I



      The Amman Plan

Urban Envelope
Implementation
           December 2010
III




      The Amman Plan

Urban Envelope
Implementation




           December 2010
                  DRAFT
IV
                                                                      THE AMMAN PLAN




     Planning for the Future – Get Involved


     Planning for the future of Amman requires a partnership among all of us – citizens,
     communities, governments and the private sector.

     We welcome your feedback on this document.



     Please contact us at:

     Amman Institute for Urban Development
     PO Box 9155
     Al Madeenah District
     Amman, Jordan
     1191

     Tel : +(962) 6 4621 829
     Fax : +(962) 6 4651 703
     www.ammaninstitute.org
V
                                                        THE AMMAN PLAN

ACKNOWLEDGEMENTS




                   Greater Amman Municipality
                   P.O. Box 132
                   12 – Ali Bin Abi Taleb Street
                   Hai Al-Muhajereen – Al Madeenah District
                   Amman, Jordan
                    www.ammancity.gov.jo




                   Amman Institute For Urban Development
                   PO Box 9155
                   Raghadan – Al Madeenah District
                   Amman, Jordan
                   1191
                   www.ammaninstitute.org




                   Planning Alliance
                   317 Adelaide Street, 2nd Floor
                   Toronto, ON
                   Canada M5V 1P9
                   www.planningalliance.ca
VI
                                                                   THE AMMAN PLAN

     TABLE OF CONTENTS




         V      ACKNOWLEDGEMENTS

        VIII    LISTS

         XI     MESSAGES



       15-27    1.THE AMMAN PLAN - OVERVIEW                             15

                1.A. OPPORTUNITY AND CHALLENGE                          16
                1.B. AMMAN PLAN - METROPOLITAN GROWTH                   18
                1.C. PLANNING AND DEVELOPMENT PRINCIPLES                20
                1.D. PLANNING SCALES                                    22
                1.E. RELATED INITIATIVES                                24

       27-131   2.URBAN ENVELOPE IMPLEMENTATION PLAN                    27

                2.A. INTRODUCTION                                       28
                             2.A.1 INTENT OF THE PLAN                   29
                             2.A.2 HOW TO USE THIS PLAN                 30
                2.B. PLAN ASSUMPTIONS                                   31
                             2.B.1 PLAN GEOGRAPHY                       32
                             2.B.2 POPULATION GROWTH PROJECTIONS        34
                             2.B.3 EMPLOYMENT GROWTH PROJECTIONS        35
                2.C. THE URBAN ENVELOPE PLAN                            37
                   2.C.1.1   2025 CONCEPTUAL PLAN                       38
                   2.C.1.2   NEIGHBOURHOOD CLASSIFICATION               40
                   2.C.2     COMPREHENSIVE AREA PLAN                    44
                   2.C.3     COMPONENT PLANS                            47
                             2.C.3.1 NATURAL HERITAGE                   48
                             2.C.3.2 RESOURCE EXTRACTION                52
                             2.C.3.3 AGRICULTURE                        56
                             2.C.3.4 CULTURAL HERITAGE                  60
                             2.C.3.5 TRANSPORTATION AND TRANSIT         64
                             2.C.3.6 SETTLEMENT AND HOUSING             72
                             2.C.3.7 CORRIDORS AND CENTRES              76
                             2.C.3.8 EMPLOYMENT                         82
                             2.C.3.9 SOCIAL FACILITIES                  88
                             2.C.3.10 OPEN SPACE                        98
                2.D. DESIGNATIONS                                       102
VII
                                                                THE AMMAN PLAN




131 - 159   3. PHASING AND PRIORITY ACTION PLAN                       131

            3.A INTRODUCTION                                          133
            3.B. PHASING PLAN AND POLICIES                            134
               3.B.1 INTRODUCTION                                     135
               3.B.2 PHASING PLAN                                     136
                      3.B.2.1 Water Infrastructure Capacity           138
                      3.B.2.2 Waste Water Infrastructure Capacity     139
                      3.B.2.3 High Order Transit Capacity             140
               3.B.3 PHASING, INFRASTRUCTURE AND SERVICING POLICIES   142
            3.C. URBAN ENVELOPE IMPLEMENTATION PLAN –
                 POLICY PRIORITIES                                    147
            3.D URBAN ENVELOPE IMPLEMENTATION PLAN –
                 RECOMMENDED DEVELOPMENT REVIEW PROCESSES             159
VIII
                                                                                            THE AMMAN PLAN

       LISTS




                    SCHEDULES
                    1.B           •   METROPOLITAN GROWTH PLAN                                          19
                    2.B.1.I       •   URBAN ENVELOPE                                                    32
                    2.B.1.II      •   PLANNING AREAS, SERVICE AREAS AND NEIGHBOURHOODS                  33
                    2.C.1.I       •   2025 CONCEPTUAL PLAN                                              39
                    2.C.1.II      •   NEIGHBOURHOOD CLASSIFICATION                                      41
                    2.C.2         •   COMPREHENSIVE AREA PLAN                                           45
                    2.C.3.1       •   NATURAL HERITAGE                                                  49
                    2.C.3.2       •   RESOURCE EXTRACTION                                               53
                    2.C.3.3       •   AGRICULTURE                                                       57
                    2.C.3.4       •   CULTURAL HERITAGE                                                 61
                    2.C.3.5.I     •   TRANSPORTATION                                                    65
                    2.C.3.5.II    •   TRANSIT                                                           69
                    2.C.3.6       •   SETTLEMENT AND HOUSING PLAN - RESIDENTIAL DENSITIES               73
                    2.C.3.7       •   CORRIDORS AND CENTRES                                             77
                    2.C.3.8.I     •   EMPLOYMENT: COMMERCIAL                                            83
                    2.C.3.8.II    •   EMPLOYMENT: INDUSTRIAL                                            85
                    2.C.3.8.III   •   EMPLOYMENT: INSTITUTIONAL                                         87
                    2.C.3.10      •   OPEN SPACE                                                        99
                    3.B.2         •   PHASING PLAN                                                     137




       Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
IX
                                                                        THE AMMAN PLAN




FIGURES
1.D           •   PLANNING SCALES                                                     23
1.E           •   LOCATION OF APPROVED COMMUNITY PLANS                                25
2.C.3.9.I     •   EXISTING SOCIAL FACILITIES - CENTRAL AREA                           92
2.C.3.9.II    •   EXISTING SOCIAL FACILITIES - NORTH AREA                             93
2.C.3.9.III   •   EXISTING SOCIAL FACILITIES - WEST AREA                              94
2.C.3.9.IV    •   EXISTING SOCIAL FACILITIES - INNER SOUTH AREA                       95
2.C.3.9.V     •   EXISTING SOCIAL FACILITIES - INNER EAST AREA                        96
3.B.2.1       •   WATER INFRASTRUCTURE CAPACITY TO ACCOMMODATE
                  GROWTH TO 2025                                                      138
3.B.2.2       •   WASTEWATER INFRASTRUCTURE CAPACITY TO ACCOMMODATE
                  GROWTH TO 2025                                                      139
3.B.2.3       •   HIGH ORDER TRANSIT CAPACITY TO 2015                                 140




  Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
X




    Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
XI
                                                                                     THE AMMAN PLAN

MESSAGE




                        HM King Abdullah II

                        “To achieve the optimum balance of healthy growth and quality living, flourishing
                        expansion and organized districts, 21st century conveniences and traditional character,
                        we must embark on a serious and comprehensive project of city planning for Amman.”


