RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
Presentation given at RAMS 2013
Three-phase inverters are physically large, complex and expensive elements of major solar power generation systems. The inverter converts DC power created by the photovoltaic (PV) panels to AC power suitable for adding to the power grid.
The inverters’ reliability testing is a complex task and relies on reliability block diagrams (RBD), vendor and field data, plus selecting accelerated life tests (ALT) based on critical elements of the product.
This paper illustrates a case study that developed an RBD, used field and vendor data, and includes the design and use of two ALTs. The result is a working framework or model that provides a reasonable estimate of the expected lifetime performance of the inverter. While any project similar to this, is always a work in progress, the examination of the decisions and inputs for the model proves valuable for the continued improvement of the model and resulting life predictions. This project provides an excellent real life example of reliability estimation having a multitude of constraints including: sample size, test duration, and field data, thus having to rely on all sources of available data starting from field and vendor data to theoretical component reliability calculations, ALT plan execution, failure analysis, and finally summarizing the results using RBD to estimate product expected lifetime. At the time of writing this paper, based on completion of system level ALT, an availability of 99.97% is valid over a 10 year period according to southern Ontario weather as the main installation base. This will be revisited once subsystem ALT is completed.
We will explore how to articulate value of reliability activities in business terms. Estimating the return on investment for risk assessment or accelerated testing can help you justify the investment in these tools. This lesson is intended to help you discover and state the value of common reliability activities. Put a number on the value you bring to the organization with your reliability work.
Hans-Henrik Olesen - What to Automate and What not to AutomateTEST Huddle
EuroSTAR Software Testing Conference 2009 presentation on What to Automate and What not to Automate by Hans-Henrik Olesen. See more at conferences.eurostarsoftwaretesting.com/past-presentations/
Test Environment Management- An Emerging Truth Of DevOpsEnov8
Companies are investing big amount to enhance the quality of test environment management tool. Improve work quality, observing the bigger picture for better DataOps, lessen the risk to manage test environment.
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
Presentation given at RAMS 2013
Three-phase inverters are physically large, complex and expensive elements of major solar power generation systems. The inverter converts DC power created by the photovoltaic (PV) panels to AC power suitable for adding to the power grid.
The inverters’ reliability testing is a complex task and relies on reliability block diagrams (RBD), vendor and field data, plus selecting accelerated life tests (ALT) based on critical elements of the product.
This paper illustrates a case study that developed an RBD, used field and vendor data, and includes the design and use of two ALTs. The result is a working framework or model that provides a reasonable estimate of the expected lifetime performance of the inverter. While any project similar to this, is always a work in progress, the examination of the decisions and inputs for the model proves valuable for the continued improvement of the model and resulting life predictions. This project provides an excellent real life example of reliability estimation having a multitude of constraints including: sample size, test duration, and field data, thus having to rely on all sources of available data starting from field and vendor data to theoretical component reliability calculations, ALT plan execution, failure analysis, and finally summarizing the results using RBD to estimate product expected lifetime. At the time of writing this paper, based on completion of system level ALT, an availability of 99.97% is valid over a 10 year period according to southern Ontario weather as the main installation base. This will be revisited once subsystem ALT is completed.
We will explore how to articulate value of reliability activities in business terms. Estimating the return on investment for risk assessment or accelerated testing can help you justify the investment in these tools. This lesson is intended to help you discover and state the value of common reliability activities. Put a number on the value you bring to the organization with your reliability work.
Hans-Henrik Olesen - What to Automate and What not to AutomateTEST Huddle
EuroSTAR Software Testing Conference 2009 presentation on What to Automate and What not to Automate by Hans-Henrik Olesen. See more at conferences.eurostarsoftwaretesting.com/past-presentations/
Test Environment Management- An Emerging Truth Of DevOpsEnov8
Companies are investing big amount to enhance the quality of test environment management tool. Improve work quality, observing the bigger picture for better DataOps, lessen the risk to manage test environment.
THE SHIFT - Change Communication for IT & ERP ProjectsElsjene Burger
We have all seen it before.
The previous ERP system is just not handling everything it needs to handle anymore. After reading countless Gartner reports, we finally make a decision to implement the latest and greatest ERP that will deliver more than we need and increase our productifity AND make a massive positive impact on our bottom line.
So, what can possibly go wrong?
Even with the best implementation partner on your side with dedicated project management, there’s one thing that can increase your chances of a quicker and greater return on investment; proper internal and inter-project communication.
At Marketec, we enable a higher rate of new system or process adoption through change communication.
