehicle Management System 3 days
303 IAU280 SAP for Automotive:Warranty Management System 3 days
304 ICP310 Sales and Distribution and Allocation Run 5 days
305 ICP320 Materials Mgnt & Production Planning for AFS 5 days
306 ICP600 Trade Promotion Management with SAP CRM 5 days
307 IHE102 SAP Student Lifecycle Management 5 days
308 IHE203 SAP Student Lifecycle Management: Student Accounting 5 days
309 IMD320 Periodical Sales and Distribution 5 days
310 IMD420 SAP for Media - Advertising Management (Publishers) 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
311 IMD700 SAP for Media - Intellectual Property Management 5 days
312 IOG100 Primary & Secondary distr. with SAP Oil 5 days
313 IOG340 Trading and Scheduling with SAP for Oil 3 days
314 IPS210 SAP Public Sector Procurement 5 days
315 IPS310 SAP Document Builder 3 days
316 IPS510 SAP Public Sector Collection and Disbursement 5 days
317 IPS520 Tax and Revenue Management 5 days
318 IPS710 SAP Grants Management - Grantor 3 days
319 IPS810 SAP Grants Management - Grantee 5 days
320 IPS910 Funds Management: Processes, Organization and Configuration 5 days
321 IRT310 Master Data in SAP for Retail 5 days
322 IRT320 Pricing and Promotion 5 days
323 IRT330 Planning, Purchasing, Merchandise Distribution 5 days
324 IRT360 Store Connection 3 days
325 ITSP70 IT Support with SAP Solution Manager 5 days
326 IUT110 Business Processes in SAP ERP for Utilities (Rev.A) 5 days
327 IUT210 Master Data and Basic Functions in SAP for Utilities (Rev.A) 3 days
328 IUT220 Device Management 3 days
329 IUT222 AMI in SAP for Utilities 3 days
330 IUT225 Energy Data Management 2 days
331 IUT230 ng and Invoicing 5 days
332 IUT235 Real-Time Pricing 2 days
333 IUT240 Contract Accounts Receivable and Payable 5 days
334 IUT250 Customer Service 3 days
335 IUT255 Integration of SAP CRM and SAP for Utilities 3 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
336 IUT260 IC Webclient for Utilities 3 days
337 IUTBIL Settling Energy Quantities 3 days
338 IUTW10 SAP Waste and Recycling Overview 5 days
339 IUTW25 SAP Waste and Recycling: Integrated SD Processes 5 days
340 IUTW44 Master Data for Deregulation and Data Exchange 2 days
341 IUTW45 Payment Processing 2 days
342 IUTW55 Change of Supplier 2 days
343 JA100 SAP J2SE Fundamentals 5 days
344 JA300 SAP J2EE Fundamentals 5 days
345 JA310 Web Dynpro for Java Basics 5 days
346 JA320 SAP J2EE Persistence 5 days
347 JA340 SAP NetWeaver Development Infrastructure 3 days
348 JA400 Introduction to Java EE 5 - Part A 5 days
349 JA410 Java for SAP NetWeaver 7.1 3 days
350 JA450 Web Dynpro Java on SAP NetWeaver 7.1 5 days
351 LT100 Change Control Management 4 days
352 MDG100 Master Data Governance 4 days
353 MDM050 Master Data Management - Overview 3 days
354 MDM100 Master Data Management - Fundamentals 5 days
355 MDM400 Master Data Management - Data Modeling & Implementation 3 days
356 MOB01 SAP Mobile Platform Fundamentals and Best Practices 3 days
357 MOB10 SAP Mobile Platform 3.0 (SP03) Administration 2 days
358 MOB20 SAP Mobile Platform 3.0 Development (SP03) 3 days
359 MOB300 SAP Agentry Essentials 5 days
360 MOB310 SAP Agentry Work Manager for SAP Foundation 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
361 MOB320 SAP Agentry Work Manager for IBM Maximo 5 days
362 MOB400 SAP Mobiliser 5.1 Development 5 days
363 MOB500 SAP Online Banking 8.3 Configuration and Customization 3 days
364 NET310 Fundamentals of Web Dynpro for ABAP 5 days
365 NET311 Advanced Web Dynpro for ABAP 4 days
366 NET312 UI Development with Web Dynpro for ABAP 4 days
367 NET313 Floorplan Manager for Web Dynpro for ABAP 5 days
368 NWBC10 NetWeaver Business Client 1 day
369 NWC110 Modeling Applications withVisual Composer 2 days
370 NWC120 Guided Procedures - Part A 3 days
371 PLM100 Business Processes in Life-cycle Data Management 5 days
372 PLM114 Basic Data for Manufacturing and Product Management 5 days
373 PLM115 Basic Data for Process Manufacturing 5 days
374 PLM120 Document Management 3 days
375 PLM130 Classification 3 days
376 PLM145 Variant Configuration I: Modeling and In 5 days
377 PLM146 Variant Config:Additional Funct. & Scenarios 4 days
378 PLM150 Change Management 3 days
379 PLM170 Integrated Product & Process Engineering (IPPE) 3 days
380 PLM200 Business Processes in SAP Project Management 5 days
381 PLM210 Master Data Configuration in SAP Project System 2 days
382 PLM220 Project Management - Logistics 5 days
383 PLM230 Project Management - Controlling 5 days
384 PLM300 Business Processes in Plant Maintenance 5 days
385 PLM301 Business Processes in Costumer Service 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
386 PLM305 ManagingTechnical Objects 3 days
387 PLM310 Maintenance and Service Processing: Preventative 3 days
388 PLM315 Maintenance Processing: Operational Functions 3 days
389 PLM318 Analytics in Enterprise Asset Management 2 days
390 PLM322 Capacity Planning&Time Scheduling in PM Projects 3 days
391 PLM335 Service Processing 5 days
392 PLM360 Multi-Resource Scheduling (MRS 9.0) 3 days
393 PLM400 Business Processes in Quality Management 5 days
394 PLM412 Quality Planning and Inspection 5 days
395 PLM415 Quality Management in Logistics 3 days
396 PLM420 Quality Management in Production 3 days
397 PLM510 SAP Project Management 3 days
398 PLM512 c-Folders 2 days
399 PLM550 SAP Portfolio Management 5 days
400 RE010 Business Processes in SAP Real Estate Management 3 days
401 RE200 Flexible Real Estate Management 5 days
402 RE300 Land Use Management 2 days
403 SAP01 SAP Overview 3 days
404 SAPBI oduction to SAP BusinessObjects BI solutions 3 days
405 SAPCRM SAP CRM Solution Overview 3 days
406 SAPEP SAP NetWeaver Portal Fundamentals 3 days
407 SAPFIN SAP Financials 3 days
408 SAPHR SAP Human Capital Management Overview 2 days
409 SAPIRT Retail Process Overview 5 days
410 SAPNW SAP NetWeaver - Overview 3 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
411 SAPSCM SAP Supply Chain Management Solution Overview 3 days
412 SAPSPM SAP Services Parts Management Overview 2 days
413 SAPSRM SAP SRM Overview 3 days
414 SAPTEC SAP NetWeaver Application Server – Fundamentals 3 days
415 SAPUX SAP Screen Personas 2.0 Development 2 days
416 SAPX03 SAP Fiori Implementation and Configuration 4 days
417 SAPX04 HTML5 Foundations for SAP SAPUI5 Development 2 days
418 SAPX05 SAP SAPUI5 User Experience Development 3 days
419 SAPX08 SAP SAPUI5 Advanced Development 2 days
420 SAPX09 SAP Screen Personas 3.0 Development 2 days
421 SAPX11 SAP Fiori Administration 3 days
422 SCM100 Business Processes in Planning (SAP ERP) 2 days
423 SCM130 SAP ERP Planning & Manufacturing Overview 5 days
424 SCM200 Advanced Planning Overview (SCM APO) 2 days
425 SCM210 Core Interface (CIF) 2 days
426 SCM220 Demand Planning (APO DP) 3 days
427 SCM221 Features and Functions of Demand Planning (SCM APO) 3 days
428 SCM226 Configuration of Demand Planning (SCM APO) 5 days
429 SCM230 Supply Network Planning (APO SNP) 5 days
430 SCM235 Planning with Capable-to-Match (APO CTM) 5 days
431 SCM240 Production Planning in ERP 5 days
432 SCM241 Production Planning in ERP for Functional Consultant 5 days
433 SCM250 Production Planning & Detailed Schedulin 5 days
434 SCM300 Business Processes in Manufacturing (SAP ERP) 3 days
435 SCM310 Production Orders in ERP 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
436 SCM320 Repetive Manufacturing 3 days
437 SCM340 Process Manufacturing 5 days
438 SCM350 Computerized KANBAN (Material Replenishment) 3 days
439 SCM360 Capacity Planning (SAP ERP) 5 days
440 SCM365 Capacity Evaluation & Leveling in ECC 3 days
441 SCM372 Execution Steps (xSteps) 3 days
442 SCM380 SAP MII - Manufacturing Integration and Intelligence Fundamental 5 days
443 SCM500 Processes in Procurement 5 days
444 SCM510 Inventory Management and Physical Inventory 5 days
445 SCM515 InvoiceVerification 3 days
446 SCM520 Purchasing 5 days
447 SCM521 Conditions and Price Determination in Procurement 3 days
448 SCM525 Consumption-Based Planning and Forecasting 2 days
449 SCM540 Procurement of External Services 2 days
450 SCM550 Cross-Functional Customizing in MM 5 days
451 SCM595 Batch Management 3 days
452 SCM600 Business Processes in Sales Order Management 5 days
453 SCM601 Processes in Logistics Execution 3 days
454 SCM605 Sales Processing in SAP ERP 5 days
455 SCM610 Delivery Processing in SAP ERP 3 days
456 SCM611 Configuration inTransportation 3 days
457 SCM615 Billing in SAP ERP 2 days
458 SCM620 Pricing in Sales Order Management 3 days
459 SCM630 Warehouse Management 5 days
460 SCM631 AdditionalTopics in Warehouse Management 2 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
461 SCM650 Cross-Functional Customizing in Sales an 3 days
462 SCM660 Handling Unit Management 2 days
463 SCM663 SAP Event Management (SAP EM) 3 days
464 SCM670 Global Availability Check (gATP) 5 days
465 SCM671 Global Availability Check (gATP) 3 days
466 SCM680 Cross Applications in Business Processes 3 days
467 SCM750 ME - Manufacturing Execution Processes and Fundamentals 5 days
468 SCM920 Production Order Customizing 3 days
469 SEM240 Financial Consolidation (SEM BCS) 5 days
470 SLT100 PDF-Based Print Forms 3 days
471 SLT100 Data Replication with SAP LT Replication Server 3 days
472 SM100 SAP Solution Manager Configuration for Operations 5 days
473 SM200 IT Service Management Configuration 5 days
474 SM300 Business Process and Interface Monitoring 5 days
475 SMI210 Solution Manager Implementation Methodology Overview 1 day
476 SMI310 Implementation projects with SAP Solution Manager 4 days
477 SMP140 SAP Mobile Platform for Mobile Application Architects 3 days
478 SMP521 SAP Mobile Platf. - Native and Hybrid AD 5 days
479 SMP530 SAP Mobile Platform - Native and Hybrid Application Development using OData 2 days
480 SMP620 SAP Mobile Platform - Native and Hybrid 5 days
481 SNC100 Supplier Collaboration with SAP SNC 7.01 3 days
482 SOP200 SAP S&OP - Sales & Operations Planning (on Demand) 5 days
483 SOP300 Sales and Operations Planning (S&OP) powered by HANA - Advanced Workshop 5 days
484 SPM100 Compound Processes and Customizing in SAP Service Parts Planning (SPP) 5 days
485 SPM110 SAP Service Parts Planning Customizing 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
486 SRM210 SRM Server Configuration 5 days
487 SRM215 Supplier Self-Service (SUS) 1 day
488 SRM270 SRM MDM Catalog 4 days
489 SRM300 SAP Sourcing (7.0) 2 days
490 SRM310 SAP Sourcing Configration 3 days
491 SSM310 SBO Strategy Management 7.5 - Introduction 5 days
492 SSM320 SBO Strategy Management 7.5 - Advanced 5 days
493 SSM330 SBO Stra. Mngmnt 7.5 - Integr. with SAP NetWeaver BW 1 day
494 SUP140 Sybase Unwired Platform 2.1 for Application Architects 2 days
495 SUP521 Sybase Unwired Platform (SUP) - Mobile Application Development 5 days
496 SUP530 Sybase Unwired Platform (SUP) and OData Integration 2 days
497 SUP620 Sybase Unwired Platform 2.1 Administrati 4 days
498 SUS300 Product Safety and Stewardship overview 5 days
499 SUS310 SAP EHS Management - Essentials and Functions (EEF) 3 days
500 SUS315 SAP EHS Management - Essentials and Functions Professional (EEF Prof) 2 days
501 SUS320 SAP EHS Management - Industrial Hygiene and Safety (IHS) 2 days
502 SUS325 SAP EHS Management - Industrial Hygiene and Safety Professional (IHS Prof) 1 day
503 SUS330 SAP EHS Management - Occupational Health (OH) 2 days
504 SUS340 SAP EHS Management - Hazardous Substance Management (HSM) 2 days
505 SUS350 SAP EHS Management - WWI Layout (WWI) 2 days
506 SUS360 SAP EHS Management - Product Safety (PS) 2 days
507 SUS365 SAP EHS Management - Product Safety Professional (PS Prof) 1 day
508 SUS370 SAP EHS Management - Global Label Management (GLM) 1 day
509 SUS375 SAP EHS Management - Global Label Management Professional (GLM Prof) 1 day
510 SUS380 SAP EHS Management - Dangerous Goods Management (DG) 3 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
511 SUS385 SAP EHS Management - Dangerous Goods Management Professional (DG Prof) 2 days
512 SUS420 SAP EHS Management - Waste Management (WA) 2 days
513 SUS425 SAP EHS Management - Waste Management Professional (WA Prof) 1 day
514 SUS450 SAP EHS Management - REACH Compliance Processes (RC Proc) 2 days
515 SUS455 SAP EHS Management - REACH Compliance Professional (RC Prof) 1 day
516 SUS460 SAP EHS Management - SubstanceVolumeTracking for REACH 1 day
517 SWPB01 SAP Workforce Performance Builder - Manager 1 day
518 SWPB02 SAP Workforce Performance Builder - Producer 3 days
519 TADM10 SAP NetWeaver AS Implementation and Operation I 10 days
520 TADM12 SAPNWAS- Implementation & OperationWEEK1 10 days
521 TADM51 SAP NETWEAVER AS DB OPERATION (ORACLE) 5 days
522 TADM56 SAP NetWeaver AS DB Operation (DB2 LUW) 5 days
523 TADM70 SAP System: Operating System and Database Migration 3 days
524 TADMD9 Delta Implementation & Operations NW AS 7.31 5 days
525 TAW10 ABAP Workbench Fundamentals 10 days
526 TAW12 ABAP Workbench Concepts 10 days
527 TBI10 BW - Query Design and Analysis 5 days
528 TBI20 BW – Web Application Designer & Data Warehousing Fundamentals 5 days
529 TBI30 Reporting with SAP BusinessObjects BI solutions for SAP NetWeaver BW 5 days
530 TBIT40 SAP NetWeaver Process Integration 5 days
531 TBIT44 PI - Mapping and BPM 5 days
532 TBIT51 PI -Technical Implementation II and Operations 5 days
533 TBW10 BW - Enterprise Data Warehousing 5 days
534 TBW20 BI - Enterprise Reporting & Query Design 5 days
535 TBW30 BI - Modeling & Implementation 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
536 TBW42 BI:Advanced enterprise Data warehousing 10 days
537 TBW45 BI - Integrated Planning 5 days
538 TBW50 BW - Data Acquisition 5 days
539 TBW55 SAP Business Intelligence Solutions & Information DesignTool 5 days
540 TBW60 BW - Operations & Performance 5 days
541 TBW65 SAP BI Solutions and Authorisations 5 days
542 TCRM10 CRM – Fundamentals I 5 days
543 TCRM20 CRM – Fundamentals II 10 days
544 TDMS10 Implementing and Configuring SAPTDMS 3 days
545 TDMS20 Using SAPTDMS for BPL, HCM and Data Scrambling 2 days
546 TE2E10 SAP Solution Manager Operations 10 days
547 TEP10 NW Portal - Impl.And Op.Week1 10 days
548 TEP12 SAP NETWEAVER PORTAL DEVELOPMENT 5 days
549 TERP10 Integrated Business Processes in SAP ERP 10 days
550 TEWM10 SAP EWM 10 days
551 TEWM12 SAP Extended Warehouse Management II (SAP EWM) 5 days
552 TFIN20 Management Accounting (CO) I 10 days
553 TFIN22 Management Accounting II (incl. Case study) 10 days
554 TFIN50 Financial Accounting I 10 days
555 TFIN52 Financial Accounting II (incl Case study) 10 days
556 THR10 SAP Human Capital Management I 10 days
557 THR12 SAP Human Capital Management II 10 days
558 TM100 Processes in SAPTransportation Management 5 days
559 TM100 SAPTransportation Management (SAPTM) - Processes and Overview 3 days
560 TM110 Planning in SAPTransportation Management - processes and customizing 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
561 TM111 Procurement II 2 days
562 TM115 SAPTransportation Management (SAPTM) 2 days
563 TM120 Execution in SAPTransportation Management - processes and customizing 5 days
564 TM200 SAPTransportation Management (SAPTM) 3 days
565 TM211 SAPTransportation Management (SAPTM) - Advanced Planning andVSR Optimizer (Shipper specific) 2 days
566 TM215 SAPTransportation Management (SAPTM) - LSP based planning and execution (LSP specific) 2 days
567 TM300 SAPTransportation Management (SAPTM) - Subcontracting 1 day
568 TM310 SAPTransportation Management (SAPTM) - Freight Order Management 1 day
569 TM320 SAPTransportation Management (SAPTM) - Execution 1 day
570 TM400 SAPTransportation Management (SAPTM) - Charge Calculation and Freight Settlement 3 days
571 TM410 SAPTransportation Management (SAPTM) - Charge Calculation Advanced and Internal Settlement 1 day
572 TM425 SAPTransportation Management (SAPTM)Settlement Advanced 1 day
573 TM430 Strategic Freight Management in SAPTransportation Management 2 days
574 TM730 SAPTransportation Management (SAPTM) 4 days
575 TM900 SAPTransportation Management (SAPTM) - Solution Architecture and Enhancement Concept 2 days
576 TM950 (SAPTM) - Event Management Integration 3 days
577 TPLM20 Project Managment I 10 days
578 TPLM22 Project Managment II (Case Study) 5 days
579 TSCM40 Planning/Manufacturing I 10 days
580 TSCM42 Planning/Manufacturing II 10 days
581 TSCM50 Procurement I 10 days
582 TSCM52 Procurement II 10 days
583 TSCM60 SAP ERP Sales and Distribution I 10 days
584 TSCM62 SAP ERP Sales and Distribution II 10 days
585 TSM10 SAP Solution Manager Implementation 10 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
586 TTM10 SAPTransportation Management I (SAPTM) 10 days
587 TTM12 SAPTransportation Management II (SAPTM) 5 days
588 TZAD74 SAP NetWeaver AS - Delta 7.3x - 7.40 2 days
589 TZASE Database Administration Sybase ASE (for SAP systems) 3 days
590 TZB240 EPT: Shared Processes for Loans and Deposits Management in SAP for Banking 8.0 4 days
591 TZB241 EPT: Loans Management with SAP for Banking 8.0 3 days
592 TZB242 EPT: Deposits Management in SAP for Banking 8.0 4 days
593 TZB250 EPT: Bank Analyzer in SAP for Banking 8.0 1 day
594 TZB251 EPT: Accounting for Financial Instruments in SAP for Banking 8.0 5 days
595 TZB252 EPT: Risk Management in SAP for Banking 8.0 3 days
596 TZB253 EPT: Bank Analyzer Infrastructure in SAP for Banking 8.0 3 days
597 TZBI44 Part1 3 days
598 TZBPC1 EPT : SAP BPC 10.1 – Embedded Model (Del 3 days
599 TZBPM Please open a ticket in SR-KPS-ISM for servers 4 days
600 TZBRF Business Rules Framework 3 days
601 TZCMP1 Commodity Management in EHP6 - Procurement / Sales / GTM 2 days
602 TZCMR1 Commodity Risk Management 2 days
603 TZCPM0 SAP Commercial Project Management - Overview 2 days
604 TZDMEE XML Payment Medium Formats in the DMEE/PMW 1 day
605 TZDSM SAP NetWeaver Decision Service Management 3 days
606 TZERP Tax and Revenue Management 5 days
607 TZGBT SAP Global BatchTraceability 2 days
608 TZIM4I SAP Information Steward 2 days
609 TZIM4M Data Migration with SAP BusinessObjects 2 days
610 TZIPSM Social Service Management 5 days
NextPrevious
Technology
Business&Process
Framework
SoftSkills
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
No Code Description Duration
611 TZLVM SAP NW LandscapeVirtualization Management 2.0 5 days
612 TZMOB3 What's New in SAP Mobile Platform 3.0 3 days
613 TZPAN TZPAN 3 days
614 TZPC10 EPT SAP BO Planning and Consolidation (10.0 DELTA), version for SAP NetWeaver 5 days
615 TZSCM1 Advanced Planning Methods in SNP 2 days
616 TZSCM2 Advanced Planning Methods in PPDS 2 days
617 TZSEPA SEPA CreditTransfer, Direct Debit and Mandates with SAP 2 days
618 TZTM30 SAPTransportation Management (SAPTM) - Solution Architecture and Enhancement Concept 2 days
619 TZTM31 SAPTM -Technical Deep Dive 5 days
620 TZTM35 SAPTransportation Management (SAPTM) - Event Management Integration 3 days
Previous
Business&Process
Framework
SoftSkills
No Description Duration
Data Center Virtualization Infrastructure Learning Paths
1 Solution Courses Learning Path 5 days
2 Security Operations for the Software-Defined Data Center 5 days
3 Data CenterVirtualization Learning Path 5 days
4 SDDC Intensive Workshop [V3.0] 5 days
vSphere 6 Learning Path
5 VMware vSphere: Install, Configure, Manage [V6] 5 days
6 VMware vSphere: FastTrack [V6] 5 days
7 VMware vSphere: Install, Configure, Manage plus Optimize and Scale FastTrack [V6.0] 6.5 days
8 VMware vSphere:What's New [V5.5 toV6] 2 days
The leading virtualization technology provider,VMware courses provide the right platform for
professionals to take the leap into a rewarding IT career ahead.VMware training Courses atVinsys
brings you hands-on experience on variousVMware skills and understandings and equip the students
with thorough understanding of variousVMware concepts, features and functionalities.
VMwareTraining atVinsys will help you gain crucial skills in managing data centres and virtual
environments.
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
Next
Technology
Business&Process
Framework
SoftSkills
No Description Duration
9 VMware vSphere: Skills for Operators [V6] 2 days
10 VMware vSphere: Optimize and Scale [V6] 5 days
11 VMware vSphere: Optimize and Scale [V6] - On Demand 45 days
12 VMware vSphere: Design and Deploy FastTrack [V6] 6.5 days
13 VMware vSphere:Troubleshooting Workshop [V6.0] 5 days
14 VMware vSphere: Optimize and Scale plusTroubleshooting FastTrack [V6.0] 6.5 days
vSphere 5 Learning Path
15 VMware vSphere: Skills for Operators [V5.5] 2 days
16 VMware vSphere: Install, Configure, Manage [V5.5] 5 days
17 VMware vSphere: Install, Configure, Manage [V5.5] On Demand 45 days
18 VMware vSphere: FastTrack [V5.5] 5 days
19 VMware vSphere: Optimize and Scale [V5.5] 5 days
20 VMware vSphere: Design Workshop [V5.5] 3 days
21 VMware vSphere:Troubleshooting Workshop [V5.5] 5 days
vCenter Site Recovery Manager Learning Path
22 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 days
23 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] - On Demand 45 days
Virtual SAN Learning Path
24 VMwareVirtual SAN: Deploy and Manage [V6] 3 days
25 VMwareVirtual SAN: Deploy and Manage [V5.5] 2 days
26 VMwareVirtual SAN: Deploy and Manage [V6.2] - BETA 3 days
27 VMware vRealize Automation: Install, Configure, Manage [V7.0] BETA 5 days
28 VMware vRealize Automation: Install, Configure, Manage [V7.0] 5 days
29 VMware vCloud Networking and Security for vSphere Professionals for FAFIEC [V5.5] 3 days
30 Pivotal Cloud Foundry Immersion 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description Duration
31 VMware vRealize Operations Manager for Operators [V6.0] 2 days
32 VMware vSphere: Optimize and Scale plusTroubleshooting FastTrack [V6.0] 5 days
33 VMware vSphere: Install, Configure, Manage plus Optimize and Scale FastTrack [V6.0] 5 days
34 Spring Cloud Services 2 days
35 Horizon Application Management Bundle 1 day
36 Pivotal HD Operations 4 days
37 VMware Site Recovery Manager: Install, Configure, Manage [V6.1] 2 days
38 VMware vSphere:Troubleshooting Workshop [V6.0] 5 days
39 AirWatch Enterprise Mobility: Bootcamp 4 days
40 AirWatch Enterprise Mobility: Install and Deploy On-Premise Solutions 1 day
41 AirWatch Enterprise Mobility: Configure and Manage 2 days
42 AirWatch Enterprise Mobility: K12 Education 2 days
43 Horizon (withView): Install, Configure, Manage [V6.2] 2 days
44 VMware vSphere: Skills for Operators [V6] 2 days
45 Horizon: Design and Deploy [V6] 4 days
46 Security Operations for the Software-Defined Data Center 5 days
47 RS2_QUO800_Standard Budgetary Quoting 1 day
48 RS2_SPQ100_Special Pricing 1 day
49 RS2_QUO950_Quote Corrections 1 day
50 VMware NSX: Install, Configure, Manage [V6.2] 5 days
51 VMwareVirtual SAN: Deploy and Manage [V6] 3 days
52 VMware vSphere: Design and Deploy FastTrack [V6] 5 days
53 VMware vSphere: FastTrack [V6] 5 days
54 Pivotal Cloud Foundry Architecture 2 days
55 Pivotal Cloud Foundry Immersion 4 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description Duration
56 RS2_IDV130_Ad Hoc Opp Loads_v2 4 Hours
57 RS2_QUO700_Quote Consolidations 3 Hours
58 RS2_SFD100_SFDC Solutions 1 hours
59 RS2_QUO400_Quote Load Process_v2 1.5 Hours
60 RS2_IBA100_Install Base Admin Portal 2 hours
61 RS2_QUO600_Bundle Quoting 3 Hours
62 RS2_QUO200_EBS Standard Quote Creation_v2 16 hours
63 RS2_QUO500_Case and Queue Management_v2 3 Hours
64 RS2_TLS100_VMware Admin Portal Overview and Navigation_v2 1 hours
65 VMware Cloud Automation: Design and Deploy FastTrack [V6.0] 5 days
66 Custom PivotalTraining Immersion 5 days
67 Custom PivotalTraining Immersion 4 days
68 Custom PivotalTraining Immersion 3 days
69 Pivotal PartnerTraining Immersion 5 days
70 Pivotal PartnerTraining Immersion 4 days
71 Pivotal PartnerTraining Immersion 3 days
72 Pivotal PartnerTraining Immersion 2 days
73 VMware vSphere: Bootcamp [V6] 5 days
74 RS2_QUO400_Quote Partner Access Reinforcement Session 1 days
75 Spring XD 3 days
76 VMware NSX for Internetworking Experts FastTrack [V6.1] 5 days
77 Pivotal HDB Architecture and Implementation (formerly known as HAWQ Architecture and Implementation) 4 days
78 VMware NSX: Install, Configure, Manage [V6.1] 5 days
79 Enterprise Spring 4 days
80 RabbitMQ Install, Configure, Manage 2 days
81 Developing Applications with Cloud Foundry 3 days
82 VMware NSX: Design and Deploy [V6.1] 4 days
83 VMware NSX:Troubleshooting and Operations [V6.1] 4 days
84 VMware vRealize Automation: Install, Configure, Manage [V6.2] 5 days
85 VMware vSphere: Optimize and Scale [V6] 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description Duration
86 VMware vSphere: Install, Configure, Manage [V6] 5 days
87 VMware vSphere:What's New [V5.5 toV6] 2 days
88 RS2_PRE400_Renewals Lifecycle Overview 1.5 Hours
89 RS2_PRE300_GCO Overview 1 hours
90 VMware Mirage [V5.0] and Horizon withView [V6.0]: FastTrack 5 days
91 VMware vRealize Business: Costing and Implementation 4 days
92 Redis Install, Configure, Manage 2 days
93 JPA with Spring 3 days
94 GemFire Administration 3 days
95 VMware vSphere: Design Workshop [V5.5] 3 days
96 SDDC Intensive Workshop [V3.0] 5 days
97 VMware NSX for Internetworking Experts FastTrack [V6.0] 5 days
98 VMware vRealize Operations Manager: Install, Configure, Manage [V6.0] 5 days
99 VMware Mirage: Install, Configure, Manage [V5.0] 3 days
100 Getting Started with vSphere Web Client Solution Programming 5 days
101 VMware Fundamentals for Developers 3.5 days
102 Data Science in Practice 5 days
103 Processing Big Data with Pivotal HD 4 days
104 RabbitMQ 3 days
105 Core Spring 4.0 4 days
106 Pivotal HD Administration 3 days
107 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 days
108 VMware Cloud Orchestration and Extensibility [V6.1] 5 days
109 Horizon (withView): Install, Configure, Manage [V6.0] 4 days
110 VMware NSX: Install, Configure, Manage [V6.0] 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description Duration
111 VMware vCenter Configuration Manager: Install, Configure, Manage [V5.7] 3 days
112 VMware vSphere: FastTrack [V5.5] 5 days
113 VMware vSphere:Troubleshooting Workshop [V5.5] 5 days
114 VMware vSphere: Skills for Operators [V5.5] 2 days
115 VMwareVirtual SAN: Deploy and Manage [V5.5] 2 days
116 VMware vCloud Automation Center: Install, Configure, Manage [V6.0] 5 days
117 What's New in Spring [V4.0] 3 days
118 ApplicationVirtualization withVMwareThinApp [V5.0] 1 day
119 VMware vCloud Director: Organization Administration [V5.5] 2 days
120 VMware vCloud Director: Install, Configure, Manage [V5.5] 3 days
121 VMware vCloud Networking and Security for vSphere Professionals [V5.5] 3 days
122 VMware vSphere: Optimize and Scale [V5.5] 5 days
123 VMware vSphere:What's New [V4.x toV5.5] 2 days
124 VMware vSphere: Install, Configure, Manage [V5.5] 5 days
125 VMware vSphere: Install, Configure, Manage for SAP Administration [V5.1] 5 days
126 VMware vSphere with Operations Management: FastTrack [V5.1] 5 days
127 VMware Horizon Mirage: Install, Configure, Manage [V4.0] 2 days
128 VMware vSphere: Overview [V5.1] 1 day
129 VMware vCenter Operations Manager:Advanced Usage and Dashboard Design [V5.x] 3 days
130 Groovy and Grails [V2.0] 4 days
131 VMware vSphere: Skills for Operators [V5.1] 2 days
132 VMware vCenter Orchestrator: Develop Workflows [V5.1] 3 days
133 VMware vSphere: Install, Configure, Manage [V5.1] 5 days
134 Spring Web 4 days
135 VMware vCenter Configuration Manager forVirtual Infrastructure and OS Management [V5.x] 5 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
Amazon
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description Duration
136 VMware vCenter Configuration Manager for Operating Systems Management [V5.x] 2 days
137 VMware vCenter Configuration Manager forVirtual Infrastructure Management [V5.x] 3 days
138 VMwareView: Design Best Practices [V5.x] 3 days
139 VMware vCenter Operations Manager:Analyze and Predict [V5.x] 2 days
140 VMware vCloud: Design Best Practices [V1.5] 3 days
141 GemFire Developer 4 days
142 VMware vSphere: Design Workshop [V5.x] 3 days
143 Tomcat Administration 4 days
144 Hibernate with SpringTraining 3 days
145 VMware vSphere: Certified Professional Exam Preparation Workshop [V1.0] 1 day
146 Rich Web Applications with Spring 4 days
147 Enterprise Integration with Spring 4 days
148 Core Spring 4 days
149 VMware Capacity Planner 2.7 5 hours
150 VMware NSX: Install, Configure, Manage [V6.2] - Lab Connect 30 days
151 VMware NSX: Install, Configure, Manage [V6.2] - SMB On Demand 20 days
152 VMware vCloud Director: Install, Configure and Manage[V5.1] 3 days
CompTIA
IBM
IT Security
Microsoft
Mobile
Oracle
RedHat
Salesforce
SAP
VMWare
ECCouncil
Cloudera
CISCO
Citrix
AmazonTechnology Previous
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Business&Process
Framework
SoftSkills
No Description
Business Management & Improvement
1 APMP - Bid & Proposal Management
2 AQRO®
3 BRMP® - Business Relationship Management Professional
4 Certified ProfessionalTechnical Communicator
5 Facilitation
6 Finance for Non-Financial Managers
7 IACCM Contract and Commercial Management
8 Lean Six Sigma
9 OBASHI® - Business and IT Management
APMG-International is an award-winning  Examination Institute. APMG accredits professional training and
consulting organisations and manages certification schemes for knowledge-based workers, and has a global
reach, with  regional offices located around the world. Our wide portfolio of certifications includes the
internationally recognised Best Management Practice schemes and a range of IT and general management
certifications based on international standards and best practices.
Next
Technology
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Business&Process
Framework
SoftSkills
No Description
10 Sourcing Governance
11 The PS Professional®
IT Governance & Service Management
12 ASL® - Application Services Library
13 BiSL® - Business information Services Library
14 Change Analyst
15 CIF - Cloud Industry Forum Code of Practice
16 CMDB - Configuration Mgmt Database
17 COBIT® 5
18 IAITAM® - IT Asset Management
19 ISO/IEC 20000
20 ITIL® - InformationTechnology Infrastructure Library
21 Lean IT
22 Problem Analyst
23 SDI® - Service Desk Institute
24 Service Catalogue
25 Service Level Analyst
Change, Risk & Benefits Management
26 Change Management
2 CHAMPS2® - Change Management in the Public Sector
28 Managing Benefits™
29 M_o_R® - Management of Risk
Cyber Security & Resilience
31 CCP - CESG Certified Professional
32 GCT - GCHQ CertifiedTraining
NextPrevious
Technology
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Business&Process
Framework
SoftSkills
No Description
33 CDCAT® - Cyber Defence Capability AssessmentTool
34 Cloud Computing
Cyber Essentials
35 ISO/IEC 27001
36 RESILIA™
Project, Programme & Portfolio Management
37 AgileBA - Agile Business Analysis
38 AgilePgM - Agile Programme Management
39 AgilePM - Agile Project Management
40 Better Business Cases™
41 EarnedValue Management
42 MoP® - Management of Portfolios
43 MoV® - Management ofValue
44 MSP® - Managing Successful Programmes
45 P3O® - Project & Programme Support Offices
46 PM4SD™ - Project Mgmt & Sustainable Development
47 PMD Pro - Project Mgmt for NGOs
48 Project Planning & Control™
49 PPM Certificate & Diploma
50 PPS - Programme & Project Sponsorship
51 PRINCE2® - Projects IN Controlled Environments
52 PRINCE2 Agile™
53 Stakeholder Engagement
Technology Previous
Business&Process
Framework
SoftSkills
No Description Duration
1 ITIL Foundation Level 3 days
2 ITIL Practitioner Level 3 days
3 ITIL Intermediate Level 4 days
4 ITIL Expert Level 5 days
5 ITIL Master Level 5 days
6 Prince 2 5 days
7 PRINCE2 Agile® Qualification 5 days
AXELOS’ Best Practice Solutions are designed to help your organisation become more effective across a range
of key business capabilities including project, programme and IT service management. Our internationally
recognised best practice methods include ITIL®, PRINCE2®, and MSP® as well as guidance on cyber resilience,
risk, value and portfolio management.
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
Business&Process
Framework
SoftSkills
No Description
1 Green IT Citizen
2 Green IT Foundation
3 EXIN Business Information Management Foundation with reference to BISL
4 Lean IT Foundation
5 Lean IT Kaizen
6 Ethical Hacking Foundation
7 EXIN Foundation Certificate in OpenStack Software
8 EXIN Specialist Certificate in OpenStack Software Neutron
9 EXIN Secure Programming Foundation
10 EXIN Application Management with reference to ASL
To support continuous growth, EXIN offers internationally recognized certification programs that
cover all ICT competence areas. These competence areas are derived from the internationally
recognized e-Competence Framework
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
Next
Business&Process
Framework
SoftSkills
No Description
11 TMap NEXT®Test Engineer
12 TMap® SuiteTest Engineer
13 TMap NEXT®Test Manager
14 TPI NEXT® Foundation
15 EXIN ITSM FoundationITSM20F
16 EXIN ITSM Foundation BridgeITSM20FB
17 EXIN ITSM AssociateITSM20AS
18 EXIN ITSM Associate BridgeITSM20ASB
19 EXIN ITSM AuditorITSM20AU
20 EXIN ITSM SpecialistITSM20SP
21 EXIN ITSM Internal AuditorITSM20IA
22 EXIN ITSM Consultant/ManagerITSM20CM
23 EXIN ITSM ExpertITSM20EXP
24 EXIN ITSM MasterITSM20MA
25 ITIL ® Foundation Certificate in IT Service ManagementITILF
26 ITIL® PractitionerITILP
27 ITIL® Continual Service Improvement CertificateITILCSI
28 ITIL® Managing Across the Lifecycle CertificateITILMLC
29 ITIL® Operational Support and Analysis CertificateITILOSA
30 ITIL® Planning, Protection and Optimization CertificateITILPPO
31 ITIL® Release, Control andValidation CertificateITILRCV
32 ITIL® Service Design CertificateITILSD
33 ITIL® Service Operation CertificateITILSO
34 ITIL® Service Offerings and Agreements CertificateITILSOA
35 ITIL® Service Strategy CertificateITILSS
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description
36 ITIL® ServiceTransition CertificateITILST
37 ITIL® Master QualificationITILMA
38 Microsoft Operations Framework Foundation
39 Certified Data Centre ProfessionalCDCP
40 Certified InformationTechnology ManagerCITM
41 Certified Data Centre Risk ProfessionalCDRP
42 Certified Data Centre Migration SpecialistCDMS
43 Certified Data Centre SpecialistCDCS
44 Certified Data Centre Facilities Operations ManagerCDFOM
45 CertifiedTIA-942 Internal AuditorCTIA
46 CertifiedTIA-942 Design ConsultantCTDC
47 Certified InformationTechnology SpecialistCITS
48 Certified Data Centre ExpertCDCEMC
49 EXIN Cloud Computing Foundation
50 EXIN CloudTechnologies Advanced
51 EXIN Agile Scrum FoundationASF
52 EXIN Agile Scrum MasterASM
53 Information Security Foundation (based on ISO/IEC 27002)ISFS
54 Information Security Management Advanced based on ISO/IEC 27002:2013ISMAS
55 Information Security Management Expert based on ISO/IEC 27002:2013ISMES
56 EXIN ITAMOrg IT Asset Management Foundation
57 EXIN Business Continuity Management FoundationBCMF
58 RESILIA™ FoundationRESF
59 RESILIA™ PractitionerRESP
60 PRINCE2® Foundation Certificate in Project ManagementPR2F
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
Business&Process
Framework
SoftSkills
No Description
61 PRINCE2® Practitioner CertificatePR2P
62 PRINCE2 Agile™ PractitionerPR2A
63 PRINCE2® Practitioner Re-Registration CertificatePR2P_re
64 P3O® Foundation Certificate in Portfolio, Programme and Project OfficesP3OF
65 P3O® Practitioner Certificate in Portfolio, Programme and Project OfficesP3OP
66 MoV® Foundation Certificate inValue ManagementMOVF
67 MoV® Practitioner Certificate inValue ManagementMOVP
68 M_o_R® Foundation Certificate in Risk ManagementMORF
69 M_o_R® Practitioner Certificate in Risk ManagementMORP
70 M_o_R® Practitioner Re-Registration CertificateMORP_re
71 MoP® Foundation Certificate in Portfolio ManagementMOPF
72 MoP® Practitioner Certificate in Portfolio ManagementMOPP
73 MSP® Foundation Certificate in Programme ManagementMSPF
74 MSP® Practitioner Certificate in Programme ManagementMSPP
75 MSP® Practitioner Re-Registration CertificateMSPP_re
76 MSP® Advanced Practitioner Certificate in Programme ManagementMSPAP
77 MSP® Advanced Practitioner Re-Registration CertificateMSPAP_re
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology Previous
Business&Process
Framework
SoftSkills
No Description Duration
1 Certified Information Systems Auditor (CISA)  3 days
2 Certified Information Security Manager (CISM) 3 days
3 Certified in the Governance of Enterprise IT (CGEIT) 3 days
4 Certified in Risk and Information Systems Control (CRISC) 3 days
5 COBIT 5 Foundation 3 days
6 COBIT 5 Implementation 3 days
7 COBIT 5 Assessor Course 3 days
8 Implementing NIST Cybersecurity Framework Using COBIT 5NEW! 2 days
9 COBIT 5 Assessor for Security NEW! 3 days
ISACA provides practical guidance, benchmarks and other effective tools for all enterprises that use information
systems. Through its comprehensive guidance and services, ISACA defines the roles of information systems
governance, security, audit and assurance professionals worldwide.The COBIT framework and the CISA, CISM,
CGEIT and CRISC certifications are ISACA brands respected and used by these professionals for the benefit of
their enterprises.
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
Business&Process
Framework
SoftSkills
No Description Duration
ISO 9001
1 ISO 9001 Introduction 1 day
2 ISO 9001 Foundation 2 days
3 ISO 9001 Lead Implementer 5 days
4 ISO 9001 Lead Auditor 5 days
5 ISO 9001:2015Transition Course 2 days
ISO 13053
6 ISO 13053 Introduction 1 day
7 ISO 13053 Foundation 2 days
8 ISO 13053 Lead Implementer 5 days
PECB is a certification body for persons, management systems, and products on a wide range of international
standards.Vinsys being a global provider of training, examination, audit, and certification services, partnering with
PECB offers its expertise on multiple fields, including but not limited to Information Security, IT, Business
Continuity, Service Management, Quality Management Systems, Risk & Management, Health, Safety, and
Environment. 



We help professionals and organisations to show commitment and competence with internationally recognised
standards by providing this assurance through the education, evaluation and certification against rigorous,
internationally recognised competence requirements. Our mission is to provide our clients comprehensive
services that inspire trust, continual improvement, demonstrate recognition, and benefit society as a whole.
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Next
Technology
Business&Process
Framework
SoftSkills
No Description Duration
9 ISO 13053 Lead Auditor 5 days
ISO 30301
10 ISO 30301 Introduction 1 day
11 ISO 30301 Foundation 2 days
12 ISO 30301 Lead Implementer 5 days
13 ISO 30301 Lead Auditor 5 days
ISO 13485
14 ISO 13485 Introduction 1 day
15 ISO 13485 Foundation 2 days
16 ISO 13485 Lead Implementer 5 days
17 ISO 13485 Lead Audtior 5 days
ISO/IEC 17025
18 ISO/IEC 17025 Introduction 1 day
19 ISO/IEC 17025 Foundation 2 days
20 ISO/IEC 17025 Lead Implementer 5 days
21 ISO/IEC 17025 Lead Assessor 5 days
ISO/TS 29001
22 ISO 29001 Introduction 1 day
23 ISO 29001 Foundation 2 days
24 ISO 29001 Lead Implementer 5 days
25 ISO 29001 Lead Auditor 5 days
ISO 39001
26 ISO 39001 Introduction 1 day
27 ISO 39001 Foundation 2 days
28 ISO 39001 Lead Implementer 5 days
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
Business&Process
Framework
SoftSkills APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
No Description Duration
29 ISO 39001 Lead Auditor 5 days
ISO 50001
30 ISO 50001 Introduction 1 day
31 ISO 50001 Foundation 2 days
32 ISO 50001 Lead Implementer 5 days
33 ISO 50001 Lead Auditor 5 days
ISO/TS 16949
34 ISO/TS 16949 Introduction 1 day
35 ISO/TS 16949 Foundation 2 days
36 ISO/TS 16949 Lead Implementer 5 days
37 ISO/TS 16949 Lead Auditor 5 days
HEALTH, SAFETY AND ENVIRONMENT
ISO 14001
38 ISO 14001 Introduction 1 day
39 ISO 14001 Foundation 2 days
40 ISO 14001 Lead Implementer 5 days
41 ISO 14001 Lead Auditor 5 days
42 ISO 14001:2015Transition Exam 2 days
ISO 22000
43 ISO 22000 Introduction 1 day
44 ISO 22000 Foundation 2 days
45 ISO 22000 Lead Implementer 5 days
46 ISO 22000 Lead Auditor 5 days
OHSAS 18001
47 OHSAS 18001 Introduction 1 day
Business&Process
Framework
SoftSkills APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
No Description Duration
48 OHSAS 18001 Foundation 2 days
49 OHSAS 18001 Lead Implementer 5 days
50 OHSAS 18001 Lead Auditor 5 days
ISO 26000
51 ISO 26000 Introduction 1 day
52 ISO 26000 Foundation 2 days
53 ISO 26000 Lead Implementer 5 days
54 ISO 26000 Lead Auditor 5 days
ISO 20121
55 ISO 26000 Introduction 1 day
56 ISO 26000 Foundation 2 days
57 ISO 26000 Lead Implementer 5 days
58 ISO 26000 Lead Auditor 5 days
INFORMATION TECHNOLOGY AND SERVICE MANAGEMENT
ISO/IEC 20000
59 ISO/IEC 20000 Introduction 1 day
60 ISO/IEC 20000 Foundation 2 days
61 ISO/IEC 20000 Lead Implementer 5 days
62 ISO/IEC 20000 Lead Auditor 5 days
ISO 22301
63 ISO 22301 Introduction 1 day
64 Certified ISO 22301 Foundation 2 days
65 ISO 22301 Lead Implementer 5 days
66 ISO 22301 Lead Auditor 5 days
Business&Process
Framework
SoftSkills APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
No Description Duration
ISO 28000
67 ISO 28000 Introduction 1 day
68 ISO 28000 Foundation 2 days
69 ISO 28000 Lead Implementer 5 days
70 ISO 28000 Lead Auditor 5 days
Disaster Recovery
71 Disaster Recovery Introduction
72 Disaster Recovery Foundation
73 Disaster Recovery Manager
74 Disaster Recovery Lead Manager
Outsourcing
75 Certified Outsourcing Manager Course 3 days
Security Courses
ISO/IEC 27001
76 ISO/IEC 27001 Introduction 1 day
77 ISO/IEC 27001 Foundation 2 days
78 ISO/IEC 27001 Lead Implementer 5 days
79 ISO/IEC 27001 Lead Auditor 5 days
ISO/IEC 27002
80 ISO/IEC 27002 Introduction 1 day
81 ISO/IEC 27002 Foundation 2 days
82 ISO/IEC 27002 Manager 5 days
83 ISO/IEC 27002 Lead Manager 5 days
ISO/IEC 27005
84 ISO/IEC 27005 Introduction 1 day
85 ISO/IEC 27005 Foundation 2 days
Business&Process
Framework
SoftSkills APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
NextPrevious
Technology
No Description Duration
86 ISO/IEC 27005 Risk Manager 3 days
ISO/IEC 27034
87 ISO/IEC 27034 Introduction 1 day
88 ISO/IEC 27034 Foundation 2 days
89 ISO/IEC 27034 Lead Implementer 5 days
90 ISO/IEC 27034 Lead Auditor 5 days
Privacy Implementer
91 Lead Privacy Implementer 5 days
ISO/IEC 27035
92 ISO/IEC 27005 Introduction 1 day
93 ISO/IEC 27035 Foundation 2 days
94 ISO/IEC 27035 Incident Manager 5 days
95 ISO/IEC 27035 Lead Incident Manager 5 days
Computer Forensics
96 Computer Forensics Introduction 1 day
97 Computer Forensics Foundation 2 days
98 Computer Lead Forensics Examiner 5 days
SCADA
99 Lead SCADA Security Professional 5 days
Pen Testing
100 Lead PenTest Professional 5 days
Risk Assessment Methods
101 OCTAVE 3 days
102 EBIOS 3 days
103 MEHARI 3 days
Business&Process
Framework
SoftSkills APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
No Description Duration
ISO/IEC 27032
104 ISO/IEC 27032 Lead Cybersecurity Manager 5 days
Previous
Business&Process
Framework
SoftSkills
No Description Duration
1 Project Management Professional (PMP®) Certification Prep 5 days
2 PMI-CAPM Certification Prep 4 days
3 Program Management Professional 4 days
4 Portfolio Management Professional 4 days
5 Certified Associate in Project Management 4 days
6 PMI Professional in Business Analysis 4 days
7 PMI Agile Certified Practitioner 4 days
8 PMI Risk Management Professional 4 days
9 PMI Scheduling Professional 4 days
Project Management Institute is the world's leading not-for-profit professional membership association for the
project, program and portfolio management profession. PMI advances careers, improves organizational success
and further matures the profession of project management through its globally recognized standards,
certifications, resources, tools, academic research, publications, professional development courses, and networking
opportunities.
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
Business&Process
Framework
SoftSkills
No Description Duration
1 APMG International Agile PM Foundation 3 days
2 APMG International Agile PM Foundation & Practitioner 4 days
3 Agile Expert Certified (AEC) 3 days
4 TOGAF 9.1 Foundation & Practitioner (Level 1 & Level 2 ) 4 days
5 TOGAF 9.1 Practitioner ( Level 2) (The Open Group Architecture Framework) 3 days
6 TOGAF 9.1 Foundation ( Level 1 ) (The Open Group Architecture Framework) 3 days
TOGAF®  - the Enterprise Architecture standard used by the world’s leading
organisations to improve business efficiency
TOGAF® is the de facto global standard for Enterprise Architecture. The Open Group Architecture Forum,
comprised of more than 200 enterprises, develops and maintains the TOGAF standard and publishes successive
versions at regular intervals.
TheTOGAF framework enables organisations to effectively address critical business needs by:
• Ensuring that everyone speaks the same language
• Avoiding lock-in to proprietary solutions by standardising on open methods for Enterprise Architecture
• Saving time and money, and utilise resources more effectively
• Achieving demonstrable ROI
 
Learn TOGAF @ Vinsys
APMG
AXELOS
EXIN
ISACA
PECB
PMI
TOGAF
Technology
Flagship
Programmes
Operational
Excellence
Business
Communication
Customer
Service
Emotional
Intelligence &
NLP
Environmental
Sustainability
Finance &
Banking
HR &Training
Leadership &
Management
Professional Self
Development
Strategy and
planning
Team Building
No Description Duration
Our Flagship Programmes
1 The Hero's Way 2 days
2 Magical Presentors 2 days
3 Organization CultureTransformation 3 days
4 Ad-HOC Sales Sense 3 days
5 Work Life Balance 3 days
6 Emotional Intelligence 4 days
Operational Excellence
7 Project Fundamentals For Operation/Admin Managers 2 days
8 Effective Meeting Management 2 days
9 How to manageYour Manager 2 days
Business&Process
Framework
SoftSkills Softskills
Next
Technology
Behavioural & Management Solutions (BMS) is a prominent vertical atVinsys.We cater to, Human
ResourceTraining, Coaching, Organizational Development and Business Consulting affiliating with
the best brands globally. BMS has been a catalyst and a contributor in the quest for people
development and business excellence. It was established to fulfil corporate needs for constant
augmentation of skills, competencies and processes. BMS, is thus an end to end strategic partner for
people excellence.
The essential differentiator of BMS is continual innovation, exceptional customization, well-crafted course
content and use of the state of the art technology tools. BMS adheres to the World Class Companies
competency framework and processes is developed, delivered and implemented through ethical and
experienced operations, a highly principled and passionate research team, project management team and
experienced facilitators. BMS, thus has the capability to accomplish projects as anticipated across the industries.
Business&Process
Framework
SoftSkills Softskills
No Description Duration
Business Communication
10 Effective Business Writing 2 days
11 Minutes taking Skills 2 days
12 Beyond Negotiation 2 days
13 Public Speaking 2 days
14 Art Of Effective Comunication 2 days
Customer Service
15 CRM Fundamentals 2 days
16 Customer Service Excellenmce 2 days
17 Defusing CustomerTemper 2 days
Emotional Intellegence & NLP
18 Achieving Business Success 2 days
19 EI 2 days
20 The Power of PositiveThinking 2 days
Environmental Sustainability
21 Green Culture 2 days
22 Going Green 2 days
Finance & Banking
23 Finance For Non-Finance 2 days
24 Finance For Managers 2 days
25 Budgeting Basics 2 days
26 Accounting Basice 2 days
27 Anti-Money Laundering andTerrorism 2 days
NextPrevious
Flagship
Programmes
Operational
Excellence
Business
Communication
Customer
Service
Emotional
Intelligence &
NLP
Environmental
Sustainability
Finance &
Banking
HR &Training
Leadership &
Management
Professional Self
Development
Strategy and
planning
Team Building
Technology
Business&Process
Framework
SoftSkills Softskills
No Description Duration
HR & Training
28 Compentency Based Interviewing Skills 3 days
29 Creating Effective Policies and Procedures 3 days
30 Career Planning and talent Management 2 days
31 HR for Non HR Managers 3 days
32 TTT 5 days
Leadership & Management
33 High Impact team Building 4 days
34 Effective mentoring Skills 3 days
35 Empowering Women leadership 3 days
36 Managing Great Events 4 days
37 Handling Harrasements at Work 2 days
38 leading through Coaching 4 days
Professional Self Development
39 CreativeThinking 2 days
40 Problem Solving 3 days
41 Decesion making 2 days
42 Business Etiquettes 3 days
43 Art Of Conflict management 2 days
44 Stress andTime Management 3 days
Strategy and planning
45 StrategicThinking and Planning 2 days
46 Setting Goals and Objectives 2 days
47 Balanced Scorecards 2 days
48 Plan Like a Chef 2 days
NextPrevious
Flagship
Programmes
Operational
Excellence
Business
Communication
Customer
Service
Emotional
Intelligence &
NLP
Environmental
Sustainability
Finance &
Banking
HR &Training
Leadership &
Management
Professional Self
Development
Strategy and
planning
Team Building
Technology
Business&Process
Framework
SoftSkills Softskills
No Description Duration
Team Building
49 The Effective team Player 2 days
50 High Impact team Building 3 days
51 A day Out onThrills--A Strategy Challenge for managers 3 days
52 Plan Like a Chef 2 days
Flagship
Programmes
Operational
Excellence
Business
Communication
Customer
Service
Emotional
Intelligence &
NLP
Environmental
Sustainability
Finance &
Banking
HR &Training
Leadership &
Management
Professional Self
Development
Strategy and
planning
Team Building
Technology Previous
enquiry@vinsys.comwww.vinsys.com

Vinsys brochure

  • 1.
  • 2.
    ABOUT US Vinsys, anISO 9001:2008 certified organisation, is a Global Training and Consulting Organisation delivering its services to enterprise worldwide with a team of 450+ highly accomplished professionals through robust practises. Over the years, the company has established itself as a reliable partner for many organisations in more than 30 countries. Our experience and expertise lies in executing training and consulting in the area of Software, Technology, Behavioural and Management solutions, Project Management, IT Service Management, IT Governance and Enterprise Architecture for major corporates. www.vinsys.com
  • 3.
    KEY DIFFERENTIATORS • Expertiseand Experience of training more than 1,400,000 professionals from different industries and on various domains. • Flexible in terms of schedule and resource availability. • Your one stop training solution for all your training needs. • 25+ office locations across the globe. • 450+ in house highly skilled SME's for training delivery and consultancy. • An environment that leads to experiential and fun learning. • Preferred training partner for all major establishments with proven customer track record. • Excellent track record of consistent quality in delivery. • Training more than 100,000 professionals per annum across domains from various industries. • Business oriented value driven approach for designing and delivering trainings. • We have thrived in attaining impeccable quality standards designed by global leaders. • Facility renting with more than 160+ state of the art training rooms with latest configuration.
  • 4.
    Technology Business&Process Framework SoftSkills No Description Duration 1AWSTechnical Essentials 5 days 2 AWS Business Essentials 5 days 3 Big Data on AWS 5 days 4 Systems Operations on AWS 5 days 5 DevOps Engineering on AWS 5 days 6 Developing on AWS 5 days 7 Architecting on AWS 5 days 8 Advanced Architecting on AWS 5 days 9 Java on AWS 3 days 10 JavaScript on AWS 3 days Amazon Web Services (AWS) is a secure cloud services platform, offering compute power, database storage, content delivery and other functionality to help businesses scale and grow. Explore how millions of customers are currently leveraging AWS cloud products and solutions to build sophisticated applications with increased flexibility, scalability and reliability. Learn @ Vinsys to lead the Cloud generation. Cloudera CISCO Citrix Amazon CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Next
  • 5.
