SlideShare a Scribd company logo
ISSN (e): 2250 – 3005 || Volume, 07 || Issue, 03|| March – 2017 ||
International Journal of Computational Engineering Research (IJCER)
www.ijceronline.com Open Access Journal Page 25
Urban Town Planning
*Dr.K.Deepa, **R.P.Sangeetha, **J.Vindhya
*professor, panimalar engineering college, Chennai,**UG Scholars, panimalar engineering college, Chennai
I. INTRODUCTION
The town planning means arrangement of various compounds such as residential, commercial, industrial,
institutional, etc., in an systematic and well organised manner so as to provide ultimate comfort for living in the
present and alsoin future. The town planning should be done in such a way that it provide a solution for various
practical problems that prevails today. Town planning is an art ofarranging thecomponentsinabeautiful,
efficient,and convenient for all classes of people exiting in the society. The town should be planned economical
as for aspossible.
1.1 History Of Town Planning
Town planning is not a new concept, it was followed in the ancient period. In those days peoples
createdtowns near to the river in a high altitude region which was called as civilization. There are many
civilization existed in the world. These civilization developed a well organised residents providing a well-
definedprovisionfordrainageflowpattern, water ways, canals, etc. Among these civilization HARAPPA and
MOHANJO- DARO which existed around 2600 BC on the bank of river Indus in Sind (now in Pakistan) are
most famous and notable one toeveryone.
1.2 Principles Of Townplanning
The town planning requires the knowledge of various professions like engineering, architecture and surveying.
The planning should not be confined to satisfy the future generation but the growth andfeaturede
velopmentalsoconsideredby the planner. Some of the principle of town planning are asfollows,
 Zoning
 Roadsystem
 Housing Publicbuilding
 Recreationcentres
 Transportfacilities
 Greenbelt
II. LAND USE ALLOCATION FOR VARIOUSSECTORS
Table 1. Land use table
Sl. No Land Use Percentage area of allocated
1. Residential 50%
2. Commercial 15%
3. Institutional 10%
4. Industrial 15%
5. Recreation centre 10%
ABSTRACT
The new towns are arranged and made to accomplish some foreordained objectives. The urban town
arranging got to be distinctly unavoidable toward the start of twentieth century that is after the
modern upheaval. Area of place for creating township put a noteworthy part during the time spent
urban town arranging. The essential target of town arranging is to achieve a manageable
advancement in every last parts by taking after certain very much characterized standards and
proposals for arranging. There is requirement for new city in ramanathapuram region on the fruition
of sethu trench extend. Subsequently we build up a very much arranged city with goal of manageable
improvement in the previously mentioned locale
Keywords: new city, practical advancement, sethu trench venture, standards and suggestions.
Urban Town Planning
www.ijceronline.com Open Access Journal Page 26
3.1 Residentialzone
4 Any residents should include dwelling, detached, semi-detached, tenements or flats and service apartments.
5% of the area under residential zone shouldbeallocatedforEWS(Economically Weaker Sections)housing.
5 Petty shops, tea stalls, bakery, retail shops, mutton stalls, milk point, mechanic shops, computer centres,
ATMs, occupying the floor area not exceeding 40m2.
6 Nursery primary and secondary schools,libraries,andreadingroomsshould be provided. Park playground,
garden are madeavailable.
7 Hotels, hostels, old age homes, religious, assembly halls occupying floor area not exceeding300m2.
8 Govt. semi govt. offices, banks, pay offices, post offices, offices of electricity board, auto mobile
workshops, corporation office, occupying a floor area not exceeding 300m2.
9 Daily or weekly marketsserving localneeds.
10 Transport depots, bus terminus and railwaystations.
11 Buring, burial grounds, crematoria andcemeteries.
12 Clinics, nursing homes, dispensaries and other health facilities not exceeding 300m2in floor area provided
the widthoftheabuttingroadisminimum10m.
13 Departmental stores with a floor area not exceeding 100m2 provided the width of the abutting roads is
minimum 10m.
2. Specification
1. Fuel filling stations and service stations with installations not exceeding 5Hpprovidedthewi
dthoftheabuttingroad is minimum10m.
2. Foreign missions, embassies andconsulates.
3. Taxi stands and car parking including multilevelparking.
13.1 Commercialzone
1. Around 10-15% area form the totalareaofthetownshipshouldbeallotted for commercialzone.
2. This area allocated for commercialzonethusnotincludesthebasic commercial activity carried out in the
residential or any othercomponents.
3. Research, experimental and testing laboratories not involving danger of fire, explosives or healthhazards.
4. Industries listed out by the Tamilnadu pollution control board as “Green industries “listed in Annexure VI
and as “Orange industries” listed in Annexure VII subject to a maximum installation of 50HP.
5. V) Taxi stand, auto stands, bus stands and railway stations, and multilevel parking should be made
available.
6. Building for development of software and its associated computer technology applications, ITparks.
7. Warehouses, and other uses connected with storage of wholesaletrades,in commodities but excluding
storage of explosives or products which are either obnoxiousorlikelytocausehealthhazards.
8. All commercial and business uses including all wholesale activities of textile, jewellery, fireworks,
combined market for fruits, vegetable, flower, fancy items, utensil, plastic item, etc, must be provided with
separate provision foreach.
The parkingnormsfor commercialcomponentshallbeprovidedat2.5 ECS (Equivalent Car Space) per 100sqm
of the total built uparea.
vi) For the provision of parking the space standards for ECS shall be asunder,
