Authorised Training Centre for :
Course Schedule 2017
Hong Kong v01
Authorised Training Centre for :
Training Partners is a certified learning partner of
the following leading IT vendors.
Company Overview
About
Training
Partners
Training Partners is Asia
Pacific’s leading ICT
infrastructure learning
and development provider.
We pride ourselves on providing training consultancy, technology partner
certifications, best practice programmes, bespoke content courses, self-
paced e-learning, virtual classroom learning and change management solution
as enablement catalysts to our clients’ business growth. Our User Adoption
Services also helps you and your users to effectively adopt new technology
from the moment it is deployed.
Established in Singapore in 1994, Training Partners is a wholly owned
subsidiary of Dimension Data and operates in 9 countries in the Asia Pacific
region. We deliver training programmes and services in five languages and have
successfully trained over 100,000 ICT professionals.
Authorized
Learning
Partners
Many of our training centres are also
accredited examination centres. We
provide our clients with a one-stop training and
accreditation solution.
Accredited
Exam
Centres
www.training-partners.com
China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand
Best
Practices
Programs
www.training-partners.com
China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand
Other than vendor specific courses, we also offer
training in Certified Best Practices Programs
which include:
•	 Project Management Professional (PMP®)
•	 Certified Datacenter Professional (CDCP)
•	 Certified Data Center Specialist (CDCS)
•	 ITIL® Foundation and Intermediate
•	 Certifications Certified Information Systems Security
Professional (CISSP)
•	 ICAgile Certified Professional (ICP)
The certifications we offer are accredited by
PEOPLECERT for our ITIL® programme, PMI for our
PMP programme, EXIN for our CDCP and CDCS
programme, and IC Agile for our Agile Fundamentals
programme
1.	 The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
2.	 ITIL® is a registered trade mark of AXELOS Limited. The Swirl logo™ is a trade mark of AXELOS Limited. The ITIL ®
Accredited Training Organization logo is a trade mark of AXELOS Limited
User Adoption Services or UAS, is a set of
planning and management services that help
users to adopt the change so that they can effectively
adopt the new system, and minimise productivity loss
when the new system is deployed.
Primary features of our User Adoption Services:
User
Adoption
Services
Our accolades speak highly of our achievements and
professionalism in training.
For enhanced learning and practical experience, our students have
access to live equipment during the class. We believe that this is
better than simulation, and had invested heavily in equipment set-up
and boasts of more than 1000 sq ft of remote lab that is headquartered
in Singapore.
Our lab facilities currently host 22 Cisco racks and 4 other vendor racks
including Juniper and VMware. The racks are also being provided with
remote power control options to extend the power recycle option to the
instructors in the region.
Awards
Scan the QR code
to visit our website
Remote
Labs
www.training-partners.com
China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand
2015
•	 Cisco Learning Partner of the Year Award – APJ
2014
•	 Best IT Training Provider from Computerworld Hong Kong
•	 Cisco APJC Collaboration Award
2013
•	 Cisco APJC Collaboration Award
2012
•	 Brandon Hall Gold award for excellence in the Best Custom Content category
•	 NetDimensions Reseller Technical Excellence award
•	 Cisco APJC Collaboration Award
2011
•	 Brandon Hall Silver Award - Best Advance in Learning Management
Technology for Global Training
•	 Brandon Hall Gold Award - Best Advance in Performance Support Technology
•	 Brandon Hall Gold Award - Best Advance in Learning Management
Technology for External Training
•	 Top 20 Learning Portal Companies by TrainingIndustry.com
2010
•	 Cisco Learning Partner of the Year, APAC & Greater China
•	 JNAEC Partner of the Year (runner-up)
•	 Top 20 Learning Portal Companies by TrainingIndustry.com
Cisco Network Certification Programs ................................................................................... 6
Microsoft ...............................................................................................................................13
ITIL - Information Technology Infrastructure Library .............................................................20
Other Infrastructure Courses
PMI Certifed Courses.......................................................................................................................................................21
I.T. Security Courses .......................................................................................................................................................21
Datacentre Specialisation Courses............................................................................................................................21-22
Check Point .....................................................................................................................................................................22
Bluecoat ..........................................................................................................................................................................22
VMware ................................................................................................................................................................... 22-24
Riverbed...........................................................................................................................................................................24
EC-Council Courses.........................................................................................................................................................24
F5 Courses .............................................................................................................................................................. 24-25
Citrix ................................................................................................................................................................................25
EMC Courses...................................................................................................................................................................26
Content
6*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
ENTRY
IP Networking (CCENT) - Cisco Certified Entry Networking Technician - Certification valid for 3 years														
Interconnecting Cisco Networking Devices Part 1 5 ICND1 100-101 ICND1 / CCENT $14,000 18 On demand, please call +852 2513 3322 for further information
ASSOCIATE
Associate												
Understanding Cisco Cloud Fundamentals 5 CLDFND 210-451 CLDFND $21,840 28 16-20 27-31 12-16
Introducing Cisco Cloud Administration 5 CLDADM 210-455 CLDADM $21,840 28 13-17 15-19
Design (CCDA) - Certification valid for 3 years	
Designing for Cisco Internetwork Solutions v3.0 5 DESGN 200-310 DESGN $18,000 23 6-10
Collaboration (CCNA) - Certification valid for 3 years												
Implementing Cisco Collaboration Devices 5 CICD 210-060 CICD $21,840 28 3, 5-7
Implementing Cisco Video Network Devices, Part 1 ELT CIVND1 210-065 CIVND USD 395 nil Please purchase from Cisco Leanring Network Store
Implementing Cisco Video Network Devices, Part 2 5 CIVND2 $24,960 32 22-26
CCNA Cyber Ops (CCNA) - Certification valid for 3 years												
Understanding Cisco Cybersecurity Fundamentals SECFND 210-250 SECFND On demand, please call +852 2513 3322 for further information
Implementing Cisco Cybersecurity Operations SECOPS 210-255 SECOPS On demand, please call +852 2513 3322 for further information
Data Center (CCNA) - Certification valid for 3 years												
Introducing Cisco Data Center Networking 4 DCICN 640-911 DCICN $21,000 27 27/2-2/3
Introducing Cisco Data Center Technologies 5 DCICT 640-916 DCICT $26,520 34 27-31
Cisco Network Certification Programs
7*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
ASSOCIATE
Industrial (CCNA) - Certification valid for 3 years												
Managing Industrial Networking for Manufacturing with Cisco Technologies 5 IMINS2 200-601 IMINS2 $24,960 32 On demand, please call +852 2513 3322 for further information
Routing and Switching (CCNA) - Certification valid for 3 years												
Interconnecting Cisco Networking Devices Part 1 v3.0 5 ICND1
100-105 ICND1 v3 /
CCENT
$15,600 20 On demand, please call +852 2513 3322 for further information
Interconnecting Cisco Networking Devices Part 2 v3.0 5 ICND2 200-105 ICND2 v3 $17,160 22 20-24 24-28 19-23
Interconnecting Cisco Networking Devices Accelerated v3.0 5 CCNAX 200-125 CCNA v3 $19,500 25 20-24 24-28 19-23
Security (CCNA) - Certification valid for 3 years												
Implementing Cisco IOS Network Security (IINS) 5 IINS 210-260 IINS $17,160 22 6-10 29/5-2/6
Service Provider (CCNA) - Certification valid for 3 years
Building Cisco Service Provider Next-Generation Networks, Part 1 5 SPNGN1 640-875 SPNGN1 $17,160 22 On demand, please call +852 2513 3322 for further information
Building Cisco Service Provider Next-Generation Networks, Part 2 5 SPNGN2 640-878 SPNGN2 $17,160 22 On demand, please call +852 2513 3322 for further information
Wireless (CCNA) - Certification valid for 3 years
Implementing Cisco Wireless Network Fundamentals 5 WIFUND 200-355 WIFUND $17,160 22 9-13 27-31 26-30
PROFESSIONAL
CCDP - Certification valid for 3 years
Implementing Cisco IP Routing v2.0 5 ROUTE 300-101 ROUTE $20,500 26 23-27 18-21
Implementing Cisco IP Switched Networks v2.0 5 SWITCH 300-115 SWITCH $20,500 26 6-10 8-12
Designing Cisco Network Service Architectures 5 ARCH 300-320 ARCH $20,500 26 13-17
8*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
PROFESSIONAL
CCNP Cloud - Certification valid for 3 years 												
Implementing and Troubleshooting the Cisco Cloud Infrastructure 5 CLDINF 300-460 CLDINF $25,740 33 On demand, please call +852 2513 3322 for further information
Designing the Cisco Cloud 5 CLDDES 300-465 CLDDES $25,740 33 On demand, please call +852 2513 3322 for further information
Automating the Cisco Enterprise Cloud 5 CLDAUT 300-470 CLDAUT $25,740 33 On demand, please call +852 2513 3322 for further information
Building the Cisco Cloud with Application Centric Infrastructure 5 CLDACI 300-475 CLDACI $25,740 33 On demand, please call +852 2513 3322 for further information
CCNP Collaboration - Certification valid for 3 years 												
Implementing Cisco IP Telephony and Video, Part 1 5 CIPTV1 300-070 CIPTV1 $27,300 35 16-20 15-19
Implementing Cisco IP Telephony and Video, Part 2 5 CIPTV2 300-075 CIPTV2 $27,300 35 13-17 5-9
Troubleshooting Cisco IP Telephony and Video 5 CTCOLLAB 300-080 CTCOLLAB $27,300 35 3-7
Implementing Cisco Collaboration Applications 5 CAPPS 300-085 CAPPS $27,300 35 8-12
CCNP Data Centre - Certification valid for 3 years 												
Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13
Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19
For Design Track (Must pass 2 of the compulsory exam above and below 2)
Designing Cisco Data Center Unified Computing 4 DCUCD 642-998 DCUCD v5.0 $25,740 33 31/1-3/2 29/5-2/6
Designing Cisco Data Center Unified Fabric 5 DCUFD 642-996 DCUFD v5.0 $31,200 40 27/2-3/3 12-16
For Troubleshooting Track (Must pass 2 of the compulsory exam above and below 2)	
Troubleshooting Cisco Data Center Unified Computing 3 DCUCT 642-035 DCUCT v5.0 $23,400 30 4-6 5-7
Troubleshooting Cisco Data Center Unified Fabric 3 DCUFT 642-980 DCUFT v5.0 $23,400 30 1-3 28-30
9*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
PROFESSIONAL
CCNP Routing & Switching - Certification valid for 3 years
Implementing Cisco IP Routing v2.0 5 ROUTE 300-101 ROUTE $20,500 26 23-27 18-21
Implementing Cisco IP Switched Networks v2.0 5 SWITCH 300-115 SWITCH $20,500 26 6-10 8-12
Troubleshooting and Maintaining Cisco IP Networks v2.0 5 TSHOOT 300-135 TSHOOT $23,400 30 20-24 12-16
CCNP Security - Certification valid for 3 years 												
Implementing Cisco Secure Access Solutions 5 SISAS 300-208 SISAS $23,400 30 20-24
Implementing Cisco Edge Network Security Solutions 5 SENSS 300-206 SENSS $23,400 30 22-26
Implementing Cisco Secure Mobility Solutions 5 SIMOS 300-209 SIMOS $23,400 30 18-21
Implementing Cisco Threat Control Solutions 5 SITCS 300-207 SITCS $23,400 30 31/1-3/2 26-30
CCNP Service Provider - Certification valid for 3 years 												
Deploying Cisco Service Provider Network Routing 5 SPROUTE 642-883 SPROUTE $24,960 32 13-17
Deploying Cisco Service Provider Advanced Network Routing 5 SPADVROUTE 642-885 SPADVROUTE $24,960 32 10-13