    Business&Process Framework SoftSkills No Description Duration 11Mobile on AWS 3 days 12 PHP on AWS 3 days 13 Python on AWS 3 days 14 Ruby on AWS 3 days 15 Windows & .NET on AWS 3 days 16 Big DataTechnology Fundamentals 2 days 17 Security Operations on AWS 2 days 18 AWS Certification Exam Readiness Workshop:AWS Certified Solutions Architect - Associate 5 days 19 AWS Certification Exam Readiness Workshop:AWS Certified Solutions Architect - Professional 5 days Cloudera CISCO Citrix Amazon CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Technology Previous
  • 6.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 CSE Cisco Sales Essentials 2 days 2 DCUFI Implementing Cisco Data Center Unified Fabric 5.0 5 days 3 DCUCT Troubleshooting Cisco Data Center Unified Computing 3 days 4 DCUFT Troubleshooting Cisco Data Center Unified Fabric 3 days 5 DCASD Designing Cisco Data Center Application Services 5 days 6 DCASI Implementing Cisco Data Center Application Services 5 days 7 DCNI-1 Implementing Cisco Data Center Network Infrastracture 1 5 days 8 DCUCS Configuring Data Center Unified Computing 2.0 4 days 9 DESGN Designing for Cisco Internetwork Solutions 5 days 10 ARCH Designing Cisco Network Service Architectures 5 days Vinsys enhances its certified Cisco training courses with hands-on exercises and labs designed by professionals with real-world Cisco networking experience.Training courses for the new CCNA Data Center and CCNP Data Center certifications are available inVinsys classrooms worldwide or via private on-site delivery. Cisco Certified Courses are the best bet if you are aiming for a high flying career in network management. From entry level credentials for beginners in the industry (CCENT, CCNA) to advanced recognition for experts (CCIE), Cisco training is for anyone looking for better opportunities in their careers. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 7.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 11 DMS Digital Media Systems 3 days 12 CPLMS Implementing Cisco Prime LMS 5 days 13 ICND1 Interconnecting Cisco Networking Devices Part 1 5 days 14 ICND2 Interconnecting Cisco Networking Devices Part 2 5 days 15 ROUTE Implementing Cisco IP Routing 5 days 16 SWITCH Implementing Cisco Switched Networks 5 days 17 TSHOOT Troubleshooting and Maintaining Cisco IP Networks 5 days 18 IINS Implementing Cisco IOS Network Security 5 days 19 SIMOS Implementing Cisco Secure Mobility Solutions 5 days 20 SENSS Implementing Cisco Edge Network Security Solutions 5 days 21 SITCS Implementing CiscoThreat Control Solutions 5 days 22 SASAA Implementing Advanced Cisco ASA Security 5 days 23 SASAC Implementing Core Cisco ASA Security 5 days 24 SISAS Implementing Cisco Secure Access Solutions 5 days 25 SECURE Securing Networks with Cisco Routers and Switches 5 days 26 BGP Configuring BGP on Cisco Routers 5 days 27 MPLS Implementing Cisco MPLS 5 days 28 QoS Implementing Cisco QoS 5 days 29 UCCXA Covering advanced techniques in scripting and overall CRS Functionality 4 days 30 ICOMM Introducing CiscoVoice and Unified Communications Administration 5 days 31 CVOICE Implementing CiscoVoice Communications & QOS 5 days 32 CIPT1 Implementing Cisco Unified Communications Manager Part 1 5 days 33 CIPT2 Implementing Cisco Unified Communications Manager Part 2 5 days 34 CAPPS Integrating Cisco Unified Communications Applications 5 days 35 TVOICE Troubleshooting Cisco Unified Communications 5 days NextPrevious Technology
  • 8.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 36 ACUCM Administering Cisco Unified Communications Manager 3 days 37 CVPI Cisco Unified CustomerVoice Portal Implementation 8.0 5 days 38 IUM Implementing Cisco Unified Messaging 5 days 39 UCAD Cisco Unified Communications Architecture and Design 5 days 40 IAUWS Implementing Advanced Cisco Unified Wireless Security 5 days 41 IUWMS Implementing Cisco Unified Wireless Mobility Services 5 days 42 IUWVN Implementing Cisco Unified WirelessVoice Networks 5 days Technology Previous
  • 9.
    Business&Process Framework SoftSkills No Code DescriptionDuration Citrix CCA Certification &Training Courses 1 CXA-206-2 Implementing Citrix XenApp 6.5 Administration 5 days 2 CXD-202 Citrix XenDesktop 5 Administration 5 days Citrix CCAA Certification &Training Courses 3 CXA-206 Citrix XenApp 6.5 Administration 5 days 4 CXA-301 Citrix XenApp 6.5 Advanced Administration 5 days Citrix XenappTraining & Certification Courses 5 CHD-100 HelpDesk Support for Citrix XenDesktop 5.6 and XenApp 6.5 3 days XenDesktop 7 and XenApp 7.5 6 CXD-203 Managing Citrix XenDesktop 7 Solutions 5 days Citrix training courses atVinsys comprises of desktop, application and server virtualization, networking and cloud computing technologies. Most popular Citrix certifications and products include XenApp, XenDesktop, XenServer, NetScaler etc. Citrix virtualization courses are in huge demand andVinsys possesses the right mix of technology expertise, infrastructure and authorization to help you ace in Citrix environments.The array of Citrix certification courses include courses on Citrix Netscaler 10, Citrix CCA Certification, Citrix Xenmobile, Citrix Xendesktop 7.x, Citrix Xenserver, Citrix Other Essentials Courses forVirtualization, Citrix Other Essentials Courses forVirtualization,  Citrix Xenapp and Citrix Certified Advanced Administration.You can choose from a variety of these courses to keep a pace with the career progression. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 10.
    Business&Process Framework SoftSkills No Code DescriptionDuration 7 CXA-207 Citrix XenApp 7.5 Skills Update 3 days 8 CMB-300 Deploy and Manage Citrix XenApp/XenDesktop 7.6 FastTrack 5 days 9 CXA-301 Advanced Administration for Citrix XenApp 6.5 5 days Citrix XenserverTraining & Certification Courses 10 CXS-203 Citrix XenServer 6.0 Administration 5 days 11 CXS-300 XenServer 6.5 SP1 Administration 5 days Citrix Xendesktop 7Training & Certification Courses 12 CXD-205 Citrix XenDesktop 7.5 Skills Update 3 days 13 CXD-105 Citrix XenApp and XenDesktop Helpdesk Support 2 days 14 CXD-203 Managing App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 5 days 15 CXD-300 Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 5 days 16 CXD-400 Designing App and Desktop Solutions with Citrix XenDesktop 7 5 days Citrix Netscaler 10Training & Certification Courses 17 CNS-204 NetScaler 10 Skills Update 1 days 18 CNS-205 Citrix NetScaler 11 Essentials and Networking 5 days 19 CNS 208 Citrix NetScaler 10.5 Essentials for ACE Migration 5 days 20 CNS-207 Implementing Citrix NetScaler 11 for App and Desktop Solutions 5 days 21 CNS-301 Citrix NetScaler 10.5 Advanced Implementation 5 days Citrix XenmobileTraining & Certification Courses 22 CXM-303 Deploying Enterprise Mobility Solutions with Citrix XenMobile 5 days 23 CXM-202 Managing and Supporting a Mobility Solution with Citrix XenMobile 3 days CitrixVirtualizationTraining & Certification Courses 24 Citrix Online 3 days Career Enabler™ ( CitrixVirtualization ) 25 CXA-206-1 Implementing Citrix XenApp 6.5 Administration 8 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 11.
    Business&Process Framework SoftSkills No Code DescriptionDuration 26 CXD-202 Citrix XenDesktop 5 Administration 8 days 27 CXS-203 Citrix XenServer 6.0 Administration 8 days 28 Simulated Internship 6 days 29 Window Essentials 8 days Career Enabler™ (Virtualization ) 30 VMware vSphere: Install, Configure, Manage [V5.5] 5 days 31 CXA-206-1 Implementing Citrix XenApp 6.5 Administration 5 days 32 CXD-202 Citrix XenDesktop 5 Administration 5 days 33 CXA-206 Implementing Citrix XenApp 6.5 Administration 6 days 34 CXD-202 Citrix XenDesktop 5 Administration 6 days 35 Security Essentials for Citrix 4 days Citrix CloudTraining & Certification Courses 36 CCP-300 Implementing Citrix CloudPlatform 4.3 Powered by Apache CloudStack 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Previous Technology
  • 12.
    Business&Process Framework SoftSkills No Description Duration 1Cloudera Essentials for Apache Hadoop 5 days 2 Cloudera AdministratorTraining for Apache Hadoop 5 days 3 Cloudera DeveloperTraining for Apache Hadoop 5 days 4 Cloudera Data AnalystTraining: Using Pig, Hive, and Impala with Hadoop 5 days 5 Introduction to Data Science: Building Recommender Systems 5 days 6 DeveloperTraining For Spark and Hadoop 4 days 7 Cloudera AdministratorTraining 4 days 8 Data AnalystTraining 4 days 9 Designing and Developing Big Data Applications 4 days 10 Data Science at Scale using Spark and Hadoop 3 days Apache Hadoop is transforming the way organizations in every vertical interact with their data, their markets, and their customers. Gartner predicts massive growth in the big data market, punctuated by Hadoop's emergence as the platform on which an estimated 65% of all advanced analytics tools will be built by 2015.These trends point towards continued adoption and the persistent need for trained, certified professionals to deliver on Hadoop's tremendous promise. Vinsys with the technical and instructional proficiency to deliver Cloudera training in all geographies will be critical to the growth and success of the big data market. Our goal is to work with the most respected organizations in the industry and to create substantial revenue opportunities. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 13.
    Business&Process Framework SoftSkills No Description Duration 11ClouderaTraining for Apache Hbase 5 days 12 SearchTraining 3 days 13 HBaseTraining 3 days 14 SparkTraining 3 days 15 MapReduce for Developers 4 days 16 Cloudera DeveloperTraining for Apache Spark 5 days 17 HDP Developer: Java 4 days 18 HDP Developer:Apache Pig and Hive 4 days 19 HDP Developer:Windows 4 days 20 HDP Developer: CustomYARN Applications 2 days 21 HDP Developer: Storm andTrident 2 days 22 HDP Developer:Apache Spark Using Python 3 days 23 HDP Operations: Migrating to the Hortonworks Data Platform 2 days 24 HDP Operations:Hadoop Administration I 4 days 25 HDP Operations:Apache HBase Advanced Management 4 days 26 HDP Analyst: Data Science 3 days 27 HDP Analyst:Apache HBase Essentials 2 days 28 Designing and Building Big Data Applications 5 days 29 Big Data Fundamentals 4 days 30 Big Data Analytics 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 14.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 A+ 2012 5 days 2 CompTIA A+ Essential CompTIA A+ Essentials (2012) 3 days 3 CompTIa A+ Practicals CompTIA A+ Practical Application (2012) 3 days 4 Network+ 6 days 5 Server+ 5 days 6 SK0-003 CompTIA Server+ Exam 2009 5 days 7 Linux+ 9 days 8 SY0-401 Security+ 5 days 9 CLO-001 CompTIA Cloud Essentials 6 days 10 CV0-001 CompTIA Cloud+ 9 days 11 SGO-001 CompTIA Storage+ Powered by SNIA 6 days 12 CAS-002 CompTIA Advanced Security Practitioner (CASP) 5 days Launch your IT career with vendor-neutral CompTIA training that’s designed to be universally applicable to any workplace. CompTIA online training is often where IT professionals begin their careers, including one of the most highly sought-after certifications, CompTIA Network+. CompTIA training is a foundation on which to build your IT career. Learn CompTIA @ Vinsys CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology
  • 15.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 Ethical Hacking Preparation Course 4 days 2 312-93 EC-Council Certified Secure Programmer (ECSP) .NET 3 days 3 ENSA 6 days 4 212-38 EC-Council Project Management in IT Security 2 days 5 312-76 EC-Council Disaster Recovery Professional 5 days 6 212-89 EC-Council Certified Incident Handler 2 days 7 312-49 Computer Hacking Forensic Investigator (CHFI)V8 6 days 8 312-94 EC-Council Certified Secure Programmer-Java 4 days 9 312-50 ANSI Certified Ethical Hacker version 8 6 days 10 Virtual infra Backup WithVeeam 4 days CEH, ECSA, CHFI, LPT,ECSP – being the most sought after Ethical Hacking course in the industry is by EC-Council.Vinsys Solutions offers EC-Council certificate security courses on ECSA, Penetration Testing and CHFI, to help professionals get ahead in the thriving IT security industry. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 16.
    Business&Process Framework SoftSkills No Code DescriptionDuration 11 CCISO 10 days 12 312-50 Certified Ethical Hacker 9 (CEH v9) 5 days 13 ECSA v9 EC-Council Certified System Analyst (ECSA v9) 5 days 14 212-81 EC-Council Certified Encryption Specialist -ECES(PKI) New 3 days 15 CAST 619 Advanced SQLi Attacks and Countermeasures 3 days 16 CAST 618 Designing and Implementing Cloud Security 3 days 17 CAST 611 Advanced Penetration testing 5 days 18 CAST 616 Securing Windows Infrastructure 5 days 19 CAST 613 Hacking and Hardening your Corporate WebApplication 5 days 20 CAST 614 Advanced Network Defense 5 days 21 CAST 612 Advanced Mobile Hacking & Forensics 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 17.
    Business&Process Framework SoftSkills No Code DescriptionDuration ANALYTICS 1 0A005 Introduction to IBM SPSS Modeler and Data Mining (v16) 2 days 2 0A035 Advanced Predictive Modeling Using IBM SPSS Modeler (v16) 1 day 3 0A045 Clustering and Association Models Using IBM SPSS Modeler (v16) 1 day 4 0A055 Advanced Data Preparation Using IBM SPSS Modeler (v16) 1 day 5 0A0G2 Automated Data Mining with IBM SPSS Modeler - ILT 1 day 6 0A0U5 Classifying Customers Using IBM SPSS Modeler (v16) 1 day 7 0A0V5 Predicting ContinuousTargets Using IBM SPSS Modeler (v16) 1 day 8 0A105 Introduction to IBM SPSSText Analytics for IBM SPSS Modeler (v16) 2 days 9 0D0W4 IBM SPSS Modeler Entity Analytics (V15) - eLearning 2 hours 10 0E002 Introduction to IBM SPSS Modeler and Data Mining SPVC 3 days With high-quality IBMTraining content and the reach and experience of our SME’s across globe, an individual can develop a strong skills portfolio to grow your career and stay competitive in an ever- changing technical marketplace. Get Trained and certified @ Vinsys CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 18.
    Business&Process Framework SoftSkills No Code DescriptionDuration 11 0E003 Introduction to IBM SPSS Modeler and Data Mining (V14.2) SPVC 2 days 12 0E004 Introduction to IBM SPSS Modeler and Data Mining (V15) SPVC 2 days 13 0E005 Introduction to IBM SPSS Modeler and Data Mining (v16) SPVC 2 days 14 0E032 Predictive Modeling with IBM SPSS Modeler SPVC 3 days 15 0E034 Advanced Predictive Modeling using IBM SPSS Modeler (v15) SPVC 1 day 16 0E035 Advanced Predictive Modeling Using IBM SPSS Modeler (v16) SPVC 1 day 17 0E042 Clustering and Association Models with IBM SPSS Modeler SPVC 1 day 18 0E044 Clustering and Association Models with IBM SPSS Modeler (v15) SPVC 1 day 19 0E045 Clustering and Association Models Using IBM SPSS Modeler (v16) SPVC 1 day 20 0E052 Advanced Data Preparation with IBM SPSS Modeler SPVC 1 day 21 0E054 Advanced Data Preparation Using IBM SPSS Modeler (v15) SPVC 1 day 22 0E055 Advanced Data Preparation Using IBM SPSS Modeler (v16) SPVC 1 day 23 0E0G2 Automated Data Mining with IBM SPSS Modeler SPVC 1 day 24 0E0U3 Classifying Customers Using IBM SPSS Modeler (V14.2) SPVC 1 day 25 0E0U4 Classifying Customers with IBM SPSS Modeler (v15) SPVC 1 day 26 0E0U5 Classifying Customers Using IBM SPSS Modeler (v16) SPVC 1 day 27 0E0V3 Predicting ContinuousTargets Using IBM SPSS Modeler SPVC 1 day 28 0E0V4 Predicting ContinuousTargets Using IBM SPSS Modeler (v15) SPVC 1 day 29 0E0V5 Predicting ContinuousTargets Using IBM SPSS Modeler (v16) SPVC 1 day 30 0E104 Introduction to IBM SPSS ModelerText Analytics (v15) SPVC 2 days 31 0E105 Introduction to IBM SPSSText Analytics for IBM SPSS Modeler (v16) SPVC 2 days 32 0G016 Advanced Statistical Methods for Healthcare Research 2 days 33 0G023 Introduction to IBM SPSS Neural Networks - ILT 1 day 34 0G036 Market Segmentation Using IBM SPSS Statistics - ILT 1 day 35 0G046 Introduction to IBM SPSS Neural Networks - ILT 5 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 19.
    Business&Process Framework SoftSkills No Code DescriptionDuration 36 0G056 Correspondence Analysis and Multidimensional Scaling w/ IBM SPSS Categories -ILT 1 day 37 0G063 AdvancedTechniques:ANOVA 2 days 38 0G073 AdvancedTechniques: Regression 3 days 39 0G093 Advanced Statistical Analysis Using IBM SPSS Statistics (V19) 3 days 40 0G096 Time Series Analysis and Forecasting with IBM SPSS Forecasting - ILT 3 days 41 0G170 Presenting Data with IBM SPSS CustomTables (V20) 2 days 42 0G203 Introduction to Structural Equation Modeling using IBM SPSS Amos (v22) 2 days 43 0G2K9 Introduction to IBM SPSS DecisionTrees (V19) 2 days 44 0G2L3 IntermediateTopics on Structural Equation Modeling Using IBM SPSS Amos (V22) 2 days 45 0G301 Introduction to IBM SPSSText Analytics for Surveys (V4.0.1) 2 days 46 0G317 Survey Analysis Using IBM SPSS Statistics 3 days 47 0G406 IBM SPSS Statistics Syntax I 1 day 48 0G416 IBM SPSS Statistics Syntax II 2 days 49 0G503 Introduction to IBM SPSS Statistics (v22) 2 days 50 0G512 Introduction to Statistical Analysis Using IBM SPSS Statistics (V21) 2 days 51 0G522 Data Management and Manipulation with IBM SPSS Statistics (V21) 2 days 52 0J022 Introduction to IBM SPSS Monte Carlo Simulation (V21) - eLearning 3 hours 53 0J760 Introduction to IBM SPSS Maps (V20) - eLearning 3 hours 54 0K016 Advanced Statistical Methods for Healthcare Research SPVC 2 days 55 0K023 Introduction to IBM SPSS Complex Samples SPVC 1 day 56 0K036 Market Segmentation Using IBM SPSS Statistics SPVC 1 day 57 0K046 Introduction to IBM SPSS Neural Networks SPVC 1 day 58 0K056 Correspondence Analysis and Multidimensional Scaling w/ IBM SPSS Categories SPVC 1 day 59 0K063 AdvancedTechniques:ANOVA SPVC 2 days 60 0K073 AdvancedTechniques: Regression SPVC 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 20.
    Business&Process Framework SoftSkills No Code DescriptionDuration 61 0K093 Advanced Statistical Analysis Using IBM SPSS Statistics (V19) SPVC 3 days 62 0K096 Time Series Analysis and Forecasting with IBM SPSS Forecasting SPVC 3 days 63 0K166 "Viz"-ualizingYour Data - On Demand Recording 1 day 64 0K170 Presenting Data with IBM SPSS CustomTables (V20) SPVC 2 days 65 0K203 Introduction to Structural Equation Modeling Using IBM SPSS Amos (v22) SPVC 2 days 66 0K2K9 Introduction to IBM SPSS DecisionTrees (V19) SPVC 2 days 67 0K2L3 IntermediateTopics on Structural Equation Modeling Using IBM SPSS Amos (v22) SPVC 2 days 68 0K301 Introduction to IBM SPSSText Analytics for SurveysV4.0.1 SPVC 2 days 69 0K317 Survey Analysis Using IBM SPSS Statistics SPVC 3 days 70 0K406 IBM SPSS Statistics Syntax I SPVC 1 day 71 0K416 IBM SPSS Statistics Syntax II SPVC 2 days 72 0K437 Integrating Functions, Procedures and Algorithms with IBM SPSS Statistics SPVC 1 day 73 0K502 Introduction to IBM SPSS Statistics (V21) SPVC 2 days 74 0K503 Introduction to IBM SPSS Statistics (V22) SPVC 2 days 75 0K512 Introduction to Statistical Analysis Using IBM SPSS Statistics (V21) SPVC 2 days 76 0K519 Introduction to Statistical Analysis Using IBM SPSS Statistics SPVC 2 days 77 0K522 Data Management and Manipulation with IBM SPSS Statistics (V21) SPVC 2 days 78 0L009 IBM SPSS Statistics: Exploratory Data AnalysisV19 - ILO 1 day 79 0L019 IBM SPSS Statistics:Adv.Topics in Regression and Discriminant AnalysisV19 ILO 1 day 80 0L2M9 IBM SPSS Statistics: Ordinal Regression, GLM and Hierarchical ModelingV19 - ILO 1 day 81 0M003 Dimensions Administration: Paper - ILT 2 days 82 0M013 Dimensions Administration (Paper) Paper Only - ILT 1 day 83 0M028 IBM SPSS Data Collection Administration (Web) (v7) 1 day 84 0M035 IBM SPSS Data Collection AdministrationTelephone for Supervisors - ILT 2 days 85 0M045 IBM SPSS Data CollectionTelephone Interviewing - ILT 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 21.
    Business&Process Framework SoftSkills No Code DescriptionDuration 86 0M065 IBM SPSS Data Collection Administration Remote Supervisor - ILT 1 day 87 0M075 IBM SPSS Data Collection Server Maintenance - ILT 1 day 88 0M105 IBM SPSS Data Collection Survey Authoring - ILT 2 days 89 0M108 IBM SPSS Data Collection Survey Authoring (Base) (v7) 1 day 90 0M118 IBM SPSS Data Collection Survey Authoring (Web Module) (v7) 1 day 91 0M125 IBM SPSS Data Collection Survey Authoring Sample Functionality - ILT 1 day 92 0M128 IBM SPSS Data Collection Survey Authoring (Data Entry Module) (v7) 1 day 93 0M135 IBM SPSS Data Collection Survey Authoring Quota Functionality - ILT 1 day 94 0M145 IBM SPSS Data Collection Survey AuthoringTranslation Utility - ILT 1 day 95 0M206 IBM SPSS Data Collection Scripting: (Survey Creation) Level I (V6.0) 2 days 96 0M210 Dimensions Scripting: Report Creation - ILT 2 days 97 0M236 IBM SPSS Data Collection Scripting: (Survey Creation) Level II 2 days 98 0M245 IBM SPSS Data Collection Survey Presentation - ILT 1 day 99 0M275 IBM SPSS Data Collection Wizard Creation and Deployment - ILT 1 day 100 0M285 IBM SPSS Data Collection Scripting Survey Creation - Best Practices - ILT 1 day 101 0M295 IBM SPSS Data Collection Scripting (Intro to Data Management) 2 days 102 0M2A5 IBM SPSS Data Collection Scripting (Intermediate Data Management) 2 days 103 0M305 IBM SPSS Reports for Surveys: Level I - ILT 1 day 104 0M307 IBM SPSS Survey Reporter (Base) (v6.0.1) 2 days 105 0M308 IBM SPSS Data Collection Survey Reporter (Base) (v7) 2 days 106 0M311 Dimensions Report Creation - ILT 1 day 107 0M324 Dimensions Survey Analysis II - ILT 1 day 108 0P2B6 IBM SPSS Data Collection: Integrating JavaScript into Surveys (V6) - eLearning 3 hours 109 0P317 IBM SPSS Survey Reporter (Custom Chart Creation) (V6.0.1) - eLearning 2 hours 110 0P327 IBM SPSS Survey Reporter (SyntaxVariable Creation) (V6.0.1) - eLearning 1 hour CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 22.
    Business&Process Framework SoftSkills No Code DescriptionDuration 111 0P337 IBM SPSS Survey Reporter (SyntaxVariable Modification) (V6.0.1) - eLearning 1 hour 112 0P347 IBM SPSS Survey Reporter (Custom Style Sheets) (V6.0.1) - eLearning 2 hours 113 0Q003 Dimensions Administration: Paper SPVC 2 days 114 0Q013 Dimensions Administration (Paper) Paper Only SPVC 1 day 115 0Q026 IBM SPSS Data Collection Administration (Web) (V6.0.1) SPVC 1 day 116 0Q028 IBM SPSS Data Collection Administration (Web) (v7) SPVC 1 day 117 0Q035 IBM SPSS Data Collection AdministrationTelephone for Supervisors SPVC 2 days 118 0Q045 IBM SPSS Data CollectionTelephone Interviewing SPVC 1 day 119 0Q065 IBM SPSS Data Collection Administration Remote Supervisor SPVC 1 day 120 0Q105 IBM SPSS Data Collection Survy Authoring SPVC 2 days 121 0Q108 IBM SPSS Data Collection Survey Authoring (Base) (v7) SPVC 1 day 122 0Q115 IBM SPSS Data Collection Survey Authoring ASP WEB 5 hours 123 0Q118 IBM SPSS Data Collection Survey Authoring (Web Module) (v7) SPVC 1 day 124 0Q125 IBM SPSS Data Collection Survey Authoring Sample Functionality SPVC 1 day 125 0Q128 IBM SPSS Data Collection Survey Authoring (Data Entry Module) (v7) SPVC 1 day 126 0Q135 IBM SPSS Data Collection Survey Authoring Quota Functionality SPVC 1 day 127 0Q145 IBM SPSS Data Collection Survey AuthoringTranslation Utility SPVC 1 day 128 0Q206 IBM SPSS Data Collection Scripting: (Survey Creation) Level I SPVC 2 days 129 0Q236 IBM SPSS Data Collection Scripting: (Survey Creation) Level II SPVC 2 days 130 0Q245 IBM SPSS Data Collection Survey Presentation SPVC 1 day 131 0Q275 IBM SPSS Data Collection Wizard Creation and Deployment SPVC 1 day 132 0Q285 IBM SPSS Data Collection Scripting Survey Creation - Best Practices SPVC 1 day 133 0Q295 IBM SPSS Data Collection Scripting (Intro to Data Management) SPVC 2 days 134 0Q2A5 IBM SPSS Data Collection Scripting (Intermediate Data Management) SPVC 2 days 135 0Q307 IBM SPSS Survey Reporter (Base) (V6.0.1) SPVC 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 23.
    Business&Process Framework SoftSkills No Code DescriptionDuration 136 0Q308 IBM SPSS Data Collection Survey Reporter (Base) (v7) SPVC 2 days 137 0Q311 Dimensions Report Creation SPVC 1 day 138 0S004 Introduction to IBM SPSS Collaboration and Deployment Services (v6) 2 days 139 0V002 IBM SPSS Collaboration and Deployment Services - Content Management - eLearning 8 hours 140 0V092 IBM SPSS Collaboration and Deployment Services - Automation - eLearning 8 hours 141 0V100 IBM SPSS Modeler Advantage and Rules Management 1 day 142 0V101 IBM SPSS Modeler Advantage and Rules Management (v7) WBT 1 day 143 0V110 IBM SPSS Decision Management for Claims and Rules Management 1 day 144 0V120 IBM SPSS Decision Management for Customer Interactions and Rules Management 1 day 145 0W004 Introduction to IBM SPSS Collaboration and Deployment Services (v6) SPVC 2 days 146 0W050 PES Overview and PEMTour - On Demand Recording 1 day 147 0W060 PES - Content Management - On Demand Recording 1 day 148 0W070 PES - Jobs and Scheduling - On Demand Recording 1 day 149 0W080 PES - SPSS Integration - On Demand Recording 1 day 150 1K110 IBM Cognos Disclosure Management (v10.2) 3 days 151 1O160 Using IBM OpenPages (v6.0) - eLearning 3 hours 152 1O162 IBM OpenPages:Administration (v6.0) (single user) - eLearning 1 day 153 1O166 IBM OpenPages:What's New (v6.0) - eLearning 2 hours 154 1O168 IBM OpenPages CoreTeam Fundamentals (v6.0) - eLearning 2 hours 155 1O201 IBM OpenPages:Administration (v7.0) 3 days 156 1O202 IBM OpenPages: Report Authoring (v7.0) 4 days 157 1O205 IBM OpenPages: CoreTeam Fundamentals (v7.0) 1 day 158 1O251 IBM OpenPages:Administration (v7.0) SPVC 3 days 159 1O252 IBM OpenPages: Report Authoring (v7.0) SPVC 4 days 160 1O255 IBM OpenPages: CoreTeam Fundamentals (v7.0) SPVC 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 24.
    Business&Process Framework SoftSkills No Code DescriptionDuration 161 1O260 Using IBM OpenPages (v7.0) eLearning 8 hours 162 1R017 IBM Cognos ICM:Advanced Configuration (v8.0/8.1) 2 days 163 1R027 IBM Cognos ICM: Building the Model (v8.1) 4 days 164 1R029 IBM Cognos ICM: Building Reports (v.8.1) 3 days 165 1R070 IBM Cognos ICM: Fundamentals of Configuration (V8.0) SPVC 4 days 166 1R071 IBM Cognos ICM:Advanced Configuration (v8.0/8.1) SPVC 2 days 167 1R073 IBM Cognos ICM: Build Reports (v8.0) SPVC 3 days 168 1R081 IBM Cognos ICM: Building the Model (v8.1) SPVC 4 days 169 1R083 IBM Cognos ICM: Building Reports (v8.1) SPVC 3 days 170 1R095 IBM Cognos ICM: Use the Admin Client (v8.0/8.1) - eLearning 5 hours 171 1R097 IBM Cognos ICM: System Administration (v8.0/8.1) - eLearning 7 hours 172 1R099 IBM Cognos ICM: Introduction to Discovery (V1.0) - eLearning 5 hours 173 5K000 IBM Clarity: BuildingTemplates and Reports (V6.2) (MSAS) SPVC 5 days 174 5K004 IBM Clarity: BuildingTemplates and Reports (V7) SPVC 5 days 175 5K007 IBM Clarity: BuildingTemplates and Reports Delta (V7) SPVC 3 days 176 5K008 IBM Clarity:AdvancedTemplate and Report Building (V7) SPVC 3 days 177 5K009 IBM Clarity:Visualizer (V7) SPVC 1 day 178 5K012 IBM Clarity: Cube Manager (V6.5) SPVC 5 hours 179 5K013 IBM Clarity: MDM (V7) SPVC 5 hours 180 5K021 IBM Clarity: BuildingTemplates and Reports (V7.2) SPVC 5 days 181 5K023 IBM Clarity: BuildingTemplates and Reports Delta (V7.2) SPVC 3 days 182 5K024 IBM Clarity:AdvancedTemplates and Report Building (V7.2) SPVC 3 days 183 5K025 IBM Clarity:Visualizer (V7.2) SPVC 1 day 184 5K026 IBM Clarity: MDM (V7.2) SPVC 5 hours 185 5K100 IBM Cognos Financial Statement Reporting (FSR) (V6.6) SPVC 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 25.
    Business&Process Framework SoftSkills No Code DescriptionDuration 186 5K105 IBM Cognos FSR: XBRL DetailedTagging (V6.6) SPVC 2 days 187 5K110 IBM Cognos Disclosure Management (V10.2) SPVC 3 days 188 A3001 Overview of IBM Cognos Express (V9.0) - eLearning 5 hours 189 A3024 IBM Cognos Express Advisor: Navigating Data Fundamentals (V9.0) - eLearning 5 hours 190 A3030 IBM Cognos Express Xcelerator: Navigating Data (version 9.0) 8 hours 191 A3502 IBM Cognos Express:What's New (V9.5) - eLearning 5 hours 192 B1602 IBM Cognos Now! Dashboard: Designing Dashboards (V4.6) - eLearning 1 hour 193 B2406 IBM Cognos 8 Go! Search Introduction (V8.4) - eLearning 1 hour 194 B2407 IBM Cognos 8 Analysis for Excel:Analyze Data in Microsoft Excel (V8.4) - eLearning 3 hours 195 B2420 IBM Cognos 8 BI Analysis Studio:Analyze Data (V8.4) - eLearning 8 hours 196 B2424 IBM Cognos 8 BI Report Studio: Express Authoring Mode (V8.4) - eLearning 5 hours 197 B2425 IBM Cognos 8 BI Report Studio: Introduction (V8.4) - eLearning 8 hours 198 B2426 IBM Cognos 8 BI Report Studio: Intermediate (V8.4) - eLearning 8 hours 199 B2427 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4) -eLearning 8 hours 200 B2429 IBM Cognos 8 BI Metric Studio: Manage Business Performance (V8.4) - eLearning 3 hours 201 B2430 IBM Cognos 8 Go! Office: Integrate with Microsoft Office (V8.4) - eLearning 1 hour 202 B2431 IBM Cognos 8 BI Event Studio: Create and Manage Agents (V8.4) - eLearning 3 hours 203 B2440 IBM Cognos 8 Go! Search:Administration (V8.4) - eLearning 1 hour 204 B2442 IBM Cognos 8 Go! Mobile for Consumers Using BlackBerry (V8.4) - eLearning 1 hour 205 B2443 IBM Cognos 8 Go! Mobile Administration (V8.4) - eLearning 1 hour 206 B2444 IBM Cognos 8 Go! Mobile for Consumers Using Windows (V8.4) - eLearning 1 hour 207 B2445 IBM Cognos 8 Go! Mobile for Consumers Using Symbian S60 (V8.4) - eLearning 1 hour 208 B2469 IBM Cognos 8 BITransformer: Creating PowerCubes (V8.4) - eLearning 1 hour 209 B2478 IBM Cognos 8 BI PowerPlay Studio:Web Exploration (V8.4) - eLearning 8 hours 210 B2488 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) -eLearning 3 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 26.
    Business&Process Framework SoftSkills No Code DescriptionDuration 211 B2497 IBM Cognos 8 BI Go! Dashboard (V8.4) - eLearning 1 hour 212 B24F0 IBM Cognos 8 BI Analysis Studio - Analyzing Data (V8.4) - eLearning - French 7 hours 213 B24F7 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4/10.1)-eLearning-French 8 hours 214 B24F8 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) - eLearning - French 3 hours 215 B24G7 IBM Cognos 8 BI Query Studio: Build Ad Hoc Reports (V8.4) - eLearning - German 8 hours 216 B24G8 IBM Cognos 8 BI Cognos Connection for Consumers (V8.4) - eLearning - German 3 hours 217 B2A08 Overview of IBM Cognos BI (v10.2.2) 1 day 218 B5A08 Overview of IBM Cognos BI (v10.2.2) 1 day 219 B5102 IBM Cognos Real-time Monitoring: Operational Analytics in Cognos BI (V10.1/10.2) 2 hours 220 B5111 IBM Cognos BI PowerPlay Migrate from Series 7 PowerPlay (V10.1) - eLearning 3 hours 221 B5117 IBM Cognos Business Insight: Create Workspaces (V10.1.1)-eLearning 3 hours 222 B5125 IBM Cognos Report Studio: Introduction (V10.1/10.2) - eLearning 8 hours 223 B5129 IBM Cognos Metric Studio: Manage Business Performance (V10.1/10.2) - eLearning 3 hours 224 B5130 IBM Cognos for Microsoft Office: Integrate with Microsoft Office (V10.1/10.2) 3 hours 225 B5131 IBM Cognos BI Event Studio: Create and Manage Agents (V8.4/10.2) - eLearning 3 hours 226 B5132 IBM Cognos BI: Manage BI Projects (V10.1) 2 days 227 B5142 IBM Cognos Mobile for Consumers Using BlackBerry (V10.1/10.2) - eLearning 3 hours 228 B5143 IBM Cognos Mobile Administration (V10.1) - eLearning 2 hours 229 B5146 IBM Cognos Mobile for Consumers Using iPhone (V10.1/10.2) - eLearning 2 hours 230 B5147 IBM Cognos Mobile for iPadTablets (V10.1.1/10.2) - eLearning 2 hours 231 B5150 IBM Cognos Query Studio: Build Ad Hoc Reports (v10.1/10.2) 1 day 232 B5151 IBM Cognos BI Analysis Studio:Analyze Data (V10.1/10.2) 1 day 233 B5157 IBM Cognos BI Metric Manager: Design Scorecards (V10.1) 3 days 234 B5167 IBM Cognos Statistics: Introduction to Statistics (V10.1) - eLearning 3 hours 235 B5169 IBM CognosTransformer: Create PowerCubes (V10.1) - eLearning 3 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 27.
    Business&Process Framework SoftSkills No Code DescriptionDuration 236 B5173 IBM Cognos PowerPlay Client: Explore and Build Reports (v10.1/10.2) 2 days 237 B5174 IBM Cognos PowerPlay Studio:Web Exploration (v10.1/10.2) 1 day 238 B5178 IBM Cognos PowerPlay Studio:Web Exploration (V8.4/10.1) - eLearning 8 hours 239 B5183 IBM Cognos Business Insight Advanced: Introduction (V10.1) - eLearning 8 hours 240 B5184 IBM Cognos Business Insight Advanced: Intermediate (V10.1) - eLearning 8 hours 241 B5188 IBM Cognos BI for Consumers (V10.1) - eLearning 3 hours 242 B5197 IBM Cognos Business Insight: Create Dashboards (V10.1) - eLearning 3 hours 243 B51F3 IBM Cognos Business Insight Advanced: Introduction (v10.1) - eLearning - French 8 hours 244 B51F4 IBM Cognos Business Insight Advanced: Intermediate (v10.1) - eLearnng - French 8 hours 245 B51F8 IBM Cognos BI for Consumers (V10.1) - eLearning - French 2 hours 246 B51S5 IBM Cognos Report Studio: Introduction (V10.1) - Spanish (WBT) 8 hours 247 B51S8 IBM Cognos BI for Consumers (V10.1) - Spanish 2 hours 248 B5205 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (v10.2) 2 days 249 B5208 Overview of IBM Cognos 8 BI (v10.2) 1 day 250 B5210 IBM Cognos BI:What's New (v10.2) 1 day 251 B5215 IBM Cognos BI What's New: 8.4 to 10.2 (v10.2) 2 days 252 B5217 IBM Cognos Workspace: Create Workspaces (V10.2) - eLearning 5 hours 253 B5218 IBM Cognos Workspace: Create Workspaces (v10.2.1) - eLearning 5 hours 254 B5219 IBM Cognos BI Administration:Architecture and Logging (V10.2) 2 days 255 B5220 IBM Cognos Analysis Studio:Analyze Data (v10.1/10.2) - eLearning 8 hours 256 B5227 IBM Cognos Query Studio: Build Ad Hoc Reports (v10.1/10.2) - eLearning 8 hours 257 B5231 IBM Cognos BI Event Studio: Create and Run Agents (v10.2) - eLearning 4 hours 258 B5252 IBM Cognos Framework Manager: Design Metadata Models (v10.2) 5 days 259 B5255 IBM Cognos BI Administration (v10.2) 3 days 260 B5258 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 28.
    Business&Process Framework SoftSkills No Code DescriptionDuration 261 B5259 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) 2 days 262 B5261 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2) 2 days 263 B5263 IBM Cognos Cube Designer: Design Dynamic Cubes (v10.2) 2 days 264 B5270 Essentials for IBM Cognos BI (V10.2) 5 days 265 B5280 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (v10.2) 5 days 266 B5281 IBM Cognos Workspace Advanced:Author Self-Service Reports (v10.2) 2 days 267 B5282 IBM CognosTransformer: Design OLAP Models (v10.2) 4 days 268 B5283 IBM Cognos Workspace Advanced: Introduction (V10.2) - eLearning 8 hours 269 B5284 IBM Cognos Workspace Advanced: Intermediate (V10.2) - eLearning 8 hours 270 B5288 IBM Cognos BI for Consumers (V10.2) - eLearning 2 hours 271 B5298 IBM Cognos Report Studio:Author Active Reports (V10.2) 1 day 272 B52F0 IBM Cognos BI Analysis Studio:Analyze Data (v10.1/10.2) - eLearning - French 8 hours 273 B5A17 IBM Cognos Workspace: Create Workspaces (v10.2.2) eLearning 5 hours 274 B5A52 IBM Cognos Framework Manager: Design Metadata Models (v10.2.2) 5 days 275 B5A58 IBM Cognos Report Studio:Author Professional Reports Fundamentals (v10.2.2) 3 days 276 B5A59 IBM Cognos Report Studio:Author Professional Reports Advanced (v10.2.2) 2 days 277 B5A61 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2.2) 2 days 278 B5A81 IBM Cognos Workspace Advanced:Author Self-Service Reports (v10.2.2) 2 days 279 B5A83 IBM Cognos Workspace Advanced: Introduction(V10.2.2) - eLearning 8 hours 280 B5A84 IBM Cognos Workspace Advanced: Intermediate (V10.2.2) - eLearning 7 hours 281 J0021 IBM Cognos Express: Manage IBM Cognos Express (V9.0) SPVC 1 day 282 J0102 IBM CognosTM1: Design and Develop Models (V9.5) SPVC 5 days 283 J0105 IBM CognosTM1:Administer theTechnical Environment (V9.5) SPVC 2 days 284 J0107 IBM CognosTM1:Analyze Data (V9.5) SPVC 3 days 285 J0108 IBM CognosTM1: Manage Planning Applications for ExistingTM1 Users (V9.5) SPVC 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 29.
    Business&Process Framework SoftSkills No Code DescriptionDuration 286 J01F2 PowerPlay OLAP Modeling for Series 7V3 and Cognos 8 BI SPVC - French 3 days 287 J01G7 IBM CognosTM1:Analyze Data (V9.4/9.5) SPVC - German 3 days 288 J0302 Series 7Version 3 and 4 - Impromptu Administration SPVC 2 days 289 J0303 Series 7Versions 3 and 4 - Report Building with Impromptu SPVC 2 days 290 J0304 Series 7Version 3 and 4 - Advanced Impromptu Reporting SPVC 1 day 291 J0305 Cognos 8 Planning 8.3 Contributor Application Administration SPVC 4 days 292 J0401 IBM Cognos 8 Planning Analyst: Build Models (V8.4) SPVC 5 days 293 J0402 IBM Cognos 8 Planning: Leverage Integration Between Cognos 8 BI andTM1 9.4 SPVC 4 days 294 J0405 IBM Cognos 8 Planning Contributor: Develop Applications (V8.4) SPVC 4 days 295 J0406 IBM Cognos 8 Planning: Overview (V8.4) SPVC 1 day 296 J0407 IBM Cognos 8 Planning:Administer theTechnical Environment (V8.4) SPVC 3 days 297 J0409 IBM Cognos 8 Planning: Essentials for Managing Planning Projects (V8.4) SPVC 2 days 298 J0410 IBM Cognos 8 BI What's New (Version 8.4) SPVC 1 day 299 J0411 IBM Cognos 8 BI PowerPlay: Migrating from Series 7 PowerPlay (Version 8.4) SPVC 1 day 300 J0419 IBM Cognos 8 BI Administration:Adv Architecture andTroubleshooting (V8.4) SPVC 3 days 301 J0421 Cognos Finance 7.4 Application Administration SPVC 3 days 302 J0422 Cognos Finance 7.4 Authoring SPVC 2 days 303 J0432 IBM Cognos 8 BI: Essentials for Managing BI Projects (V8.4) SPVC 2 days 304 J0433 IBM Cognos 8: Configure and Extend Analytic Models (V8.4) - Part 1 SPVC 3 days 305 J0452 IBM Cognos 8 BI Framework Manager: Design Metadata Models (V8.4) SPVC 5 days 306 J0453 Essentials for IBM Cognos 8 BI: Supplement for Metadata Modelers (V8.4) SPVC 2 days 307 J0456 IBM Cognos 8 BI Administration (V8.4) SPVC 3 days 308 J0457 IBM Cognos 8 BI Metrics Manager: Design Scorecards (V8.4) SPVC 3 days 309 J0458 IBM Cognos 8 BI Rep Studio:Author Professional Reports Fundamentals (V8.4) SPVC 3 days 310 J0459 IBM Cognos 8 BI Report Studio:Author Professional Reports Advanced (V8.4) SPVC 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 30.
    Business&Process Framework SoftSkills No Code DescriptionDuration 311 J0461 IBM Cognos 8 BI Report Studio:Author Reports w/Multidimensional DataV8.4-SPVC 2 days 312 J0472 IBM Cognos 8 BI SDK for Developers (V8.4) SPVC 2 days 313 J0473 IBM Cognos 8 PowerPlay Client: Exploration and Reports (V8.4) SPVC 2 days 314 J0475 IBM Cognos 8 BI PowerPlay Administration (V8.4) SPVC 1 day 315 J0480 IBM Cognos 8 BI Data Manager: Build Datamarts with Enterprise Data (V8.4) SPVC 5 days 316 J0482 IBM Cognos 8 BITransformer: Design OLAP Models (V8.4) SPVC 4 days 317 J0492 IBM CognosTM1 9.4: Designing and Developing Applications SPVC 5 days 318 J0495 IBM CognosTM1:Administer theTechnical Environment (V9.4) SPVC 2 days 319 J0497 IBM CognosTM1:Analyzing Data (version 9.4) SPVC 3 days 320 J04C1 IBM Cognos 8 Controller: Develop Applications (V8.4) SPVC 5 days 321 J04F7 IBM CognosTM1:Analyzing Data (version 9.4) SPVC - French 3 days 322 J04F8 IBM Cognos 8 BI Report Studio:Author Prof. Reports Fundamentals 8.4 SPVC-French 3 days 323 J04F9 IBM Cognos 8 BI Report Studio:Author Prof. Reports AdvancedV8.4 SPVC-French 2 days 324 J04G8 IBM Cognos 8 BI Report Studio: Berichtserstellung, GrundlagenV8.4 - SPVC 3 days 325 J04G9 IBM Cognos 8 BI Report Studio:Author Prof. Reports Advanced (V8.4) SPVC - German 2 days 326 J0501 IBM Cognos 8 Controller: Develop Applications (V8.5) SPVC 5 days 327 J0503 IBM Cognos 8 Controller: Create BI with Consolidation Data (V8.5) SPVC 2 days 328 J0741 IBM Cognos 8 BusinessViewpoint: Manage Dimensions (V8.4) SPVC 2 days 329 J0F01 Cognos 8 Planning 8.3 - Création de modèles Analyst SPVC - Francais 5 days 330 J0F61 Cognos 8 BI Report Studio:Author Reports w/Multidimensional Data 8.3 SPVC-French 2 days 331 J1101 IBM Cognos Planning Analyst: Build Models (V10.1) SPVC 5 days 332 J1105 IBM Cognos Planning Contributor: Develop Applications (V10.1) SPVC 4 days 333 J1107 IBM Cognos Planning:Administer theTechnical Environment (V10.1) SPVC 3 days 334 J1110 IBM Cognos BusinessViewpoint 10.1: Manage Dimensions and Data SPVC 2 days 335 J1111 IBM Cognos BusinessViewpoint 10.1:Administer BusinessViewpoint SPVC 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 31.
    Business&Process Framework SoftSkills No Code DescriptionDuration 336 J1120 IBM Cognos Controller:Administer theTechnical Environment (V10.1) SPVC 1 day 337 J1121 IBM Cognos Controller: Develop Applications (V10.1) SPVC 5 days 338 J1122 IBM Cognos Controller:Author Reports (V10.1) SPVC 1 day 339 J1123 IBM Cognos Controller: Create BI with Consolidation Data (V10.1) SPVC 2 days 340 J1152 IBM CognosTM1: Design and Develop Models (V10.1) SPVC 5 days 341 J1155 IBM CognosTM1:Administer theTechnical Environment (V10.1) SPVC 2 days 342 J1157 IBM CognosTM1:Analyze and Share Data (V10.1) SPVC 3 days 343 J1158 IBM CognosTM1:What's New (V10.1) SPVC 2 days 344 J1170 IBM Cognos Express:Analyze Data with Advisor (V10.1) SPVC 1 day 345 J1171 IBM Cognos Express:Analyze Data with Xcelerator (V10.1) SPVC 2 days 346 J1172 IBM Cognos Express:Work with Planner Applications (V10.1) SPVC 1 day 347 J1173 IBM Cognos Express: Essentials for Reporter (V10.1) SPVC 5 days 348 J11F7 IBM CognosTM1:Analyze and Share Data (V10.1) SPVC - French 3 days 349 J11G7 IBM CognosTM1: Daten Analysieren und freigeben (V10.1) SPVC German 3 days 350 J1252 IBM CognosTM1: Design and Develop Models in Performance Modeler (v10.2) SPVC 5 days 351 J1255 IBM CognosTM1:Administer theTechnical Environment (v10.2) SPVC 2 days 352 J1257 IBM CognosTM1:Analyze and Share Data (v10.2) SPVC 3 days 353 J1258 IBM CognosTM1:What's New (v10.2) SPVC 1 day 354 J1259 IBM CognosTM1: Create Scorecards (v10.2) SPVC 1 day 355 J1261 IBM CognosTM1: Design and Develop Models in Architect (v10.2) SPVC 5 days 356 J2105 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (10.1) SPVC 2 days 357 J2108 IBM Cognos BI Overview (V10.1) SPVC 1 day 358 J2110 IBM Cognos BI What's New (V10.1) SPVC 2 days 359 J2119 IBM Cognos BI Administration:Architecture and Logging (V10.1.1) SPVC 2 days 360 J2132 IBM Cognos BI: Manage Projects (V10.1) SPVC 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 32.
    Business&Process Framework SoftSkills No Code DescriptionDuration 361 J2152 IBM Cognos Framework Manager: Design Metadata Models (V10.1) SPVC 5 days 362 J2156 IBM Cognos BI Administration (V10.1) SPVC 3 days 363 J2157 IBM Cognos Metric Studio: Design Scorecards (V10.1/10.2) SPVC 3 days 364 J2158 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.1) SPVC 3 days 365 J2159 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.1) SPVC 2 days 366 J2161 IBM Cognos Report Studio:Author Reports with Multidimensional Data (V10.1) SPVC 2 days 367 J2168 IBM Cognos Statistics:Author Statistical Reports in Report StudioV10.1/2 SPVC 1 day 368 J2173 IBM Cognos PowerPlay Client: Explore and Build Reports (V10.1/10.2) SPVC 2 days 369 J2180 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (V10.1) SPVC 5 days 370 J2182 IBM CognosTransformer: Design OLAP Models (V10.1) SPVC 4 days 371 J2198 IBM Cognos Report Studio:Author Active Reports (V10.1) SPVC 1 day 372 J21F8 IBM Cognos BI Report Studio:Author Prof. Reports Fundamentals 10.1 SPVC-French 3 days 373 J21F9 IBM Cognos BI Report Studio:Author Prof. Reports Advanced 10.1 SPVC-French 2 days 374 J21G1 IBM Cognos Report Studio: Berichtserstellung mit multidim. DatenV10.1 SPVC 2 days 375 J21G8 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.1) SPVC 3 days 376 J21G9 IBM Cognos Report Studio: Berichtserstellung,FortgeschrittenV10.1 SPVC 2 days 377 J2205 Essentials for IBM Cognos BI: Supplement for Metadata Modelers (V10.2) SPVC 2 days 378 J2208 Overview of IBM Cognos BI (v10.2) SPVC 1 day 379 J2210 IBM Cognos BI What's New (V10.2) SPVC 1 day 380 J2215 IBM Cognos BI What's New: 8.4 to 10.2 (v10.2) SPVC 2 days 381 J2219 IBM Cognos BI Administration:Architecture and Logging (V10.2) - SPVC 2 days 382 J2252 IBM Cognos Framework Manager: Design Metadata Models (V10.2) SPVC 5 days 383 J2255 IBM Cognos BI Administration (V10.2) SPVC 3 days 384 J2258 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) SPVC 3 days 385 J2259 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) SPVC 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 33.
    Business&Process Framework SoftSkills No Code DescriptionDuration 386 J2261 IBM Cognos Report Studio:Author Reports with Multidimensional Data (V10.2) SPVC 2 days 387 J2262 IBM Cognos BI: Combined Administration,Architecture, and Logging (V10.2) SPVC 5 days 388 J2263 IBM Cognos Cube Designer: Design Dynamic Cubes (V10.2) SPVC 2 days 389 J2280 IBM Cognos Data Manager: Build Data Marts with Enterprise Data (V10.2) SPVC 5 days 390 J2281 IBM Cognos Workspace Advanced:Author Self-Service Reports (V10.2) SPVC 2 days 391 J2282 IBM CognosTransformer: Design OLAP Models (V10.2) SPVC 4 days 392 J2298 IBM Cognos Report Studio:Author Active Reports (v10.2) SPVC 1 day 393 J22F8 IBM Cognos Report Studio:Author Professional Reports Fundamentals (V10.2) SPVC 3 days 394 J22F9 IBM Cognos Report Studio:Author Professional Reports Advanced (V10.2) SPVC 2 days 395 J22G8 IBM Cognos Report Studio:Author Prof. Reports Fundamentals (V10.2) SPVC German 3 days 396 J22G9 IBM Cognos Report Studio:Author Professional Reports AdvancedV10.2 SPVC German 2 days 397 J2A08 Overview of IBM Cognos BI (v10.2.2) SPVC 1 day 398 J2A52 IBM Cognos Framework Manager: Design Metadata Models (v10.2.2) SPVC 5 days 399 J2A58 IBM Cognos Report Studio:Author Professional Reports Fundamentals (v10.2.2) SPVC 3 days 400 J2A59 IBM Cognos Report Studio:Author Professional Reports Advanced (v10.2.2) SPVC 3 days 401 J2A61 IBM Cognos Report Studio:Author Reports with Multidimensional Data (v10.2.2) SPVC 5 days 402 J2A81 IBM Cognos Workspace Advanced:Author Self-Service Reports (V10.2.2) SPVC 2 days 403 J2F81 IBM Cognos Business Insight Adv.:Author Self-Service ReportsV10.1 SPVC- French 2 days 404 J2F98 IBM Cognos Report Studio:Author Active ReportsV10.1 SPVC - French 1 day 405 J2G81 IBM Cognos Business Insight Adv.:Author Self-Service ReportsV10.1 SPVC German 2 days 406 J2G98 IBM Cognos Report Studio:Author Active Reports (V10.1) SPVC - German 1 day 407 P1403 IBM Cognos 8 Planning: Explore and Contribute to Plans (V8.4) -eLearning 8 hours 408 P1410 IBM Cognos 8 Planning:What's New for Contributors (version 8.4) - eLearning 1 hour 409 P1411 IBM Cognos 8 Planning:What's New for Administrators (version 8.4) - eLearning 1 hour 410 P14F3 IBM Cognos 8 Planning: Explore and Contribute to Plans (V8.4) - eLearning-French 8 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 34.
    Business&Process Framework SoftSkills No Code DescriptionDuration 411 P6503 IBM CognosTM1: Interact with Data (V9.5) - eLearning 8 hours 412 P6506 IBM CognosTM1: Explore Data (V9.5) - eLearning 3 hours 413 P6523 IBM CognosTM1: IntegrateTM1 and Cognos 8 BI (V9.5) - eLearning 1 hour 414 P6524 IBM CognosTM1: Security Cubes and Other Control Objects (V9.5) - eLearning 2 hours 415 P6525 IBM CognosTM1: Import Users and Groups into aTM1 Model (V9.5) - eLearning 1 hour 416 P8101 IBM Cognos Planning Analyst: Build Models (V10.1) 5 days 417 P8103 IBM Cognos Planning: Explore and Contribute to Plans (V8.4/10.1) - eLearning 8 hours 418 P8104 IBM Cognos Planning: Explore and Contribute to Plans (V10.1) 1 day 419 P8105 IBM Cognos 8 Planning Contributor: Develop Applications (V10.1) 4 days 420 P8106 IBM Cognos Planning: Overview (V10.1) 2 days 421 P8107 IBM Cognos Planning:Administer theTechnical Environment (V10.1) 3 days 422 P8117 IBM Cognos Consumer Insight: Overview (V1.1) - eLearning 3 hours 423 P8120 IBM Cognos Controller:Administer theTechnical Environment (V10.1) 1 day 424 P8121 IBM Cognos Controller: Develop Applications (V10.1) 5 days 425 P8122 IBM Cognos Controller:Author Reports (V10.1) 1 day 426 P8123 IBM Cognos Controller: Create BI with Consolidation Data (V10.1) 2 days 427 P8124 IBM Cognos Controller What's New (V10.1) - eLearning 3 hours 428 P8125 IBM Cognos Analysis for Microsoft Excel:Analyze BI Data (V10.1) - eLearning 1 hour 429 P8153 IBM CognosTM1: Interact with Data (V10.1) - eLearning 8 hours 430 P8156 IBM CognosTM1: Explore Data (V10.1) - eLearning 3 hours 431 P8163 IBM CognosTM1: IntegrateTM1 and Cognos BI (V9.5/V10.1) - eLearning 2 hours 432 P8164 IBM CognosTM1: Security Cubes and Other Control Objects (V9.5/V10.1)- eLearning 2 hours 433 P8176 IBM Cognos Insight:Analyze and Share Data (V10.1/10.1.1) - eLearning 8 hours 434 P8218 IBM Cognos Integration Server: Extract Data from Oracle Essbase (v10.2) 2 hours 435 P8219 IBM Cognos Integration Server: Extract Data from Oracle HFM (v10.2) - eLearning 1 hour CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 35.
    Business&Process Framework SoftSkills No Code DescriptionDuration 436 P8252 IBM CognosTM1: Design and Develop Models in Performance Modeler (v10.2) 5 days 437 P8253 IBM CognosTM1: Interact with Data (v10.2) - eLearning 1 day 438 P8254 IBM CognosTM1:Work with IBM Cognos Analysis for Microsoft Excel (v10.2) - eLearning 1 hour 439 P8255 IBM CognosTM1:Administer theTechnical Environment (v10.2) 2 days 440 P8256 IBM CognosTM1: Explore Data (v10.2) - eLearning 3 hours 441 P8257 IBM CognosTM1:Analyze and Share Data (v10.2) 3 days 442 P8258 IBM CognosTM1:What's New (v10.2) 1 day 443 P8259 IBM CognosTM1: Create Scorecards (v10.2) 1 day 444 P8261 IBM CognosTM1: Design and Develop Models in Architect (v10.2) 5 days 445 P8280 IBM Cognos Command Center:Automation Using PluginTasks (v10.2) - eLearning 2 hours 446 Z3302 Impromptu Administration 2 days 447 Z3303 Report Building with Impromptu 2 days 448 Z3304 Advanced Impromptu Reporting 1 day 449 Z5303 IBM Cognos Series 7V3 PowerPlay Web Exploration CBT - eLearning 8 hours 450 F0429 IBM FileNet P8 Platform Administration 5 days 451 F0439 IBM FileNet Content Manager Java API Programming 4.5 5 days 452 F0619 IBM Content Collector 2.1 Installation for P8 Repository 1 day 453 F0639 IBM InfoSphere Content Collector: E-mail Collection 2.1.1 1 day 454 F0659 IBM InfoSphere Content Collector 2.1.1: File System Collection 1 day 455 F0729 IBM FileNet Content Manager: Bulk Operations 4.5 1 day 456 F0739 IBM FileNet Content Manager: Back Up and Restore Data 4.5 1 day 457 F0800 IBM Case Manager 5.1: User Interface Development 5 days 458 F0989 IBM ICC 2.1.1: Content Classification and Record Declaration 1 day 459 F1120 ICC Workshop 2.2: eMail Collection for Lotus Domino, eDiscovery 3 days 460 F1130 ICC Workshop 2.2: eMail Collection for Microsoft Exchange, eDiscovery 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 36.
