Experience Summary
10 Years of, Project design and development experience as a developer of
various competent using PLC SCADA, HMI, AC AND DC DRIVE,PCC-MCC
PANEL,DRIVE PANEL,I/O PANEL,PLC PANEL etc.PLC – SIEMENS S7 -300,
ALLEN BRADLLEYS MICROLOGIX 1000,SCADA – INTELLUTION VIEW, RS
LOGIX VIEW, HMI- SIEMENS SIMATIC PANEL OP7, MAGELIS ,
PROTOCOL – PROFIBUS, MODBUS AUTOCAD ,
Knowledge and experience in Hydraulic and Pneumatic control.
. Thorough understanding of Complete Plant layout, Function logic, Conveyor flow,
Control Design of complete conveyor as per project requirement and, engineering,
commissioning, testing, and troubleshooting.
 Having experience with Capital equipment design, Ice plant making
design with Electrical system design.MCC Panel,PLC Panel design,
Interfacing of MCC Panel and plc panel,Fat,Customer interaction,
specification deign, material procurement
 Define logic for each section, incorporating all logic in project, Selection of
PLC, AC Drive, Soft starter. Selection of Power cable, control cable, signals
cable. Selection of control panel component as per Customer requirement for
Standards like UL For US- CANADA Project. Preparation of control schematic,
Preparation of control panel design.
 Preparation of Data sheet for Component selection with different products for
approval from Customers
 Giving Control panel for production to Vendors, Follow up with vendor for
status of panel, visiting to vendor site for technical issues, Relation
maintaining with different vendors for meeting project requirement on time.
 Experience in working with various switchgear equipment, ac and dc motor,
Transformer, H/T AND L/T PANEL, MCC PCC PANEL APFC PANEL. Experience in
use of Hydraulic, Pneumatic controls.
 Experience in pre-commissioning activity, post commissioning activities.
 Strong collaboration & team building skills.
 Experience in learning new technical concepts quickly, Willingness to learn
new technology & utilize the same in a productive manner.
Organizational Profile
 Working With Master Integrators PVT LTD from 2 April 2014 to 13
JUNE 2015
 Worked with HI-Point services Pvt. Ltd. Andheri from 27
August 2012 to 6 September 2013
 Worked for ABG Cranes Pvt. Ltd, Khopoli as Electrical Engineer
(April‘10 to Aug 2012).
 Worked for Uttam Galva steels LTD (Nov 06 to April 10).
 Worked with -Automation and Control Post- Application Engineer
Period- 1st October 2005 TO 1st October 2006
 Company Name -Supreme Industries Ltd. Post -Trainee Engineer
Period 20th Sept. 2004 to 20th Sept 2005
Academic Qualification
Qualification Institution Board Year % Marks
B.tech
Electrical
Dr.Batu,Lonere Dr.Batu,Lonere 2004 52.7%
H.S.C J.V.J.C
KHOPOLI
MUMBAI 1995 60.0%
S.S.C SAHYADRI
VIDYALAYA
PUNE 1993 79.23
Technical profile
Skill Experienced
PLC,SCADA,HMI- Siemens, Allen bradlleys, Schenider Electric
Modicon quantum,selection of I/o
devices,Design of I/O ,PLC PANEL,DRIVE
PANEL,electrical layout
AUTOMATIC
LIGHTING
C-BUS,CLIPSAL INTEGRATED SYSTEM
SERVO ,AC DRIVE
AND DC DRIVE
SIEMENS,YASKAWA,TOSHIBA,SCHENEIDER
ELECTRIC
MAINTENANCE
And Troubleshooting,
Inspection
AC AND DC motors,Transfomers,100 KV ,
22/.440 KV Substation, Generator, Furnace
and it’s equipment like Temp. Transmitter,
Pressure transmitters, Pressure
transducers and switches etc. Blower,
Pumps, Gas and air compressor, Heaters
H/T L/T Panel and APFC panel.
Having knowledge of control system, it’s
logic development, testing etc.
ISO WORK 9001 -2002,IMS ( QMS + EHS ),TPM,5’s system
Material Work on web based indent system for
material indent, Material record, Material
Inspection after receiving from the vendors
and also inspection at the vendor site.
Design Design of control logic, design of control
panel, preparation of I/O list, cable
schedule, preparation of Bill of material,
wiring schematic using AutoCAD 2007,2010
Projects Profile:
Presently working with Master Integrators PVT LTD.
Understanding of complete plant, their requirement specification design as per plant
requirement, Material requirement and procurement, Design of Electrical MCC PANEL,
Control panel, PLC Panel, Interfcing of MCC Panel and PLC Panel, FAT, Preparation of
documents, Installation and commissioning, Customer support on site and over
telephone.
Worked on Rail preparation column conveyors, in which complete engineering done
which includes getting input from customer depends on requirement design complete
flow system of plant, Study of Process flow, design of control panel, Making G.A