Implementing Cisco Service Provider Next-Generation Core Network
Services
5 SPCORE 642-887 SPCORE $24,960 32 23-27 19-23
Implementing Cisco Service Provider Next-Generation Edge Network
Services
5 SPEDGE 642-889 SPEDGE $24,960 32 20-24
CCNP Wireless - Certification valid for 3 years
Designing Cisco Wireless Enterprise Networks 5 WIDESGN 300-360 WIDESGN $27,300 35 3-6 3-7
Deploying Cisco Wireless Enterprise Networks 5 WIDEPLOY 300-365 WIDEPLOY $27,300 35 31/1-3/2 10-13
Troubleshooting Cisco Wireless Enterprise Networks 5 WITSHOOT 300-370 WITSHOOT $27,300 35 27/2-3/3 8-12
Securing Cisco Wireless Enterprise Networks 5 WISECURE 300-375 WISECURE $27,300 35 6-10 15-19
10*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
EXPERT - Certifcation valid for 2 years
CCIE 360 Program
CCIE 360 - Routing and Switching WorkShop 1 5 CIERS-1 400-101 Written Exam $32,760 42 27-31
CCIE 360 - Routing and Switching WorkShop 2 5 CIERS-2 Written and Lab Exam $39,000 50 22-26
IronPort																			
End User Training
Securing Email with Cisco Email Security Appliance Part 1 and 2 3 SESA 650-153 ESFE $21,000 27 On demand, please call +852 2513 3322 for further information
Securing the Web with Cisco Web Security Appliance 2 SWSA 650-568 WSFE $14,040 18 On demand, please call +852 2513 3322 for further information
Partner Training	
Securing Email with Cisco Email Security Appliance 2 PASESA 650-153 ESFE $14,040 18 On demand, please call +852 2513 3322 for further information
Securing the Web with Cisco Web Security Solutions 2 PASWSA 650-568 WSFE $14,040 18 On demand, please call +852 2513 3322 for further information
SPECIALIST CERTIFICATIONS	
Data Center 		
Cisco Data Center Unified Computing Design Specialist - Valid for 2 years												
Designing Cisco Data Center Unified Computing 4 DCUCD 642-998 DCUCD v5.0 $25,740 33 31/1-3/2 29/5-2/6
Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13
Cisco Data Center Unified Computing Support Specialist - Valid for 2 years												
Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13
Troubleshooting Cisco Data Center Unified Computing 3 DCUCT 642-035 DCUCT v5.0 $23,400 30 4-6 5-7
11*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Data Center																	
Cisco Data Center Unified Fabric Design Specialist - Valid for 2 years												
Designing Cisco Data Center Unified Fabric 5 DCUFD 642-996 DCUFD v5.0 $31,200 40 27/2-3/3 12-16
Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19
Cisco Data Center Unified Fabric Support Specialist - Valid for 2 years
Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19
Troubleshooting Cisco Data Center Unified Fabric 3 DCUFT 642-980 DCUFT v5.0 $23,400 30 1-3 28-30
Other Storage and Data Centre Trainings												
Introducing Cisco Nexus 9000 and Application Centric Infrastructure (ACI) 2 DCINX9K $17,940 23 On demand, please call +852 2513 3322 for further information
Configuring Cisco Nexus 9000 switches in ACI mode 5 DCAC9K $35,100 45 6-10
Configuring Cisco MDS 9000 Switches 5 DCMDS $31,200 40 31/1-3/2 8-12
Configuring Cisco Nexus 7000 Switches 5 DCNX7K $31,200 40 3-7
Configuring Cisco Nexus 5000 Switches 5 DCNX5K $31,200 40 On demand, please call +852 2513 3322 for further information
Configuring Cisco Data Center Unified Computing 5 DCUCS $31,200 40 26-30
Implementing the Cisco Nexus 1000V 3 DCNX1K $23,400 30 On demand, please call +852 2513 3322 for further information
Other Cisco Discipline													
Configuring BGP on Cisco Routers 5 BGP $23,400 30 On demand, please call +852 2513 3322 for further information
IPv6 Fundamentals, Design and Deployment 5 IP6FD $23,400 30 On demand, please call +852 2513 3322 for further information
12*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Cisco Network Certification Programs
Course
Duration
(days)
Course Code Exam Code
List Price
HK$
Learning
Credits
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Other Cisco Discipline													
Implementing Cisco MPLS 5 MPLS $23,400 30 On demand, please call +852 2513 3322 for further information
Implementing Cisco MPLS Traffic Engineering & Other Features 5 MPLST $23,400 30 On demand, please call +852 2513 3322 for further information
Implementing Cisco Quality of Service 5 QOS $23,400 30 On demand, please call +852 2513 3322 for further information
Securing Networks with Cisco Routers and Switches 5 SECURE $27,300 35 On demand, please call +852 2513 3322 for further information
Deploying Cisco ASA Firewall Solutions 5 FIREWALL $27,300 35 On demand, please call +852 2513 3322 for further information
Deploying Cisco ASA VPN Solutions 5 VPN $27,300 35 On demand, please call +852 2513 3322 for further information
Implementing Cisco Intrusion Prevention System 5 IPS $27,300 35 On demand, please call +852 2513 3322 for further information
Implementing CiscoWorks LMS 5 CWLMS $27,300 35 On demand, please call +852 2513 3322 for further information
Implementing the Application Control Engine Service Module 4 ACESM $27,300 35 On demand, please call +852 2513 3322 for further information
Implementing the Cisco Application Control Engine Appliance 4 ACEAP $27,300 35 On demand, please call +852 2513 3322 for further information
Unified Contact Center Express Advanced 4 UCCXA $28,000 36 On demand, please call +852 2513 3322 for further information
Deploying Cisco Unified Contact Center Express 5 UCCX $28,000 36 31/1-3/2
Implementing and Configuring the Cisco Identity Services Engine 5 SISE 500-254 SISE $25,740 33 20-24 22-26
Implementing Core Cisco ASA Security 1.0 5 SASAC $26,500 34 13-17 5-9
Implementing Advanced Cisco ASA Security 5 SASAA $28,000 36 18-21
Implementing Cisco TelePresence Video Solutions, Part 1 ELT VTVS1 USD 395 nil Please purchase from Cisco Leanring Network Store
Implementing Cisco TelePresence Video Solutions, Part 2 5 VTVS2 $28,000 36 On demand, please call +852 2513 3322 for further information
*** For other Cisco Advanced Services Education trainings, please feel free to contact Training Partners @ 251 3 3322, hk@training-partners.com
13*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Windows 7 / 8 / 10
MCSA Windows 8
Installing and Configuring Windows 10 [NEW] 4 20697-1 70-697 $10,000.00 23-26 27-30 23-26
Deploying and Managing Windows 10 Using Enterprise Services [NEW] 4 20697-2 70-697 $10,000.00 21-24 24-27 26-29
Supporting and Troubleshooting Windows 10 [NEW] 4 10982 - $10,000.00 10-13 21-24 22-25
Virtualizing Enterprise Desktops and Apps [NEW] 4 20694 70-694 $10,000.00 16-19 13-16 15-18
MCSE Windows 8
Deploying Windows Devices and Enterprise Apps [NEW] 4 20695 70-695 $10,000.00 23-26 20-23 22-25
Administering System Center Configuration Manager and Intune [NEW] 4 20696 70-696 $10,000.00 13-16 10-13 12-15
Windows 7 / 10
Installing and Configuring Windows 7 Client 2 6292 70-680 $7,000.00 27-28 27-28 29-30
Planning and Managing Windows 7 Desktop Deployments and Environments 4 6294 70-686 $10,000.00 6-9 9-12
Troubleshooting and Supporting Windows 7 in the Enterprise 2 6293 70-685 $7,000.00 5-6 30-31 29 & 31
Windows 7, Enterprise Desktop Support Technician 4 50331 70-685 $10,000.00 7-10 3 & 5-7 5-8
Server
Windows Server 2016
Installation, Storage and Compute with Windows Server 2016 [NEW] 4 20740 70-740 $10,000.00 3-6 7-10 7-10 3 & 5-7 9-12 6-9
Networking with Windows Server 2016 [NEW] 4 20741 70-741 $10,000.00 10-13 14-17 14-17 10-13 16-19 13-16
Identity with Windows Server 2016 [NEW] 4 20742 70-742 $10,000.00 17-20 21-24 21-24 18-21 23-26 20-23
Securing Windows Server 2016 [NEW] 4 20744 740-744 $10,000.00 23-26 27/2 - 2/3 22-25
Microsoft Certification Programs
14*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Server
Windows Server 2016
Upgrading Your Skills to MCSA: Windows Server 2016 [NEW]
MCSA upgrade exam preparation course for students who hold either an
MCSA: Windows Server 2012 or MCSA: Windows Server 2008 certification
4 20742 70-743 $10,000.00 20-23 24-27 26-29
Upgrading Your Skills to Windows Server 2016 [NEW] 4 10983 - $10,000.00 27-30 22-25
MCSA Windows Server 2012
Upgrading Your Skills to Windows Server 2016 [NEW] 4 10983 - $10,000.00 27-30 22-25
Installing and Configurig Windows Server 2012 R2 4 20410 70-410 $10,000.00 3-6 6-9 6-9 3 & 5-7 8-11 5-8
Administering Windows Server 2012 R2 4 20411 70-411 $10,000.00 9-12 13-16 13-16 10-13 15-18 12-15
Configuring Advanced Windows Server 2012 R2 Services 4 20412 70-412 $10,000.00 16-19 20-23 20-23 18-21 22-25 19-22
MCSE Server Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012)
Designing and Implementing a Server Infrastructure 4 20413 70-413 $10,000.00 10-13 28/2-3/3 9-12
Implementing an Advanced Server Infrastructure 4 20414 70-414 $10,000.00 17-20 7-10 16-19
MCSE Desktop Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012)
Implementing a Desktop Infrastructure 4 20415 70-415 $10,000.00 7-10 3 & 5-7 5-8
Implementing Desktop Application Environments 4 20416 70-416 $10,000.00 14-17 10-13 12-15
Upgrading Your Skills to MCSA Windows Server 2012 R2 4 20417 70-417 $10,000.00 28/2-3/3 18-21 19-22
Automating Administration with Windows PowerShell 4 10961 - $10,000.00 16-19 14-17 23-26
Advanced Automated Administration with Windows PowerShell 2 10962 - $7,000.00 23-24 23-24 25-26
Active Directory services with Windows Server (Windows Server 2012 R2) 4 10969 - $10,000.00 7-10 18-21 13-16
Microsoft Certification Programs
15*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Server
MCSE Desktop Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012)
Networking with Windows Server (Windows Server 2012 R2) 4 10970 - $10,000.00 14-17 24-27 26-29
"Storage and High Availability with Windows Server
(Windows Server 2012 R2) "
3 10971 - $8,000.00 13-15 12-14
Administering the Web Server (IIS) Role of Windows Server 4 10972 - $10,000.00 20-23 19-22
Deploying and Migrating Windows Servers 2 10974 - $7,000.00 2-3 6-7 1-2
Server Virtualization with Windows Server Hyper-V and System Center 4 20409 70-409 $10,000.00 16-19 6-9 8-11
SharePoint 2013 / 2016
Planning and Administering SharePoint 2016 [NEW] 4 20339-1 - $10,000.00 16-19 13-16 13-16 10-13 15-18 19-22
Advanced Technologies of SharePoint 2016 [NEW] 4 20339-2 - $10,000.00 23-26 20-23 20-23 24-27 22-25 26-29
Core Solutions of Microsoft SharePoint Server 2013 4 20331 70-331 $10,000.00 3-6 7-10 6-9 3 & 5-7 8-11 5-8
Advanced Solutions of Microsoft SharePoint Server 2013 4 20332 70-332 $10,000.00 10-13 14-17 13-16 10-13 15-18 12-15
PowerPivot, Power View and SharePoint 2013 Business Intelligence Center for
Analysts
1 55049 - $4,000.00 27 31 31
Visualizing Data with SharePoint 2013, Report Builder, PowerPivot & PowerView
with NO CODE
3 55072 - $8,000.00
SharePoint 2013 Site Collection and Site Administration [NEW] 4 55033 - $10,000.00 27/2 - 2/3 24-27 26-29
Microsoft SharePoint Server 2013 for the Site Owner/Power User [NEW] 2 55035 - $7,000.00 19-20 27-28 31/5 - 1/6
MCSE Private Cloud (Valid MCSA Windows Server 2012)
Administering System Center Configuration Manager and Intune [NEW] 4 20246 70-246 $10,000.00 16-19 13-16 15-18
Configuring and Deploying a Private Cloud [NEW] 4 20247 70-247 $10,000.00 23-26 20-23 22-25
Microsoft Certification Programs
** Feel free to call for customized training that fits your company environment.
16*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Server
Exchange Server 2013 / 2016
Core Solutions of Microsoft Exchange Server 2013 4 20341 70-341 $10,000.00 3-6 6-9 6-9 3 & 5-7 8-11 5-8
Advanced Solutions of Microsoft Exchange Server 2013 4 20342 70-342 $10,000.00 10-13 13-16 7-10 10-13 16-19 19-22
Administering Microsoft Exchange Server 2016 [NEW] 4 20345-1 70-345 $10,000.00 10-13 14-17 14-17 10-13 15-18 12-15
Designing and Deploying Microsoft Exchange Server 2016 [NEW] 4 20345-2 70-345 $10,000.00 17-20 21-24 21-24 18-21 23-26 20-23
Lync Server 2013 / Skype for Business 2015
Core Solutions of Microsoft Skype for Business 2015 [NEW] 4 20334 70-334 $10,000.00 14-17 18-21 20-23
Core Solutions of Microsoft Lync Server 2013 4 20336 70-336 $10,000.00 16-19 21-24 20-23 25-28 22-25 19-22
Enterprise Voice and Online Services with Microsoft Lync Server 2013 4 20337 70-337 $10,000.00 24-27 27/2 - 2/3 28-31 25-28 23-26 27-30
SQL
Server 2016
Querying Data with Transact-SQL [NEW] 2 20761 - $7,000.00 27-28 27-28 29-30
Developing SQL Databases [NEW] 3 20762 - $8,000.00 25-27 29-31 31/5 - 2/6
Administering a SQL Database Infrastructure [NEW] 4 20764 - $10,000.00 27/2 - 2/3 18-21 20-23
Provisioning SQL Databases [NEW] 2 20765 - $7,000.00 5-6 2-3 4-5
Implementing a SQL Data Warehouse [NEW] 3 20767 - $8,000.00 10-13 7-10 9-12
Developing SQL Data Models [NEW] 2 20768 - $7,000.00 23-24 20-21 22-23
Updating Your Skills to SQL Server 2016 [NEW] 2 10986 - $7,000.00 18-19 14-15 15-16
Performance Tuning and Optimizing SQL Databases [NEW] 3 10987 - $8,000.00 15-17 11-13 14-16
