SlideShare a Scribd company logo
Resume:
VIJAYARAGHAVAN.V
Mobile: +919791042163, E-mail: mercy.raghavan@gmail.com/
No: 155/1, Ganga Raju nagar, road number 04,
Valasapakal, Kakinada rural, East Godavari DT
Andhra Pradesh: 533005
OBJECTIVE
To achieve a challenging position and rewarding career in a well-established reputed
Organization in the field of Electrical and Instrumentation that would offer me Inspirational
opportunities for the Organization growth. I am willing to work any were in India.
CAREER OBJECTIVE
Seeking a challenging position in a growth oriented organization, where my skills and
experience can be effectively utilized for the grow.th of the Organization and my Career development.
PROFESSIONAL EXPERIENCE:
BOTHRA SHIPPING SERVICE PVT LTD
Electrical & PLC Automation Engineer - 15.09.2014 TO still now
 Bulk handling machine & conveyors electrical & PLC Automation
maintenance.
 Allocation of shift schedule & allocation of man power for the
work
 Allocation of jobs and man power for the shutdown &
preventative maintenance work
 Electrical & PLC hardware stock follow up and maintenance.
LOTUS WIRELESS TECHNOLOGIES INDIA PVT LTD
Commissioning Engineer - 01.06.2012 TO 05.9.2014
 Commissioning Engineer for the Stacker cum Reclaimer (SCR).
 PLC, SCADA, HMI Screen Programmer/Designer
 Testing of Panels like MCC, VVVFD, PLC and RIO Panel
 Preparation of PLC Input/output list
 Field device Testing & Commissioning
 Preparation of Routine Test Certificate (RTC) for the Panel
testing
 Preparation of Control Write-up for the Stacker cum Reclaimer &
Wagon Tippler
 Support during factory acceptance,
 Testing and commissioning of the Stacker cum Reclaimer.
SESHASAYE PAPERBOARD LTD
Calibration Technician - 31.05.2011 to 30.05.2012
 Performing calibration on force, dimensional, pressure,
temperature and mass testing equipment.
 Calibration of control valve and the IP (current pressure
convertor)
 Ensuring all equipment is calibrated on periodic basic reviewing
and comparing the data collected from calibrated machines and
comparing with ideal date.
 Analyzing the data and producing reports.
PROJECT DETAILS
PROJECT NUMBER: 3
JINDAL INDIA THERMAL POWER LIMITED
Project Title: Bucket wheel stacker cum Reclaimer
Client: JINDAL INDIA THERMAL POWER LIMITED
Duration: Mar 2014 – May2014
Project Location: Thalchar (Odrisa)
Role: Erection Testing & Commissioning Engineer
Skill Used:
1. Ladder logic development.
2. HMI Screen development.
PLC, HMI& VVVFD HARDWARE DISCRIPTION:
PLC: SIMENS ET200S CPU with INTERFACE MASTER MODULE& MODBUS
MODULE
VVVFD: SCHNEIDER ATV71
HMI: 10” BASIC PANEL
Role Description:
 Testing of LT panels & LT motors
 PLC logic Development.
 PLC commissioning according to the approved configuration
Project Details:
 PLC logic development for the bulk handle machine Bucket Wheel Stacker Reclimer.
 Communication between Remote IO PLC to machine PLC
 Radio modem commissioning for communication between main client PLC to machine PLC
PROJECT NUMBER: 2
BOTHARA SHIPPING
Project Title: Bucket wheel stacker cum Reclaimer, Rail Trolley Loader, &
Track Hopper
Client: BOTHARA SHIPPING SERVICE PRIVATED LIMITED
Duration: Jan 2014 to Feb 2014
Project Location: Kakinada
Role: Erection Testing & Commissioning Engineer
Skill Used:
1. Ladder logic development.
2. HMI Screen development.
PLC, HMI & VVVFD HARDWARE DISCRIPTION:
PLC: SIMENS ET200S CPU with INTERFACE MASTER
MODULE& MODE BUS MODULE
VVVFD: ABB ACS850
HMI: 10” BASIC PANEL
Role Description:
 Testing of LT panels & LT motors
 PLC logic Development.
 PLC commissioning according to the approved configuration
Project Details:
 PLC logic development for the bulk handle machine Bucket Wheel
Stacker Reclimer.
 Communication between Remote IO PLC to machine PLC
 MODBUS to FO communication between main client PLC to machine
PLC
PROJECT NUMBER: 1
JINDAL STEELS POWER LIMITED
Project Title: Bucket wheel stacker cum Reclaimer
Client: JINDAL STEELS POWER LIMITED
Duration: NOV 2012 to AUG 2013
Role: Erection Testing & Commissioning Engineer
Skill Used:
1. Ladder logic development.
2. HMI Screen development.
PLC, HMI & VVVFD HARDWARE DISCRIPTION:
PLC: SIMENS S7 400 2H CPU with DP
master module.
VVVFD: SIMENS SINAMIC G120
HMI: 10.5” MULTI PANEL
Role Description:
 Testing of LT panels & LT motors
 PLC logic Development.
 PLC commissioning according to the approved configuration
Project Details:
 PLC logic development for the bulk handle machine Bucket Wheel
Stacker Reclimer.
 Communication between Remote IO PLC to machine PLC
 Through hard wire DI/DO signal communication between main PLC to
machine PLC
EDUCATIONAL QUALIFICATION:
Personal Profile
Date of Birth : 20 July 1989
Nationality : Indian
Languages Known : English, Tamil, Hindi, & Telugu
Married Status : Married
Date:
Place: KAKINADA – 05
V.VIJAYARAGHAVAN
Year Qualification Institution / University
2010
BE. Electronic &
Instrumentation Engineer
Erode Sengunthar Engineering
College
Anna University.
2007
Diploma Electronic &
Communication Engineering
Andavar Polytechnic College
2004 SSLC PRIVATE