Drawings, sending it for approval, selection of panel components, PLC,AC-
Drive,Softstarter ,making BOM, selection of field equipments, after getting approval from
customer selection of cable, cable schedule preparation, cable tray layout, INDENT for
material follow up for material, installation of plant. Taking FAT, after completion of FAT
sending plant to customer location. THEN Installation and commissioning. Preparation of
Document for UL CERTIFICATION.
Project #1:
Project Title : Preparation of Rail column conveyor
Organization : Showa Denko, US.
Project #2:
Project Title : Preparation of Rail column conveyor
Organization : International Paper, US.
Project #3:
Project Title : Chain conveyor
Organization : Australian Paper, Australia.
Project #4
Project Title : Blasting booth AND Paint booth
Organization : ABG CRANES, KHOPOLI
Technologies : AutoCAD L/t panel design, commissioning,
Team Size : 6
Duration : May 10 to June 10.
Description: Planning for new project starting from material procurement,
control and power circuit design, preparation of I/O list, preparation
of cable schedule ,logic development, complete data preparation
including selection of switchgear, cable etc.
Involvement:
 Preparation of bill of material
 Design of control panel
 Also commissioning of drive, PLC and control panel.
Project # 5
Project Title : LPG gas firing Circuit replaced with NG gas circuit
Organization : Uttam Galva steels ltd
Technologies : PLC, AUTOCAD, EXCEL -2007
Team Size : 12
Duration : NOV 09 to MARCH’10.
Description : This project was about replacing existing LPG gas firing circuit with
Natural gas, circuit for having low cost consumption of gas required for
Non –ox furnace.
Planning for new project starting from material procurement, control and power circuit
design, preparation of I/O list, preparation of cable schedule ,logic development,
complete data preparation including selection of switchgear, cable etc.
Involvement:
 Preparation of bill of material
 Also commissioning of PLC and control panel.
Project # 6 Project Title : Replacing NH3 drier cam timer cycle with Schneider
electric PLC and MMI
Organization : Uttam Galva steels ltd
Technologies : PLC, AUTOCAD, EXCEL -2007
Team Size : 12
Duration : April 09 to MAY ’09.
Description : This project was about Replacing NH3 drier cam timer cycle with
Schneider electric PLC and MMI for having better operating time required.
Planning for new project starting from material procurement, control and power circuit
design, preparation of I/O list, preparation of cable schedule ,logic development,
complete data preparation including selection of switchgear, cable etc.
Involvement:
Preparation of bill of material also commissioning of PLC ,MMI and control panel
Project # 7:
Project Name : Replacing FIFO system with EMG system for coil wound
recoiled.
Organization : Uttam Galva steels ltd
Technologies : PLC, EMG EDGE GUIDE CONTROL PANEL, EXCEL -2007
Team Size : 8
Duration : April 09 to MAY ’09.
Description: Replacing FIFO system with EMG system for coil wound recoiler for
having better coil size, efficient troubleshooting, better productivity.
Project # 8:
Project Name : Replacing star delta starter with ac drive for PHF combustion
blower
Organization : Uttam Galva steels ltd
Involvement - control and power circuit design, preparation of I/O list, preparation of
cable schedule ,logic development, complete data preparation including
selection of switchgear, cable etc
Project # 9:
Project Name : Automatic lighting control using Clipsal integrated system
Organization : Automation and control
Involvement Responsible for project execution of home automation equipments
In includes preparation of lighting circuit and designing ALC panel for lighting control .
Also execution of complete project with installation commissioning and preparation of
relevant documents lighting project done for John Deere Pune, It includes complete
project right from planning to completion of project.
PROFESSIONAL ACHIEVEMENTS
 Achieved Savings of 40% in Phf combustion Blower using ac drives.
 Achieved perfect NH3 drier cycle using PLC.
 Achieved design skills for project and knowledge of costing, so work.
STRENGTH
 Hunting desire to learn
 High energy level
 Good analytical and communication skill
Personal Details
Name : Prakash J Goyal
Date of Birth : 12-01-1977
Marital Status : Married
Languages Known: English, Hindi
(Prakash J Goyal)
RESUME_PRAKASH
RESUME_PRAKASH