a) 23sqm per ECS for openparking.
b) 28sqm per ECS foe covered parking at groundlevel.
c) 33sqm per ECS for parking at basementlevel.
3.3 Institutionalzone
Table 2 recommendations for educational institute
Sl.No Institution population Minimum Area
1. Nursery and primary school 5,000 0.3 hectare
2. High/ high secondary school 15,000 1.6 hectare
3. Colleges 1,00,000 4 hectare
Urban Town Planning
www.ijceronline.com Open Access Journal Page 27
1. Additional institution shall be provided when the population exceeds 50 % of the standards.
2. Adequate arrangement of parking of buses, vehicles ofstaffs/students shall bemade.
3. Minimum 25% of the site area shall be allocated as a playarea.
4. Government and Quasi- Government offices, professionaloffices.
5. Art galleries, museums, public libraries,socialandculturalinstitutionsand religiousbuilding.
6. Broad casting installation and weatherstations.
7. Public utilities, storage and public yards, municipal and community facilities.
8. In addition to above Other Community/ Public/ Cultural/ Heritage Buildings may be considered for
provision by the Developer/Promoter, keeping in view the larger interest and welfare of the residents.
4.3 Industrialzone
1. Around 15% area form the total area of the township should be allotted for industrialzone.
2. All industries using electrical power utilising machinery notexceeding
3. 130 HP but excluding all industries of obnoxiousandhazardousnaturebyyeasons of odour, effluent, dust,
smoke, gas, vibration, etc. or otherwise likely to cause danger or nuisance to public health or amenity.
4. All industries not producing noxious or dangerous effluents or where sufficient precaution to the
satisfaction of the authority have been taken to eliminate noxious or dangerouseffluents.
5. Storage of petroleum, timber, explosives and inflammable and dangerous materials.
6. container terminals (at sites or gaining access from minimum 18 metre wide publicroad)
7. It is better to create a industrial estate like ambattur or guindy industrial estate for carrying out industrial
activity in an efficientway
8. Some residential provisions should be made for employees. All kind of retail stores, hotels and other
facility to satisfy the basic needs of the employee should be madeavailable.
9. All special and hazardous industries (classified as „Red‟ by the Tamil Nadu pollution control board )
without restriction of Horse power that are likely to be dangerous to human life or health or amenity, but
sufficient precaution to the satisfaction of the TNPC Board have been taken to eliminate noxious or
dangerous effluents and to alleviate danger to human life or health or amenity(Annexure-viii)
4.4 Recreationzone
1. Around 10% area form the total area of the township should be allotted for industrialzone.
2. All public and semi-public recreational uses and open spaces, parks and play ground, zoological and
botanical gardens,nurseries,waterfront development, museums andmemorials.
3. 3% of the area should be allocated for parks and playgrounds.
4. Themeparks,cinematheatreand amusementparks.
5. Open air theatre, exhibitions, circuses, fairs and festival grounds, public utilities.
6. Sports stadia and recreational complexes.
7. Beach cottages each not exceeding 100Sqm in floor area and 7.5m inheigh.
4.5 Other Utilityfacilities
3.6.1 Communitycentre
Community building in the project area shall be provided at the following norms individually and severally,
Table 3 recommendations for community building
Sl.No Community building Population Minimum area
1. One community centre 30,000 0.6 hectare
2. One religious site 15.000 0.1 hectare
3. One police post 30,000 0.2 hectare
4. One police station 1,00,000 0.8 hectare
5. One sub-post office 25,000 80Sqm
6. Telephone exchange 1,00,000 0.8 hectare
Urban Town Planning
www.ijceronline.com Open Access Journal Page 28
3.6.2 Medicalfacilities
Table 4 recommendations for medical facilities
Sl.NO Medical institution population Minimum area
1. One dispensary 15,000 0.2 hectare
2. One health centre 50,000 0.6 hectare
3. One poly clinic 1,00,000 1.0 hectare
4. One hospital 1,00,000 3.7 hectare
3.7 Roadspecification
i) Outer/inner ring road shall not be less than 30m in width. In addition to this service road of width 8m is
provided on either side along the entire length of suchroads.
ii) Arterialroadsshouldbeprovided with the width of 45m (i.e. 150ft in width )
iii) Sub arterial roads should be providedwiththewidthof30m(i.e. 100ft in width)
iv) The local roads that collect traffic from various parts of the town shall not be less than12m
v) All streets in the residential zone shall not be less8m.
III. CONCLUSION
An all around arranged town ship can be made by taking after the previously mentioned suggestions. The
arrangement made for parks and play areas make attention to sports among the more youthful era It is evaluated
that if these proposals are actualized the new township will be free from all the testing issues like activity,
contamination, over populace, storm water waste, ghettos, and so forth, that are confronted by the ebb and flow
existing urban areas.
REFERENCES
[1]. Jaya kumar,R; Town planning, 2009.
[2]. Raju,K; Town and city development,2007.
[3]. Alok Tiwari, Is slipshod Urban planning, hampering sustainability ofSmall
[4]. IndianTowns,2015
[5]. Heng Wei, Key Issues in Integrating New Town Development intoUrban
[6]. TransportationPlanning,2013.
[7]. EPC. Streamlining Urban Planning and Land ManagementPractices.
[8]. State Policy Study for the Government of Gujarat and supportedby
[9]. The World Bank.2007.
[10]. Gupta,g.k; Guide line for town planning.2006
[11]. Khalil Farid, Urban sprawl Vs urban renewal: What role for Town and
[12]. Country planning instruments in ensuring sustainablecities,2011.
[13]. Motoya Koga, Proposal for welfare town planning method and experimental
[14]. Development,2011.