    Business&Process Framework SoftSkills No Code DescriptionDuration 461 F1150 IBM FileNet Content Manager 5.2: Implementation and Administration 5 days 462 F1200 IBM Content Navigator 2.0.2: Customize and Extend the Features 3 days 463 F1400 IBM FileNet P8 5.0: Prerequisite Skills using Workplace 2 days 464 F1410 IBM FileNet P8 5.0: Prerequisite Skills using Workplace XT 2 days 465 F1420 IBM FileNet P8 Platform 5.0: System Implementation and Administration 5 days 466 F1430 IBM FileNet Content Manager 5.0: Java API Programming 5 days 467 F1440 IBM Case Foundation (formerly IBM FileNet BPM) 5.0:Administration 4 days 468 F1450 IBM Case Foundation (formerly IBM FileNet BPM) 5.0: Process Design 5 days 469 F1560 IBM Case Foundation (formerly IBM FileNet BPM) 5.0: Java API Programming 4 days 470 F1620 IBM Content Collector 2.2: Core Skills 1 day 471 F1640 IBM Content Collector 2.2: Email Collection for P8 and Domino 1 day 472 F1650 IBM Datacap 8.1: Introduction 2 days 473 F1660 IBM Datacap 8.1:Application Builder 2 days 474 F1680 IBM DatacapTaskmaster Capture 8.1: Configuration and Implementation 5 days 475 F1740 IBM Enterprise Records 5.1: Records Management 2 days 476 F1750 IBM Enterprise Records 5.1: System Administration 4 days 477 F1760 IBM DatacapTaskmaster Capture 8.0.1: Implementation and Configuration 5 days 478 F1780 IBM Enterprise Records 5.1: Core Skills 1 day 479 F1790 IBM Enterprise Records 5.1: System Configuration 1 day 480 F1800 IBM Enterprise Records 5.1: System Maintenance 1 day 481 F1810 IBM Enterprise Records 5.1: File Plan Design 1 day 482 F1820 IBM Enterprise Records 5.1:Automate Declaration 1 day 483 F1850 IBM Case Manager 5.1: Build, Deploy, and Monitor a Solution 4 days 484 F1860 IBM Case Manager 5.1: Installation 2 days 485 F1870 IBM Datacap 8.1:Advanced Configuration and Administration 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 37.
    Business&Process Framework SoftSkills No Code DescriptionDuration 486 F1900 IBM FileNet P8 Platform 5.1: Installation 4 days 487 F2019 IBM Content Collector 3.0 Core Skills: Installation and Configuration 1 day 488 F2059 Getting Started with Content Navigator 2.0 (WBT) 3 hours 489 F2078 Atlas eDiscovery Process Management 6.x: Introduction to Defensible Disposal 1 day 490 F2088 IBM Content Collector 3.0: eMail Collection for P8 and Exchange 5 hours 491 F2098 Atlas eDiscovery Process Management 6.x: Paralegal Skills 1 day 492 F2110 IBM FileNet Platform 5.2: Installation 4 days 493 F2120 IBM Case Manager 5.2: Build and Migrate a Solution 2 days 494 F2140 IBM Case Manager 5.2: Integrated Rules 1.5 days 495 F2150 IBM Case Manager 5.2: Introduction to Case Manager 1 day 496 F2160 IBM Case Manager 5.2: Security 2 days 497 F2170 IBM Case Manager 5.2: Customize & Extend the Features 3 days 498 F2180 IBM Case Manager 5.2: Integrating Case AnalyticTools 1.5 days 499 F2190 IBM Case Manager 5.2: Solution Implementation 4.5 days 500 F2200 IBM Datacap 9.0: Introduction 2 days 501 F2309 IBM Case Foundation 5.2.1: Introduction 5 hours 502 IM169 IBM CM OnDemand for Multiplatforms Application Implementation 8.4 5 days 503 IM179 IBM Content Manager OnDemand for Multiplatforms System Administration 8.4 5 days 504 IM180 IBM Content Manager OnDemand for Multiplatforms 8.5:Sys Implementation and Admin 5 days 505 IM520 IBM Content Manager System Administration 8.4 4 days 506 CNW41 Social Computing for Business with IBM Connections 3.0.1 3 days 507 CNW42 IBM Connections 4.0 - Social Software for Business 2 days 508 CNW43 What’s new in IBM Connections 4.5 2 days 509 D8420 Exploring New Features in IBM Lotus Domino Designer 8 1 day 510 D8510 Fundamentals of IBM Lotus Domino 8 Application Development 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 38.
    Business&Process Framework SoftSkills No Code DescriptionDuration 511 D8520 Building Web Applications with IBM Lotus Domino Designer 8 2 days 512 D8530 Developing IBM Lotus Domino 8 Applications - Intermediate Skills 3 days 513 D8550 Developing Composite Applications for IBM Lotus Notes 8 1 day 514 D8720 Exploring New Features in IBM Lotus Domino 8 Administration 2 days 515 D8730 Exploring New Features in IBM Lotus Domino 8.5 Administration 1 day 516 D8750 IBM Lotus Domino 8 System Administration Operating Fundamentals 1 day 517 D8760 Building the IBM Lotus Domino 8 Infrastructure 2 days 518 D8770 Managing IBM Lotus Domino 8 Servers and Users 3 days 519 D8900 IBM Lotus Domino 8 System Administration Bootcamp 5 days 520 D8L36 IBM Lotus Domino 8.5.x Help DeskTroubleshooting 2 days 521 D8L51 Fundamentals of IBM Lotus Domino 8.5.1 Application Development 5 days 522 D8L53 Developing IBM Lotus Domino 8.5.2 Applications: Intermediate XPage Design 3 days 523 D8L54 Developing IBM® Lotus® Domino® 8.5.2 Applications:Advanced XPage Design 2 days 524 D8L56 Modernizing IBM Lotus Domino 8.5.2 Applications 2 days 525 D8L75 IBM Lotus Domino 8.5 System Administration Fundamentals 1 day 526 D8L76 Building the IBM Lotus Domino 8.5 Infrastructure 2 days 527 D8L77 Managing IBM Lotus Domino 8.5 Servers and Users 3 days 528 D8L89 IBM Lotus Domino 8.5 System Administration Bootcamp 5 days 529 D8P36 IBM Lotus Domino 8.5.x Help DeskTroubleshooting 1.5 days 530 D8P51 Fundamentals of IBM Lotus Domino 8.5.1 Application Development  (SPVC) 5 days 531 D8P53 Developing IBM Lotus Domino 8.5.2 Applications: Intermediate XPage Design (SPVC) 3 days 532 D8P54 Fundamentals of IBM Lotus Domino 8.5.1 Application Development  (SPVC) 2 days 533 N8360 Help Desk BasicTroubleshooting for IBM Lotus Notes Domino 8 2 days 534 ND900 IBM Domino 9 Administration Fundamentals 5 days 535 ST850 Implementing an IBM Lotus Sametime 8 Infrastructure 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 39.
    Business&Process Framework SoftSkills No Code DescriptionDuration 536 STL85 Deploying and Administering Lotus Sametime 8.5.1 2 days 537 STW85 Lotus Sametime 8.5: Building Collaborative Communication Solutions 3 days 538 WPP52 Developing Multichannel Applications with IBM Web Experience Factory (SPVC) 3 days 539 9D648 IBM Care Management 6.0 - Functional andTechnical Overview 1 day 540 9I020 IBM i2 Analyst's Notebook Essentials 3 days 541 9I030 IBM i2 Analyst's Notebook Advanced Importing and Analysis 2 days 542 9I040 IBM i2 Analyst's Notebook Customizing and Semantics 2 days 543 9I130 i2 iBase Essentials 2 days 544 9I140 IBM i2 iBase User 3 days 545 9I150 i2 iBase Designer 3 days 546 9I160 i2 Analyst’s Notebook Premium Essentials 2 days 547 9I209 IBM i2 Intelligence Portal Essentials 8 hours 548 9I218 IBM i2 iBase Intellishare Essentials 8 hours 549 9I248 IBM i2 Overview 3 hours 550 9I369 IBM i2 COPLINK Detect Essentials 2 days 551 9J010 IBM Intelligent Operations Center Fundamentals 3 days 552 9J028 IBM IntelligentTransportation Fundamentals (WBT) 5 hours 553 9J030 IBM Intelligent Operations Center Customization and Configuration 2 days 554 9J040 IBM Intelligent Operations forTransportation 1.5 Fundamentals 1.5 days 555 9J050 IBM IntelligentTransit Analytics 1.5 Fundamentals 1 day 556 9J069 Getting Started with Intelligent Operations for Water 1.5 days 557 9J078 IBM® Intelligent Operations Center 1.6 Primer 5 hours 558 9J089 Water Information Hub in Intelligent Operations for Water 1.5.1 - SPVC 1 day 559 9J099 IBM Intelligent Operations forTransportation 1.6Traffic Awareness Configuration 2 days 560 9J109 Advanced Analytics in Intelligent Operations for Water 1.5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 40.
    Business&Process Framework SoftSkills No Code DescriptionDuration 561 9J119 Getting Started with Intelligent Operations Center 1.6 6 hours 562 9J129 Installation and Administration of Intelligent Operations Center 1.6 5 hours 563 9J139 Intelligent Operations Center 1.6 Configuration 3 days 564 9J148 IBM Intelligent City Planning and Operations v1.6 Essentials 5 hours 565 9J159 Data Source Configuration Workshop for Intelligent Operations Center 1.6 1.5 days 566 9J168 IBM Intelligent City Planning and Operations v1.6 Configuration 3 hours 567 9J179 IBM Intelligent City Planning and Operations 1.6 Infrastructure Planning - SPVC 2 days 568 9J188 Getting Started with IntelligentVideo Analytics 3 hours 569 9J208 Getting Started with Intelligent Operations Center 1.6 5 hours 570 9J218 Installation and Administration of Intelligent Operations Center 1.6 5 hours 571 9J228 IntelligentVideo Analytics User Interface Operation 8 hours 572 9J238 User Interface Customization of Intelligent Operations Center 1.6 3 hours 573 9J248 REST Services in Intelligent Operations Center 4 hours 574 9J258 Installation of IBMVideo Analytics 1.6 1 day 575 9J328 Getting Started with Intelligent Operations Center on Cloud 5 hours 576 9K018 IBM Counter Fraud Management Essentials 3 hours 577 9S205 i2 COPLINK Detect Refresher (SPVC) 5 hours 578 9S317 Introduction to IBM Unica Campaign 8.5 (SPVC) 3 days 579 9S318 IBM Unica Campaign Administration 8.5 (SPVC) 2 days 580 9S323 Introduction to IBM Unica Interact (SPVC) 1 day 581 9S324 Introduction to Unica Marketing Operations (SPVC) 2 days 582 9S325 IBM Unica Marketing Operations Administration (SPVC) 2 days 583 9T205 i2 COPLINK Detect Refresher 5 hours 584 9T211 i2 COPLINK Detect 2 days 585 9T239 i2Text Chart 8 User 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 41.
    Business&Process Framework SoftSkills No Code DescriptionDuration 586 9T245 Using iBase with i2 Analyst's Notebook 1 day 587 9T246 i2 iBridge User 2 days 588 1B740 IBM InfoSphere Optim Performance Manager Extended Edition Essentials - WBT 3 days 589 1E031 DB2 Family Fundamentals (WBT) 4 days 590 1E121 SQL Workshop (WBT) 2 days 591 1E131 DB2 SQL for Experienced Users (WBT) 2.5 days 592 1E221 Using SQL Replication (Web Based) 3 days 593 1E231 SQL Replication:AdvancedTopics (Web Based) 2 days 594 1E243 Using Queue Replication - Web Based 4 days 595 1I213IN IBM InfoSphere Identity Insight EssentialsV8 (Web) 4 days 596 1I900 Federation Server Essentials - Web Based 3 days 597 1L121 Query XML data with DB2 9 (Web) 3 days 598 1L131 Query and Manage XML Data with DB2 9 - Web Based 5 days 599 1L141 Manage XML data with DB2 9 (Web) 2 days 600 1L284 Fast Path to DB2 10.1 for Experienced Relational DBAs (WBT) 2 days 601 1L2X3 DB2 10 Administration Workshop for Linux and Windows - WBT 4 days 602 1L312 DB2 9.7 for Linux, UNIX, and Windows New Features (Web-Based) 2 days 603 1L313 DB2 10.1 for LUW New Features and Database Migration Considerations (WBT) 2 days 604 1L314 DB2 10.5 for LUW New Features and Database Migration Considerations - WBT 1 day 605 1L450 Implementation and Use of DB2 BLU Acceleration - WBT 1 day 606 1L463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration - WBT 5 days 607 1L484 DB2 10.1 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs - WBT 4 days 608 1L493 DB2 10 for LUW Advanced Database Recovery - WBT 4 days 609 1L600 Implementing DB2 Connect and Client Connections to DB2 for z/OS - WBT 2 days 610 1L800 DB2 9 pureScale Implementation and Control for DB2 LUW Administrators - WBT 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 42.
    Business&Process Framework SoftSkills No Code DescriptionDuration 611 1M001 Data Replication Essentials - WBT 1 day 612 1M130 IS Overview:Lifecycle of Information Integration w/ Information ServerV8.7-WBT 1 day 613 1M201 IBM InfoSphere DataStage EssentialsV8.7 (WBT) 4 days 614 1M202 IBM InfoSphere DataStage EssentialsV9.1 (WBT) 4 days 615 1M212 IBM InfoSphere QualityStage Essentials 9.1 (WBT) 4 days 616 1M230 Data ClickV10 for Big Insights - WBT 1 day 617 1M402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 - WBT 3 days 618 1M412 IBM InfoSphere Advanced QualityStageV9.1 - WBT 3 days 619 1M422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 - WBT 2 days 620 1M502 IBM InfoSphere Information Server Administration 9.1 (WBT) 4 days 621 1M611 IBM InfoSphere Business Glossary EssentialsV8.7 (WBT) 1 day 622 1M612 IBM InfoSphere Business Glossary EssentialsV9.1 - WBT 1 day 623 1M613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 - WBT 1 day 624 1M621 IBM InfoSphere Metadata Workbench EssentialsV8.7 - WBT 2 days 625 1M622 IBM InfoSphere Metadata Workbench EssentialsV9.1 - WBT 2 days 626 1M623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 - WBT 1.5 days 627 1M631 IBM InfoSphere FastTrack EssentialsV8.7 (WBT) 1 day 628 1M632 IBM InfoSphere FastTrack EssentialsV9.1 - WBT 1.5 days 629 1M801 IBM InfoSphere Information AnalysisV8.7 (WBT) 4 days 630 1M802 IBM InfoSphere Information Analysis 9.1 (WBT) 4 days 631 1T101 IBM InfoSphere Discovery Fundamentals - Web 3 days 632 1T204 Using Optim Data Growth for Archiving on Dist Systems - WBT 3 days 633 1T205G Using Optim Data Growth for Archiving on Dist Systems - WBT 4 days 634 1T215 Using OptimTest Data Management and Data Masking on Distributed Systems - WBT 4 days 635 1T802 InfoSphere Optim Data Growth for Archiving on z/OS - WBT 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 43.
    Business&Process Framework SoftSkills No Code DescriptionDuration 636 1T812 InfoSphere OptimTest Data Management and Data Masking on z/OS - WBT 4 days 637 1U202 InfoSphere GuardiumV9TechnicalTraining - WBT 3 days 638 1V311 DB2 for z/OS New Functions and Features inV10 - WBT 4 days 639 1V722 DB2 11 for z/OS Application Programming Workshop - WBT 3 days 640 1V831 DB2 10 for z/OS Database Administration Workshop Part 1 (WBT) 5 days 641 1W503 IBM PureData System for Analytics Usage - WBT 3 days 642 1W512 IBM PureData System for Analytics Advanced Concepts - WBT 2 days 643 1W522 IBM PureData System for Analytics for Developers and Administrators - WBT 5 days 644 1W530 IBM Netezza 6.0 New Features (Web) 2 days 645 1W531 IBM PureData System for Analytics, NPS 7.0 New Features - WBT 1 day 646 1W580 IBM PureData System for Analytics Programming and Usage - WBT 4 days 647 1W585 IBM PureData System for Analytics Programming and Usage - WBT 4 days 648 1W612 InfoSphere BigInsights Foundation - WBT 2.5 days 649 1W631 IBM BigInsights Big SQL - WBT 2 days 650 1W632 IBM BigInsights Big SQL - WBT 1 day 651 1W642 BigInsights Analytics for Business Analysts - WBT 2 days 652 1W643 BigInsights Analytics for Business Analysts - WBT 1 day 653 1W653 BigInsights Analytics for Programmers - WBT 2 days 654 1W723 Programming for InfoSphere StreamsV3 with SPL (WBT) 4 days 655 1W731 Administration of InfoSphere StreamsV3 (WBT) 1 day 656 1X302 Informix 11.70 New Features (Web) 2 days 657 1X711 IBM Informix Stored Procedures andTriggers - (Web) 2 days 658 1Z031 Using Inspector v9.x - Web Based 0.375 days 659 1Z310 InfoSphere Master Data Management Server Workbench for MDM Server 9.0.2 (Web) 3 days 660 1Z340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 (Web) 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 44.
    Business&Process Framework SoftSkills No Code DescriptionDuration 661 1Z401 Introduction to IBM InfoSphere Master Data Management Standard EditionV10 (WBT) 5 hours 662 1Z450 Administrating InfoSphere MDM Standard Edition v10 - WBT 1 day 663 1Z470 InfoSphere Master Data Policy - WBT 5 hours 664 1Z520 Using InfoSphere MDM Collaborative EditionV10 - WBT 3 days 665 1Z540 Programming with InfoSphere MDM Collaborative Edition - WBT 5 days 666 1Z610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 (WBT) 3 days 667 1Z620 InfoSphere MDM Advanced Edition ArchitectureV10 - WBT 3 days 668 1Z640 Customizing InfoSphere MDM Advanced EditionV10 - WBT 3 days 669 1Z670 InfoSphere MDM Reference Data ManagementV10 (WBT) 2 days 670 1Z780 InfoSphere MDM Algorithms v11 - WBT 3 days 671 1Z800 Introduction to InfoSphere Master Data Management v11 - WBT 5 hours 672 1Z801 Introduction to InfoSphere Master Data Management v11.3 - WBT 1 day 673 1Z820 InfoSphere MDM Architecture v11 - WBT 3 days 674 1Z840 InfoSphere MDM Workbench v11 - WBT 3 days 675 1Z870 InfoSphere MDM ApplicationToolkit v11.3 - WBT N 676 1Z880 Virtual Module Algorithms for InfoSphere MDM v11 - WBT 2 days 677 1Z980 Physical Module Algorithms for InfoSphere MDM v11 - WBT 2 days 678 2B740 IBM InfoSphere Optim Performance Manager Extended Edition Essentials (SPVC) 3 days 679 2E121 SQL Workshop (SPVC) 2 days 680 2E131 DB2 SQL for Experienced Users (SPVC) 2.5 days 681 2E221 Using SQL Replication (SPVC) 3 days 682 2E231 SQL Replication:AdvancedTopics (SPVC) 2 days 683 2I213 IBM InfoSphere Identity Insight EssentialsV8 (SPVC) 4 days 684 2I900 Federation Server Essentials - SPVC 3 days 685 2L100 DB2 9 for Linux, UNIX and Windows Application Programming Fundamentals - SPVC 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 45.
    Business&Process Framework SoftSkills No Code DescriptionDuration 686 2L110 DB2 9 for Linux, UNIX and Windows Application Programming Advanced - SPVC 2 days 687 2L121 Query XML Data with DB2 9 (SPVC) 3 days 688 2L131 Query and Manage XML Data with DB2 9 (SPVC) 5 days 689 2L141 Manage XML data with DB2 9 (SPVC) 2 days 690 2L202 DB2 9 Administration Workshop for Linux (SPVC) 4 days 691 2L203 DB2 10 Administration Workshop for Linux - SPVC 4 days 692 2L232 DB2 9 Administration Workshop for Windows (SPVC) 4 days 693 2L233 DB2 10 Administration Workshop for Windows - SPVC 4 days 694 2L240 DB2 9 for LUW Multiple Partition DBA Workshop - Self PacedVirtual Class 5 days 695 2L250 DB2 9 for LUW Multiple Partition Environment for Single Partition DBAs (SPVC) 3 days 696 2L283 Fast Path to DB2 9.7 for Experienced Relational DBAs - Self PacedVirtual Class 2 days 697 2L284 Fast Path to DB2 10.1 for Experienced Relational DBAs (SPVC) 2 days 698 2L412 DB2 for Linux, UNIX and Windows PerformanceTuning and Monitoring Workshop -SPVC 4 days 699 2L413 DB2 for LUW PerformanceTuning and Monitoring Workshop - SPVC 4 days 700 2L442 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition-SPVC 5 days 701 2L443 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition DBs - SPVC 5 days 702 2L450 Implementation and Use of DB2 BLU Acceleration - SPVC 1 day 703 2L463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration - SPVC 5 days 704 2L483 DB2 9.7 for LUW Quickstart for Experienced Relational DBAs (SPVC) 4 days 705 2L484 DB2 10.1 for Linux, UNIX, and WIN Quickstart for EXP. Relational DBAs (SPVC) 4 days 706 2L493 DB2 10 for LUW Advanced Database Recovery - SPVC 4 days 707 2L711 DB2 Stored Procedures Programming Workshop (SPVC) 2 days 708 2M130 IS Overview:Lifecycle of Information Integration w/ Information ServerV8.7-SPVC 1 day 709 2M201 IBM InfoSphere DataStage EssentialsV8.7 (SPVC) 4 days 710 2M202 IBM InfoSphere DataStage EssentialsV9.1 (SPVC) 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 46.
    Business&Process Framework SoftSkills No Code DescriptionDuration 711 2M212 IBM InfoSphere QualityStage Essentials 9.1 (SPVC) 4 days 712 2M230 Data ClickV10 for Big Insights - SPVC 1 day 713 2M402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 - SPVC 3 days 714 2M412 IBM InfoSphere Advanced QualityStageV9.1 - SPVC 3 days 715 2M422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 - SPVC 2 days 716 2M502 IBM InfoSphere Information Server Administration 9.1 - SPVC 4 days 717 2M611 IBM InfoSphere Business Glossary EssentialsV8.7 (SPVC) 1 day 718 2M612 IBM InfoSphere Business Glossary EssentialsV9.1 - SPVC 1 day 719 2M613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 - SPVC 1 day 720 2M621 IBM InfoSphere Metadata Workbench EssentialsV8.7 - SPVC 2 days 721 2M622 IBM InfoSphere Metadata Workbench EssentialsV9.1 - SPVC 2 days 722 2M623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 - SPVC 1.5 days 723 2M631 IBM InfoSphere FastTrack EssentialsV8.7 (SPVC) 1 day 724 2M632 IBM InfoSphere FastTrack EssentialsV9.1 - SPVC 1 day 725 2M801 IBM InfoSphere Information AnalysisV8.7 (SPVC) 4 days 726 2M802 IBM InfoSphere Information Analysis 9.1 (SPVC) 4 days 727 2T101 IBM InfoSphere Discovery Fundamentals - SPVC 3 days 728 2T204 Using Optim Data Growth for Archiving on Dist Systems - SPVC 3 days 729 2T205 Using Optim Data Growth for Archiving on Dist Systems - SPVC 4 days 730 2T215 Using OptimTest Data Management and Data Masking on Distributed Systems - SPVC 4 days 731 2U202 InfoSphere GuardiumV9TechnicalTraining - SPVC 3 days 732 2W220 InfoSphere Data Explorer AdministratorTraining (SPVC) 5 days 733 2W503 IBM PureData System for Analytics Usage - SPVC 3 days 734 2W512 IBM PureData System for Analytics Advanced Concepts - SPVC 2 days 735 2W522 IBM PureData System for Analytics for Developers and Administrators - SPVC 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 47.
    Business&Process Framework SoftSkills No Code DescriptionDuration 736 2W580 IBM PureData System for Analytics Programming and Usage - SPVC 4 days 737 2W612 InfoSphere BigInsights Foundation - SPVC 2.5 days 738 2W631 IBM BigInsights Big SQL - SPVC 2 days 739 2W632 IBM BigInsights Big SQL - SPVC 1 day 740 2W642 BigInsights Analytics for Business Analysts - SPVC 2 days 741 2W643 BigInsights Analytics for Business Analysts - SPVC 1 day 742 2W653 BigInsights Analytics for Programmers - SPVC 2 days 743 2W723 Programming for InfoSphere StreamsV3 with SPL (SPVC) 4 days 744 2W731 Administration of InfoSphere StreamsV3 (SPVC) 1 day 745 2X101 Developing Applications Using Informix 4GL - SPVC 5 days 746 2X222 Informix 11.7 Database Administration (SPVC) 4 days 747 2X480 Fast Path to Informix for Experienced Relational Database Administrators (SPVC) 4 days 748 2X711 IBM Informix Stored Procedures andTriggers - SPVC 2 days 749 2X812 Informix 11.7 System Administration - SPVC 4 days 750 2Z310 IBM InfoSphere MDM Server Workbench for MDM Server 9.0.2 (SPVC) 3 days 751 2Z340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 (SPVC) 2 days 752 2Z450 Administrating InfoSphere MDM Standard EditionV10 - SPVC 1 day 753 2Z520 Using InfoSphere MDM Collaborative EditionV10 - SPVC 3 days 754 2Z540 Programming with InfoSphere MDM Collaborative Edition - SPVC 4 days 755 2Z610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 (SPVC) 3 days 756 2Z620 InfoSphere MDM Advanced Edition ArchitectureV10 - SPVC 3 days 757 2Z640 Customizing InfoSphere MDM Advanced EditionV10 - SPVC 3 days 758 2Z670 InfoSphere MDM Reference Data ManagementV10 (SPVC) 2 days 759 2Z780 InfoSphere MDM Algorithms v11 - SPVC 3 days 760 2Z820 InfoSphere MDM Architecture v11 - SPVC 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 48.
    Business&Process Framework SoftSkills No Code DescriptionDuration 761 2Z840 InfoSphere MDM Workbench v11 - SPVC 3 days 762 2Z870 InfoSphere MDM ApplicationToolkit v11.3 - WBT 2 days 763 2Z880 Virtual Module Algorithms for InfoSphere MDM v11 - SPVC 2 days 764 2Z980 Physical Module Algorithms for InfoSphere MDM v11 - SPVC 2 days 765 CE031 DB2 Family Fundamentals 2 days 766 CE121 DB2 SQL Workshop 2 days 767 CE131 DB2 SQL Workshop for Experienced Users 2.5 days 768 CL212 DB2 9 Database Administration Workshop for UNIX 4 days 769 CL213 DB2 10 for LUW: Basic Administration for AIX 4 days 770 CL240 DB2 9 for LUW Multiple Partition DBA Workshop 5 days 771 CL250 DB2 9 for LUW Multiple Partition Environment for Single Partition DBAs 3 days 772 CL2X2 DB2 9 Database Administration Workshop for Linux, UNIX, and Windows 4 days 773 CL2X3 DB2 10 for LUW: Basic Administration for Linux and Windows 4 days 774 CL313 DB2 10.1 for LUW New Features and Database Migration Considerations 2 days 775 CL314 DB2 10.5 for LUW New Features and Database Upgrade Considerations 1 day 776 CL412 DB2 for Linux, UNIX, and Windows PerformanceTuning and Monitoring Workshop 4 days 777 CL413 DB2 for LUW PerformanceTuning and Monitoring Workshop 4 days 778 CL442 DB2 LUW PerformanceTuning and Monitoring for Single and Multiple Partition DBs 5 days 779 CL450 Implementation and Use of DB2 BLU Acceleration 1 day 780 CL462 DB2 9 for LUW Advanced Database Administration for Experts 5 days 781 CL463 DB2 10.5 for LUW Advanced Database Administration with DB2 BLU Acceleration 5 days 782 CL483 DB2 9 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days 783 CL484 DB2 10.1 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days 784 CL485 DB2 10 for Linux, UNIX, and Windows Quickstart for Experienced Relational DBAs 4 days 785 CL492 DB2 9 for LUW Advanced Database Recovery 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 49.
    Business&Process Framework SoftSkills No Code DescriptionDuration 786 CL493 DB2 10 for LUW Advanced Database Recovery 4 days 787 CL800 DB2 9.8 pureScale Implementation and Control for DB2 LUW Administrators 2 days 788 CV020 Introduction to DB2 for z/OS for Systems and Operations Personnel 3 days 789 CV041 z/OS and DB2 Basics for DB2 for z/OS DBA Beginners 5 days 790 CV311 DB2 for z/OS New Functions and Features inV10 4 days 791 CV312 New Functions and Features in DB2 10 for z/OS Workshop 5 days 792 CV320 New Functions and Features in DB2 11 for z/OS 3 days 793 CV722 DB2 11 for z/OS Application Programming Workshop 3 days 794 CV831 DB2 10 for z/OS Database Administration Workshop Part 1 5 days 795 CV832 DB2 11 for z/OS Database Administration Part 1 4 days 796 CV842 DB2 10 for z/OS Database Administration Part 2 3 days 797 CV851 DB2 10 for z/OS System Administration 5 days 798 CV852 DB2 11 for z/OS System Administration 5 days 799 CV861 DB2 10 for z/OS Implementation Workshop 5 days 800 CV871 DB2 10 for z/OS Utilities for Database Administrators 3 days 801 CV951 DB2 10 for z/OS System Performance Analysis andTuning 4 days 802 CV962 DB2 10 for z/OS Application Performance andTuning 5 days 803 DC712 What is New in IBM InfoSphere MDM Server for PIMV9 1 day 804 DC722 Using InfoSphere MDM Server for PIMV9 3 days 805 DC732 Implementing IBM InfoSphere MDM Server for PIMV9 4 days 806 DC742 Programming with IBM InfoSphere MDM Server for PIM 5 days 807 DT101 IBM InfoSphere Discovery Fundamentals 3 days 808 DT205 Using Optim Data Growth for Archiving on Distributed Systems 3 days 809 DT215 Using OptimTest Data Management and Data Masking on Distributed Systems 4 days 810 DT225 Using IBM InfoSphere Optim Solutions on Distributed Platforms 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 50.
    Business&Process Framework SoftSkills No Code DescriptionDuration 811 DT802 InfoSphere Optim Data Growth for Archiving on z/OS 4 days 812 DT812 InfoSphere OptimTest Data Management and Data Masking on z/OS 4 days 813 DW220 InfoSphere Data Explorer AdministratorTraining 5 days 814 DW503 IBM PureData System for Analytics Usage 3 days 815 DW512 IBM PureData System for Analytics Advanced Concepts 2 days 816 DW522 IBM PureData System for Analytics for Developers and Administrators 5 days 817 DW531 IBM PureData System for Analytics, NPS 7.0 New Features 1 day 818 DW580 IBM PureData System for Analytics Programming and Usage 4 days 819 DW585 IBM PureData System for Analytics Programming and Usage 4 days 820 DW612 InfoSphere BigInsights Foundation 2.5 days 821 DW632 IBM BigInsights Big SQL 1 day 822 DW643 BigInsights Analytics for Business Analysts 1 day 823 DW653 BigInsights Analytics for Programmers 2 days 824 DW723 Programming for InfoSphere StreamsV3 with SPL 4 days 825 DW731 Administration of InfoSphere StreamsV3 1 day 826 DX900 Federation Server Essentials 3 days 827 EA214 IBM InfoSphere Identity Insight EssentialsV8 3 days 828 EA313 IBM InfoSphere Identity Insight Advanced ConfigurationV8 3 days 829 GU2Z2 InfoSphere GuardiumV9TechnicalTraining 3 days 830 IX222 Informix 11.7 Database Administration 4 days 831 KM001 Data Replication Essentials 1 day 832 KM020 IBM InfoSphere Data Replication - InfoSphere Change Data Capture Essentials 3 days 833 KM130 IS Overview: Lifecycle of Information Integration with Information Server 1 day 834 KM201 IBM InfoSphere DataStage EssentialsV8.7 4 days 835 KM202 IBM InfoSphere DataStage Essentials 9.1 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 51.
    Business&Process Framework SoftSkills No Code DescriptionDuration 836 KM211 IBM InfoSphere QualityStage EssentialsV8.7 4 days 837 KM212 IBM InfoSphere QualityStage Essentials 9.1 4 days 838 KM230 Data ClickV10 for BigInsights 1 day 839 KM310 IBM InfoSphere QualityStageV8.5 Postal Modules 2 days 840 KM400 IBM InfoSphere Advanced DataStageV8 4 days 841 KM402 IBM InfoSphere Advanced DataStage - Parallel Framework v9.1 3 days 842 KM411 InfoSphere QualityStage 8.7 Advanced 3 days 843 KM412 IBM InfoSphere Advanced QualityStageV9.1 3 days 844 KM422 IBM InfoSphere Advanced DataStage - Advanced Data Processing v9.1 2 days 845 KM502 IBM InfoSphere Information Server AdministrationV9.1 4 days 846 KM611 IBM InfoSphere Business Glossary EssentialsV8.7 1 day 847 KM612 IBM InfoSphere Business Glossary EssentialsV9.1 1 day 848 KM613 IBM InfoSphere IGC II - Building the Governance Catalog v11.3 1 day 849 KM621 IBM InfoSphere Metadata Workbench EssentialsV8.7 2 days 850 KM622 IBM InfoSphere Metadata Workbench EssentialsV9.1 2 days 851 KM623 IBM InfoSphere IGC I - UnderstandingYour Information Assets v11.3 1.5 days 852 KM631 IBM InfoSphere FastTrack EssentialsV8.7 1 day 853 KM632 IBM InfoSphere FastTrack EssentialsV9.1 1 day 854 KM640 IBM InfoSphere Information Services Director EssentialsV8 1 day 855 KM650 New Features in IBM InfoSphere Data Integration and GovernanceV11.3 1 day 856 KM801 IBM InfoSphere Information AnalysisV8.7 4 days 857 KM802 IBM InfoSphere Information Analysis 9.1 4 days 858 ZZ101 InitiateTechnical Boot CampV10 5 days 859 ZZ121 Implementing Initiate Message Broker Suite 2 days 860 ZZ131 Implementing Initiate HL7 Query Adapter 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 52.
    Business&Process Framework SoftSkills No Code DescriptionDuration 861 ZZ310 InfoSphere Master Data Management Server Workbench for MDM Server 9.0.2 3 days 862 ZZ340 IBM InfoSphere MDM Server Service Customization for MDM Server 9 2 days 863 ZZ401 Introduction to IBM InfoSphere Master Data Management Standard EditionV10 5 hours 864 ZZ420 IBM InfoSphere MDM Standard Edition Architecture and Data Model Design 1 day 865 ZZ430 Initial Load and Data Processing for InfoSphere MDM - Standard EditionV10 2 days 866 ZZ440 Configuring InfoSphere MDM Standard EditionV10 1 day 867 ZZ450 Administrating InfoSphere MDM Standard EditionV10 1 day 868 ZZ520 Using InfoSphere MDM Collaborative Edition 3 days 869 ZZ540 Programming with InfoSphere MDM Collaborative Edition v10.1 4 days 870 ZZ610 Data Model and Service Mapping for InfoSphere MDM Advanced EditionV10 3 days 871 ZZ620 InfoSphere MDM Advanced Edition ArchitectureV10 3 days 872 ZZ640 Customizing the InfoSphere MDM Advanced EditionV10 3 days 873 ZZ670 InfoSphere MDM Reference Data ManagementV10 2 days 874 ZZ780 InfoSphere MDM Algorithms v11 3 days 875 ZZ820 InfoSphere MDM Architecture v11 3 days 876 ZZ840 InfoSphere MDM Workbench v11 3 days 877 ZZ870 InfoSphere MDM ApplicationToolkit v11.3 2 days 878 ZZ880 Virtual Module Algorithms for InfoSphere MDM v11 2 days 879 ZZ980 Physical Module Algorithms for InfoSphere MDM v11 2 days 880 KM203 IBM InfoSphere DataStage Essentials v11.3 2 days 881 QN114 IBM Rational DOORS Practitioner,V9.4 1 day 882 QN118 Customizing DOORS Using DXLV9.3 2 days 883 QN164 IBM Rational DOORS Foundation,V9.4 1 day 884 QN171 Essentials of IBM Rational DOORS Next GenerationV5.0 1 day 885 QQ001 Introduction to IBM Rational Rhapsody 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 53.
    Business&Process Framework SoftSkills No Code DescriptionDuration 886 QQ139 Essentials of IBM Rational RhapsodyV7.6 for Software Engineers 4 days 887 QQ142 Essentials of IBM Rational RhapsodyV7.6 for Software Engineers (no UML) 3 days 888 QQ144 Essentials of IBM Rational Rhapsody v8.1 for System Engineers 3.5 days 889 TA511 IBMTRIRIGA 10.3 Operations and Maintenance 5 days 890 TA521 IBMTRIRIGA 10.3 Capital Projects 3 days 891 TA531 IBMTRIRIGA Leased and Owned Property Contract Management 10.3 3 days 892 TA541 IBMTRIRIGA 10.3 Real Estate -Transaction Management 2 days 893 TA550 IBMTRIRIGA Real Estate Environmental Sustainability (TREES) 10.2 3 days 894 TA561 IBMTRIRIGA Facilities - Space Management 10.3 2 days 895 TA570 TRIRIGA Strategic Facilities Planning 2 days 896 TA611 IBMTRIRIGA 10.3 Application Platform I 5 days 897 TA701 IBMTRIRIGA 10.3 Application Platform II 1 day0 898 TOS25 Tivoli Process Automation Engine 7.5 Fundamentals (SPVC) 5 days 899 TOS26 IBMTRIRIGA 10.3 Portfolio (SPVC) 2 days 900 TOS27 IBM License MetricTool 7.5 (WBT) 2.5 days 901 TOS30 IBM Maximo Asset Configuration Manager 7.5 (SPVC) 2 days 902 TOS36 IBM Maximo Asset Management Scheduler 7.5.1 (SPVC) 75 mins 903 TOS43 IBM Maximo Asset Management 7.5 Fundamentals (SPVC) 3 days 904 TOS44 Scenario Based Problem Solving Using APM: Business Process Modeling (SPVC) 0.75 days 905 TOS64 IBM Maximo Asset Configuration Manager 7.5.1 (SPVC) 2 days 906 TOS66 IBM Maximo Health, Safety and Environment 7.5.1 (SPVC) 1.5 days 907 TOS67 IBM Maximo for Oil and Gas 7.5.1 (SPVC) 1.5 days 908 TR232 Business Intelligence and ReportingTool (BIRT) 3 days 909 TR571 IBM Maximo Asset Management 7.5 Fundamentals 4 days 910 TR632 IBM Maximo Asset Management 7.5.1 Work Management 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 54.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology No CodeDescription Duration 911 TR691 IBM Maximo for Service Providers 7.5.3 3 days 912 TR711 Tivoli's Process Automation Engine 7.5 Fundamentals 5 days 913 ZB307 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 (Self-paced) 5 days 914 ZB308 Capturing and Authoring Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 5 days 915 ZB309 Capturing Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 (Self-paced) 3 days 916 ZB310 Authoring Business Rules in IBM WebSphere ILOG RuleTeam ServerV7.1 (Selfpaced) 3 days CLOUD 917 TM023 IBMTivoli Monitoring 6.3 Fundamentals 3 days 918 TM063 IBMTivoli Monitoring 6.3 Advanced Administration 2 days 919 TM165 IBMTivoli Application Dependency Discovery Manager 7.2.1 Implementation 5 days 920 TM337 IBMTivoli Business Services Manager 6.1.1 for Administrators 5 days 921 TM393 IBMTivoli Workload Scheduler for z/OS 8.6 Operations 2 days 922 TM404 IBMTivoli Workload Scheduler for z/OS 8.6.0 for Schedulers 4 days 923 TM662 IBMTCAM forTransactions 7.3 Implementation and Administration 4 days 924 TM690 IBMTivoli Composite Application Manager for AD 7.1 Usage 2 days 925 TN013 IBMTivoli Netcool/OMNIbus 7.3 User 2 days 926 TN023 IBMTivoli Netcool/OMNIbus 7.3 Installation and Configuration 3 days 927 TN024 IBMTivoli Netcool/OMNIbus 7.4 - Installation and Configuration 3 days 928 TN025 IBMTivoli Netcool/OMNIbus 8.1 Installation and Configuration 3 days 929 TN033 IBMTivoli Netcool/OMNIbus 7.3 Administration and Maintenance 4 days 930 TN034 IBMTivoli Netcool/OMNIbus 7.4 Administration and Maintenance 4 days 931 TN044 IBMTivoli Netcool/Impact 6.1.1 Administration and Implementation 4 days 932 TN500 IBMTivoli Netcool/Omnibus 7.3 New Features Implementation 3 days 933 TN550 IBMTivoli Netcool Configuration Manager 6.3 Administration and Implementation 5 days 934 TN600 IBM Netcool Network Management 9.2 Fundamentals 2 days 935 TN610 IBM SmartCloud Analytics Predictive Insights 1.2 Implementation, Configuration 2 days Cloud Commerce Security Systems Watson HealthAnalytics
  • 55.
    Business&Process Framework SoftSkills No Code DescriptionDuration 936 TOD26 IBM SmartCloud Analytics Log Analysis 1.2.0.3 Administration 16 hours 937 TOS23 DifferencesTraining: IBMTivoli Workload Scheduler for z/OS 8.5.1 (WBT) 8 hours 938 TOS31 IBM SmartCloud Provisioning 2.1 (WBT) 14 hours 939 TOS33 Tivoli Common Reporting 2.1.1 Fundamentals 3 hours 940 TOS34 IBM SmartCloud Control Desk 7.5 Foundations (SPVC) 2 days 941 TOS35 IBMTivoli Netcool/OMNIbus 7.4 User 2 days 942 TOS38 IBM SmartCloud Control Desk 7.5 IT Asset Management Fundamentals (SPVC) 3 days 943 TOS41 IBMTivoli Netcool Configuration Manager 6.4 Advanced Features (SPVC) 1 day 944 TOS47 IBMTivoli Netcool Configuration Manager 6.4 Operations and Configuration (SPVC) 5 days 945 TOS48 IBM SmartCloud Monitoring 7.2 (SPVC) 1 day 946 TOS52 IBMTivoli Netcool/Impact 6.1.1 Differences 1.5 hours 947 TOS55 Service Health for SmartCloud Provisioning 2.1 4 hours 948 TOS56 Jazz for Service Management Reporting Service Fundamentals 1 day 949 TOS57 IBMTivoli Monitoring 6.3 Fundamentals (SPVC) 3 days 950 TOS59 IBMTivoli Monitoring 6.3 for Implementers (SPVC) 3 days 951 TOS63 IBMTivoli Monitoring 6.3 Advanced Administration (SPVC) 2 days 952 TOS68 IBM SmartCloud Control Desk 7.5.1 Service Request Management Fundamentals (SPVC) 3 days 953 TOS71 IBM SmartCloud Orchestrator Enterprise 2.3 Administration and Operations (WBT) 4 hours 954 TOS79 IBM SmartCloud Analytics Log Analysis 1.2 Administration 1 day 955 TOS81 Jazz for Service Management Advanced Dashboard Implementation - SPVC 8 hours 956 TOS82 Using Jazz for Service Management Dashboard Widgets with Netcool/OMNIbus Data 5 hours 957 TOS86 Using Jazz for Service Management Dashboard Widgets with Netcool/Impact Data 5 hours 958 TOS87 Using Jazz for Service Management Dashboard Widgets withTivoli Monitoring Data 5 hours 959 TOS88 Using Jazz for Service Management Dashboard Widgets withTBSM Service Data 5 hours 960 TOS89 Using Jazz for Service Management Dashboards with IBM Directory Integrator Data 5 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 56.
    Business&Process Framework SoftSkills No Code DescriptionDuration 961 TOS90 Using the Jazz for Service Management Web Widget with Business Dashboards 5 hours 962 TOS94 IBM SmartCloud Orchestrator 2.3 Administration and Operations (WBT) 2 days 963 TP350 IBM SmartCloud Control Desk 7.5 Foundations 2 days 964 TP361 IBM SmartCloud Control Desk 7.5.1 Service Request Management Fundamentals 3 days 965 TP380 IBM SmartCloud Control Desk 7.5 IT Asset Management Fundamentals 3 days 966 TV355 IBMTivoli Monitoring 6.3 for Implementers 3 days 967 TT372 IBMTivoli Monitoring 6.2 Historical Reporting and Data Collection 1 day 968 TV382 IBMTivoli Monitoring 6.2.1 Agent Builder 2 days 969 TX304 IBMTivoli Workload Scheduler 8.6 Operations and Scheduling 3 days 970 TX314 IBMTivoli Workload Scheduler 8.6 Administration 2 days COMMERCE 971 6D289 Introduction to IBM Emptoris Program Management (V9) 4 hours 972 6D290 IBM® Emptoris® Service Procurement for System Administrators (V9.2) 1 day 973 6D309 Introduction to IBM® Emptoris® Service Procurement 3 hours 974 6D310 IBM® Emptoris® Service Procurement 1 day 975 6D379 IBM® Emptoris® Service Procurement for Contractors (V9.2) 2 hours 976 6D408 IBM® Emptoris® Service ProcurementV9.5 (WBT) 4 hours 977 6D418 IBM® Emptoris® Service Procurement for System Administrators (WBT) 3 hours 978 6D438 Introduction to IBM® Emptoris® Strategic Supply Management (V10.0) (WBT) 1 hour 979 6D478 Introduction to IBM® Emptoris® Contract ManagementV10.0 (WBT) 2 hours 980 6D508 IBM® Emptoris® Contract Management System AdministrationV10.0 (WBT) 4 hours 981 6D518 IBM® Emptoris® Contract Management Reports (V10.0) 1 hour 982 6D538 IBM® Emptoris® Spend Analysis for Power UsersV10.0.2 (WBT) 6 hours 983 6D558 IBM® Emptoris® Strategic Supply Management System Administration (WBT) 2 hours 984 6D568 IBM® Emptoris® Strategic Supply Management User Administration (WBT) 1 hour 985 6D578 IBM® Emptoris® Strategic Supply Management External Party ManagementV10.0 (WB 1 hour CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 57.