                        Abdullah II Ibn Al Hussein
                        Amman
                        5 Rabi’ Al Thani 1427 Hijri
                        3 May 2006




      Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
XII




      Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
XIII
                                                                                         THE AMMAN PLAN

MESSAGE




                        HE Mayor Omar Maani:

                        “Our City is a reflection of ourselves. It is our office to work in; it is our home to raise
                        a family in; and it is our playground to relax in. It is where we spend our lives”

                        All of us have seen Amman grow over the past several years with tremendous impact
                        on transportation and other services, including our Neighbourhoods and unique
                        cityscape. This development has been happening without a plan; we can no longer
                        afford to grow without direction for it will damage what is special about Amman and
                        we will miss opportunities to become a modern world city while retaining the soul of
                        our community.
                        The Greater Amman Municipality (GAM) has embarked on the preparation of the
                        Amman Plan, a comprehensive set of documents. This Plan will be the City’s blueprint
                        for sustainable development and will help Jordan achieve the objectives outlined by
                        the National Agenda. It will guide the growth of our community and address such
                        issues as the built and natural environment, culture and heritage, transportation and
                        infrastructure, and community development . . .

                        We are committed to preparing this Amman Plan based on community input so that
                        it reflects the aspirations of our citizens. Such aspirations begin with a Vision of what
                        we want our City to be, rather than just reacting to current problems . . .”

                        Mayor Omar Maani
                        Amman




      Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
14




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
15




                       1.THE AMMAN PLAN
                         OVERVIEW
                             A. OPPORTUNITY AND CHALLENGE
                             B. AMMAN METROPOLITAN GROWTH PLAN
                             C. PLANNING AND DEVELOPMENT PRINCIPLES
                             D. PLANNING SCALES
                             E. RELATED INITIATIVES




Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
16
                                                                                  1. THE AMMAN PLAN - OVERVIEW

     1.A. OPPORTUNITY AND CHALLENGE

                                             Amman is growing. With high rates of population growth and a unique geography,
                                             the Greater Amman Municipality is faced with both unprecedented challenges
                                             in managing the city’s lands and infrastructure and also offered exceptional
                                             opportunities in revitalizing neighbourhoods and enhancing quality of life for all
                                             of the city’s residents.

                                             The Amman Plan allows the Greater Amman Municipality to both address these
                                             challenges and seize the opportunities.

                                             Comprised of several elements – from the Metropolitan Growth Plan to detailed
                                             Community Plans – the Amman Plan provides guidance to decision makers,
                                             investors and residents on the spatial and physical development of the city now
                                             and in the future. It is based on a clear vision and principles and sets a framework
                                             for both urban development and environmental protection for the benefit of
                                             future generations in a balanced, efficient and humane manner. Its objectives are
                                             long term in nature and the Plan presents the desired development form of the
                                             City in the year 2025.

                                             Each element of the Amman Plan reflects the following opportunities and
                                             challenges:

                                             Prioritizing Urban Growth: Amman is taking part in a major transition which
                                             is occurring worldwide, where over half of the global population now lives in
                                             cities. Attracted by economic potential, cultural amenities, and educational
                                             opportunities, people are shifting from rural to urban ways of life. Planning for
                                             urban growth is critical as our young population matures, and greater demands
                                             rise for convenient jobs, housing, transit and social services in close proximity.

                                             Controlling Sprawl: Amman has grown rapidly in the last 25 years. In that time,
                                             the city’s landscape has changed dramatically, affecting the natural environment,
                                             water resources, and prime agricultural lands. As growth continues into the future,
                                             it is critical that we minimize negative impacts. By accommodating more growth
                                             within existing neighbourhoods, and enhancing centres and corridors, the Plan
                                             reduces pressures on agricultural and natural lands and it revitalizes existing urban
                                             neighbourhoods as economic and social hubs. This equates to greater access to
                                             more opportunity for all residents of Amman.

                                             Conserving Resources: The Plan emphasizes the need to conserve limited
                                             resources such as water, agricultural lands and natural areas in order to ensure
                                             that meeting the demands of today’s generation does not compromise the needs
                                             of Jordan’s future generations.

                                             Planning For the Economy: The economic landscape of Amman is changing.
                                             Prioritizing infrastructure investment, supporting high quality employment areas,
                                             and planning for quality educational and social services are all important elements
                                             to ensure that Amman is better equipped to seize new economic opportunities.




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
17
                                                      1. THE AMMAN PLAN - OVERVIEW




Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
18
                                                                                 1. THE AMMAN PLAN - OVERVIEW

     1.B. AMMAN PLAN - METROPOLITAN GROWTH

                                             The Metropolitan Growth Plan issued in 2008 by the Greater Amman
                                             Municipality, establishes a physical planning and policy framework to guide the
                                             strategic growth and development of the Greater Amman Municipality (GAM) to
                                             the year 2025. The Plan establishes an overall growth management framework,
                                             delineates an “urban envelope” within which the majority of population and
                                             employment growth will occur to 2025, identifies policies and land uses for a
                                             number of particular components and establishes guiding policies.

                                             The comprehensive Metropolitan Growth Plan is shown in Schedule 1.B

                                             The key mechanism employed by the Metropolitan Growth Plan to manage the
                                             growth and development of Amman is to make better use of existing urban lands
                                             through greater intensification, infill and higher density development along transit
                                             corridors and nodes. At the same time, the growth plan establishes a process to
                                             make wiser strategic choices when bringing new lands on the urban periphery into
                                             urban development.

                                             The Metropolitan Growth Plan offers a preferred direction for the city’s future
                                             development, ensures the protection of cultural heritage, the environment,
                                             agricultural lands and natural resources, and addresses the provision of
                                             infrastructure and transportation services. The Plan was developed in consultation
                                             with a broad cross-section of Amman society, and is founded in a set of consensus-
                                             based planning and development principles (see Section 1.C).