More Related Content

What's hot

ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
Bayar Tsend
 
Review of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development planReview of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development plan
Anoushka Tyagi
 
CHENNAI CITY -URBAN SPRAWL
CHENNAI CITY -URBAN  SPRAWL CHENNAI CITY -URBAN  SPRAWL
CHENNAI CITY -URBAN SPRAWL
Manju Arjunan
 
Master Plan Guwahati
Master Plan GuwahatiMaster Plan Guwahati
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
Dhawal Kataria
 
Navi Mumbai Project management
Navi Mumbai Project management  Navi Mumbai Project management
Navi Mumbai Project management
Prateek Nigam
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
Geeva Chandana
 
Presentation
PresentationPresentation
Presentation
Christine Guan
 
New Broucher - Smart Cit - 22-6-2016
New Broucher - Smart Cit - 22-6-2016New Broucher - Smart Cit - 22-6-2016
New Broucher - Smart Cit - 22-6-2016
Faiyaz Khan
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
liquorstud
 
Songdo, City of the Future
Songdo, City of the FutureSongdo, City of the Future
Songdo, City of the Future
Soleiman
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
shrdcinfo
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
Ar. M. Senthil [ senthilmani ]
 
Futuretech
FuturetechFuturetech
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Shrikant Kate
 

What's hot (15)

ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
 
Review of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development planReview of Mumbai Metropolitan regional development plan
Review of Mumbai Metropolitan regional development plan
 
CHENNAI CITY -URBAN SPRAWL
CHENNAI CITY -URBAN  SPRAWL CHENNAI CITY -URBAN  SPRAWL
CHENNAI CITY -URBAN SPRAWL
 
Master Plan Guwahati
Master Plan GuwahatiMaster Plan Guwahati
Master Plan Guwahati
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 
Navi Mumbai Project management
Navi Mumbai Project management  Navi Mumbai Project management
Navi Mumbai Project management
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Presentation
PresentationPresentation
Presentation
 