    Business&Process Framework SoftSkills No Code DescriptionDuration 986 6D588 IBM Emptoris SSM Organization, Category and Location Management (V10.0) (WBT) 1 hour 987 6D618 IBM® Emptoris® Spend Analysis Supplier and Category MappingV10.0 (WBT) 1 hour 988 6D628 IBM® Emptoris® Contract Management ContractTemplate Creation (V10.0) 2 hours 989 6D630 IBM® Emptoris® Contract Management Contract Lifecycle (V10.0.1) 3 days 990 6D648 IBM® Emptoris® Contract Management Contract Review and Approve (V10.0.1) 2 days 991 6D658 Structure and Design of IBM® Emptoris® Sourcing (V10.0.2) 1 hour 992 6D668 IBM® Emptoris® Sourcing for System Administrators (V10.0.2) (WBT) 1 hour 993 6D688 IBM® Emptoris® Sourcing Auctioning Process (V10.0.2) (WBT) 3 hours 994 6D698 IBM® Emptoris® Sourcing Non Auctioning Process (V10.0.2) (WBT) 3 hours 995 6D708 IBM® Emptoris® Contract Management Contract LifecycleV10.0.1 (WBT) 2 days 996 6D718 IBM® Emptoris® Supplier Lifecycle Management (V10.0.2) (WBT) 1 hour 997 6D728 IBM® Emptoris® Supplier Lifecycle Management Essentials for Purchasers (V10.0. 1 hour 998 6D738 Supplier Qualification in IBM® Emptoris® Supplier Lifecycle Management 6 hours 999 6D748 Supplier Evaluation in IBM Emptoris Supplier Lifecycle Management 5 hours 1000 6D758 Supplier Classification in IBM Emptoris Supplier Lifecycle Management - WBT 2 hours 1001 6D768 Supplier Risk in IBM Emptoris Supplier Lifecycle Management 2 hours 1002 6D778 Supplier Development in IBM Emptoris Supplier Lifecycle Management 2 hours 1003 6D818 IBM Emptoris Spend Analysis for Management UsersV10.0.2 2 hours 1004 6D828 IBM® Emptoris® Spend Analysis Administration (V10.0.2) - WBT 1 day 1005 6D848 IBM Emptoris SSM SuiteV10.0.2 Installation - Expert Arena 5 days 1006 6E216 IBM® WebSphere CommerceV7 Server Expert Arena 5 days 1007 6E217 IBM WebSphere CommerceV7 Development Environment Expert Arena 5 days 1008 6F020 Sterling Selling and Fulfillment Suite Participant Modeling and User Security 2 days 1009 6F030 IBM® Sterling Selling and Fulfillment Foundation Process Modeling 1 day 1010 6F040 IBM® Sterling Selling and Fulfillment Foundation Item and Pricing Configuration 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 58.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1011 6F050 IBM Sterling Selling and Fulfillment Inventory and Order Mngmnt Business Rules 2 days 1012 6F080 IBM® Sterling Selling and Fulfillment Foundation Extending the Application 4 days 1013 6F168 Job Aid for IBM® Multi-Enterprise Relationship Management 1 hour 1014 6F19G IBM SSFF Introduction to Sterling Order Management 1 hour 1015 6F20G IBM SSFF Introduction to Applications Manager 25 mins 1016 6F21G IBM SSFF Overview of Participants and Roles 25 mins 1017 6F22G IBM Sterling Selling and Fulfillment Foundation Overview of Users andTeams 25 mins 1018 6F23G IBM Sterling Selling and Fulfillment Foundation Item and Pricing Basics 1 hour 1019 6F24G IBM Sterling Selling and Fulfillment Foundation Business Center Overview 1 hour 1020 6F268 IBM Sterling Selling and Fulfillment Foundation Setting up Customer Definitions 1 hour 1021 6F28G IBM Sterling Selling and Fulfillment Foundation Managing Item Attributes 25 mins 1022 6F298 IBM SSFF Performing Services and Fulfillment Configuration 2 hours 1023 6F398 IBM Sterling Selling and Fulfillment Foundation Call Center for Commerce 1 hour 1024 6G01G Commerce Composer Customization for IBM WebSphere CommerceV7 Feature Pack 7 2 days 1025 6G02G Commerce Composer Functionality for WebSphere CommerceV 7 for Feature Pack 7 1.5 days 1026 6G24G Introduction to IBM WebSphere Commerce Management Center 25 mins 1027 6G25G Introduction to Product Catalog for IBM WebSphere CommerceVersion 7 FEP 7 1 hour 1028 6G27G Product and Category Search Optimization for IBM WebSphere CommerceV7 25 mins 1029 6G288 Marketing with Search for WebSphere Commerce Feature Pack 7 2 hours 1030 6G308 Installments Management for IBM WebSphere CommerceVersion 7 FEP 7 1 hour 1031 6G31G Introduction to IBM WebSphere Commerce Extended Sites 25 mins 1032 6G34G Asset Management for IBM WebSphere CommerceVersion 7 FEP 7 25 mins 1033 6G358 Catalog Upload for IBM WebSphere CommerceV7 1 hour 1034 6G36G Product Information Management for IBM WebSphere CommerceVersion 7 FEP 7 25 mins 1035 6G388 Introduction to Marketing Management for IBM WebSphere CommerceVersion 7 FEP 7 1 hour CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 59.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1036 6S221 IBM WebSphere CommerceV7 Foundation 2 days 1037 6S405 IBM XML Essentials (SPVC) 5 hours 1038 6S611 IBM Sterling B2B Integrator Fundamentals (SPVC) 5 days 1039 6S632 IBM Sterling B2B Integrator Advanced Business Process Modeling (SPVC) 2 days 1040 6S656 IBM Sterling B2B Integrator Data Mapping and EDI Processing - X12 (SPVC) 5 days 1041 6T115 WebSphereTransformation Extender System Design 2 days 1042 6T116 WebSphereTransformation Extender System Management 2 days 1043 6T130 IBM WebSphereTransformation ExtenderV8.3 Fundamentals 3 days 1044 6T133 IBM WebSphereTransformation ExtenderV8.3 AdvancedTransformationTechniques 3 days 1045 6T223 IBM WebSphere CommerceV7 System Administration 5 days 1046 6T225 Programming Essentials for IBM WebSphere CommerceV7 Customization 5 days 1047 6T226 Advanced Programming topics for IBM WebSphere CommerceV7 Customization 5 days 1048 6T231 IBM WebSphere CommerceV7 Management Center Functionality for Feature Pack 5 4 days 1049 6T400 IBM Sterling eCommerce Essentials 5 hours 1050 6T405 IBM Sterling XML Essentials 5 hours 1051 6T505 IBM Sterling Gentran:Basic for zSeries Mapping andTranslation 4 days 1052 6T530 IBM Sterling Gentran: Server for Microsoft Windows Mapping andTranslation 4 days 1053 6T605 IBM Sterling B2B Integrator Architectural Overview 1 day 1054 6T611 IBM Sterling B2B Integrator Fundamentals 5 days 1055 6T632 IBM Sterling B2B Integrator Advanced Business Process Modeling 2 days 1056 6T636 IBM Sterling B2B Integrator Administration andTuning 4 days 1057 6T656 IBM Sterling B2B Integrator Data Mapping and EDI Processing 5 days 1058 6T705 IBM Sterling Connect:Direct for UNIX Fundamentals 3 days 1059 6T710 IBM Sterling Connect:Direct for Microsoft Windows Fundamentals 3 days 1060 6T735 IBM Sterling Secure ProxyTechnical Fundamentals 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 60.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1061 6T746 IBM Sterling File Gateway - Managing Sterling File Gateway 2 days 1062 6T755 IBM Sterling Connect:Direct Secure+ Configuration for Windows using SSL 1 day 1063 6T816 IBM Sterling Warehouse Management System - Configuring a WMS Solution 5 days 1064 6T836 IBM Sterling Call Center and Sterling Store Administration 1 day 1065 6T841 IBM Sterling Field Sales - Administer Sterling Field Sales 1 day 1066 6T853 IBM Sterling ConfiguratorVisual Modeler Fundamentals 2 days 1067 6T857 IBM Sterling ConfiguratorVisual Modeler - Advanced Concepts 3 days 1068 6W856 IBM Sterling Selling and Fulfillment Suite Supply Chain Concepts 3 hours 1069 6W860 IBM® Sterling Supply ChainVisibility Administering an Inbound Supply Chain 7 hours 1070 6W861 IBM® Sterling Supply ChainVisibility Monitoring an Outbound Supply Chain (WBT) 7 hours 1071 9F068 Introduction to IBM®Tealeaf® Collection - WBTs 4 hours 1072 9F079 IBMTealeaf Administration and Maintenance Workshop 8.8 1 day 1073 9F088 IBMTealeaf cxOverstat 8.8 Usability Analysis and Configuration 3 hours 1074 9F099 IBMTealeaf 8.8 Fundamentals 5 hours 1075 9F109 IBMTealeaf Customer Experience 8.8 Events and Reports 2 days 1076 9F119 IBMTealeaf 8.8 Advanced Reports and Dashboards 1 day 1077 9F139 IBMTealeaf Customer Service Optimization for Representativies 8.8 5 hours 1078 9F156 IBMTealeaf Customer Experience 8.8 Expert Arena 3 days 1079 9F218 IBMTealeaf 9.0 Goal-Based Dimensions and Events 1 hour 1080 9F228 IBMTealeaf cxOverstat 9.0 Usability Analysis and Configuration 3 hours 1081 9F288 IBMTealeaf cxOverstat 9.0.1 Usability Analysis and Configuration 5 hours 1082 9J296 IBM IOC and IntelligentTransportation 1.6.0.2: Expert Arena 1 day 1083 9T319 IBM Unica Campaign 8.5 Architecture and Installation 1 day 1084 9T320 IBM Unica Campaign 8.5 Reports Installation and Administration 1 day 1085 9T326 IBM Unica Marketing Operations 8.5 Architecture and Installation 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 61.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1086 9T331 Introduction to IBM Unica Campaign 8.6 3 days 1087 9T332 IBM Unica Campaign 8.6 Administration 2 days 1088 9T335 IBM Unica Campaign AdvancedTechniques 3 days 1089 9U010 IBM Building Campaigns 9x 2 days 1090 9U028 Introduction to IBM eMessage:Video Demo Collection 5 hours 1091 9U040 IBM Building Interactive Campaigns 1 day 1092 9U050 IBM Campaign 9.x Administration 2 days 1093 9U088 IBM Contact Optimization: OptimizingYour Contact Strategy 2 hours 1094 9U110 IBM Marketing Operations 9.x: Marketing Contributor 1 day 1095 9U120 IBM Marketing Operations Project Manager 2 days 1096 9U130 IBM Marketing Operations Administration 2 days 1097 9U148 IBM Building Interactive Campaigns 1 day 1098 9U190 IBM Interact Advanced Course 2 days 1099 9U258 IBM Building Campaigns 9.x 2 days 1100 9U269 IBM® Omni-Channel Marketing Expert Arena - SPVC 1 day 1101 9V038 IBM Mobile Web Push 1 hour 1102 9V048 IBM Xtify Mobile Push Notification Console 2 hours 1103 9W344 IBM eMessage Document Composer 1 hour 1104 9W720 IBM Digital Analytics and Marketing Center On-Demand Learning Modules 1 day SECURITY 1105 BQ102 IBM Security QRadar SIEM Foundations 2 days 1106 BQ121 IBM Security QRadar SIEM 7.2 Administration and Configuration 3 days 1107 BQ141 IBM Security QRadarVulnerabilty Manager 7.2.2 Usage 5 hours 1108 IS603 IBM Security SiteProtector System: Basic Implementation and Administration 2 days 1109 IS613 IBM Security Network Intrusion Prevention System 4.6 Configuration and Deployment Workshop 2 days 1110 IS670 IBM Security Network Protection: Configuration and Deployment 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 62.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1111 RL310 Essentials of IBM Rational AppScan Source Edition for Security v8.5 1 day 1112 RL362 Essentials of IBM Rational PolicyTester v8.0 2 days 1113 RT302 Essentials of Web Application Security 0.5 days 1114 RT305 Essentials of Web Accessibility 0.5 days 1115 TK222 IBM Security zSecure UNIX System Services (USS) Security Overview 1 day 1116 TK231 IBM Security zSecure Auditing and Reporting Language (CARLa) (ILT) 3 days 1117 TK232 IBM Security zSecure CARLa Auditing and Reporting Language 3 days 1118 TK242 IBM Security zSecure RACF and SMF Auditing 2 days 1119 TK252 IBM Security zSecure RACF Management Workshop 2 days 1120 TK262 IBM Security zSecure Admin Basic Administration and Reporting 3 days 1121 TK272 IBM Security zSecure Audit Rule-based Compliance Evaluation and Customization 1 day 1122 TK300 IBM Security AppScan Enterprise Fundamentals 2 days 1123 TK400 IBM Security AppScan Standard Fundamentals 2 days 1124 TOS04 IBMTivoli Identity Manager 5.1 Differences and Migration (SPVC) 3 days 1125 TOS14 IBMTivoli Identity Manager 5.1 Basic Implementation (SPVC) 5 days 1126 TOS17 IBMTivoli Identity Manager 5.1 System Administration (SPVC) 3 days 1127 TW064 IBMTivoli Federated Identity Manager 6.2.2 Deployment and Administration 5 days 1128 TW084 IBM Security Directory Server 6.3.1 System Administration 4 days 1129 TW092 IBMTivoli Directory Integrator 7.1.1 Administration and Deployment 3 days 1130 TW104 IBM Security Access Manager 7.0 for Web 4 days 1131 TW105 IBM Security Access Manager for Web 8.0 4 days 1132 TW115 IBM Security Access Manager for Mobile 8.0 2 days 1133 TW173 IBM Security Access Manager for Enterprise Single Sign-On Administration 4 days 1134 TW220 Introduction to IBM Security Federated Directory Services 1 day 1135 TW233 IBMTivoli Directory Server 6.3 Advanced Deployment 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 63.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1136 TW241 IBMTivoli Identity Manager 5.1 Differences and Migration 3 days 1137 TW251 IBMTivoli Identity Manager 5.1 Basic Administration 5 days 1138 TW253 IBM Security Identity Manager 6.0 Basic Administration 5 days 1139 TW261 IBMTivoli Identity Manager 5.1 System Administration 3 days 1140 TW273 IBM Security Role and Policy Modeler 1.1.0.2 Basic Administration 2 days 1141 TW293 IBM Security Privileged Identity Manager 1.0 3 days 1142 XIS01 IBMTivoli Directory Integrator 7.1.1 (SPVC) 3 days 1143 XIS02 IBM Security Network Intrusion Prevention System 4.4 Configuration and Deployment (SPVC) 5 hours 1144 XIS04 IBMTivoli Federated Identity Manager 6.2.2 (SPVC) 5 days 1145 XIS05 IBM Security Identity Manager 6.0 Basic Administration (SPVC) 5 days 1146 XIS07 IBM Security QRadar SIEM 7.2 Foundations (SPVC) 2 days 1147 XIS08 IBM Security QRadar SIEM 7.2 Administration and Configuration (SPVC) 3 days 1148 XIS09 IBM Security Privileged Identity Manager 1.0 (SPVC) 3 days 1149 TOD19 IBM Endpoint Manager 9 for Server Automation - SPVC 1 day 1150 TOS42 IBM Endpoint Manager for Server Automation 8.2 (SPVC) 0.75 days 1151 TOS46 IBM Endpoint Manager for Software Use Analysis 2.1 (SPVC) 1 day 1152 TOS50 IBM Endpoint Manager for Lifecycle Management - Remote Control (SPVC) 5 hours 1153 TOS51 IBM Endpoint Manager 9 Platform Fundamentals (SPVC) 3 days 1154 TOS60 IBM Endpoint Manager 9 Console Operations (SPVC) 1 day 1155 TOS80 IBM Endpoint Manager Software Use Analysis 9.1/IBM License ManagementTool 9.0 1 day 1156 TP403 IBM Endpoint Manager 9 Platform Fundamentals 3 days 1157 TP433 IBM Endpoint Manager 9 Content Development and Customization 3 days 1158 TP451 IBMTivoli Endpoint Manager 8.2 for Security and Compliance Fundamentals 3 days 1159 TR223 Tivoli Process Automation Engine 7.5 Workflow Design and Implementation 3 days 1160 TS113 IBMTivoli Storage Productivity Center 5.2.3 Installation and Configuration 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 64.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1161 TS114 IBMTivoli Storage Productivity Center 5.2.3 Daily Operations and Provisioning 2 days 1162 TS115 IBMTivoli Storage Productivity Center 5.2.3 Cognos Reporting 1 day 1163 TS311 IBMTivoli Storage Manager FastBack 6.1.1 Installation, Configuration, Operation 3 days 1164 TS602 IBMTivoli Storage Manager 6.3 Differences 2 days 1165 TS612 IBMTivoli Storage Manager 6.3 Implementation and Administration 5 days 1166 TS613 IBMTivoli Storage Manager 7.1 Implementation and Administration 5 days 1167 TS614 IBMTivoli Storage Manager 7.1.1 Implementation and Administration 5 days 1168 TS622 IBMTSM 6.3 Advanced Administration,Tuning,Troubleshooting 5 days 1169 TS623 IBMTSM 7.1 Advanced Administration,Tuning,Troubleshooting 5 days 1170 TS631 IBMTivoli Storage Manager forVirtual Environments 6.4 1 day 1171 TS632 IBMTivoli Storage Manager forVirtual Environments 7.1 1 day 1172 TSX12 IBMTivoli Storage Manager 6.3 Implementation and Administration for AIX 5 days 1173 TSX22 IBMTivoli Storage Manager 6.3 Advanced Administration for AIX 5 days SYSTEMS 1174 QB133 Fundamentals of IBM Rational System Architect,V11.4 1 day 1175 QB138G DoDAF 2.0 Modeling with IBM Rational System ArchitectV.11.4 3 days 1176 WRZ14 IBM ITSO POWER8Technology and SystemsTechnical Deep Dive 1 day 1177 H0050 IBM Platform GPFS 4.1 for Linux 3 days 1178 H0100 Platform LSF 9.1 Basic for Linux 3 days 1179 H0230 Platform LSF 9.1 Advanced for Linux 3 days 1180 H0310 Platform Analitics 9.1 Admin (for LSF) 2 days 1181 H0320 Platform Analytics 9.1 End User (for LSF) 3 days 1182 H0420 IBM Platform Application Center (PAC) 9.1.2 1 day 1183 H0430 Platform Process Manager 9.1.2 1 day 1184 H0440 IBM Platform ReportTrack Monitor (RTM) 9.1.2 1 day 1185 H0500 Platform Symphony 6.1 Admin Basic 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 65.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1186 H0520 Platform Symphony 6.1 Admin Advanced 2 days 1187 H0620 Platform Symphony 6.1 Application Programming 3 days 1188 H0800 IBM Platform HPC 4.1.1 4 days 1189 AL320 Korn and Bash Shell Programming 5 days 1190 AN080 Power Systems and AIX Differences Workshop 3 days 1191 AN1010 POWER8 and AIX Enhancements 2 days 1192 AN1010 POWER8 and AIX Enhancements Workshop 2.5 days 1193 AN100 AIX Basics 4 days 1194 AN110 Power Systems for AIX I: LPAR Configuration and Planning 3 days 1195 AN120 Power Systems for AIX II:AIX Implementation and Administration 5 days 1196 AN140 AIX Jumpstart for UNIX Professionals 5 days 1197 AN150 Power Systems for AIX III:Advanced Administration and Problem Determination 5 days 1198 AN170 AIX Workload Partitions: Configuration and Management 4 days 1199 AN210 TCPIP for AIX Administrators 4 days 1200 AN220 AIX Network Installation Manager: Concepts and Configuration 2 days 1201 AN301 Power Systems for AIX -Virtualization I: ImplementingVirtualization 5 days 1202 AN310 Power Systems for AIX -Virtualization II:Advanced PowerVM and Performance 4.5 days 1203 AN320 Power Systems for AIX III:Virtualization - Implementing Shared Storage Pools 3 days 1204 AN330 Implementing PowerVM Live Partition Mobility 3 days 1205 AN410 PowerHA SystemMirror 6.1 Planning, Implementation and Administration 5 days 1206 AN420 PowerHA SystemMirror 6.1 Migration, Extended Configuration and PD 5 days 1207 AN490 AIX SAN Management I:Administration 2 days 1208 AN510 Power Systems for AIX IV: Performance Management 5 days 1209 AN520 AdvancedTools for AIX Performance Analysis 4 days 1210 AN570 Implementing AIX Security Features 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 66.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1211 AN610 PowerHA SystemMirror 7 Planning, Implementation, Customization and Basic Admininstration 5 days 1212 AN620 PowerHA SystemMirror 7 Advanced Configurations 5 days 1213 AN651 PowerHA SystemMirror 7 and Migration 3 days 1214 AN660 PowerHA SystemMirror 7 Problem Determination 3 days 1215 AN670 PowerHA SystemMirror 7.1 Planning and Implementation 3 days 1216 AN680 PowerHA SystemMirror 7.1: Customization and Basic Administration 2 days 1217 AN720 UNIX / AIX User Essentials 2 days 1218 AN730 UNIX / AIX Additional User Skills 2 days 1219 AT111 AIX Problem Determination I Boot Issues (WBT) 3 days 1220 AT121 AIX Problem Determination II LVM Issues (WBT) 3 days 1221 AT880 PowerVM forVmware Administrators (WBT) 5 hours 1222 AU241 PERL Programming for Open Systems 4 days 1223 AS060 RPG IV Programming Fundamentals Workshop for IBM i 4 days 1224 AS100 RPG IV Programming Advanced Workshop for IBM i 4 days 1225 AS180 IBM i Network and Web Security 3 days 1226 AS240 System Operator Workshop for IBM i 4 days 1227 AS270 Advanced System Operator Workshop for IBM i 3 days 1228 AS280 BRMS for IBM i 5 days 1229 AS2B0 System Operator Workshop using System i Navigator 2 days 1230 AS2C0 System Operator Workshop using IBM Navigator for i 2 days 1231 AS541 IBM Power HA for i, Clustering, and IASP Implementation 4 days 1232 AS5A0 Implementing IASP on IBM i 2 days 1233 AS5B0 HA and Implementing Clusters on IBM i 2 days 1234 AS5E0 PowerVM on IBM i - I: ImplementingVirtualization and LPAR 3 days 1235 AS5F0 PowerVM on IBM i - II:AdvancedTopics and Performance 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 67.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1236 OD040 Getting Started with DB2 Web Query 1 day 1237 OD470 IBM i DB2 and SQL School 5 days 1238 OE980 Introduction to IBM i for New Users 1 day 1239 OL190 IBM i System Administration 5 days 1240 OL201 Control Language Programming Workshop for IBM i 4 days 1241 OL230 IBM i PerformanceTuning - I: PerformanceTools and BasicTuning 2 days 1242 OL2A0 Basic CL Programming Workshop for IBM i 2 days 1243 OL2B0 Advanced CL Programming Workshop for IBM i 2 days 1244 OL370 Accessing the IBM i Database Using SQL 2 days 1245 OL380 Developing IBM i Applications Using SQL 2 days 1246 OL4A0 IBM iTechnical Introduction 3 days 1247 OL4B0 ILE Foundation for IBM i 1 day 1248 OL500 IBM i Security Concepts and Implementation 2 days 1249 OL510 IBM i Recovery and Availability Management 2 days 1250 OL520 Hardware Management Console (HMC) for Power Systems with IBM i 2 days 1251 OL620 DB2 for i: DB Coding and Implementation Using DDS and CL Commands 3 days 1252 OL660 IBM i PerformanceTuning - II:Advanced Analysis and CapacityTuning 4 days 1253 OS019 What's new in IBM iVR2 and IBM POWER8 systems 3 days 1254 OS180 What's new inV7R1 and IBM Power Systems 2 days 1255 LX021 Linux Basic and Installation 4 days 1256 LX032 LINUX System Administration I - Implementation 5 days 1257 LX150 Linux Jumpstart for UNIX System Administrators 4 days 1258 LX210 Linux on Power Fundamentals 3 days 1259 LX520 Linux on Power Performance 3 days 1260 LX530 Virtualizing Linux on Power with PowerKVM 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 68.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1261 SN712 Storage Area Networking Fundamentals 4 days 1262 SN781 Supporting IBM N series 5 days 1263 SNV10 SANVolume Controller (SVC) Planning and Implementation Workshop 4 days 1264 SS050 Introduction to Data Storage Subsystems 2 days 1265 SS060 Storage Management Fundamentals 2.5 days 1266 SS260 IBMVirtualization EngineTS7700 Planning and Implementation 2 days 1267 SS270 IBMTape Encryption Implementation 2 days 1268 SS280 TS3500Tape Library Architecture and Implementation – Open Systems and System z 2 days 1269 SS291 IBM System StorageTS7650 ProtecTIER 2 days 1270 SS830 z/OSVSAM and Access Method Services 4 days 1271 SS840 DFSMS Implementation 4 days 1272 SS860 DFSMShsm Implementation 4.5 days 1273 SSA00 IBM XIVTechnicalTraining 2 days 1274 SSC100 OpenStack Integration with IBM System Storage 2 days 1275 SSC200 IBM Software-defined Networking forVirtual Environments: Implementation 2 days 1276 SSD00 Scale Out Network Attached Storage (SONAS)TechnicalTraining 3 days 1277 SSE10 IBM StorwizeV7000 Implementation Workshop 4 days 1278 SSF00 IBM DS8000 Implementation Workshop for Open Systems 4 days 1279 SSF10 IBM DS8000 Implementation Workshop for System z 3 days 1280 SSFS1 IBM Flash Storage Fundamentals 1 day 1281 SSG00 IBM StorwizeV7000 Unified Implementation Workshop 4 days 1282 QZ0020 Implementing Cloud Manager with Openstack on Power Systems 3 days 1283 NGT11 IBM PureFlex System Fundamentals 3 days 1284 NGT31 IBM Flex System Power Compute Nodes -Virtualization and Management 3 days 1285 NGT41 IBM Flex System Manager 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 69.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1286 NGT61 IBM Flex SystemV7000 Storage Node 3 days 1287 NGTB1 IBM PureFlex Systems Fundamentals & Implementation Services (5 Day) 5 days 1288 NGTB2 IBM PureFlex Systems Implementation Services (2 Day) 2 days 1289 XTR21 IBM System Storage Connectivity Options for System x 2 days 1290 BE870 Effective RACF Administration 4.5 days 1291 CB695 TCP/IP for z/OS Implementation Workshop 5 days 1292 ES050 An Introduction to the z/OS Environment 2 days 1293 ES070 z/OS JCL and Utilities 4.5 days 1294 ES10A Fundamental System Skills in Z/OS 5 days 1295 ES155 z/OS Facilities 4.5 days 1296 ES191 Basics of z/OS RACF Administration 4.5 days 1297 ES200 z/OS System Services Structure 4.5 days 1298 ES240 IBM System z Hardware Management Console (HMC) Operations 2 days 1299 ES261 SMP/E for z/OS Workshop 4.5 days 1300 ES270 z/OS System Operators 3 days 1301 ES281 z/OS JES2 OperatorTraining 2 days 1302 ES311 COBOL Programming Basic 4 days 1303 ES312 PL/I Programming 4 days 1304 ES313 z/OS Basic 4 days 1305 ES314 z/OS Utility 4 days 1306 ES315 z/OS JCL 4 days 1307 ES316 TSO (ISPF) Operation Basic 4 days 1308 ES317 REXX Programming 4 days 1309 ES328 FICON Planning, Operation, Implementation and Problem Determination 3 days 1310 ES340 Assembler Language Coding Workshop (copied) 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 70.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1311 ES350 Advanced Assembler Language Coding Workshop 5 days 1312 ES400 z/OS System Programmer Fundamentals 5 days 1313 ES41A z/OS Installation Using ServerPac 4.5 days 1314 ES420 Parallel Sysplex Implementation Workshop 4.5 days 1315 ES52A z/OS REXX Programming Workshop 4.5 days 1316 ES545 Basic z/OSTuning Using the Workload Manager 4.5 days 1317 ES662 Advanced z/OS Security: Crypto, Network, RACF andYour Enterprise 3.5 days 1318 ES685 WebSphere for z/OSVersion 8 Implementation 4.5 days 1319 ES732 IBM System z Parallel Sysplex Operations 3 days 1320 ES820 IBM System z:Technical Overview of HW and SW Mainframe Evolution 2 days 1321 ES840 Implementing RACF Security for CICS/ESA and CICS/TS 4.5 days 1322 ES851 Advanced z/OS Performance:WLM, Sysplex, UNIX Services and Web 4.5 days 1323 ES885 Exploiting the Advanced Features of RACF 4 days 1324 ES900 Advanced Parallel Sysplex Operations and Recovery Workshop 4.5 days 1325 ES962 Hardware Configuration and Definition (HCD) for z/OS 4 days 1326 ESA01 IBM zEnterprise System:ATechnical Introduction 1 day 1327 ESB10 z/OS Management Facility Implementation and Use 3 days 1328 ESB30 z/OS Management Facility Implementation and Use 2.1 3 days 1329 ESC10 z/OSV1R11 Update and Migration 3 days 1330 ESC30 z/OSV1R12 Update 3 days 1331 ESC50 z/OSV1R12 to z/OSV1R13 Update 3 days 1332 ESC60 z/OS 1.13 to z/OS 2.1 Migration 3 days 1333 ESD00 IBM zEnterprise HMC Ensemble Operations 2 days 1334 ESD20 z/OS Health Check andTroubleshooting 3 days 1335 ESG00 IBM zEnterprise System Channel Architecture and I/O Operations 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 71.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1336 ESZ00 IBM System z FastTrack 1 day0 1337 MV100 Parallel Sysplex Overview 1 day 1338 NW751 TCP/IP High Availability Solutions for z/OS 4 days 1339 NW791 TCP/IP for z/OS: Diagnostics and Debugging 4 days 1340 OP052 Introducing z/OS UNIX System Services 2.5 days 1341 OP251 z/OS UNIX System Services Implementation 4.5 days 1342 SZ810 z/OS Security Server RACF, Implementing and Customization 3 days 1343 ZL000 zVM and zLinux Bootcamp 5 days 1344 ZL100 Linux Implementation for System z 3 days 1345 ZL120 Linux Basics - A System z Perspective 2 days 1346 ZL150 Advanced Solutions for Linux on System z (SuSE) 4 days 1347 ZV020 z/VM Introduction and Concepts 3 days 1348 ZV062 Installing, Configuring and Servicing z/VM for Linux Guests 5 days 1349 ZV100 z/VM & Linux Connectivity and Management 3.5 days 1350 ZV200 z/VM RACF and DIRMAINT Implementation 4.5 days 1351 ZV220 IBM Wave for z/VM and Linux on System z 3 days 1352 1SM00 Introduction to Cloud Computing Architecture 2 days 1353 1SP00 Implementing Power Infrastructure for Cloud 3 days 1354 1SP20 Implementing IBM SmartCloud Entry on Power Systems 2 days 1355 1SP40 Cloud Administration on Power Systems 3 days 1356 1SS20 Implementing SmartCloud Storage Access 3 days 1357 1SX20 Implementing IBM SmartCloud Entry on System x 2 days 1358 1SX40 Cloud Admininstration on System x 3 days 1359 1SX50 Advanced Cloud Solutions using IBM SmartCloud Orchestrator on x86 Platform 3 days 1360 2SX20 Implementing Cloud Manager with Openstack on x86 Architecture Servers 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 72.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1361 AN0D0 IBM Systems Director 6.3 - Power and System x - Planning and Installation (SPVC) 3 days 1362 XTRD0 IBM Systems Director 6.3 - Power and System x - Planning and Installation (SPVC) 3 days 1363 QZ0010 Implementing Power Cloud Infrastructure with PowerVC 2 days 1364 SM926 IBMTivoli System Automation for z/OS 3.4 Introduction and Operations 4 days 1365 SM936 IBMTivoli System Automation for z/OS 3.4 Implementation and Administration 5 days 1366 SM952 IBMTivoli SA for Multiplatforms 3.2.1: Installation and Administration 3 days 1367 TOD15 IBMTivoli Storage Manager 7.1 forVirtual Environments (WBT) 1.5 hours 1368 TOS39 IBMTivoli Storage Manager Suite for Unified Recovery Daily Administration 2.25 days 1369 TOS53 IBM Automation Control for z/OS 1.1 Fundamentals (SPVC) 8 hours 1370 TOS61 IBMTivoli Storage Manager 6.3 Implementation and Administration (SPVC) 5 days 1371 TOS78 IBMTivoli Storage Manager Fundamentals and Daily Operations 3 days 1372 TOS85 IBMTivoli Storage Flashcopy Manager 4.1 for Windows - WBT 5 hours 1373 TZ203 IBMTivoli NetView for z/OS 6.1 Fundamentals 1 day 1374 TZ213 IBMTivoli NetView for z/OS 6.1 Automation 2 days 1375 TZ223 IBMTivoli NetView for z/OS 6.1 REXX 1 day 1376 TZ233 IBMTivoli NetView for z/OS 6.1 PIPEs 1 day 1377 TZ243 IBMTivoli NetView for z/OS 6.1 Fundamentals,Automation, REXX, PIPEs 5 days 1378 RA903 Architecting Services with Rational Software ArchitectV7.5 and SoaML 2 days 1379 RD420 Domain-Specific Modeling with IBM Rational Software Architect,V7.5 1 day 1380 RN110 Developing COBOL with IBM Rational Developer for System zV8.0 2 days 1381 RN111 Developing Mainframe Applications with IBM Rational Developer for System zV9.0 2 days 1382 RN200 Essentials of IBM Rational Asset AnalyzerV6.0 1 day 1383 RR353 Essentials of IBM Rational Requirements Composer,V4.0 2 days 1384 RS727 Configuring Projects in IBM RationalTeam ConcertV4.0 3 days 1385 RS728 Configuring Projects in IBM RationalTeam ConcertV4.0.4 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 73.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1386 RS842 Developing Software with IBM RationalTeam ConcertV4.0 1 day 1387 RS843 Developing Software with IBM RationalTeam Concert v4.0.4 1 day 1388 RS860 JazzTeam ServerV4.0 Administration 2 days 1389 RS861 JazzTeam ServerV4.0.4 Administration 2 days 1390 RT273 Test Management with IBM Rational Quality Manager,V4.0 2 days 1391 RT283 Testing with IBM Rational Quality ManagerV4.0 1 day 1392 RT294 Administering IBM Rational Quality ManagerV4.0.4 Projects 1 day 1393 RT525 Essentials of IBM Rational PerformanceTesterV8.2 2 days 1394 RT545 Essentials of IBM Rational FunctionalTester, Java Scripting,V8.0 2 days 1395 RT561 Essentials of IBM Rational IntegrationTesterV8.6 1 day 1396 RT566 Testing with IBM Rational IntegrationTesterV8.6 2 days 1397 RT571 ServiceVirtualization with IBM Rational IntegrationTesterV8.6 2 days 1398 VW009 Technical Introduction to IBM MessageSight Insight and MQTT 3 hours 1399 VW324 Roadmap to Mobile Web Development 1 day 1400 VW328 Push Notification in IBM Worklight Hybrid Apps 5 hours 1401 VW330 Foundations of Mobile Computing and IBM MobileFirst 3 hours 1402 VW406 Technical Introduction to WebSphere DataPowerV5 3 hours 1403 VW410 Using Styles to Create Responsive Mobile Web Experiences (Web-based) 1 day 1404 VW420 API Management Concepts (WBT) 5 hours 1405 VW421 Getting Started with IBM API ManagementV3 5 hours 1406 VW584 WebSphere Application Server Liberty Profile Collective/Cluster Administration 4 hours 1407 VW600 Technical Introduction to WebSphere DataPowerV6 (WBT) 3 hours 1408 VW700 Technical Introduction to IBM WebSphere DataPower Gateway AppliancesV7-WBT 3 hours 1409 VW851 CICS Fundamentals 3 days 1410 VW852 CICSV5 BasicTailoring 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 74.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1411 VW865 CICS Command Level Coding - WBT 5 days 1412 VW871 Mobile Access to IBM Business Process Manager with IBM Worklight (WBT) 2 hours 1413 VW901 Understanding Business Process Manager (WBT) 6 hours 1414 VW902 Introducing IBM Business Process Manager 5 hours 1415 VW903 Getting Started with IBM Operational Decision Manager-WBT 2 hours 1416 VW916 IBM PureApplication SystemV1.1Technical Overview (WBT) 1 day 1417 VW917 IBM PureApplication System v1.1 Backup and Recovery 3 hours 1418 VW920 Developing Patterns with IBM PureApplication SystemV2.0 3 hours 1419 VW945 IBM WebSphere Cast IronV7 Configuration (WBT) 1 day 1420 VW946 IBM WebSphere Cast IronV7.0: Database and Salesforce Applications 5 hours 1421 VW955 WebSphere Cast IronV7 Administration 5 hours 1422 VW976 Administering Java Batch in WebSphere Application ServerV8.5.5 (WBT) 1 day 1423 VY102 Developing BlueMix Applications with IBM SDK for Node.js 5 hours 1424 VY103 Working with Liberty Profile on Bluemix (BYOE) 1.5 days 1425 VY329 Developing Server Applications with Node.js (BYOE) - WBT 5 hours 1426 VY583 Working with WebSphere Application ServerV8.5.5.2 Liberty Profile (BYOE) - WBT 1.5 days 1427 WA170 IBM WebSphere Application ServerV7 Administration on AIX 5 days 1428 WA180 WebSphere Application ServerV8 Administration for AIX 5 days 1429 WA370 IBM WebSphere Application ServerV7 Administration on Windows 5 days 1430 WA380 WebSphere Application ServerV8 Administration for Windows 5 days 1431 WA504 Managing Mobile Applications with IBM WorklightV6 2 days 1432 WA505 Mobile Application Administration with IBM Worklight FoundationV6.2 2 days 1433 WA570 IBM WebSphere Application ServerV7 Administration on Linux 5 days 1434 WA580 WebSphere Application ServerV8 Administration for Linux 5 days 1435 WA585 WebSphere Application ServerV8.5 Administration 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 75.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1436 WA591 WebSphere Application ServerV8.5.5 Problem Determination 5 days 1437 WA680 WebSphere Application ServerV8.5 Scripting and Automation 5 days 1438 WA715 IBM WebSphere Application ServerV7 PerformanceTuning 3 days 1439 WA815 WebSphere Application ServerV8.5.5 PerformanceTuning 4 days 1440 WA855 WebSphere Application ServerV8.5.5 Administration 5 days 1441 WA870 IBM WebSphere Application ServerV7 Multi-node Administration 3 days 1442 WA880 WebSphere Application ServerV8.5: Using Intelligent Management 3 days 1443 WB001 IBM WebSphere Lombardi Edition 7.1-7.2 Process Modeling 2 days 1444 WB002 IBM WebSphere Lombardi Edition 7.1-7.2 Process Implementation 3 days 1445 WB003 IBM WebSphere Lombardi Edition 7.1-7.2 Process Modeling and Implementation 5 days 1446 WB004 BPM Project Management 2 days 1447 WB005 IBM WebSphere Lombardi EditionV7.1 Process Modeling, Operations,Administration 5 days 1448 WB009 BPM Process Analysis Methods I 3 days 1449 WB010 BPM Process Analysis Methods II 4 days 1450 WB011 BPM Process Analysis Methods III 5 days 1451 WB282 IBM WebSphere Business ModelerV6.2: Process Mapping, Simulation and Analysis 5 days 1452 WB284 IBM WebSphere Business ModelerV6.2: Process Mapping and Analysis 3 days 1453 WB286 IBM WebSphere Business ModelerV6.2: Process Simulation and Analysis 2 days 1454 WB301 Capturing and Authoring Business Rules with IBM WebSphere ILOG JRulesV7.0 5 days 1455 WB307 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 5 days 1456 WB308 Capturing and Authoring Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 5 days 1457 WB309 Capturing Business Rules in IBM WebSphere ILOG JRules BRMSV7.1 3 days 1458 WB310 Authoring Business Rules in IBM WebSphere ILOG RuleTeam ServerV7.1 3 days 1459 WB313 Capturing and Authoring Rules in IBM ILOG JRules BRMSV7.1 – Rule StudioVersi 5 days 1460 WB314 Authoring Business Rules in IBM WebSphere ILOG Rule StudioV7.1 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 76.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1461 WB315 Developing Applications in IBM WebSphere ILOG JRules BRMSV7.1 - II 3 days 1462 WB319 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV7.5 4 days 1463 WB321 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV7.5 5 days 1464 WB324 Managing Decisions in IBM WebSphere Operational Decision ManagementV7.5 5 days 1465 WB325 Authoring Rules in IBM WebSphere Operational Decision ManagementV7.5 3 days 1466 WB380 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV8 4 days 1467 WB381 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV8 5 days 1468 WB383 Developing Rule Solutions in IBM Operational Decision ManagerV8.5 5 days 1469 WB384 Managing Decisions in IBM WebSphere Operational Decision ManagementV8 5 days 1470 WB385 Authoring Rules in IBM WebSphere Operational Decision ManagementV8 3 days 1471 WB386 Managing Decisions in IBM Operational Decision ManagerV8.5 5 days 1472 WB387 Administering IBM WebSphere Operational Decision ManagementV8 4 days 1473 WB389 Administering IBM Operational Decision ManagerV8.5 4 days 1474 WB390 Developing Rule Solutions in IBM Operational Decision ManagerV8.6 5 days 1475 WB391 Managing Decisions in IBM Operational Decision ManagerV8.6 5 days 1476 WB392 Developing Rule Solutions in IBM Operational Decision ManagerV8.7 5 days 1477 WB394 Developing Solutions with IBM Decision Server InsightsV8.7 3 days 1478 WB711 Developing Applications for IBM WebSphere Process ServerV7 - I 5 days 1479 WB712 Developing Applications for IBM WebSphere Process ServerV7 - II 5 days 1480 WB713 Developing Applications for IBM WebSphere Enterprise Service BusV7 5 days 1481 WB715 Developing HumanTask Business Processes for IBM WebSphere Process ServerV7 3 days 1482 WB722 Administration of IBM WebSphere Process ServerV7 5 days 1483 WB723 WebSphere Enterprise Service BusV7.0 Administration 3 days 1484 WB724 IBM WebSphere Process ServerV7 Performance andTuning 3 days 1485 WB725 IBM WebSphere Process ServerV7.0 Problem Determination 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 77.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1486 WB731 Process Modeling with IBM Business Process Manager (BPM) 2 days 1487 WB733 Process Modeling and Implementation with IBM Business Process Manager (BPM) 5 days 1488 WB738 Process Implementation II with IBM Business Process ManagerV7.5.1 3 days 1489 WB741 Modeling with IBM Business Process ManagerV7.5.1 2 days 1490 WB743 Modeling and Implementing with IBM Business Process ManagerV7.5.1 5 days 1491 WB745 IBM Business Process ManagerV7.5.1 Process Modeling and Administration 5 days 1492 WB746 Process Center Administration with IBM Business Process ManagerV7.5.1 3 days 1493 WB751 Developing Applications for IBM Business Process Manager AdvancedV7.5 - I 5 days 1494 WB752 Developing Applications for IBM Business Process Manager AdvancedV7.5 - II 5 days 1495 WB753 Developing Applications for IBM WebSphere Enterprise Service BusV7.5 5 days 1496 WB754 Transition to IBM Business Process Manager AdvancedV7.5 for Developers 2 days 1497 WB762 Administration of IBM Business Process Manager AdvancedV7.5 5 days 1498 WB771 Using IBM WebSphereV7 Products for Business Process Management 3 days 1499 WB782 IBM WebSphere Business ModelerV7: Process Mapping, Simulation and Analysis 5 days 1500 WB784 IBM WebSphere Business ModelerV7: Process Mapping and Analysis 3 days 1501 WB786 IBM WebSphere Business ModelerV7: Process Simulation and Analysis 2 days 1502 WB792 IBM WebSphere Business MonitorV7: Implementation and Administration 3 days 1503 WB793 Developing Applications with IBM WebSphere Business MonitorV7 3 days 1504 WB794 Administering IBM WebSphere Business MonitorV7 2 days 1505 WB795 Business Activity Monitoring with IBM WebSphere Business MonitorV7 1 day 1506 WB797 Developing Applications with IBM Business MonitorV7.5 3 days 1507 WB798 Administering IBM Business MonitorV7.5 2 days 1508 WB799 Business Activity Monitoring with IBM Business MonitorV7.5 1 day 1509 WB801 Process Modeling with IBM Business Process Manager StandardV8 2 days 1510 WB802 Modeling and Implementing with IBM Business Process ManagerV8 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 78.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1511 WB803 Process Implementation with IBM Business Process Manager StandardV8 - II 5 days 1512 WB804 Administration of IBM Business Process Manager StandardV8 4 days 1513 WB806 Reporting with IBM Business Process Manager StandardV8 2 days 1514 WB807 Process Modeling with IBM Business Process Manager StandardV8.5 2 days 1515 WB808 Process Implementing with IBM Business Process Manager StandardV8.5 - I 5 days 1516 WB809 Process Implementing with IBM Business Process Manager StandardV8.5 - II 5 days 1517 WB811 Reporting with IBM Business Process Manager StandardV8.5 2 days 1518 WB812 Administration of IBM Business Process Manager StandardV8.5 4 days 1519 WB813 Process Modeling with IBM Business Process Manager StandardV8.5.5 2 days 1520 WB814 Process Implementing with IBM Business Process Manager StandardV8.5.5 - I 5 days 1521 WB815 Process Implementing with IBM Business Process Manager StandardV8.5.5 - II 5 days 1522 WB851 Developing Applications in IBM Business Process Manager AdvancedV8 – I 5 days 1523 WB852 Developing Applications in IBM Business Process Manager AdvancedV8 - II 5 days 1524 WB855 Developing Applications in IBM Business Process Manager AdvancedV8.5 -I 5 days 1525 WB857 Developing Applications in IBM Business Process Manager AdvancedV8.5.5 - I 5 days 1526 WB862 Administration of IBM Business Process Manager AdvancedV8 5 days 1527 WB867 Administration of IBM Business Process Manager AdvancedV8.5 5 days 1528 WB868 IBM Business Process ManagerV8.5 Performance andTuning 3 days 1529 WB869 IBM Business Process ManagerV8.5 Problem Determination 5 days 1530 WB870 Administration of IBM Business Process Manager AdvancedV8.5.5 5 days 1531 WB891 Developing Applications with IBM Business MonitorV8 3 days 1532 WB895 Developing Applications with IBM Business MonitorV8.5.5 3 days 1533 WD104 Fundamentals of Enterprise OSGi with IBM WebSphere Application ServerV8.5 1 day 1534 WD150 Introduction to Object-Oriented Programming with Java Examples 3 days 1535 WD154 Java SE 6 Programming Fundamentals 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 79.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1536 WD160 Developing Applications with Java Persistence API (JPA) 2 days 1537 WD329 Location Services with IBM Worklight FoundationV6.2 5 hours 1538 WD370 Java EE 5 Development for WebSphere Application ServerV7 4 days 1539 WD470 Developing Mobile Web 2.0 Applications for WebSphere Application ServerV8 3 days 1540 WD506 Web Service Development for IBM WebSphere Application ServerV7 5 days 1541 WD507 REST Service Development with Java 3 days 1542 WD601 Mobile Application Development with IBM WorklightV6.1 4 days 1543 WD602 Mobile Application Development with IBM Worklight FoundationV6.2 3 days 1544 WE601 Accelerate, Secure and Integrate with IBM DataPowerV6 5 days 1545 WE620 Administration of IBM WebSphere DataPower SOA AppliancesV6 3 days 1546 WE701 Accelerate, Secure and Integrate with WebSphere DataPowerV7.0 Web Gateway 5 days 1547 WE702 XML and Web Services Solutions with IBM DataPower Gateway v7 4 days 1548 WE703 REST and Oauth Solutions with IBM DataPower Gateway v7 1 day 1549 WE720 Administration of IBM WebSphere DataPower GatewayV7 3.5 days 1550 WE947 Making APIs Work forYou with IBM API ManagementV3 2 days 1551 WM101 Technical Introduction to IBM WebSphere MQ 1 day 1552 WM102 Technical Introduction to IBM MQ 1 day 1553 WM201 IBM WebSphere MQV7 System Administration (using Windows for labs) 4 days 1554 WM203 IBM WebSphere MQV7 System Administration (Linux labs) 4 days 1555 WM207 IBM MQV8 System Administration (using Windows for labs) 4 days 1556 WM209 IBM MQV8 System Administration (using Linux for labs) 4 days 1557 WM211 IBM WebSphere MQV7.5 Advanced System Administration (Distributed) 4 days 1558 WM212 IBM MQV8 Advanced System Administration (Distributed) 4 days 1559 WM252 Designing, Implementing, and Managing IBM MQV8 Clusters 3 days 1560 WM300 IBM WebSphere MQV7 System Administration for z/OS 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 80.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1561 WM310 IBM WebSphere MQV7 Advanced System Administration for z/OS 3.5 days 1562 WM503 IBM WebSphere MQV7 Application Development (using z/OS for labs) 3 days 1563 WM504 IBM WebSphere MQV7.5 Application Development (Windows labs) 3 days 1564 WM505 IBM WebSphere MQV7.5 Application Development (Linux Labs) 3 days 1565 WM515 IBM WebSphere MQV7 Programming Using JMS 3 days 1566 WM644 IBM WebSphere Message BrokerV8.0 System Administration 4 days 1567 WM645 IBM Integration BusV9.0 System Administration 4 days 1568 WM664 IBM WebSphere Message BrokerV8 Application Development I 5 days 1569 WM665 IBM Integration BusV9 Application Development I 5 days 1570 WM674 IBM WebSphere Message BrokerV8 Application Development II 3 days 1571 WM675 IBM Integration BusV9 Application Development II 4 days 1572 WM820 CICSV3 Advanced System ProgrammerTopics Including SOA and Web Services 5 days 1573 WM844 CICSPlex System ManagerV4 Introduction 1 day 1574 WM845 CICSV5 CICSPlex System Manager Introduction 1 day 1575 WM851 CICSV5 Fundamentals 3 days 1576 WM852 CICSV5 BasicTailoring 5 days 1577 WM854 CICSPlex System ManagerV4 Administration 4 days 1578 WM855 CICSV5 CICSPlex System Manager Administration 4 days 1579 WM865 CICS Command Level Coding 5 days 1580 WM875 CICSV5 Advanced Application Development for SOA and Web Services 4 days 1581 WM880 Getting to Know IBMTXSeries 5 days 1582 WPL41 Administering IBM Web Content Manager 2 days 1583 WPL43 Developing websites using IBM Web Content Manager 8 5 days 1584 WPL44 Administering IBM Web Content Manager 8.0 2 days 1585 WPL45 Advanced IBM Web Content Manager 8.0 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 81.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1586 WPL51 Developing Applications for IBM WebSphere Portal 7.0 5 days 1587 WPL53 Developing Applications for IBM WebSphere Portal 8.0 using IBM RAD 8.5 5 days 1588 WPL55 Build IBM WebSphere Portal 8.5 Applications Using Rational Application Developer 5 days 1589 WPL56 Developing Multichannel Applications with IBM Web Experience Factory 8.5 3 days 1590 WPL81 Installation and Administration of IBM WebSphere Portal 7.0 on Windows 5 days 1591 WPL82 Essential Websphere Portal 7.0 Administration skills for Developers on Windows 3 days 1592 WPL83 Installation and Administration of IBM WebSphere Portal 8 on Windows 5 days 1593 WPL91 Installation and Administration of IBM WebSphere Portal 7.0 on Linux 5 days 1594 WPL93 Installation and Administration of IBM WebSphere Portal 8 on Linux 5 days 1595 WPL95 Installation and Administration of IBM WebSphere Portal 8.5 on Linux 5 days 1596 WPP41 Administering IBM Web Content Manager (SPVC) 1.5 days 1597 WPP43 Developing Websites with IBM Web Content Manager 8 (SPVC) 5 days 1598 WPP51 Developing Applications for IBM WebSphere Portal 7.0 (SPVC) 5 days 1599 WPP80 Exploring new features of Websphere Portal 7.0 Administration on Windows (SPVC) 2 days 1600 WPP81 Installation and Administration of IBM WebSphere Portal 7.0 on Windows (SPVC) 5 days 1601 WPP82 Essential WS Portal 7.0 Administration skills for Developers on Windows (SPVC) 3 days 1602 WPP90 Exploring new features of Websphere Portal 7.0 Administration on Linux (SPVC) 2.5 days 1603 WPP91 Installation and Administration of IBM WebSphere Portal 7.0 on Linux (SPVC) 5 days 1604 WPW20 IBM Forms 8.0 Workshop 3 days 1605 WS800 IBM WebSphere Service Registry and RepositoryV8 for Developers 3 days 1606 WS811 IBM WebSphere Service Registry and RepositoryV8.0 for Administrators 2 days 1607 WU582 IBM WebSphere Application ServerV8 Problem Determination 4 days 1608 WU611 WebSphere Application ServerV7 Security 3 days 1609 WY583 Working with WebSphere Application ServerV8.5.5.2 Liberty Profile (BYOE) 1.5 days 1610 ZA007 IBM WebSphere Application ServerV7 Architecture (Self-paced) 1 hour CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 82.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1611 ZA008 IBM WebSphere Application ServerV7 Installation and Administration (Self-paced) 4 hours 1612 ZA009 IBM WebSphere Application ServerV7 Workload Management 1 day 1613 ZA370 IBM WebSphere Application ServerV7 Administration on Windows (Self-Paced) 5 days 1614 ZA380 WebSphere Application ServerV8 Administration for Windows (Self-paced) 5 days 1615 ZA504 Managing Mobile Applications with IBM WorklightV6 (SPVC) 2 days 1616 ZA505 Mobile Application Administration with IBM WorklightV6.2 2 days 1617 ZA570 IBM WebSphere Application ServerV7 Administration on Linux (Self-paced) 5 days 1618 ZA580 WebSphere Application ServerV8 Administration for Linux (Self-paced) 5 days 1619 ZA585 WebSphere Application ServerV8.5 Administration (Self-paced) 5 days 1620 ZA591 WebSphere Application ServerV8.5.5 Problem Determination (SPVC) 5 days 1621 ZA615 IBM WebSphere Application ServerV7 Scalability and High Availability 1.5 days 1622 ZA680 WebSphere Application ServerV8.5 Scripting and Automation (Self-paced) 5 days 1623 ZA715 IBM WebSphere Application ServerV7 PerformanceTuning (Self-paced) 3 days 1624 ZA815 WebSphere Application ServerV8.5.5 PerformanceTuning (SPVC) 3.5 days 1625 ZA855 IBM WebSphere Application ServerV8.5.5 Administration (Self-paced) 5 days 1626 ZB001 IBM WebSphere Lombardi EditionV7.1 Process Modeling (Self-paced) 2 days 1627 ZB003 IBM WebSphere Lombardi EditionV7.1 Process Modeling and Implementation 5 days 1628 ZB004 BPM Project Management (Self Paced) 2 days 1629 ZB005 IBM WebSphere Lombardi EditionV7.1 Process Modeling, Operations,Administration 5 days 1630 ZB009 BPM Process Analysis Methods I (Self-paced) 3 days 1631 ZB029 Process Discovery and Modeling in IBM Blueworks Live 6 hours 1632 ZB030 IBM Blueworks Live Account Administration (SPVC) 6 hours 1633 ZB031 Process Discovery and Modeling in IBM Blueworks Live 6 hours 1634 ZB040 BPM Change Management 3 hours 1635 ZB282 IBM WebSphere Business ModelerV6.2: Process Mapping, Simulation and Analysis 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 83.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1636 ZB284 IBM WebSphere Business ModelerV6.2: Process Mapping and Analysis (Self-Paced) 3 days 1637 ZB286 IBM WebSphere Business ModelerV6.2: Process Simulation and Analysis 2 days 1638 ZB319 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV7.5 4 days 1639 ZB380 Developing Event Solutions in IBM WebSphere Operational Decision ManagementV8 4 days 1640 ZB381 Developing Rule Solutions in IBM WebSphere Operational Decision ManagementV8 5 days 1641 ZB383 Developing Rule Solutions in IBM Operational Decision ManagerV8.5 (Self-paced) 5 days 1642 ZB384 Managing Decisions in IBM WebSphere Operational Decision ManagementV8 (SPVC) 5 days 1643 ZB386 Managing Decisions in IBM Operational Decision ManagerV8.5 5 days 1644 ZB389 Administering IBM Operational Decision ManagerV8.5 - SPVC 4 days 1645 ZB390 Developing Rule Solutions in IBM Operational Decision ManagerV8.6 5 days 1646 ZB391 Managing Decisions in IBM Operational Decision ManagerV8.6 5 days 1647 ZB392 Developing Rule Solutions in IBM Operational Decision ManagerV8.7 5 days 1648 ZB394 Developing Solutions with IBM Decision Server InsightsV8.7 3 days 1649 ZB562 WebSphere DataPower Option for Application Optimization (Self-Paced) 5 hours 1650 ZB711 Developing Applications for IBM WebSphere Process ServerV7 - I (Self-paced) 5 days 1651 ZB712 Developing Applications for IBM WebSphere Process ServerV7 – II (Self-paced) 5 days 1652 ZB713 Developing Applications for IBM WebSphere Enterprise Service BusV7 (Self-paced) 5 days 1653 ZB722 Administration of IBM WebSphere Process ServerV7 (Self-paced) 5 days 1654 ZB723 WebSphere Enterprise Service BusV7.0 Administration (Self-paced) 3 days 1655 ZB724 IBM WebSphere Process ServerV7 Performance andTuning (Self-paced) 3 days 1656 ZB725 IBM WebSphere Process ServerV7.0 Problem Determination (Self-paced) 5 days 1657 ZB731 Process Modeling with IBM Business Process Manager (Self-paced) 2 days 1658 ZB733 Process Modeling and Implementation with IBM Business Process Manager (SPVC) 5 days 1659 ZB739 Teamworks 6Transition to IBM Business Process ManagerV7.5.1 1 day 1660 ZB741 Modeling with IBM Business Process ManagerV7.5.1 (self-paced) 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 84.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1661 ZB743 Modeling and Implementing with IBM Business Process ManagerV7.5.1 (Self-paced) 5 days 1662 ZB744 WebSphere Lombardi EditionTransition to IBM Business Process ManagerV7.5.1 5 hours 1663 ZB751 Developing Applications for IBM Business Process Manager AdvancedV7.5 - I 5 days 1664 ZB753 Developing Applications for IBM WebSphere Enterprise Service BusV7.5 (SPVC) 5 days 1665 ZB771 Using IBM WebSphereV7 Products for Business Process Management (Self-paced) 3 days 1666 ZB782 IBM WebSphere Business ModelerV7: Process Mapping, Simulation and Analysis 5 days 1667 ZB783 IBM WebSphere Business CompassV7:Administration andTeam Collaboration 1 day 1668 ZB784 IBM WebSphere Business ModelerV7: Process Mapping and Analysis (Self-paced) 3 days 1669 ZB786 IBM WebSphere Business ModelerV7: Process Simulation and Analysis (Self-paced) 2 days 1670 ZB792 IBM WebSphere Business MonitorV7 Implementation and Administration (Self-paced) 3 days 1671 ZB797 Developing Applications with IBM Business MonitorV7.5 (Self-paced) 3 days 1672 ZB801 Process Modeling with IBM Business Process Manager StandardV8 (Self-paced) 2 days 1673 ZB802 Modeling and Implementing with IBM Business Process ManagerV8 (Self-paced) 5 days 1674 ZB803 Process Implementation with IBM Business Process Manager StandardV8 - II (SPVC) 5 days 1675 ZB804 Administration of IBM Business Process Manager StandardV8 (Self-paced) 4 days 1676 ZB806 Reporting with IBM Business Process Manager StandardV8 (Self-paced) 2 days 1677 ZB807 Process Modeling with IBM Business Process Manager StandardV8.5 (SPVC) 2 days 1678 ZB808 Process Implementing with IBM Business Process Manager StandardV8.5 - I 5 days 1679 ZB809 Process Implementing with IBM Business Process Manager StandardV8.5 - II - SPVC 5 days 1680 ZB811 Reporting with IBM Business Process Manager StandardV8.5 - SPVC 2 days 1681 ZB812 Administration of IBM Business Process Manager StandardV8.5 (SPVC) 4 days 1682 ZB813 Process Modeling with IBM Business Process Manager StandardV8.5.5 2 days 1683 ZB814 Process Implementing with IBM Business Process Manager StandardV8.5.5 - I - SPVC 5 days 1684 ZB815 Process Implementing with IBM Business Process Manager StandardV8.5.5 - II 5 days 1685 ZB851 Developing Applications in IBM Business Process Manager AdvancedV8 - I (SPVC) 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 85.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1686 ZB852 Developing Applications in IBM Business Process Manager AdvancedV8 - II (SPVC) 5 days 1687 ZB855 Developing Applications in IBM Business Process Manager AdvancedV8.5 - I (SPVC) 5 days 1688 ZB857 Developing Applications in IBM Business Process Manager AdvancedV8.5.5 - I 5 days 1689 ZB862 Administration of IBM Business Process Manager AdvancedV8 (Self-paced) 5 days 1690 ZB867 Administration of IBM Business Process Manager AdvancedV8.5 (SPVC) 5 days 1691 ZB868 IBM Business Process ManagerV8.5 Performance andTuning 3 days 1692 ZB869 IBM Business Process ManagerV8.5 Problem Determination - SPVC 5 days 1693 ZB870 Administration of IBM Business Process Manager AdvancedV8.5.5 5 days 1694 ZB891 Developing Applications with IBM Business MonitorV8 (Self-paced) 3 days 1695 ZD104 Fundamentals of Enterprise OSGi with IBM WebSphere Application ServerV8.5 1 day 1696 ZD154 Java SE 6 Programming Fundamentals (Self-paced) 5 days 1697 ZD160 Developing Applications with Java Persistence API (JPA) (Self-paced) 2 days 1698 ZD325 Developing Mobile Web Applications with Dojo (SPVC) 1 day 1699 ZD326 Rest Web Services for Ajax and Mobile Applications 8 hours 1700 ZD329 Location Services with IBM Worklight FoundationV6.2 5 hours 1701 ZD506 Web Service Development for IBM WebSphere Application ServerV7 (Self-paced) 5 days 1702 ZD511 Introduction to Java EE 5 Web Services (Self-paced) 1 day 1703 ZD512 Developing Java EE 5 Web Service Applications (Self-paced) 2 days 1704 ZD513 AdvancedTopics in Java EE Web Services (Self-paced) 2 days 1705 ZD601 Mobile Application Development with IBM WorklightV6.1 4 days 1706 ZD602 Mobile Application Development with IBM Worklight FoundationV6.2 3 days 1707 ZE436 Enforcing Governance in IBM WebSphere DataPowerV5.0 (SPVC) 5 hours 1708 ZE601 Accelerate, Secure and Integrate with IBM DataPowerV6.0 5 days 1709 ZE942 IBM WebSphere Cast IronV6.1 Configuration (Self-paced) 3 days 1710 ZE952 IBM WebSphere Cast Iron 6.1 Administration 6 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 86.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1711 ZM101 Technical Introduction to IBM WebSphere MQ (Self-paced) 1 day 1712 ZM207 IBM MQV8 System Administration (using Windows for Labs) - SPVC 4 days 1713 ZM211 IBM WebSphere MQV7.5 Advanced System Administration (Distributed) (self-paced) 4 days 1714 ZM212 IBM MQV8 Advanced System Administration (Distributed) - SPVC 4 days 1715 ZM251 IBM WebSphere MQV7: Designing and Architecting Clustering Solutions (SPVC) 4 days 1716 ZM501 IBM WebSphere MQV7 Application Development (Windows Labs) (Self-Paced) 3 days 1717 ZM643 IBM WebSphere Message BrokerV7.0 System Administration Workshop (self-paced) 4 days 1718 ZM644 IBM WebSphere Message BrokerV8.0 System Administration (Self-paced) 4 days 1719 ZM645 IBM Integration BusV9.0 System Administration (SPVC) 4 days 1720 ZM663 IBM WebSphere Message BrokerV7.0 Developer Workshop (Self-paced) 5 days 1721 ZM664 IBM WebSphere Message BrokerV8 Application Development I (Self-paced) 5 days 1722 ZM665 IBM Integration BusV9 Application Development I (SPVC) 5 days 1723 ZM674 IBM WebSphere Message BrokerV8 Application Development II (Self-paced) 3 days 1724 ZM675 IBM Integration BusV9 Application Development II (SPVC) 4 days 1725 ZS805 Fundamentals of IBM WebSphere Service Registry and RepositoryV8 (SPVC) 1 day 1726 ZS806 IBM WebSphere Service Registry and RepositoryV8 Administration 1 day 1727 ZU370 Introduction to HTML5 and JavaScript Programming (Self-paced) 6 hours 1728 ZU372 Developing Mobile Web Applications with jQuery Mobile 8 hours 1729 ZU610 WebSphere Default Messaging: Using the SIBus 7 hours 1730 ZU715 WebSphere Application Server for z/OS PerformanceTuning 1 day 1731 ZU802 WebSphere Application Server Liberty Profile for Application Developers 1 day WATSON HEALTH 1732 9D010 Fundamentals of the Curam Enterprise Framework for Business Analysts 6.0 5 days 1733 9D050 Fundamentals of the Curam Enterprise Framework for Developers 6.0 1 day0 1734 9D070 Curam Solution Architecture Workshop 6.0 2 days 1735 9D310 Fundamentals of the IBM Cúram SPM Platform for Business AnalystsV6.0.4 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 87.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1736 9D320 Fundamentals of the IBM Curam SPM Platform for DevelopersV6.0.4 10 days 1737 9D330 Functional Overview of the IBM Curam SPM Platform 6.0.4 (One-Day) 1 day 1738 9D340 Functional Overview of the IBM Curam SPM PlatformV6.0.4 (Two-Day) 2 days 1739 9D350 Fundamentals of IBM Cúram Express Rules 6.0.4 4 days 1740 9D360 Fundamentals of IBM Cúram Express Rules for Developers 6.0.4 5 days 1741 9D370 Functional Overview of IBM Curam Universal Access Entry Edition 6.0.4 1 day 1742 9D409 Fundamentals of the IBM Curam SPM Platform for Developers (ADE) 6.0.4 (SPVC) 5 days 1743 9D419 Fundamentals of the IBM Curam SPM Platform for Developers (Customization) 6.0.4 (SPVC) 5 days 1744 9D420 Fundamentals of IBM Curam Workflow for Developers 6.0.4 4 days 1745 9D438 Functional Overview of Health Care Reform in IBM Cúram SPM 6.0.5 (WBT) 7 hours 1746 9D440 Fundamentals of IBM Cúram SPM Platform for Developers 6.0.5 10 days 1747 9D456 IBM Cúram SPM Platform Runtime Environment 6.0.4 - Expert Arena (SPVC) 1 day 1748 9D466 IBM Cúram SPM Platform Development Environment 6.0.4: Expert Arena (SPVC) 1 day 1749 9D470 Fundamentals of the IBM Cúram SPM Platform for Business Analysts 6.0.5 5 days 1750 9D480 IBM Curam Express Rules for Business Analysts 6.0.5 4 days 1751 9D499 Fundamentals of IBM Cúram SPM Platform for Developers (ADE) 6.0.5 (SPVC) 5 days 1752 9D509 Fundamentals of the IBM Cúram SPM Platform for Developers (Customization) 6.0.5 5 days 1753 9D510 IBM Curam Express Rules for Developers 5 days 1754 9D520 IBM Cúram Workflow for Developers 6.0.5 5 days 1755 9D536 IBM Cúram SPM Platform Development Environment 6.0.5: Expert Arena 1 day 1756 9D559 IBM Curam Intelligence Evidence Gathering (IEG) for Developers 6.x (SPVC) 3 days 1757 9D566 IBM Cúram SPM Platform Runtime Environment 6.0.5 (Expert Arena) 1 day 1758 9D578 Introducing IBM Cúram Universal Access 6.0.5 5 hours 1759 9D588 IBM Curam Child Welfare Solution 6.0.5: Functional Primer 5 hours 1760 9D598 Introduction to IBM Cúram Social Program Management 6.0.5: Functional Overview 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Commerce Security Systems Watson HealthAnalytics
  • 88.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1761 9D609 IBM Cúram Express Rules for Developers (ADE) 3 days 1762 9D619 IBM Cúram Express Rules for Developers (Application Integration) 3 days 1763 9D628 Batch Processing in IBM Cúram 6.0.5 5 hours CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Cloud Commerce Security Systems Watson HealthAnalytics Previous
  • 89.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 SEC301 Intro to Information Security 5 days 2 SEC401 Security Essentials Bootcamp Style 6 days 3 SEC440 Critical Security Controls: Planning, Implementing and Auditing 2 days 4 SEC464 Cyber SecurityTraining for IT Administrators 2 days 5 SEC480 Top 4 Mitigation Strategies: Implementing & AuditingNew 3 days 6 SEC501 Advanced Security Essentials - Enterprise Defender 6 days 7 SEC502 Perimeter Protection In-Depth 6 days 8 SEC503 Intrusion Detection In-Depth 6 days 9 SEC504 HackerTools,Techniques, Exploits and Incident Handling 6 days 10 SEC505 Securing Windows with PowerShell and the Critical Security Controls 6 days Advance your career and explore our cyber security training courses and cyber security training events . Our curriculum span from the core essential technical skills and strategies that every cyber security professional should know, to advanced topics in penetration testing and ethical hacking, digital forensics and incident response, defence of critical infrastructure, application development, and audit, and legal topics. Vinsys is the best source for high quality information security training.We have been training Information Security and IT Professionals since 1999 with a diverse line up of relevant training courses.  CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 90.
    Business&Process Framework SoftSkills No Code DescriptionDuration 11 SEC506 Securing Linux/Unix 6 days 12 SEC511 Continuous Monitoring and Security Operations 6 days 13 SEC524 Cloud Security Fundamentals 2 days 14 SEC542 Web App PenetrationTesting and Ethical Hacking 6 days 15 SEC546 IPv6 Essentials 2 days 16 SEC550 Active Defense, Offensive Countermeasures and Cyber DeceptionNew 5 days 17 SEC560 Network PenetrationTesting and Ethical HackingNew 6 days 18 SEC561 Immersive Hands-On HackingTechniques 6 days 19 SEC562 CyberCity Hands-on Kinetic Cyber Range ExerciseNew 6 days 20 SEC566 Implementing and Auditing the Critical Security Controls - In-Depth 5 days 21 SEC567 Social Engineering for PenetrationTestersNew 2 days 22 SEC573 Python for PenetrationTesters 5 days 23 SEC575 Mobile Device Security and Ethical Hacking 6 days 24 SEC579 Virtualization and Private Cloud Security 6 days 25 SEC580 Metasploit Kung Fu for Enterprise PenTesting 2 days 26 SEC617 Wireless Ethical Hacking, PenetrationTesting, and Defenses 6 days 27 SEC642 Advanced Web App PenetrationTesting and Ethical Hacking 6 days 28 SEC660 Advanced PenetrationTesting, Exploit Writing, and Ethical Hacking 6 days 29 SEC760 Advanced Exploit Development for PenetrationTesters 6 days 30 FOR408 Windows Forensic Analysis 6 days 31 FOR508 Advanced Digital Forensics and Incident Response 6 days 32 FOR518 Mac Forensic Analysis 6 days 33 FOR526 Memory Forensics In-Depth 6 days 34 FOR572 Advanced Network Forensics and Analysis 6 days 35 FOR578 CyberThreat IntelligenceNew 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 91.