More Related Content

What's hot

Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar MVijayakumar M
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
dhiresh kumar
 
Resume - Electrical Engineer
Resume - Electrical EngineerResume - Electrical Engineer
Resume - Electrical EngineerNarender Singh
 
Jaikaran Dan ( Testing and Commissioning Engineer )
Jaikaran Dan ( Testing and Commissioning Engineer  ) Jaikaran Dan ( Testing and Commissioning Engineer  )
Jaikaran Dan ( Testing and Commissioning Engineer ) jaikaran dan
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMEOmer Liaquat
 
NOMANTAHIR.ELECTR.ENGINEER.pdf
NOMANTAHIR.ELECTR.ENGINEER.pdfNOMANTAHIR.ELECTR.ENGINEER.pdf
NOMANTAHIR.ELECTR.ENGINEER.pdfnoman tahir
 
(Ahmed Hamza)CV
(Ahmed Hamza)CV (Ahmed Hamza)CV
(Ahmed Hamza)CV Ahmed Hamza
 

What's hot (20)

my resume-1
my resume-1my resume-1
my resume-1
 
Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar M
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume Instrumentation Engineer
Resume Instrumentation EngineerResume Instrumentation Engineer
Resume Instrumentation Engineer
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
Resume - Electrical Engineer
Resume - Electrical EngineerResume - Electrical Engineer
Resume - Electrical Engineer
 
qusay khalid
qusay khalidqusay khalid
qusay khalid
 
wajahat
wajahatwajahat
wajahat
 
Jaikaran Dan ( Testing and Commissioning Engineer )
Jaikaran Dan ( Testing and Commissioning Engineer  ) Jaikaran Dan ( Testing and Commissioning Engineer  )
Jaikaran Dan ( Testing and Commissioning Engineer )
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUME
 
QAZI CV
QAZI CVQAZI CV
QAZI CV
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
Resume
ResumeResume
Resume
 
Shahin Resume 2015-2016 (1)
Shahin Resume  2015-2016 (1)Shahin Resume  2015-2016 (1)
Shahin Resume 2015-2016 (1)
 