Microsoft Certification Programs
** Feel free to call for customized training that fits your company environment.
17*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Microsoft Certification Programs
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Server 2016
Managing SQL Business Intelligence Operations [NEW] 2 10988 - $7,000.00 1-2 5-6 1-2
Analyzing Data with Power BI [NEW] 1 10989 - $4,000.00 5-6 1-2 4-5
Analyzing Data with SQL Server Reporting Services [NEW] 2 10990 - $7,000.00 2-3 6-7 5-6
Server 2012
Querying Microsoft SQL Server 4 20461D 70-461 $10,000.00 3-6 6-9 28/2 - 3/3 3 & 5-7 9-12 5-8
Administering Microsoft SQL Server Databases 4 20462D 70-462 $10,000.00 10-13 13-16 7-10 10-13 16-19 12-15
Implementing a Data Warehouse with Microsoft SQL Server 4 20463D 70-463 $10,000.00 17-20 20-23 14-17 18-21 23-26 19-22
MCSE Data Platform SQL 2012 (Valid MCSA SQL Server 2012)
Developing Microsoft SQL Server 2012 Databases 4 20464D 70-464 $10,000.00 24-27 21-24 25-28 26-29
Designing Database Solutions with Microsoft SQL Server 4 20465D 70-465 $10,000.00 23-24 30-31 25-26
MCSE Business Intelligence SQL 2012 (Valid MCSA SQL Server 2012)
Implementing Data Models and Reports with Microsoft SQL Server 4 20466D 70-466 $10,000.00 9-12 6-9 6-9 10-13 8-11 12-15
Designing Self-Service Business Intelligence and Big Data Solutions 4 20467D 70-467 $10,000.00 16-19 13-16 15-18
Server 2014
Updating Your SQL Server Skills to Microsoft SQL Server 2014 [NEW] 4 10977 - $10,000.00 23-26 27-30 23-26
SQL Server 2014 Performance Tuning and Optimization [NEW] 4 55144 - $10,000.00 13-16 18-21 26-29
Microsoft Report Builder 3.0 with SQL 2008R2, SQL 2012, and SQL 2014 2 55005 - $7,000.00 25-26 29-30 23-24
System Center 2012
Administering System Center 2012 Configuration Manager 4 10747 70-243 $10,000.00 On demand, please call +852 2513 3322 for further information
Planning and Deploying System Center 2012 Configuration Manager 2 10748 70-243 $7,000.00 5-6 1-2 1-2 6-7 4-5 1-2
Monitoring and Operating a Private Cloud [NEW] 4 20246 70-246 $10,000.00 16-19 13-16 15-18
18*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Microsoft Certification Programs
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
System Center 2012
Configuring and Deploying a Private Cloud [NEW] 4 20247 70-247 $10,000.00 23-26 20-23 22-25
Administering System Center Configuration Manager and Intune [NEW] 4 20696 70-696 $10,000.00 13-16 10-13 12-15
Infrastructure Provisioning with System Center Virtual Machine Manager [NEW] 4 10981 - $10,000.00 9-12 7-10 8-11
Cloud & Datacenter Monitoring with System Center 2012 Operations Manager 4 10964 $10,000.00 21-24 18-21 19-22
IT Service Management with System Center Service Manager 3 10965 $8,000.00 27/2 - 2/3 25-28 27-30
Installing and Configuring System Center 2012 Operations Manager 4 55004 $10,000.00 3-6 28/2 - 3/3 9-12
System Center 2012 Orchestrator 2 55007 $7,000.00 12-13 30-31 4-5
Office 365
Enabling and Managing Office 365 [NEW] 4 20347
70-346 /
70-347
$10,000.00 13-16 10-13 12-15
Office 365: A day in the life of the End-User 1 50588 $4,000.00 On demand, please call +852 2513 3322 for further information
Azure
Microsoft Azure Fundamentals [NEW] 4 10979 - $10,000.00 5-6 2-3 4-5
Developing Microsoft Azure Solutions [NEW] 4 20532 70-532 $10,000.00 On demand, please call +852 2513 3322 for further information
Implementing Microsoft Azure Infrastructure Solutions [NEW] 4 20533 70-533 $10,000.00 23-26 20-23 27-30 24-27 22-25 26-29
Linux System Administration [NEW] 4 55187 LFCS $10,000.00 16-19 20-23 15-18
19*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Microsoft Certification Programs
Course
Duration
(days)
Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
EMS
Planning for and Managing Devices in the Enterprise: Enterprise Management Suite
(EMS) & On-Premises Tools [NEW]
4 20398 $10,000.00 10-13 7-10 9-12
Microsoft Project
Mastering Microsoft Project 2013 [NEW] 2 55054 $7,000.00 15-16 12-13 14-15
Managing Projects with Project Server 2013 [NEW] 2 55107 $7,000.00 On demand, please call +852 2513 3322 for further information
Mastering Microsoft Project 2010 2 50413 $7,000.00 23-24 28-29 25-26
20*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
ITIL - Information Technology Infrastructure Library
Course Description
Duration
(days)
Code Exam Code
Learning
Pts
List Price
HKD
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
ITIL Version 3 Syllabus **
ITIL Foundation - Syllabus 2011 (include exams) 3 ITIL-F Inhse exam 2.0 $10,000 23-25 22-24 27-29 5-7 2,4-5 7-9
ITIL Services Lifecycle Modules					
Service Strategy (include exams) 3 SS_v3 Inhse exam 3.0 $16,500 8-10 5-7
Service Design (include exams) 3 SD_v3 Inhse exam 3.0 $16,500 8-10 19-21
Service Transition (include exams) 3 ST_v3 Inhse exam 3.0 $16,500 24-26
Service Operation (include exams) 3 SO_v3 Inhse exam 3.0 $16,500 16-18 8-10
Continual Service Improvement (include exams) 3 CSI_v3 Inhse exam 3.0 $16,500 13-15 19-21
ITIL Services Capability Modules 																		
Service Offerings & Agreement (include exams) 5 SOA_v3 Inhse exam 4.0 $20,500 13-17
Operational Support & Analysis (include exams) 5 OSA_v3 Inhse exam 4.0 $20,500 16-20
Release, Control & Validation (include exams) 5 RCV_v3 Inhse exam 4.0 $20,500 20-24 8-12
Planning , Protection & Optimization (include exams) 5 PPO_v3 Inhse exam 4.0 $20,500 20-24 5-9
Managing Across Lifecycle - for the certification of ITIL EXPERT Attainment
Managing Across Lifecycle - for the certification of ITIL EXPERT Attainment (include exams) 5 MALC_v3 Inhse exam 5.0 $21,800 24-28
**22 Points to obtain ITIL Expert
21*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
PMI Certified Courses										
Project Management Professional Fast Track (PMI Certified) - 35 PDUs (extra fee - exam voucher -
HKD$4800)
5 PMP $12,000 13-17
PMP Exam Revision Workshop 2 PMP-ERW $5,000 12-13
I.T. Security Courses										
Certified Information System Security Professional (extra fee - exam voucher - HKD$4800) 5 CISSP $12,000 23-27 10-13
Certified in Risk and Information Systems Control (extra fee - exam voucher - HKD$5700) 4 CRISC $12,000 20-23
Certified Information System Auditor (extra fee - exam voucher - HKD$5700) 4 CISA $12,000 27-30 26-29
Certified Information Security Manager (extra fee - exam voucher - HKD$5700) 4 CISM $12,000 28/2-3/3 5-8
CISSP Exam Revision Workshop 2 CISSP-ERW $5,000 4-5
CRISC Exam Revision Workshop 2 CRISC-ERW $5,000 6-7
CISA Exam Revision Workshop 2 CISA-ERW $5,000 1-2
CISM Exam Revision Workshop 2 CISM-ERW $5,000 29&31
Datacentre Specialisation Courses		 								
Certified Datacenter Professional (include exam) 2 CDCP $13,000 6-7 19-20
Certified Datacenter Specialist (include exam) 3 CDCS $21,000 8-10 21-23
Certified Datacentre Expert (include exam) 5 CDCE $31,200
Certified Datacentre Facilities Operations Manager (include exam) 3 CDFOM $21,000 24-26
Certified Datacentre Migration Specialist (include exam) 2 CDMS $13,000 27-28
Certified Datacentre Risk Professional (include exam) 2 CDRP $13,000
Certified TIA-942 Design Consultant (include exam, TIA-942 standard) 3 CTDC $24,000 22-24
Certified TIA-942 Internal Auditor (include exam) 2 CTIA $13,000 25-26
Certified Datacenter Professional (include exam) - Virtual ILT 2 CDCP-VILT $13,000 13-14 12-13
Other Infrastructure Courses
22*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Other Infrastructure Courses
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Datacentre Specialisation Courses										
Certified Datacenter Specialist (include exam) - Virtual ILT 3 CDCS-VILT $21,000 15-17
Certified Datacentre Facilities Operations Manager (include exam) - Virtual ILT 3 CDFOM-VILT $21,000 14-16
Certified IT Professional (include exam) - Virtual ILT 2 CITP-VILT $13,000 3-4
Certified IT Specialist (include exam) - Virtual ILT 3 CITS-VILT $15,000 5-7
Certified Datacentre Risk Professional (include exam) - Virtual ILT 2 CDRP-VILT $13,000 27-28
Certified Datacentre Migration Specialist (include exam) - Virtual ILT 2 CDMS-VILT $13,000 14-15 29-30
Check Point Courses										
Check Point Security Administration (R77.3 Gaia) 3 CCSA-R77 156-215.77 $19,500 8-10 23-25
Check Point Security Engineering (R77 Gaia) 4 CCSE-R77 156-315.77 $27,300 14-17 6-9
Secure Web Gateway 2 SWG 156-726.77 $15,600 On demand, please call +852 2513 3322 for further information
Threat Prevention 2 ThreatP 156-727.77 $15,600 On demand, please call +852 2513 3322 for further information
Bluecoat - Secure Web Gateway Track	
Blue Coat Certified Proxy Administrator 3 BCCPA $26,500 On demand, please call +852 2513 3322 for further information
Blue Coat Certified Proxy Professional 2 BCCPP $19,500 On demand, please call +852 2513 3322 for further information
VMware
Datacentre Virtulization
vSphere: Install, Configure, Manage [V6] (extra fee - exam voucher - HKD$1750 on VCP6-DCV,
HKD$950 on vSphere 6 Foundation exam)
5 VI6ICM VCP6-DCV* $23,400 9-13 6-10 6-10 24-28 8-12 5-9
vSphere: Troubleshooting Workshop [V6.0] (extra fee - exam voucher - HKD$1750 on VCP6-DCV,
HKD$950 on vSphere 6 Foundation exam)
5 VI6TS
VCP6-DCV* or
VCIX6-DCV^
(VCAP6-DCV
Deploy)
$25,700 23-27 20-24 20-24 24-28 22-26 19-23
vSphere: What's New [V5.x to V6] (extra fee - exam voucher - HKD$1750 on VCP6-DCV, HKD$950 on
vSphere 6 Foundation exam)
2 VI6WN VCP6-DCV* $9,400 27-28 20-21 4-5 1-2
23*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Other Infrastructure Courses
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
VMware
Datacentre Virtulization
vSphere: Optimize and Scale V6
(extra fee - exam voucher - HKD$1750 on VCP6 - DCV or HKD$ 3200 on VCIX6-DCA, HKD$950 on
vSphere 6 Foundation exam)
5 VI6OS
VCP6-DCV* or
VCIX6-DCV^
(VCAP6-DCV
Deploy)
$26,000 16-20 13-17 13-17 15-19 12-16
VMware vSphere: Design & Deploy Fast Track [V6.0] 5 VI6DDFT
VCP6-DCV* or
VCIX6-DCV^
(VCAP6-DCV
Design)
$36,000 16-20 20-24 22-26
VMware vSphere: Skills for Operators [V5.5] to [V6.0] 2 VSFO55 NIL $9,400 27-28 4-5
VMware Virtual SAN: Deploy and Manage [V6] 3 VVSDM6 NIL $14,000 23-25 27-29 24-26
NSX : Install, Configure, Manage [V6.0]
( extra fee - exam voucher - HKD$1750 on VCP6-NV, HKD$950 on vSphere 6 Foundation exam)
5 VNSX VCP6-NV* $23,400 13-17 24-28 26-30
End User Computing
VMware Horizon 7: Install, Configure, Manage [V7.0]
(extra fee - exam voucher - HKD$1750 on VCP5-DT, HKD$950 on vSphere 6 Foundation exam)
5 VV7ICM TBA $23,400 6-10 24-28 5-9
VMware Cloud Automation: Design and Deploy Fast Track [V6.x] (NEW!)
(extra fee - exam voucher - HKD$1750 on VCP5-DT, HKD$950 on vSphere 6 Foundation exam)
5 VCADD VCIX6-CMA $36,000 20-24 24-28 12-16
VMware Horizon Mirage: Install, Configure, Manage V5.0 3 VHMICM5 NIL $14,000 9-11 8-10 10-12
Cloud										
vCloud Director: Install, Configure, Manage V5.5
(extra fee - exam voucher - HKD$1750 on VCP-Cloud)
3 VCICM55 VCP-Cloud $14,000 18-20 15-17 24-26
VMware vRealize Automation: Install, Configure, Manage [V7] NEW!