    Business&Process Framework SoftSkills No Code DescriptionDuration 36 FOR585 Advanced Smartphone Forensics 6 days 37 FOR610 Reverse-Engineering Malware: Malware AnalysisTools andTechniques 6 days 38 MGT405 Critical Infrastructure Protection 2 days 39 MGT415 A Practical Introduction to Cyber Security Risk ManagementNew 2 days 40 MGT433 SecuringThe Human: How to Build, Maintain and Measure a High-Impact Awareness Program 2 days 41 MGT514 IT Security Strategic Planning, Policy and LeadershipNew 5 days 42 MGT525 IT Project Management, Effective Communication, and PMP® Exam Prep 6 days 43 MGT535 Incident ResponseTeam Management 2 days 44 DEV522 Defending Web Applications Security Essentials 6 days 45 DEV536 Secure Coding: Developing Defensible Applications 2 days 46 DEV541 Secure Coding in Java/JEE: Developing Defensible Applications 4 days 47 DEV543 Secure Coding in C & C++ 2 days 48 DEV544 Secure Coding in .NET: Developing Defensible Applications 4 days 49 AUD440 Critical Security Controls: Planning, Implementing and Auditing 2 days 50 AUD480 Top 4 Mitigation Strategies: Implementing & AuditingNew 3 days 51 AUD507 Auditing & Monitoring Networks, Perimeters & Systems 6 days 52 AUD566 Implementing and Auditing the Critical Security Controls - In-Depth 5 days 53 LEG523 Law of Data Security and Investigations 5 days 54 ICS410 ICS/SCADA Security Essentials 5 days 55 ICS456 Essentials for NERC Critical Infrastructure ProtectionBeta 5 days 56 ICS Active Defense and Incident ResponseNew 5 days 57 SPECIAL: Hacker Guard:Threat Update 2 days 58 SPECIAL: ComplianceTraining and Securing the Human 1 day 59 SPECIAL: Security AwarenessTraining for Electric Entities 1 day 60 SPECIAL: Special for HIMSS - Implementing Healthcare Cyber-Hygiene with the Critical Security ControlsNew 1 day 61 SPECIAL: Introduction to Malware Analysis: Hands-on andTechnicalNew 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 92.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 10000AC Skillpipe Evaluation Course 5 days 2 10135BC Configuring, Managing andTroubleshooting Microsoft® Exchange Server 2010 Service Pack 2 5 days 3 10165AC UpdatingYour Skills from Microsoft® Exchange Server 2003 or Exchange Server 2007 to Exchange Server 2010 SP1 5 days 4 10174BC Configuring and Administering Microsoft® SharePoint® 2010 5 days 5 10175AC Microsoft® SharePoint® 2010,Application Development 5 days 6 10215AC Implementing and Managing Microsoft® ServerVirtualization 5 days 7 10231BC Designing a Microsoft® SharePoint® 2010 Infrastructure 5 days 8 10232AC Designing and Developing Microsoft® SharePoint® Server 2010 Applications 5 days 9 10233BC Designing and Deploying Messaging Solutions with Microsoft® Exchange Server 2010 SP2 5 days 10 10262AC Developing Windows® Applications with Microsoft®Visual Studio® 2010 5 days Vinsys is an eminent Global Learning Partner of Microsoft and offers all major Microsoft certification courses. Having our own research labs and centre of excellence differentiates us to provide live learning as well as implementation simulations during the course. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Microsoft being a pioneer in IT technology partnering withVinsys to specialise on project deliveries including Microsoft Office Applications, business intelligence, virtualisation, enterprise application management, database management, and many more.These MS certification courses not only assess the technical know-how of the aspirants but also helps them enhance their technical knowledge on various Microsoft technologies, tools and products. IT aspirants from across the globe can register withVinsys for various MS certifications and get their potential evaluated by achieving Microsoft certifications. Technology
  • 93.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious No CodeDescription Duration 11 10263AC Developing Windows® Communication Foundation Solutions with Microsoft®Visual Studio® 2010 5 days 12 10264AC Developing Web Applications with Microsoft®Visual Studio® 2010 5 days 13 10265AC Developing Data Access Solutions with Microsoft®Visual Studio® 2010 5 days 14 10266AC Programming in C# with Microsoft®Visual Studio® 2010 5 days 15 10267AC Introduction to Web Development with Microsoft®Visual Studio® 2010 5 days 16 10324AC Implementing and Managing Microsoft® DesktopVirtualization 5 days 17 10508AC Planning, Deploying, and Managing Microsoft® Exchange Server 2010 Unified Messaging 5 days 18 10533AC Deploying, Configuring, and Administering Microsoft® Lync™ Server 2010 5 days 19 10534AC Planning and Designing a Microsoft® Lync™ Server 2010 Solution 5 days 20 10550AC Programming inVisual Basic with Microsoft®Visual Studio® 2010 5 days 21 10553AC Fundamentals of XAML and Microsoft® Expression Blend® 5 days 22 10554AC Developing Rich Internet Applications Using Microsoft® Silverlight® 4 5 days 23 10747DC Administering System Center 2012 Configuration Manager 5 days 24 10748CC Deploying System Center 2012 Configuration Manager 5 days 25 10802AC Microsoft® Enterprise Search for IT Professionals 5 days 26 10805AC Microsoft® SharePoint® 2010 Search for Application Developers 5 days 27 10806AC Microsoft® FAST Search Server 2010 for SharePoint® for Application Developers 5 days 28 10958BC Programming Fundamentals of Web Applications 5 days 29 10961BC Automating Administration with Windows PowerShell® 5 days 30 10962BC Advanced Automated Administration with Windows PowerShell 5 days 31 10964CC Cloud & Datacenter Monitoring with System Center Operations Manager 5 days 32 10965CC IT Service Management with System Center Service Manager 5 days 33 10967AC Fundamentals of a Windows Server® Infrastructure 5 days 34 10968BC Designing for Office 365® Infrastructure 5 days 35 10969BC Active Directory® Services with Windows Server® 5 days Technology
  • 94.
    Business&Process Framework SoftSkills No Code DescriptionDuration 36 10970BC Networking with Windows Server® 5 days 37 10971BC Storage and High Availability with Windows Server 5 days 38 10972BC Administering the Web Server (IIS) Role of Windows Server 5 days 39 10974BC Deploying and Migrating Windows Servers 5 days 40 10975AC Introduction to Programming 5 days 41 10977BC UpgradingYour SQL Server Skills to Microsoft® SQL Server® 2014 5 days 42 10978AC Introduction to Azure for Developers 5 days 43 10979BC Microsoft Azure Fundamentals 5 days 44 10981AC Infrastructure Provisioning with System CenterVirtual Machine Manager 5 days 45 10982AC Supporting andTroubleshooting Windows 10 5 days 46 1846AC Microsoft® Solutions Framework Essentials 5 days 47 1913AC Exchanging andTransforming Data Using XML and XSLT 5 days 48 2011AC Troubleshooting Microsoft® Exchange Server 2003Toolkit 5 days 49 20246DC Monitoring and Operating a Private Cloud 5 days 50 20247DC Configuring and Deploying a Private Cloud 5 days 51 20331BC Core Solutions of Microsoft® SharePoint® Server 2013 5 days 52 20332BC Advanced Solutions of Microsoft® SharePoint® Server 2013 5 days 53 20334AC Core Solutions of Microsoft Skype for Business 2015 5 days 54 20335BC Lync® Network Readiness Assessment 5 days 55 20336BC Core Solutions of Microsoft® Lync® Server 2013 5 days 56 20337BC EnterpriseVoice and Online Services with Microsoft Lync Server 2013 5 days 57 20341BC Core Solutions of Microsoft Exchange Server 2013 5 days 58 20342BC Advanced Solutions of Microsoft Exchange Server 2013 5 days 59 20346DC Managing Office 365 Identities and Services 5 days 60 20409BC ServerVirtualization with Windows Server Hyper-V® and System Center 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 95.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 61 20410DC Installing and Configuring Windows Server® 2012 5 days 62 20411DC Administering Windows Server® 2012 5 days 63 20412DC Configuring Advanced Windows Server® 2012 Services 5 days 64 20413CC Designing and Implementing a Server Infrastructure 5 days 65 20414CC Implementing an Advanced Server Infrastructure 5 days 66 20415BC Implementing a Desktop Infrastructure 5 days 67 20416BC Implementing Desktop Application Environments 5 days 68 20417DC UpgradingYour Skills to MCSA Windows Server® 2012 5 days 69 20461CC Querying Microsoft SQL Server® 5 days 70 20462CC Administering Microsoft® SQL Server® Databases 5 days 71 20463CC Implementing a Data Warehouse with Microsoft® SQL Server® 5 days 72 20464CC Developing Microsoft® SQL Server® Databases 5 days 73 20465CC Designing a Data Solution with Microsoft® SQL Server® 2014 5 days 74 20466CC Implementing Data Models and Reports with Microsoft® SQL Server® 5 days 75 20467CC Designing Self-Service Business Intelligence and Big Data Solutions 5 days 76 20480BC Programming in HTML5 with JavaScript and CSS3 5 days 77 20481CC Essentials of Developing Windows® Store Apps Using HTML5 and JavaScript 5 days 78 20482CC Advanced Windows® Store App Development Using HTML5 and JavaScript 5 days 79 20483BC Programming in C# 5 days 80 20484CC Essentials of Developing Windows® Store Apps Using C# 5 days 81 20485CC Advanced Windows® Store App Development Using C# 5 days 82 20486BC Developing ASP.NET MVC 4 Web Applications 5 days 83 20487BC Developing Windows Azure and Web Services 5 days 84 20488BC Developing Microsoft© SharePoint© Server 2013 Core Solutions 5 days 85 20489BC Developing Microsoft® SharePoint® Server 2013 Advanced Solutions 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 96.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 86 20497AC SoftwareTesting with MicrosoftVisual Studio® 2013 5 days 87 20532BC Developing Microsoft Azure Solutions 5 days 88 20533BC Implementing Microsoft Azure Infrastructure Solutions 5 days 89 20687DC Configuring Windows® 8.1 5 days 90 20688DC Supporting Windows® 8.1 5 days 91 20689DC UpgradingYour Skills to MCSA Windows® 8 5 days 92 20694BC Virtualizing Enterprise Desktops and Apps 5 days 93 20695BC Deploying Windows Desktops and Enterprise Applications 5 days 94 20696BC Administering System Center Configuration Manager and Intune 5 days 95 20697-1AC Installing and Configuring Windows 10 5 days 96 20697-2AC Deploying and Managing Windows 10 Using Enterprise Services 5 days 97 2261CC Supporting Users Running the Microsoft Windows XP Operating System 5 days 98 2272CC Implementing and Supporting Microsoft® Windows® XP Professional 5 days 99 2274CC Managing a Microsoft® Windows Server™ 2003 Environment 5 days 100 2275CC Maintaining a Microsoft Windows Server 2003 Environment 5 days 101 2276CC Implementing a Microsoft Windows Server 2003 Network Infrastructure: Network Hosts 5 days 102 2277CC Implementing, Managing, and Maintaining a Microsoft Windows Server 2003 Network Infrastructure: Network Services 5 days 103 2285BC Installing, Configuring & Administering Microsoft® Windows® XP Professional 5 days 104 2310DC Developing Web Applications Using Microsoft®Visual Studio® 2008 SP1 5 days 105 2311AC Advanced Web Application Development Using Microsoft® ASP.NET 5 days 106 2349BC Programming with the Microsoft® .NET Framework (MicrosoftVisual C#™ .NET) 5 days 107 2373BC Programming with MicrosoftVisual Basic .NET 5 days 108 2389BC Programming with Microsoft® ADO.NET 5 days 109 2400CC Implementing and Managing Microsoft Exchange Server 2003 5 days 110 2433BC MicrosoftVisual Basic Scripting Edition and Microsoft Windows Script Host Essentials 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 97.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 111 2500AC Introduction to XML and the Microsoft® .NET Platform 5 days 112 2541BC Core Data Access with Microsoft®Visual Studio® 2005 5 days 113 2542AC Advanced Data Access With Microsoft®Visual Studio® 2005 5 days 114 2543BC Core Web ApplicationTechnologies With Microsoft®Visual Studio® 2005 5 days 115 2544AC Advanced Web ApplicationTechnologies With Microsoft®Visual Studio® 2005 5 days 116 2546BC Core Windows® FormsTechnologies With Microsoft®Visual Studio® 2005 5 days 117 2547AC Advanced Windows® FormsTechnologies With Microsoft®Visual Studio® 2005 5 days 118 2548BC Core Distributed Application Development With Microsoft®Visual Studio® 2005 5 days 119 2549AC Advanced Distributed Application Development With Microsoft®Visual Studio® 2005 5 days 120 2555AC Developing Microsoft.NET Applications for Windows (Visual C#.NET) 5 days 121 2556AC Developing Mobile Applications Using the Microsoft® .NET Compact Framework 5 days 122 2559BC Introduction toVisual Basic .NET Programming with Microsoft .NET 5 days 123 2576AC Implementing And Administering Microsoft® Internet Information Services IIS) 6.0 5 days 124 2609AC Introduction to C# Programming with Microsoft .NET 5 days 125 2667AC Introduction to Programming 5 days 126 2710BC Analyzing Requirements and Defining Microsoft® .NET Solution Architectures 5 days 127 2717CC Introduction to Microsoft® .NET Development 5 days 128 2730AC Building Microsoft® Content Management Server 2002 Solutions 5 days 129 2778AC Writing Queries Using Microsoft® SQL Server™ 2008Transact-SQL 5 days 130 2810AC Fundamentals of Network Security 5 days 131 2821AC Designing and Managing a Microsoft® Windows® Public Key Infrastructure 5 days 132 2823BC Implementing and Administering Security in a Microsoft® Windows Server™ 2003 Network 5 days 133 2830BC Designing Security for Microsoft® Networks 5 days 134 2933AC Developing Business Process and Integration Solutions Using Microsoft BizTalk Server 2006 5 days 135 2956BC Core Foundations of Microsoft .NET 2.0 Development 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 98.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 136 2957BC Advanced Foundations of Microsoft .NET 2.0 Development 5 days 137 3938CC UpdatingYour Skills from Microsoft® Exchange Server 2000 or Microsoft Exchange Server 2003 to Microsoft Exchange Server 2007 SP1 5 days 138 40008AC Updating your Database Skills to Microsoft® SQL Server® 2012 5 days 139 40009AC Updating your Business Intelligence Skills to Microsoft® SQL Server® 2012 5 days 140 40032AC Networking and Security Fundamentals:Training 2-Pack for MTA Exams 98-366 and 98-367 5 days 141 40033AC Windows Operating System and Windows Server Fundamentals:Training 2-Pack for MTA Exams 98-349 and 98-365 5 days 142 40034AC Software Development Fundamentals with HTML5:Training 2-Pack for MTA Exams 98-361 and 98-375 5 days 143 40035AC Software Development Fundamentals with .NET:Training 2-Pack for MTA Exams 98-361 and 98-372 5 days 144 40043AC Windows® 8 UX Design Workshop 5 days 145 40044AC Search Advertising with Bing Ads 5 days 146 40045AC Microsoft® SQL Server® for Oracle DBAs 5 days 147 40074AC Microsoft® SQL Server® 2014 for Oracle DBAs 5 days 148 40076AC MVA Workshop:Troubleshooting Windows Systems with SysInternalsTools 5 days 149 40332AC Partner Applied Workshop:What's New in Windows 10 5 days 150 40349AC Windows Operating System Fundamentals:Training for MTA Exam 98-349 5 days 151 40361AC Software Development Fundamentals:Training for MTA Exam 98-361 5 days 152 40362AC Windows Development Fundamentals:Training for MTA Exam 98-362 5 days 153 40363AC Web Development Fundamentals:Training for MTA Exam 98-363 5 days 154 40364AC Database Administration Fundamentals:Training for MTA Exam 98-364 5 days 155 40365AC Windows Server Administration Fundamentals:Training for MTA Exam 98-365 5 days 156 40366AC Networking Fundamentals:Training for MTA Exam 98-366 5 days 157 40367AC Security Fundamentals:Training for MTA Exam 98-367 5 days 158 40372AC Microsoft .NET Fundamentals:Training for MTA Exam 98-372 5 days 159 40373AC Mobile Development Fundamentals:Training for MTA Exam 98-373 5 days 160 40374AC Gaming Development Fundamentals: MTA Exam 98-374 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 99.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 161 40375AC HTML5 Application Development Fundamentals:Training for MTA Exam 98-375 5 days 162 4994AC Introduction to Programming Microsoft .NET Applications with MicrosoftVisual Studio 2005 5 days 163 4995AC Programming with the Microsoft .NET Framework using MicrosoftVisual Studio 2005 5 days 164 50040AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Access 2007 5 days 165 50041AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Excel 2007 5 days 166 50042AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Outlook 2007 5 days 167 50043AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office PowerPoint 2007 5 days 168 50044AC Preparing for the Microsoft Certified Application Specialist Exam in Microsoft Office Word 2007 5 days 169 50045AC Preparing for the Microsoft Certified Application Specialist Exam in WindowsVista 5 days 170 50107AC Learn Microsoft® OfficeVisio® 2007 Step by Step 5 days 171 50123AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 1 5 days 172 50124AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 2 5 days 173 50125AC Learn Microsoft® Office Excel® 2007 Step by Step, Level 3 5 days 174 50126AC Learn Microsoft® Office Word 2007 Step by Step, Level 1 5 days 175 50127AC Learn Microsoft® Office Word 2007 Step by Step, Level 2 5 days 176 50128AC Learn Microsoft® Office Word 2007 Step by Step, Level 3 5 days 177 50129AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 1 5 days 178 50130AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 2 5 days 179 50131AC Learn Microsoft® Office PowerPoint® 2007 Step by Step, Level 3 5 days 180 50132AC Learn Microsoft® Office Outlook® 2007 Step by Step, Level 1 5 days 181 50133AC Learn Microsoft® Office Outlook ® 2007 Step by Step, Level 2 5 days 182 50134AC Learn Microsoft® Office Outlook® 2007 Step by Step, Level 3 5 days 183 50135AC Learn Microsoft® Office Access® 2007 Step by Step, Level 1 5 days 184 50136AC Learn Microsoft® Office Access® 2007 Step by Step, Level 2 5 days 185 50207AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 1 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 100.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 186 50208AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 2 5 days 187 50209AC Learn Microsoft Office SharePoint® Designer 2007 Step by Step, Level 3 5 days 188 50367AC Learn Windows 7 Step by Step, Level 1 5 days 189 50368AC Learn Windows 7 Step by Step, Level 2 5 days 190 50369AC Learn Windows Internet Explorer 8 Step by Step 5 days 191 50374BC Microsoft ServerVirtualization and Management for the ExperiencedVMware IT Pro 5 days 192 50382BC Implementing Forefront Identity Manager 2010 5 days 193 50383BC Upgrading Identity Lifecycle Manager 2007 to Forefront Identity Manager 2010 5 days 194 50402BC Implementing Forefront Unified Access Gateway 2010 5 days 195 50403BC Implementing Active Directory Rights Management Services with Exchange and SharePoint 5 days 196 50404BC Overview of Active Directory Rights Management Services with Windows Server 2008 R2 5 days 197 50412BC Implementing Active Directory Federation Services 2.0 5 days 198 50430BC AdministeringTeam Foundation Server 2010 5 days 199 50466BC Windows® Azure™ Solutions with Microsoft®Visual Studio® 2010 5 days 200 5047BC Introduction to Installing and Managing Microsoft® Exchange Server 2007 SP1 5 days 201 5049AC Managing Messaging Security Using Microsoft Exchange Server 2007 5 days 202 50509AC Implementing Forefront Endpoint Protection 2010 5 days 203 5050AC Recovering Messaging Servers and Databases using Microsoft® Exchange Server 2007 5 days 204 5051AC Monitoring andTroubleShooting Microsoft Exchange Server 2007 2007 5 days 205 50526AC IT Basics I 5 days 206 50527AC IT Basics II 5 days 207 50528AC IT Basics III 5 days 208 50529AC IT Basics for Advanced Users I 5 days 209 50530AC IT Basics for Advanced Users II 5 days 210 50532AC Learn Microsoft Access 2010 Step by Step, Level 1 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 101.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 211 50533AC Learn Microsoft Access 2010 Step by Step, Level 2 5 days 212 50534AC Learn Microsoft Access 2010 Step by Step, Level 3 5 days 213 50535AC Learn Microsoft Outlook 2010 Step by Step, Level 1 5 days 214 50536AC Learn Microsoft Outlook 2010 Step by Step, Level 2 5 days 215 50537AC Learn Microsoft Outlook 2010 Step by Step, Level 3 5 days 216 50538AC Learn Microsoft PowerPoint 2010 Step by Step, Level 1 5 days 217 50539AC Learn Microsoft PowerPoint 2010 Step by Step, Level 2 5 days 218 5053AC Designing a Messaging Infrastructure Using Microsoft Exchange Server 2007 5 days 219 50540AC Learn Microsoft PowerPoint 2010 Step by Step, Level 3 5 days 220 50541AC Learn Microsoft Word 2010 Step by Step, Level 1 5 days 221 50542AC Learn Microsoft Word 2010 Step by Step, Level 2 5 days 222 50543AC Learn Microsoft Word 2010 Step by Step, Level 3 5 days 223 50544AC Learn Microsoft Excel 2010 Step by Step, Level 1 5 days 224 50545AC Learn Microsoft Excel 2010 Step by Step, Level 2 5 days 225 50546AC Learn Microsoft Excel 2010 Step by Step, Level 3 5 days 226 5054AC Designing a High Availability Messaging Solution Using Microsoft Exchange Server 2007 5 days 227 50571AC Partner Lync SupportTraining - Pre-Read Material 5 days 228 50572AC Premier Support for Lync PartnersTier 1 5 days 229 50573AC Premier Support for Lync PartnersTier 2 5 days 230 5058AC Project Series: Deploying Microsoft Office 2007 Professional Edition  5 days 231 5060AC Implementing Microsoft Windows SharePoint Services 3.0 5 days 232 5061AC Implementing Microsoft® Office SharePoint® Server 2007 5 days 233 5105CC Deploying WindowsVista® Business Desktops 5 days 234 5115BC Installing, Configuring, andTroubleshooting WindowsVista® 5 days 235 5117AC Installing, Configuring,Troubleshooting, and Maintaining WindowsVista® 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 102.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 236 5118BC Supporting WindowsVista® and Applications in the Enterprise 5 days 237 5177AC Implementing and Maintaining Instant Messaging Using Microsoft Office Communications Server 2007 5 days 238 5178AC Implementing and Maintaining Audio/Visual Conferencing and Web Conferencing Using Microsoft Office Communications Server 2007 5 days 239 5179AC Implementing and MaintainingTelephony Using Microsoft Office Communications Server 2007 5 days 240 5D4-00001 CoursewareVoucher Product: Digital MOCVoucher 5 days 241 5D4-00002 CoursewareVoucher Product: Digital MLOVoucher 5 days 242 6066AC Developing Managed Applications for Windows Mobile 6 5 days 243 6067AC Developing Native Applications for Microsoft Windows Mobile 6 5 days 244 6158CC UpdatingYour SQL Server® 2005 Skills to SQL Server 2008 5 days 245 6214AC EffectiveTeam Development using Microsoft®Visual Studio®Team System 5 days 246 6215AC Implementing and Administering Microsoft®Visual Studio® 2008Team Foundation Server 5 days 247 6231BC Maintaining a Microsoft® SQL Server® 2008 R2 Database 5 days 248 6232BC Implementing a Microsoft® SQL Server® 2008 R2 Database 5 days 249 6234AC Implementing and Maintaining Microsoft® SQL Server® 2008 Analysis Services 5 days 250 6235AC Implementing and Maintaining Microsoft® SQL Server® 2008 Integration Services 5 days 251 6236AC Implementing and Maintaining Microsoft® SQL Server™ 2008 Reporting Services 5 days 252 6292AC Installing and Configuring Windows® 7 Client 5 days 253 6293AC Troubleshooting and Supporting Windows® 7 in the Enterprise 5 days 254 6294AC Planning and Managing Windows® 7 Desktop Deployments and Environments 5 days 255 6317AC UpgradingYour SQL Server® 2000 Database Administration (DBA) Skills to SQL Server 2008 DBA Skills 5 days 256 6367AC Introduction to Object Oriented Programming using Microsoft®Visual Studio® 2008 5 days 257 6368AC Programming with the Microsoft® .NET Framework Using Microsoft®Visual Studio® 2008 5 days 258 6416DC UpdatingYour Windows Server® 2003Technology Skills to Windows Server® 2008 5 days 259 6418CC Deploying Windows Server® 2008 5 days 260 6419BC Configuring, Managing and Maintaining Windows Server® 2008-based Servers 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 103.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 261 6421BC Configuring andTroubleshooting a Windows Server® 2008 Network Infrastructure 5 days 262 6425CC Configuring andTroubleshooting Windows Server® 2008 Active Directory® Domain Services 5 days 263 6426CC Configuring andTroubleshooting Identity and Access Solutions with Windows Server® 2008 Active Directory® 5 days 264 6433AC Planning and Implementing Windows Server® 2008 5 days 265 6435BC Designing Windows Server® 2008 Network and Applications Infrastructure 5 days 266 6436BC Designing Windows Server® 2008 Active Directory® Infrastructure and Services 5 days 267 6438AC Implementing and Administering Windows® SharePoint® Services 3.0 in Windows Server® 2008 5 days 268 6439AC Configuring andTroubleshooting Windows Server® 2008 Application Infrastructure 5 days 269 6445AC Implementing and Administering Windows® Small Business Server 2008 5 days 270 6460AC Visual Studio® 2008:Windows® Presentation Foundation 5 days 271 6461AC Visual Studio® 2008:Windows® Communication Foundation 5 days 272 6462AC Visual Studio® 2008:Windows® Workflow Foundation 5 days 273 7197AC Managing Enterprise Desktops using the Microsoft® Desktop Optimization Pack 5 days 274 7SF-00029 Pearson/VUE MTA CertificationVoucher: Commercial Single-Shot 5 days 275 80229AC Inventory Control in Microsoft Dynamics® GP 2010 5 days 276 80230AC Project Series in Microsoft Dynamics® GP 2010 5 days 277 80231AC Purchase Order Processing in Microsoft Dynamics® GP 2010 5 days 278 80232AC Sales Order Processing in Microsoft Dynamics® GP 2010 5 days 279 80239AC Extender for Microsoft Dynamics® GP 2010 5 days 280 80240AC Using Microsoft® SharePoint®Technology with Microsoft Dynamics® GP 2010 5 days 281 80307AC Enterprise Portal Development in Microsoft Dynamics® AX 2012 5 days 282 80308AC Procurement in Microsoft Dynamics® AX 2012 5 days 283 80310AC LEAN Manufacturing in Microsoft Dynamics® AX 2012 5 days 284 80311BC Service Industries in Microsoft Dynamics® AX 2012 R2 5 days 285 80312AC Development III in Microsoft Dynamics® AX 2012 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 104.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 286 80313AC Development IV in Microsoft Dynamics® AX 2012 5 days 287 80314AC Discrete Manufacturing Basics in Microsoft Dynamics® AX 2012 5 days 288 80315AC Discrete Manufacturing Advanced in Microsoft Dynamics® AX 2012 5 days 289 80316BC Project Essentials in Microsoft Dynamics® AX 2012 R2 5 days 290 80317BC Project Advanced in Microsoft Dynamics® AX 2012 R2 5 days 291 80318AC Reporting in Microsoft Dynamics® AX 2012 5 days 292 80338AC Microsoft Dynamics® AX 2012 Public Sector - Financials 5 days 293 80414AC Service Management in Microsoft Dynamics® AX 2012 5 days 294 80415AC Public Sector Procurement and Payables in Microsoft Dynamics® AX 2012 5 days 295 80416AC Application Integration Framework and Services in Microsoft Dynamics® AX 2012 5 days 296 80419AC Manufacturing Execution in Microsoft Dynamics® AX 2012 5 days 297 80420AC Data Upgrade and Code Upgrade to Microsoft Dynamics® AX 2012 5 days 298 80421AC Sales and Marketing in Microsoft Dynamics® AX 2012 5 days 299 80422AC Intercompany Setup and Order Processing in Microsoft Dynamics® AX 2012 5 days 300 80423AC Master Planning in Microsoft Dynamics® AX 2012 5 days 301 80424AC Product Configuration in Microsoft Dynamics® AX 2012 5 days 302 80425AC Intelligent Data Management Framework in Microsoft Dynamics® AX 2012 5 days 303 80427AC Warehouse Management in Microsoft Dynamics® AX 2012 5 days 304 80428AC SQL Optimization for Microsoft Dynamics® 5 days 305 80429AC Travel and Expense Management in Microsoft Dynamics® AX 2012 5 days 306 80430AC Vendor Management and Collaboration in Microsoft Dynamics® AX 2012 5 days 307 80433AC Reporting in Microsoft Dynamics® NAV 2013 5 days 308 80434AC Fixed Assets in Microsoft Dynamics® NAV 2013 5 days 309 80435AC Application Setup in Microsoft Dynamics® NAV 2013 5 days 310 80436AC C/Side Introduction in Microsoft Dynamics® NAV 2013 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 105.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 311 80437AC C/Side Solution Development in Microsoft Dynamics® NAV 2013 5 days 312 80438AC Installation and Configuration in Microsoft Dynamics® NAV 2013 5 days 313 80439AC Introduction in Microsoft Dynamics® NAV 2013 5 days 314 80440AC Trade in Microsoft Dynamics® NAV 2013 5 days 315 80450AC Delivering Microsoft Dynamics® Solutions with Sure Step 5 days 316 80534AC Finance Essentials in Microsoft Dynamics® NAV 2013 5 days 317 80535AC Finance Advanced in Microsoft Dynamics® NAV 2013 5 days 318 80537AC Microsoft Dynamics® AX 2012 R2 for Retail in Brick and Mortar Stores: Installation and Configuration 5 days 319 80538AC Human Resource Management in Microsoft Dynamics® AX 2012 R2 5 days 320 80539AC Installation and Deployment in Microsoft Dynamics® CRM 2013 5 days 321 80540AC Installation and Configuration in Microsoft Dynamics® GP 2013 5 days 322 80541AC Payroll in Microsoft Dynamics® AX 2012 R2 5 days 323 80542AC Customization and Configuration in Microsoft Dynamics® CRM 2013 5 days 324 80544AC Warehouse Management System in Microsoft Dynamics® AX 2012 R2 5 days 325 80545AC Customer Service in Microsoft Dynamics® CRM 2013 5 days 326 80546AC Sales Management in Microsoft Dynamics® CRM 2013 5 days 327 80549AC Data Upgrade and Code Upgrade to Microsoft Dynamics® NAV 2013 5 days 328 80550AC Manufacturing in Microsoft Dynamics® NAV 2013 5 days 329 80571AC Introduction to Microsoft Dynamics® GP 2013 5 days 330 80572AC General Ledger in Microsoft Dynamics® GP 2013 5 days 331 80573AC Payables Management in Microsoft Dynamics® GP 2013 5 days 332 80574AC Receivables Management in Microsoft Dynamics® GP 2013 5 days 333 80575AC Bank Reconciliation in Microsoft Dynamics® GP 2013 5 days 334 80576AC Fixed Assets in Microsoft Dynamics® GP 2013 5 days 335 80583AC Microsoft Dynamics® AX 2012 R2 for Retail in eCommerce Stores: Installation and Configuration 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious
  • 106.
    Technology Business&Process Framework SoftSkills No Code DescriptionDuration 336 80584AC Microsoft Dynamics® AX 2012 R2 for Retail in eCommerce Stores: Development and Customization 5 days 337 80585AC Microsoft Dynamics® AX 2012 R2 for Retail in Brick and Mortar Stores: Development and Customization 5 days 338 A85-04151 Pearson/VUE MCP ExamVoucher (Second Shot Eligible) 5 days 339 C90-07284 ServerVirtualization Microsoft Official Courseware 20409BC (print version) and Certification 5 days 340 F46-00083 Microsoft® CPLS English Student Certificate (SILVER)- Bundle of 25 units 5 days 341 G73-00142 MCT ProgramVoucher – First-Time (“New”) Information Worker/Microsoft Office Applicant Only 5 days 342 G73-00143 MCT ProgramVoucher - First-Time (“New”) IT Professional/Developer/Dynamics Applicant Only 5 days 343 G73-00144 MCT ProgramVoucher – Renewing/Reinstated Information Worker/Microsoft OfficeTrainer Only 5 days 344 G73-00145 MCT ProgramVoucher - Renewing/Reinstated IT Professional/Developer/DynamicsTrainer Only 5 days 345 G73-00146 MCT Alumni ProgramVoucher – First-Time (“New”) or Renewing MCT Alumni Candidate Only 5 days 346 J7F-00893 ServerVirtualization Microsoft Official Courseware 20409BC (digital version) and Certification 5 days 347 J7F-00980 30 Day 100 USD Azure Pass 5 days 348 OD10747DC Administering System Center 2012 Configuration Manager 5 days 349 OD10961BC Automating Administration with Windows PowerShell® 5 days 350 OD20341BC Core Solutions of Microsoft® Exchange Server 2013 5 days 351 OD20483BC Programming in C# 5 days 352 QS9-00003 PracticeTestVoucher, Courseware Sales - Commercial 5 days 353 QS9-00004 PracticeTestVoucher, ExamVoucher Sales - Commercial 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Previous
  • 107.
    Business&Process Framework SoftSkills No Description Duration 1Android Application Development & Programming 4 days 2 Mobile Application and Device Security 3 days 3 Mobile & Responsive Web Design 3 days 4 iPhone and iPad Application Development Introduction 4 days 5 Swift Programming Introduction 4 days 6 Securing Smartphones with Mobile Apps 1 day 7 Implementing Web Application Security 1 day 8 PhoneGap for Mobile Application 3 days 9 Responsive Web Design with HTML5 & CSS3 4 days 10 SenchaTouch Mobile Framework 3 days Vinsys is an early adopter of mobile application design and development including native and HTML5 cross-platform apps.With over 40 apps developed we can share a vast amount of experience and help you to choose the right technology for your next project.Apple,Android, Windows, Oracle Mobile being robust and widely used. Get Mobile @ Vinsys CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 108.
    Business&Process Framework SoftSkills No Description Duration 11AppceleratotTitanium for Mobile Application 3 days 12 Android Security Essentials 3 days 13 Monetize Android Applications 3 days 14 Building iOS 8 Apps with Swift 4 days 15 The Swift Programming Language 5 days 16 iOS 9 using SWIFT 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 109.
    Business&Process Framework SoftSkills No Description Duration APPLICATION 111i Advanced Supply Chain Planning Fundamentals Ed 3 4 Days 2 11i Payroll Management Fundamentals: Processing Payroll Ed 1 2 Days 3 11i Project Costing Fundamentals Ed 2 4 Days 4 11i/2.6 Implement Oracle Workflow Ed 3 5 Days 5 11i Financials Functional Foundation Ed 3 5 Days 6 11i Asset Management Fundamentals Ed 2 4 Days 7 11i Oracle Receivables Fundamentals Ed 3 3 Days 8 11i Oracle Order Management Fundamentals Ed 2 4 Days 9 11i/2.6 E-Business Functional Workflow Fundamentals Ed 2 2 Days 10 11i10TOI Family Pack E: U.S. Federal Financials Functional Overview 1 Hours Vinsys, one of the biggest technology training giant in the world, offers Oracle certification as well as real time hands on sessions on cutting edge Oracle Products. Being an Oracle Approved Education Centre,Vinsys provides various prestigious and worthy Oracle Certification courses for professionals who wish to climb the corporate ladder. From database management systems to enterprise software applications such as ERP, CRM and SCM, Business Intelligence products, Identity Management products,Application Server products and Collaboration products to name a few.You can register for OracleTraining and opt from a wide range of OracleTraining Courses atVinsys. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 110.
    Business&Process Framework SoftSkills No Description Duration 1111i10TOI: Family Pack E: OracleTreasury and Oracle Risk Management Functional Overview 1 Hours 12 11i10TOI: Family Pack E: Public Sector Budgeting Product Introduction 1 Hours 13 11i10TOI: Family Pack E:Treasury and Risk Management Product Introduction 1 Hours 14 11i10TOI: Family Pack E: U.S. Federal Financials Functional Overview 1 Hours 15 11i10TOI: OSS - Admissions Functional Overview 1 Hours 16 11i10TOI: OSS - Enrollment Functional Overview 1 Hours 17 11i10TOI: OSS - Financial Aid Functional Overview 1 Hours 18 11i10TOI: OSS - Higher Ed Statistics Agency (HESA) Functional Overview 1 Hours 19 11i10TOI: OSS - Program Structure & Planning Functional Overview 1 Hours 20 11i10TOI: OSS - Records Functional Overview 1 Hours 21 11i10TOI: OSS - Recruiting Functional Overview 1 Hours 22 11i10TOI: OSS - Student Finance Functional Overview 1 Hours 23 11i10TOI: OSS - Student Wide Services Functional Overview 1 Hours 24 11i10TOI: OSS - University & College Admissions Services (UCAS) Functional Overview 1 Hours 25 11i10TOI: Student Systems Product Introduction 1 Hours 26 11i System Administrator Fundamentals Ed 3 5 Days 27 11i Purchasing Fundamentals Ed 1 4 Days 28 11i Inventory Management Fundamentals Ed 2 4 Days 29 11i eBusiness Suite Essentials for Implementers Ed 4 2 Days 30 11i Install, Patch and Maintain Oracle Applications Ed 5.1 5 Days 31 11i General Ledger Management Fundamentals Ed 3.1 5 Days 32 11i Oracle Payables Fundamentals Ed 3.2 4 Days 33 11i Extend Oracle Applications: Building OA Framework Applications Ed 1.1 5 Days 34 11i Financial Applications Overview Ed 2.1 5 Days 35 R12 Oracle Payroll Fundamentals: Earnings and Deductions (UK) Ed 1 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 111.
    Business&Process Framework SoftSkills No Description Duration 3611i Oracle Payables Fundamentals Ed 3.2 LWC 4 Days 37 11i General Ledger Management Fundamentals Ed 3.1 LWC 5 Days 38 11i Oracle Receivables Fundamentals Ed 3 LWC 3 Days 39 11i Procure to Pay Fundamentals Ed 2 LWC 5 Days 40 11i Asset Management Fundamentals Ed 2 LWC 4 Days 41 11i Implement and Use Internet Expenses Ed 2 LVC 3 Days 42 11iTime and Labor Management Fundamentals Ed 1.1 LVC 4 Days 43 11i Project Billing Fundamentals Ed 2 LVC 2 Days 44 11i Advanced Collections Fundamentals Ed 1 LVC 3 Days 45 E R12 Manufacturing Overview Ed 1 PRV 5 Days 46 11i System Administrator Fundamentals Ed 3 LWC 5 Days 47 11i Financial Applications Overview Ed 2.1 LVC 5 Days 48 11i Oracle Order Management Fundamentals Ed 2 LWC 4 Days 49 11i eBusiness Suite Essentials for Implementers Ed 4 LWC 2 Days 50 11i Purchasing Fundamentals Ed 1 LWC 4 Days 51 R12 Oracle Sales Fundamentals Ed 1 LWC 4 Days 52 11i Inventory Management Fundamentals Ed 2 LWC 4 Days 53 11i iProcurement Fundamentals Ed 2 LWC 3 Days 54 11i Use and Implement Incentive Compensation Ed 2 LVC 4 Days 55 R12 Oracle Common Application Components Fundamentals Ed 1 LWC 3 Days 56 11i Project Costing Fundamentals Ed 2 LWC 4 Days 57 R12 Grants Accounting Fundamentals Ed 1 LWC 5 Days 58 11i HRMS People Management Fundamentals Ed 1 LWC 2 Days 59 11i Financials Functional Foundation Ed 3 LWC 5 Days 60 11i Manufacturing Functional Foundation Ed 2 LWC 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 112.
    Business&Process Framework SoftSkills No Description Duration 61E R12 Data Model for P2P (Procurement to Pay) - IBM Graduate Program 1 Days 62 E R12 Data Model for O2C (Order to Cash) - IBM Graduate Program 1 Days 63 E R12 eBusiness Suite Essentials for Implementers - IBM Graduate Program Ed 1 PRV 2 Days 64 E R12 Interfaces and API's - IBM Graduate Program Ed 1 PRV 1 Days 65 R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1 5 Days 66 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1 5 Days 67 S R12.1 Oracle Human Capital Management New Features Ed 1 LVC 2 Days 68 11i Install, Patch and Maintain Oracle Applications Ed 5.1 LWC 5 Days 69 11i/2.6 E-Business Functional Workflow Fundamentals Ed 2 LWC 2 Days 70 R12 Oracle HRMSTalent Management Fundamentals Ed 1 LWC 2 Days 71 11i ImplementTreasury Management Ed 1 LWC 4 Days 72 11i Implement and Use Cost Management Ed 1.1 LWC 3 Days 73 11i Global Order Promising Fundamentals Ed 2 LWC 2 Days 74 R12 Project Resource Management Fundamentals Ed 1 LWC 1 Days 75 R12.x Oracle Manufacturing Functional Foundation Ed 1 LVC 4 Days 76 R12.x Oracle Bills of Material and Engineering Fundamentals Ed 1 LVC 4 Days 77 R12.x Oracle Cost Management Fundamentals Ed 1 LVC 3 Days 78 R12.x Oracle Enterprise Asset Management Fundamentals Ed 1 4 Days 79 R12.x Oracle Enterprise Asset Management Fundamentals Ed 1 LVC 4 Days 80 R12.1 Oracle Product Information Management Fundamentals Ed 1 LVC 4 Days 81 R12.x Oracle Work in Process Fundamentals Ed 1 LVC 4 Days 82 R12.x Oracle Depot Repair Fundamentals Ed 1 LVC 2 Days 83 R12.x Oracle Payables Management Fundamentals Ed 1 4 Days 84 R12.x Oracle Payables Management Fundamentals Ed 1 LVC 4 Days 85 R12.x Oracle Financials New Features Fundamentals Ed 1 LVC 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 113.
    Business&Process Framework SoftSkills No Description Duration 86R12.x Oracle Customer Data Management Ed 1 LVC 3 Days 87 R12.x Oracle Cash Management Fundamentals Ed 1 LVC 2 Days 88 R12.x Oracle Advanced Collections Fundamentals Ed 1 LVC 3 Days 89 R12.x Oracle Financials New Features Fundamentals Ed 1 5 Days 90 R12.x Oracle Project Management Fundamentals Ed 1 LVC 4 Days 91 R12.x Oracle Project Billing Fundamentals Ed 1 LVC 2 Days 92 R12.x Oracle Project Foundation Fundamentals Ed 1 LVC 3 Days 93 R12.x Oracle Implement Configurator Ed 1 LVC 5 Days 94 R12.x Oracle Project Costing Fundamentals Ed 1 4 Days 95 R12.x Oracle Project Costing Fundamentals Ed 1 LVC 4 Days 96 R12.x Oracle Service Fundamentals Ed 1 LVC 4 Days 97 R12.x Oracle Purchasing Fundamentals Ed 1 5 Days 98 R12.x Oracle Purchasing Fundamentals Ed 1 LVC 5 Days 99 R12.x Oracle Advanced Pricing Fundamentals Ed 1 LVC 3 Days 100 R12.x Oracle iProcurement Fundamentals Ed 1 LVC 3 Days 101 R12.x Oracle Sourcing Fundamentals Ed 1 LVC 3 Days 102 R12.x Oracle Service Contracts Fundamentals Ed 1 LVC 3 Days 103 R12.x Oracle iStore Fundamentals Ed 1 LVC 5 Days 104 R12.x Oracle Procurement Contracts Fundamentals Ed 1 LVC 2 Days 105 R12.x Oracle Warehouse Management Fundamentals Ed 1 LVC 4 Days 106 R12.x Oracle Payroll Fundamentals: Configuration (Global) Ed 1 2 Days 107 R12.x Oracle Payroll Fundamentals: Earnings and Deductions Ed 1 2 Days 108 R12.x Oracle Payroll Fundamentals:Administration (Global) Ed 1 3 Days 109 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1 3 Days 110 R12.x Oracle E-Business Suite Personalizations Ed 1 LVC 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 114.
    Business&Process Framework SoftSkills No Description Duration 111R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1 LVC 5 Days 112 R12.x Oracle HRMS People Management Fundamentals Ed 1 LVC 2 Days 113 R12.x Oracle HRMS Self Service Fundamentals Ed 1 LVC 3 Days 114 R12.x Oracle Payroll Fundamentals:Administration (Global) Ed 1 LVC 3 Days 115 R12.x Oracle Payroll Fundamentals: Configuration (Global) Ed 1 LVC 2 Days 116 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1 LVC 3 Days 117 R12.x Oracle HRMS Work Structures Fundamentals Ed 1 LVC 2 Days 118 R12.x Oracle HRMSTotal Compensation Foundations Ed 1 2 Days 119 R12.x Oracle HRMS Learning Management Fundamentals Ed 1 LVC 3 Days 120 R12.x Oracle HRMS System Administration Fundamentals Ed 1 LVC 3 Days 121 R12.x Oracle Payroll Fundamentals: Earnings and Deductions Ed 1 LVC 2 Days 122 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1 LVC 3 Days 123 R12.x Oracle HRMS iRecruitment Fundamentals Ed 1 LVC 2 Days 124 R12.x Oracle HRMSTotal Compensation Foundations Ed 1 LVC 2 Days 125 R12.x Oracle HRMS Compensation Workbench and Salary Configuration Ed 1 LVC 4 Days 126 R12.x Oracle Payroll Fundamentals: Earnings and Deductions (US) Ed 1 2 Days 127 R12.x Oracle Payroll Fundamentals: Earnings and Deductions (US) Ed 1 LVC 2 Days 128 R12.1 Oracle Site Hub Ed 1 LVC 2 Days 129 R12 Oracle HRMS Implement and Use Fast Formula Ed 1 LWC 2 Days 130 R12.x Extend Oracle Applications: Building OA Framework Applications Ed 1 5 Days 131 R12.x Extend Oracle Applications: Customizing OA Framework Applications Ed 1 5 Days 132 OPN R12.1 Oracle FMS Essentials Implementation Boot Camp Ed 1 LVC 15 Days 133 OPN R12.1 Oracle HRMS Essentials Implementation Boot Camp Ed 1 LVC 10 Days 134 OPN Oracle AIA 2.1 Implementation Boot Camp Ed 1 LVC 3 Days 135 R12.x Use and Implement Incentive Compensation Ed 1 LVC 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 115.
    Business&Process Framework SoftSkills No Description Duration 136E Delta 11i / R12 Oracle Application - Finance Ed 2 3 Days 137 OPN Oracle EBS FMS 11i to R12.1 Delta Implementation Boot Camp Ed 1.1 LVC 5 Days 138 R12.x Oracle Quality Fundamentals Ed 1 LVC 2 Days 139 E R12 E-Business XML & BI Publisher Case Study - IBM Graduate Program Ed 1 PRV 2 Days 140 E R12 Interfaces and API's Case Study - IBM Graduate Program Ed 1 PRV 5 Days 141 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1 LVC 5 Days 142 E-Business Suite: BI Publisher 5.6.3 for End Users Ed 1 3 Days 143 E-Business Suite: BI Publisher 5.6.3 for End Users Ed 1 LVC 3 Days 144 OPN R12.1 Process Manufacturing Delta Implementation Boot Camp Ed 1 LVC 3 Days 145 OPN R12.1 Projects Essentials Implementation Boot Camp Ed 1 15 Days 146 OPN R12.1 Projects Essentials Implementation Boot Camp Ed 1 LVC 15 Days 147 OPN R12.1 Discrete Manufacturing Delta Implementation Boot Camp Ed 1 3 Days 148 OPN R12.1 Discrete Manufacturing Delta Implementation Boot Camp Ed 1 LVC 3 Days 149 OPN R12.1 Process Manufacturing Delta Implementation Boot Camp Ed 1 3 Days 150 R12.x Inventory Management/Bill of Material & Engineering Accel Ed 1 5 Days 151 R12.x Inventory Management/Bill of Material & Engineering Accel Ed 1 LVC 5 Days 152 R12.x Oracle Payables Management Fundamentals (NAMER) Ed 1 5 Days 153 R12.x Oracle Payables Management Fundamentals (NAMER) Ed 1 LVC 5 Days 154 OPN Ramp up Bootcamp R12 General Ledger Ed 1 3 Days 155 OPN Ramp up Bootcamp R12 General Ledger Ed 1 LVC 3 Days 156 R12.x Extend Oracle Applications: OA Framework Personalizations Ed 1 LVC 2 Days 157 OPN R12.1 Oracle E-Bus Suite Essentials for Implementers Bootcamp Ed 1 3 Days 158 OPN Oracle EBS R12.1 Accounts Receivable Boot Camp Ed 1 3 Days 159 OPN Oracle EBS R12.1 Accounts Receivable Boot Camp Ed 1 LVC 3 Days 160 OPN R12.1 Oracle E-Bus Suite Essentials for Implementers Bootcamp Ed 1 LVC 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 116.
    Business&Process Framework SoftSkills No Description Duration 161OPN Oracle EBS R12.1 General Ledger Boot Camp Ed 1 LVC 3 Days 162 OPN Oracle EBS R12.1 Payables Boot Camp Ed 1 4 Days 163 OPN Oracle EBS R12.1 General Ledger Boot Camp Ed 1 3 Days 164 OPN Oracle EBS R12.1 Payables Boot Camp Ed 1 LVC 4 Days 165 E Oracle R12 Order Mgmt Fundamentals (OPN APAC only) Ed 1 3 Days 166 E Oracle R12 Order Mgmt Fundamentals (OPN APAC only) Ed 1 LVC 3 Days 167 E Oracle R12 General Ledger Fundamentals (OPN APAC only) Ed 1 3 Days 168 E Oracle R12 General Ledger Fundamentals (OPN APAC only) Ed 1 LVC 3 Days 169 R12.x OracleTime and Labor Fundamentals Ed 1 LVC 4 Days 170 OPN R12.1 Oracle Inventory Implementation Boot Camp Ed 1 5 Days 171 OPN R12.1 Oracle Inventory Implementation Boot Camp Ed 1 LVC 5 Days 172 OPN R12.1 Oracle Purchasing Implementation Boot Camp Ed 1 5 Days 173 OPN R12.1 Oracle Purchasing Implementation Boot Camp Ed 1 LVC 5 Days 174 OPN R12.1 Oracle Order Management Implementation Boot Camp Ed 1 5 Days 175 OPN R12.1 Oracle Order Management Implementation Boot Camp Ed 1 LVC 5 Days 176 R12.x Oracle HRMS Performance Management Fundamentals Ed 1 LVC 2 Days 177 CEL Oracle E-BusinessSuite: Context Files,Autoconfig, Install - Elke Phelps LVC 1 Days 178 CEL Oracle E-Business Suite:Architecture and Filesystems with Elke Phelps LVC 1 Days 179 E R12 Oracle E-Business Specialist - SCMTrack Ed 1 LVC 5 Days 180 CEL Oracle EBS R12 Applications DBA with Elke Phelps Ed 1 LVC 2 Days 181 R12.x Extend Oracle Applications: Building OA Framework Applications Ed 1TOD 5 Days 182 R12.x Oracle E-Business Suite Essentials for Implementers Ed 1TOD 3 Days 183 R12.x Oracle General Ledger Management Fundamentals Ed 1TOD 5 Days 184 R12.x Oracle Applications System Administrator Fundamentals Ed 1TOD 5 Days 185 R12.x Implement Oracle Workflow Ed 1TOD 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 117.
    Business&Process Framework SoftSkills No Description Duration 186R12.x Install/Patch/Maintain Oracle E-Business Suite Ed 1TOD 5 Days 187 R12.x Oracle Internet Expenses Fundamentals Ed 1.1 LVC 3 Days 188 11i Extend Apps-Forms Ed 1TOD 5 Days 189 OPN R12.1 Oracle HCM Essentials Implementation Boot Camp Ed 1 LVC 5 Days 190 Flexcube Application for Oracle Financial Services (OFSS) 5 Days 191 R12.x Extend Oracle Applications: Customizing OA Framework Applications Ed 1TOD 5 Days 192 R12.x Oracle Receivables Management Fundamentals Ed 1TOD 4 Days 193 R12.x Oracle Financials Accounting Hub Fundamentals Ed 1 2 Days 194 R12.x Oracle Financials Accounting Hub Fundamentals Ed 1 LVC 2 Days 195 R12.x Oracle Financial Applications Overview Ed 1TOD 5 Days 196 R12.x Oracle Purchasing Fundamentals Ed 1TOD 5 Days 197 R12.2 Oracle Manufacturing New Features Ed 1 5 Days 198 R12.2 Oracle Manufacturing New Features Ed 1 LVC 5 Days 199 E R12 Oracle EBS Suite: Introduction - IBM Graduate Program Ed 1 PRV 7 Days 200 E R12 Oracle EBS - Build OAF - IBM Graduate Program Ed 1 PRV 3 Days 201 E R12 Report & BI integration to Oracle EBS - IBM Graduate Program Ed 1 6 Days 202 E R12 Interfaces and API's - IBM Graduate Program Ed 2 PRV 11 Days 203 E R12 E-Business XML & BI Publisher - IBM Graduate Program Ed 1 LVC 3 Days 204 E R12 E-Business XML & BI Publisher Case Study - IBM Graduate Program Ed 1 LVC 2 Days 205 E R12 eBusiness Suite Essentials for Implementers - IBM Graduate Pgrm Ed 1 LVC 2 Days 206 E R12 Data Model for P2P (Procurement to Pay) - IBM Graduate Program Ed 1 LVC 1 Days 207 E R12 Data Model for O2C (Order to Cash) - IBM Graduate Program LVC 1 Days 208 E R12 Interfaces and API's - IBM Graduate Program Ed 1 LVC 1 Days 209 E R12 Interfaces and API's Case Study - IBM Graduate Program Ed 1 LVC 5 Days 210 R12.1 Oracle Field Service Fundamentals Ed 1.1 LVC 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 118.
    Business&Process Framework SoftSkills No Description Duration 211R12.x Oracle Advanced Global Intercompany System Ed 1 LVC 2 Days 212 E IBM - R12.x Oracle eBusiness Suite: Procure to Pay Ed 1TOD 3 Days 213 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1 2 Days 214 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1 LVC 2 Days 215 E Oracle Product Hub for Communications Solution Foundations Ed 1 PRV 4 Days 216 R12.x Oracle Financials New Features Fundamentals Ed 1TOD 5 Days 217 R12.x Oracle Financials Functional Foundation Ed 1TOD 5 Days 218 R12.x Oracle Order Management Fundamentals Ed 1TOD 4 Days 219 R12.x Oracle Payables Management Fundamentals Ed 1TOD 4 Days 220 R12.x Oracle Project Costing Fundamentals Ed 1TOD 4 Days 221 R12.x Oracle iProcurement Fundamentals Ed 1TOD 3 Days 222 E IBM - R12.x Oracle eBusiness Suite: Order to Cash Ed 1TOD 5 Days 223 E Oracle Product Hub for Communications Solution Foundations Ed 1 LVC 4 Days 224 R12.2 Oracle Applications System Administrator Fundamentals Ed 1 LVC 5 Days 225 R12.2 Oracle Applications System Administrator Fundamentals Ed 1 5 Days 226 R12.2 Implement Oracle Workflow Ed 1 5 Days 227 R12.2 Implement Oracle Workflow Ed 1 LVC 5 Days 228 E R12 Report & BI integration to Oracle EBS - IBM Graduate Program Ed 1 LVC 6 Days 229 E R12 Oracle EBS - Build OAF - IBM Graduate Program Ed 1 LVC 3 Days 230 E R12 Oracle EBS Suite: Introduction - IBM Graduate Program Ed 1 LVC 7 Days 231 E R12 Interfaces and API's - IBM Graduate Program Ed 2 LVC 11 Days 232 R12.2 Oracle Subledger Accounting Fundamentals Ed 1 2 Days 233 R12.2 Oracle Subledger Accounting Fundamentals Ed 1 LVC 2 Days 234 R12.2 Oracle Financial Applications Overview Ed 1 LVC 5 Days 235 R12.2 Oracle Financial Applications Overview Ed 1 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 119.
    Business&Process Framework SoftSkills No Description Duration 236R12.2 Oracle Order Management Fundamentals Ed 1 4 Days 237 R12.2 Oracle Order Management Fundamentals Ed 1 LVC 4 Days 238 R12.2 Oracle Receivables Management Fundamentals Ed 1 4 Days 239 R12.2 Oracle Receivables Management Fundamentals Ed 1 LVC 4 Days 240 R12.2 Oracle Payables Management Fundamentals Ed 1 4 Days 241 R12.2 Oracle Payables Management Fundamentals Ed 1 LVC 4 Days 242 R12.2 Oracle Asset Management Fundamentals Ed 1 4 Days 243 R12.2 Oracle Asset Management Fundamentals Ed 1 LVC 4 Days 244 R12.2 Oracle E-BusinessTax Fundamentals Ed 1 3 Days 245 R12.2 Oracle E-BusinessTax Fundamentals Ed 1 LVC 3 Days 246 R12.2 Oracle Financials Functional Foundation Ed 1 5 Days 247 R12.2 Oracle Financials Functional Foundation Ed 1 LVC 5 Days 248 R12.2 Oracle General Ledger Management Fundamentals Ed 1 5 Days 249 R12.2 Oracle General Ledger Management Fundamentals Ed 1 LVC 5 Days 250 R12.2 Install/Patch/Maintain Oracle E-Business Suite Ed 1 5 Days 251 R12.2 Install/Patch/Maintain Oracle E-Business Suite Ed 1 LVC 5 Days 252 R12.2 Oracle Advanced Supply Chain Planning Fundamentals Ed 1 4 Days 253 R12.2 Oracle Advanced Supply Chain Planning Fundamentals Ed 1 LVC 4 Days 254 R12.2 Oracle E-Business Suite Fundamentals Ed 1 3 Days 255 R12.2 Oracle E-Business Suite Fundamentals Ed 1 LVC 3 Days 256 R12.2 Oracle Inventory Management Fundamentals Ed 2 5 Days 257 R12.2 Oracle Inventory Management Fundamentals Ed 2 LVC 5 Days 258 E IBM R12.x Oracle EBus Suite-Record to Report Process Proj Sim Ed 1 PRV 5 Days 259 R12.x Oracle Production Scheduling Ed 1 LVC 3 Days 260 E IBM R12.x Oracle EBus Suite-Record to Report Process Proj Sim Ed 1 LVC 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 120.