Each product development project is different. Different features, customers, use cases, and expectations. Let’s discuss how to build a custom reliability program that fits your specific situation.
“Insanity: doing the same thing over and over and expecting different results.”
– attributed to Albert Einstein, basically describes many organizations reliability program plans.
The idea that a set of activities will effectively address all of the reliability risks of a new design is all too common in industry. Why is this?
Let’s explore recognizing the current situation and which activities will provide the most value. The focus should be on creating a product that meets customer and business expectations withe lowest risk and cost.
In this interactive webinar, we will discuss a couple of different situations and how to develop and manage the right reliability program. Startups with brand new technology to mature industrial equipment families of products all have reliability performance expectations, it is how we create and execute the reliability activities in support of the project that is key.
Each element of the entire program should add value, not done ‘just because we always do that.” With just a little thought you can create and justify a tailored plan. Join the discussion.
This Accendo Reliability webinar originally broadcast on 9 September 2014.
How to Get Stuff Right
Innovation and facts over opinions and assumptions; follow a plan that responds to change.
Project Control is application of control theory to development of solutions. Through creating tests first we create negative feedback to help development.
Obstacle Driven Development combines the latest engineering methods and software development. ODD helps identify, correct and prevent errors as early and efficiently as practical.
This presentation shows how ODD extends and combines ISO compatible V-models, Test Driven Development, requirements analysis, extended specifications and Agile.
Please see the series for further information.
We work on projects to improve reliability. There may not be the field data immediately available. Let’s explore what you can do to improve the overall program while delivering on your project. Specifically, what’s with cost and procurement?
Detailed Information: As a reliability professional we often work with a team focused on improving the reliability of single product or system. We work with the resources and capabilities of the organization. For me a reliability project is one product or line, a program is the entire organization and lifecycle. We bring specific tools and knowledge, yet rely on the overall reliability culture of an organization to be successful
The overall reliability program may or may not have the field data, root cause analysis and other element of information that allow us to effectively solve problems for a specific project. In some cases we have to work to improve the overall program while striving to create a reliable product. Let’s explore what you should do when you are building a reliability model for a new project and would like to use previous reliability history.
If the data is not available what do you do? What are your options? Let’s discuss what happens when the procurement team consistently selects the least expensive and least reliable components. What are your options? You can and should change the way entire departments do business, for the good of the project and the organization. Let’s discuss the scope of your role as a reliability engineer.
This Accendo Reliability webinar originally broadcast on 19 May 2015.
Guide to better Project Management from SeveraSevera PSA
Top 10 list of project management tips to curb on project failure, reduce spending in project-based organizations and improve productivity. A must read for all project managers in a professional services firm.
THE SHIFT - Change Communication for IT & ERP ProjectsElsjene Burger
We have all seen it before.
The previous ERP system is just not handling everything it needs to handle anymore. After reading countless Gartner reports, we finally make a decision to implement the latest and greatest ERP that will deliver more than we need and increase our productifity AND make a massive positive impact on our bottom line.
So, what can possibly go wrong?
Even with the best implementation partner on your side with dedicated project management, there’s one thing that can increase your chances of a quicker and greater return on investment; proper internal and inter-project communication.
At Marketec, we enable a higher rate of new system or process adoption through change communication.
Each product development project is different. Different features, customers, use cases, and expectations. Let’s discuss how to build a custom reliability program that fits your specific situation.
“Insanity: doing the same thing over and over and expecting different results.”
– attributed to Albert Einstein, basically describes many organizations reliability program plans.
The idea that a set of activities will effectively address all of the reliability risks of a new design is all too common in industry. Why is this?
Let’s explore recognizing the current situation and which activities will provide the most value. The focus should be on creating a product that meets customer and business expectations withe lowest risk and cost.
In this interactive webinar, we will discuss a couple of different situations and how to develop and manage the right reliability program. Startups with brand new technology to mature industrial equipment families of products all have reliability performance expectations, it is how we create and execute the reliability activities in support of the project that is key.
Each element of the entire program should add value, not done ‘just because we always do that.” With just a little thought you can create and justify a tailored plan. Join the discussion.
This Accendo Reliability webinar originally broadcast on 9 September 2014.
How to Get Stuff Right
Innovation and facts over opinions and assumptions; follow a plan that responds to change.
Project Control is application of control theory to development of solutions. Through creating tests first we create negative feedback to help development.
Obstacle Driven Development combines the latest engineering methods and software development. ODD helps identify, correct and prevent errors as early and efficiently as practical.