New Broucher - Smart Cit - 22-6-2016
New Broucher - Smart Cit - 22-6-2016New Broucher - Smart Cit - 22-6-2016
New Broucher - Smart Cit - 22-6-2016
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
 
Songdo, City of the Future
Songdo, City of the FutureSongdo, City of the Future
Songdo, City of the Future
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Futuretech
FuturetechFuturetech
Futuretech
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
 

Viewers also liked

Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
ijceronline
 
Location of Zeros of Polynomials
Location of Zeros of PolynomialsLocation of Zeros of Polynomials
Location of Zeros of Polynomials
ijceronline
 
PCB Faults Detection Using Image Processing
PCB Faults Detection Using Image ProcessingPCB Faults Detection Using Image Processing
PCB Faults Detection Using Image Processing
ijceronline
 
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
ijceronline
 
Wi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
Wi MAX Deinter leaver’s Address Generation Unit through FPGA ImplementationWi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
Wi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
ijceronline
 
An Evaluation of the Taxi Supply Management at the International Airport of S...
An Evaluation of the Taxi Supply Management at the International Airport of S...An Evaluation of the Taxi Supply Management at the International Airport of S...
An Evaluation of the Taxi Supply Management at the International Airport of S...
ijceronline
 
XRD Studies of Some Cellulose Fibers at Different Temperatures
XRD Studies of Some Cellulose Fibers at Different TemperaturesXRD Studies of Some Cellulose Fibers at Different Temperatures
XRD Studies of Some Cellulose Fibers at Different Temperatures
ijceronline
 
Conceptual Design and Structural Analysis of Solid Rocket Motor Casing
Conceptual Design and Structural Analysis of Solid Rocket Motor CasingConceptual Design and Structural Analysis of Solid Rocket Motor Casing
Conceptual Design and Structural Analysis of Solid Rocket Motor Casing
ijceronline
 
Transient Thermal Analysis of AlSiCp Composite Disc Brake
Transient Thermal Analysis of AlSiCp Composite Disc BrakeTransient Thermal Analysis of AlSiCp Composite Disc Brake
Transient Thermal Analysis of AlSiCp Composite Disc Brake
ijceronline
 
Location of Regions Containing all or Some Zeros of a Polynomial
Location of Regions Containing all or Some Zeros of a PolynomialLocation of Regions Containing all or Some Zeros of a Polynomial
Location of Regions Containing all or Some Zeros of a Polynomial
ijceronline
 
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
ijceronline
 
Study of the Class and Structural Changes Caused By Incorporating the Target ...
Study of the Class and Structural Changes Caused By Incorporating the Target ...Study of the Class and Structural Changes Caused By Incorporating the Target ...
Study of the Class and Structural Changes Caused By Incorporating the Target ...
ijceronline
 
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
ijceronline
 

Viewers also liked (13)

Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
Effect of Turbulence Model in Numerical Simulation of Single Round Jet at Low...
 
Location of Zeros of Polynomials
Location of Zeros of PolynomialsLocation of Zeros of Polynomials
Location of Zeros of Polynomials
 
PCB Faults Detection Using Image Processing
PCB Faults Detection Using Image ProcessingPCB Faults Detection Using Image Processing
PCB Faults Detection Using Image Processing
 
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
Time-History Analysis on Seismic Stability of Nuclear Island Bedrock with wea...
 
Wi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
Wi MAX Deinter leaver’s Address Generation Unit through FPGA ImplementationWi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
Wi MAX Deinter leaver’s Address Generation Unit through FPGA Implementation
 
An Evaluation of the Taxi Supply Management at the International Airport of S...
An Evaluation of the Taxi Supply Management at the International Airport of S...An Evaluation of the Taxi Supply Management at the International Airport of S...
An Evaluation of the Taxi Supply Management at the International Airport of S...
 