                                             The Metropolitan Growth Plan is the primary document which establishes
                                             the basis of the Urban Envelope Implementation Plan. The Urban Envelope
                                             Implementation Plan builds on the Metropolitan Growth Plan by providing more
                                             specific land use designations, more detailed policy directions and recommends
                                             additional mechanisms to allow the goals of the Metropolitan Growth Plan to be
                                             achieved within the area defined as the Urban Envelope of Amman.

                                             It is important to emphasize that the Urban Envelope Implementation Plan does
                                             not address lands within the Greater Amman Municipality that are outside the
                                             Urban Envelope boundary. This applies to urbanized or industrialized areas such
                                             as Na’our, Al Mouwaqer, Al Jeezah and parts of Marj Al Hamam as well as the
                                             rural, agricultural and desert areas that surround the Urban Envelope. A number
                                             of policies and plans are in place to guide development in these areas and should
                                             be referred to for further direction.




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
19
                                                                     1. THE AMMAN PLAN - OVERVIEW
Schedule 1.B
Metropolitan Growth Plan




               Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
20
                                                                                  1. THE AMMAN PLAN - OVERVIEW

     1.C. PLANNING AND DEVELOPMENT PRINCIPLES

                                             The Metropolitan Growth Plan sets forth a vision for the future and establishes
                                             a set of planning and development principles. For more information about the
                                             Metropolitan Growth Plan’s vision for the future of the City, see the Metropolitan
                                             Growth Plan, Section 2.

                                             The Planning and Development Principles which continue to guide the Urban
                                             Envelope Implementation Plan are outlined below:

                                             1.   Plan for ‘complete communities’ that provide residents with a choice of
                                                  housing, a full range of urban amenities – parks, schools, clinics, and cultural
                                                  centres – and good accessibility to employment, shopping, and recreational
                                                  facilities.

                                             2.   Plan and develop ‘inclusive communities’ rather than segregated ones, by
                                                  allowing for different lifestyles, building typologies, and public spaces
                                                  that unite citizens from different socio-economic, cultural, and ethnic
                                                  backgrounds. Special care must be taken to accommodate people with
                                                  disabilities in the ‘built environment’ and in the provision of services such
                                                  as public transit.

                                             3.   Encourage compact urban growth in order to make the best use of existing
                                                  services, promote increased transit use, improve pedestrian accessibility, and
                                                  improve affordability for both the Greater Amman Municipality and its
                                                  residents.

                                             4.   Direct growth to both existing built-up area, in order to make the best use of
                                                  existing services, and to new designated expansion areas that are located close
                                                  to the urban core. Special attention must be paid to preserving the ‘organic
                                                  historic growth’ of the City and to providing conditions that replicate this
                                                  style of urban form.

                                             5.   Promote mixed land use in general, and a healthy mix of residential and
                                                  employment uses in particular, in order to foster a diverse economy and to
                                                  limit commuting times. This mixed-use development will be promoted in all
                                                  socioeconomic sectors of society.

                                             6.   Promote clear distinctions between urban, suburban, and traditional
                                                  communities in order to protect valuable environmental and agricultural
                                                  lands and to support traditional lifestyles and culture.

                                             7.   Focus GAM’s transportation policy on moving people and goods, rather than
                                                  moving vehicles. Promote public transit and develop a transportation system
                                                  that offers residents choices for going shopping, going to work, taking time
                                                  off to relax or play, and getting back home again. Provide for a safe and
                                                  convenient pedestrian environment that is integrated with other modes of
                                                  transportation.

                                             8.   Create a connected ‘Natural Heritage System’ that protects and connects
                                                  important environmental features – forests, wadis, highlands, deserts, and
                                                  aquifers – at the same time as it accommodates a network of public walking
                                                  trails throughout the City. An urban parks system will be an integral part of
                                                  the Natural Heritage System, including neighbourhood parks, playgrounds,
                                                  and large open green spaces within the urban setting.

                                             9.   Conserve the ‘cultural heritage’ of the City, including modern and ancient
                                                  heritage, and promote it as an integral part of the overall contemporary
                                                  metropolitan living experience.

                                             10. Promote ‘sustainable development practices’ and encourage environment-
                                                 friendly ‘green building’ standards that minimize the City’s carbon footprint
                                                 on the global community.


     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
21
                                                      1. THE AMMAN PLAN - OVERVIEW




Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
22
                                                                                  1. THE AMMAN PLAN - OVERVIEW

     1.D. PLANNING SCALES

                                             The Amman Plan presents a somewhat unorthodox approach to metropolitan,
                                             urban area and community planning. Conventional “master plans” are typically
                                             structured from the top down – from the larger, metropolitan scale down to the
                                             small, community scale - in a progressively more detailed sequence. The Amman
                                             Plan is being created at all scales simultaneously - from both the top down and
                                             the bottom up - as well as focusing on different sectoral issues, from corridor
                                             intensification to industrial land policy. Each scale responds to different questions
                                             and challenges. This flexibility allows the City of Amman to respond to particular
                                             priorities or development pressures in a timely fashion.

                                             Figure 1.D illustrates the three different scales which The Amman Plan works at:


                                             Metropolitan Scale

                                             The metropolitan scale relates to the entire 1,662-square-kilometre Greater
                                             Amman Municiaplity Area and is the scale of the Metropolitan Growth Plan.


                                             Urban Area Scale

                                             The Metropolitan Planning Area is subdivided into eight Planning Areas where a
                                             finer scale of planning can be undertaken. Five of the Planning Areas fall within
                                             Amman’s Urban Envelope, which is approximatly 630 squares kilometres in size
                                             and where the majority of future growth will be directed to 2025.


                                             Community Scale

                                             The community scale relates to areas and neighbourhoods where the greatest
                                             level of plan specificity can be achieved. There are 170 neighbourhoods within
                                             the Urban Envelope and 228 overall within the Greater Amman Municipality.
                                             Community Plans within or across these neighbourhoods provide detailed
                                             planning and design proposals, including recommended zoning.




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
23
                                                                   1. THE AMMAN PLAN - OVERVIEW
Figure 1.D
Planning Scales




METROPOLITAN SCALE
Metropolitan Growth Plan




URBAN AREA SCALE
Urban Envelope Implementation Plan




COMMUNITY SCALE
Arafat Node Community Plan




             Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
24
                                                                                 1. THE AMMAN PLAN - OVERVIEW

     1.E. RELATED INITIATIVES

                                             In addition to building on the Metropolitan Growth Plan, the Urban Envelope
                                             Implementation Plan presented in this document builds on and is complemented
                                             by a series of accompanying plans, studies and other initiatives that have been
                                             generated since 2006. Together this body of work forms The Amman Plan.