NOMANTAHIR.ELECTR.ENGINEER.pdf
NOMANTAHIR.ELECTR.ENGINEER.pdfNOMANTAHIR.ELECTR.ENGINEER.pdf
NOMANTAHIR.ELECTR.ENGINEER.pdf
 
(Ahmed Hamza)CV
(Ahmed Hamza)CV (Ahmed Hamza)CV
(Ahmed Hamza)CV
 
HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)
 
Resume_L&T
Resume_L&TResume_L&T
Resume_L&T
 

Viewers also liked

Ch4 v70 system_configuration_en
Ch4 v70 system_configuration_enCh4 v70 system_configuration_en
Ch4 v70 system_configuration_en
confidencial
 
PLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationPLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationMuhammad Sarfraz
 
Five Health Benefits of Drinking Beer
Five Health Benefits of Drinking BeerFive Health Benefits of Drinking Beer
Five Health Benefits of Drinking Beer
edwardsnrmxaegnfc
 
Rasheed Ahmed CV (August 2015)
Rasheed Ahmed CV (August 2015)Rasheed Ahmed CV (August 2015)
Rasheed Ahmed CV (August 2015)Ahmed Rasheed
 
Recommendations for Kevin Brown
Recommendations for Kevin BrownRecommendations for Kevin Brown
Recommendations for Kevin BrownCoach Kevin Brown
 
CURRICULUM VITAE for Prince Ashan
CURRICULUM VITAE for Prince AshanCURRICULUM VITAE for Prince Ashan
CURRICULUM VITAE for Prince AshanPrince Ashan
 
Ensayo critico
Ensayo critico Ensayo critico
asad resume final
asad resume finalasad resume final
asad resume finalasad raza
 
Kenneth Roi Villanueva's Resume
Kenneth Roi Villanueva's ResumeKenneth Roi Villanueva's Resume
Kenneth Roi Villanueva's Resume
Kenneth Roi Villanueva
 
DRPTechnicalDocumentationV1.0
DRPTechnicalDocumentationV1.0DRPTechnicalDocumentationV1.0
DRPTechnicalDocumentationV1.0Azaam Alfi
 
Field of play
Field of playField of play
Field of play
gloryjane95
 
Summer project Sales Pitch
Summer project Sales PitchSummer project Sales Pitch
Summer project Sales PitchHanna Hughes
 
American Airlines Winners
American Airlines WinnersAmerican Airlines Winners
American Airlines Winners
mandyrodriguez93
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
Abdelfatah Hussein
 
FRICollegePresents 2014i copy
FRICollegePresents 2014i copyFRICollegePresents 2014i copy
FRICollegePresents 2014i copyLarry Kushner
 

Viewers also liked (17)

Ch4 v70 system_configuration_en
Ch4 v70 system_configuration_enCh4 v70 system_configuration_en
Ch4 v70 system_configuration_en
 
PLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationPLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling Station
 
Five Health Benefits of Drinking Beer
Five Health Benefits of Drinking BeerFive Health Benefits of Drinking Beer
Five Health Benefits of Drinking Beer
 
Rasheed Ahmed CV (August 2015)
Rasheed Ahmed CV (August 2015)Rasheed Ahmed CV (August 2015)
Rasheed Ahmed CV (August 2015)
 
research1
research1research1
research1
 
Recommendations for Kevin Brown
Recommendations for Kevin BrownRecommendations for Kevin Brown
Recommendations for Kevin Brown
 
CURRICULUM VITAE for Prince Ashan
CURRICULUM VITAE for Prince AshanCURRICULUM VITAE for Prince Ashan
CURRICULUM VITAE for Prince Ashan
 
Ensayo critico
Ensayo critico Ensayo critico
Ensayo critico
 
asad resume final
asad resume finalasad resume final
asad resume final
 
Kenneth Roi Villanueva's Resume
Kenneth Roi Villanueva's ResumeKenneth Roi Villanueva's Resume
Kenneth Roi Villanueva's Resume
 
DRPTechnicalDocumentationV1.0
DRPTechnicalDocumentationV1.0DRPTechnicalDocumentationV1.0
DRPTechnicalDocumentationV1.0
 