XRD Studies of Some Cellulose Fibers at Different Temperatures
XRD Studies of Some Cellulose Fibers at Different TemperaturesXRD Studies of Some Cellulose Fibers at Different Temperatures
XRD Studies of Some Cellulose Fibers at Different Temperatures
 
Conceptual Design and Structural Analysis of Solid Rocket Motor Casing
Conceptual Design and Structural Analysis of Solid Rocket Motor CasingConceptual Design and Structural Analysis of Solid Rocket Motor Casing
Conceptual Design and Structural Analysis of Solid Rocket Motor Casing
 
Transient Thermal Analysis of AlSiCp Composite Disc Brake
Transient Thermal Analysis of AlSiCp Composite Disc BrakeTransient Thermal Analysis of AlSiCp Composite Disc Brake
Transient Thermal Analysis of AlSiCp Composite Disc Brake
 
Location of Regions Containing all or Some Zeros of a Polynomial
Location of Regions Containing all or Some Zeros of a PolynomialLocation of Regions Containing all or Some Zeros of a Polynomial
Location of Regions Containing all or Some Zeros of a Polynomial
 
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
Modelling, Fabrication & Analysis of Pelton Turbine for Different Head and Ma...
 
Study of the Class and Structural Changes Caused By Incorporating the Target ...
Study of the Class and Structural Changes Caused By Incorporating the Target ...Study of the Class and Structural Changes Caused By Incorporating the Target ...
Study of the Class and Structural Changes Caused By Incorporating the Target ...
 
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
Relationship between Refractive Index, Electronic Polarizavility, Optical Ene...
 

Similar to Urban Town Planning

TOWN PLANNING PPT.pptx
TOWN PLANNING PPT.pptxTOWN PLANNING PPT.pptx
TOWN PLANNING PPT.pptx
kartik395517
 
Ch 1 intro of tp
Ch 1 intro of tpCh 1 intro of tp
Town Planning and Legal Aspects in Civil
Town Planning and Legal Aspects in CivilTown Planning and Legal Aspects in Civil
Town Planning and Legal Aspects in Civil
vvsasane
 
01. introduction of town planning
01. introduction of town planning01. introduction of town planning
01. introduction of town planning
Hanif Ullah Khan
 
Lec- 4 Introduction to Town Planning.pptx
Lec- 4  Introduction to Town Planning.pptxLec- 4  Introduction to Town Planning.pptx
Lec- 4 Introduction to Town Planning.pptx
Samirsinh Parmar
 
IRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated TownshipIRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated Township
IRJET Journal
 
2013 - Mon Tresor master plan
2013 - Mon Tresor master plan 2013 - Mon Tresor master plan
2013 - Mon Tresor master plan
Jacques Van Dinteren
 
EIA
EIAEIA
Ake me there
Ake me thereAke me there
Ake me there
Lam Yu
 
INRODUCTION TO TOWN PLANNING 1.pptx
INRODUCTION TO TOWN PLANNING 1.pptxINRODUCTION TO TOWN PLANNING 1.pptx
INRODUCTION TO TOWN PLANNING 1.pptx
SwatiThakur315700
 
Town and country planning
Town and country planningTown and country planning
Town and country planning
Dr. Mohd Zameeruddin
 
Town Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdfTown Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdf
Rohan Dasgupta
 
Bangalore zoning regulations
Bangalore zoning regulationsBangalore zoning regulations
Bangalore zoning regulations
Rishii2i
 
Final
FinalFinal
Final
kerneng
 
Introduction to planning
Introduction to planningIntroduction to planning
Introduction to planning
Noshad Ahmed Wahocho
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
Angeline KH
 
Urban planning concept,principles and elementes
Urban planning  concept,principles and elementes Urban planning  concept,principles and elementes
Urban planning concept,principles and elementes
TeshagerMengesha
 
River Edge Development: A case of West Zone, Surat City
River Edge Development: A case of West Zone, Surat CityRiver Edge Development: A case of West Zone, Surat City
River Edge Development: A case of West Zone, Surat City
IRJET Journal
 
Town Planning
Town PlanningTown Planning
Town Planning
Rohan Dasgupta
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning ppt
shradha arun
 

Similar to Urban Town Planning (20)

TOWN PLANNING PPT.pptx
TOWN PLANNING PPT.pptxTOWN PLANNING PPT.pptx
TOWN PLANNING PPT.pptx
 
Ch 1 intro of tp
Ch 1 intro of tpCh 1 intro of tp
Ch 1 intro of tp
 
Town Planning and Legal Aspects in Civil
Town Planning and Legal Aspects in CivilTown Planning and Legal Aspects in Civil
Town Planning and Legal Aspects in Civil
 
01. introduction of town planning
01. introduction of town planning01. introduction of town planning
01. introduction of town planning
 