More Related Content

What's hot

Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar MVijayakumar M
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Todd Calvert
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
kmccarthy1981
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_ResumeMEHTA VIVEK
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
Viswambhar Murahu Pal
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
S.Manikandan_Resume.doc
S.Manikandan_Resume.docS.Manikandan_Resume.doc
S.Manikandan_Resume.docmanikandan .
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 

What's hot (19)

Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar M
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Resume Kallol Chatterjee
Resume Kallol ChatterjeeResume Kallol Chatterjee
Resume Kallol Chatterjee
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
Vivek Mehta_Resume
Vivek Mehta_ResumeVivek Mehta_Resume
Vivek Mehta_Resume
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
S.Manikandan_Resume.doc
S.Manikandan_Resume.docS.Manikandan_Resume.doc
S.Manikandan_Resume.doc
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 

Viewers also liked

Гарден Сити - торгово-выставочный комплекс.
Гарден Сити - торгово-выставочный комплекс.Гарден Сити - торгово-выставочный комплекс.
Гарден Сити - торгово-выставочный комплекс.
Сергей Терещенко
 
How to perform photo recovery
How to perform photo recoveryHow to perform photo recovery
How to perform photo recovery
Lisa Liao
 
Marketing Week 2015 Recap
Marketing Week 2015 Recap Marketing Week 2015 Recap
Marketing Week 2015 Recap
Pitt_AMA
 
Jobs in DSIIDC, New Delhi
Jobs in DSIIDC, New DelhiJobs in DSIIDC, New Delhi
Jobs in DSIIDC, New Delhi
Sudha Sati
 
So you want to go digital
So you want to go digitalSo you want to go digital
So you want to go digital
Michael Burgess
 
9/11: An event from which we still feel the ripples today.
9/11: An event from which we still feel the ripples today. 9/11: An event from which we still feel the ripples today.
9/11: An event from which we still feel the ripples today.
Sandra Olivarez
 
More media work
More media workMore media work
More media work
kye99
 
Sixth form analysis2
Sixth form analysis2Sixth form analysis2
Sixth form analysis2
Anna Campbell
 
graduate_fellows_pb_no.11
graduate_fellows_pb_no.11graduate_fellows_pb_no.11
graduate_fellows_pb_no.11Aya Al-Shalchi
 
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
SCHOLEDGE R&D CENTER
 
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshowSmith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
ZachSmith0215
 

Viewers also liked (12)

Гарден Сити - торгово-выставочный комплекс.
Гарден Сити - торгово-выставочный комплекс.Гарден Сити - торгово-выставочный комплекс.
Гарден Сити - торгово-выставочный комплекс.
 
How to perform photo recovery
How to perform photo recoveryHow to perform photo recovery
How to perform photo recovery
 
Thirupathi
ThirupathiThirupathi
Thirupathi
 
Marketing Week 2015 Recap
Marketing Week 2015 Recap Marketing Week 2015 Recap
Marketing Week 2015 Recap
 
Jobs in DSIIDC, New Delhi
Jobs in DSIIDC, New DelhiJobs in DSIIDC, New Delhi
Jobs in DSIIDC, New Delhi
 
So you want to go digital
So you want to go digitalSo you want to go digital
So you want to go digital
 
9/11: An event from which we still feel the ripples today.
9/11: An event from which we still feel the ripples today. 9/11: An event from which we still feel the ripples today.
9/11: An event from which we still feel the ripples today.
 
More media work
More media workMore media work
More media work
 
Sixth form analysis2
Sixth form analysis2Sixth form analysis2
Sixth form analysis2
 
graduate_fellows_pb_no.11
graduate_fellows_pb_no.11graduate_fellows_pb_no.11
graduate_fellows_pb_no.11
 
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
ANALYZING THE CORRELATION ASPECT LINKING CONSUMPTION OF WINE AGAINST UNDERSTA...
 
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshowSmith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
Smith_Zachary_PCP-O_1509_4.4FinalPPPSlideshow
 

Similar to RESUME_PRAKASH

Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_AtulnjadhavAtul Jadhav
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
Kunal Saha
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEERSETHU MADHAVAN
 
Resume2
Resume2Resume2
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016PANKAJ PAL
 
J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationTarkeshwar Jayanti
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeMEHTA VIVEK
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
Satish Tumbare
 
Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Samuel Joseph
 

Similar to RESUME_PRAKASH (20)

Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_Atulnjadhav
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
 
Resume2
Resume2Resume2
Resume2
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
PUNIT_GUPTA
PUNIT_GUPTAPUNIT_GUPTA
PUNIT_GUPTA
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & Automation
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Resume-Prashanth
Resume-PrashanthResume-Prashanth
Resume-Prashanth
 
Electronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resumeElectronics & Communication_Engineer_resume
Electronics & Communication_Engineer_resume
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Profile_SamuelJaideep_05
Profile_SamuelJaideep_05Profile_SamuelJaideep_05
Profile_SamuelJaideep_05
 

RESUME_PRAKASH

  • 1. GOYAL PRAKASH JAWANJI Khopoli Pen road, Shilphata Khopoli Taluka-Khalapur,Dist – Raigad Maharashtra -410203 Mob no: +91-8552945753 Email:prakash_jgoyal@rediffmail.com Experience Summary 10 Years of, Project design and development experience as a developer of various competent using PLC SCADA, HMI, AC AND DC DRIVE,PCC-MCC PANEL,DRIVE PANEL,I/O PANEL,PLC PANEL etc.PLC – SIEMENS S7 -300, ALLEN BRADLLEYS MICROLOGIX 1000,SCADA – INTELLUTION VIEW, RS LOGIX VIEW, HMI- SIEMENS SIMATIC PANEL OP7, MAGELIS , PROTOCOL – PROFIBUS, MODBUS AUTOCAD , Knowledge and experience in Hydraulic and Pneumatic control. . Thorough understanding of Complete Plant layout, Function logic, Conveyor flow, Control Design of complete conveyor as per project requirement and, engineering, commissioning, testing, and troubleshooting.  Having experience with Capital equipment design, Ice plant making design with Electrical system design.MCC Panel,PLC Panel design, Interfacing of MCC Panel and plc panel,Fat,Customer interaction, specification deign, material procurement  Define logic for each section, incorporating all logic in project, Selection of PLC, AC Drive, Soft starter. Selection of Power cable, control cable, signals cable. Selection of control panel component as per Customer requirement for Standards like UL For US- CANADA Project. Preparation of control schematic, Preparation of control panel design.  Preparation of Data sheet for Component selection with different products for approval from Customers  Giving Control panel for production to Vendors, Follow up with vendor for status of panel, visiting to vendor site for technical issues, Relation maintaining with different vendors for meeting project requirement on time.  Experience in working with various switchgear equipment, ac and dc motor, Transformer, H/T AND L/T PANEL, MCC PCC PANEL APFC PANEL. Experience in use of Hydraulic, Pneumatic controls.  Experience in pre-commissioning activity, post commissioning activities.  Strong collaboration & team building skills.  Experience in learning new technical concepts quickly, Willingness to learn new technology & utilize the same in a productive manner.
  • 2. Organizational Profile  Working With Master Integrators PVT LTD from 2 April 2014 to 13 JUNE 2015  Worked with HI-Point services Pvt. Ltd. Andheri from 27 August 2012 to 6 September 2013  Worked for ABG Cranes Pvt. Ltd, Khopoli as Electrical Engineer (April‘10 to Aug 2012).  Worked for Uttam Galva steels LTD (Nov 06 to April 10).  Worked with -Automation and Control Post- Application Engineer Period- 1st October 2005 TO 1st October 2006  Company Name -Supreme Industries Ltd. Post -Trainee Engineer Period 20th Sept. 2004 to 20th Sept 2005 Academic Qualification Qualification Institution Board Year % Marks B.tech Electrical Dr.Batu,Lonere Dr.Batu,Lonere 2004 52.7% H.S.C J.V.J.C KHOPOLI MUMBAI 1995 60.0% S.S.C SAHYADRI VIDYALAYA PUNE 1993 79.23 Technical profile Skill Experienced PLC,SCADA,HMI- Siemens, Allen bradlleys, Schenider Electric Modicon quantum,selection of I/o devices,Design of I/O ,PLC PANEL,DRIVE PANEL,electrical layout AUTOMATIC LIGHTING C-BUS,CLIPSAL INTEGRATED SYSTEM SERVO ,AC DRIVE AND DC DRIVE SIEMENS,YASKAWA,TOSHIBA,SCHENEIDER ELECTRIC MAINTENANCE And Troubleshooting, Inspection AC AND DC motors,Transfomers,100 KV , 22/.440 KV Substation, Generator, Furnace and it’s equipment like Temp. Transmitter, Pressure transmitters, Pressure transducers and switches etc. Blower, Pumps, Gas and air compressor, Heaters H/T L/T Panel and APFC panel. Having knowledge of control system, it’s logic development, testing etc. ISO WORK 9001 -2002,IMS ( QMS + EHS ),TPM,5’s system Material Work on web based indent system for material indent, Material record, Material Inspection after receiving from the vendors and also inspection at the vendor site. Design Design of control logic, design of control panel, preparation of I/O list, cable schedule, preparation of Bill of material, wiring schematic using AutoCAD 2007,2010