                                             Figure 1.E. depicts approved plans that guide planning and decision-making at a
                                             detailed neighbourhood level and must be consulted for land use matters relating
                                             to this particular geography.

                                             For additional direction, background and guidance on sectoral and land-use
                                             planning matters, users of the Urban Envelope Implementation Plan are also
                                             recommended to consult other plans and studies that have been prepared by the
                                             Greater Amman Municipality since 2006:

                                             •   Amman Plan for Tall Buildings – Interim Growth Strategy, February 2007
                                             •   Amman Development Corridor Master Plan – Corridors Intensification
                                                 Strategy, June 2007
                                             •   Interim Industrial Land Policy, August 2007
                                             •   Airport Corridor Plan, October 2007
                                             •   Outlying Settlement Policy – Rural Growth Centres, October 2007

                                             In addition, work that was undertaken in the following areas has also informed
                                             the preparation of this Plan:

                                             •   Downtown Development Plan
                                             •   Capital Parkway Community Plan
                                             •   Ras Al Ain Community Plan
                                             •   Al Jusur Al Ashra Community Plan
                                             •   Magabalien Community Plan
                                             •   Metro Park Community Plan
                                             •   South Park/ Yadoudah Community Plan
                                             •   Southern Gateway Community Plan
                                             •   Amman Development Corridor Master Plan Study
                                             •   Amman Area Plan - Cultural Heritage and Antiquities
                                             •   Transportation and Mobility Master Plan
                                             •   Planning for Heritage Protection Study

                                             This Plan was also informed by the proposed new Zoning Bylaw for the City of
                                             Amman which is still in development at this time. The permitted and recommended
                                             land uses that are proposed in the Plan make reference to the draft version of the
                                             new Zoning Bylaw, pre-final version as of July 2010, and a significant attempt has
                                             been made to align the Plan with the Bylaw.




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
25
                                                                                     1. THE AMMAN PLAN - OVERVIEW
Figure 1.E
Location of Approved Community Plans




  1. Al Kindi Street Corridor                     8. Queen Alia Airport Road Corridor
  2. Shaker Bin Zaid Street Corridor              9. King Abdullah II Corridor
  3. Hussein Bin Ali Street Corridor              10. Mecca / King Abdullah II intersection
  4. Arar Street Corridor                         11. HDMU Site A
  5. Mecca Street Corridor                        12. HDMU Site C
  6. Queen Rania Queen Alia University Corridor   13. Arafat Node Community Plan
  7. Abdullah Ghosheh Street Corridor             14. Abdali



                  Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
26




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
27




                   2.URBAN ENVELOPE
                     IMPLEMENTATION
                     PLAN
                         A. INTRODUCTION
                         B. PLAN ASSUMPTIONS
                         C. THE URBAN ENVELOPE PLAN
                         D. DESIGNATIONS



Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
A. INTRODUCTION
2.A. INTRODUCTION
   2.A.1 INTENT OF THE PLAN
   2,A.2 HOW TO USE THIS PLAN




   Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
29
                                                                            2. URBAN ENVELOPE IMPLEMENTATION PLAN

2.A.1 INTENT OF THE PLAN

                                                          The Urban Envelope Implementation Plan is intended to serve as a mechanism to
                                                          implement the Metropolitan Growth Plan and should be read in conjunction with
                                                          that document. The Urban Envelope Implementation Plan converts the strategic
                                                          directions of the Metropolitan Growth Plan for the geography of the Amman
                        Summary Report
                                                          Urban Envelope into an integrated set of schedules, designations, definitions, and
                                                          policies. Lands outside of the Urban Envelope are guided by other policies and
                  THE AMMAN PLAN                          plans which guide matters for those areas.

                                                          The Urban Envelope Implementation Plan is intended to serve several purposes:
         Metropolitan                                     • it informs and guides decisions on development applications within the
                                                              Urban Envelope;
           Growth                                         • it helps to guide the development of more detailed community plans and
                                                              zoning;
                                                          • it creates a mechanism for coordination across different departments within
                                                              the Greater Amman Municipality, as well as with National government
                                                              ministries and agencies as well as utility companies; and
                                                          • It provides a basis for establishing priorities for servicing and infrastructure
                                                              investment and other work programming.

                                                          Part 1 of this document provides an overview of the Amman Plan which forms
Amman Metropolitan Growth Plan, 2008                      the basis for this Plan.

                                                          Part 2 contains the land-use planning provisions of the Plan and is organized in
                                                          four main sections:
                                The Amman Plan            • Section A introduces the Plan’s intent and structure
                   Urban Envelope                         • Section B provides base information on the Plan’s applicable geography and
              Implementation Plan                              demographic assumptions.
                                                          • Section C contains the 2025 conceptual growth plan, comprehensive area
                                                               plan and individual component plans, including schedules, figures and
                                                               policies.
                                                          • Section D contains definitions and proposed uses for each of the designations
                                                               illustrated in the plan’s schedules.

                                                          Part 3 provides recommended priorities for phasing and servicing to achieve the
                                                          Plan.

                                                          While every effort has been made to ensure accuracy at the broader scale of
                                                          the Urban Envelope area, the geographical information depicted graphically
                                                          in the schedules of the Plan is conceptual only. For the assessment of detailed
                                                          development applications, additional verification will be required. Extension of
                                                          rights granted within this Plan is subject to cadastral survey results.
                          Phase II Report – Summer 2010
                                                 DRAFT
                                                          To the extent possible, the recommended land uses presented in this Plan reflect
Urban Envelope Implementation Plan,                       existing regulatory provisions (zoning) and respect current development rights.
2010                                                      Additional zoning is to be established within more detailed Community Plans,
                                                          though this Plan may recommend some areas within the Urban Envelope that
                                                          require re-zoning. In any situation where development applications have an
                                                          existing as-of-right that is not reflected in a broad land use designation identified
                                                          in a schedule of this Plan, it is recommended that any discrepancy be reviewed on
*Annexes which add supplementary                          a case-by-case basis through the development review process.
information to aid in the implementation of
this Plan are provided separately.




                   Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
30
                                                              2. URBAN ENVELOPE IMPLEMENTATION PLAN

     2.A.2 HOW TO USE THIS PLAN

                                             The Urban Envelope Implementation Plan is a reference tool to guide development
                                             within the Amman Urban Envelope to 2025. The Plan is comprised of an
                                             integrated set of Schedules, Figures, Designations and Policies. Taken together,
                                             these constituent elements provide direction on land use and infrastructure
                                             decisions, for the purpose of both reviewing development applications and for
                                             prioritizing the City of Amman’s capital investment program.