Field of play
Field of playField of play
Field of play
 
Summer project Sales Pitch
Summer project Sales PitchSummer project Sales Pitch
Summer project Sales Pitch
 
American Airlines Winners
American Airlines WinnersAmerican Airlines Winners
American Airlines Winners
 
sb arakeri.pdf cv
sb arakeri.pdf cvsb arakeri.pdf cv
sb arakeri.pdf cv
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
 
FRICollegePresents 2014i copy
FRICollegePresents 2014i copyFRICollegePresents 2014i copy
FRICollegePresents 2014i copy
 

Similar to Vijayaraghavan Resume 15-07-16

Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Rajesh S
 
pintu_crane maintanance2016_resume
pintu_crane maintanance2016_resumepintu_crane maintanance2016_resume
pintu_crane maintanance2016_resumepintu ROY
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_ResumeMEHTA VIVEK
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Resume Abdul Malik
Resume Abdul MalikResume Abdul Malik
Resume Abdul MalikAbdul Malik
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeMEHTA VIVEK
 
Resume2
Resume2Resume2
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...Raj Sharma
 

Similar to Vijayaraghavan Resume 15-07-16 (20)

Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
pintu_crane maintanance2016_resume
pintu_crane maintanance2016_resumepintu_crane maintanance2016_resume
pintu_crane maintanance2016_resume
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_Resume
 
kishan update
kishan updatekishan update
kishan update
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
arvind_resume_new (1)
arvind_resume_new (1)arvind_resume_new (1)
arvind_resume_new (1)
 
RESUME.
RESUME.RESUME.
RESUME.
 
Resume Abdul Malik
Resume Abdul MalikResume Abdul Malik
Resume Abdul Malik
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
comising
comisingcomising
comising
 
comising
comisingcomising
comising
 
Resume Kallol Chatterjee
Resume Kallol ChatterjeeResume Kallol Chatterjee
Resume Kallol Chatterjee
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
SUNIL KUMAR new
SUNIL KUMAR newSUNIL KUMAR new
SUNIL KUMAR new
 
vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_vidhyadaran_updated_resume__1_
vidhyadaran_updated_resume__1_
 
Resume2
Resume2Resume2
Resume2
 
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...
Raj Kumar Sharma, B.Tech Electronics & Instrumentation, Sr. Manager, Industri...
 