(extra fee - exam voucher - HKD$1750 on VCP-Cloud, HKD$950 on vSphere 6 Foundation exam)
5 VCAC7 NIL $23,400 6-10 24-28 19-23
VMware vRealize Operations Manager: Install, Configure, Manage [V6.0] NEW! 5 VOM6 NIL $25,800 13-17 5-9
VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 VSRM5 NIL $10,500 23-24 23-24 25-26
AirWatch Enterprise Mobility
AirWatch Enterprise Mobility: Install and Deploy On-Premise Solutions (NEW!) 1 VAWID NIL $6,000 1 3 9
24*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Other Infrastructure Courses
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
VMware
AirWatch Enterprise Mobility
AirWatch Enterprise Mobility: Configure and Deploy Integrated Solutions (NEW!) 2 VAWCD NIL $10,500 5-6 2-3 4-5
AirWatch Enterprise Mobility: Configure and Manage (NEW!) 2 VAWCM NIL $10,500 2-3 6-7 6-7
AirWatch Enterprise Mobility: Bootcamp (NEW!) (Intensive combination of "Mobility: Configure &
Manage" and "Mobility: Configure & Deploy Integrated Solutions" courses)
4 VAWBC NIL $18,000 21-24 18-21 19-22
Riverbed Courses											
Riverbed WAN200 Optimization Essentials 5 WAN200 $39,000 5-9
Implementing Enterprise Optimization Architectures 5 WAN350 $39,000 On demand, please call +852 2513 3322 for further information
EC-Council Courses										
EC-Council Network Security Administrator (Bundled with ONE exam voucher) 5 ENSA 312-38 $15,000 On demand, please call +852 2513 3322 for further information
EC-Council Certified Ethical Hacker (Bundled with ONE exam voucher) 5 CEH 312-50 $22,000 27-31 22-26
Computer Hacking Forensic Investigator (Bundled with ONE exam voucher) 5 CHFI 312-49 $16,800 8-12
EC-Council Certified Security Analyst (Bundled with ONE exam voucher) 5 ECSA 412-79 $25,000 19-23
EC-Council Certified Incident Handler (Bundled with ONE exam voucher) 2 ECIH 212-89 $12,500 On demand, please call +852 2513 3322 for further information
F5 Courses										
Administering BIG-IP v11 2 BIG-OP-ADMIN $15,600 16-17 6-7 8-9
Configuring BIG-IP LTM v11: Local Traffic Manager 3 BIG-LTM-CFG-3 $23,400 18-20 8-10 10-12
Troubleshooting BIG-IP LTM v11 2 BIG-TRBL-INT2 $15,600 On demand, please call +852 2513 3322 for further information
Configuring BIG-IP v11 on VIPRION 1 VPR-1 $7,800 10 9
Configuring BIG-IP GTM v11: Global Traffic Manager 2 BIG-GTM-IL $15,600 23-24 27-28
25*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Other Infrastructure Courses
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
F5 Courses
Configuring BIG-IP ASM v11: Application Security Manager 4 BIG-ASM-ESS $31,200 10-13 5-8
Configuring BIG-IP APM v11: Access Policy Manager 3 BIG-EGW-APM $23,400 20-22 24-26
Configuring BIG-IP AFM v11: Advanced Firewall Manager 2 BIG-AFM-CFG $15,600 On demand, please call +852 2513 3322 for further information
Developing iRules for BIG-IP v11 3 BIG-IRULE-CFG $23,400 On demand, please call +852 2513 3322 for further information
Citrix Courses
Managing App and Desktop Solutions with Citrix XenDesktop 7.6 (Bundled with ONE exam voucher) 4 CXD-203 EXAM-201 $35,000 3-6 7-10 3 & 5-7 5-8
Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 (Bundled ONE exam
voucher)
4 CXD-300 EXAM-301 $35,000 14-17 10-13 12-15
Citrix XenApp and XenDesktop Advanced Concepts – Troubleshooting (2 days) (Bundled ONE exam
voucher)
2 CXD-302 $15,000 27-28 27-28 29-30
Designing App and Desktop Solutions with Citrix XenDesktop 7 (Bundled with ONE Exam voucher) 4 CXD-400 EXAM-401 $35,000 20-23 15-18
Deploy and Manage Citrix XenApp/XenDesktop 7.6 Fast Track (Fast Track Course of CXD-203 & CXD-
300)(Bundled TWO exam voucher)
5 CMB-300 $39,000 23-27 27-31 22-26
Citrix XenApp 6.5 Administration [Bundle with One Exam Voucher] 4 CXA-206 EXAM-A20 $35,000 6-9 6-9
Citrix NetScaler Essentials and Traffic Management [NEW] (Bundled with ONE exam voucher) 4 CNS-220 EXAM-351 $35,000 20-23 24-27 19-22
Citrix NetScaler Essentials and Unified Gateway (Bundled with ONE exam voucher) 4 CNS-222 EXAM-253 $35,000 13-16 15-18
Deploying Enterprise Mobility Solutions with Citrix XenMobile [NEW] (Bundled with ONE exam Voucher) 4 CXM-303 EXAM-371 $35,000 9-12 6-9 8-11
Brocade Courses
Brocade Associate San Administrator 4 BASA 200 $23,400 On demand, please call +852 2513 3322 for further information
Brocade Professional IP Administrator 4 BPIPA 200 $31,200 On demand, please call +852 2513 3322 for further information
Brocade Professional San Administrator 3 BPSA 300 $23,400 On demand, please call +852 2513 3322 for further information
Brocade Certified Ethernet Fabric Engineer 5 CEF 300 $27,300 On demand, please call +852 2513 3322 for further information
26*Prices and course dates are subject to change
Part time schedule available based on request
<< Back to CONTENT
Other Infrastructure Courses
Course Description
Duration
(days)
Code Exam Code
List Price
HK$
Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
Brocade Courses
ADX Advanced Techniques in Server Load Balancing Certified Layer 4 - 7 Professional 3 CLP 240 $23,400 On demand, please call +852 2513 3322 for further information
Brocade MPLS Implementation 3 MPLS 400 $23,400 On demand, please call +852 2513 3322 for further information
MPLS Traffic Engineering 2 MPLS-TE 450 $15,600 On demand, please call +852 2513 3322 for further information
Brocade 5600 vRouter Fundamentals 3 NFV200 $23,400 On demand, please call +852 2513 3322 for further information
BASA 200 & BPSA 300 Combo 5 SAN Combo $39,000 On demand, please call +852 2513 3322 for further information
SAN Troubleshooting 3 TS 300 $23,400 On demand, please call +852 2513 3322 for further information
EMC Courses										
VPLEX Management 3
MR-1CN-
VPLEXMGMT
$11,700 On demand, please call +852 2513 3322 for further information
Avamar Integration and Performance Management 5 $19,500 8-12
Isilon Administration and Management 5 MR-1CP-ISIAM $19,500 On demand, please call +852 2513 3322 for further information
Data Domain System Administration 4
MR-1CP-
DDSADMIN
$15,600 24-27
NetWorker Implementation and Management 5 $19,500 13-17
Networker Integration Workshop 5 $19,500 13-17
Symmetrix VMAX Configuration Management 5 MR-1CP-SYMCFG $19,500 On demand, please call +852 2513 3322 for further information
Symmetrix VMAX Business Continuity Management 5
MR-1CP-
SYMBCMGMT
$19,500 On demand, please call +852 2513 3322 for further information
VMAX3 Business Continuity Management 2
MR-1CP-
VMAXBCM
$7,800 On demand, please call +852 2513 3322 for further information
VMAX3 Configuration Management 3
MR-1CP-
VMAXCM
$11,700 On demand, please call +852 2513 3322 for further information
VNX Unified Storage Management 5
MR-1CP-
VNXUNIDM
$19,500 On demand, please call +852 2513 3322 for further information
ECS for Geo-Scale Object Storage 3
MR-1CN-
ETECSOBJS
$11,700 On demand, please call +852 2513 3322 for further information
Optimizing Storage Services for Applications with XtremIO 3
MR-1CP-
XIO4APPS
$11,700 On demand, please call +852 2513 3322 for further information
Company Name
CAPM/PMP Application Only
PMI Member Applying for PMI Membership
Contact Person Billing Details (Please complete if different from Contact Person)
Mailing Address Mailing Address
Name Contact Number Name Contact Number
Email Address Email Address
No
Name of Attendee
(as per passport)
Email Job Title Contact Number
Course
Code/Title
Course Date
(dd/mm/yy)
01
02
03
Total:
Total amount of the registration:
bill my company	 cheque enclosed	
Authorized Signature / Company Stamp
I/We hereby have read and accepted the Terms & Conditions
Course Registration Form (Hong Kong)
Call us for any query or fax/email completed form to Training Partners, Attention: Training Administrator
Sales Contact Person
PO/PR Reference
Promotion Codes
Date:
I/We hereby have read and accepted the Terms & Conditions on page 2.
Yes YesNo No
Course Fees
1
China Hong Kong India Indonesia Korea Malaysia Singapore Taiwan Thailand
tel: (86) 10 5737 1904 tel: (852) 2513 3322 tel: (9180) 4901 2800 tel: (62) 21 831 7585 tel: (82) 2 6256 7057 tel: (603) 7729 8966 tel: (65) 6225 9188 tel: (886) 2 2171 1500 tel: (66) 2625 0988
fax: (86) 10 8525 1126 fax: (852) 2513 3387 fax: (9180) 4901 2803 fax: (62) 21 831 7585 fax: (82) 2 556 7314 fax: (603) 7729 9266 fax: (65) 6225 9288 fax: (886) 2 2171 1509 fax: (66) 2625 0893
cn@training-partners.com hk@training-partners.com in@training-partners.com info.id@dimensiondata.com kr@training-partners.com my@training-partners.com sg@training-partners.com tw@training-partners.com th@training-partners.com
Terms and Conditions
China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand
2
Intellectual Property
Rights
All intellectual property rights, including copyright, patent, design rights relating to the course or course materials that are provided, or made available during the course, remain the sole property of TP, Dimension Data or its
licensors. No copies of course materials may be made either whole or in part unless expressly agreed in advance in writing by *TP.
Course Pre-requisite
It is the responsibility of the company and/ or participant(s) to ensure that they meet the pre-requisite of the course(s) on the course outline. *TP will not be held responsible for any participant(s) who faces difficulties during
course(s) who do not meet the pre-requisite. TP reserves the right to charge up to HKD3900 for courses that has commenced and client request to change course due to not meeting course pre-requisite.
Course Confirmation Course schedule is considered tentative until course confirmation is sent to participants.
Course Cancellation
*TP reserves the right to cancel a course without liability if it is not able to meet the minimum class size or for any unforeseen circumstances. Participants will be given written notice of cancellation at least 3 working days before
course commencement.
Exception of Policy
No deferment or cancellation of course(s) is allowed for registration under promotional rates. Company is allowed to substitute participant(s). Individual Participants may choose a similar course on another date. Course fee will be
considered forfeited for absentee of participant(s).
Payment Terms
Full payment is to be made upon confirmation of registration. Payment is due 5 working days before course commencement. Course/ Exam fees are subject to all applicable local government taxes such as GST/ VAT. Seats are
deemed confirmed once full payment is received. TP reserves the right to refuse attendance for unpaid courses until receipt of full payment. A receipt for the payment will be provided to participants.
Consumption of Course
Full course/ Exam(s) attendance must be utilized within 12 months upon registration. No refunds will be allowed for unconsumed course/ Exam. However substitution of candidate(s) or Course/ Exam(s) of similar/equal value is
allowed.
Deferment of Course
Written notice received:
More than 10 working days – No penalty
Less than 10 working days – Penalty of up to HKD3900 may be charged
Less than 3 working days / No show – 100% of course fees
Cancellation of Course
Written notice received:
More than 10 working days – No penalty
Less than 10 working days – 50% of course fees
Less than 3 working days / No show – 100% of course fees
Mode of Payment
Mode of payment can be by cheque or telegraphic transfer. Training Partners administrator will contact you to confirm your preferred mode of payment.
By Cheque : Payable to “ Training Partners Pte Ltd “
By Telegraphic Transfer :
Account name – Training Partners Pte Ltd
Account Number – 6896020242 (HKD) or 6896020259 (USD)
SWIFT Code : CHASHKHH
Bank Name : JPMorgan Chase Bank N.A., Hong Kong Branch
Bank Code : 007
Bank Address : 18/F JPMorgan Tower, 138 Shatin Rural Committee Road, Shatin, New Territories, HK
Limitation of Liability
*TP’s total aggregate/ cumulative liability for all claims, whether for breach of contract, breach of warranty or in tort, including negligence, will be limited to the amount paid to *TP for the Courses/ Exams. *TP will not be liable for
any indirect, punitive, special, incidental or consequential damages in connection with or arising out of any of its Courses.
*TP also may include Dimension Data. In certain territories in Asia, TP is trading under the auspices of the Dimension Data entity. These terms and conditions may be subject to change at any time by *TP.
Training Partners
5/F, Oxford House, Taikoo Place, 979 King’s Road, Quarry Bay, Hong Kong
Tel: (852) 2513 3322 | Fax: (852) 2513 3387 | Email: hk@training-partners.com

TPHK 2017 Training Schedule

  • 1.
