The document provides specifications for three construction projects:
1) 1st class brickwork in cement mortar (1:6), requiring soaked bricks laid with mortar and skilled masons over 15 days.
2) Earthwork excavation for foundations, with vertical trenches and protected existing services.
3) Marble flooring using first quality marble set with anchors and polished vertically and horizontally.
Detailed specification of an item of work specifies the quantities of materials, proportion of mortar, workmanship, method of preparation & execution and method of measurement.
Detailed specifications of different items of works are prepared separately and describe what the work should be and these shall be executed and constructed.
Detailed specification of an item of work specifies the quantities of materials, proportion of mortar, workmanship, method of preparation & execution and method of measurement.
Detailed specifications of different items of works are prepared separately and describe what the work should be and these shall be executed and constructed.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
2. BRIEF SPECIFICATION FOR 1ST CLASS BRICKWORK IN CM (1:6)
PropertiesofBricks–Soakinginwater–mortar–Workmanship–measurement–Scaffolding.
Brick shall be table – moulded, well burnt in approved kiln, copper coloured, free from cracks and with sharp
andsquareedges
The brick shall be uniform in shape and shall be of standard size and shall give a clear ringing sound when
struckwitheachother.
Thebrick shallnotabsorb watermore thanonefifth of theirweightafteronehour of soaking inwater.
Brickshallhavemaximum crushingstrengthof 10.5 N/mm2.
The bricks shall be well soaked in water for atleast 12 hours before their use, preferably in water tank provided
atsiteof work.
Theproportion of mortarshallbe 1:6 by volume.
Thecement shallbe standardquality.
Thesandshallbe cleanand course.
3. The cement mortar shall be prepared in required quantity of not more than one bag of cement at a
timeandthisshall beconsumedin halfanhouraftermixing.
Themixing ofmortarshall bedoneon awatertightplatformorin asteel trough.
Thewaterfit fordrinking shallbeusedin preparingmortar.
Thebrokenbricksshall notbeusedexceptasclosers.
All cornersshallbetrulyin plumbandsidesshall bein line andlevel.
Themortarshallbreakforbondingandshallnotexceed10 mm in thickness.
All jointsshallberakedandfacesofwall shall becleanedattheendofeach dayswork.
4. Only skilled masons shall be employed on the work and the work shall be kept well watered for at least 15
days.
All brickworkshall becarriedoutin sucha waythatnoportionisraisedunduly aboveanother.
Thelength andheight shallbemeasuredasonatsite.
Thethicknessofwall shallbepaidforasonebrick,oneandhalfbricks,twobricksandsoon.
Tofacilitatetheconstructionofbrickwork,necessaryandsuitablescaffoldingshall beprovided.
Thescaffoldingshall bestrongandsoundandwithsufficientstrongsupports.
Therateforbrickworkincludesthisnecessaryscaffoldingalso.
5. DETAILED SPECIFICATION FOR EARTHWORKEXCAVATION
Startingofwork–workmanship–excavatedmaterial–protectiontoexistingservices–measurement–
whattherateincludes.
The excavation for the foundation trenches shall be carried out in all sorts of soils as per plan and
lining approvedatsite.
Thesidesofthefoundationtrenchesshall betrulyvertical andbottomshall beuniformlylevelled.
The excavated material shall be stacked away from the sides of the trenches of the excavation by
atleast2m.
Thesurplusexcavatedmaterialshall bespreadoutuniformly uptoa leadof 100m.
All the existing services such as pipes, sewers, electric cables etc., which are met with in foundation
trenchesshall becarefullysupportedandprotectedbycontractorasperinstructionoftheengineer.
6. The excavation shall be measured as per exact length and width of the lowest step of footings
accordingtodrawing.
The rate of excavation includes all timbering and other supports which are necessary for securing the
sidesofthetrenchesandthecontractorshall beresponsiblefortheirsafety.
Noextraamountshallbepaidtothecontractorfortheexcavationoftheworkingspace.
Thematerialorvaluablefoundduringexcavationshall bethepropertyoftheowner.
7. SPECIFICATION FOR MARBLE FLOORING
Quality of marble - samples –anchors and dowels –vertical and horizontal surfaces –
workmanship –finishing –measurement.
The marble to be used for the work shall be first class quality, free from cracks, non porous, uniform in
colourandcarefullyselectedso astopresent harmoniousveins throughoutthefinished work.
The samples of each type to be used shall be submitted to show the full range of variation and the work
shall becompletedwith marblesin accordancewiththeapprovedsamplebytheengineer.
All necessary bronzeorbrassanchors ,dowels,clamps,wires etc,requiredtosecurethe marblesin place
shall havetobeprovidedbythe contractorandbuiltin atnoextracosttotheowner.
Nomarbleshallbefacescrew.
8. The vertical work commencing at floor level shall be allowed to set before the flooring is laid and the
marbleshall extendabout25mm belowthefinishedfloorlevel.
The vertical and horizontal surfaces shall be laid in cement mortar (1:3) and the joints shall be finished
withwhitecement.
The vertical marble shall be machine polished in the workshop and the hzl marbles shall be machine
polished afterlaying.
The marble for dado and skirting shall be set in non staining white cement and of height described in
drawing.
Theskirtingshallbe plain,roundedorofbevelled edges.
Marbleworkshall becarriedoutin thebestworkmanshipmanner.
All necessary precautions shall be taken to prevent staining or discolouration of marble surface due to
anymaterialusedin setting.
9. All joints shallshow perfectalignment ofsurfaceandshall begroutedtomatchthecolourofmarble.
All marble work shall be covered or finished with wax or other protective material as may be necessary
when set.
The payment shall be made for the actual work done on site on superficial area basis and no extra
amountshall bepaidforwastageofmaterials,anchors,dowels,etc,
The rate of the marble work shall include any drilling, cutting, fitting or making any special provisions
requiredin themarblework.
10. SPECIFICATION FOR 12MM THICK CEMENT PLASTER IN CM (1:4)
Preliminary – process of first coat – second coat of sagol finish after six hours of first
coat –watering –three coats ofwhite or colour wash - measurement