DSS RAJESH
DSS RAJESHDSS RAJESH
DSS RAJESH
 

Vijayaraghavan Resume 15-07-16

  • 1. Resume: VIJAYARAGHAVAN.V Mobile: +919791042163, E-mail: mercy.raghavan@gmail.com/ No: 155/1, Ganga Raju nagar, road number 04, Valasapakal, Kakinada rural, East Godavari DT Andhra Pradesh: 533005 OBJECTIVE To achieve a challenging position and rewarding career in a well-established reputed Organization in the field of Electrical and Instrumentation that would offer me Inspirational opportunities for the Organization growth. I am willing to work any were in India. CAREER OBJECTIVE Seeking a challenging position in a growth oriented organization, where my skills and experience can be effectively utilized for the grow.th of the Organization and my Career development. PROFESSIONAL EXPERIENCE: BOTHRA SHIPPING SERVICE PVT LTD Electrical & PLC Automation Engineer - 15.09.2014 TO still now  Bulk handling machine & conveyors electrical & PLC Automation maintenance.  Allocation of shift schedule & allocation of man power for the work  Allocation of jobs and man power for the shutdown & preventative maintenance work  Electrical & PLC hardware stock follow up and maintenance. LOTUS WIRELESS TECHNOLOGIES INDIA PVT LTD Commissioning Engineer - 01.06.2012 TO 05.9.2014  Commissioning Engineer for the Stacker cum Reclaimer (SCR).  PLC, SCADA, HMI Screen Programmer/Designer  Testing of Panels like MCC, VVVFD, PLC and RIO Panel  Preparation of PLC Input/output list  Field device Testing & Commissioning  Preparation of Routine Test Certificate (RTC) for the Panel testing  Preparation of Control Write-up for the Stacker cum Reclaimer & Wagon Tippler  Support during factory acceptance,  Testing and commissioning of the Stacker cum Reclaimer.
  • 2. SESHASAYE PAPERBOARD LTD Calibration Technician - 31.05.2011 to 30.05.2012  Performing calibration on force, dimensional, pressure, temperature and mass testing equipment.  Calibration of control valve and the IP (current pressure convertor)  Ensuring all equipment is calibrated on periodic basic reviewing and comparing the data collected from calibrated machines and comparing with ideal date.  Analyzing the data and producing reports. PROJECT DETAILS PROJECT NUMBER: 3 JINDAL INDIA THERMAL POWER LIMITED Project Title: Bucket wheel stacker cum Reclaimer Client: JINDAL INDIA THERMAL POWER LIMITED Duration: Mar 2014 – May2014 Project Location: Thalchar (Odrisa) Role: Erection Testing & Commissioning Engineer Skill Used: 1. Ladder logic development. 2. HMI Screen development. PLC, HMI& VVVFD HARDWARE DISCRIPTION: PLC: SIMENS ET200S CPU with INTERFACE MASTER MODULE& MODBUS MODULE VVVFD: SCHNEIDER ATV71 HMI: 10” BASIC PANEL Role Description:  Testing of LT panels & LT motors  PLC logic Development.  PLC commissioning according to the approved configuration Project Details:  PLC logic development for the bulk handle machine Bucket Wheel Stacker Reclimer.  Communication between Remote IO PLC to machine PLC  Radio modem commissioning for communication between main client PLC to machine PLC
  • 3. PROJECT NUMBER: 2 BOTHARA SHIPPING Project Title: Bucket wheel stacker cum Reclaimer, Rail Trolley Loader, & Track Hopper Client: BOTHARA SHIPPING SERVICE PRIVATED LIMITED Duration: Jan 2014 to Feb 2014 Project Location: Kakinada Role: Erection Testing & Commissioning Engineer Skill Used: 1. Ladder logic development. 2. HMI Screen development. PLC, HMI & VVVFD HARDWARE DISCRIPTION: PLC: SIMENS ET200S CPU with INTERFACE MASTER MODULE& MODE BUS MODULE VVVFD: ABB ACS850 HMI: 10” BASIC PANEL Role Description:  Testing of LT panels & LT motors  PLC logic Development.  PLC commissioning according to the approved configuration Project Details:  PLC logic development for the bulk handle machine Bucket Wheel Stacker Reclimer.  Communication between Remote IO PLC to machine PLC  MODBUS to FO communication between main client PLC to machine PLC PROJECT NUMBER: 1 JINDAL STEELS POWER LIMITED Project Title: Bucket wheel stacker cum Reclaimer Client: JINDAL STEELS POWER LIMITED Duration: NOV 2012 to AUG 2013 Role: Erection Testing & Commissioning Engineer Skill Used: 1. Ladder logic development. 2. HMI Screen development.
  • 4. PLC, HMI & VVVFD HARDWARE DISCRIPTION: PLC: SIMENS S7 400 2H CPU with DP master module. VVVFD: SIMENS SINAMIC G120 HMI: 10.5” MULTI PANEL Role Description:  Testing of LT panels & LT motors  PLC logic Development.  PLC commissioning according to the approved configuration Project Details:  PLC logic development for the bulk handle machine Bucket Wheel Stacker Reclimer.  Communication between Remote IO PLC to machine PLC  Through hard wire DI/DO signal communication between main PLC to machine PLC EDUCATIONAL QUALIFICATION: Personal Profile Date of Birth : 20 July 1989 Nationality : Indian Languages Known : English, Tamil, Hindi, & Telugu Married Status : Married Date: Place: KAKINADA – 05 V.VIJAYARAGHAVAN Year Qualification Institution / University 2010 BE. Electronic & Instrumentation Engineer Erode Sengunthar Engineering College Anna University. 2007 Diploma Electronic & Communication Engineering Andavar Polytechnic College 2004 SSLC PRIVATE