    Authorised Training Centrefor : Course Schedule 2017 Hong Kong v01 Authorised Training Centre for :
  • 2.
    Training Partners isa certified learning partner of the following leading IT vendors. Company Overview About Training Partners Training Partners is Asia Pacific’s leading ICT infrastructure learning and development provider. We pride ourselves on providing training consultancy, technology partner certifications, best practice programmes, bespoke content courses, self- paced e-learning, virtual classroom learning and change management solution as enablement catalysts to our clients’ business growth. Our User Adoption Services also helps you and your users to effectively adopt new technology from the moment it is deployed. Established in Singapore in 1994, Training Partners is a wholly owned subsidiary of Dimension Data and operates in 9 countries in the Asia Pacific region. We deliver training programmes and services in five languages and have successfully trained over 100,000 ICT professionals. Authorized Learning Partners Many of our training centres are also accredited examination centres. We provide our clients with a one-stop training and accreditation solution. Accredited Exam Centres www.training-partners.com China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand
  • 3.
    Best Practices Programs www.training-partners.com China • HongKong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand Other than vendor specific courses, we also offer training in Certified Best Practices Programs which include: • Project Management Professional (PMP®) • Certified Datacenter Professional (CDCP) • Certified Data Center Specialist (CDCS) • ITIL® Foundation and Intermediate • Certifications Certified Information Systems Security Professional (CISSP) • ICAgile Certified Professional (ICP) The certifications we offer are accredited by PEOPLECERT for our ITIL® programme, PMI for our PMP programme, EXIN for our CDCP and CDCS programme, and IC Agile for our Agile Fundamentals programme 1. The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc. 2. ITIL® is a registered trade mark of AXELOS Limited. The Swirl logo™ is a trade mark of AXELOS Limited. The ITIL ® Accredited Training Organization logo is a trade mark of AXELOS Limited User Adoption Services or UAS, is a set of planning and management services that help users to adopt the change so that they can effectively adopt the new system, and minimise productivity loss when the new system is deployed. Primary features of our User Adoption Services: User Adoption Services
  • 4.
    Our accolades speakhighly of our achievements and professionalism in training. For enhanced learning and practical experience, our students have access to live equipment during the class. We believe that this is better than simulation, and had invested heavily in equipment set-up and boasts of more than 1000 sq ft of remote lab that is headquartered in Singapore. Our lab facilities currently host 22 Cisco racks and 4 other vendor racks including Juniper and VMware. The racks are also being provided with remote power control options to extend the power recycle option to the instructors in the region. Awards Scan the QR code to visit our website Remote Labs www.training-partners.com China • Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand 2015 • Cisco Learning Partner of the Year Award – APJ 2014 • Best IT Training Provider from Computerworld Hong Kong • Cisco APJC Collaboration Award 2013 • Cisco APJC Collaboration Award 2012 • Brandon Hall Gold award for excellence in the Best Custom Content category • NetDimensions Reseller Technical Excellence award • Cisco APJC Collaboration Award 2011 • Brandon Hall Silver Award - Best Advance in Learning Management Technology for Global Training • Brandon Hall Gold Award - Best Advance in Performance Support Technology • Brandon Hall Gold Award - Best Advance in Learning Management Technology for External Training • Top 20 Learning Portal Companies by TrainingIndustry.com 2010 • Cisco Learning Partner of the Year, APAC & Greater China • JNAEC Partner of the Year (runner-up) • Top 20 Learning Portal Companies by TrainingIndustry.com
  • 5.
    Cisco Network CertificationPrograms ................................................................................... 6 Microsoft ...............................................................................................................................13 ITIL - Information Technology Infrastructure Library .............................................................20 Other Infrastructure Courses PMI Certifed Courses.......................................................................................................................................................21 I.T. Security Courses .......................................................................................................................................................21 Datacentre Specialisation Courses............................................................................................................................21-22 Check Point .....................................................................................................................................................................22 Bluecoat ..........................................................................................................................................................................22 VMware ................................................................................................................................................................... 22-24 Riverbed...........................................................................................................................................................................24 EC-Council Courses.........................................................................................................................................................24 F5 Courses .............................................................................................................................................................. 24-25 Citrix ................................................................................................................................................................................25 EMC Courses...................................................................................................................................................................26 Content
  • 6.
    6*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 ENTRY IP Networking (CCENT) - Cisco Certified Entry Networking Technician - Certification valid for 3 years Interconnecting Cisco Networking Devices Part 1 5 ICND1 100-101 ICND1 / CCENT $14,000 18 On demand, please call +852 2513 3322 for further information ASSOCIATE Associate Understanding Cisco Cloud Fundamentals 5 CLDFND 210-451 CLDFND $21,840 28 16-20 27-31 12-16 Introducing Cisco Cloud Administration 5 CLDADM 210-455 CLDADM $21,840 28 13-17 15-19 Design (CCDA) - Certification valid for 3 years Designing for Cisco Internetwork Solutions v3.0 5 DESGN 200-310 DESGN $18,000 23 6-10 Collaboration (CCNA) - Certification valid for 3 years Implementing Cisco Collaboration Devices 5 CICD 210-060 CICD $21,840 28 3, 5-7 Implementing Cisco Video Network Devices, Part 1 ELT CIVND1 210-065 CIVND USD 395 nil Please purchase from Cisco Leanring Network Store Implementing Cisco Video Network Devices, Part 2 5 CIVND2 $24,960 32 22-26 CCNA Cyber Ops (CCNA) - Certification valid for 3 years Understanding Cisco Cybersecurity Fundamentals SECFND 210-250 SECFND On demand, please call +852 2513 3322 for further information Implementing Cisco Cybersecurity Operations SECOPS 210-255 SECOPS On demand, please call +852 2513 3322 for further information Data Center (CCNA) - Certification valid for 3 years Introducing Cisco Data Center Networking 4 DCICN 640-911 DCICN $21,000 27 27/2-2/3 Introducing Cisco Data Center Technologies 5 DCICT 640-916 DCICT $26,520 34 27-31 Cisco Network Certification Programs
  • 7.
    7*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 ASSOCIATE Industrial (CCNA) - Certification valid for 3 years Managing Industrial Networking for Manufacturing with Cisco Technologies 5 IMINS2 200-601 IMINS2 $24,960 32 On demand, please call +852 2513 3322 for further information Routing and Switching (CCNA) - Certification valid for 3 years Interconnecting Cisco Networking Devices Part 1 v3.0 5 ICND1 100-105 ICND1 v3 / CCENT $15,600 20 On demand, please call +852 2513 3322 for further information Interconnecting Cisco Networking Devices Part 2 v3.0 5 ICND2 200-105 ICND2 v3 $17,160 22 20-24 24-28 19-23 Interconnecting Cisco Networking Devices Accelerated v3.0 5 CCNAX 200-125 CCNA v3 $19,500 25 20-24 24-28 19-23 Security (CCNA) - Certification valid for 3 years Implementing Cisco IOS Network Security (IINS) 5 IINS 210-260 IINS $17,160 22 6-10 29/5-2/6 Service Provider (CCNA) - Certification valid for 3 years Building Cisco Service Provider Next-Generation Networks, Part 1 5 SPNGN1 640-875 SPNGN1 $17,160 22 On demand, please call +852 2513 3322 for further information Building Cisco Service Provider Next-Generation Networks, Part 2 5 SPNGN2 640-878 SPNGN2 $17,160 22 On demand, please call +852 2513 3322 for further information Wireless (CCNA) - Certification valid for 3 years Implementing Cisco Wireless Network Fundamentals 5 WIFUND 200-355 WIFUND $17,160 22 9-13 27-31 26-30 PROFESSIONAL CCDP - Certification valid for 3 years Implementing Cisco IP Routing v2.0 5 ROUTE 300-101 ROUTE $20,500 26 23-27 18-21 Implementing Cisco IP Switched Networks v2.0 5 SWITCH 300-115 SWITCH $20,500 26 6-10 8-12 Designing Cisco Network Service Architectures 5 ARCH 300-320 ARCH $20,500 26 13-17
  • 8.
    8*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 PROFESSIONAL CCNP Cloud - Certification valid for 3 years Implementing and Troubleshooting the Cisco Cloud Infrastructure 5 CLDINF 300-460 CLDINF $25,740 33 On demand, please call +852 2513 3322 for further information Designing the Cisco Cloud 5 CLDDES 300-465 CLDDES $25,740 33 On demand, please call +852 2513 3322 for further information Automating the Cisco Enterprise Cloud 5 CLDAUT 300-470 CLDAUT $25,740 33 On demand, please call +852 2513 3322 for further information Building the Cisco Cloud with Application Centric Infrastructure 5 CLDACI 300-475 CLDACI $25,740 33 On demand, please call +852 2513 3322 for further information CCNP Collaboration - Certification valid for 3 years Implementing Cisco IP Telephony and Video, Part 1 5 CIPTV1 300-070 CIPTV1 $27,300 35 16-20 15-19 Implementing Cisco IP Telephony and Video, Part 2 5 CIPTV2 300-075 CIPTV2 $27,300 35 13-17 5-9 Troubleshooting Cisco IP Telephony and Video 5 CTCOLLAB 300-080 CTCOLLAB $27,300 35 3-7 Implementing Cisco Collaboration Applications 5 CAPPS 300-085 CAPPS $27,300 35 8-12 CCNP Data Centre - Certification valid for 3 years Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13 Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19 For Design Track (Must pass 2 of the compulsory exam above and below 2) Designing Cisco Data Center Unified Computing 4 DCUCD 642-998 DCUCD v5.0 $25,740 33 31/1-3/2 29/5-2/6 Designing Cisco Data Center Unified Fabric 5 DCUFD 642-996 DCUFD v5.0 $31,200 40 27/2-3/3 12-16 For Troubleshooting Track (Must pass 2 of the compulsory exam above and below 2) Troubleshooting Cisco Data Center Unified Computing 3 DCUCT 642-035 DCUCT v5.0 $23,400 30 4-6 5-7 Troubleshooting Cisco Data Center Unified Fabric 3 DCUFT 642-980 DCUFT v5.0 $23,400 30 1-3 28-30
  • 9.
    9*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 PROFESSIONAL CCNP Routing & Switching - Certification valid for 3 years Implementing Cisco IP Routing v2.0 5 ROUTE 300-101 ROUTE $20,500 26 23-27 18-21 Implementing Cisco IP Switched Networks v2.0 5 SWITCH 300-115 SWITCH $20,500 26 6-10 8-12 Troubleshooting and Maintaining Cisco IP Networks v2.0 5 TSHOOT 300-135 TSHOOT $23,400 30 20-24 12-16 CCNP Security - Certification valid for 3 years Implementing Cisco Secure Access Solutions 5 SISAS 300-208 SISAS $23,400 30 20-24 Implementing Cisco Edge Network Security Solutions 5 SENSS 300-206 SENSS $23,400 30 22-26 Implementing Cisco Secure Mobility Solutions 5 SIMOS 300-209 SIMOS $23,400 30 18-21 Implementing Cisco Threat Control Solutions 5 SITCS 300-207 SITCS $23,400 30 31/1-3/2 26-30 CCNP Service Provider - Certification valid for 3 years Deploying Cisco Service Provider Network Routing 5 SPROUTE 642-883 SPROUTE $24,960 32 13-17 Deploying Cisco Service Provider Advanced Network Routing 5 SPADVROUTE 642-885 SPADVROUTE $24,960 32 10-13 Implementing Cisco Service Provider Next-Generation Core Network Services 5 SPCORE 642-887 SPCORE $24,960 32 23-27 19-23 Implementing Cisco Service Provider Next-Generation Edge Network Services 5 SPEDGE 642-889 SPEDGE $24,960 32 20-24 CCNP Wireless - Certification valid for 3 years Designing Cisco Wireless Enterprise Networks 5 WIDESGN 300-360 WIDESGN $27,300 35 3-6 3-7 Deploying Cisco Wireless Enterprise Networks 5 WIDEPLOY 300-365 WIDEPLOY $27,300 35 31/1-3/2 10-13 Troubleshooting Cisco Wireless Enterprise Networks 5 WITSHOOT 300-370 WITSHOOT $27,300 35 27/2-3/3 8-12 Securing Cisco Wireless Enterprise Networks 5 WISECURE 300-375 WISECURE $27,300 35 6-10 15-19
  • 10.
    10*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 EXPERT - Certifcation valid for 2 years CCIE 360 Program CCIE 360 - Routing and Switching WorkShop 1 5 CIERS-1 400-101 Written Exam $32,760 42 27-31 CCIE 360 - Routing and Switching WorkShop 2 5 CIERS-2 Written and Lab Exam $39,000 50 22-26 IronPort End User Training Securing Email with Cisco Email Security Appliance Part 1 and 2 3 SESA 650-153 ESFE $21,000 27 On demand, please call +852 2513 3322 for further information Securing the Web with Cisco Web Security Appliance 2 SWSA 650-568 WSFE $14,040 18 On demand, please call +852 2513 3322 for further information Partner Training Securing Email with Cisco Email Security Appliance 2 PASESA 650-153 ESFE $14,040 18 On demand, please call +852 2513 3322 for further information Securing the Web with Cisco Web Security Solutions 2 PASWSA 650-568 WSFE $14,040 18 On demand, please call +852 2513 3322 for further information SPECIALIST CERTIFICATIONS Data Center Cisco Data Center Unified Computing Design Specialist - Valid for 2 years Designing Cisco Data Center Unified Computing 4 DCUCD 642-998 DCUCD v5.0 $25,740 33 31/1-3/2 29/5-2/6 Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13 Cisco Data Center Unified Computing Support Specialist - Valid for 2 years Cisco Data Center Unified Computing Implementation 5 DCUCI 642-999 DCUCI v5.0 $31,200 40 16-20 10-13 Troubleshooting Cisco Data Center Unified Computing 3 DCUCT 642-035 DCUCT v5.0 $23,400 30 4-6 5-7
  • 11.