    Business&Process Framework SoftSkills No Description Duration 261R12.2 Oracle Asset Management Fundamentals Ed 1TOD 4 Days 262 E Oracle Product Hub for Communications Solution Foundations Ed 1TOD 4 Days 263 E-Business Suite: BI Publisher 5.6.3 for Developers Ed 1TOD 5 Days 264 R12.2 Oracle Subledger Accounting Fundamentals Ed 1TOD 2 Days 265 R12.x Oracle Applications User Management Fundamentals Ed 1TOD 2 Days 266 R12.x Oracle Advanced Collections Fundamentals Ed 1TOD 3 Days 267 R12.x Oracle Project Billing Fundamentals Ed 1TOD 2 Days 268 S OracleValue Chain Planning: Service Parts Planning Ed 1TOD 3 Days 269 S OracleValue Chain Planning: Implement Production Scheduling Ed 1TOD 3 Days 270 R12.2 Oracle Inventory Management Fundamentals Ed 2TOD 5 Days 271 R12.x Oracle Advanced Pricing Fundamentals Ed 1TOD 3 Days 272 R12.x Oracle Warehouse Management Fundamentals Ed 1TOD 4 Days 273 R12.x Oracle Service Contracts Fundamentals Ed 1TOD 3 Days 274 R12.x Oracle Payroll Fundamentals:Administration (US) Ed 1TOD 3 Days 275 R12.x Oracle Payroll Fundamentals: Configuration (US) Ed 1.1TOD 2 Days 276 OPN Consulting Skills for Partners Ed 1TOD 2 Days 277 OPN Cloud Consulting Skills for Partners Ed 1TOD 2 Days 278 S OracleValue Chain Planning: Implement Inventory Optimization Ed 1TOD 3 Days 279 OPN Documents Cloud Service Bootcamp Ed 1TOD 2 Days 280 R12.2 Oracle Applications System Administrator Fundamentals Ed 1TOD 5 Days 281 S OracleValue Chain Planning: Implement Rapid Planning Ed 1TOD 2 Days 282 R12.x Oracle HRMS Performance Management Fundamentals Ed 1TOD 2 Days 283 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1TOD 3 Days 284 S OracleValue Chain Planning: Implement Adv Plann Command Ctr Ed 1TOD 2 Days 285 R12.2 Oracle Order Management Fundamentals Ed 2 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 121.
    Business&Process Framework SoftSkills No Description Duration 286R12.2 Oracle Order Management Fundamentals Ed 2 LVC 4 Days 287 11i Implement and Use Work in Process Ed 1 4 Days 288 11i Implement and Use Material Requirements Planning Ed 1 4 Days 289 11i Procure to Pay Fundamentals Ed 2 5 Days 290 11i Implement and Use Internet Expenses Ed 2 3 Days 291 11iTrade Management: Implementing Deduction Management 2 Days 292 11iTime & Labor Management Fundamentals Ed 1.1 4 Days 293 11i Project Billing Fundamentals Ed 2 2 Days 294 11i ImplementTreasury Management Ed 1 4 Days 295 11i Extend Oracle Applications: Customizing OA Framework Applications Ed 1 4 Days 296 11i Implement and Use Cash Management Ed 2 1 Days 297 11i Advanced Collections Fundamentals Ed 1 3 Days 298 11i iProcurement Fundamentals Ed 2 3 Days 299 11i Project Foundation Fundamentals Ed 3 3 Days 300 11i Project Management Fundamentals Ed 3 4 Days 301 11i Sourcing Fundamentals Ed 1 3 Days 302 11i Implement Daily Business Intelligence Ed 3 4 Days 303 R12 Project Resource Management Fundamentals Ed 1 1 Days 304 R12 Grants Accounting Fundamentals Ed 1 5 Days 305 R12 Oracle Common Application Components Fundamentals Ed 1 3 Days 306 R12 Oracle Sales Fundamentals Ed 1 4 Days 307 R12 Oracle HRMS Implement and Use Fast Formula Ed 1 2 Days 308 R12 Oracle HRMSTalent Management Fundamentals Ed 1 2 Days 309 11i Oracle Production Scheduling Ed 1 3 Days 310 E R12 Oracle E-Business Specialist - FinancialTrack Ed 1 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 122.
    Business&Process Framework SoftSkills No Description Duration 311E R12 Oracle E-Business Specialist - SCMTrack Ed 1 5 Days 312 R12.x Oracle E-Business Suite Personalizations Ed 1 5 Days 313 S R12.1 Oracle Human Capital Management New Features Ed 1 2 Days 314 R12.x Oracle Manufacturing Functional Foundation Ed 1 4 Days 315 R12.x Oracle Bills of Material and Engineering Fundamentals Ed 1 4 Days 316 R12.x Oracle Cost Management Fundamentals Ed 1 3 Days 317 R12.1 Oracle Product Information Management Fundamentals Ed 1 4 Days 318 R12.x Oracle Work in Process Fundamentals Ed 1 4 Days 319 R12.x Oracle Depot Repair Fundamentals Ed 1 2 Days 320 R12 Oracle Purchasing / Payables Accelerated Ed 1 5 Days 321 R12.x Oracle Customer Data Management Ed 1 3 Days 322 R12.x Oracle Advanced Collections Fundamentals Ed 1 3 Days 323 R12.x Oracle Cash Management Fundamentals Ed 1 2 Days 324 R12.x Oracle Implement Configurator Ed 1 5 Days 325 R12.x Oracle Project Foundation Fundamentals Ed 1 3 Days 326 R12.x Oracle Project Management Fundamentals Ed 1 4 Days 327 R12.x Oracle Project Billing Fundamentals Ed 1 2 Days 328 R12.x Oracle Service Fundamentals Ed 1 4 Days 329 R12.x Oracle Advanced Pricing Fundamentals Ed 1 3 Days 330 R12.x Oracle iProcurement Fundamentals Ed 1 3 Days 331 R12.x Oracle Sourcing Fundamentals Ed 1 3 Days 332 R12.x Oracle Service Contracts Fundamentals Ed 1 3 Days 333 R12.x Oracle iStore Fundamentals Ed 1 5 Days 334 R12.x Oracle Procurement Contracts Fundamentals Ed 1 2 Days 335 R12.x Oracle Warehouse Management Fundamentals Ed 1 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 123.
    Business&Process Framework SoftSkills No Description Duration 336R12.x Oracle HRMS Work Structures Fundamentals Ed 1 2 Days 337 R12.x Oracle HRMS People Management Fundamentals Ed 1 2 Days 338 R12.x Oracle HRMS Self Service Fundamentals Ed 1 3 Days 339 R12.x Oracle HRMS Advanced Benefits Fundamentals Ed 1 3 Days 340 R12.x Oracle HRMS iRecruitment Fundamentals Ed 1 2 Days 341 R12.x Oracle HRMS Learning Management Fundamentals Ed 1 3 Days 342 R12.x Oracle HRMS Compensation Workbench and Salary Configuration Ed 1 4 Days 343 R12.x Oracle HRMS System Administration Fundamentals Ed 1 3 Days 344 R12.1 Oracle Site Hub Ed 1 2 Days 345 R12.x Extend Oracle Applications: OA Framework Personalizations Ed 1 2 Days 346 OPN Oracle AIA 2.1 Implementation Boot Camp Ed 1 3 Days 347 OPN R12.1 Oracle FMS Essentials Implementation Boot Camp Ed 1 15 Days 348 OPN R12.1 Oracle HRMS Essentials Implementation Boot Camp Ed 1 10 Days 349 OPN R12.1 Oracle SCM Essentials Implementation Boot Camp Ed 1 10 Days 350 R12.x Use and Implement Incentive Compensation Ed 1 4 Days 351 OPN Oracle EBS FMS 11i to R12.1 Delta Implementation Boot Camp Ed 1.1 5 Days 352 R12.x Oracle Quality Fundamentals Ed 1 2 Days 353 E R12 E-Business XML & BI Publisher - IBM Graduate Program Ed 1 PRV 3 Days 354 R12.x Oracle HRMS Performance Management Fundamentals Ed 1 2 Days 355 R12.x OracleTime and Labor Fundamentals Ed 1 4 Days 356 R12.x Oracle Internet Expenses Fundamentals Ed 1.1 3 Days 357 OPN R12.1 Oracle HCM Essentials Implementation Boot Camp Ed 1 5 Days 358 R12.1 Oracle Field Service Fundamentals Ed 1.1 3 Days 359 R12.x Oracle Advanced Global Intercompany System Ed 1 2 Days 360 R12.x Oracle Production Scheduling Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 124.
    Business&Process Framework SoftSkills No Description Duration 361Fusion Applications: Extend Applications with ADF Ed 1 5 Days 362 Fusion Applications: Extend Applications with ADF Ed 1 LVC 5 Days 363 Fusion Applications: Extend Applications with ADFTOD 5 Days 364 Fusion Applications: Install and Configure Identity Management Ed 2 4 Days 365 E IBM - Fusion Applications Executive Overview Ed 1TOD 2 Days 366 E IBM - Oracle Fusion Applications Security Ed 1TOD 2 Days 367 Fusion Applications R8: Installation and Patching Ed 1 5 Days 368 Fusion Applications R8: Provision Identity Management Ed 1 2 Days 369 Fusion Applications R8:Administer using EM12c Cloud Control Ed 1 3 Days 370 E IBM Fusion Applications Executive Overview with R7 New Features Ed 2TOD 3 Days 371 E Fusion ApplicationsTechnical Bootcamp Ed 1 5 Days 372 Oracle HCM Cloud: Global Human Resources Ed 1TOD 5 Days 373 Oracle HCM Cloud:Talent Management Ed 1TOD 5 Days 374 Oracle HCM Cloud: Compensation Ed 1TOD 5 Days 375 Oracle HCM Cloud: Benefits Ed 1TOD 5 Days 376 Oracle HCM Cloud:Absence Management Ed 1TOD 2 Days 377 Oracle HCM Cloud: US Operational Payroll Ed 1TOD 2 Days 378 Oracle HCM Cloud: US Payroll Ed 1TOD 5 Days 379 Oracle HCM Cloud:Time & Labor Ed 1TOD 3 Days 380 Oracle HCM Cloud: Fast Formula Ed 1TOD 2 Days 381 Oracle Financials Cloud: Financials Implementation I Ed 1TOD 5 Days 382 Oracle Procurement Cloud: Procurement Implementation Ed 1TOD 4 Days 383 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 1TOD 3 Days 384 Oracle Financials Cloud: Financials Implementation II Ed 1TOD 5 Days 385 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 1TOD 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 125.
    Business&Process Framework SoftSkills No Description Duration 386Oracle Financials Cloud: Financials Reporting Ed 1TOD 3 Days 387 S Fusion Applications R8: Installation and Patching Ed 1TOD 5 Days 388 OPN Financials Cloud R9 Ed 1TOD 5 Days 389 Oracle Financials Cloud: Financials Implementation I Ed 2 5 Days 390 Oracle Financials Cloud: Financials Implementation I Ed 2 LVC 5 Days 391 Oracle Financials Cloud: Financials Implementation II Ed 2 5 Days 392 Oracle Financials Cloud: Financials Implementation II Ed 2 LVC 5 Days 393 Oracle Financials Cloud: Financials Reporting Ed 2 3 Days 394 Oracle Financials Cloud: Financials Reporting Ed 2 LVC 3 Days 395 Fusion Applications:Accounting Hub Fundamentals Ed 6 4 Days 396 Fusion Applications:Accounting Hub Fundamentals Ed 6 LVC 4 Days 397 Oracle Applications Cloud: Functional Setup Mgr for Imp Ed 2 1 Days 398 Oracle Applications Cloud: Functional Setup Mgr for Imp Ed 2 LVC 1 Days 399 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 2 5 Days 400 Oracle Project Portfolio Mgmt Cloud: Proj Financial Mgmt Impl Ed 2 LVC 5 Days 401 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 2 LVC 3 Days 402 Oracle Project Portfolio Mgmt Cloud: Project Exec Mgmt Func Setup Ed 2 3 Days 403 Oracle SCM Cloud: Product Information Mgmt Implementation Ed 2 4 Days 404 Oracle SCM Cloud: Product Information Mgmt Implementation Ed 2 LVC 4 Days 405 Oracle Procurement Cloud: Procurement Implementation Ed 2 4 Days 406 Oracle Procurement Cloud: Procurement Implementation Ed 2 LVC 4 Days 407 Oracle HCM Cloud:Absence Management Ed 2 2 Days 408 Oracle HCM Cloud:Absence Management Ed 2 LVC 2 Days 409 Oracle HCM Cloud: Benefits Ed 2 5 Days 410 Oracle HCM Cloud: Benefits Ed 2 LVC 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 126.
    Business&Process Framework SoftSkills No Description Duration 411Oracle HCM Cloud: Compensation Ed 2 5 Days 412 Oracle HCM Cloud: Compensation Ed 2 LVC 5 Days 413 Oracle HCM Cloud: Fast Formula Ed 2 2 Days 414 Oracle HCM Cloud: Fast Formula Ed 2 LVC 2 Days 415 Oracle HCM Cloud: Global Human Resources Ed 2 5 Days 416 Oracle HCM Cloud: Global Human Resources Ed 2 LVC 5 Days 417 Oracle HCM Cloud: Security Ed 2 2 Days 418 Oracle HCM Cloud: Security Ed 2 LVC 2 Days 419 Oracle HCM Cloud:Talent Management Ed 2 5 Days 420 Oracle HCM Cloud:Talent Management Ed 2 LVC 5 Days 421 Oracle HCM Cloud:Time & Labor Ed 2 3 Days 422 Oracle HCM Cloud:Time & Labor Ed 2 LVC 3 Days 423 Oracle HCM Cloud: US Operational Payroll Ed 2 2 Days 424 Oracle HCM Cloud: US Operational Payroll Ed 2 LVC 2 Days 425 Oracle HCM Cloud: US Payroll Ed 2 5 Days 426 Oracle HCM Cloud: US Payroll Ed 2 LVC 5 Days 427 Oracle SCM Cloud: Implementing Innovation Mgmt with Agile PLM Ed 2 2 Days 428 Oracle SCM Cloud: Implementing Innovation Mgmt with Agile PLM Ed 2 LVC 2 Days 429 Oracle SCM Cloud: Implementing Product Development Ed 1 2 Days 430 Oracle SCM Cloud: Implementing Product Development Ed 1 LVC 2 Days 431 Oracle HCM Cloud: Security Ed 2TOD 2 Days 432 Oracle HCM Cloud:Talent Management Ed 2TOD 5 Days 433 Fusion Applications:Accounting Hub Fundamentals Ed 6TOD 4 Days 434 OPN Financials Cloud R9 LS Ed 1TOD 5 Days 435 Oracle Financials Cloud: General Ledger Fundamentals Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 127.
    Business&Process Framework SoftSkills No Description Duration 436Oracle Financials Cloud: General Ledger Fundamentals Ed 1 LVC 3 Days 437 Oracle Financials Cloud: Payables Fundamentals Ed 1 2 Days 438 Oracle Financials Cloud: Payables Fundamentals Ed 1 LVC 2 Days 439 Oracle Financials Cloud: Receivables Fundamentals Ed 1 2 Days 440 Oracle Financials Cloud: Receivables Fundamentals Ed 1 LVC 2 Days 441 Oracle Financials Cloud: Cash Management Fundamentals Ed 1 1 Days 442 Oracle Financials Cloud: Fixed Assets Fundamentals Ed 2 2 Days 443 Oracle Financials Cloud: Fixed Assets Fundamentals Ed 2 LVC 2 Days 444 Oracle Financials Cloud: Cash Management Fundamentals Ed 1 LVC 1 Days 445 Siebel 8.0 Essentials Ed 1 10 Days 446 Siebel 8.0 New Features Ed 1 3 Days 447 Siebel 8.0 New Features LWC Ed 1 3 Days 448 Siebel 8.0 Customer Order Management: Product Admin. Ed 1 3 Days 449 Application Administration (Siebel 8.0) Ed 1 3 Days 450 Siebel 8.0 Marketing: Marketing Manager Ed 1 3 Days 451 Siebel 8.0 Fundamentals Ed 2 LWC 2 Days 452 Application Administration (Siebel 8.0) Ed 1 LWC 3 Days 453 Siebel 8.0 Fundamentals Ed 2 2 Days 454 Fundamentals for Business Analysts (Siebel 8.0) Ed 2 5 Days 455 CDT Siebel CRM OnDemand Overview Seminar (JP) PRV 2 Days 456 Siebel 8.1.x Enterprise Integration Manager Ed 1 LVC 2 Days 457 Siebel 8.0 Marketing: Marketing Manager Ed 1 LVC 3 Days 458 Fundamentals for Business Analysts (Siebel 8.0) Ed 2 LWC 5 Days 459 Siebel 8.1 Loyalty Ed 1 LVC 2 Days 460 Siebel 8.0 Customer Order Management: Product Admin. Ed 1 LWC 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 128.
    Business&Process Framework SoftSkills No Description Duration 461Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1 LWC 3 Days 462 Siebel 8.0 Customer Order Management Accelerated Ed 1 LWC 5 Days 463 Siebel 8.1.x Scripting Ed 1 LVC 3 Days 464 Siebel 8.1.x Scripting Ed 1 3 Days 465 Siebel 8.1.x Application Administration Ed 1 5 Days 466 Siebel 8.1.xTools Ed 1 5 Days 467 Siebel 8.1.xTools Ed 1 LVC 5 Days 468 Siebel 8.1.x Business Analyst Ed 1 5 Days 469 Siebel 8.1.x Business Analyst Ed 1 LVC 5 Days 470 Siebel 8.1.x Application Administration Ed 1 LVC 5 Days 471 Siebel 8.1.x BI Publisher Reports Ed 1 3 Days 472 Siebel 8.1.x BI Publisher Reports Ed 1 LVC 3 Days 473 Siebel 8.1.x Business Automation Ed 1 5 Days 474 Siebel 8.1.x Business Automation Ed 1 LVC 5 Days 475 Siebel 8.1.xTechnical Foundations Ed 1 LVC 3 Days 476 Siebel 8.1.x Integration Ed 1 LVC 5 Days 477 Siebel 8.1.x Integration Ed 1 5 Days 478 Siebel 8.1.xTechnical Foundations Ed 1 3 Days 479 Oracle CRM On Demand Advanced Analytics Workshop Ed 4 3 Days 480 Oracle CRM On Demand Advanced Analytics Workshop Ed 4 LVC 3 Days 481 Oracle CRM On Demand Data Import Workshop Ed 3 LVC 1 Days 482 Siebel 8.1.x Fundamentals Ed 1 LVC 2 Days 483 Siebel 8.1.x Fundamentals Ed 1 2 Days 484 E Siebel 8.1.xTools (OPN APAC only) Ed 1 LVC 3 Days 485 E Siebel 8.1.xTools (OPN APAC only) Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 129.
    Business&Process Framework SoftSkills No Description Duration 486Siebel 8.2.2 Case Management for Public Sector Ed 1 5 Days 487 Siebel 8.2.2 Case Management for Public Sector Ed 1 LVC 5 Days 488 Oracle Policy Automation (OPA) Connector for Siebel Ed 1 LVC 3 Days 489 Siebel 8.1.x Business Analyst Ed 1TOD 5 Days 490 Siebel 8.1.x Integration Ed 1TOD 5 Days 491 Siebel 8.1.x System AdministrationTOD 3 Days 492 Siebel 8.0 Essentials ITOD 5 Days 493 Siebel 8.0 Essentials IITOD 5 Days 494 Siebel 8.1.xToolsTOD 5 Days 495 E Scripting for Siebel - IBM Graduate Program Ed 1 LVC 2 Days 496 E Designing a Siebel Project - IBM Graduate Program Ed 1 LVC 1 Days 497 E Building a Siebel Project - IBM Graduate Program Ed 1 LVC 6 Days 498 E Workflow for Siebel - IBM Graduate Program Ed 1 LVC 2 Days 499 E Siebel Case Study - IBM Graduate Program Ed 1 LVC 5 Days 500 Oracle CRM On Demand Advanced Analytics Workshop Ed 4TOD 3 Days 501 Oracle CRM On Demand Administration Essentials Ed 4TOD 4 Days 502 E IBM Oracle CRM OnDemand Workshop Ed 1TOD 3 Days 503 Siebel 8.1.x Installation Ed 3 2 Days 504 Siebel 8.1.x Installation Ed 3 LVC 2 Days 505 E IBM Siebel Upgrade Process (7.7 to 8.1.x) Ed 1 LVC 4 Days 506 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 1 4 Days 507 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 1 LVC 4 Days 508 E IBM Siebel Upgrade Process (7.7 to 8.1.x) Ed 1 4 Days 509 E IBM Siebel Application COM webservices forTELCO Ed 1 2 Days 510 E IBM Siebel Application COM webservices forTELCO Ed 1 LVC 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 130.
    Business&Process Framework SoftSkills No Description Duration 511Siebel 8.1.x Installation and System Administration Ed 2.1 5 Days 512 Siebel 8.1.x Installation and System Administration Ed 2.1 LVC 5 Days 513 Oracle CRM On Demand Administration Essentials Ed 4.1 4 Days 514 Oracle CRM On Demand Administration Essentials Ed 4.1 LVC 4 Days 515 Oracle CRM On Demand Data Import Workshop Ed 4.1 LVC 1 Days 516 Siebel 8.1.x System Administration Ed 2.1 3 Days 517 Siebel 8.1.x System Administration Ed 2.1 LVC 3 Days 518 Siebel 8.1.x BI Publisher Reports Ed 1TOD 3 Days 519 Siebel Open UI Essentials Ed 1.1 LVC 5 Days 520 Siebel Open UI Foundations Ed 2.1 LVC 2 Days 521 Siebel Open UI Adv JavaScript API Ed 1.1 3 Days 522 Siebel Open UI Adv JavaScript API Ed 1.1 LVC 3 Days 523 Siebel Open UI Essentials Ed 1.1 5 Days 524 Siebel Open UI Foundations Ed 2.1 2 Days 525 Siebel Open UI Essentials Ed 1TOD 5 Days 526 Siebel 8.1.x Core Consultant Course Ed 2.1 15 Days 527 Siebel 8.1.x Core Consultant Course Ed 2.1 LVC 15 Days 528 Siebel 8.1 Loyalty Ed 1TOD 2 Days 529 Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1TOD 3 Days 530 Siebel 8.0 Customer Order Management: Product Admin. Ed 1TOD 3 Days 531 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 2 4 Days 532 Siebel 8.1.x Scripting Ed 1TOD 3 Days 533 Siebel 8.1.x Enterprise Integration Manager Ed 1TOD 2 Days 534 E IBM Siebel Appl Perf tuning &Troubleshooting for Adms Ed 2 LVC 4 Days 535 E IBM Siebel CRM Innovation Pack 2015: OverviewTOD 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 131.
    Business&Process Framework SoftSkills No Description Duration 536SiebelTools Rel 15.5 Ed 2 5 Days 537 SiebelTools Rel 15.5 Ed 2 LVC 5 Days 538 SiebelTechnical Foundations Rel 15.5 Ed 1 3 Days 539 SiebelTechnical Foundations Rel 15.5 Ed 1 LVC 3 Days 540 Siebel Business Analyst Rel 15.5 Ed 1 5 Days 541 Siebel Fundamentals Rel 15.5 Ed 1 2 Days 542 Siebel Business Automation Rel 15.5 Ed 1 5 Days 543 Siebel Business Analyst Rel 15.5 Ed 1 LVC 5 Days 544 Siebel Fundamentals Rel 15.5 Ed 1 LVC 2 Days 545 Siebel Open UI Adv JavaScript API Ed 2 3 Days 546 Siebel Open UI Adv JavaScript API Ed 2 LVC 3 Days 547 Siebel Open UI Essentials Ed 2 LVC 5 Days 548 Siebel Open UI Essentials Ed 2 5 Days 549 Siebel Open UI Foundations Ed 3 2 Days 550 Siebel Open UI Foundations Ed 3 LVC 2 Days 551 Siebel Business Automation Rel 15.5 Ed 1 LVC 5 Days 552 Siebel 8.0 Customer Order Management: Pricing Configuration Ed 1 3 Days 553 Siebel 8.1 Loyalty Ed 1 2 Days 554 Siebel 8.0 Customer Order Management Accelerated Ed 1 5 Days 555 Siebel 8.1.x Enterprise Integration Manager Ed 1 2 Days 556 E Designing a Siebel Project - IBM Graduate Program Ed 1 PRV 1 Days 557 E Building a Siebel Project - IBM Graduate Program Ed 1 PRV 7 Days 558 E Scripting for Siebel - IBM Graduate Program Ed 1 PRV 2 Days 559 E Workflow for Siebel - IBM Graduate Program Ed 1 PRV 2 Days 560 test_virtual_dates 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 132.
    Business&Process Framework SoftSkills No Description Duration 561E Siebel Case Study - IBM Graduate Program Ed 1 PRV 5 Days 562 Oracle Policy Automation (OPA) Connector for Siebel Ed 1 3 Days 563 Oracle CRM On Demand Data Import Workshop Ed 4.1 1 Days 564 PS/nVision for GL Reporting Foundation Accelerated Rel 8.9 Ed 2 5 Days 565 PS / nVision for General Ledger Rel 8.9 Ed 2 5 Days 566 Enterprise Expenses 8.8 to 8.9 Delta (minus the extras on Enterprise) 1 Hours 567 Enterprise Billing and eBill Payment 8.9 to 8.9 Delta Presentation (PSft) 1 Hours 568 Enterprise Pricer Delta Seminar On Demand -V8.8 -V8.9 (Psft) 1 Hours 569 Enterprise Strategic Sourcing 8.9 Delta(PSft) 1 Hours 570 PeopleSoft Enterprise Inventory and Cost Management - 8.9 DeltaTraining 1 Hours 571 PeopleSoft Enterprise Services Procurement 8.9 Delta 1 Hours 572 PeopleSoft Enterprise Supplier Contract Management 8.9 (PSft) 1 Hours 573 PeopleSoft Order Management 8.9 Delta Seminar On Demand (PSft) 1 Hours 574 Promotions Management Delta Seminar On Demand - Between Release 8.8 and Release 8.9 1 Hours 575 SRM Purchasing 8.8 to 8.9 Delta 1 Hours 576 PeopleSoft Enterprise eProcurement Release 8.9 (PSft) 1 Hours 577 PeopleSoft PeopleTools I Rel 8.50 Ed 1 5 Days 578 PeopleSoft PeopleTools II Rel 8.50 Ed 1 5 Days 579 PeopleSoft PeopleTools I / II Rel 8.50 Accelerated Ed 1 5 Days 580 PeopleSoft IntegrationTools Rel 8.50 Ed 1 5 Days 581 PeopleSoft PeopleTools Installation & Server Admin. Rel 8.50 Ed 1 5 Days 582 PeopleSoft Security Rel 8.50 Ed 1 4 Days 583 PeopleSoft SQR Rel 8.50 Ed 1 5 Days 584 PeopleSoft Query Reporting Rel 8.50 Ed 1 2 Days 585 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50 Ed 1 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 133.
    Business&Process Framework SoftSkills No Description Duration 586PeopleSoft Query/XMLP Power Combo Rel 8.50 Ed 1 4 Days 587 PeopleSoft Workflow Rel 8.50 Ed 1 5 Days 588 PeopleSoft PeopleTools II Rel 8.50 Ed 1 LVC 5 Days 589 PeopleSoft Security Rel 8.50 Ed 1 LVC 4 Days 590 PeopleSoft PeopleTools I Rel 8.50 Ed 1 LVC 5 Days 591 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50 Ed 1 LVC 2 Days 592 PeopleSoft IntegrationTools Rel 8.50 Ed 1 LVC 5 Days 593 PeopleSoft SQR Rel 8.50 Ed 1 LVC 5 Days 594 PeopleSoft Query Reporting Rel 8.50 Ed 1 LVC 2 Days 595 PeopleSoft Workflow Rel 8.50 Ed 1 LVC 5 Days 596 E Application Engine Rel 8.48 - IBM Graduate Program Ed 1 3 Days 597 E Workflow Rel 8.48 - IBM Graduate Program Ed 1 1 Days 598 E IntegrationTools Rel 8.48 - IBM Graduate Program Ed 1 2 Days 599 E Reporting Options: XML & BI Publisher - IBM Graduate Program Ed 1 3 Days 600 E PeopleSoft Case Studies - IBM Graduate Program Ed 1 10 Days 601 Introduction to PeopleSoft for HRMS Rel 9.1 Ed 1 1 Days 602 PeopleSoft Base Benefits - U.S. Rel 9.1 Ed 1 2 Days 603 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.1 Ed 1 4 Days 604 General Ledger Rel 9.1 Ed 4 4 Days 605 Billing / Receivables Accelerated Rel 9.1 Ed 4 5 Days 606 Receivables Rel 9.1 Ed 4 5 Days 607 Asset Management Rel 9.1 Ed 4 4 Days 608 Project Costing Rel 9.1 Ed 2 5 Days 609 Inventory Rel 9.1 Ed 4 4 Days 610 eProcurement Rel 9.1 Ed 4 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 134.
    Business&Process Framework SoftSkills No Description Duration 611General Ledger Foundation Accelerated Rel 9.1 Ed 4 5 Days 612 Financial Consolidations Rel 9.1 Ed 4 1 Days 613 PS / nVision for General Ledger Rel 9.1 Ed 3 5 Days 614 Payables Rel 9.1 Ed 4 4 Days 615 Purchasing Rel 9.1 Ed 4 4 Days 616 PS/nVision for GL Reporting Foundation Accelerated Rel 9.1 Ed 3 5 Days 617 PeopleSoft PeopleTools Installation & Server Admin. Rel 8.50 Ed 1 LVC 5 Days 618 PeopleSoft Recruiting Solutions Rel 9.1 Ed 1 4 Days 619 PeopleSoft Global Payroll Rel 9.1 Ed 1 5 Days 620 PeopleSoft ePerformance Rel 9.1 Ed 1 4 Days 621 PeopleSoft Base Benefits - U.S. Rel 9.1 Ed 1 LVC 2 Days 622 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.1 Ed 1 LVC 4 Days 623 Introduction to PeopleSoft for HRMS Rel 9.1 Ed 1 LVC 1 Days 624 PeopleSoft Global Payroll: Core Absence Rel. 9.1 Ed 1 3 Days 625 PeopleSoft Global Payroll & Absence Accelerated Rel 9.1 Ed 1 5 Days 626 PeopleSoft PeopleTools I / II Rel 8.50 Accelerated Ed 1 LVC 5 Days 627 PeopleSoft Query/XMLP Power Combo Rel 8.5 Ed 1 LVC 4 Days 628 Receivables Rel 9.1 Ed 4 LVC 5 Days 629 Payables Rel 9.1 Ed 4 LVC 4 Days 630 Purchasing Rel 9.1 Ed 4 LVC 4 Days 631 Purchasing / Payables Accelerated Rel 9.1 Ed 4 LVC 5 Days 632 General Ledger Foundation Accelerated Rel 9.1 Ed 4 LVC 5 Days 633 Billing Rel 9.1 Ed 4 LVC 4 Days 634 Asset Management Rel 9.1 Ed 4 LVC 4 Days 635 Project Costing Rel 9.1 Ed 2 LVC 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 135.
    Business&Process Framework SoftSkills No Description Duration 636Inventory Rel 9.1 Ed 4 LVC 4 Days 637 Purchasing / eProcurement Accelerated Rel 9.1 Ed 2 LVC 5 Days 638 eProcurement Rel 9.1 Ed 4 LVC 4 Days 639 Purchasing/Inventory Accelerated Rel 9.1 Ed 4 LVC 5 Days 640 CRM Automation and Configuration Rel 9.1 Ed 3 LVC 5 Days 641 CRM Fundamentals Rel 9.1 Ed 3 LVC 2 Days 642 CRM Fundamentals for Higher Education Rel 9.1 Ed 1 LVC 1 Days 643 PeopleSoft PeopleTools Rel 8.50 Delta Ed 1 LVC 2 Days 644 PeopleSoft Global Payroll Rel 9.1 Ed 1 LVC 5 Days 645 PeopleSoft Global Payroll: Core Absence Rel. 9.1 Ed 1 LVC 3 Days 646 PeopleSoft Global Payroll & Absence Accelerated Rel 9.1 Ed 1 LVC 5 Days 647 Expenses Rel 9.1 Ed 3 LVC 4 Days 648 PeopleSoft Approval Framework Rel 9.1 Ed 1 1 Days 649 PeopleSoft Approval Framework Rel 9.1 Ed 1 LVC 1 Days 650 Support and HelpDesk Rel 9.1 Ed 3 LVC 2 Days 651 Implementing HRMS Self-Service Applications Rel 9.1 Ed 1 LVC 3 Days 652 PeopleSoft ePerformance Rel 9.1 Ed 1 LVC 4 Days 653 PeopleSoft Application Engine Rel 8.50 Ed 1 4 Days 654 PeopleSoft Application Engine Rel 8.50 Ed 1 LVC 4 Days 655 Transfer Credit Rel 9.0 Ed 3 LVC 1 Days 656 PeopleSoft Benefits Administration Rel 9.1 Ed 1 LVC 5 Days 657 XML Publisher for Campus Solutions Ed 1 LVC 1 Days 658 PeopleSoft Absence Management Rel 9.1 Ed 1 LVC 5 Days 659 PeopleSoft Absence Management Rel 9.1 Ed 1 5 Days 660 Online Marketing Rel 9.1 Ed 1 LVC 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 136.
    Business&Process Framework SoftSkills No Description Duration 661PeopleSoft Applications Portal Rel 9.1 Ed 1 3 Days 662 PeopleSoft Applications Portal Rel 9.1 Ed 1 LVC 3 Days 663 PeopleSoft Human Resources Rel 9.1 Ed 2 2 Days 664 PeopleSoft Human Resources Rel 9.1 Ed 2 LVC 2 Days 665 PeopleSoftTest Framework Rel 8.52 Ed 1 3 Days 666 PeopleSoftTest Framework Rel 8.52 Ed 1 LVC 3 Days 667 PeopleSoft IntegrationTools Rel 8.50 Ed 1TOD 5 Days 668 PeopleSoft PeopleTools II Rel 8.50 Ed 1TOD 5 Days 669 PeopleSoft PeopleTools I Rel 8.50 Ed 1TOD 5 Days 670 PeopleSoft Recruiting Solutions Rel 9.1TOD 4 Days 671 PeopleSoft PeopleCode Rel 8.50 Ed 1 5 Days 672 PeopleSoft PeopleCode Rel 8.50 Ed 1 LVC 5 Days 673 PeopleSoft Benefits Administration Rel 9.1TOD 5 Days 674 PeopleSoft Payroll - US Rel 9.1 Ed 1TOD 5 Days 675 PeopleSoft ePerformance Rel 9.1TOD 4 Days 676 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.50 Ed 1 LVC 5 Days 677 Student Financials Fundamentals Rel 9 Ed 4 LVC 4 Days 678 PeopleSoft Workflow Rel 8.50TOD 5 Days 679 XML Publisher for PeopleSoft Enterprise PeopleTools Rel 8.50TOD 2 Days 680 PeopleSoft Query Reporting Rel 8.50TOD 2 Days 681 PeopleSoftYear-End Payroll - Canada Ed 1 LVC 1 Days 682 PeopleSoftYear-End Payroll - U.S. Ed 1 LVC 1 Days 683 PeopleTools Delta Rel 8.50 - 8.52 Ed 2 4 Days 684 PeopleTools Delta Rel 8.50 - 8.52 Ed 2 LVC 4 Days 685 PeopleSoft IntegrationTools New Features for 8.52 Ed 2 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 137.
    Business&Process Framework SoftSkills No Description Duration 686PeopleSoft IntegrationTools New Features for 8.52 Ed 2 LVC 5 Days 687 PeopleSoft PeopleTools PortalTechnologies Rel 8.52 Ed 1 3 Days 688 PeopleSoft PeopleTools PortalTechnologies Rel 8.52 Ed 1 LVC 3 Days 689 PeopleSoft PeopleTools Upgrade & Data Management Rel 8.50 Ed 2 LVC 5 Days 690 PeopleSoft PeopleTools Upgrade & Data Management Rel 8.50 Ed 2 5 Days 691 PeopleSoft IntegrationTools New Features for 8.52 Ed 2TOD 5 Days 692 PeopleSoft Applications Portal Rel 9.1 Accelerated Ed 1 LVC 2 Days 693 PeopleSoft Applications Portal Rel 9.1 Accelerated Ed 1 2 Days 694 PeopleSoft Application Engine Rel 8.53 Ed 1 4 Days 695 PeopleSoft PeopleTools I Rel 8.53 Ed 1 5 Days 696 PeopleSoft PeopleTools SQR Rel 8.53 Ed 1 5 Days 697 PeopleSoft PeopleCode Rel 8.53 Ed 1 5 Days 698 PeopleSoft PeopleTools II Rel 8.53 Ed 1 5 Days 699 PeopleSoft PeopleTools I / II Rel 8.53 Accelerated Ed 1 5 Days 700 PeopleSoft PeopleCode Rel 8.53 Ed 1TOD 5 Days 701 PeopleSoft Application Engine Rel 8.53 Ed 1 LVC 4 Days 702 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.53 Ed 1 LVC 5 Days 703 PeopleSoft PeopleCode Rel 8.53 Ed 1 LVC 5 Days 704 PeopleSoft PeopleTools I / II Rel 8.53 Accelerated Ed 1 LVC 5 Days 705 PeopleSoft PeopleTools I Rel 8.53 Ed 1 LVC 5 Days 706 PeopleSoft PeopleTools II Rel 8.53 Ed 1 LVC 5 Days 707 PeopleSoft PeopleTools SQR Rel 8.53 Ed 1 LVC 5 Days 708 PeopleSoft Human Resources Rel 9.2 Ed 1 3 Days 709 PeopleSoft Human Resources Rel 9.2 Ed 1 LVC 3 Days 710 PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 138.
    Business&Process Framework SoftSkills No Description Duration 711PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1 LVC 2 Days 712 PeopleSoft Base Benefits - Canada Rel 9.2 Ed 1 2 Days 713 PeopleSoft Base Benefits - Canada Rel 9.2 Ed 1 LVC 2 Days 714 PeopleSoft Benefits Administration Rel 9.2 Ed 1 5 Days 715 PeopleSoft Benefits Administration Rel 9.2 Ed 1 LVC 5 Days 716 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.2 Ed 1 5 Days 717 Intro to PeopleSoft/HR/Benefits Accelerated - US Rel 9.2 Ed 1 LVC 5 Days 718 Intro to PeopleSoft/HR/Benefits Accelerated - Canada Rel 9.2 Ed 1 5 Days 719 Intro to PeopleSoft/HR/Benefits Accelerated - Canada Rel 9.2 Ed 1 LVC 5 Days 720 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1 1 Days 721 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1 LVC 1 Days 722 PeopleSoft Payroll - US Rel 9.2 Ed 1 5 Days 723 PeopleSoft Payroll - US Rel 9.2 Ed 1 LVC 5 Days 724 PeopleSoft Payroll - Canada Rel 9.2 Ed 1 5 Days 725 PeopleSoft Payroll - Canada Rel 9.2 Ed 1 LVC 5 Days 726 PeopleSoftTime & LaborTechnical Rules Ed 1 3 Days 727 PeopleSoftTime & LaborTechnical Rules Ed 1 LVC 3 Days 728 PeopleSoft Global Payroll: Core Absence Ed 1 3 Days 729 PeopleSoft Global Payroll: Core Absence Ed 1 LVC 3 Days 730 S PeopleSoft HCM Security Overview Ed 1 1 Days 731 S PeopleSoft HCM Security Overview Ed 1 LVC 1 Days 732 PeopleSoft Career and Succession Planning Ed 1 LVC 1 Days 733 PeopleSoft PeopleTools Delta Rel 8.52 - 8.53 Ed 1 2 Days 734 PeopleSoft PeopleTools Delta Rel 8.52 - 8.53 Ed 1 LVC 2 Days 735 PeopleSoft Asset Management Rel 9.2 Ed 1 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 139.
    Business&Process Framework SoftSkills No Description Duration 736PeopleSoft Asset Management Rel 9.2 Ed 1 LVC 4 Days 737 PeopleSoft General Ledger Foundation Accel Rel 9.2 Ed 1 5 Days 738 PeopleSoft General Ledger Foundation Accel Rel 9.2 Ed 1 LVC 5 Days 739 PeopleSoft Billing / Receivables Accelerated Rel 9.2 Ed 1 5 Days 740 PeopleSoft Billing / Receivables Accelerated Rel 9.2 Ed 1 LVC 5 Days 741 PeopleSoft Payables Rel 9.2 Ed 1 4 Days 742 PeopleSoft Payables Rel 9.2 Ed 1 LVC 4 Days 743 PeopleSoft Purchasing Rel 9.2 Ed 1 4 Days 744 PeopleSoft Purchasing Rel 9.2 Ed 1 LVC 4 Days 745 PeopleSoft General Ledger Rel 9.2 Ed 1 4 Days 746 PeopleSoft General Ledger Rel 9.2 Ed 1 LVC 4 Days 747 PeopleSoft Receivables Rel 9.2 Ed 1 5 Days 748 PeopleSoft Receivables Rel 9.2 Ed 1 LVC 5 Days 749 PeopleSoft Project Costing Rel 9.2 Ed 1 5 Days 750 PeopleSoft Project Costing Rel 9.2 Ed 1 LVC 5 Days 751 PeopleSoft Billing Rel 9.2 Ed 1 LVC 4 Days 752 PeopleSoft Purchasing/Payables Accelerated Rel 9.2 Ed 1 5 Days 753 PeopleSoft Purchasing/Payables Accelerated Rel 9.2 Ed 1 LVC 5 Days 754 PeopleSoft Expenses Rel 9.2 Ed 1 LVC 4 Days 755 PeopleSoft Contracts Ed 1 LVC 4 Days 756 PeopleSoftTreasury Ed 1 LVC 4 Days 757 Intro to PeopleSoft for FMS and SCM Ed 1 LVC 1 Days 758 PeopleSoft Commitment Control Ed 1 LVC 3 Days 759 PeopleSoft Grants Ed 1 LVC 5 Days 760 S PeopleSoft Financial Solutions Rel 9.2 New Features Ed 1 LVC 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 140.
    Business&Process Framework SoftSkills No Description Duration 761S PeopleSoft Supply Chain Solutions Rel 9.2 New Features Ed 1 LVC 1 Days 762 PeopleSoft eProcurement Rel 9.2 Ed 1 4 Days 763 PeopleSoft eProcurement Rel 9.2 Ed 1 LVC 4 Days 764 PeopleSoft PS / nVision for General Ledger Rel 9.2 Ed 1 5 Days 765 PeopleSoft Inventory Rel 9.2 Ed 1 4 Days 766 PeopleSoft Inventory Rel 9.2 Ed 1 LVC 4 Days 767 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1 2 Days 768 PeopleSoft Lifecycle Management Rel 8.53 Ed 1 4 Days 769 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1 LVC 2 Days 770 PeopleSoft Lifecycle Management Rel 8.53 Ed 1 LVC 4 Days 771 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1 5 Days 772 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1 LVC 5 Days 773 PeopleSoft Security Rel 8.53 Ed 1 4 Days 774 PeopleSoft Security Rel 8.53 Ed 1 LVC 4 Days 775 PeopleSoft Purchasing / eProcurement Accelerated Rel 9.2 Ed 1 5 Days 776 PeopleSoft Purchasing / eProcurement Accelerated Rel 9.2 Ed 1 LVC 5 Days 777 PeopleSoft Purchasing/Inventory Accelerated Rel 9.2 Ed 1 LVC 5 Days 778 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1 5 Days 779 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1 4 Days 780 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1 LVC 4 Days 781 PeopleSoft ePerformance Rel 9.2 Ed 1 LVC 4 Days 782 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1 LVC 4 Days 783 PeopleSoft Absence Management Rel 9.2 Ed 1 5 Days 784 PeopleSoft Absence Management Rel 9.2 Ed 1 LVC 5 Days 785 PeopleSoft Global Payroll Rel 9.2 Ed 1 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 141.
    Business&Process Framework SoftSkills No Description Duration 786PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1 3 Days 787 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1 LVC 5 Days 788 PeopleSoft ePerformance Rel 9.2 Ed 1 4 Days 789 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1 4 Days 790 PeopleSoft Global Payroll Rel 9.2 Ed 1 LVC 5 Days 791 PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1 LVC 3 Days 792 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1 5 Days 793 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1 LVC 5 Days 794 S PeopleSoft CRM Solutions Rel 9.2 New Features Ed 1 1 Days 795 S PeopleSoft CRM Solutions Rel 9.2 New Features Ed 1 LVC 1 Days 796 PeopleSoft CRM Fundamentals Ed 1 2 Days 797 PeopleSoft CRM Fundamentals Ed 1 LVC 2 Days 798 PeopleSoft CRM HelpDesk for Human Resources Ed 1 4 Days 799 PeopleSoft CRM HelpDesk for Human Resources Ed 1 LVC 4 Days 800 PeopleSoft CRM Automation and Configuration Ed 1 5 Days 801 PeopleSoft CRM Automation and Configuration Ed 1 LVC 5 Days 802 PeopleSoft PS / nVision for General Ledger Rel 9.2 Ed 1 LVC 5 Days 803 PeopleTools Server Admin Rel 8.53 Delta/Oracle SES Config Ed 1 LVC 1 Days 804 PeopleTools Server Admin Rel 8.53 Delta/Oracle SES Config Ed 1 1 Days 805 PeopleSoft PeopleTools & Server Admin Delta Combo Rel 8.53 Ed 1 3 Days 806 PeopleSoft PeopleTools & Server Admin Delta Combo Rel 8.53 Ed 1 LVC 3 Days 807 PS / nVision for General Ledger Rel 9.1 Ed 3TOD 5 Days 808 Payables Rel 9.1 Ed 4TOD 4 Days 809 eProcurement Rel 9.1 Ed 4TOD 4 Days 810 Purchasing Rel 9.1 Ed 4TOD 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 142.
    Business&Process Framework SoftSkills No Description Duration 811Asset Management Rel 9.1 Ed 4TOD 4 Days 812 PeopleSoftYear-End Payroll - Canada Ed 1TOD 1 Days 813 PeopleSoftYear-End Payroll - U.S. Ed 1TOD 1 Days 814 PeopleSoft IntegrationTools I Rel 8.53 Ed 1 5 Days 815 PeopleSoft IntegrationTools I Rel 8.53 Ed 1 LVC 5 Days 816 PeopleSoft PeopleTools II Rel 8.53 Ed 1TOD 5 Days 817 PeopleSoft IntegrationTools II Rel 8.53 Ed 1 4 Days 818 PeopleSoft IntegrationTools II Rel 8.53 Ed 1 LVC 4 Days 819 PeopleSoft Integration Broker Administration Rel 8.53 Ed 1 1 Days 820 PeopleSoft Integration Broker Administration Rel 8.53 Ed 1 LVC 1 Days 821 PeopleSoft PeopleTools I Rel 8.53 Ed 1TOD 5 Days 822 PeopleTools Portal AdvancedTopics Ed 1 1 Days 823 PeopleTools Portal AdvancedTopics Ed 1 LVC 1 Days 824 PeopleSoft Absence Management Rel 9.2 Ed 1TOD 5 Days 825 PeopleSoft Receivables Rel 9.2 Ed 1TOD 5 Days 826 PeopleSoft Enterprise Learning Management Rel 9.2 Ed 1TOD 4 Days 827 PeopleSoftTime & LaborTechnical Rules Ed 1TOD 3 Days 828 PeopleSoft Human Resources Rel 9.2 Ed 1TOD 3 Days 829 PeopleSoft Lifecycle Mgmt & Update Manager Combo Rel 8.53 Ed 2 5 Days 830 PeopleSoft Update Manager Rel 8.53 Ed 2 1 Days 831 PeopleSoft Lifecycle Mgmt & Update Manager Combo Rel 8.53 Ed 2 LVC 5 Days 832 PeopleSoft Update Manager Rel 8.53 Ed 2 LVC 1 Days 833 PeopleTools Portal & Interaction Hub Admin/AdvTopics Accel Ed 1 5 Days 834 PeopleTools Portal & Interaction Hub Admin/AdvTopics Accel Ed 1 LVC 5 Days 835 PeopleSoft Asset Management Rel 9.2 Ed 1TOD 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 143.
    Business&Process Framework SoftSkills No Description Duration 836PeopleSoft General Ledger Rel 9.2 Ed 1TOD 4 Days 837 E IBM - PSFT HCM 9.2 New Features & PeopleTools 8.53 Ed 1TOD 2 Days 838 E IntegrationTools Rel 8.48 - IBM Graduate Program Ed 1 LVC 2 Days 839 E Reporting Options: XML & BI Publisher - IBM Graduate Program Ed 1 LVC 3 Days 840 E PeopleSoft Case Studies - IBM Graduate Program Ed 1 LVC 10 Days 841 E Workflow Rel 8.48 - IBM Graduate Program Ed 1 LVC 1 Days 842 Introduction to PeopleSoft for HCM Rel 9.2 Ed 1TOD 1 Days 843 PeopleSoft Base Benefits - U.S. Rel 9.2 Ed 1TOD 2 Days 844 PeopleSoft Update Manager Rel 8.54 Ed 1 2 Days 845 PeopleSoft Update Manager Rel 8.54 Ed 1 LVC 2 Days 846 PeopleSoft Pivot Grids Rel 8.54 Ed 1 2 Days 847 PeopleSoft Pivot Grids Rel 8.54 Ed 1 LVC 2 Days 848 PeopleSoft Lifecycle Mgmt & Update Manager Accelerated Rel 8.54 Ed 1 5 Days 849 PeopleSoft Lifecycle Mgmt & Update Manager Accelerated Rel 8.54 Ed 1 LVC 5 Days 850 PeopleSoft Recruiting Solutions Rel 9.2 Ed 1TOD 5 Days 851 PeopleSoft Payables Rel 9.2 Ed 1TOD 4 Days 852 PeopleSoft Purchasing Rel 9.2 Ed 1TOD 4 Days 853 PeopleSoft HCM Security Overview Ed 1TOD 1 Days 854 PeopleSoft Fluid User Interface Rel 8.54 Ed 1 2 Days 855 PeopleSoft Fluid User Interface Rel 8.54 Ed 1 LVC 2 Days 856 PeopleSoft Benefits Administration Rel 9.2 Ed 1TOD 5 Days 857 PeopleSoft Payroll - Canada Rel 9.2 Ed 1TOD 5 Days 858 PeopleSoft Payroll - US Rel 9.2 Ed 1TOD 5 Days 859 PeopleSoft Financial Allocations Rel 9.2 Ed 1TOD 1 Days 860 PeopleSoft HCM Self-Service Applications Rel 9.2 Ed 1TOD 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 144.
    Business&Process Framework SoftSkills No Description Duration 861PeopleSoft eProcurement Rel 9.2 Ed 1TOD 4 Days 862 PeopleSoft Inventory Rel 9.2 Ed 1TOD 4 Days 863 PeopleSoftTime and Labor - North America Rel. 9.2 Ed 1TOD 4 Days 864 PeopleSoft Commitment Control Ed 1TOD 3 Days 865 PeopleSoft ePerformance Rel 9.2 Ed 1TOD 4 Days 866 PeopleSoft Financial Consolidations Rel 9.2 Ed 1TOD 1 Days 867 Intro to PeopleSoft for FMS and SCM Ed 1TOD 1 Days 868 BI Publisher for PeopleSoft PeopleTools Rel 8.53 Ed 1TOD 2 Days 869 PeopleSoft Career and Succession Planning Ed 1TOD 1 Days 870 PeopleSoft Security Rel 8.53 Ed 1TOD 4 Days 871 PeopleSoft Application Engine Rel 8.53 Ed 1TOD 4 Days 872 S PeopleSoft Financial Solutions New Features Ed 2 3 Days 873 S PeopleSoft Supply Chain Solutions New Features Ed 2 1 Days 874 S PeopleSoft Financial Solutions New Features Ed 2 LVC 3 Days 875 S PeopleSoft Supply Chain Solutions New Features Ed 2 LVC 1 Days 876 PeopleSoft PeopleTools Installation & Server Admin Rel 8.53 Ed 1TOD 5 Days 877 PeopleSoft IntegrationTools I Rel 8.53 Ed 1TOD 5 Days 878 PeopleTools Portal & PeopleSoft Interaction Hub Admin Ed 1TOD 5 Days 879 PeopleTools Portal AdvancedTopics Ed 1TOD 1 Days 880 PeopleSoft IntegrationTools II Rel 8.53 Ed 1TOD 4 Days 881 PeopleSoft Update Manager Rel 8.54 Ed 1TOD 2 Days 882 PeopleSoft Lifecycle Management Rel 8.53 Ed 1TOD 4 Days 883 PeopleSoft Query Reporting Rel 8.53 Ed 1.1 3 Days 884 PeopleTools Server Admin Rel 8.54 Delta/Oracle SES Config Ed 2 1 Days 885 PeopleTools Server Admin Rel 8.54 Delta/Oracle SES Config Ed 2 LVC 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 145.
    Business&Process Framework SoftSkills No Description Duration 886PeopleSoft Query Reporting Rel 8.53 Ed 1.1 LVC 3 Days 887 PeopleSoft Fluid User Interface Rel 8.54 Ed 1TOD 2 Days 888 PeopleSoft Pivot Grids Rel 8.54 Ed 1TOD 2 Days 889 PeopleSoft Query/BI Publisher Power Combo Rel 8.53 Ed 1.1 5 Days 890 PeopleSoft Query/BI Publisher Power Combo Rel 8.53 Ed 1.1 LVC 5 Days 891 PeopleSoft Query Reporting Rel 8.53 Ed 1.1TOD 3 Days 892 PeopleSoft HCM Rel 9.0 - 9.2 Delta Ed 1.1 LVC 3 Days 893 PeopleSoft HCM Rel 9.0 - 9.2 Delta Ed 1.1 3 Days 894 PeopleSoft Project Costing Rel 9.2 Ed 1TOD 5 Days 895 PeopleSoftTest Framework Rel 8.52 Ed 1TOD 3 Days 896 PeopleSoft eProcurement/Payables Accelerated Rel 9.2 Ed 1 5 Days 897 PeopleSoft eProcurement/Payables Accelerated Rel 9.2 Ed 1 LVC 5 Days 898 PeopleSoft HCM Core HR and Benefits New Features Ed 1 1 Days 899 PeopleSoft HCM Core HR and Benefits New Features Ed 1 LVC 1 Days 900 PeopleSoft HCMTime and Pay New Features Ed 1 1 Days 901 PeopleSoft HCMTalent Management New Features Ed 1 1 Days 902 PeopleSoft HCMTime and Pay New Features Ed 1 LVC 1 Days 903 PeopleSoft HCMTalent Management New Features Ed 1 LVC 1 Days 904 Academic Structure Rel 9 Ed 3 2 Days 905 Equations Engine Rel 9 Ed 2 2 Days 906 Financial Aid Advanced Packaging Rel 9 Ed 2 3 Days 907 Financial Aid Fundamentals Rel 9 Ed 3 4 Days 908 Contributor Relations Rel 9 Ed 2 4 Days 909 Academic Advisement Fundamentals Rel 9 Ed 3 3 Days 910 Academic Records Maintenance Rel 9 Ed 3 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 146.
    Business&Process Framework SoftSkills No Description Duration 911Recruiting and Admissions Rel 9 Ed 1 3 Days 912 Student Enrollment Rel 9 Ed 2 4 Days 913 Introduction to PS for Campus Solutions Ed 1 1 Days 914 3Cs - Communications, Checklists and Comments Rel 9 Ed 3 2 Days 915 3Cs - Communications, Checklists and Comments Rel 9 Ed 3 LWC 2 Days 916 Recruiting and Admissions Rel 9 Ed 1 LWC 3 Days 917 Student Enrollment Rel 9 Ed 2 LWC 4 Days 918 Academic Structure Rel 9 Ed 3 LWC 2 Days 919 Equations Engine Rel 9 Ed 2 LWC 2 Days 920 Financial Aid Fundamentals Rel 9 Ed 3 LWC 4 Days 921 Academic Records Maintenance Rel 9 Ed 3 LWC 2 Days 922 Academic Advisement Fundamentals Rel 9 Ed 3 LWC 3 Days 923 Contributor Relations Rel 9 Ed 2 LWC 4 Days 924 Financial Aid Advanced Packaging Rel 9 Ed 2 LWC 3 Days 925 Financial Allocations Rel 9.1 Ed 4 1 Days 926 Purchasing / Payables Accelerated Rel 9.1 Ed 4 5 Days 927 CRM Automation and Configuration Rel 9.1 Ed 3 5 Days 928 CRM Fundamentals Rel 9.1 Ed 3 2 Days 929 Billing Rel 9.1 Ed 4 4 Days 930 Purchasing / eProcurement Accelerated Rel 9.1 Ed 2 5 Days 931 Purchasing/Inventory Accelerated Rel 9.1 Ed 4 5 Days 932 CRM Fundamentals for Higher Education Rel 9.1 Ed 1 1 Days 933 Implementing HRMS Self-Service Applications Rel 9.1 Ed 1 3 Days 934 PeopleSoft PeopleTools Rel 8.50 Delta Ed 1 2 Days 935 Expenses Rel 9.1 Ed 3 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 147.