This presentation shows how ODD extends and combines ISO compatible V-models, Test Driven Development, requirements analysis, extended specifications and Agile.
Please see the series for further information.
We work on projects to improve reliability. There may not be the field data immediately available. Let’s explore what you can do to improve the overall program while delivering on your project. Specifically, what’s with cost and procurement?
Detailed Information: As a reliability professional we often work with a team focused on improving the reliability of single product or system. We work with the resources and capabilities of the organization. For me a reliability project is one product or line, a program is the entire organization and lifecycle. We bring specific tools and knowledge, yet rely on the overall reliability culture of an organization to be successful
The overall reliability program may or may not have the field data, root cause analysis and other element of information that allow us to effectively solve problems for a specific project. In some cases we have to work to improve the overall program while striving to create a reliable product. Let’s explore what you should do when you are building a reliability model for a new project and would like to use previous reliability history.
If the data is not available what do you do? What are your options? Let’s discuss what happens when the procurement team consistently selects the least expensive and least reliable components. What are your options? You can and should change the way entire departments do business, for the good of the project and the organization. Let’s discuss the scope of your role as a reliability engineer.
This Accendo Reliability webinar originally broadcast on 19 May 2015.
Guide to better Project Management from SeveraSevera PSA
Top 10 list of project management tips to curb on project failure, reduce spending in project-based organizations and improve productivity. A must read for all project managers in a professional services firm.
Software organizations that want to maximize the yield of Software Testing find that choosing the right testing strategy is hard, and most testing managers are ill-prepared for this. The organization has to learn how to plan testing efforts based on the characteristics of each project and the many ways the software product is to be used. This tutorial is intended for Software professionals who are likely to be responsible for defining the strategy and planning of the testing effort and managing it through its life cycle. These roles are usually Testing Managers or Project Managers.
Project Plan Development - A FlackVentures Training ExampleKate Pynn
Project planning is the construction of a dynamic agreement across diverse functional groups involved in a project. This agreement specifies:
Goals and deliverables of the project
What is being developed
Major activities that will be performed to achieve those goals
The assumptions that were made
Major risks, as they become known
Presentation made to top executives seeking to understand how to increase their ROI on IT investments. based on principles developed in my book, "The Ultimate Guide to the SDLC." http://www.ultimatesdlc.com/
Asset finance system project initiation 101. “Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.” This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
This blog help you to estimate the cost of software development project. For more detail information Read full article here, https://www.vrinsofts.com/how-to-estimate-software-development-project-cost/
“Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.”
This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
Primer on enterprise_performance_maturity_v0.2Trevor Warren
This presentation focuses on the concepts around Enterprise Performance Maturity, Costs of addressing performance maturity including how to go about building performance maturity across the enterprise.
Applicability of CMMI for Small to Medium Enterprisesrhefner
There are many reasons why CMMI is difficult to implement in small organizations and small projects -- the fixed costs of establishing the necessary infrastructure; the large number of roles which must be filled by a limited number of people; the quantity of information that must be absorbed to properly interpret the model. Similar problems are experienced when applying the CMMI to short duration projects.
This tutorial will outline the challenges in applying CMMI in small settings, and present practical strategies for overcoming them. Specific techniques for infrastructure, adoption, and appraisals will be presented. In addition, a guide for interpreting each CMMI practice in small settings will be provided.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Remote sensing and monitoring are changing the mining industry for the better. These are providing innovative solutions to long-standing challenges. Those related to exploration, extraction, and overall environmental management by mining technology companies Odisha. These technologies make use of satellite imaging, aerial photography and sensors to collect data that might be inaccessible or from hazardous locations. With the use of this technology, mining operations are becoming increasingly efficient. Let us gain more insight into the key aspects associated with remote sensing and monitoring when it comes to mining.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
3. What We Do Build the right framework to optimize time , resources and customers satisfaction Your Challenge VeeShell Solution
4.
5.
6. CHAOS Summary 2009 Report "This year's results show a marked decrease in project success rates, with 32% of all projects succeeding which are delivered on time, on budget, with required features and functions; 44% were challenged which are late, over budget, and/or with less than the required features and functions and 24% failed which are cancelled prior to completion or delivered and never used….This year's results represent the highest failure rate in over a decade” Jim Johnson, Chairman of The Standish Group
7.
8.
9.
10.
11. How many times have you heard these? There is another way!
12.
13.
14.
15.
16.
17.
18. Thank you for your time Tel. +972-9-7929062, +972-57-7783561 , VeeShell.com, office@veeshell.com