    11*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Data Center Cisco Data Center Unified Fabric Design Specialist - Valid for 2 years Designing Cisco Data Center Unified Fabric 5 DCUFD 642-996 DCUFD v5.0 $31,200 40 27/2-3/3 12-16 Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19 Cisco Data Center Unified Fabric Support Specialist - Valid for 2 years Implementing Cisco Data Center Unified Fabric 5 DCUFI 642-997 DCUFI v5.0 $31,200 40 13-17 15-19 Troubleshooting Cisco Data Center Unified Fabric 3 DCUFT 642-980 DCUFT v5.0 $23,400 30 1-3 28-30 Other Storage and Data Centre Trainings Introducing Cisco Nexus 9000 and Application Centric Infrastructure (ACI) 2 DCINX9K $17,940 23 On demand, please call +852 2513 3322 for further information Configuring Cisco Nexus 9000 switches in ACI mode 5 DCAC9K $35,100 45 6-10 Configuring Cisco MDS 9000 Switches 5 DCMDS $31,200 40 31/1-3/2 8-12 Configuring Cisco Nexus 7000 Switches 5 DCNX7K $31,200 40 3-7 Configuring Cisco Nexus 5000 Switches 5 DCNX5K $31,200 40 On demand, please call +852 2513 3322 for further information Configuring Cisco Data Center Unified Computing 5 DCUCS $31,200 40 26-30 Implementing the Cisco Nexus 1000V 3 DCNX1K $23,400 30 On demand, please call +852 2513 3322 for further information Other Cisco Discipline Configuring BGP on Cisco Routers 5 BGP $23,400 30 On demand, please call +852 2513 3322 for further information IPv6 Fundamentals, Design and Deployment 5 IP6FD $23,400 30 On demand, please call +852 2513 3322 for further information
  • 12.
    12*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Cisco Network Certification Programs Course Duration (days) Course Code Exam Code List Price HK$ Learning Credits Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Other Cisco Discipline Implementing Cisco MPLS 5 MPLS $23,400 30 On demand, please call +852 2513 3322 for further information Implementing Cisco MPLS Traffic Engineering & Other Features 5 MPLST $23,400 30 On demand, please call +852 2513 3322 for further information Implementing Cisco Quality of Service 5 QOS $23,400 30 On demand, please call +852 2513 3322 for further information Securing Networks with Cisco Routers and Switches 5 SECURE $27,300 35 On demand, please call +852 2513 3322 for further information Deploying Cisco ASA Firewall Solutions 5 FIREWALL $27,300 35 On demand, please call +852 2513 3322 for further information Deploying Cisco ASA VPN Solutions 5 VPN $27,300 35 On demand, please call +852 2513 3322 for further information Implementing Cisco Intrusion Prevention System 5 IPS $27,300 35 On demand, please call +852 2513 3322 for further information Implementing CiscoWorks LMS 5 CWLMS $27,300 35 On demand, please call +852 2513 3322 for further information Implementing the Application Control Engine Service Module 4 ACESM $27,300 35 On demand, please call +852 2513 3322 for further information Implementing the Cisco Application Control Engine Appliance 4 ACEAP $27,300 35 On demand, please call +852 2513 3322 for further information Unified Contact Center Express Advanced 4 UCCXA $28,000 36 On demand, please call +852 2513 3322 for further information Deploying Cisco Unified Contact Center Express 5 UCCX $28,000 36 31/1-3/2 Implementing and Configuring the Cisco Identity Services Engine 5 SISE 500-254 SISE $25,740 33 20-24 22-26 Implementing Core Cisco ASA Security 1.0 5 SASAC $26,500 34 13-17 5-9 Implementing Advanced Cisco ASA Security 5 SASAA $28,000 36 18-21 Implementing Cisco TelePresence Video Solutions, Part 1 ELT VTVS1 USD 395 nil Please purchase from Cisco Leanring Network Store Implementing Cisco TelePresence Video Solutions, Part 2 5 VTVS2 $28,000 36 On demand, please call +852 2513 3322 for further information *** For other Cisco Advanced Services Education trainings, please feel free to contact Training Partners @ 251 3 3322, hk@training-partners.com
  • 13.
    13*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Windows 7 / 8 / 10 MCSA Windows 8 Installing and Configuring Windows 10 [NEW] 4 20697-1 70-697 $10,000.00 23-26 27-30 23-26 Deploying and Managing Windows 10 Using Enterprise Services [NEW] 4 20697-2 70-697 $10,000.00 21-24 24-27 26-29 Supporting and Troubleshooting Windows 10 [NEW] 4 10982 - $10,000.00 10-13 21-24 22-25 Virtualizing Enterprise Desktops and Apps [NEW] 4 20694 70-694 $10,000.00 16-19 13-16 15-18 MCSE Windows 8 Deploying Windows Devices and Enterprise Apps [NEW] 4 20695 70-695 $10,000.00 23-26 20-23 22-25 Administering System Center Configuration Manager and Intune [NEW] 4 20696 70-696 $10,000.00 13-16 10-13 12-15 Windows 7 / 10 Installing and Configuring Windows 7 Client 2 6292 70-680 $7,000.00 27-28 27-28 29-30 Planning and Managing Windows 7 Desktop Deployments and Environments 4 6294 70-686 $10,000.00 6-9 9-12 Troubleshooting and Supporting Windows 7 in the Enterprise 2 6293 70-685 $7,000.00 5-6 30-31 29 & 31 Windows 7, Enterprise Desktop Support Technician 4 50331 70-685 $10,000.00 7-10 3 & 5-7 5-8 Server Windows Server 2016 Installation, Storage and Compute with Windows Server 2016 [NEW] 4 20740 70-740 $10,000.00 3-6 7-10 7-10 3 & 5-7 9-12 6-9 Networking with Windows Server 2016 [NEW] 4 20741 70-741 $10,000.00 10-13 14-17 14-17 10-13 16-19 13-16 Identity with Windows Server 2016 [NEW] 4 20742 70-742 $10,000.00 17-20 21-24 21-24 18-21 23-26 20-23 Securing Windows Server 2016 [NEW] 4 20744 740-744 $10,000.00 23-26 27/2 - 2/3 22-25 Microsoft Certification Programs
  • 14.
    14*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Server Windows Server 2016 Upgrading Your Skills to MCSA: Windows Server 2016 [NEW] MCSA upgrade exam preparation course for students who hold either an MCSA: Windows Server 2012 or MCSA: Windows Server 2008 certification 4 20742 70-743 $10,000.00 20-23 24-27 26-29 Upgrading Your Skills to Windows Server 2016 [NEW] 4 10983 - $10,000.00 27-30 22-25 MCSA Windows Server 2012 Upgrading Your Skills to Windows Server 2016 [NEW] 4 10983 - $10,000.00 27-30 22-25 Installing and Configurig Windows Server 2012 R2 4 20410 70-410 $10,000.00 3-6 6-9 6-9 3 & 5-7 8-11 5-8 Administering Windows Server 2012 R2 4 20411 70-411 $10,000.00 9-12 13-16 13-16 10-13 15-18 12-15 Configuring Advanced Windows Server 2012 R2 Services 4 20412 70-412 $10,000.00 16-19 20-23 20-23 18-21 22-25 19-22 MCSE Server Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012) Designing and Implementing a Server Infrastructure 4 20413 70-413 $10,000.00 10-13 28/2-3/3 9-12 Implementing an Advanced Server Infrastructure 4 20414 70-414 $10,000.00 17-20 7-10 16-19 MCSE Desktop Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012) Implementing a Desktop Infrastructure 4 20415 70-415 $10,000.00 7-10 3 & 5-7 5-8 Implementing Desktop Application Environments 4 20416 70-416 $10,000.00 14-17 10-13 12-15 Upgrading Your Skills to MCSA Windows Server 2012 R2 4 20417 70-417 $10,000.00 28/2-3/3 18-21 19-22 Automating Administration with Windows PowerShell 4 10961 - $10,000.00 16-19 14-17 23-26 Advanced Automated Administration with Windows PowerShell 2 10962 - $7,000.00 23-24 23-24 25-26 Active Directory services with Windows Server (Windows Server 2012 R2) 4 10969 - $10,000.00 7-10 18-21 13-16 Microsoft Certification Programs
  • 15.
    15*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Server MCSE Desktop Infrastructure Windows Server 2012 (Valid MCSA Windows Server 2012) Networking with Windows Server (Windows Server 2012 R2) 4 10970 - $10,000.00 14-17 24-27 26-29 "Storage and High Availability with Windows Server (Windows Server 2012 R2) " 3 10971 - $8,000.00 13-15 12-14 Administering the Web Server (IIS) Role of Windows Server 4 10972 - $10,000.00 20-23 19-22 Deploying and Migrating Windows Servers 2 10974 - $7,000.00 2-3 6-7 1-2 Server Virtualization with Windows Server Hyper-V and System Center 4 20409 70-409 $10,000.00 16-19 6-9 8-11 SharePoint 2013 / 2016 Planning and Administering SharePoint 2016 [NEW] 4 20339-1 - $10,000.00 16-19 13-16 13-16 10-13 15-18 19-22 Advanced Technologies of SharePoint 2016 [NEW] 4 20339-2 - $10,000.00 23-26 20-23 20-23 24-27 22-25 26-29 Core Solutions of Microsoft SharePoint Server 2013 4 20331 70-331 $10,000.00 3-6 7-10 6-9 3 & 5-7 8-11 5-8 Advanced Solutions of Microsoft SharePoint Server 2013 4 20332 70-332 $10,000.00 10-13 14-17 13-16 10-13 15-18 12-15 PowerPivot, Power View and SharePoint 2013 Business Intelligence Center for Analysts 1 55049 - $4,000.00 27 31 31 Visualizing Data with SharePoint 2013, Report Builder, PowerPivot & PowerView with NO CODE 3 55072 - $8,000.00 SharePoint 2013 Site Collection and Site Administration [NEW] 4 55033 - $10,000.00 27/2 - 2/3 24-27 26-29 Microsoft SharePoint Server 2013 for the Site Owner/Power User [NEW] 2 55035 - $7,000.00 19-20 27-28 31/5 - 1/6 MCSE Private Cloud (Valid MCSA Windows Server 2012) Administering System Center Configuration Manager and Intune [NEW] 4 20246 70-246 $10,000.00 16-19 13-16 15-18 Configuring and Deploying a Private Cloud [NEW] 4 20247 70-247 $10,000.00 23-26 20-23 22-25 Microsoft Certification Programs ** Feel free to call for customized training that fits your company environment.
  • 16.
    16*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Server Exchange Server 2013 / 2016 Core Solutions of Microsoft Exchange Server 2013 4 20341 70-341 $10,000.00 3-6 6-9 6-9 3 & 5-7 8-11 5-8 Advanced Solutions of Microsoft Exchange Server 2013 4 20342 70-342 $10,000.00 10-13 13-16 7-10 10-13 16-19 19-22 Administering Microsoft Exchange Server 2016 [NEW] 4 20345-1 70-345 $10,000.00 10-13 14-17 14-17 10-13 15-18 12-15 Designing and Deploying Microsoft Exchange Server 2016 [NEW] 4 20345-2 70-345 $10,000.00 17-20 21-24 21-24 18-21 23-26 20-23 Lync Server 2013 / Skype for Business 2015 Core Solutions of Microsoft Skype for Business 2015 [NEW] 4 20334 70-334 $10,000.00 14-17 18-21 20-23 Core Solutions of Microsoft Lync Server 2013 4 20336 70-336 $10,000.00 16-19 21-24 20-23 25-28 22-25 19-22 Enterprise Voice and Online Services with Microsoft Lync Server 2013 4 20337 70-337 $10,000.00 24-27 27/2 - 2/3 28-31 25-28 23-26 27-30 SQL Server 2016 Querying Data with Transact-SQL [NEW] 2 20761 - $7,000.00 27-28 27-28 29-30 Developing SQL Databases [NEW] 3 20762 - $8,000.00 25-27 29-31 31/5 - 2/6 Administering a SQL Database Infrastructure [NEW] 4 20764 - $10,000.00 27/2 - 2/3 18-21 20-23 Provisioning SQL Databases [NEW] 2 20765 - $7,000.00 5-6 2-3 4-5 Implementing a SQL Data Warehouse [NEW] 3 20767 - $8,000.00 10-13 7-10 9-12 Developing SQL Data Models [NEW] 2 20768 - $7,000.00 23-24 20-21 22-23 Updating Your Skills to SQL Server 2016 [NEW] 2 10986 - $7,000.00 18-19 14-15 15-16 Performance Tuning and Optimizing SQL Databases [NEW] 3 10987 - $8,000.00 15-17 11-13 14-16 Microsoft Certification Programs ** Feel free to call for customized training that fits your company environment.