Lec- 4 Introduction to Town Planning.pptx
Lec- 4  Introduction to Town Planning.pptxLec- 4  Introduction to Town Planning.pptx
Lec- 4 Introduction to Town Planning.pptx
 
IRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated TownshipIRJET- A Review on Self Sustainable Integrated Township
IRJET- A Review on Self Sustainable Integrated Township
 
2013 - Mon Tresor master plan
2013 - Mon Tresor master plan 2013 - Mon Tresor master plan
2013 - Mon Tresor master plan
 
EIA
EIAEIA
EIA
 
Ake me there
Ake me thereAke me there
Ake me there
 
INRODUCTION TO TOWN PLANNING 1.pptx
INRODUCTION TO TOWN PLANNING 1.pptxINRODUCTION TO TOWN PLANNING 1.pptx
INRODUCTION TO TOWN PLANNING 1.pptx
 
Town and country planning
Town and country planningTown and country planning
Town and country planning
 
Town Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdfTown Planning - Rohan Dasgupta.pdf
Town Planning - Rohan Dasgupta.pdf
 
Bangalore zoning regulations
Bangalore zoning regulationsBangalore zoning regulations
Bangalore zoning regulations
 
Final
FinalFinal
Final
 
Introduction to planning
Introduction to planningIntroduction to planning
Introduction to planning
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
 
Urban planning concept,principles and elementes
Urban planning  concept,principles and elementes Urban planning  concept,principles and elementes
Urban planning concept,principles and elementes
 
River Edge Development: A case of West Zone, Surat City
River Edge Development: A case of West Zone, Surat CityRiver Edge Development: A case of West Zone, Surat City
River Edge Development: A case of West Zone, Surat City
 
Town Planning
Town PlanningTown Planning
Town Planning
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning ppt
 

Recently uploaded

Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
ravindarpurohit26
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...
IJECEIAES
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
skuxot
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 

Recently uploaded (20)

Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
一比一原版(UC Berkeley毕业证)加利福尼亚大学|伯克利分校毕业证成绩单专业办理
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 