  • 3. Projects Profile: Presently working with Master Integrators PVT LTD. Understanding of complete plant, their requirement specification design as per plant requirement, Material requirement and procurement, Design of Electrical MCC PANEL, Control panel, PLC Panel, Interfcing of MCC Panel and PLC Panel, FAT, Preparation of documents, Installation and commissioning, Customer support on site and over telephone. Worked on Rail preparation column conveyors, in which complete engineering done which includes getting input from customer depends on requirement design complete flow system of plant, Study of Process flow, design of control panel, Making G.A Drawings, sending it for approval, selection of panel components, PLC,AC- Drive,Softstarter ,making BOM, selection of field equipments, after getting approval from customer selection of cable, cable schedule preparation, cable tray layout, INDENT for material follow up for material, installation of plant. Taking FAT, after completion of FAT sending plant to customer location. THEN Installation and commissioning. Preparation of Document for UL CERTIFICATION. Project #1: Project Title : Preparation of Rail column conveyor Organization : Showa Denko, US. Project #2: Project Title : Preparation of Rail column conveyor Organization : International Paper, US. Project #3: Project Title : Chain conveyor Organization : Australian Paper, Australia. Project #4 Project Title : Blasting booth AND Paint booth Organization : ABG CRANES, KHOPOLI Technologies : AutoCAD L/t panel design, commissioning, Team Size : 6 Duration : May 10 to June 10. Description: Planning for new project starting from material procurement, control and power circuit design, preparation of I/O list, preparation
  • 4. of cable schedule ,logic development, complete data preparation including selection of switchgear, cable etc. Involvement:  Preparation of bill of material  Design of control panel  Also commissioning of drive, PLC and control panel. Project # 5 Project Title : LPG gas firing Circuit replaced with NG gas circuit Organization : Uttam Galva steels ltd Technologies : PLC, AUTOCAD, EXCEL -2007 Team Size : 12 Duration : NOV 09 to MARCH’10. Description : This project was about replacing existing LPG gas firing circuit with Natural gas, circuit for having low cost consumption of gas required for Non –ox furnace. Planning for new project starting from material procurement, control and power circuit design, preparation of I/O list, preparation of cable schedule ,logic development, complete data preparation including selection of switchgear, cable etc. Involvement:  Preparation of bill of material  Also commissioning of PLC and control panel. Project # 6 Project Title : Replacing NH3 drier cam timer cycle with Schneider electric PLC and MMI Organization : Uttam Galva steels ltd Technologies : PLC, AUTOCAD, EXCEL -2007 Team Size : 12 Duration : April 09 to MAY ’09. Description : This project was about Replacing NH3 drier cam timer cycle with Schneider electric PLC and MMI for having better operating time required. Planning for new project starting from material procurement, control and power circuit design, preparation of I/O list, preparation of cable schedule ,logic development, complete data preparation including selection of switchgear, cable etc. Involvement: Preparation of bill of material also commissioning of PLC ,MMI and control panel Project # 7:
  • 5. Project Name : Replacing FIFO system with EMG system for coil wound recoiled. Organization : Uttam Galva steels ltd Technologies : PLC, EMG EDGE GUIDE CONTROL PANEL, EXCEL -2007 Team Size : 8 Duration : April 09 to MAY ’09. Description: Replacing FIFO system with EMG system for coil wound recoiler for having better coil size, efficient troubleshooting, better productivity. Project # 8: Project Name : Replacing star delta starter with ac drive for PHF combustion blower Organization : Uttam Galva steels ltd Involvement - control and power circuit design, preparation of I/O list, preparation of cable schedule ,logic development, complete data preparation including selection of switchgear, cable etc Project # 9: Project Name : Automatic lighting control using Clipsal integrated system Organization : Automation and control Involvement Responsible for project execution of home automation equipments In includes preparation of lighting circuit and designing ALC panel for lighting control . Also execution of complete project with installation commissioning and preparation of relevant documents lighting project done for John Deere Pune, It includes complete project right from planning to completion of project. PROFESSIONAL ACHIEVEMENTS  Achieved Savings of 40% in Phf combustion Blower using ac drives.  Achieved perfect NH3 drier cycle using PLC.  Achieved design skills for project and knowledge of costing, so work. STRENGTH  Hunting desire to learn  High energy level  Good analytical and communication skill Personal Details Name : Prakash J Goyal Date of Birth : 12-01-1977 Marital Status : Married Languages Known: English, Hindi (Prakash J Goyal)