  • 17.
    17*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Microsoft Certification Programs Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Server 2016 Managing SQL Business Intelligence Operations [NEW] 2 10988 - $7,000.00 1-2 5-6 1-2 Analyzing Data with Power BI [NEW] 1 10989 - $4,000.00 5-6 1-2 4-5 Analyzing Data with SQL Server Reporting Services [NEW] 2 10990 - $7,000.00 2-3 6-7 5-6 Server 2012 Querying Microsoft SQL Server 4 20461D 70-461 $10,000.00 3-6 6-9 28/2 - 3/3 3 & 5-7 9-12 5-8 Administering Microsoft SQL Server Databases 4 20462D 70-462 $10,000.00 10-13 13-16 7-10 10-13 16-19 12-15 Implementing a Data Warehouse with Microsoft SQL Server 4 20463D 70-463 $10,000.00 17-20 20-23 14-17 18-21 23-26 19-22 MCSE Data Platform SQL 2012 (Valid MCSA SQL Server 2012) Developing Microsoft SQL Server 2012 Databases 4 20464D 70-464 $10,000.00 24-27 21-24 25-28 26-29 Designing Database Solutions with Microsoft SQL Server 4 20465D 70-465 $10,000.00 23-24 30-31 25-26 MCSE Business Intelligence SQL 2012 (Valid MCSA SQL Server 2012) Implementing Data Models and Reports with Microsoft SQL Server 4 20466D 70-466 $10,000.00 9-12 6-9 6-9 10-13 8-11 12-15 Designing Self-Service Business Intelligence and Big Data Solutions 4 20467D 70-467 $10,000.00 16-19 13-16 15-18 Server 2014 Updating Your SQL Server Skills to Microsoft SQL Server 2014 [NEW] 4 10977 - $10,000.00 23-26 27-30 23-26 SQL Server 2014 Performance Tuning and Optimization [NEW] 4 55144 - $10,000.00 13-16 18-21 26-29 Microsoft Report Builder 3.0 with SQL 2008R2, SQL 2012, and SQL 2014 2 55005 - $7,000.00 25-26 29-30 23-24 System Center 2012 Administering System Center 2012 Configuration Manager 4 10747 70-243 $10,000.00 On demand, please call +852 2513 3322 for further information Planning and Deploying System Center 2012 Configuration Manager 2 10748 70-243 $7,000.00 5-6 1-2 1-2 6-7 4-5 1-2 Monitoring and Operating a Private Cloud [NEW] 4 20246 70-246 $10,000.00 16-19 13-16 15-18
  • 18.
    18*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Microsoft Certification Programs Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 System Center 2012 Configuring and Deploying a Private Cloud [NEW] 4 20247 70-247 $10,000.00 23-26 20-23 22-25 Administering System Center Configuration Manager and Intune [NEW] 4 20696 70-696 $10,000.00 13-16 10-13 12-15 Infrastructure Provisioning with System Center Virtual Machine Manager [NEW] 4 10981 - $10,000.00 9-12 7-10 8-11 Cloud & Datacenter Monitoring with System Center 2012 Operations Manager 4 10964 $10,000.00 21-24 18-21 19-22 IT Service Management with System Center Service Manager 3 10965 $8,000.00 27/2 - 2/3 25-28 27-30 Installing and Configuring System Center 2012 Operations Manager 4 55004 $10,000.00 3-6 28/2 - 3/3 9-12 System Center 2012 Orchestrator 2 55007 $7,000.00 12-13 30-31 4-5 Office 365 Enabling and Managing Office 365 [NEW] 4 20347 70-346 / 70-347 $10,000.00 13-16 10-13 12-15 Office 365: A day in the life of the End-User 1 50588 $4,000.00 On demand, please call +852 2513 3322 for further information Azure Microsoft Azure Fundamentals [NEW] 4 10979 - $10,000.00 5-6 2-3 4-5 Developing Microsoft Azure Solutions [NEW] 4 20532 70-532 $10,000.00 On demand, please call +852 2513 3322 for further information Implementing Microsoft Azure Infrastructure Solutions [NEW] 4 20533 70-533 $10,000.00 23-26 20-23 27-30 24-27 22-25 26-29 Linux System Administration [NEW] 4 55187 LFCS $10,000.00 16-19 20-23 15-18
  • 19.
    19*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Microsoft Certification Programs Course Duration (days) Course Code Exam Code List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 EMS Planning for and Managing Devices in the Enterprise: Enterprise Management Suite (EMS) & On-Premises Tools [NEW] 4 20398 $10,000.00 10-13 7-10 9-12 Microsoft Project Mastering Microsoft Project 2013 [NEW] 2 55054 $7,000.00 15-16 12-13 14-15 Managing Projects with Project Server 2013 [NEW] 2 55107 $7,000.00 On demand, please call +852 2513 3322 for further information Mastering Microsoft Project 2010 2 50413 $7,000.00 23-24 28-29 25-26
  • 20.
    20*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT ITIL - Information Technology Infrastructure Library Course Description Duration (days) Code Exam Code Learning Pts List Price HKD Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 ITIL Version 3 Syllabus ** ITIL Foundation - Syllabus 2011 (include exams) 3 ITIL-F Inhse exam 2.0 $10,000 23-25 22-24 27-29 5-7 2,4-5 7-9 ITIL Services Lifecycle Modules Service Strategy (include exams) 3 SS_v3 Inhse exam 3.0 $16,500 8-10 5-7 Service Design (include exams) 3 SD_v3 Inhse exam 3.0 $16,500 8-10 19-21 Service Transition (include exams) 3 ST_v3 Inhse exam 3.0 $16,500 24-26 Service Operation (include exams) 3 SO_v3 Inhse exam 3.0 $16,500 16-18 8-10 Continual Service Improvement (include exams) 3 CSI_v3 Inhse exam 3.0 $16,500 13-15 19-21 ITIL Services Capability Modules Service Offerings & Agreement (include exams) 5 SOA_v3 Inhse exam 4.0 $20,500 13-17 Operational Support & Analysis (include exams) 5 OSA_v3 Inhse exam 4.0 $20,500 16-20 Release, Control & Validation (include exams) 5 RCV_v3 Inhse exam 4.0 $20,500 20-24 8-12 Planning , Protection & Optimization (include exams) 5 PPO_v3 Inhse exam 4.0 $20,500 20-24 5-9 Managing Across Lifecycle - for the certification of ITIL EXPERT Attainment Managing Across Lifecycle - for the certification of ITIL EXPERT Attainment (include exams) 5 MALC_v3 Inhse exam 5.0 $21,800 24-28 **22 Points to obtain ITIL Expert
  • 21.
    21*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 PMI Certified Courses Project Management Professional Fast Track (PMI Certified) - 35 PDUs (extra fee - exam voucher - HKD$4800) 5 PMP $12,000 13-17 PMP Exam Revision Workshop 2 PMP-ERW $5,000 12-13 I.T. Security Courses Certified Information System Security Professional (extra fee - exam voucher - HKD$4800) 5 CISSP $12,000 23-27 10-13 Certified in Risk and Information Systems Control (extra fee - exam voucher - HKD$5700) 4 CRISC $12,000 20-23 Certified Information System Auditor (extra fee - exam voucher - HKD$5700) 4 CISA $12,000 27-30 26-29 Certified Information Security Manager (extra fee - exam voucher - HKD$5700) 4 CISM $12,000 28/2-3/3 5-8 CISSP Exam Revision Workshop 2 CISSP-ERW $5,000 4-5 CRISC Exam Revision Workshop 2 CRISC-ERW $5,000 6-7 CISA Exam Revision Workshop 2 CISA-ERW $5,000 1-2 CISM Exam Revision Workshop 2 CISM-ERW $5,000 29&31 Datacentre Specialisation Courses Certified Datacenter Professional (include exam) 2 CDCP $13,000 6-7 19-20 Certified Datacenter Specialist (include exam) 3 CDCS $21,000 8-10 21-23 Certified Datacentre Expert (include exam) 5 CDCE $31,200 Certified Datacentre Facilities Operations Manager (include exam) 3 CDFOM $21,000 24-26 Certified Datacentre Migration Specialist (include exam) 2 CDMS $13,000 27-28 Certified Datacentre Risk Professional (include exam) 2 CDRP $13,000 Certified TIA-942 Design Consultant (include exam, TIA-942 standard) 3 CTDC $24,000 22-24 Certified TIA-942 Internal Auditor (include exam) 2 CTIA $13,000 25-26 Certified Datacenter Professional (include exam) - Virtual ILT 2 CDCP-VILT $13,000 13-14 12-13 Other Infrastructure Courses
  • 22.
    22*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Other Infrastructure Courses Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Datacentre Specialisation Courses Certified Datacenter Specialist (include exam) - Virtual ILT 3 CDCS-VILT $21,000 15-17 Certified Datacentre Facilities Operations Manager (include exam) - Virtual ILT 3 CDFOM-VILT $21,000 14-16 Certified IT Professional (include exam) - Virtual ILT 2 CITP-VILT $13,000 3-4 Certified IT Specialist (include exam) - Virtual ILT 3 CITS-VILT $15,000 5-7 Certified Datacentre Risk Professional (include exam) - Virtual ILT 2 CDRP-VILT $13,000 27-28 Certified Datacentre Migration Specialist (include exam) - Virtual ILT 2 CDMS-VILT $13,000 14-15 29-30 Check Point Courses Check Point Security Administration (R77.3 Gaia) 3 CCSA-R77 156-215.77 $19,500 8-10 23-25 Check Point Security Engineering (R77 Gaia) 4 CCSE-R77 156-315.77 $27,300 14-17 6-9 Secure Web Gateway 2 SWG 156-726.77 $15,600 On demand, please call +852 2513 3322 for further information Threat Prevention 2 ThreatP 156-727.77 $15,600 On demand, please call +852 2513 3322 for further information Bluecoat - Secure Web Gateway Track Blue Coat Certified Proxy Administrator 3 BCCPA $26,500 On demand, please call +852 2513 3322 for further information Blue Coat Certified Proxy Professional 2 BCCPP $19,500 On demand, please call +852 2513 3322 for further information VMware Datacentre Virtulization vSphere: Install, Configure, Manage [V6] (extra fee - exam voucher - HKD$1750 on VCP6-DCV, HKD$950 on vSphere 6 Foundation exam) 5 VI6ICM VCP6-DCV* $23,400 9-13 6-10 6-10 24-28 8-12 5-9 vSphere: Troubleshooting Workshop [V6.0] (extra fee - exam voucher - HKD$1750 on VCP6-DCV, HKD$950 on vSphere 6 Foundation exam) 5 VI6TS VCP6-DCV* or VCIX6-DCV^ (VCAP6-DCV Deploy) $25,700 23-27 20-24 20-24 24-28 22-26 19-23 vSphere: What's New [V5.x to V6] (extra fee - exam voucher - HKD$1750 on VCP6-DCV, HKD$950 on vSphere 6 Foundation exam) 2 VI6WN VCP6-DCV* $9,400 27-28 20-21 4-5 1-2
  • 23.
    23*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Other Infrastructure Courses Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 VMware Datacentre Virtulization vSphere: Optimize and Scale V6 (extra fee - exam voucher - HKD$1750 on VCP6 - DCV or HKD$ 3200 on VCIX6-DCA, HKD$950 on vSphere 6 Foundation exam) 5 VI6OS VCP6-DCV* or VCIX6-DCV^ (VCAP6-DCV Deploy) $26,000 16-20 13-17 13-17 15-19 12-16 VMware vSphere: Design & Deploy Fast Track [V6.0] 5 VI6DDFT VCP6-DCV* or VCIX6-DCV^ (VCAP6-DCV Design) $36,000 16-20 20-24 22-26 VMware vSphere: Skills for Operators [V5.5] to [V6.0] 2 VSFO55 NIL $9,400 27-28 4-5 VMware Virtual SAN: Deploy and Manage [V6] 3 VVSDM6 NIL $14,000 23-25 27-29 24-26 NSX : Install, Configure, Manage [V6.0] ( extra fee - exam voucher - HKD$1750 on VCP6-NV, HKD$950 on vSphere 6 Foundation exam) 5 VNSX VCP6-NV* $23,400 13-17 24-28 26-30 End User Computing VMware Horizon 7: Install, Configure, Manage [V7.0] (extra fee - exam voucher - HKD$1750 on VCP5-DT, HKD$950 on vSphere 6 Foundation exam) 5 VV7ICM TBA $23,400 6-10 24-28 5-9 VMware Cloud Automation: Design and Deploy Fast Track [V6.x] (NEW!) (extra fee - exam voucher - HKD$1750 on VCP5-DT, HKD$950 on vSphere 6 Foundation exam) 5 VCADD VCIX6-CMA $36,000 20-24 24-28 12-16 VMware Horizon Mirage: Install, Configure, Manage V5.0 3 VHMICM5 NIL $14,000 9-11 8-10 10-12 Cloud vCloud Director: Install, Configure, Manage V5.5 (extra fee - exam voucher - HKD$1750 on VCP-Cloud) 3 VCICM55 VCP-Cloud $14,000 18-20 15-17 24-26 VMware vRealize Automation: Install, Configure, Manage [V7] NEW! (extra fee - exam voucher - HKD$1750 on VCP-Cloud, HKD$950 on vSphere 6 Foundation exam) 5 VCAC7 NIL $23,400 6-10 24-28 19-23 VMware vRealize Operations Manager: Install, Configure, Manage [V6.0] NEW! 5 VOM6 NIL $25,800 13-17 5-9 VMware vCenter Site Recovery Manager: Install, Configure, Manage [V5.8] 2 VSRM5 NIL $10,500 23-24 23-24 25-26 AirWatch Enterprise Mobility AirWatch Enterprise Mobility: Install and Deploy On-Premise Solutions (NEW!) 1 VAWID NIL $6,000 1 3 9
  • 24.