Urban Town Planning

  • 1. ISSN (e): 2250 – 3005 || Volume, 07 || Issue, 03|| March – 2017 || International Journal of Computational Engineering Research (IJCER) www.ijceronline.com Open Access Journal Page 25 Urban Town Planning *Dr.K.Deepa, **R.P.Sangeetha, **J.Vindhya *professor, panimalar engineering college, Chennai,**UG Scholars, panimalar engineering college, Chennai I. INTRODUCTION The town planning means arrangement of various compounds such as residential, commercial, industrial, institutional, etc., in an systematic and well organised manner so as to provide ultimate comfort for living in the present and alsoin future. The town planning should be done in such a way that it provide a solution for various practical problems that prevails today. Town planning is an art ofarranging thecomponentsinabeautiful, efficient,and convenient for all classes of people exiting in the society. The town should be planned economical as for aspossible. 1.1 History Of Town Planning Town planning is not a new concept, it was followed in the ancient period. In those days peoples createdtowns near to the river in a high altitude region which was called as civilization. There are many civilization existed in the world. These civilization developed a well organised residents providing a well- definedprovisionfordrainageflowpattern, water ways, canals, etc. Among these civilization HARAPPA and MOHANJO- DARO which existed around 2600 BC on the bank of river Indus in Sind (now in Pakistan) are most famous and notable one toeveryone. 1.2 Principles Of Townplanning The town planning requires the knowledge of various professions like engineering, architecture and surveying. The planning should not be confined to satisfy the future generation but the growth andfeaturede velopmentalsoconsideredby the planner. Some of the principle of town planning are asfollows,  Zoning  Roadsystem  Housing Publicbuilding  Recreationcentres  Transportfacilities  Greenbelt II. LAND USE ALLOCATION FOR VARIOUSSECTORS Table 1. Land use table Sl. No Land Use Percentage area of allocated 1. Residential 50% 2. Commercial 15% 3. Institutional 10% 4. Industrial 15% 5. Recreation centre 10% ABSTRACT The new towns are arranged and made to accomplish some foreordained objectives. The urban town arranging got to be distinctly unavoidable toward the start of twentieth century that is after the modern upheaval. Area of place for creating township put a noteworthy part during the time spent urban town arranging. The essential target of town arranging is to achieve a manageable advancement in every last parts by taking after certain very much characterized standards and proposals for arranging. There is requirement for new city in ramanathapuram region on the fruition of sethu trench extend. Subsequently we build up a very much arranged city with goal of manageable improvement in the previously mentioned locale Keywords: new city, practical advancement, sethu trench venture, standards and suggestions.
  • 2. Urban Town Planning www.ijceronline.com Open Access Journal Page 26 3.1 Residentialzone 4 Any residents should include dwelling, detached, semi-detached, tenements or flats and service apartments. 5% of the area under residential zone shouldbeallocatedforEWS(Economically Weaker Sections)housing. 5 Petty shops, tea stalls, bakery, retail shops, mutton stalls, milk point, mechanic shops, computer centres, ATMs, occupying the floor area not exceeding 40m2. 6 Nursery primary and secondary schools,libraries,andreadingroomsshould be provided. Park playground, garden are madeavailable. 7 Hotels, hostels, old age homes, religious, assembly halls occupying floor area not exceeding300m2. 8 Govt. semi govt. offices, banks, pay offices, post offices, offices of electricity board, auto mobile workshops, corporation office, occupying a floor area not exceeding 300m2. 9 Daily or weekly marketsserving localneeds. 10 Transport depots, bus terminus and railwaystations. 11 Buring, burial grounds, crematoria andcemeteries. 12 Clinics, nursing homes, dispensaries and other health facilities not exceeding 300m2in floor area provided the widthoftheabuttingroadisminimum10m. 13 Departmental stores with a floor area not exceeding 100m2 provided the width of the abutting roads is minimum 10m. 2. Specification 1. Fuel filling stations and service stations with installations not exceeding 5Hpprovidedthewi dthoftheabuttingroad is minimum10m. 2. Foreign missions, embassies andconsulates. 3. Taxi stands and car parking including multilevelparking. 13.1 Commercialzone 1. Around 10-15% area form the totalareaofthetownshipshouldbeallotted for commercialzone. 2. This area allocated for commercialzonethusnotincludesthebasic commercial activity carried out in the residential or any othercomponents. 3. Research, experimental and testing laboratories not involving danger of fire, explosives or healthhazards. 4. Industries listed out by the Tamilnadu pollution control board as “Green industries “listed in Annexure VI and as “Orange industries” listed in Annexure VII subject to a maximum installation of 50HP. 5. V) Taxi stand, auto stands, bus stands and railway stations, and multilevel parking should be made available. 6. Building for development of software and its associated computer technology applications, ITparks. 7. Warehouses, and other uses connected with storage of wholesaletrades,in commodities but excluding storage of explosives or products which are either obnoxiousorlikelytocausehealthhazards. 8. All commercial and business uses including all wholesale activities of textile, jewellery, fireworks, combined market for fruits, vegetable, flower, fancy items, utensil, plastic item, etc, must be provided with separate provision foreach. The parkingnormsfor commercialcomponentshallbeprovidedat2.5 ECS (Equivalent Car Space) per 100sqm of the total built uparea. vi) For the provision of parking the space standards for ECS shall be asunder, a) 23sqm per ECS for openparking. b) 28sqm per ECS foe covered parking at groundlevel. c) 33sqm per ECS for parking at basementlevel. 3.3 Institutionalzone Table 2 recommendations for educational institute Sl.No Institution population Minimum Area 1. Nursery and primary school 5,000 0.3 hectare 2. High/ high secondary school 15,000 1.6 hectare 3. Colleges 1,00,000 4 hectare