                                             Section 2 includes the following key elements:

                                             •   A Conceptual Plan to 2025 which portrays the Plan’s future vision and
                                                 articulates direction for spatial development in the urban envelope in a
                                                 schematic way;

                                             •   A Comprehensive Area Plan which depicts the full set of aggregated land
                                                 uses and overlay designations in one schedule and provides general direction
                                                 on the plan’s implementation; and

                                             •   Ten Component Plans which contain more detailed mapping, descriptions
                                                 and policies for each designation that appears in the Comprehensive Area
                                                 Plan.

                                             Each of these elements incorporates Schedules and Figures, which are made up of
                                             individual Designations and accompanied by guiding Policies.

                                             Schedules physically and spatially depict the designations in the Plan. Schedules
                                             are used to guide planning and development decisions and may reflect both
                                             existing and proposed land uses. The designations depicted in schedules are
                                             conceptual only and require detailed cadastral surveys to properly reflect property
                                             and build-to lines. Figures are included for information purposes only to illustrate
                                             additional background data that can assist decision makers.

                                             Designations are defined and explained in Section 2.D of the Plan. Each
                                             designation includes a description, along with proposed and permitted uses that
                                             are linked to current regulatory standards, as well as additional clarifying notes.
                                             Designations are depicted in the Plan’s Schedules and Figures. The definition
                                             and uses associated with each designation serve as an important tool to guide
                                             development review.

                                             Policies accompany each schedule and provide general provisions, establish
                                             standards or propose processes to be followed by the Greater Amman Municipality
                                             and other authorities to achieve the objectives depicted in the Plan’s Schedules.

                                             The Schedules, Figures, Designations and Policies are to be read in their entirety
                                             and taken together they form the body of the Plan.

                                             This Plan is to be read within the context and planning regime established by the
                                             Metropolitan Growth Plan, 2008.




     Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010

Urban Envelope Implementation

  • 1.
    I The Amman Plan Urban Envelope Implementation December 2010
  • 2.
    III The Amman Plan Urban Envelope Implementation December 2010 DRAFT
  • 3.
    IV THE AMMAN PLAN Planning for the Future – Get Involved Planning for the future of Amman requires a partnership among all of us – citizens, communities, governments and the private sector. We welcome your feedback on this document. Please contact us at: Amman Institute for Urban Development PO Box 9155 Al Madeenah District Amman, Jordan 1191 Tel : +(962) 6 4621 829 Fax : +(962) 6 4651 703 www.ammaninstitute.org
  • 4.
    V THE AMMAN PLAN ACKNOWLEDGEMENTS Greater Amman Municipality P.O. Box 132 12 – Ali Bin Abi Taleb Street Hai Al-Muhajereen – Al Madeenah District Amman, Jordan www.ammancity.gov.jo Amman Institute For Urban Development PO Box 9155 Raghadan – Al Madeenah District Amman, Jordan 1191 www.ammaninstitute.org Planning Alliance 317 Adelaide Street, 2nd Floor Toronto, ON Canada M5V 1P9 www.planningalliance.ca
  • 5.
    VI THE AMMAN PLAN TABLE OF CONTENTS V ACKNOWLEDGEMENTS VIII LISTS XI MESSAGES 15-27 1.THE AMMAN PLAN - OVERVIEW 15 1.A. OPPORTUNITY AND CHALLENGE 16 1.B. AMMAN PLAN - METROPOLITAN GROWTH 18 1.C. PLANNING AND DEVELOPMENT PRINCIPLES 20 1.D. PLANNING SCALES 22 1.E. RELATED INITIATIVES 24 27-131 2.URBAN ENVELOPE IMPLEMENTATION PLAN 27 2.A. INTRODUCTION 28 2.A.1 INTENT OF THE PLAN 29 2.A.2 HOW TO USE THIS PLAN 30 2.B. PLAN ASSUMPTIONS 31 2.B.1 PLAN GEOGRAPHY 32 2.B.2 POPULATION GROWTH PROJECTIONS 34 2.B.3 EMPLOYMENT GROWTH PROJECTIONS 35 2.C. THE URBAN ENVELOPE PLAN 37 2.C.1.1 2025 CONCEPTUAL PLAN 38 2.C.1.2 NEIGHBOURHOOD CLASSIFICATION 40 2.C.2 COMPREHENSIVE AREA PLAN 44 2.C.3 COMPONENT PLANS 47 2.C.3.1 NATURAL HERITAGE 48 2.C.3.2 RESOURCE EXTRACTION 52 2.C.3.3 AGRICULTURE 56 2.C.3.4 CULTURAL HERITAGE 60 2.C.3.5 TRANSPORTATION AND TRANSIT 64 2.C.3.6 SETTLEMENT AND HOUSING 72 2.C.3.7 CORRIDORS AND CENTRES 76 2.C.3.8 EMPLOYMENT 82 2.C.3.9 SOCIAL FACILITIES 88 2.C.3.10 OPEN SPACE 98 2.D. DESIGNATIONS 102
  • 6.
    VII THE AMMAN PLAN 131 - 159 3. PHASING AND PRIORITY ACTION PLAN 131 3.A INTRODUCTION 133 3.B. PHASING PLAN AND POLICIES 134 3.B.1 INTRODUCTION 135 3.B.2 PHASING PLAN 136 3.B.2.1 Water Infrastructure Capacity 138 3.B.2.2 Waste Water Infrastructure Capacity 139 3.B.2.3 High Order Transit Capacity 140 3.B.3 PHASING, INFRASTRUCTURE AND SERVICING POLICIES 142 3.C. URBAN ENVELOPE IMPLEMENTATION PLAN – POLICY PRIORITIES 147 3.D URBAN ENVELOPE IMPLEMENTATION PLAN – RECOMMENDED DEVELOPMENT REVIEW PROCESSES 159
  • 7.
    VIII THE AMMAN PLAN LISTS SCHEDULES 1.B • METROPOLITAN GROWTH PLAN 19 2.B.1.I • URBAN ENVELOPE 32 2.B.1.II • PLANNING AREAS, SERVICE AREAS AND NEIGHBOURHOODS 33 2.C.1.I • 2025 CONCEPTUAL PLAN 39 2.C.1.II • NEIGHBOURHOOD CLASSIFICATION 41 2.C.2 • COMPREHENSIVE AREA PLAN 45 2.C.3.1 • NATURAL HERITAGE 49 2.C.3.2 • RESOURCE EXTRACTION 53 2.C.3.3 • AGRICULTURE 57 2.C.3.4 • CULTURAL HERITAGE 61 2.C.3.5.I • TRANSPORTATION 65 2.C.3.5.II • TRANSIT 69 2.C.3.6 • SETTLEMENT AND HOUSING PLAN - RESIDENTIAL DENSITIES 73 2.C.3.7 • CORRIDORS AND CENTRES 77 2.C.3.8.I • EMPLOYMENT: COMMERCIAL 83 2.C.3.8.II • EMPLOYMENT: INDUSTRIAL 85 2.C.3.8.III • EMPLOYMENT: INSTITUTIONAL 87 2.C.3.10 • OPEN SPACE 99 3.B.2 • PHASING PLAN 137 Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 8.
    IX THE AMMAN PLAN FIGURES 1.D • PLANNING SCALES 23 1.E • LOCATION OF APPROVED COMMUNITY PLANS 25 2.C.3.9.I • EXISTING SOCIAL FACILITIES - CENTRAL AREA 92 2.C.3.9.II • EXISTING SOCIAL FACILITIES - NORTH AREA 93 2.C.3.9.III • EXISTING SOCIAL FACILITIES - WEST AREA 94 2.C.3.9.IV • EXISTING SOCIAL FACILITIES - INNER SOUTH AREA 95 2.C.3.9.V • EXISTING SOCIAL FACILITIES - INNER EAST AREA 96 3.B.2.1 • WATER INFRASTRUCTURE CAPACITY TO ACCOMMODATE GROWTH TO 2025 138 3.B.2.2 • WASTEWATER INFRASTRUCTURE CAPACITY TO ACCOMMODATE GROWTH TO 2025 139 3.B.2.3 • HIGH ORDER TRANSIT CAPACITY TO 2015 140 Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 9.
    X Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 10.
    XI THE AMMAN PLAN MESSAGE HM King Abdullah II “To achieve the optimum balance of healthy growth and quality living, flourishing expansion and organized districts, 21st century conveniences and traditional character, we must embark on a serious and comprehensive project of city planning for Amman.” Abdullah II Ibn Al Hussein Amman 5 Rabi’ Al Thani 1427 Hijri 3 May 2006 Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 11.
    XII Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 12.
    XIII THE AMMAN PLAN MESSAGE HE Mayor Omar Maani: “Our City is a reflection of ourselves. It is our office to work in; it is our home to raise a family in; and it is our playground to relax in. It is where we spend our lives” All of us have seen Amman grow over the past several years with tremendous impact on transportation and other services, including our Neighbourhoods and unique cityscape. This development has been happening without a plan; we can no longer afford to grow without direction for it will damage what is special about Amman and we will miss opportunities to become a modern world city while retaining the soul of our community. The Greater Amman Municipality (GAM) has embarked on the preparation of the Amman Plan, a comprehensive set of documents. This Plan will be the City’s blueprint for sustainable development and will help Jordan achieve the objectives outlined by the National Agenda. It will guide the growth of our community and address such issues as the built and natural environment, culture and heritage, transportation and infrastructure, and community development . . . We are committed to preparing this Amman Plan based on community input so that it reflects the aspirations of our citizens. Such aspirations begin with a Vision of what we want our City to be, rather than just reacting to current problems . . .” Mayor Omar Maani Amman Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 13.
    14 Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 14.
    15 1.THE AMMAN PLAN OVERVIEW A. OPPORTUNITY AND CHALLENGE B. AMMAN METROPOLITAN GROWTH PLAN C. PLANNING AND DEVELOPMENT PRINCIPLES D. PLANNING SCALES E. RELATED INITIATIVES Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 15.
    16 1. THE AMMAN PLAN - OVERVIEW 1.A. OPPORTUNITY AND CHALLENGE Amman is growing. With high rates of population growth and a unique geography, the Greater Amman Municipality is faced with both unprecedented challenges in managing the city’s lands and infrastructure and also offered exceptional opportunities in revitalizing neighbourhoods and enhancing quality of life for all of the city’s residents. The Amman Plan allows the Greater Amman Municipality to both address these challenges and seize the opportunities. Comprised of several elements – from the Metropolitan Growth Plan to detailed Community Plans – the Amman Plan provides guidance to decision makers, investors and residents on the spatial and physical development of the city now and in the future. It is based on a clear vision and principles and sets a framework for both urban development and environmental protection for the benefit of future generations in a balanced, efficient and humane manner. Its objectives are long term in nature and the Plan presents the desired development form of the City in the year 2025. Each element of the Amman Plan reflects the following opportunities and challenges: Prioritizing Urban Growth: Amman is taking part in a major transition which is occurring worldwide, where over half of the global population now lives in cities. Attracted by economic potential, cultural amenities, and educational opportunities, people are shifting from rural to urban ways of life. Planning for urban growth is critical as our young population matures, and greater demands rise for convenient jobs, housing, transit and social services in close proximity. Controlling Sprawl: Amman has grown rapidly in the last 25 years. In that time, the city’s landscape has changed dramatically, affecting the natural environment, water resources, and prime agricultural lands. As growth continues into the future, it is critical that we minimize negative impacts. By accommodating more growth within existing neighbourhoods, and enhancing centres and corridors, the Plan reduces pressures on agricultural and natural lands and it revitalizes existing urban neighbourhoods as economic and social hubs. This equates to greater access to more opportunity for all residents of Amman. Conserving Resources: The Plan emphasizes the need to conserve limited resources such as water, agricultural lands and natural areas in order to ensure that meeting the demands of today’s generation does not compromise the needs of Jordan’s future generations. Planning For the Economy: The economic landscape of Amman is changing. Prioritizing infrastructure investment, supporting high quality employment areas, and planning for quality educational and social services are all important elements to ensure that Amman is better equipped to seize new economic opportunities. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 16.
