Eli Torres Structural Superintendent
CAREER SUMMARY
23 years of experience on Oil & Gas Industry in the construction projects such as: Marine
Platforms (onshore & offshore), Ships & Oil Refineries. I have worked in México & Overseas.
WORK EXPERIENCE
Structural Superintendent: J. Ray McDermott de Mexico.
Project Pemex PB-Litoral-A: ACTUAL
Production Marine Platform.
Top responsible of the construction of one 100’ length jacket (8 legs) & piles, one 100’ length
tripod jacket & piles, 2 (each) 350’ length interconnection Bridges & one tripod deck.
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (200 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety; responsible of load out & tie down.
Structural Superintendent: J. Ray McDermott de Mexico.
Project Pemex Ayatsil-B: 2013 – 2014
Drilling Marine Platform.
Top responsible of the construction of 400’ length jacket (8 legs) & piles (9 400 metric tons.
total).
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (450 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety; responsible of load out & tie down.
Revised 28/02/2015
Eli Torres Structural Superintendent
Structural Superintendent: J. Ray McDermott de Mexico.
Project: Repair of 2 drilling rigs: 2012 - 2013
Naval maintenance of Drilling Marine Platform.
Top responsible of the repair of 2 (each) drilling rigs.
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (300 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety.
Structural Superintendent: J. Ray McDermott ( USA ).
Project: COMPRESSOR MODULE by British Gas: 2012
Top responsible of the construction of one Compressor Module as part of one marine platform.
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (150 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety.
Structural superintendent: J. Ray McDermott de Mexico.
Project PEMEX KUIL-A & PEMEX KAMBESAH: 2010 – 2012
Drilling Marine Platform.
Top responsible of the construction of one 100’ length jacket (4 legs); 4 legs drilling deck &
piles (6500 tons. total).
Revised 28/02/2015
Eli Torres Structural Superintendent
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (550 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety; responsible of load out & tie down.
Structural Superintendent: PT. McDermott (Indonesia).
Project CHEVRON THAILAND & ESSO AUSTRALIA: 2009 – 2010
Drilling Marine Platforms.
Part of the Project Management Team in the construction of 2 (each) 8 legs jackets (5000 tons
total).
My duties: Coordinator at field of foremen, leader men & crews (150 people total) on the
execution of the project, getting resources, equipments, tools, materials, consumables &
drawings required, planning work safe practices, leader on safety.
Structural Superintendent: J. Ray McDermott de Mexico.
Project PEMEX KU-MAALOB-C: 2008 – 2009
Drilling Marine Platform.
Top responsible of the construction of 350’ length jacket (8 legs) & piles (6 500 metric tons.
total).
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (350 people total) on the execution of the project, getting resources, equipment,
tools, materials, consumables, engineering & drawings required, planning work safe practices,
leader on safety; responsible of load out & tie down.
Revised 28/02/2015
Eli Torres Structural Superintendent
Yard Superintendent: BOSNOR S.A. de C.V. (1992 – 2008)
Top responsible of the construction of 8, 4 & 3 legs jackets, drilling & production decks,
interconnection bridges, flare booms, repair, modification of vessels & semi submersible
marine platforms. Working onshore & offshore.
My duties: Elaboration of construction plan, construction schedule, erection sequence,
materials ROS schedule, quality control procedures; coordinator at field of foremen, leader
men & crews (up to 1200 people total) on the execution of the project, getting resources,
equipments, tools, materials, consumables & drawings required, planning work safe practices,
leader on safety; responsible of load out & tie down in the projects listed below:
CONSTRUCTION OF MARINE PLATFORM FOR PEMEX PB-KU-H
CONSTRUCTION OF MARINE PLATFORM FOR PEMEX PP-KU-C
CONSTRUCTION OF MARINE PLATFORM FOR PEMEX EPC-22 A
CONSTRUCTION OF MARINE PLATFORM FOR PEMEX EPC-01
MAINTENANCE AND INTERCONNECTION OF MARINE PLATFORMS OFFSHORE.
MAINTENANCE OF SEMI-SUBMERSIBLE PLATFORMS ONSHORE.
ADECUATION OF A DRILLING VESSEL INTO CRANE VESSEL ONSHORE.
CONSTRUCTION OF A GREASE PLANT FOR PEMEX.
EDUCATION
Mechanic Engineer “ Instituto Tecnologico de Cd.Madero”
Lenguages: English 90% & Spanish 100%
Nacionality: Mexican
Documents: Current Mexican Passport, Current USA tourist Visa; expired USA work
visa; expired Indonesian Work visa;.