    Business&Process Framework SoftSkills No Description Duration 936Support and HelpDesk Rel 9.1 Ed 3 2 Days 937 Transfer Credit Rel 9.0 Ed 3 1 Days 938 XML Publisher for Campus Solutions Ed 1 1 Days 939 Online Marketing Rel 9.1 Ed 1 2 Days 940 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.50 Ed 1 5 Days 941 Student Financials Fundamentals Rel 9 Ed 4 4 Days 942 PeopleSoftYear-End Payroll - Canada Ed 1 1 Days 943 PeopleSoftYear-End Payroll - U.S. Ed 1 1 Days 944 PeopleSoft Application Engine/PeopleCode - Accel. Rel 8.53 Ed 1 5 Days 945 PeopleSoft Career and Succession Planning Ed 1 1 Days 946 PeopleSoft Billing Rel 9.2 Ed 1 4 Days 947 PeopleSoft Financial Allocations Rel 9.2 Ed 1 1 Days 948 PeopleSoft Financial Consolidations Rel 9.2 Ed 1 1 Days 949 PeopleSoft Expenses Rel 9.2 Ed 1 4 Days 950 PeopleSoft Contracts Ed 1 4 Days 951 PeopleSoftTreasury Ed 1 4 Days 952 Intro to PeopleSoft for FMS and SCM Ed 1 1 Days 953 PeopleSoft Commitment Control Ed 1 3 Days 954 PeopleSoft Grants Ed 1 5 Days 955 PeopleSoft Purchasing/Inventory Accelerated Rel 9.2 Ed 1 5 Days 956 PeopleSoft Financial Allocations Rel 9.2 Ed 1 LVC 1 Days 957 PeopleSoft Financial Consolidations Rel 9.2 Ed 1 LVC 1 Days CLOUD 958 Oracle CPQ Cloud Blue Belt Advanced Document Engine Ed 1 LVC 1 Days 959 Oracle CPQ Cloud: Document Designer Administration Ed 1 1 Days 960 Oracle CPQ Cloud: Document Designer Administration Ed 1 LVC 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 148.
    Business&Process Framework SoftSkills No Description Duration 961Oracle CPQ CloudYellow Belt Ed 1.1 4 Days 962 Oracle CPQ CloudYellow Belt Ed 1.1 LVC 4 Days 963 Oracle CPQ CloudYellow Belt Ed 1.1TOD 4 Days 964 S Oracle CPQ CloudYellow Belt for the Business User Ed 1.1 1 Days 965 S Oracle CPQ CloudYellow Belt for the Business User Ed 1.1 LVC 1 Days 966 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1TOD 1 Days 967 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1TOD 1 Days 968 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1TOD 1 Days 969 Oracle CPQ Cloud: Document Designer Administration Ed 1TOD 1 Days 970 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1 1 Days 971 Oracle CPQ Cloud Blue Belt Advanced Commerce Ed 1 LVC 1 Days 972 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1 1 Days 973 Oracle CPQ Cloud Blue Belt Advanced BML Ed 1 LVC 1 Days 974 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1 1 Days 975 Oracle CPQ Cloud Blue Belt Advanced Configuration Ed 1 LVC 1 Days 976 Oracle CPQ Cloud Blue Belt Ed 1 4 Days 977 Oracle CPQ Cloud Blue Belt Ed 1 LVC 4 Days 978 Oracle Sales Cloud Workshop Ed 1TOD 5 Days 979 Oracle Sales Cloud Workshop Ed 2 5 Days 980 Oracle Sales Cloud Workshop Ed 2 LVC 5 Days 981 Oracle Sales Cloud Workshop Ed 2TOD 5 Days DATABASE 982 Oracle Database 11g: Oracle Certified Master Upgrade (OCM) Ed 1 1 Days 983 S Oracle Enterprise Manager 10g: Grid Control R5 New Features Seminar Ed 1 2 Days 984 S Implement Oracle Data Warehousing Best Practices Ed 1 1 Days 985 Oracle SQLTuning for Developers Workshop Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 149.
    Business&Process Framework SoftSkills No Description Duration 986S Introduction to Big Data Ed 1 1 Days 987 Introduction to Oracle NoSQL Database Ed 1 1 Days 988 ITIL Foundation in IT Service Management Ed 2 - Internal Only 3 Days 989 Oracle NoSQL Database for Developers Ed 1 2 Days 990 S Oracle Real-World PerformanceTOD 1 Days 991 Certification Exam Prep Seminar: Upgrade OCP to Oracle Database 11gTOD 1 Days 992 Using Oracle NoSQL Database Ed 1 4 Days 993 CEL Advanced SQLTuningTips andTechniques with Dan Hotka Ed 1 2 Days 994 E Oracle Database: Intro to SQL & PL/SQL- IBM Graduate Program Ed 1 PRV 6 Days 995 E Oracle Database:Oracle Developer:Reports & BI publisher- IBM Program Ed 1 PRV 5 Days 996 Certification Exam Prep Seminar: Upgrade to Oracle Database 12cTOD 1 Days 997 Certification Exam Prep Seminar: Oracle Database 12c: Install and AdminTOD 1 Days 998 S Oracle Cloud OverviewTOD 1 Days 999 S Oracle Big Data OverviewTOD 1 Days 1000 S Oracle Security OverviewTOD 1 Days 1001 Using Oracle NoSQL Database Workshop Ed 1 4 Days 1002 Cert Exam Prep Seminar: Upgrade 9i/10g/11g OCA to Oracle 12c OCPTOD 1 Days 1003 Certification Exam Prep Seminar: Database 12c:Advanced AdministrationTOD 1 Days 1004 Oracle Big Data Fundamentals Ed 1 5 Days 1005 Oracle NoSQL Database for Administrators Ed 1TOD 2 Days 1006 S ProcessingYour Big Data with Oracle Ed 1 1 Days 1007 Oracle Database 11g: Data MiningTechniques Ed 1TOD 2 Days 1008 Oracle ApplicationTesting Suite: Essentials Ed 3 3 Days 1009 CEL Optimizer Master Class withTom Kyte Ed 1 1 Days 1010 Oracle NoSQL Database for Administrators Ed 1 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 150.
    Business&Process Framework SoftSkills No Description Duration 1011Oracle Big Data Fundamentals Ed 1TOD 5 Days 1012 Oracle GoldenGate 11g: Fundamentals forTeradata Ed 1 3 Days 1013 Oracle GoldenGate 11g Fundamentals for HP NonStop Ed 1 3 Days 1014 Oracle GoldenGate 11g: Fundamentals for DB2 Ed 1 3 Days 1015 Oracle GoldenGate 11g: Fundamentals for Oracle Ed 2 4 Days 1016 Oracle GoldenGate 11g:Advanced Configuration for Oracle Ed 1 4 Days 1017 Oracle GoldenGate 11g Fundamentals for OracleTOD 4 Days 1018 Oracle GoldenGate 11gTroubleshooting andTuningTOD 3 Days 1019 Oracle GoldenGate 11g: Fundamentals for SQL Server Ed 2 3 Days 1020 Oracle GoldenGate 12c: Fundamentals for Oracle Ed 1 4 Days 1021 Oracle GoldenGate 12c:Troubleshooting andTuning Ed 1 4 Days 1022 Oracle GoldenGate 12c: Fundamentals for Oracle Ed 1TOD 4 Days 1023 Oracle GoldenGate 12c: Management Pack Overview Ed 1 2 Days 1024 Oracle GoldenGate 12c:Advanced Configuration for Oracle Ed 1 4 Days 1025 Oracle GoldenGate 12c:Troubleshooting andTuning Ed 1TOD 4 Days 1026 Oracle GoldenGate 11g:Advanced Configuration for Oracle Ed 1TOD 4 Days 1027 Oracle GoldenGateVeridata 12c: Essentials Ed 1 1 Days 1028 Oracle GoldenGate 12c:Advanced Configuration for Oracle Ed 1TOD 4 Days 1029 Oracle GoldenGateVeridata 12c: Essentials Ed 1TOD 1 Days 1030 Oracle Database 12c: Install and Upgrade Workshop Ed 1 2 Days 1031 Oracle Database 12c:Admin, Install and Upgrade Accelerated Ed 1 5 Days 1032 Oracle Database 12c: Managing Multitenant Architecture Ed 1 2 Days 1033 Oracle Database 12c: Fundamentals for Devs and SysAdmins Ed 1 2 Days 1034 Oracle Database 12c: Data Guard Administration Ed 1 4 Days 1035 Oracle Database 12c: Performance Management andTuning Ed 1 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 151.
    Business&Process Framework SoftSkills No Description Duration 1036Oracle Database 12c: Global Data Services Ed 1 1 Days 1037 Oracle Database 12c: SQLTuning for Developers Ed 1 3 Days 1038 Oracle Database 12c:Analytic SQL for Data Warehousing Ed 1 2 Days 1039 Oracle Database 12c:Advanced PL/SQL Ed 1 3 Days 1040 Oracle Database 12c: Install and Upgrade Workshop Ed 1TOD 2 Days 1041 Oracle Database 12c: Backup and Recovery Workshop Ed 1TOD 5 Days 1042 Oracle Database 12c: Fundamentals for Devs and SysAdmins Ed 1TOD 2 Days 1043 Oracle Database 12c: Performance Management andTuning Ed 1TOD 5 Days 1044 Oracle Database 12c: Data Guard Administration Ed 1TOD 4 Days 1045 Oracle Database 12c: Managing Multitenant Architecture Ed 1TOD 2 Days 1046 S Oracle Database 12c: Global Data Services Ed 1TOD 1 Days 1047 Oracle Database 12c: High Availability New Features Ed 1.1TOD 3 Days 1048 Oracle Database 12c: Security Ed 1 5 Days 1049 Certification Exam Prep Seminar: Upgrade to Oracle Database 12cTOD 1 Days 1050 Certification Exam Prep Seminar: Oracle Database 12c: Install and AdminTOD 1 Days 1051 Oracle Database 12c: High Availability New Features Ed 1.1 3 Days 1052 Oracle Database 12c: New Features for Administrators Ed 2 5 Days 1053 Oracle Database 12c: Security Ed 1TOD 5 Days 1054 Oracle Database 12c: Implement Partitioning Ed 1 2 Days 1055 Oracle Database 12c: SQL Workshop I Ed 1.1 3 Days 1056 Oracle Database 12c: SQL Workshop II Ed 1.1 2 Days 1057 Oracle Database 12c: Develop PL/SQL Program Units Ed 1.1 3 Days 1058 Oracle Database 12c: Introduction to SQL/PLSQL Accelerated Ed 1.1 5 Days 1059 Oracle Database 12c: Introduction to SQL Ed 1.1 5 Days 1060 Oracle Database 12c: PL/SQL Fundamentals Ed 1.1 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 152.
    Business&Process Framework SoftSkills No Description Duration 1061Oracle Database 12c: Program with PL/SQL Ed 1.1 5 Days 1062 Oracle Database 12c: SQL and PL/SQL Fundamentals Ed 1.1 5 Days 1063 Oracle Database 12c: Introduction to SQL Ed 1.1TOD 5 Days 1064 Oracle Database 12c:Advanced PL/SQL Ed 1TOD 3 Days 1065 Using Oracle DatabaseVault with Oracle Database 12c Ed 1TOD 2 Days 1066 Oracle Database 12c: RAC and Grid Infra Deployment Workshop Ed 1 4 Days 1067 S Parallel Processing in Oracle Database 12c Ed 1 1 Days 1068 Oracle Database 12c: Program with PL/SQL Ed 1.1TOD 5 Days 1069 Oracle Database 12c: Clusterware & ASM Admin Accelerated Ed 1 5 Days 1070 Oracle Database 12c: Clusterware & RAC Admin Accelerated Ed 1 5 Days 1071 E Oracle Database 12c Administration (Spain Only) Ed 1 PRV 19 Days 1072 Oracle Database 12c:ASM Administration Ed 1.1 2 Days 1073 Oracle Database 12c: RAC Administration Ed 1.1 4 Days 1074 Oracle Database 12c: Clusterware Administration Ed 1.1 4 Days 1075 Oracle Database 12c:Administration Workshop Ed 2 5 Days 1076 Oracle Database 12c: New Features for Administrators Ed 2TOD 5 Days 1077 Oracle Database 12c: Clusterware Administration Ed 1.1TOD 4 Days 1078 Oracle Database 12c:ASM Administration Ed 1.1TOD 2 Days 1079 Oracle Database 12c: RAC Administration Ed 1.1TOD 4 Days 1080 Oracle Database 12c: SQL and PL/SQL New Features Ed 1TOD 2 Days 1081 Oracle Database 12c: Backup and Recovery Workshop Ed 2 5 Days 1082 Oracle Database 12c: SQLTuning for Developers Ed 1TOD 3 Days 1083 Oracle Database 12c: SQL and PL/SQL New Features Ed 1 2 Days 1084 Oracle Database 12c:Administration Workshop Ed 2TOD 5 Days 1085 Oracle Database 12c:Analytic SQL for Data Warehousing Ed 1TOD 2 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 153.
    Business&Process Framework SoftSkills No Description Duration 1086Oracle Database 12c: Oracle Certified Master Upgrade (OCM) Ed 1.1 1 Days IDM 1087 Oracle Unified Directory 11g: Services Deployment Essentials Ed 1 2 Days 1088 Oracle Directory Services 11g:Administration Ed 2 5 Days 1089 Oracle Identity Manager 11g R2: Essentials Ed 2 5 Days 1090 Oracle Identity Manager 11g R2: Develop Identity Provisioning Ed 2 5 Days 1091 Oracle Identity Manager 11g: Develop Identity Provisioning Ed 1TOD 5 Days 1092 Oracle Identity Federation 11g R2:Administration Ed 1 4 Days 1093 Oracle Identity Manager 11g: Essentials Ed 1TOD 4 Days 1094 Oracle Access Manager 11g R2:Advanced Administration Workshop Ed 1 5 Days 1095 LDAP and Directory Services: Essentials Ed 1 2 Days 1096 OracleVirtual Directory 11g:Administration Ed 1 2 Days 1097 Oracle Identity Governance 11g R2: Essentials Ed 3TOD 5 Days 1098 Oracle Unified Directory 11g R2:Administration Ed 1 4 Days 1099 Oracle Identity Governance 11g R2: System Admin Workshop Ed 1 3 Days 1100 Oracle Identity Governance 11g R2: Essentials Ed 2 5 Days 1101 Oracle Identity Governance 11g R2: Develop Identity Provisioning Ed 2 5 Days 1102 Oracle Identity Federation 11g R2:Administration Ed 1TOD 4 Days 1103 Oracle Access Manager 11g R2:Administration Essentials Ed 2 5 Days 1104 Oracle Identity Governance 11g R2: Privileged Acc Mgmt Ed 2 4 Days 1105 S Getting Started with Oracle's Access Portal Ed 1 LVC 1 Days 1106 S Oracle Access Management Suite 11g R2 for Mobile and Social LVC 1 Days 1107 Oracle Identity Governance 11g R2: Essentials Ed 3 5 Days 1108 Oracle Identity Governance 11g R2: Develop Identity Provisioning Ed 3 5 Days 1109 Oracle Access Manager 11g R2:Administration Essentials Ed 3 5 Days 1110 Oracle Access Manager 11g R2:Advanced Administration Workshop Ed 2 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 154.
    Business&Process Framework SoftSkills No Description Duration 1111Oracle Identity Governance 11g R2: Privileged Acc Mgmt Ed 2TOD 4 Days 1112 Oracle Identity Governance 11g R2: Essentials Ed 2TOD 5 Days 1113 Oracle Identity Manager 11.1.2.3: New Features and Enhancements Ed 1 2 Days OS 1114 Oracle Linux System Administration Ed 2TOD 5 Days 1115 Oracle Linux 5 & 6 Advanced Administration Ed 1 5 Days 1116 Oracle Linux Advanced Administration Ed 1TOD 5 Days 1117 Oracle Linux 5 & 6 System Administration Ed 2 5 Days 1118 Oracle Linux 7: System Administration Ed 1 5 Days 1119 Oracle Linux 7:Advanced Administration Ed 1 5 Days 1120 OPN - Oracle Linux 6 Implementation Specialists Boot Camp Ed 1TOD 2 Days 1121 Oracle Solaris 10 Operating System Essentials Ed 2.1 4 Days 1122 S What's New in Oracle Solaris 11 Ed 1 1 Days 1123 S What's New in Oracle Solaris 11 Ed 1 LVC 1 Days 1124 Transition to Oracle Solaris 11 Ed 1TOD 5 Days 1125 Oracle Solaris 11 ZFS Administration Ed 1 4 Days 1126 Oracle Solaris 11 Security Administration Ed 1 5 Days 1127 Oracle Solaris Cluster 4.x Advanced Administration Ed 1 5 Days 1128 Oracle Solaris 11 Performance Management Ed 1 5 Days 1129 Oracle Solaris 11 Advanced System Administration Ed 4TOD 5 Days 1130 How to Build a Private Cloud Using Oracle Solaris 11 Ed 1 3 Days 1131 System Administration for the Oracle Solaris 10 OS Part 1 Ed 4 5 Days 1132 System Administration for the Oracle Solaris 10 OS Part 2 Ed 4 5 Days 1133 Oracle Solaris 11 Fault Analysis andTroubleshooting Ed 1 5 Days 1134 Oracle Solaris 11 ZFS Administration Ed 2TOD 3 Days 1135 PTR/INT SPARC M5-32 Installation and Maintenance Ed 1 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 155.
    Business&Process Framework SoftSkills No Description Duration 1136Oracle Solaris Cluster Administration Ed 4 5 Days 1137 Oracle Solaris Cluster Advanced Administration Ed 4 5 Days 1138 Oracle Solaris 11 Sys Admin for Experienced UNIX/Linux Admins Ed 1 5 Days 1139 Managing Oracle Database on Oracle Solaris 11 Ed 1 4 Days 1140 Oracle Solaris 11 DynamicTracing (DTrace) Ed 1 3 Days 1141 S Oracle SuperCluster Administration and Maintenance Seminar Ed 1 2 Days 1142 S Oracle SuperCluster Administration and Maintenance Seminar Ed 1 LVC 2 Days 1143 Oracle Solaris 11 System Administration Ed 4 5 Days 1144 Oracle Solaris 11 Advanced System Administration Ed 4 5 Days 1145 PTR/INT SPARC M6/M5-32 Server Installation for OPN Partners Ed 1 4 Days 1146 Oracle Solaris 11 System Administration Ed 3TOD 5 Days 1147 Transition to Oracle Solaris 11 Ed 3 5 Days 1148 Oracle Solaris 11 Network Administration Ed 2 5 Days 1149 Oracle Solaris 11 ZFS Administration Ed 2 3 Days 1150 Oracle Hierarchical Storage Manager and QFS 6.0 Admin Ed 1 4 Days 1151 Oracle Solaris 11 Security Administration Ed 2 5 Days 1152 Oracle Solaris 11 System Administration Ed 5 5 Days 1153 Transition to Oracle Solaris 11 Ed 4 5 Days 1154 Oracle Solaris 11 Zones Administration Ed 3 4 Days 1155 Oracle Solaris Cluster 4.x Administration Ed 4 5 Days 1156 Oracle Solaris 11 Zones Administration Ed 3TOD 4 Days 1157 S Oracle Solaris 11 Fault Analysis andTroubleshooting Ed 1TOD 5 Days 1158 S Oracle SuperCluster for System Administrators Ed 1TOD 1 Days 1159 S Oracle SuperCluster for System Administrators Ed 1 1 Days 1160 S Oracle SuperCluster for System Administrators Ed 1 LVC 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 156.
    Business&Process Framework SoftSkills No Description Duration JAVA& MIDDLEWARE 1161 Sun Systems Fault Analysis Workshop Ed 1 5 Days 1162 SolarisVolume Manager Administration Ed 1 3 Days 1163 MySQL High Availability Ed 1 3 Days 1164 MySQL Advanced Stored Procedures Ed 1 2 Days 1165 MySQL and PHP - Developing Dynamic Web Applications Ed 1 4 Days 1166 SL500 Operations Overview Ed 1 1 Days 1167 MySQL DeveloperTechniques Ed 1 3 Days 1168 PTR/INT SL500 Field Service and FrontlineTraining Ed 1 2 Days 1169 S Oracle Exadata Storage ServerV2 Overview Seminar Ed 1 1 Days 1170 S Oracle Exadata Storage ServerV2 Overview Seminar Ed 1 LVC 1 Days 1171 Solaris System Administration for Experienced UNIX Administrators Ed 2 5 Days 1172 Object-Oriented Analysis and Design Using UML Ed 2 5 Days 1173 Java SE 7: Develop Rich Client Applications Ed 1 5 Days 1174 Oracle Solaris Containers Administration Ed 2 3 Days 1175 Oracle Directory Server EE 11gR1: Maintenance and Operations Ed 1 4 Days 1176 Oracle Solaris 10 ZFS Administration Ed 3 3 Days 1177 Oracle Solaris 10 Performance Management Ed 3 5 Days 1178 Network Administration for the Oracle Solaris 10 Operating System Ed 2 5 Days 1179 S Exadata and Database Machine Administration Seminar Ed 1 2 Days 1180 S Exadata and Database Machine Administration Seminar Ed 1 LVC 2 Days 1181 Java PerformanceTuning and Optimization Ed 1 3 Days 1182 Oracle GlassFish Server 3.1:Administration and Deployment Ed 1 4 Days 1183 Developing Applications for the Java EE 6 Platform Ed 2 5 Days 1184 Oracle Solaris DTrace for System Administrators Ed 1 3 Days 1185 S Introduction to MySQL 5.5 Ed 1 LVC 1 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 157.
    Business&Process Framework SoftSkills No Description Duration 1186PTR/INT Sun ZFS Storage 7000 Appliance Install and Admin Ed 1 4 Days 1187 S Introduction to MySQL 5.5 Ed 1 1 Days 1188 Java Design Patterns Ed 1 4 Days 1189 PTR/INT SPARC M-series Support ReadinessTraining Ed 1 5 Days 1190 SPARC M-series Administration Ed 1.1 4 Days 1191 PTR/INT Oracle Exadata Database Machine X2-2, X2-8: Install and Maint. Ed 1 5 Days 1192 Java ME: Develop Applications for Mobile Phones Ed 1 5 Days 1193 Java ME: Develop Applications for Mobile Phones Ed 1 LVC 5 Days 1194 PTR/INT StorageTek SL3000 Modular Library System Install and Maint Ed 1 3 Days 1195 PTR/INT StorageTek SL8500 Modular Library System Install and Maint Ed 1 5 Days 1196 Developing Applications with Java EE 6 on WebLogic Server 12c Ed 3 LVC 5 Days 1197 Developing Applications with Java EE 6 on WebLogic Server 12c Ed 3 5 Days 1198 Java SE 7 New Features Ed 1TOD 2 Days 1199 Certification Exam Preparation Seminar: Java SE 6 ProgrammerTOD 1 Days 1200 MySQL for Developers with DeveloperTechniques Accelerated Ed 1 5 Days 1201 MySQL for Developers with DeveloperTechniques Accelerated Ed 1 LVC 5 Days 1202 MySQL DeveloperTechniques with Advanced Stored Procedures Ed 1 5 Days 1203 MySQL DeveloperTechniques with Advanced Stored Procedures Ed 1 LVC 5 Days 1204 UNIX and Linux Essentials Ed 1 3 Days 1205 UNIX and Linux Essentials Ed 1 LVC 3 Days 1206 Java EE 7: New Features Ed 1 2 Days 1207 Java EE 7: New Features Ed 1 LVC 2 Days 1208 SL8500 OperatorTraining Ed 1 1 Days 1209 Java EE 6: Develop Web Applications with JSF Ed 1 4 Days 1210 Java EE 6: Develop Web Applications with JSF Ed 1 LVC 4 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 158.
    Business&Process Framework SoftSkills No Description Duration 1211Java EE 6: Develop Business Components with JMS & EJBs Ed 1 4 Days 1212 Java EE 6: Develop Business Components with JMS & EJBs Ed 1 LVC 4 Days 1213 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1 5 Days 1214 Java EE 6: Develop Database Applications with JPA Ed 1 4 Days 1215 Java EE 6: Develop Web Components with Servlets & JSPs Ed 1 5 Days 1216 Java EE 6: Develop Web Components with Servlets & JSPs Ed 1 LVC 5 Days 1217 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1 LVC 5 Days 1218 Java EE 6: Develop Database Applications with JPA Ed 1 LVC 4 Days 1219 PTR/INT Sun ZFS Storage Appliance Hands On Lab Ed 1 1 Days 1220 PTR/INT Oracle Exalogic Elastic Cloud Installation & Maint Ed 1 5 Days 1221 OPN SparcT4-Based Servers Installation Boot Camp Ed 1 LVC 1 Days 1222 PTR/INT Sun ZFS Storage 7000 Appliance Install,Admin & Hands On Lab Ed 1 5 Days 1223 OracleVM Server for SPARC: Installation and Configuration Ed 1 2 Days 1224 OracleVM Server for SPARC: Installation and Configuration Ed 1 LVC 2 Days 1225 Certification Exam Prep Seminar: Java SE 7 Programmer ITOD 1 Days 1226 Certification Exam Prep Seminar: Java SE 7 Programmer IITOD 1 Days 1227 Certification Exam Prep Seminar: Java EE 5/6 Web Component DeveloperTOD 1 Days 1228 Architect Enterprise Applications with Java EETOD 5 Days 1229 SL3000 Operators Course for Customers Ed 1.1 1 Days 1230 PTR/INTTape and Modular Library Field Service Bootcamp Ed 1 4 Days 1231 Java SE 8 New Features Ed 1 2 Days 1232 Java SE 8 New Features Ed 1 LVC 2 Days 1233 MySQL for Beginners Ed 3 4 Days 1234 MySQL for Beginners Ed 3 LVC 4 Days 1235 MySQL for Database Administrators Ed 3TOD 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 159.
    Business&Process Framework SoftSkills No Description Duration 1236MySQL Cluster Ed 2 4 Days 1237 MySQL Cluster Ed 2 LVC 4 Days 1238 OPN SPARC Enterprise M-Series Servers Installation Bootcamp Ed 1 1 Days 1239 OPN SPARC Enterprise M-Series Servers Installation Bootcamp Ed 1 LVC 1 Days 1240 OPN SPARCT-Series Servers Installation (IDO) Boot Camp Ed 1 LVC 1 Days 1241 OPN SPARCT-Series Servers Installation (IDO) Boot Camp Ed 1 1 Days 1242 Java PerformanceTuning with Mission Control & Flight Recorder Ed 1 3 Days 1243 Java PerformanceTuning with Mission Control & Flight Recorder Ed 1 LVC 3 Days 1244 Java ME Embedded: Develop Applications for Embedded Devices Ed 1 LVC 2 Days 1245 Java ME Embedded: Develop Applications for Embedded Devices Ed 1 2 Days 1246 MySQL for Developers Ed 3 5 Days 1247 MySQL for Developers Ed 3 LVC 5 Days 1248 Java EE 6: Develop Business Components with JMS & EJBs Ed 1TOD 4 Days 1249 Java EE 6: Develop Web Services with JAX-WS & JAX-RS Ed 1TOD 5 Days 1250 Java EE 6: Develop Web Applications with JSF Ed 1TOD 4 Days 1251 Java SE 8 Fundamentals Ed 1 5 Days 1252 Java SE 8 Fundamentals Ed 1 LVC 5 Days 1253 PTR/INT SPARC M5/M6-32 Installation and Maintenance Ed 1 5 Days 1254 (WDPIN) S -Java SE 7 Programming Ed 2 5 Days 1255 (WDPIN) S - Fundamentals of the Java Programming Language, Java SE 6 Ed 1 5 Days 1256 (WDPIN) S - Java Programming Language, Java SE 6 Ed 1 5 Days 1257 Oracle Enterprise Manager Ops Center 12c R2Virtualizing Systems Ed 2 4 Days 1258 Oracle Enterprise Manager Ops Center 12c R2Virtualizing Systems Ed 2 LVC 4 Days 1259 Java SE 7 Programming Ed 2TOD 5 Days 1260 Java SE 7 Fundamentals Ed 2TOD 5 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 160.
    Business&Process Framework SoftSkills No Description Duration 1261MySQL PerformanceTuning Ed 2TOD 4 Days 1262 MySQL for Beginners Ed 3TOD 4 Days 1263 MySQL for Database Administrators Ed 3.1 5 Days 1264 MySQL for Database Administrators Ed 3.1 LVC 5 Days 1265 Java SE 8 Programming Ed 1 5 Days 1266 JavaScript and HTML5: Develop Web Applications Ed 1 LVC 4 Days 1267 Java SE 8 Programming Ed 1 LVC 5 Days 1268 JavaScript and HTML5: Develop Web Applications Ed 1 4 Days 1269 Object-Oriented Analysis and Design Using UML Ed 2TOD 5 Days 1270 Java EE 7: Back-end Server Application Development Ed 1 5 Days 1271 Java EE 7: Front-end Web Application Development Ed 1 5 Days 1272 Java EE 7: Front-end Web Application Development Ed 1 LVC 5 Days 1273 Java EE 7: Back-end Server Application Development Ed 1 LVC 5 Days 1274 Shell Programming Ed 1 5 Days 1275 Shell Programming Ed 1 LVC 5 Days 1276 S OPN StorageTekTape Libraries Implementation Specialist Boot Camp Ed 1 1 Days 1277 S OPN StorageTekTape Libraries Implementation Specialist Boot Camp Ed 1 LVC 1 Days 1278 S OPN SPARCT5 andT4-Based Servers Installation Boot Camp Ed 1 1 Days 1279 S OPN SPARCT5 andT4-Based Servers Installation Boot Camp Ed 1 LVC 1 Days 1280 MySQL PerformanceTuning Ed 3 4 Days 1281 MySQL PerformanceTuning Ed 3 LVC 4 Days 1282 Oracle Enterprise Manager Ops Center 12c Administration Ed 2 LVC 5 Days 1283 Oracle Enterprise Manager Ops Center 12c Administration Ed 2 5 Days 1284 SPARC M6-32/M5-32 Server Administration Ed 1 4 Days 1285 S StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 161.
    Business&Process Framework SoftSkills No Description Duration 1286S StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 LVC 3 Days 1287 UNIX and Linux Essentials Ed 1TOD 3 Days 1288 MySQL for Developers Ed 3TOD 5 Days 1289 Java SE 8 Fundamentals Ed 1TOD 5 Days 1290 Java SE 8 New Features Ed 1TOD 2 Days 1291 SPARC M6-32/M5-32 Server Administration Ed 1 LVC 4 Days 1292 Oracle ZFS Storage Appliance Administration Ed 1 LVC 4 Days 1293 Oracle ZFS Storage Appliance Administration Ed 1 4 Days 1294 S PTR/INT SPARC Supercluster Install,Admin. &Troubleshooting Ed 1TOD 2 Days 1295 Oracle Solaris Cluster 4.x Administration Ed 3 5 Days 1296 Oracle Solaris Cluster 4.x Administration Ed 3 LVC 5 Days 1297 Java SE 8 Programming Ed 1TOD 5 Days 1298 E Developing Web Application with PHP and MySQL (Spain Only) Ed 1 PRV 8 Days 1299 E MySQL Database Administration (Spain Only) Ed 1 PRV 9 Days 1300 Java SE 7 Fundamentals Ed 2 5 Days 1301 Java SE 7 Fundamentals Ed 2 LVC 5 Days 1302 Perl Programming Ed 3 5 Days 1303 Perl Programming Ed 3 LVC 5 Days 1304 Java SE 7 Programming Ed 2.1 5 Days 1305 Java SE 7 Programming Ed 2.1 LVC 5 Days 1306 S Oracle Exadata Database Machine: One-Day Overview Ed 1 1 Days 1307 S Oracle Exadata Database Machine: One-Day Overview Ed 1 LVC 1 Days 1308 Oracle Solaris Cluster 4.x Advanced Administration Ed 2 5 Days 1309 Oracle Solaris Cluster 4.x Advanced Administration Ed 2 LVC 5 Days 1310 OpenStack Administration Using Oracle Solaris 11 Ed 1 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 162.
    Business&Process Framework SoftSkills No Description Duration 1311OPN ZFS Appliance Implementation Boot Camp Ed 1TOD 2 Days 1312 OpenStack Administration Using Oracle Solaris 11 Ed 1 LVC 3 Days 1313 Oracle Hierarchical Storage Manager and QFS 6.0 Admin Ed 1 LVC 4 Days 1314 Exadata Database Machine Administration Workshop Ed 3.1 LVC 5 Days 1315 Exadata Database Machine Administration Workshop Ed 3.1 5 Days 1316 PTR/INT Oracle Solaris 11 Internals Ed 1 5 Days 1317 PTR/INT Oracle Solaris 11 Internals Ed 1 LVC 5 Days 1318 S Oracle Enterprise Manager Ops Center 12c Administration Ed 2TOD 5 Days 1319 OPN Oracle Solaris 11 Implementation Specialist Boot Camp Ed 1TOD 2 Days 1320 Architect Enterprise Applications with Java EE Ed 2 5 Days 1321 Architect Enterprise Applications with Java EE Ed 2 LVC 5 Days 1322 Oracle Enterprise Manager Ops Center 12c Administration Ed 3 5 Days 1323 Oracle Enterprise Manager Ops Center 12c Administration Ed 3 LVC 5 Days 1324 E HSBC - Oracle EM Ops Center 12c Administration andVirtualization Ed 1TOD 5 Days 1325 Exadata Database Machine Administration Workshop Ed 3.1TOD 5 Days 1326 Perl Programming Ed 3TOD 5 Days 1327 Shell Programming Ed 1TOD 5 Days 1328 Java EE 7: Front-end Web Application Development Ed 1TOD 5 Days 1329 Managing Storage Area Networks Ed 1 5 Days 1330 ACSLS Systems Administration Ed 2 3 Days 1331 Architect Enterprise Applications with Java EE Ed 1 5 Days 1332 Architect Enterprise Applications with Java EE Ed 1 LVC 5 Days 1333 Configuring Security on the Oracle Solaris 10 Operating System Ed 2 5 Days 1334 StorageTek Enterprise Library (ELS) - SMC and HSC Ed 1 4 Days 1335 Oracle Identity Analytics 11gR1:Administration Ed 3 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation
  • 163.
    Business&Process Framework SoftSkills No Description Duration 1336StorageTek Enterprise Library Software (ELS) -VTCS Ed 2 4 Days Virtulisation 1337 S OracleVM Essentials Overview Ed 1 LVC 1 Days 1338 S OracleVM with OracleVM Server for x86 Seminar Ed 1 LVC 1 Days 1339 S OracleVM with OracleVM Server for x86 Seminar Ed 1 1 Days 1340 S OPN OracleVM 2 Overview & Implementation Boot Camp Ed 1 1 Days 1341 S OPN OracleVM 2 Overview & Implementation Boot Camp Ed 1 LVC 1 Days 1342 OracleVM Server for x86: Implementation Ed 1 3 Days 1343 OracleVM Server for x86:Administration Ed 1 3 Days 1344 OracleVM Server for x86:Administration Ed 1TOD 3 Days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Cloud Database IDM OS Java & MiddlewareApplication Virtualisation Previous
  • 164.
    Business&Process Framework SoftSkills No Code DescriptionDuration CLOUD 1 CL210 Red Hat OpenStack Administration 4 days 2 CL216 Red Hat CloudForms Hybrid Cloud Administration 2 days 3 CL218 Red Hat CloudForms Hybrid Cloud Operations 2 days 4 CL220 Red Hat CloudForms Hybrid Cloud Management 4 days 5 CL275 OpenShift Enterprise Application Development 2 days 6 CL280 OpenShift Enterprise Administration 3 days 7 CL306 Neutron Networking with Red Hat Enterprise Linux OpenStack Platform 2 days 8 CL314 Apache Qpid Messaging with Red Hat Enterprise Linux OpenStack Platform 2 days 9 CL315 RabbitMQ Messaging with Red Hat 2 days 10 CL332 High Availability with Red Hat Enterprise Linux OpenStack Platform 2 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Red Hat training courses fromVinsys have been considered to be the best certifications in acquiring skills for the open source Linux operating system. Knowledge of operating and managing a Linux system, helps professionals gain an edge over others. In addition to preparing for certification dedicated centre of excellence atVinsys provides an insight to positive R&D and deployment. Technology
  • 165.
    Business&Process Framework SoftSkills No Code DescriptionDuration MIDDLEWARE 11 JB248 Red Hat JBoss Application Administration I 4 days 12 JB348 Red Hat JBoss Application Administration II 4 days 13 JB225 Red Hat JBoss Enterprise Application Development I 4 days 14 JB325 Red Hat JBoss Enterprise Application Development II 4 days 15 JB297 Red Hat JBoss Development: Persistence with Hibernate 4 days 16 JB232 Monitoring with Red Hat JBoss Operations Network 1 day 17 JB234 Systems Management with Red Hat JBoss Operations Network 3 days 18 JB417 SwitchYard Development with Red Hat JBoss Fuse Service Works 2 days 19 JB421 Camel Development with Red Hat JBoss Fuse 3 days 20 JB435 Enterprise Service Bus Deployment with Red Hat JBoss Fuse 2 days 21 Jb437 Red Hat JBoss A-MQ Development and Deployment 2 days 22 JB439 Red Hat JBoss Fuse with Red Hat JBoss A-MQ and Camel 5 days 23 JB450 Red Hat JBoss DataVirtualization Development 3 days 24 JB431 Jboss SOA: ESB Service Implementation 2 days 25 JB461 Authoring Rules with Red Hat JBoss BRMS 2 days 26 JB463 Developing Rules Applications with Red Hat JBoss BRMS 2 days 27 JB465 Implementing with Red Hat JBoss BRMS 4 days 28 JB427 Developing Workflow Applications with Red Hat JBoss BPM Suite 2 days PLATFORM 29 RH124 Red Hat System Administration I 5 days 30 RH134 Red Hat System Administration II 4 days 31 RH199 RHCSA RapidTrack Course 4 days 32 RH236 Red Hat Enterprise PerformanceTuning 2 days 33 RH242 Red Hat LinuxTroubleshooting 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 166.
    Business&Process Framework SoftSkills No Code DescriptionDuration 34 RH254 Red Hat System Administration III 4 days 35 RH270 Managing Containers with Red Hat Enterprise Linux Atomic Host 3 days 36 RH299 RHCE Certification lab 4 days 37 RH318 Red Hat EnterpriseVirtualization 4 days 38 RH401 Red Hat Enterprise Deployment and Systems Management 4 days 39 RH403 Red Hat Satellite 6 Administration 4 days 40 RH413 Red Hat Server Hardening 4 days 41 RH436 Red Hat Enterprise Clustering and Storage Management 4 days 42 RH442 Red Hat Enterprise PerformanceTuning 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 167.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 NPO101 Get Started with Salesforce and the Nonprofit Starter Pack 2 days 2 ADM201 Administration Essentials for New Admins 5 days 3 ADM201C Administration Essentials for New Admins plus Certification 5 days 4 ADM202 Administration Essentials for New Admins (Professional Edition) 2 days 5 ADM211 Administration Essentials for Experienced Admins 4 days 6 CRT101 Preparing forYour Salesforce Administrator Certification 1 day 7 ADM214 Customizing Salesforce1 with Clicks 1 day 8 ADM231 Introduction to Object-Oriented Programming with Force.com Code 5 days 9 ADM251 Sales Cloud Administration: Products, Quotes, Orders and Collaborative Forecasts 1 day 10 ADM261 Service Cloud Administration 2 days If you want to maximize your Salesforce investment, there’s no better way than giving your people the skills to use Salesforce to its fullest extent.That’s why we atVinsys offer a wide range of training options, from in-person classes featuring hands-on instruction, to virtual training, self-led courses, private workshops, and more. Learn Salesforce @ Vinsys CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 168.
    Business&Process Framework SoftSkills No Code DescriptionDuration 11 ADM271 Get Started with Communities .5 days 12 STR301 Implementing a Reporting Strategy for the Sales Cloud 3 days 13 DEV401 Building Applications with Force.com 5 days 14 DEV450 Programmatic Development using Apex andVisualforce 5 days 15 DEV502 Integrating with Force.com 4 days 16 DEV601 Programming Lightning Components 5 days 17 STR101 What’s Possible: Salesforce Fundamentals 3 days 18 STR301 Implementing a Reporting Strategy for the Sales Cloud 3 days 19 CRT251 Preparing forYour Salesforce.com Sales Cloud Consultant Certification 1 day 20 CRT261 Preparing forYour Salesforce Service Cloud Consultant Certification 1 day 21 RPT101 Reporting Fundamentals 1 day 22 SLS101 Sales CloudTraining for Sales Reps 1 day 23 SLX101 Sales CloudTraining for Sales Reps Using Lightning 1 day 24 SLS201 Sales CloudTraining for Sales Managers 1 day 25 SVC101 Service Cloud Essentials for Agents 2 days 26 SVC201 Service Cloud Essentials for Managers 2 days 27 SVC301 Service Cloud Essentials for Executives .5 days 28 ANC101 Mobile and Desktop Exploration in Wave Analytics 1 day 29 ANC201 Building Lenses, Dashboards and Apps in Wave Analytics 1 day 30 MCC102 Execute and Automate Marketing Cloud Email in the Sales and Service Clouds 1 day 31 EEB101 Email Essentials 3 days 32 JB101 Journey Builder 101 1 day 33 MBC101 Mobile Messages 101 1 day 34 PDI101 Predictive Intelligence 101 .5 days 35 SS101 Social Studio 101 1 day CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 169.
    Business&Process Framework SoftSkills No Code DescriptionDuration 1 AC010 Business Processes in Financial Accounting 5 days 2 AC020 Business Processes in Investment Management 3 days 3 AC040 Business Processes in Management Account 5 days 4 AC050 Financial & Mgnt Acct for Service Industries 5 days 5 AC100 SAP Simple Finance add-on for SAP Business Suite powered by SAP HANA 1.0 - Migration 2 days 6 AC200 Accounting Customizing Fundamentals - G/L,AP,AR 5 days 7 AC201 Accounting Customizing I 2 days 8 AC202 Accounting Customizing II 2 days 9 AC205 Individual Account Closing 4 days 10 AC207 Parallel Accounting Standards / New GL 3 days Empower your SAP end users, from developers to marketers – with our suite of SAP training courses and certification programs. Create a comprehensive training plan, choose from live, mobile, or online courses – and ultimately boost technology proficiency across your organization. Our software training covers SAP S/4HANA, SAP HANA, SAP Success Factors, SAP Business Objects, and more.  Explore SAP @ Vinsys CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 170.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 11 AC210 New General Ledger 5 days 12 AC212 Migration to the New General Ledger  5 days 13 AC235 SAP Convergent Charging 4.1 5 days 14 AC236 SAP Convergent Charging – Functional Foundations 2 days 15 AC240 Business Processes in Contract Accounting 5 days 16 AC245 SAP Convergent Invoicing 3 days 17 AC270 Travel Management 5 days 18 AC280 Reporting in Financial Accounting 3 days 19 AC305 Asset Accounting 5 days 20 AC350 Configuration for Investment Management 2 days 21 AC405 Cost Center & Internal Order Accounting 5 days 22 AC410 Cost Center Accounting 3 days 23 AC415 Internal Orders 2 days 24 AC505 Product Cost Planning 5 days 25 AC506 Basics of Product Cost Planning 3 days 26 AC507 Additional Functions of Product Cost Planning 2 days 27 AC520 Cost Object Controlling for Make-To-Stock Manufacturing and Sales-Order- Related Production 5 days 28 AC521 Cost Object Controlling for Make-to-Stock 4 days 29 AC522 Cost Object Controlling for Make-To-Order, Production Industries 1 day 30 AC523 Cost Object Controlling for Make-to-Orde 1 day 31 AC530 Actual Costing / Material Ledger 3 days 32 AC605 Profitability Analysis 5 days 33 AC612 Profit Center Accounting in New General Ledger Accounting 3 days 34 AC710 SAP Commodity Procurement and Sales 2 days 35 AC712 SAP Commodity Risk Management 2 days NextPrevious Technology
  • 171.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 36 AC805 Cash Management 3 days 37 ADM100 AS ABAP - Administration 5 days 38 ADM102 AS ABAP - Administration II 3 days 39 ADM103 AS ABAP - Advanced Administration 3 days 40 ADM106 SAP SYSTEM MONITORING USING CCMS I 2 days 41 ADM107 SAP SYSTEM MONITORING USING CCMS II 2 days 42 ADM110 SAP System Installation and Patching 4 days 43 ADM200 AS Java 7.0 – Administration 5 days 44 ADM225 SAP SOFTWARE LOGISTICS FOR JAVA 5 days 45 ADM315 Workload Analysis AS ABAP 3 days 46 ADM325 AS ABAP – Software Logistics 4 days 47 ADM326 SAP ECC Upgrade 5 days 48 ADM327 Enhancement Package Installation 2 days 49 ADM328 Upgrade and EHP installation 5 days 50 ADM340 AS ABAP – Software Logistics NW 5 days 51 ADM505 DATABASE ADMINISTRATION ORACLE I 3 days 52 ADM506 DATABASE ADMINISTRATION ORACLE II 2 days 53 ADM515 Database Administration SAP MaxDB 3 days 54 ADM520 DATABASE ADMINISTRATION MS SQL SERVER 3 days 55 ADM535 Database Administration DB2 3 days 56 ADM540 Sybase ASE administration 3 days 57 ADM542 Sybase ASE database : Performance andTuning for SAP systems 1 day 58 ADM545 Database Migration to Sybase ASE (for SAP systems) 3 days 59 ADM546 Database Migration to Sybase ASE (for SAP systems) 3 days 60 ADM800 AS Java - Administration 5 days NextPrevious Technology
  • 172.
    Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 61 ADM900 SAP Security - Fundamentals 2 days 62 ADM920 max. 14 part per course, NW Identity Man 5 days 63 ADM940 ABAP AS Authorization Concept 3 days 64 ADM950 Secure SAP System Management 2 days 65 ADM960 SAP NetWeaver AS - Security 5 days 66 AII100 SAP Auto-ID Infrastructure (SAP AII) and 3 days 67 BC100 Introduction to Programming (with ABAP) 2 days 68 BC400 ABAP Workbench Foundations 5 days 69 BC401 ABAP Objects 5 days 70 BC402 Advanced ABAP 5 days 71 BC403 Advanced ABAP debugging and analysis 3 days 72 BC404 ABAP in Eclipse 3 days 73 BC405 Programming ABAP Reports 5 days 74 BC407 Reporting: QuickViewer, InfoSet Query, and SAP Query 2 days 75 BC410 Developing Screen-Based User Dialogs 3 days 76 BC412 ABAP Dialog Programming Using EnjoySAP Controls 5 days 77 BC414 Programming Database Changes 2 days 78 BC420 DataTransfer 5 days 79 BC425 Enhancements and Modifications including enhancement framework 5 days 80 BC427 Enhancement Framework 2 days 81 BC430 ABAP Dictionary 3 days 82 BC450 ABAP Performance:Analysis and Optimizat 5 days 83 BC470 Form Printing with SAP Smart Forms 2 days 84 BC480 PDF-Based Print Forms 3 days 85 BC481 SAP Interactive Forms by Adobe 2 days NextPrevious Technology
  • 173.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 86 BIT100 SAPNW IntegrationTechnology - Overview 3 days 87 BIT400 SAP NetWeaver Process Integration 5 days 88 BIT420 PI - Proxy Dev&Ser Provision with ESR 5 days 89 BIT430 PI - Business Process Management 3 days 90 BIT460 PI Message Mapping 2 days 91 BIT480 Process Integration & Business IntegrationTechnologies 3 days 92 BIT600 SAP Business Workflow - Concepts, Inbox andTemplate Usage 3 days 93 BIT601 SAP Business Workflow - Build and Use 5 days 94 BIT665 Information Lifecycle Management 2 days 95 BIT800 SAP NetWeaver Process Orchestration 3 days 96 BIT900 SAP HANA Cloud Integration 3 days 97 BO100 Reporting with SAP BusinessObjects BI solutions for SAP NetWeaver BW 5 days 98 BOA340 SAP BusinessObjects Profitability and Cost Management: Fundamentals in Model Building 3 days 99 BOAN10 SAP BusinessObjects Analysis, edition for Microsoft Office 2 days 100 BOAN20 Planning with BusinessObjects Analysis 1 day 101 BOC310 SAP Crystal Reports: Fundamentals of Report Design 2 days 102 BOC320 SAP Crystal Reports: Business Reporting & Report Processing Strategies 3 days 103 BOCE10 Crystal Reports Enterprise: Fundamentals of Report Design 2 days 104 BOCE20 Crystal Reports Enterprise:Advanced Report Design 3 days 105 BOD310 SAP BusinessObjects Design Studio 1.4 3 days 106 BODS10 Data Services - Platform andTransforms 3 days 107 BODS30 Data Services - Data Quality Management 2 days 108 BOE310 SAP BusinessObjects Business Intelligence Platform:Administration & Security 2 days 109 BOE320 SAP BusinessObjects Business Intelligenc 3 days 110 BOE330 SAP BusinessObjects BI Platform DesigDev 5 days NextPrevious
  • 174.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 111 BOF202 SAP BOBJ Financial Consolidation: Using the Starter Kit for IFRS 1 day 112 BOF203 SAP BOBJ Financial Consolidation: Enhancing the Starter Kit for IFRS 2 days 113 BOF210 SAP BusinessObjects Financial Consolidation - XL Link / PivotTable 1 day 114 BOF250 SAP Business OBjects Planning and Consolidation - Consolidation 5 days 115 BOF360 BO Financial Consolidation - Rollup Config. 1 day 116 BOF370 SAP BusinessObjects Financial Consolidatoin:Advanced Category Scenario Configuration 1 day 117 BOF390 SAP BusinessObjects Financial Information Management 1 day 118 BOID10 SAP BusinessObjects Information DesignTool 5 days 119 BOID20 Information DesignTool II 2 days 120 BOII10 SAP InfiniteInsight 3 days 121 BOINTI Technical Integration with SAP BusinessObjects BI solutions for SAP NetWeaver BW 2 days 122 BOW310 SAP BusinessObjects Web Intelligence: Report Design I 2 days 123 BOW320 SAP BusinessObjects Web Intelligence: Report Design II 2 days 124 BOX310 SAP BusinessObjects Dashboards: Core and 3 days 125 BPC410 SAP Planning and Consolidation (10.0), version for the Microsoft Platform:Administration 3 days 126 BPC420 SAP Planning and Consolidation (10.0), version for SAPNetWeaver:Administration 5 days 127 BPC430 SAP Planning and Consolidation (10.0): Reporting and Planning 5 days 128 BPC440 SAP Planning and Consolidation (10.0): Consolidation 5 days 129 BW305 BW - Query Design and Analysis 5 days 130 BW306 BI - Ent. Reporting,Query&Analysis II 5 days 131 BW307 Web Application Designer 2 days 132 BW310 BW - Enterprise Data Warehousing 5 days 133 BW330 BI - Modeling & Implementation 5 days 134 BW350 BW - Data Acquisition 5 days 135 BW360 BW - Operations & Performance 5 days NextPrevious
  • 175.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 136 BW362 SAP BW on SAP HANA 5 days 137 BW365 BW - User Management & Authorizations 3 days 138 BW370 BW - Integrated Planning 5 days 139 BW380 BI - Analysis Processes & Data Mining 2 days 140 C4C10 SAP Cloud for Customer - Project Implementation 4 days 141 C4C30 SAP Cloud Applications Studio 4 days 142 C4C50 SAP Cloud for Customer – Integration with On-premise SAP Solutions 4 days 143 CA611 Web Dynpro ABAP (2 clients of 1system) 5 days 144 CA700 Reporting in Financials 4 days 145 CA705 Report Painter 2 days 146 CA710 Report Writer 3 days 147 CR100 CRM Base Customizing 5 days 148 CR300 CRM Sales 5 days 149 CR410 CRM Interaction Center WebClient 3 days 150 CR500 CRM Middleware 2 days 151 CR580 CRM User Interface 4 days 152 CR600 CRM Marketing 5 days 153 CR700 CRM Service 5 days 154 CRMFUN SAP All-in-One CRM Fundamentals 7 days 155 CRMTEC SAP All-in-One CRMTechnology 3 days 156 DADJ73 AS Java – Administration Delta 7.3 3 days 157 DBW73 BW - Delta BW 7.0 => BW 7.3 3 days 158 DBW74 Delta BW 7.0 to BW 7.4 (non-HANA) 3 days 159 DCO66 Enhancements in Management Accounting SAP ERP 6.0 EhP6 1 day 160 DERP Delta MM 4.7 to BS7 based on ERP 6.4 1 day NextPrevious
  • 176.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 161 DERP65 Enhanc. Overview in SAP ERP 6.0 (up to EHP5) 1 day 162 DERPMM Delta MM 4.7 to BS7 based on ERP 6.4 1 day 163 DEV134 Introduction to SAP PowerBuilder 12.5.1 5 days 164 DEV355 Data Modeling with PowerDesigner 16.5 4 days 165 DEV523 Customizing and Extending PowerDesigner 16.5 2 days 166 DEV524 PowerDesigner Adminstration 16.5 2 days 167 DEV621 Modeling for Enterprise Architecture using PowerDesigner 16.5 2 days 168 DFI65 Enhancements in Financial Accounting SAPERP6.0 EHP1.05 2 days 169 DFI66 Enhancements in Financial Accounting SAP ERP 6.0 EhP6 1 day 170 DFPS60 Basics of Defense & Security 3 days 171 DFPS66 Defense & Security Workshop Organizational Flexibility Part 1 4 days 172 DFPS67 Defense & Security Workshop Organizational Flexibility Part 2 5 days 173 DFPS68 Defense & Security Workshop :Technology 5 days 174 DHCM Enhancements HCM SAP ERP EhP1-6 2 days 175 DHCM65 Enhancements in HCM SAP ERP 6.0 EHP1-5 2 days 176 DLDM65 Enhancements in LDM SAP ERP 6.0 EHP1-5 2 days 177 DM100 SAP Disclosure Management 10.0 SP4 3 days 178 DMM65 Materials Manag SAP ERP 6.0 EHP1-5 1 day 179 DMM66 Enhancements in Materials Management SAP 1 day 180 DPI73 SAP NetWeaver Process Integration - Delta PI 7.3 1 day 181 DPI74 SAP NetWeaver Process Integration - Delta PI 7.4 1 day 182 DPM65 Enterp.Asset Manag SAP ERP 6.0 EHP1-5 2 days 183 DPP65 Enhancements in Production Planning SAP ERP 6.0 EHP1-5 1 day 184 DS10 Data Services - Platform andTransforms 3 days 185 DS30 Data Services - Data Quality Management 2 days NextPrevious
  • 177.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 186 DS50 SAP BusinessObjects Information Steward 4.0 2 days 187 DSCM7P Delta SAPSCM 7.0 Production Planning 2 days 188 DSCM7S Delta APO SNP & DP 2 days 189 DSD65 Ehm in Sales Order Mgt. ERP 6.0 EHP1-5 1 day 190 DSRM71 Delta SRM7.01 2 days 191 DSRM72 Delta SRM7.02 2 days 192 DWD702 Web Dynpro for ABAP - Delta 7.0 => 7.02 3 days 193 E2E040 Run SAP End-to-End Solution Operations Overview 3 days 194 E2E060 Customer Center of Expertise 3 days 195 E2E100 E2E Root Cause Analysis 5 days 196 E2E120 Technical Monitoring in SAP Solution Manager 7.1 5 days 197 E2E140 DataVolume Management 3 days 198 E2E200 Change Control Management 5 days 199 E2E220 SAPTest Management 3 days 200 E2E300 Business Process Operations 5 days 201 E2E400 Technical Upgrade Management 3 days 202 E2E500 Custom Code Management 3 days 203 EDB116 FastTrack to Adaptive Server Enterprise 5 days 204 EDB358 System and Database Administration:Adaptive Server Enterprise 15.7 5 days 205 EDB367 Powering Up with ASE 15.7 2 days 206 EDB377 FastTrack to Replication Server Administration 15.7 5 days 207 EDB553 Configuring Adaptive Server Enterprise 15.7 5 days 208 EDB634 Performance andTuning:Adaptive Server Enterprise 15.7 Query Optimization 5 days 209 EDB785 SAP IQ Administration 5 days 210 EDB795 SAP IQ Administration 4 days NextPrevious
  • 178.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 211 EP120 Java development for NetWeaver Portal 7.31 3 days 212 EP200 SAP NetWeaver Portal System Administration 5 days 213 EP300 Configuration of Knowledge Mngmt and Collaboration 5 days 214 EP350 Innovated Content Management and Collabo 5 days 215 EP360 Enterprise Workspaces 1 day 216 EWM100 Processes in SAP Extended Warehouse Mang 5 days 217 EWM110 Customizing (1) in SAP Extended Warehouse Mangement (SAP EWM) 5 days 218 EWM120 Customizing (2) in SAP Extended Warehous 5 days 219 EWM125 Labor Management in SAP Extended Warehouse Management (EWM) 1 day 220 FIN900 Auditing of Financial Business Processes in SAP 5 days 221 FS225 Collateral Management System Functional Overview 3 days 222 FS240 Shared Processes for Loans and Deposits Management in Banking Services from SAP 8.0 5 days 223 FS241 Loans Management in Banking Services from SAP 8.0 3 days 224 FS242 Deposits Management in Banking Services from SAP 8.0 4 days 225 FS244 SAP CRM Account Origination 3 days 226 FS245 SAP Payment Engine 4 days 227 FS250 Bank Analyzer Overview in Banking Services from SAP 8.0 1 day 228 FS251 Accounting for Fin.Instr.Bank.Serv SAP8. 5 days 229 FS252 Risk Mngmnt in Banki.Servi. from SAP8.0 3 days 230 FS253 Bank Analyzer Infrastructure in Banking Services from SAP 8.0 3 days 231 FS270 SAP Leasing Overview 2 days 232 FS271 SAP Leasing ERP Customizing 2 days 233 FS272 SAP Leasing CRM Customizing 3 days 234 FS290 SAP Financial Database Overview 1 day 235 FS291 SAP Accounting for Financial Instru Overview 1 day NextPrevious
  • 179.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 236 FS292 Processes with SAP Financial DB 2 days 237 FS293 Processes in SAP Accounting for Financial Instruments 2 days 238 FS295 SAP Accounting for Financial Instru Configuration 2 days 239 FS296 Integrated Financial & Mngmt Accounting Overview 1 day 240 FS297 SAP PA & IFMA Processes 2 days 241 FS299 SAP PA&IFMA:CostTypeDetails&Customizing 2 days 242 FS300 SAP for Insurance Overview 2 days 243 FS310 SAP Collections & Disbursements Overview 2 days 244 FS315 SAP Collections & Disbursements - Customizing 3 days 245 FS320 Incentive & Commission Management 3 days 246 FS320 Incentive & Commission Management 3 days 247 FS325 Incentive&Commission Manag. for Insurance 2 days 248 FS325 Incentive & Commission Management - Customizing 2 days 249 FS330 SAP Claims Management 2 days 250 FS335 SAP Claims Management - Customizing 3 days 251 FS340 SAP Policy Management 3 days 252 FS345 SAP Policy Management - Customizing 4 days 253 FSC010 Processes inTreasury & Risk Management 5 days 254 FSC020 Processes in SAP Credit Mngmt, SAP Biller Direct, SAP Dispute & SAP Collections Mngmt  3 days 255 FSC110 Customizing inTreasury & Risk Management 5 days 256 FSC120 SAP Inhouse Cash 3 days 257 FSC130 SAP Bank Communication Mgt. 2 days 258 FSC200 Customizing SAP Dispute & SAP Collections 2 days 259 GRC100 SAP BusinessObjects GRC - Compliance Principles and Harmonization 2 days 260 GRC300 SAP Access Control 10.0 5 days NextPrevious
  • 180.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 261 GRC330 SAP BusinessObjects Process Control 10.0 5 days 262 GRC340 SAP BusinessObjects Risk Management 3.0 3 days 263 GTS100 SAP GlobalTrade Services -Two clients 3 days 264 GTS200 Configuration of SAP GlobalTrade Services 8.0 1 day 265 GW100 Building OData Services Using SAP NetWea 3 days 266 HA100 SAP HANA - Introduction 2 days 267 HA150 SQL Basics for SAP HANA 2 days 268 HA200 SAP HANA – Installation and Operations 5 days 269 HA240 SAP HANA Security & Authorization 2 days 270 HA250 SAP HANA - Database Migration 2 days 271 HA300 SAP HANA - Implementation & Modeling 3 days 272 HA350 SAP HANA - Data Provisioning 2 days 273 HA400 ABAP Programming for SAP HANA 3 days 274 HA900 SAP HANA Live 2 days 275 HABS1 SAP Business Suite on SAP HANA 3 days 276 HR050 Business Processes in Human Capital Management 5 days 277 HR110 Business Processes in HCM Payroll 2 days 278 HR250 Employee Self-Service 5 days 279 HR260 Employee Self-Service 3 days 280 HR270 SAP Enterprise Learning 3 days 281 HR272 SAP Enterprise Learning - E-Learning Dev 2 days 282 HR280 SAP HCM Processes and Forms 4 days 283 HR290 System Configuration for ESS/MSS 3 days 284 HR305 Master Data Configuration 5 days 285 HR306 Configuration ofTime Recording 5 days NextPrevious
  • 181.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 286 HR310 Time Evaluation 5 days 287 HR316 SAP E-Recruiting 3 days 288 HR325 Benefits Administration 3 days 289 HR350 Programming in Human Capital Management 5 days 290 HR400 Payroll Configuration 5 days 291 HR505 Organizational Management 5 days 292 HR510 Personnel Development and Performance Management 5 days 293 HR515 Training and Event Management 3 days 294 HR540 Enterprise Compensation Management 3 days 295 HR580 Analytics and Reporting in HCM 3 days 296 HR600 SAP HR Renewal 1.0, FP1-4 3 days 297 HR940 Authorizations in HCM 3 days 298 HY600 hybris-SAP Solution Integration 3 days 299 IAU210 Automotive: Processes in the Supplier Industry 5 days 300 IAU240 SAP for Automotive: JIT-Processes 3 days 301 IAU260 SAP for Automotive:Ope. Pro Material Flow 3 days 302 IAU270 SAP for Automotive:Vehicle Management System 3 days 303 IAU280 SAP for Automotive:Warranty Management System 3 days 304 ICP310 Sales and Distribution and Allocation Run 5 days 305 ICP320 Materials Mgnt & Production Planning for AFS 5 days 306 ICP600 Trade Promotion Management with SAP CRM 5 days 307 IHE102 SAP Student Lifecycle Management 5 days 308 IHE203 SAP Student Lifecycle Management: Student Accounting 5 days 309 IMD320 Periodical Sales and Distribution 5 days 310 IMD420 SAP for Media - Advertising Management (Publishers) 5 days NextPrevious
  • 182.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 311 IMD700 SAP for Media - Intellectual Property Management 5 days 312 IOG100 Primary & Secondary distr. with SAP Oil 5 days 313 IOG340 Trading and Scheduling with SAP for Oil 3 days 314 IPS210 SAP Public Sector Procurement 5 days 315 IPS310 SAP Document Builder 3 days 316 IPS510 SAP Public Sector Collection and Disbursement 5 days 317 IPS520 Tax and Revenue Management 5 days 318 IPS710 SAP Grants Management - Grantor 3 days 319 IPS810 SAP Grants Management - Grantee 5 days 320 IPS910 Funds Management: Processes, Organization and Configuration 5 days 321 IRT310 Master Data in SAP for Retail 5 days 322 IRT320 Pricing and Promotion 5 days 323 IRT330 Planning, Purchasing, Merchandise Distribution 5 days 324 IRT360 Store Connection 3 days 325 ITSP70 IT Support with SAP Solution Manager 5 days 326 IUT110 Business Processes in SAP ERP for Utilities (Rev.A) 5 days 327 IUT210 Master Data and Basic Functions in SAP for Utilities (Rev.A) 3 days 328 IUT220 Device Management 3 days 329 IUT222 AMI in SAP for Utilities 3 days 330 IUT225 Energy Data Management 2 days 331 IUT230 ng and Invoicing 5 days 332 IUT235 Real-Time Pricing 2 days 333 IUT240 Contract Accounts Receivable and Payable 5 days 334 IUT250 Customer Service 3 days 335 IUT255 Integration of SAP CRM and SAP for Utilities 3 days NextPrevious
  • 183.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 336 IUT260 IC Webclient for Utilities 3 days 337 IUTBIL Settling Energy Quantities 3 days 338 IUTW10 SAP Waste and Recycling Overview 5 days 339 IUTW25 SAP Waste and Recycling: Integrated SD Processes 5 days 340 IUTW44 Master Data for Deregulation and Data Exchange 2 days 341 IUTW45 Payment Processing 2 days 342 IUTW55 Change of Supplier 2 days 343 JA100 SAP J2SE Fundamentals 5 days 344 JA300 SAP J2EE Fundamentals 5 days 345 JA310 Web Dynpro for Java Basics 5 days 346 JA320 SAP J2EE Persistence 5 days 347 JA340 SAP NetWeaver Development Infrastructure 3 days 348 JA400 Introduction to Java EE 5 - Part A 5 days 349 JA410 Java for SAP NetWeaver 7.1 3 days 350 JA450 Web Dynpro Java on SAP NetWeaver 7.1 5 days 351 LT100 Change Control Management 4 days 352 MDG100 Master Data Governance 4 days 353 MDM050 Master Data Management - Overview 3 days 354 MDM100 Master Data Management - Fundamentals 5 days 355 MDM400 Master Data Management - Data Modeling & Implementation 3 days 356 MOB01 SAP Mobile Platform Fundamentals and Best Practices 3 days 357 MOB10 SAP Mobile Platform 3.0 (SP03) Administration 2 days 358 MOB20 SAP Mobile Platform 3.0 Development (SP03) 3 days 359 MOB300 SAP Agentry Essentials 5 days 360 MOB310 SAP Agentry Work Manager for SAP Foundation 5 days NextPrevious
  • 184.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 361 MOB320 SAP Agentry Work Manager for IBM Maximo 5 days 362 MOB400 SAP Mobiliser 5.1 Development 5 days 363 MOB500 SAP Online Banking 8.3 Configuration and Customization 3 days 364 NET310 Fundamentals of Web Dynpro for ABAP 5 days 365 NET311 Advanced Web Dynpro for ABAP 4 days 366 NET312 UI Development with Web Dynpro for ABAP 4 days 367 NET313 Floorplan Manager for Web Dynpro for ABAP 5 days 368 NWBC10 NetWeaver Business Client 1 day 369 NWC110 Modeling Applications withVisual Composer 2 days 370 NWC120 Guided Procedures - Part A 3 days 371 PLM100 Business Processes in Life-cycle Data Management 5 days 372 PLM114 Basic Data for Manufacturing and Product Management 5 days 373 PLM115 Basic Data for Process Manufacturing 5 days 374 PLM120 Document Management 3 days 375 PLM130 Classification 3 days 376 PLM145 Variant Configuration I: Modeling and In 5 days 377 PLM146 Variant Config:Additional Funct. & Scenarios 4 days 378 PLM150 Change Management 3 days 379 PLM170 Integrated Product & Process Engineering (IPPE) 3 days 380 PLM200 Business Processes in SAP Project Management 5 days 381 PLM210 Master Data Configuration in SAP Project System 2 days 382 PLM220 Project Management - Logistics 5 days 383 PLM230 Project Management - Controlling 5 days 384 PLM300 Business Processes in Plant Maintenance 5 days 385 PLM301 Business Processes in Costumer Service 5 days NextPrevious
  • 185.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 386 PLM305 ManagingTechnical Objects 3 days 387 PLM310 Maintenance and Service Processing: Preventative 3 days 388 PLM315 Maintenance Processing: Operational Functions 3 days 389 PLM318 Analytics in Enterprise Asset Management 2 days 390 PLM322 Capacity Planning&Time Scheduling in PM Projects 3 days 391 PLM335 Service Processing 5 days 392 PLM360 Multi-Resource Scheduling (MRS 9.0) 3 days 393 PLM400 Business Processes in Quality Management 5 days 394 PLM412 Quality Planning and Inspection 5 days 395 PLM415 Quality Management in Logistics 3 days 396 PLM420 Quality Management in Production 3 days 397 PLM510 SAP Project Management 3 days 398 PLM512 c-Folders 2 days 399 PLM550 SAP Portfolio Management 5 days 400 RE010 Business Processes in SAP Real Estate Management 3 days 401 RE200 Flexible Real Estate Management 5 days 402 RE300 Land Use Management 2 days 403 SAP01 SAP Overview 3 days 404 SAPBI oduction to SAP BusinessObjects BI solutions 3 days 405 SAPCRM SAP CRM Solution Overview 3 days 406 SAPEP SAP NetWeaver Portal Fundamentals 3 days 407 SAPFIN SAP Financials 3 days 408 SAPHR SAP Human Capital Management Overview 2 days 409 SAPIRT Retail Process Overview 5 days 410 SAPNW SAP NetWeaver - Overview 3 days NextPrevious
  • 186.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 411 SAPSCM SAP Supply Chain Management Solution Overview 3 days 412 SAPSPM SAP Services Parts Management Overview 2 days 413 SAPSRM SAP SRM Overview 3 days 414 SAPTEC SAP NetWeaver Application Server – Fundamentals 3 days 415 SAPUX SAP Screen Personas 2.0 Development 2 days 416 SAPX03 SAP Fiori Implementation and Configuration 4 days 417 SAPX04 HTML5 Foundations for SAP SAPUI5 Development 2 days 418 SAPX05 SAP SAPUI5 User Experience Development 3 days 419 SAPX08 SAP SAPUI5 Advanced Development 2 days 420 SAPX09 SAP Screen Personas 3.0 Development 2 days 421 SAPX11 SAP Fiori Administration 3 days 422 SCM100 Business Processes in Planning (SAP ERP) 2 days 423 SCM130 SAP ERP Planning & Manufacturing Overview 5 days 424 SCM200 Advanced Planning Overview (SCM APO) 2 days 425 SCM210 Core Interface (CIF) 2 days 426 SCM220 Demand Planning (APO DP) 3 days 427 SCM221 Features and Functions of Demand Planning (SCM APO) 3 days 428 SCM226 Configuration of Demand Planning (SCM APO) 5 days 429 SCM230 Supply Network Planning (APO SNP) 5 days 430 SCM235 Planning with Capable-to-Match (APO CTM) 5 days 431 SCM240 Production Planning in ERP 5 days 432 SCM241 Production Planning in ERP for Functional Consultant 5 days 433 SCM250 Production Planning & Detailed Schedulin 5 days 434 SCM300 Business Processes in Manufacturing (SAP ERP) 3 days 435 SCM310 Production Orders in ERP 5 days NextPrevious
  • 187.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 436 SCM320 Repetive Manufacturing 3 days 437 SCM340 Process Manufacturing 5 days 438 SCM350 Computerized KANBAN (Material Replenishment) 3 days 439 SCM360 Capacity Planning (SAP ERP) 5 days 440 SCM365 Capacity Evaluation & Leveling in ECC 3 days 441 SCM372 Execution Steps (xSteps) 3 days 442 SCM380 SAP MII - Manufacturing Integration and Intelligence Fundamental 5 days 443 SCM500 Processes in Procurement 5 days 444 SCM510 Inventory Management and Physical Inventory 5 days 445 SCM515 InvoiceVerification 3 days 446 SCM520 Purchasing 5 days 447 SCM521 Conditions and Price Determination in Procurement 3 days 448 SCM525 Consumption-Based Planning and Forecasting 2 days 449 SCM540 Procurement of External Services 2 days 450 SCM550 Cross-Functional Customizing in MM 5 days 451 SCM595 Batch Management 3 days 452 SCM600 Business Processes in Sales Order Management 5 days 453 SCM601 Processes in Logistics Execution 3 days 454 SCM605 Sales Processing in SAP ERP 5 days 455 SCM610 Delivery Processing in SAP ERP 3 days 456 SCM611 Configuration inTransportation 3 days 457 SCM615 Billing in SAP ERP 2 days 458 SCM620 Pricing in Sales Order Management 3 days 459 SCM630 Warehouse Management 5 days 460 SCM631 AdditionalTopics in Warehouse Management 2 days NextPrevious
  • 188.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 461 SCM650 Cross-Functional Customizing in Sales an 3 days 462 SCM660 Handling Unit Management 2 days 463 SCM663 SAP Event Management (SAP EM) 3 days 464 SCM670 Global Availability Check (gATP) 5 days 465 SCM671 Global Availability Check (gATP) 3 days 466 SCM680 Cross Applications in Business Processes 3 days 467 SCM750 ME - Manufacturing Execution Processes and Fundamentals 5 days 468 SCM920 Production Order Customizing 3 days 469 SEM240 Financial Consolidation (SEM BCS) 5 days 470 SLT100 PDF-Based Print Forms 3 days 471 SLT100 Data Replication with SAP LT Replication Server 3 days 472 SM100 SAP Solution Manager Configuration for Operations 5 days 473 SM200 IT Service Management Configuration 5 days 474 SM300 Business Process and Interface Monitoring 5 days 475 SMI210 Solution Manager Implementation Methodology Overview 1 day 476 SMI310 Implementation projects with SAP Solution Manager 4 days 477 SMP140 SAP Mobile Platform for Mobile Application Architects 3 days 478 SMP521 SAP Mobile Platf. - Native and Hybrid AD 5 days 479 SMP530 SAP Mobile Platform - Native and Hybrid Application Development using OData 2 days 480 SMP620 SAP Mobile Platform - Native and Hybrid 5 days 481 SNC100 Supplier Collaboration with SAP SNC 7.01 3 days 482 SOP200 SAP S&OP - Sales & Operations Planning (on Demand) 5 days 483 SOP300 Sales and Operations Planning (S&OP) powered by HANA - Advanced Workshop 5 days 484 SPM100 Compound Processes and Customizing in SAP Service Parts Planning (SPP) 5 days 485 SPM110 SAP Service Parts Planning Customizing 5 days NextPrevious
  • 189.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 486 SRM210 SRM Server Configuration 5 days 487 SRM215 Supplier Self-Service (SUS) 1 day 488 SRM270 SRM MDM Catalog 4 days 489 SRM300 SAP Sourcing (7.0) 2 days 490 SRM310 SAP Sourcing Configration 3 days 491 SSM310 SBO Strategy Management 7.5 - Introduction 5 days 492 SSM320 SBO Strategy Management 7.5 - Advanced 5 days 493 SSM330 SBO Stra. Mngmnt 7.5 - Integr. with SAP NetWeaver BW 1 day 494 SUP140 Sybase Unwired Platform 2.1 for Application Architects 2 days 495 SUP521 Sybase Unwired Platform (SUP) - Mobile Application Development 5 days 496 SUP530 Sybase Unwired Platform (SUP) and OData Integration 2 days 497 SUP620 Sybase Unwired Platform 2.1 Administrati 4 days 498 SUS300 Product Safety and Stewardship overview 5 days 499 SUS310 SAP EHS Management - Essentials and Functions (EEF) 3 days 500 SUS315 SAP EHS Management - Essentials and Functions Professional (EEF Prof) 2 days 501 SUS320 SAP EHS Management - Industrial Hygiene and Safety (IHS) 2 days 502 SUS325 SAP EHS Management - Industrial Hygiene and Safety Professional (IHS Prof) 1 day 503 SUS330 SAP EHS Management - Occupational Health (OH) 2 days 504 SUS340 SAP EHS Management - Hazardous Substance Management (HSM) 2 days 505 SUS350 SAP EHS Management - WWI Layout (WWI) 2 days 506 SUS360 SAP EHS Management - Product Safety (PS) 2 days 507 SUS365 SAP EHS Management - Product Safety Professional (PS Prof) 1 day 508 SUS370 SAP EHS Management - Global Label Management (GLM) 1 day 509 SUS375 SAP EHS Management - Global Label Management Professional (GLM Prof) 1 day 510 SUS380 SAP EHS Management - Dangerous Goods Management (DG) 3 days NextPrevious
  • 190.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 511 SUS385 SAP EHS Management - Dangerous Goods Management Professional (DG Prof) 2 days 512 SUS420 SAP EHS Management - Waste Management (WA) 2 days 513 SUS425 SAP EHS Management - Waste Management Professional (WA Prof) 1 day 514 SUS450 SAP EHS Management - REACH Compliance Processes (RC Proc) 2 days 515 SUS455 SAP EHS Management - REACH Compliance Professional (RC Prof) 1 day 516 SUS460 SAP EHS Management - SubstanceVolumeTracking for REACH 1 day 517 SWPB01 SAP Workforce Performance Builder - Manager 1 day 518 SWPB02 SAP Workforce Performance Builder - Producer 3 days 519 TADM10 SAP NetWeaver AS Implementation and Operation I 10 days 520 TADM12 SAPNWAS- Implementation & OperationWEEK1 10 days 521 TADM51 SAP NETWEAVER AS DB OPERATION (ORACLE) 5 days 522 TADM56 SAP NetWeaver AS DB Operation (DB2 LUW) 5 days 523 TADM70 SAP System: Operating System and Database Migration 3 days 524 TADMD9 Delta Implementation & Operations NW AS 7.31 5 days 525 TAW10 ABAP Workbench Fundamentals 10 days 526 TAW12 ABAP Workbench Concepts 10 days 527 TBI10 BW - Query Design and Analysis 5 days 528 TBI20 BW – Web Application Designer & Data Warehousing Fundamentals 5 days 529 TBI30 Reporting with SAP BusinessObjects BI solutions for SAP NetWeaver BW 5 days 530 TBIT40 SAP NetWeaver Process Integration 5 days 531 TBIT44 PI - Mapping and BPM 5 days 532 TBIT51 PI -Technical Implementation II and Operations 5 days 533 TBW10 BW - Enterprise Data Warehousing 5 days 534 TBW20 BI - Enterprise Reporting & Query Design 5 days 535 TBW30 BI - Modeling & Implementation 5 days NextPrevious
  • 191.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 536 TBW42 BI:Advanced enterprise Data warehousing 10 days 537 TBW45 BI - Integrated Planning 5 days 538 TBW50 BW - Data Acquisition 5 days 539 TBW55 SAP Business Intelligence Solutions & Information DesignTool 5 days 540 TBW60 BW - Operations & Performance 5 days 541 TBW65 SAP BI Solutions and Authorisations 5 days 542 TCRM10 CRM – Fundamentals I 5 days 543 TCRM20 CRM – Fundamentals II 10 days 544 TDMS10 Implementing and Configuring SAPTDMS 3 days 545 TDMS20 Using SAPTDMS for BPL, HCM and Data Scrambling 2 days 546 TE2E10 SAP Solution Manager Operations 10 days 547 TEP10 NW Portal - Impl.And Op.Week1 10 days 548 TEP12 SAP NETWEAVER PORTAL DEVELOPMENT 5 days 549 TERP10 Integrated Business Processes in SAP ERP 10 days 550 TEWM10 SAP EWM 10 days 551 TEWM12 SAP Extended Warehouse Management II (SAP EWM) 5 days 552 TFIN20 Management Accounting (CO) I 10 days 553 TFIN22 Management Accounting II (incl. Case study) 10 days 554 TFIN50 Financial Accounting I 10 days 555 TFIN52 Financial Accounting II (incl Case study) 10 days 556 THR10 SAP Human Capital Management I 10 days 557 THR12 SAP Human Capital Management II 10 days 558 TM100 Processes in SAPTransportation Management 5 days 559 TM100 SAPTransportation Management (SAPTM) - Processes and Overview 3 days 560 TM110 Planning in SAPTransportation Management - processes and customizing 5 days NextPrevious
  • 192.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 561 TM111 Procurement II 2 days 562 TM115 SAPTransportation Management (SAPTM) 2 days 563 TM120 Execution in SAPTransportation Management - processes and customizing 5 days 564 TM200 SAPTransportation Management (SAPTM) 3 days 565 TM211 SAPTransportation Management (SAPTM) - Advanced Planning andVSR Optimizer (Shipper specific) 2 days 566 TM215 SAPTransportation Management (SAPTM) - LSP based planning and execution (LSP specific) 2 days 567 TM300 SAPTransportation Management (SAPTM) - Subcontracting 1 day 568 TM310 SAPTransportation Management (SAPTM) - Freight Order Management 1 day 569 TM320 SAPTransportation Management (SAPTM) - Execution 1 day 570 TM400 SAPTransportation Management (SAPTM) - Charge Calculation and Freight Settlement 3 days 571 TM410 SAPTransportation Management (SAPTM) - Charge Calculation Advanced and Internal Settlement 1 day 572 TM425 SAPTransportation Management (SAPTM)Settlement Advanced 1 day 573 TM430 Strategic Freight Management in SAPTransportation Management 2 days 574 TM730 SAPTransportation Management (SAPTM) 4 days 575 TM900 SAPTransportation Management (SAPTM) - Solution Architecture and Enhancement Concept 2 days 576 TM950 (SAPTM) - Event Management Integration 3 days 577 TPLM20 Project Managment I 10 days 578 TPLM22 Project Managment II (Case Study) 5 days 579 TSCM40 Planning/Manufacturing I 10 days 580 TSCM42 Planning/Manufacturing II 10 days 581 TSCM50 Procurement I 10 days 582 TSCM52 Procurement II 10 days 583 TSCM60 SAP ERP Sales and Distribution I 10 days 584 TSCM62 SAP ERP Sales and Distribution II 10 days 585 TSM10 SAP Solution Manager Implementation 10 days NextPrevious
  • 193.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 586 TTM10 SAPTransportation Management I (SAPTM) 10 days 587 TTM12 SAPTransportation Management II (SAPTM) 5 days 588 TZAD74 SAP NetWeaver AS - Delta 7.3x - 7.40 2 days 589 TZASE Database Administration Sybase ASE (for SAP systems) 3 days 590 TZB240 EPT: Shared Processes for Loans and Deposits Management in SAP for Banking 8.0 4 days 591 TZB241 EPT: Loans Management with SAP for Banking 8.0 3 days 592 TZB242 EPT: Deposits Management in SAP for Banking 8.0 4 days 593 TZB250 EPT: Bank Analyzer in SAP for Banking 8.0 1 day 594 TZB251 EPT: Accounting for Financial Instruments in SAP for Banking 8.0 5 days 595 TZB252 EPT: Risk Management in SAP for Banking 8.0 3 days 596 TZB253 EPT: Bank Analyzer Infrastructure in SAP for Banking 8.0 3 days 597 TZBI44 Part1 3 days 598 TZBPC1 EPT : SAP BPC 10.1 – Embedded Model (Del 3 days 599 TZBPM Please open a ticket in SR-KPS-ISM for servers 4 days 600 TZBRF Business Rules Framework 3 days 601 TZCMP1 Commodity Management in EHP6 - Procurement / Sales / GTM 2 days 602 TZCMR1 Commodity Risk Management 2 days 603 TZCPM0 SAP Commercial Project Management - Overview 2 days 604 TZDMEE XML Payment Medium Formats in the DMEE/PMW 1 day 605 TZDSM SAP NetWeaver Decision Service Management 3 days 606 TZERP Tax and Revenue Management 5 days 607 TZGBT SAP Global BatchTraceability 2 days 608 TZIM4I SAP Information Steward 2 days 609 TZIM4M Data Migration with SAP BusinessObjects 2 days 610 TZIPSM Social Service Management 5 days NextPrevious
  • 194.
    Technology Business&Process Framework SoftSkills CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon No CodeDescription Duration 611 TZLVM SAP NW LandscapeVirtualization Management 2.0 5 days 612 TZMOB3 What's New in SAP Mobile Platform 3.0 3 days 613 TZPAN TZPAN 3 days 614 TZPC10 EPT SAP BO Planning and Consolidation (10.0 DELTA), version for SAP NetWeaver 5 days 615 TZSCM1 Advanced Planning Methods in SNP 2 days 616 TZSCM2 Advanced Planning Methods in PPDS 2 days 617 TZSEPA SEPA CreditTransfer, Direct Debit and Mandates with SAP 2 days 618 TZTM30 SAPTransportation Management (SAPTM) - Solution Architecture and Enhancement Concept 2 days 619 TZTM31 SAPTM -Technical Deep Dive 5 days 620 TZTM35 SAPTransportation Management (SAPTM) - Event Management Integration 3 days Previous
  • 195.
    Business&Process Framework SoftSkills No Description Duration DataCenter Virtualization Infrastructure Learning Paths 1 Solution Courses Learning Path 5 days 2 Security Operations for the Software-Defined Data Center 5 days 3 Data CenterVirtualization Learning Path 5 days 4 SDDC Intensive Workshop [V3.0] 5 days vSphere 6 Learning Path 5 VMware vSphere: Install, Configure, Manage [V6] 5 days 6 VMware vSphere: FastTrack [V6] 5 days 7 VMware vSphere: Install, Configure, Manage plus Optimize and Scale FastTrack [V6.0] 6.5 days 8 VMware vSphere:What's New [V5.5 toV6] 2 days The leading virtualization technology provider,VMware courses provide the right platform for professionals to take the leap into a rewarding IT career ahead.VMware training Courses atVinsys brings you hands-on experience on variousVMware skills and understandings and equip the students with thorough understanding of variousVMware concepts, features and functionalities. VMwareTraining atVinsys will help you gain crucial skills in managing data centres and virtual environments. CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon Next Technology
  • 196.
    Business&Process Framework SoftSkills No Description Duration 9VMware vSphere: Skills for Operators [V6] 2 days 10 VMware vSphere: Optimize and Scale [V6] 5 days 11 VMware vSphere: Optimize and Scale [V6] - On Demand 45 days 12 VMware vSphere: Design and Deploy FastTrack [V6] 6.5 days 13 VMware vSphere:Troubleshooting Workshop [V6.0] 5 days 14 VMware vSphere: Optimize and Scale plusTroubleshooting FastTrack [V6.0] 6.5 days vSphere 5 Learning Path 15 VMware vSphere: Skills for Operators [V5.5] 2 days 16 VMware vSphere: Install, Configure, Manage [V5.5] 5 days 17 VMware vSphere: Install, Configure, Manage [V5.5] On Demand 45 days 18 VMware vSphere: FastTrack [V5.5] 5 days 19 VMware vSphere: Optimize and Scale [V5.5] 5 days 20 VMware vSphere: Design Workshop [V5.5] 3 days 21 VMware vSphere:Troubleshooting Workshop [V5.5] 5 days vCenter Site Recovery Manager Learning Path 22 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 days 23 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] - On Demand 45 days Virtual SAN Learning Path 24 VMwareVirtual SAN: Deploy and Manage [V6] 3 days 25 VMwareVirtual SAN: Deploy and Manage [V5.5] 2 days 26 VMwareVirtual SAN: Deploy and Manage [V6.2] - BETA 3 days 27 VMware vRealize Automation: Install, Configure, Manage [V7.0] BETA 5 days 28 VMware vRealize Automation: Install, Configure, Manage [V7.0] 5 days 29 VMware vCloud Networking and Security for vSphere Professionals for FAFIEC [V5.5] 3 days 30 Pivotal Cloud Foundry Immersion 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 197.
    Business&Process Framework SoftSkills No Description Duration 31VMware vRealize Operations Manager for Operators [V6.0] 2 days 32 VMware vSphere: Optimize and Scale plusTroubleshooting FastTrack [V6.0] 5 days 33 VMware vSphere: Install, Configure, Manage plus Optimize and Scale FastTrack [V6.0] 5 days 34 Spring Cloud Services 2 days 35 Horizon Application Management Bundle 1 day 36 Pivotal HD Operations 4 days 37 VMware Site Recovery Manager: Install, Configure, Manage [V6.1] 2 days 38 VMware vSphere:Troubleshooting Workshop [V6.0] 5 days 39 AirWatch Enterprise Mobility: Bootcamp 4 days 40 AirWatch Enterprise Mobility: Install and Deploy On-Premise Solutions 1 day 41 AirWatch Enterprise Mobility: Configure and Manage 2 days 42 AirWatch Enterprise Mobility: K12 Education 2 days 43 Horizon (withView): Install, Configure, Manage [V6.2] 2 days 44 VMware vSphere: Skills for Operators [V6] 2 days 45 Horizon: Design and Deploy [V6] 4 days 46 Security Operations for the Software-Defined Data Center 5 days 47 RS2_QUO800_Standard Budgetary Quoting 1 day 48 RS2_SPQ100_Special Pricing 1 day 49 RS2_QUO950_Quote Corrections 1 day 50 VMware NSX: Install, Configure, Manage [V6.2] 5 days 51 VMwareVirtual SAN: Deploy and Manage [V6] 3 days 52 VMware vSphere: Design and Deploy FastTrack [V6] 5 days 53 VMware vSphere: FastTrack [V6] 5 days 54 Pivotal Cloud Foundry Architecture 2 days 55 Pivotal Cloud Foundry Immersion 4 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 198.
    Business&Process Framework SoftSkills No Description Duration 56RS2_IDV130_Ad Hoc Opp Loads_v2 4 Hours 57 RS2_QUO700_Quote Consolidations 3 Hours 58 RS2_SFD100_SFDC Solutions 1 hours 59 RS2_QUO400_Quote Load Process_v2 1.5 Hours 60 RS2_IBA100_Install Base Admin Portal 2 hours 61 RS2_QUO600_Bundle Quoting 3 Hours 62 RS2_QUO200_EBS Standard Quote Creation_v2 16 hours 63 RS2_QUO500_Case and Queue Management_v2 3 Hours 64 RS2_TLS100_VMware Admin Portal Overview and Navigation_v2 1 hours 65 VMware Cloud Automation: Design and Deploy FastTrack [V6.0] 5 days 66 Custom PivotalTraining Immersion 5 days 67 Custom PivotalTraining Immersion 4 days 68 Custom PivotalTraining Immersion 3 days 69 Pivotal PartnerTraining Immersion 5 days 70 Pivotal PartnerTraining Immersion 4 days 71 Pivotal PartnerTraining Immersion 3 days 72 Pivotal PartnerTraining Immersion 2 days 73 VMware vSphere: Bootcamp [V6] 5 days 74 RS2_QUO400_Quote Partner Access Reinforcement Session 1 days 75 Spring XD 3 days 76 VMware NSX for Internetworking Experts FastTrack [V6.1] 5 days 77 Pivotal HDB Architecture and Implementation (formerly known as HAWQ Architecture and Implementation) 4 days 78 VMware NSX: Install, Configure, Manage [V6.1] 5 days 79 Enterprise Spring 4 days 80 RabbitMQ Install, Configure, Manage 2 days 81 Developing Applications with Cloud Foundry 3 days 82 VMware NSX: Design and Deploy [V6.1] 4 days 83 VMware NSX:Troubleshooting and Operations [V6.1] 4 days 84 VMware vRealize Automation: Install, Configure, Manage [V6.2] 5 days 85 VMware vSphere: Optimize and Scale [V6] 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 199.
    Business&Process Framework SoftSkills No Description Duration 86VMware vSphere: Install, Configure, Manage [V6] 5 days 87 VMware vSphere:What's New [V5.5 toV6] 2 days 88 RS2_PRE400_Renewals Lifecycle Overview 1.5 Hours 89 RS2_PRE300_GCO Overview 1 hours 90 VMware Mirage [V5.0] and Horizon withView [V6.0]: FastTrack 5 days 91 VMware vRealize Business: Costing and Implementation 4 days 92 Redis Install, Configure, Manage 2 days 93 JPA with Spring 3 days 94 GemFire Administration 3 days 95 VMware vSphere: Design Workshop [V5.5] 3 days 96 SDDC Intensive Workshop [V3.0] 5 days 97 VMware NSX for Internetworking Experts FastTrack [V6.0] 5 days 98 VMware vRealize Operations Manager: Install, Configure, Manage [V6.0] 5 days 99 VMware Mirage: Install, Configure, Manage [V5.0] 3 days 100 Getting Started with vSphere Web Client Solution Programming 5 days 101 VMware Fundamentals for Developers 3.5 days 102 Data Science in Practice 5 days 103 Processing Big Data with Pivotal HD 4 days 104 RabbitMQ 3 days 105 Core Spring 4.0 4 days 106 Pivotal HD Administration 3 days 107 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 days 108 VMware Cloud Orchestration and Extensibility [V6.1] 5 days 109 Horizon (withView): Install, Configure, Manage [V6.0] 4 days 110 VMware NSX: Install, Configure, Manage [V6.0] 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 200.
    Business&Process Framework SoftSkills No Description Duration 111VMware vCenter Configuration Manager: Install, Configure, Manage [V5.7] 3 days 112 VMware vSphere: FastTrack [V5.5] 5 days 113 VMware vSphere:Troubleshooting Workshop [V5.5] 5 days 114 VMware vSphere: Skills for Operators [V5.5] 2 days 115 VMwareVirtual SAN: Deploy and Manage [V5.5] 2 days 116 VMware vCloud Automation Center: Install, Configure, Manage [V6.0] 5 days 117 What's New in Spring [V4.0] 3 days 118 ApplicationVirtualization withVMwareThinApp [V5.0] 1 day 119 VMware vCloud Director: Organization Administration [V5.5] 2 days 120 VMware vCloud Director: Install, Configure, Manage [V5.5] 3 days 121 VMware vCloud Networking and Security for vSphere Professionals [V5.5] 3 days 122 VMware vSphere: Optimize and Scale [V5.5] 5 days 123 VMware vSphere:What's New [V4.x toV5.5] 2 days 124 VMware vSphere: Install, Configure, Manage [V5.5] 5 days 125 VMware vSphere: Install, Configure, Manage for SAP Administration [V5.1] 5 days 126 VMware vSphere with Operations Management: FastTrack [V5.1] 5 days 127 VMware Horizon Mirage: Install, Configure, Manage [V4.0] 2 days 128 VMware vSphere: Overview [V5.1] 1 day 129 VMware vCenter Operations Manager:Advanced Usage and Dashboard Design [V5.x] 3 days 130 Groovy and Grails [V2.0] 4 days 131 VMware vSphere: Skills for Operators [V5.1] 2 days 132 VMware vCenter Orchestrator: Develop Workflows [V5.1] 3 days 133 VMware vSphere: Install, Configure, Manage [V5.1] 5 days 134 Spring Web 4 days 135 VMware vCenter Configuration Manager forVirtual Infrastructure and OS Management [V5.x] 5 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix Amazon NextPrevious Technology
  • 201.
    Business&Process Framework SoftSkills No Description Duration 136VMware vCenter Configuration Manager for Operating Systems Management [V5.x] 2 days 137 VMware vCenter Configuration Manager forVirtual Infrastructure Management [V5.x] 3 days 138 VMwareView: Design Best Practices [V5.x] 3 days 139 VMware vCenter Operations Manager:Analyze and Predict [V5.x] 2 days 140 VMware vCloud: Design Best Practices [V1.5] 3 days 141 GemFire Developer 4 days 142 VMware vSphere: Design Workshop [V5.x] 3 days 143 Tomcat Administration 4 days 144 Hibernate with SpringTraining 3 days 145 VMware vSphere: Certified Professional Exam Preparation Workshop [V1.0] 1 day 146 Rich Web Applications with Spring 4 days 147 Enterprise Integration with Spring 4 days 148 Core Spring 4 days 149 VMware Capacity Planner 2.7 5 hours 150 VMware NSX: Install, Configure, Manage [V6.2] - Lab Connect 30 days 151 VMware NSX: Install, Configure, Manage [V6.2] - SMB On Demand 20 days 152 VMware vCloud Director: Install, Configure and Manage[V5.1] 3 days CompTIA IBM IT Security Microsoft Mobile Oracle RedHat Salesforce SAP VMWare ECCouncil Cloudera CISCO Citrix AmazonTechnology Previous
  • 202.
    APMG AXELOS EXIN ISACA PECB PMI TOGAF Business&Process Framework SoftSkills No Description Business Management& Improvement 1 APMP - Bid & Proposal Management 2 AQRO® 3 BRMP® - Business Relationship Management Professional 4 Certified ProfessionalTechnical Communicator 5 Facilitation 6 Finance for Non-Financial Managers 7 IACCM Contract and Commercial Management 8 Lean Six Sigma 9 OBASHI® - Business and IT Management APMG-International is an award-winning  Examination Institute. APMG accredits professional training and consulting organisations and manages certification schemes for knowledge-based workers, and has a global reach, with  regional offices located around the world. Our wide portfolio of certifications includes the internationally recognised Best Management Practice schemes and a range of IT and general management certifications based on international standards and best practices. Next Technology
  • 203.
    APMG AXELOS EXIN ISACA PECB PMI TOGAF Business&Process Framework SoftSkills No Description 10 SourcingGovernance 11 The PS Professional® IT Governance & Service Management 12 ASL® - Application Services Library 13 BiSL® - Business information Services Library 14 Change Analyst 15 CIF - Cloud Industry Forum Code of Practice 16 CMDB - Configuration Mgmt Database 17 COBIT® 5 18 IAITAM® - IT Asset Management 19 ISO/IEC 20000 20 ITIL® - InformationTechnology Infrastructure Library 21 Lean IT 22 Problem Analyst 23 SDI® - Service Desk Institute 24 Service Catalogue 25 Service Level Analyst Change, Risk & Benefits Management 26 Change Management 2 CHAMPS2® - Change Management in the Public Sector 28 Managing Benefits™ 29 M_o_R® - Management of Risk Cyber Security & Resilience 31 CCP - CESG Certified Professional 32 GCT - GCHQ CertifiedTraining NextPrevious Technology
  • 204.
    APMG AXELOS EXIN ISACA PECB PMI TOGAF Business&Process Framework SoftSkills No Description 33 CDCAT®- Cyber Defence Capability AssessmentTool 34 Cloud Computing Cyber Essentials 35 ISO/IEC 27001 36 RESILIA™ Project, Programme & Portfolio Management 37 AgileBA - Agile Business Analysis 38 AgilePgM - Agile Programme Management 39 AgilePM - Agile Project Management 40 Better Business Cases™ 41 EarnedValue Management 42 MoP® - Management of Portfolios 43 MoV® - Management ofValue 44 MSP® - Managing Successful Programmes 45 P3O® - Project & Programme Support Offices 46 PM4SD™ - Project Mgmt & Sustainable Development 47 PMD Pro - Project Mgmt for NGOs 48 Project Planning & Control™ 49 PPM Certificate & Diploma 50 PPS - Programme & Project Sponsorship 51 PRINCE2® - Projects IN Controlled Environments 52 PRINCE2 Agile™ 53 Stakeholder Engagement Technology Previous
  • 205.
    Business&Process Framework SoftSkills No Description Duration 1ITIL Foundation Level 3 days 2 ITIL Practitioner Level 3 days 3 ITIL Intermediate Level 4 days 4 ITIL Expert Level 5 days 5 ITIL Master Level 5 days 6 Prince 2 5 days 7 PRINCE2 Agile® Qualification 5 days AXELOS’ Best Practice Solutions are designed to help your organisation become more effective across a range of key business capabilities including project, programme and IT service management. Our internationally recognised best practice methods include ITIL®, PRINCE2®, and MSP® as well as guidance on cyber resilience, risk, value and portfolio management. APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology
  • 206.
    Business&Process Framework SoftSkills No Description 1 GreenIT Citizen 2 Green IT Foundation 3 EXIN Business Information Management Foundation with reference to BISL 4 Lean IT Foundation 5 Lean IT Kaizen 6 Ethical Hacking Foundation 7 EXIN Foundation Certificate in OpenStack Software 8 EXIN Specialist Certificate in OpenStack Software Neutron 9 EXIN Secure Programming Foundation 10 EXIN Application Management with reference to ASL To support continuous growth, EXIN offers internationally recognized certification programs that cover all ICT competence areas. These competence areas are derived from the internationally recognized e-Competence Framework APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology Next
  • 207.
    Business&Process Framework SoftSkills No Description 11 TMapNEXT®Test Engineer 12 TMap® SuiteTest Engineer 13 TMap NEXT®Test Manager 14 TPI NEXT® Foundation 15 EXIN ITSM FoundationITSM20F 16 EXIN ITSM Foundation BridgeITSM20FB 17 EXIN ITSM AssociateITSM20AS 18 EXIN ITSM Associate BridgeITSM20ASB 19 EXIN ITSM AuditorITSM20AU 20 EXIN ITSM SpecialistITSM20SP 21 EXIN ITSM Internal AuditorITSM20IA 22 EXIN ITSM Consultant/ManagerITSM20CM 23 EXIN ITSM ExpertITSM20EXP 24 EXIN ITSM MasterITSM20MA 25 ITIL ® Foundation Certificate in IT Service ManagementITILF 26 ITIL® PractitionerITILP 27 ITIL® Continual Service Improvement CertificateITILCSI 28 ITIL® Managing Across the Lifecycle CertificateITILMLC 29 ITIL® Operational Support and Analysis CertificateITILOSA 30 ITIL® Planning, Protection and Optimization CertificateITILPPO 31 ITIL® Release, Control andValidation CertificateITILRCV 32 ITIL® Service Design CertificateITILSD 33 ITIL® Service Operation CertificateITILSO 34 ITIL® Service Offerings and Agreements CertificateITILSOA 35 ITIL® Service Strategy CertificateITILSS APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology
  • 208.
    Business&Process Framework SoftSkills No Description 36 ITIL®ServiceTransition CertificateITILST 37 ITIL® Master QualificationITILMA 38 Microsoft Operations Framework Foundation 39 Certified Data Centre ProfessionalCDCP 40 Certified InformationTechnology ManagerCITM 41 Certified Data Centre Risk ProfessionalCDRP 42 Certified Data Centre Migration SpecialistCDMS 43 Certified Data Centre SpecialistCDCS 44 Certified Data Centre Facilities Operations ManagerCDFOM 45 CertifiedTIA-942 Internal AuditorCTIA 46 CertifiedTIA-942 Design ConsultantCTDC 47 Certified InformationTechnology SpecialistCITS 48 Certified Data Centre ExpertCDCEMC 49 EXIN Cloud Computing Foundation 50 EXIN CloudTechnologies Advanced 51 EXIN Agile Scrum FoundationASF 52 EXIN Agile Scrum MasterASM 53 Information Security Foundation (based on ISO/IEC 27002)ISFS 54 Information Security Management Advanced based on ISO/IEC 27002:2013ISMAS 55 Information Security Management Expert based on ISO/IEC 27002:2013ISMES 56 EXIN ITAMOrg IT Asset Management Foundation 57 EXIN Business Continuity Management FoundationBCMF 58 RESILIA™ FoundationRESF 59 RESILIA™ PractitionerRESP 60 PRINCE2® Foundation Certificate in Project ManagementPR2F APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology
  • 209.
    Business&Process Framework SoftSkills No Description 61 PRINCE2®Practitioner CertificatePR2P 62 PRINCE2 Agile™ PractitionerPR2A 63 PRINCE2® Practitioner Re-Registration CertificatePR2P_re 64 P3O® Foundation Certificate in Portfolio, Programme and Project OfficesP3OF 65 P3O® Practitioner Certificate in Portfolio, Programme and Project OfficesP3OP 66 MoV® Foundation Certificate inValue ManagementMOVF 67 MoV® Practitioner Certificate inValue ManagementMOVP 68 M_o_R® Foundation Certificate in Risk ManagementMORF 69 M_o_R® Practitioner Certificate in Risk ManagementMORP 70 M_o_R® Practitioner Re-Registration CertificateMORP_re 71 MoP® Foundation Certificate in Portfolio ManagementMOPF 72 MoP® Practitioner Certificate in Portfolio ManagementMOPP 73 MSP® Foundation Certificate in Programme ManagementMSPF 74 MSP® Practitioner Certificate in Programme ManagementMSPP 75 MSP® Practitioner Re-Registration CertificateMSPP_re 76 MSP® Advanced Practitioner Certificate in Programme ManagementMSPAP 77 MSP® Advanced Practitioner Re-Registration CertificateMSPAP_re APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology Previous
  • 210.
    Business&Process Framework SoftSkills No Description Duration 1Certified Information Systems Auditor (CISA)  3 days 2 Certified Information Security Manager (CISM) 3 days 3 Certified in the Governance of Enterprise IT (CGEIT) 3 days 4 Certified in Risk and Information Systems Control (CRISC) 3 days 5 COBIT 5 Foundation 3 days 6 COBIT 5 Implementation 3 days 7 COBIT 5 Assessor Course 3 days 8 Implementing NIST Cybersecurity Framework Using COBIT 5NEW! 2 days 9 COBIT 5 Assessor for Security NEW! 3 days ISACA provides practical guidance, benchmarks and other effective tools for all enterprises that use information systems. Through its comprehensive guidance and services, ISACA defines the roles of information systems governance, security, audit and assurance professionals worldwide.The COBIT framework and the CISA, CISM, CGEIT and CRISC certifications are ISACA brands respected and used by these professionals for the benefit of their enterprises. APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology
  • 211.
    Business&Process Framework SoftSkills No Description Duration ISO9001 1 ISO 9001 Introduction 1 day 2 ISO 9001 Foundation 2 days 3 ISO 9001 Lead Implementer 5 days 4 ISO 9001 Lead Auditor 5 days 5 ISO 9001:2015Transition Course 2 days ISO 13053 6 ISO 13053 Introduction 1 day 7 ISO 13053 Foundation 2 days 8 ISO 13053 Lead Implementer 5 days PECB is a certification body for persons, management systems, and products on a wide range of international standards.Vinsys being a global provider of training, examination, audit, and certification services, partnering with PECB offers its expertise on multiple fields, including but not limited to Information Security, IT, Business Continuity, Service Management, Quality Management Systems, Risk & Management, Health, Safety, and Environment. 
 
 We help professionals and organisations to show commitment and competence with internationally recognised standards by providing this assurance through the education, evaluation and certification against rigorous, internationally recognised competence requirements. Our mission is to provide our clients comprehensive services that inspire trust, continual improvement, demonstrate recognition, and benefit society as a whole. APMG AXELOS EXIN ISACA PECB PMI TOGAF Next Technology
  • 212.
    Business&Process Framework SoftSkills No Description Duration 9ISO 13053 Lead Auditor 5 days ISO 30301 10 ISO 30301 Introduction 1 day 11 ISO 30301 Foundation 2 days 12 ISO 30301 Lead Implementer 5 days 13 ISO 30301 Lead Auditor 5 days ISO 13485 14 ISO 13485 Introduction 1 day 15 ISO 13485 Foundation 2 days 16 ISO 13485 Lead Implementer 5 days 17 ISO 13485 Lead Audtior 5 days ISO/IEC 17025 18 ISO/IEC 17025 Introduction 1 day 19 ISO/IEC 17025 Foundation 2 days 20 ISO/IEC 17025 Lead Implementer 5 days 21 ISO/IEC 17025 Lead Assessor 5 days ISO/TS 29001 22 ISO 29001 Introduction 1 day 23 ISO 29001 Foundation 2 days 24 ISO 29001 Lead Implementer 5 days 25 ISO 29001 Lead Auditor 5 days ISO 39001 26 ISO 39001 Introduction 1 day 27 ISO 39001 Foundation 2 days 28 ISO 39001 Lead Implementer 5 days APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology
  • 213.
    Business&Process Framework SoftSkills APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology No DescriptionDuration 29 ISO 39001 Lead Auditor 5 days ISO 50001 30 ISO 50001 Introduction 1 day 31 ISO 50001 Foundation 2 days 32 ISO 50001 Lead Implementer 5 days 33 ISO 50001 Lead Auditor 5 days ISO/TS 16949 34 ISO/TS 16949 Introduction 1 day 35 ISO/TS 16949 Foundation 2 days 36 ISO/TS 16949 Lead Implementer 5 days 37 ISO/TS 16949 Lead Auditor 5 days HEALTH, SAFETY AND ENVIRONMENT ISO 14001 38 ISO 14001 Introduction 1 day 39 ISO 14001 Foundation 2 days 40 ISO 14001 Lead Implementer 5 days 41 ISO 14001 Lead Auditor 5 days 42 ISO 14001:2015Transition Exam 2 days ISO 22000 43 ISO 22000 Introduction 1 day 44 ISO 22000 Foundation 2 days 45 ISO 22000 Lead Implementer 5 days 46 ISO 22000 Lead Auditor 5 days OHSAS 18001 47 OHSAS 18001 Introduction 1 day
  • 214.
    Business&Process Framework SoftSkills APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology No DescriptionDuration 48 OHSAS 18001 Foundation 2 days 49 OHSAS 18001 Lead Implementer 5 days 50 OHSAS 18001 Lead Auditor 5 days ISO 26000 51 ISO 26000 Introduction 1 day 52 ISO 26000 Foundation 2 days 53 ISO 26000 Lead Implementer 5 days 54 ISO 26000 Lead Auditor 5 days ISO 20121 55 ISO 26000 Introduction 1 day 56 ISO 26000 Foundation 2 days 57 ISO 26000 Lead Implementer 5 days 58 ISO 26000 Lead Auditor 5 days INFORMATION TECHNOLOGY AND SERVICE MANAGEMENT ISO/IEC 20000 59 ISO/IEC 20000 Introduction 1 day 60 ISO/IEC 20000 Foundation 2 days 61 ISO/IEC 20000 Lead Implementer 5 days 62 ISO/IEC 20000 Lead Auditor 5 days ISO 22301 63 ISO 22301 Introduction 1 day 64 Certified ISO 22301 Foundation 2 days 65 ISO 22301 Lead Implementer 5 days 66 ISO 22301 Lead Auditor 5 days
  • 215.
    Business&Process Framework SoftSkills APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology No DescriptionDuration ISO 28000 67 ISO 28000 Introduction 1 day 68 ISO 28000 Foundation 2 days 69 ISO 28000 Lead Implementer 5 days 70 ISO 28000 Lead Auditor 5 days Disaster Recovery 71 Disaster Recovery Introduction 72 Disaster Recovery Foundation 73 Disaster Recovery Manager 74 Disaster Recovery Lead Manager Outsourcing 75 Certified Outsourcing Manager Course 3 days Security Courses ISO/IEC 27001 76 ISO/IEC 27001 Introduction 1 day 77 ISO/IEC 27001 Foundation 2 days 78 ISO/IEC 27001 Lead Implementer 5 days 79 ISO/IEC 27001 Lead Auditor 5 days ISO/IEC 27002 80 ISO/IEC 27002 Introduction 1 day 81 ISO/IEC 27002 Foundation 2 days 82 ISO/IEC 27002 Manager 5 days 83 ISO/IEC 27002 Lead Manager 5 days ISO/IEC 27005 84 ISO/IEC 27005 Introduction 1 day 85 ISO/IEC 27005 Foundation 2 days
  • 216.
    Business&Process Framework SoftSkills APMG AXELOS EXIN ISACA PECB PMI TOGAF NextPrevious Technology No DescriptionDuration 86 ISO/IEC 27005 Risk Manager 3 days ISO/IEC 27034 87 ISO/IEC 27034 Introduction 1 day 88 ISO/IEC 27034 Foundation 2 days 89 ISO/IEC 27034 Lead Implementer 5 days 90 ISO/IEC 27034 Lead Auditor 5 days Privacy Implementer 91 Lead Privacy Implementer 5 days ISO/IEC 27035 92 ISO/IEC 27005 Introduction 1 day 93 ISO/IEC 27035 Foundation 2 days 94 ISO/IEC 27035 Incident Manager 5 days 95 ISO/IEC 27035 Lead Incident Manager 5 days Computer Forensics 96 Computer Forensics Introduction 1 day 97 Computer Forensics Foundation 2 days 98 Computer Lead Forensics Examiner 5 days SCADA 99 Lead SCADA Security Professional 5 days Pen Testing 100 Lead PenTest Professional 5 days Risk Assessment Methods 101 OCTAVE 3 days 102 EBIOS 3 days 103 MEHARI 3 days
  • 217.
    Business&Process Framework SoftSkills APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology No DescriptionDuration ISO/IEC 27032 104 ISO/IEC 27032 Lead Cybersecurity Manager 5 days Previous
  • 218.
    Business&Process Framework SoftSkills No Description Duration 1Project Management Professional (PMP®) Certification Prep 5 days 2 PMI-CAPM Certification Prep 4 days 3 Program Management Professional 4 days 4 Portfolio Management Professional 4 days 5 Certified Associate in Project Management 4 days 6 PMI Professional in Business Analysis 4 days 7 PMI Agile Certified Practitioner 4 days 8 PMI Risk Management Professional 4 days 9 PMI Scheduling Professional 4 days Project Management Institute is the world's leading not-for-profit professional membership association for the project, program and portfolio management profession. PMI advances careers, improves organizational success and further matures the profession of project management through its globally recognized standards, certifications, resources, tools, academic research, publications, professional development courses, and networking opportunities. APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology
  • 219.
    Business&Process Framework SoftSkills No Description Duration 1APMG International Agile PM Foundation 3 days 2 APMG International Agile PM Foundation & Practitioner 4 days 3 Agile Expert Certified (AEC) 3 days 4 TOGAF 9.1 Foundation & Practitioner (Level 1 & Level 2 ) 4 days 5 TOGAF 9.1 Practitioner ( Level 2) (The Open Group Architecture Framework) 3 days 6 TOGAF 9.1 Foundation ( Level 1 ) (The Open Group Architecture Framework) 3 days TOGAF®  - the Enterprise Architecture standard used by the world’s leading organisations to improve business efficiency TOGAF® is the de facto global standard for Enterprise Architecture. The Open Group Architecture Forum, comprised of more than 200 enterprises, develops and maintains the TOGAF standard and publishes successive versions at regular intervals. TheTOGAF framework enables organisations to effectively address critical business needs by: • Ensuring that everyone speaks the same language • Avoiding lock-in to proprietary solutions by standardising on open methods for Enterprise Architecture • Saving time and money, and utilise resources more effectively • Achieving demonstrable ROI   Learn TOGAF @ Vinsys APMG AXELOS EXIN ISACA PECB PMI TOGAF Technology
  • 220.
    Flagship Programmes Operational Excellence Business Communication Customer Service Emotional Intelligence & NLP Environmental Sustainability Finance & Banking HR&Training Leadership & Management Professional Self Development Strategy and planning Team Building No Description Duration Our Flagship Programmes 1 The Hero's Way 2 days 2 Magical Presentors 2 days 3 Organization CultureTransformation 3 days 4 Ad-HOC Sales Sense 3 days 5 Work Life Balance 3 days 6 Emotional Intelligence 4 days Operational Excellence 7 Project Fundamentals For Operation/Admin Managers 2 days 8 Effective Meeting Management 2 days 9 How to manageYour Manager 2 days Business&Process Framework SoftSkills Softskills Next Technology Behavioural & Management Solutions (BMS) is a prominent vertical atVinsys.We cater to, Human ResourceTraining, Coaching, Organizational Development and Business Consulting affiliating with the best brands globally. BMS has been a catalyst and a contributor in the quest for people development and business excellence. It was established to fulfil corporate needs for constant augmentation of skills, competencies and processes. BMS, is thus an end to end strategic partner for people excellence. The essential differentiator of BMS is continual innovation, exceptional customization, well-crafted course content and use of the state of the art technology tools. BMS adheres to the World Class Companies competency framework and processes is developed, delivered and implemented through ethical and experienced operations, a highly principled and passionate research team, project management team and experienced facilitators. BMS, thus has the capability to accomplish projects as anticipated across the industries.
  • 221.
    Business&Process Framework SoftSkills Softskills No DescriptionDuration Business Communication 10 Effective Business Writing 2 days 11 Minutes taking Skills 2 days 12 Beyond Negotiation 2 days 13 Public Speaking 2 days 14 Art Of Effective Comunication 2 days Customer Service 15 CRM Fundamentals 2 days 16 Customer Service Excellenmce 2 days 17 Defusing CustomerTemper 2 days Emotional Intellegence & NLP 18 Achieving Business Success 2 days 19 EI 2 days 20 The Power of PositiveThinking 2 days Environmental Sustainability 21 Green Culture 2 days 22 Going Green 2 days Finance & Banking 23 Finance For Non-Finance 2 days 24 Finance For Managers 2 days 25 Budgeting Basics 2 days 26 Accounting Basice 2 days 27 Anti-Money Laundering andTerrorism 2 days NextPrevious Flagship Programmes Operational Excellence Business Communication Customer Service Emotional Intelligence & NLP Environmental Sustainability Finance & Banking HR &Training Leadership & Management Professional Self Development Strategy and planning Team Building Technology
  • 222.
    Business&Process Framework SoftSkills Softskills No DescriptionDuration HR & Training 28 Compentency Based Interviewing Skills 3 days 29 Creating Effective Policies and Procedures 3 days 30 Career Planning and talent Management 2 days 31 HR for Non HR Managers 3 days 32 TTT 5 days Leadership & Management 33 High Impact team Building 4 days 34 Effective mentoring Skills 3 days 35 Empowering Women leadership 3 days 36 Managing Great Events 4 days 37 Handling Harrasements at Work 2 days 38 leading through Coaching 4 days Professional Self Development 39 CreativeThinking 2 days 40 Problem Solving 3 days 41 Decesion making 2 days 42 Business Etiquettes 3 days 43 Art Of Conflict management 2 days 44 Stress andTime Management 3 days Strategy and planning 45 StrategicThinking and Planning 2 days 46 Setting Goals and Objectives 2 days 47 Balanced Scorecards 2 days 48 Plan Like a Chef 2 days NextPrevious Flagship Programmes Operational Excellence Business Communication Customer Service Emotional Intelligence & NLP Environmental Sustainability Finance & Banking HR &Training Leadership & Management Professional Self Development Strategy and planning Team Building Technology
  • 223.
    Business&Process Framework SoftSkills Softskills No DescriptionDuration Team Building 49 The Effective team Player 2 days 50 High Impact team Building 3 days 51 A day Out onThrills--A Strategy Challenge for managers 3 days 52 Plan Like a Chef 2 days Flagship Programmes Operational Excellence Business Communication Customer Service Emotional Intelligence & NLP Environmental Sustainability Finance & Banking HR &Training Leadership & Management Professional Self Development Strategy and planning Team Building Technology Previous
  • 224.