  • 3. Urban Town Planning www.ijceronline.com Open Access Journal Page 27 1. Additional institution shall be provided when the population exceeds 50 % of the standards. 2. Adequate arrangement of parking of buses, vehicles ofstaffs/students shall bemade. 3. Minimum 25% of the site area shall be allocated as a playarea. 4. Government and Quasi- Government offices, professionaloffices. 5. Art galleries, museums, public libraries,socialandculturalinstitutionsand religiousbuilding. 6. Broad casting installation and weatherstations. 7. Public utilities, storage and public yards, municipal and community facilities. 8. In addition to above Other Community/ Public/ Cultural/ Heritage Buildings may be considered for provision by the Developer/Promoter, keeping in view the larger interest and welfare of the residents. 4.3 Industrialzone 1. Around 15% area form the total area of the township should be allotted for industrialzone. 2. All industries using electrical power utilising machinery notexceeding 3. 130 HP but excluding all industries of obnoxiousandhazardousnaturebyyeasons of odour, effluent, dust, smoke, gas, vibration, etc. or otherwise likely to cause danger or nuisance to public health or amenity. 4. All industries not producing noxious or dangerous effluents or where sufficient precaution to the satisfaction of the authority have been taken to eliminate noxious or dangerouseffluents. 5. Storage of petroleum, timber, explosives and inflammable and dangerous materials. 6. container terminals (at sites or gaining access from minimum 18 metre wide publicroad) 7. It is better to create a industrial estate like ambattur or guindy industrial estate for carrying out industrial activity in an efficientway 8. Some residential provisions should be made for employees. All kind of retail stores, hotels and other facility to satisfy the basic needs of the employee should be madeavailable. 9. All special and hazardous industries (classified as „Red‟ by the Tamil Nadu pollution control board ) without restriction of Horse power that are likely to be dangerous to human life or health or amenity, but sufficient precaution to the satisfaction of the TNPC Board have been taken to eliminate noxious or dangerous effluents and to alleviate danger to human life or health or amenity(Annexure-viii) 4.4 Recreationzone 1. Around 10% area form the total area of the township should be allotted for industrialzone. 2. All public and semi-public recreational uses and open spaces, parks and play ground, zoological and botanical gardens,nurseries,waterfront development, museums andmemorials. 3. 3% of the area should be allocated for parks and playgrounds. 4. Themeparks,cinematheatreand amusementparks. 5. Open air theatre, exhibitions, circuses, fairs and festival grounds, public utilities. 6. Sports stadia and recreational complexes. 7. Beach cottages each not exceeding 100Sqm in floor area and 7.5m inheigh. 4.5 Other Utilityfacilities 3.6.1 Communitycentre Community building in the project area shall be provided at the following norms individually and severally, Table 3 recommendations for community building Sl.No Community building Population Minimum area 1. One community centre 30,000 0.6 hectare 2. One religious site 15.000 0.1 hectare 3. One police post 30,000 0.2 hectare 4. One police station 1,00,000 0.8 hectare 5. One sub-post office 25,000 80Sqm 6. Telephone exchange 1,00,000 0.8 hectare
  • 4. Urban Town Planning www.ijceronline.com Open Access Journal Page 28 3.6.2 Medicalfacilities Table 4 recommendations for medical facilities Sl.NO Medical institution population Minimum area 1. One dispensary 15,000 0.2 hectare 2. One health centre 50,000 0.6 hectare 3. One poly clinic 1,00,000 1.0 hectare 4. One hospital 1,00,000 3.7 hectare 3.7 Roadspecification i) Outer/inner ring road shall not be less than 30m in width. In addition to this service road of width 8m is provided on either side along the entire length of suchroads. ii) Arterialroadsshouldbeprovided with the width of 45m (i.e. 150ft in width ) iii) Sub arterial roads should be providedwiththewidthof30m(i.e. 100ft in width) iv) The local roads that collect traffic from various parts of the town shall not be less than12m v) All streets in the residential zone shall not be less8m. III. CONCLUSION An all around arranged town ship can be made by taking after the previously mentioned suggestions. The arrangement made for parks and play areas make attention to sports among the more youthful era It is evaluated that if these proposals are actualized the new township will be free from all the testing issues like activity, contamination, over populace, storm water waste, ghettos, and so forth, that are confronted by the ebb and flow existing urban areas. REFERENCES [1]. Jaya kumar,R; Town planning, 2009. [2]. Raju,K; Town and city development,2007. [3]. Alok Tiwari, Is slipshod Urban planning, hampering sustainability ofSmall [4]. IndianTowns,2015 [5]. Heng Wei, Key Issues in Integrating New Town Development intoUrban [6]. TransportationPlanning,2013. [7]. EPC. Streamlining Urban Planning and Land ManagementPractices. [8]. State Policy Study for the Government of Gujarat and supportedby [9]. The World Bank.2007. [10]. Gupta,g.k; Guide line for town planning.2006 [11]. Khalil Farid, Urban sprawl Vs urban renewal: What role for Town and [12]. Country planning instruments in ensuring sustainablecities,2011. [13]. Motoya Koga, Proposal for welfare town planning method and experimental [14]. Development,2011.