    24*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Other Infrastructure Courses Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 VMware AirWatch Enterprise Mobility AirWatch Enterprise Mobility: Configure and Deploy Integrated Solutions (NEW!) 2 VAWCD NIL $10,500 5-6 2-3 4-5 AirWatch Enterprise Mobility: Configure and Manage (NEW!) 2 VAWCM NIL $10,500 2-3 6-7 6-7 AirWatch Enterprise Mobility: Bootcamp (NEW!) (Intensive combination of "Mobility: Configure & Manage" and "Mobility: Configure & Deploy Integrated Solutions" courses) 4 VAWBC NIL $18,000 21-24 18-21 19-22 Riverbed Courses Riverbed WAN200 Optimization Essentials 5 WAN200 $39,000 5-9 Implementing Enterprise Optimization Architectures 5 WAN350 $39,000 On demand, please call +852 2513 3322 for further information EC-Council Courses EC-Council Network Security Administrator (Bundled with ONE exam voucher) 5 ENSA 312-38 $15,000 On demand, please call +852 2513 3322 for further information EC-Council Certified Ethical Hacker (Bundled with ONE exam voucher) 5 CEH 312-50 $22,000 27-31 22-26 Computer Hacking Forensic Investigator (Bundled with ONE exam voucher) 5 CHFI 312-49 $16,800 8-12 EC-Council Certified Security Analyst (Bundled with ONE exam voucher) 5 ECSA 412-79 $25,000 19-23 EC-Council Certified Incident Handler (Bundled with ONE exam voucher) 2 ECIH 212-89 $12,500 On demand, please call +852 2513 3322 for further information F5 Courses Administering BIG-IP v11 2 BIG-OP-ADMIN $15,600 16-17 6-7 8-9 Configuring BIG-IP LTM v11: Local Traffic Manager 3 BIG-LTM-CFG-3 $23,400 18-20 8-10 10-12 Troubleshooting BIG-IP LTM v11 2 BIG-TRBL-INT2 $15,600 On demand, please call +852 2513 3322 for further information Configuring BIG-IP v11 on VIPRION 1 VPR-1 $7,800 10 9 Configuring BIG-IP GTM v11: Global Traffic Manager 2 BIG-GTM-IL $15,600 23-24 27-28
  • 25.
    25*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Other Infrastructure Courses Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 F5 Courses Configuring BIG-IP ASM v11: Application Security Manager 4 BIG-ASM-ESS $31,200 10-13 5-8 Configuring BIG-IP APM v11: Access Policy Manager 3 BIG-EGW-APM $23,400 20-22 24-26 Configuring BIG-IP AFM v11: Advanced Firewall Manager 2 BIG-AFM-CFG $15,600 On demand, please call +852 2513 3322 for further information Developing iRules for BIG-IP v11 3 BIG-IRULE-CFG $23,400 On demand, please call +852 2513 3322 for further information Citrix Courses Managing App and Desktop Solutions with Citrix XenDesktop 7.6 (Bundled with ONE exam voucher) 4 CXD-203 EXAM-201 $35,000 3-6 7-10 3 & 5-7 5-8 Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 (Bundled ONE exam voucher) 4 CXD-300 EXAM-301 $35,000 14-17 10-13 12-15 Citrix XenApp and XenDesktop Advanced Concepts – Troubleshooting (2 days) (Bundled ONE exam voucher) 2 CXD-302 $15,000 27-28 27-28 29-30 Designing App and Desktop Solutions with Citrix XenDesktop 7 (Bundled with ONE Exam voucher) 4 CXD-400 EXAM-401 $35,000 20-23 15-18 Deploy and Manage Citrix XenApp/XenDesktop 7.6 Fast Track (Fast Track Course of CXD-203 & CXD- 300)(Bundled TWO exam voucher) 5 CMB-300 $39,000 23-27 27-31 22-26 Citrix XenApp 6.5 Administration [Bundle with One Exam Voucher] 4 CXA-206 EXAM-A20 $35,000 6-9 6-9 Citrix NetScaler Essentials and Traffic Management [NEW] (Bundled with ONE exam voucher) 4 CNS-220 EXAM-351 $35,000 20-23 24-27 19-22 Citrix NetScaler Essentials and Unified Gateway (Bundled with ONE exam voucher) 4 CNS-222 EXAM-253 $35,000 13-16 15-18 Deploying Enterprise Mobility Solutions with Citrix XenMobile [NEW] (Bundled with ONE exam Voucher) 4 CXM-303 EXAM-371 $35,000 9-12 6-9 8-11 Brocade Courses Brocade Associate San Administrator 4 BASA 200 $23,400 On demand, please call +852 2513 3322 for further information Brocade Professional IP Administrator 4 BPIPA 200 $31,200 On demand, please call +852 2513 3322 for further information Brocade Professional San Administrator 3 BPSA 300 $23,400 On demand, please call +852 2513 3322 for further information Brocade Certified Ethernet Fabric Engineer 5 CEF 300 $27,300 On demand, please call +852 2513 3322 for further information
  • 26.
    26*Prices and coursedates are subject to change Part time schedule available based on request << Back to CONTENT Other Infrastructure Courses Course Description Duration (days) Code Exam Code List Price HK$ Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Brocade Courses ADX Advanced Techniques in Server Load Balancing Certified Layer 4 - 7 Professional 3 CLP 240 $23,400 On demand, please call +852 2513 3322 for further information Brocade MPLS Implementation 3 MPLS 400 $23,400 On demand, please call +852 2513 3322 for further information MPLS Traffic Engineering 2 MPLS-TE 450 $15,600 On demand, please call +852 2513 3322 for further information Brocade 5600 vRouter Fundamentals 3 NFV200 $23,400 On demand, please call +852 2513 3322 for further information BASA 200 & BPSA 300 Combo 5 SAN Combo $39,000 On demand, please call +852 2513 3322 for further information SAN Troubleshooting 3 TS 300 $23,400 On demand, please call +852 2513 3322 for further information EMC Courses VPLEX Management 3 MR-1CN- VPLEXMGMT $11,700 On demand, please call +852 2513 3322 for further information Avamar Integration and Performance Management 5 $19,500 8-12 Isilon Administration and Management 5 MR-1CP-ISIAM $19,500 On demand, please call +852 2513 3322 for further information Data Domain System Administration 4 MR-1CP- DDSADMIN $15,600 24-27 NetWorker Implementation and Management 5 $19,500 13-17 Networker Integration Workshop 5 $19,500 13-17 Symmetrix VMAX Configuration Management 5 MR-1CP-SYMCFG $19,500 On demand, please call +852 2513 3322 for further information Symmetrix VMAX Business Continuity Management 5 MR-1CP- SYMBCMGMT $19,500 On demand, please call +852 2513 3322 for further information VMAX3 Business Continuity Management 2 MR-1CP- VMAXBCM $7,800 On demand, please call +852 2513 3322 for further information VMAX3 Configuration Management 3 MR-1CP- VMAXCM $11,700 On demand, please call +852 2513 3322 for further information VNX Unified Storage Management 5 MR-1CP- VNXUNIDM $19,500 On demand, please call +852 2513 3322 for further information ECS for Geo-Scale Object Storage 3 MR-1CN- ETECSOBJS $11,700 On demand, please call +852 2513 3322 for further information Optimizing Storage Services for Applications with XtremIO 3 MR-1CP- XIO4APPS $11,700 On demand, please call +852 2513 3322 for further information
  • 27.
    Company Name CAPM/PMP ApplicationOnly PMI Member Applying for PMI Membership Contact Person Billing Details (Please complete if different from Contact Person) Mailing Address Mailing Address Name Contact Number Name Contact Number Email Address Email Address No Name of Attendee (as per passport) Email Job Title Contact Number Course Code/Title Course Date (dd/mm/yy) 01 02 03 Total: Total amount of the registration: bill my company cheque enclosed Authorized Signature / Company Stamp I/We hereby have read and accepted the Terms & Conditions Course Registration Form (Hong Kong) Call us for any query or fax/email completed form to Training Partners, Attention: Training Administrator Sales Contact Person PO/PR Reference Promotion Codes Date: I/We hereby have read and accepted the Terms & Conditions on page 2. Yes YesNo No Course Fees 1 China Hong Kong India Indonesia Korea Malaysia Singapore Taiwan Thailand tel: (86) 10 5737 1904 tel: (852) 2513 3322 tel: (9180) 4901 2800 tel: (62) 21 831 7585 tel: (82) 2 6256 7057 tel: (603) 7729 8966 tel: (65) 6225 9188 tel: (886) 2 2171 1500 tel: (66) 2625 0988 fax: (86) 10 8525 1126 fax: (852) 2513 3387 fax: (9180) 4901 2803 fax: (62) 21 831 7585 fax: (82) 2 556 7314 fax: (603) 7729 9266 fax: (65) 6225 9288 fax: (886) 2 2171 1509 fax: (66) 2625 0893 cn@training-partners.com hk@training-partners.com in@training-partners.com info.id@dimensiondata.com kr@training-partners.com my@training-partners.com sg@training-partners.com tw@training-partners.com th@training-partners.com
  • 28.
    Terms and Conditions China• Hong Kong • India • Indonesia • Korea • Malaysia • Singapore • Taiwan • Thailand 2 Intellectual Property Rights All intellectual property rights, including copyright, patent, design rights relating to the course or course materials that are provided, or made available during the course, remain the sole property of TP, Dimension Data or its licensors. No copies of course materials may be made either whole or in part unless expressly agreed in advance in writing by *TP. Course Pre-requisite It is the responsibility of the company and/ or participant(s) to ensure that they meet the pre-requisite of the course(s) on the course outline. *TP will not be held responsible for any participant(s) who faces difficulties during course(s) who do not meet the pre-requisite. TP reserves the right to charge up to HKD3900 for courses that has commenced and client request to change course due to not meeting course pre-requisite. Course Confirmation Course schedule is considered tentative until course confirmation is sent to participants. Course Cancellation *TP reserves the right to cancel a course without liability if it is not able to meet the minimum class size or for any unforeseen circumstances. Participants will be given written notice of cancellation at least 3 working days before course commencement. Exception of Policy No deferment or cancellation of course(s) is allowed for registration under promotional rates. Company is allowed to substitute participant(s). Individual Participants may choose a similar course on another date. Course fee will be considered forfeited for absentee of participant(s). Payment Terms Full payment is to be made upon confirmation of registration. Payment is due 5 working days before course commencement. Course/ Exam fees are subject to all applicable local government taxes such as GST/ VAT. Seats are deemed confirmed once full payment is received. TP reserves the right to refuse attendance for unpaid courses until receipt of full payment. A receipt for the payment will be provided to participants. Consumption of Course Full course/ Exam(s) attendance must be utilized within 12 months upon registration. No refunds will be allowed for unconsumed course/ Exam. However substitution of candidate(s) or Course/ Exam(s) of similar/equal value is allowed. Deferment of Course Written notice received: More than 10 working days – No penalty Less than 10 working days – Penalty of up to HKD3900 may be charged Less than 3 working days / No show – 100% of course fees Cancellation of Course Written notice received: More than 10 working days – No penalty Less than 10 working days – 50% of course fees Less than 3 working days / No show – 100% of course fees Mode of Payment Mode of payment can be by cheque or telegraphic transfer. Training Partners administrator will contact you to confirm your preferred mode of payment. By Cheque : Payable to “ Training Partners Pte Ltd “ By Telegraphic Transfer : Account name – Training Partners Pte Ltd Account Number – 6896020242 (HKD) or 6896020259 (USD) SWIFT Code : CHASHKHH Bank Name : JPMorgan Chase Bank N.A., Hong Kong Branch Bank Code : 007 Bank Address : 18/F JPMorgan Tower, 138 Shatin Rural Committee Road, Shatin, New Territories, HK Limitation of Liability *TP’s total aggregate/ cumulative liability for all claims, whether for breach of contract, breach of warranty or in tort, including negligence, will be limited to the amount paid to *TP for the Courses/ Exams. *TP will not be liable for any indirect, punitive, special, incidental or consequential damages in connection with or arising out of any of its Courses. *TP also may include Dimension Data. In certain territories in Asia, TP is trading under the auspices of the Dimension Data entity. These terms and conditions may be subject to change at any time by *TP.
  • 29.
    Training Partners 5/F, OxfordHouse, Taikoo Place, 979 King’s Road, Quarry Bay, Hong Kong Tel: (852) 2513 3322 | Fax: (852) 2513 3387 | Email: hk@training-partners.com