    17 1. THE AMMAN PLAN - OVERVIEW Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 17.
    18 1. THE AMMAN PLAN - OVERVIEW 1.B. AMMAN PLAN - METROPOLITAN GROWTH The Metropolitan Growth Plan issued in 2008 by the Greater Amman Municipality, establishes a physical planning and policy framework to guide the strategic growth and development of the Greater Amman Municipality (GAM) to the year 2025. The Plan establishes an overall growth management framework, delineates an “urban envelope” within which the majority of population and employment growth will occur to 2025, identifies policies and land uses for a number of particular components and establishes guiding policies. The comprehensive Metropolitan Growth Plan is shown in Schedule 1.B The key mechanism employed by the Metropolitan Growth Plan to manage the growth and development of Amman is to make better use of existing urban lands through greater intensification, infill and higher density development along transit corridors and nodes. At the same time, the growth plan establishes a process to make wiser strategic choices when bringing new lands on the urban periphery into urban development. The Metropolitan Growth Plan offers a preferred direction for the city’s future development, ensures the protection of cultural heritage, the environment, agricultural lands and natural resources, and addresses the provision of infrastructure and transportation services. The Plan was developed in consultation with a broad cross-section of Amman society, and is founded in a set of consensus- based planning and development principles (see Section 1.C). The Metropolitan Growth Plan is the primary document which establishes the basis of the Urban Envelope Implementation Plan. The Urban Envelope Implementation Plan builds on the Metropolitan Growth Plan by providing more specific land use designations, more detailed policy directions and recommends additional mechanisms to allow the goals of the Metropolitan Growth Plan to be achieved within the area defined as the Urban Envelope of Amman. It is important to emphasize that the Urban Envelope Implementation Plan does not address lands within the Greater Amman Municipality that are outside the Urban Envelope boundary. This applies to urbanized or industrialized areas such as Na’our, Al Mouwaqer, Al Jeezah and parts of Marj Al Hamam as well as the rural, agricultural and desert areas that surround the Urban Envelope. A number of policies and plans are in place to guide development in these areas and should be referred to for further direction. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 18.
    19 1. THE AMMAN PLAN - OVERVIEW Schedule 1.B Metropolitan Growth Plan Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 19.
    20 1. THE AMMAN PLAN - OVERVIEW 1.C. PLANNING AND DEVELOPMENT PRINCIPLES The Metropolitan Growth Plan sets forth a vision for the future and establishes a set of planning and development principles. For more information about the Metropolitan Growth Plan’s vision for the future of the City, see the Metropolitan Growth Plan, Section 2. The Planning and Development Principles which continue to guide the Urban Envelope Implementation Plan are outlined below: 1. Plan for ‘complete communities’ that provide residents with a choice of housing, a full range of urban amenities – parks, schools, clinics, and cultural centres – and good accessibility to employment, shopping, and recreational facilities. 2. Plan and develop ‘inclusive communities’ rather than segregated ones, by allowing for different lifestyles, building typologies, and public spaces that unite citizens from different socio-economic, cultural, and ethnic backgrounds. Special care must be taken to accommodate people with disabilities in the ‘built environment’ and in the provision of services such as public transit. 3. Encourage compact urban growth in order to make the best use of existing services, promote increased transit use, improve pedestrian accessibility, and improve affordability for both the Greater Amman Municipality and its residents. 4. Direct growth to both existing built-up area, in order to make the best use of existing services, and to new designated expansion areas that are located close to the urban core. Special attention must be paid to preserving the ‘organic historic growth’ of the City and to providing conditions that replicate this style of urban form. 5. Promote mixed land use in general, and a healthy mix of residential and employment uses in particular, in order to foster a diverse economy and to limit commuting times. This mixed-use development will be promoted in all socioeconomic sectors of society. 6. Promote clear distinctions between urban, suburban, and traditional communities in order to protect valuable environmental and agricultural lands and to support traditional lifestyles and culture. 7. Focus GAM’s transportation policy on moving people and goods, rather than moving vehicles. Promote public transit and develop a transportation system that offers residents choices for going shopping, going to work, taking time off to relax or play, and getting back home again. Provide for a safe and convenient pedestrian environment that is integrated with other modes of transportation. 8. Create a connected ‘Natural Heritage System’ that protects and connects important environmental features – forests, wadis, highlands, deserts, and aquifers – at the same time as it accommodates a network of public walking trails throughout the City. An urban parks system will be an integral part of the Natural Heritage System, including neighbourhood parks, playgrounds, and large open green spaces within the urban setting. 9. Conserve the ‘cultural heritage’ of the City, including modern and ancient heritage, and promote it as an integral part of the overall contemporary metropolitan living experience. 10. Promote ‘sustainable development practices’ and encourage environment- friendly ‘green building’ standards that minimize the City’s carbon footprint on the global community. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 20.
    21 1. THE AMMAN PLAN - OVERVIEW Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 21.
    22 1. THE AMMAN PLAN - OVERVIEW 1.D. PLANNING SCALES The Amman Plan presents a somewhat unorthodox approach to metropolitan, urban area and community planning. Conventional “master plans” are typically structured from the top down – from the larger, metropolitan scale down to the small, community scale - in a progressively more detailed sequence. The Amman Plan is being created at all scales simultaneously - from both the top down and the bottom up - as well as focusing on different sectoral issues, from corridor intensification to industrial land policy. Each scale responds to different questions and challenges. This flexibility allows the City of Amman to respond to particular priorities or development pressures in a timely fashion. Figure 1.D illustrates the three different scales which The Amman Plan works at: Metropolitan Scale The metropolitan scale relates to the entire 1,662-square-kilometre Greater Amman Municiaplity Area and is the scale of the Metropolitan Growth Plan. Urban Area Scale The Metropolitan Planning Area is subdivided into eight Planning Areas where a finer scale of planning can be undertaken. Five of the Planning Areas fall within Amman’s Urban Envelope, which is approximatly 630 squares kilometres in size and where the majority of future growth will be directed to 2025. Community Scale The community scale relates to areas and neighbourhoods where the greatest level of plan specificity can be achieved. There are 170 neighbourhoods within the Urban Envelope and 228 overall within the Greater Amman Municipality. Community Plans within or across these neighbourhoods provide detailed planning and design proposals, including recommended zoning. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 22.
    23 1. THE AMMAN PLAN - OVERVIEW Figure 1.D Planning Scales METROPOLITAN SCALE Metropolitan Growth Plan URBAN AREA SCALE Urban Envelope Implementation Plan COMMUNITY SCALE Arafat Node Community Plan Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 23.