Revised 28/02/2015

updated resume eli english

  • 1.
    Eli Torres StructuralSuperintendent CAREER SUMMARY 23 years of experience on Oil & Gas Industry in the construction projects such as: Marine Platforms (onshore & offshore), Ships & Oil Refineries. I have worked in México & Overseas. WORK EXPERIENCE Structural Superintendent: J. Ray McDermott de Mexico. Project Pemex PB-Litoral-A: ACTUAL Production Marine Platform. Top responsible of the construction of one 100’ length jacket (8 legs) & piles, one 100’ length tripod jacket & piles, 2 (each) 350’ length interconnection Bridges & one tripod deck. My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (200 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety; responsible of load out & tie down. Structural Superintendent: J. Ray McDermott de Mexico. Project Pemex Ayatsil-B: 2013 – 2014 Drilling Marine Platform. Top responsible of the construction of 400’ length jacket (8 legs) & piles (9 400 metric tons. total). My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (450 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety; responsible of load out & tie down. Revised 28/02/2015
  • 2.
    Eli Torres StructuralSuperintendent Structural Superintendent: J. Ray McDermott de Mexico. Project: Repair of 2 drilling rigs: 2012 - 2013 Naval maintenance of Drilling Marine Platform. Top responsible of the repair of 2 (each) drilling rigs. My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (300 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety. Structural Superintendent: J. Ray McDermott ( USA ). Project: COMPRESSOR MODULE by British Gas: 2012 Top responsible of the construction of one Compressor Module as part of one marine platform. My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (150 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety. Structural superintendent: J. Ray McDermott de Mexico. Project PEMEX KUIL-A & PEMEX KAMBESAH: 2010 – 2012 Drilling Marine Platform. Top responsible of the construction of one 100’ length jacket (4 legs); 4 legs drilling deck & piles (6500 tons. total). Revised 28/02/2015
  • 3.
    Eli Torres StructuralSuperintendent My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (550 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety; responsible of load out & tie down. Structural Superintendent: PT. McDermott (Indonesia). Project CHEVRON THAILAND & ESSO AUSTRALIA: 2009 – 2010 Drilling Marine Platforms. Part of the Project Management Team in the construction of 2 (each) 8 legs jackets (5000 tons total). My duties: Coordinator at field of foremen, leader men & crews (150 people total) on the execution of the project, getting resources, equipments, tools, materials, consumables & drawings required, planning work safe practices, leader on safety. Structural Superintendent: J. Ray McDermott de Mexico. Project PEMEX KU-MAALOB-C: 2008 – 2009 Drilling Marine Platform. Top responsible of the construction of 350’ length jacket (8 legs) & piles (6 500 metric tons. total). My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (350 people total) on the execution of the project, getting resources, equipment, tools, materials, consumables, engineering & drawings required, planning work safe practices, leader on safety; responsible of load out & tie down. Revised 28/02/2015
  • 4.
    Eli Torres StructuralSuperintendent Yard Superintendent: BOSNOR S.A. de C.V. (1992 – 2008) Top responsible of the construction of 8, 4 & 3 legs jackets, drilling & production decks, interconnection bridges, flare booms, repair, modification of vessels & semi submersible marine platforms. Working onshore & offshore. My duties: Elaboration of construction plan, construction schedule, erection sequence, materials ROS schedule, quality control procedures; coordinator at field of foremen, leader men & crews (up to 1200 people total) on the execution of the project, getting resources, equipments, tools, materials, consumables & drawings required, planning work safe practices, leader on safety; responsible of load out & tie down in the projects listed below: CONSTRUCTION OF MARINE PLATFORM FOR PEMEX PB-KU-H CONSTRUCTION OF MARINE PLATFORM FOR PEMEX PP-KU-C CONSTRUCTION OF MARINE PLATFORM FOR PEMEX EPC-22 A CONSTRUCTION OF MARINE PLATFORM FOR PEMEX EPC-01 MAINTENANCE AND INTERCONNECTION OF MARINE PLATFORMS OFFSHORE. MAINTENANCE OF SEMI-SUBMERSIBLE PLATFORMS ONSHORE. ADECUATION OF A DRILLING VESSEL INTO CRANE VESSEL ONSHORE. CONSTRUCTION OF A GREASE PLANT FOR PEMEX. EDUCATION Mechanic Engineer “ Instituto Tecnologico de Cd.Madero” Lenguages: English 90% & Spanish 100% Nacionality: Mexican Documents: Current Mexican Passport, Current USA tourist Visa; expired USA work visa; expired Indonesian Work visa;. Revised 28/02/2015