    24 1. THE AMMAN PLAN - OVERVIEW 1.E. RELATED INITIATIVES In addition to building on the Metropolitan Growth Plan, the Urban Envelope Implementation Plan presented in this document builds on and is complemented by a series of accompanying plans, studies and other initiatives that have been generated since 2006. Together this body of work forms The Amman Plan. Figure 1.E. depicts approved plans that guide planning and decision-making at a detailed neighbourhood level and must be consulted for land use matters relating to this particular geography. For additional direction, background and guidance on sectoral and land-use planning matters, users of the Urban Envelope Implementation Plan are also recommended to consult other plans and studies that have been prepared by the Greater Amman Municipality since 2006: • Amman Plan for Tall Buildings – Interim Growth Strategy, February 2007 • Amman Development Corridor Master Plan – Corridors Intensification Strategy, June 2007 • Interim Industrial Land Policy, August 2007 • Airport Corridor Plan, October 2007 • Outlying Settlement Policy – Rural Growth Centres, October 2007 In addition, work that was undertaken in the following areas has also informed the preparation of this Plan: • Downtown Development Plan • Capital Parkway Community Plan • Ras Al Ain Community Plan • Al Jusur Al Ashra Community Plan • Magabalien Community Plan • Metro Park Community Plan • South Park/ Yadoudah Community Plan • Southern Gateway Community Plan • Amman Development Corridor Master Plan Study • Amman Area Plan - Cultural Heritage and Antiquities • Transportation and Mobility Master Plan • Planning for Heritage Protection Study This Plan was also informed by the proposed new Zoning Bylaw for the City of Amman which is still in development at this time. The permitted and recommended land uses that are proposed in the Plan make reference to the draft version of the new Zoning Bylaw, pre-final version as of July 2010, and a significant attempt has been made to align the Plan with the Bylaw. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 24.
    25 1. THE AMMAN PLAN - OVERVIEW Figure 1.E Location of Approved Community Plans 1. Al Kindi Street Corridor 8. Queen Alia Airport Road Corridor 2. Shaker Bin Zaid Street Corridor 9. King Abdullah II Corridor 3. Hussein Bin Ali Street Corridor 10. Mecca / King Abdullah II intersection 4. Arar Street Corridor 11. HDMU Site A 5. Mecca Street Corridor 12. HDMU Site C 6. Queen Rania Queen Alia University Corridor 13. Arafat Node Community Plan 7. Abdullah Ghosheh Street Corridor 14. Abdali Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 25.
    26 Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 26.
    27 2.URBAN ENVELOPE IMPLEMENTATION PLAN A. INTRODUCTION B. PLAN ASSUMPTIONS C. THE URBAN ENVELOPE PLAN D. DESIGNATIONS Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 27.
    A. INTRODUCTION 2.A. INTRODUCTION 2.A.1 INTENT OF THE PLAN 2,A.2 HOW TO USE THIS PLAN Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 28.
    29 2. URBAN ENVELOPE IMPLEMENTATION PLAN 2.A.1 INTENT OF THE PLAN The Urban Envelope Implementation Plan is intended to serve as a mechanism to implement the Metropolitan Growth Plan and should be read in conjunction with that document. The Urban Envelope Implementation Plan converts the strategic directions of the Metropolitan Growth Plan for the geography of the Amman Summary Report Urban Envelope into an integrated set of schedules, designations, definitions, and policies. Lands outside of the Urban Envelope are guided by other policies and THE AMMAN PLAN plans which guide matters for those areas. The Urban Envelope Implementation Plan is intended to serve several purposes: Metropolitan • it informs and guides decisions on development applications within the Urban Envelope; Growth • it helps to guide the development of more detailed community plans and zoning; • it creates a mechanism for coordination across different departments within the Greater Amman Municipality, as well as with National government ministries and agencies as well as utility companies; and • It provides a basis for establishing priorities for servicing and infrastructure investment and other work programming. Part 1 of this document provides an overview of the Amman Plan which forms Amman Metropolitan Growth Plan, 2008 the basis for this Plan. Part 2 contains the land-use planning provisions of the Plan and is organized in four main sections: The Amman Plan • Section A introduces the Plan’s intent and structure Urban Envelope • Section B provides base information on the Plan’s applicable geography and Implementation Plan demographic assumptions. • Section C contains the 2025 conceptual growth plan, comprehensive area plan and individual component plans, including schedules, figures and policies. • Section D contains definitions and proposed uses for each of the designations illustrated in the plan’s schedules. Part 3 provides recommended priorities for phasing and servicing to achieve the Plan. While every effort has been made to ensure accuracy at the broader scale of the Urban Envelope area, the geographical information depicted graphically in the schedules of the Plan is conceptual only. For the assessment of detailed development applications, additional verification will be required. Extension of rights granted within this Plan is subject to cadastral survey results. Phase II Report – Summer 2010 DRAFT To the extent possible, the recommended land uses presented in this Plan reflect Urban Envelope Implementation Plan, existing regulatory provisions (zoning) and respect current development rights. 2010 Additional zoning is to be established within more detailed Community Plans, though this Plan may recommend some areas within the Urban Envelope that require re-zoning. In any situation where development applications have an existing as-of-right that is not reflected in a broad land use designation identified in a schedule of this Plan, it is recommended that any discrepancy be reviewed on *Annexes which add supplementary a case-by-case basis through the development review process. information to aid in the implementation of this Plan are provided separately. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010
  • 29.
    30 2. URBAN ENVELOPE IMPLEMENTATION PLAN 2.A.2 HOW TO USE THIS PLAN The Urban Envelope Implementation Plan is a reference tool to guide development within the Amman Urban Envelope to 2025. The Plan is comprised of an integrated set of Schedules, Figures, Designations and Policies. Taken together, these constituent elements provide direction on land use and infrastructure decisions, for the purpose of both reviewing development applications and for prioritizing the City of Amman’s capital investment program. Section 2 includes the following key elements: • A Conceptual Plan to 2025 which portrays the Plan’s future vision and articulates direction for spatial development in the urban envelope in a schematic way; • A Comprehensive Area Plan which depicts the full set of aggregated land uses and overlay designations in one schedule and provides general direction on the plan’s implementation; and • Ten Component Plans which contain more detailed mapping, descriptions and policies for each designation that appears in the Comprehensive Area Plan. Each of these elements incorporates Schedules and Figures, which are made up of individual Designations and accompanied by guiding Policies. Schedules physically and spatially depict the designations in the Plan. Schedules are used to guide planning and development decisions and may reflect both existing and proposed land uses. The designations depicted in schedules are conceptual only and require detailed cadastral surveys to properly reflect property and build-to lines. Figures are included for information purposes only to illustrate additional background data that can assist decision makers. Designations are defined and explained in Section 2.D of the Plan. Each designation includes a description, along with proposed and permitted uses that are linked to current regulatory standards, as well as additional clarifying notes. Designations are depicted in the Plan’s Schedules and Figures. The definition and uses associated with each designation serve as an important tool to guide development review. Policies accompany each schedule and provide general provisions, establish standards or propose processes to be followed by the Greater Amman Municipality and other authorities to achieve the objectives depicted in the Plan’s Schedules. The Schedules, Figures, Designations and Policies are to be read in their entirety and taken together they form the body of the Plan. This Plan is to be read within the context and planning regime established by the Metropolitan Growth Plan, 2008. Greater Amman Municipality – The Amman Plan - Urban Envelope Implementation – December 2010