Continuity and Resilience (CORE)
ISO 22301 BCM Consulting Firm
Presentations by our partners and
extended team of industry experts
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower
Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033
Fax: ++91 11 41055535
Email: neha@continuityandresilience.com
Continuity and Resilience
P. O. Box 127557
Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530
Tel: +971 2 8152831
Fax: +971 2 8152888
Email: info@continuityandresilience.com
AE/HSC/NCEMA 7000:2012
Mohammed Al Jenaibi
BCM Specialist
CBCP – MBCI (Hon)
 UAE Government Strategy.
 UAE BCM Standard and Guideline
AE/HNSC 7000:2012.
 AE/7000 related standard.
 BCM roll-out example.
 Current status.
 Future steps.
Government Strategy of the
UAE
2021 vision
'' seeking to be responsible and effective
government, characterized by flexibility and
creativity, and looking forward to the future''
The aim is to explain what is the requirements and
program elements required in order to build the
organization's ability to business continuity.
Part one :
Specifications
The aim is to clarify how to do those steps in the
first part and general guidance about the program
and method of implementation.
Part Two:
Guidelines
has a business continuity plan template and explain
its elements and how to build it.
Part three:
BC Plan Templates
 ISO/ 31000:2009 Risk management --
Principles and guidelines.
 BS 25999 BSI’s BCM system.
New version soon will meet all requirements of:
 ISO/ 22301 Requirements .. 2012
 ISO/ 22313 Guidance .. 2013
 Societal security -- Business continuity
management system
 Infra Structure.
 Government entities.
 Contractors.
 Critical private sector.
 Supply chain.
 Public.
 Risk management – eliminate mitigate.
 Planning – Plan for the residual risks.
 ERP Emergency response plans – Save life and
properties.
 BCM – continuation of critical functions for the
community.
 Resiliency – Achieve full cycle of Total emergency
management solutions.
 Strong support from leadership to embrace EM
up to resiliency stage.
 Basic awareness in BCM throughout the
Government of UAE.
 A very well ERP maturity level throughout the
government nevertheless critical.
 Qualification of a good number of Gov. staff in
Certified BCM training providers.
 A complete BCM programme have been
implemented in a number of entities.
 An awareness program to be launched based on UAE
BCM standard in both languages .
 A centralized (UAE and Emirate level) body such as
COE/or any proper authority to manage, coordinate,
follow-up and provide assistance to entities.
 A similar program to run in the private sector for selected
entities by the BCM authority.
 Build an auditing and certification body based on AE
7000:2012.
 Build actual BC capabilities and resiliency throughout
UAE.
UAE Business Continuity Management Standard

UAE Business Continuity Management Standard

  • 1.
    Continuity and Resilience(CORE) ISO 22301 BCM Consulting Firm Presentations by our partners and extended team of industry experts Our Contact Details: INDIA UAE Continuity and Resilience Level 15,Eros Corporate Tower Nehru Place ,New Delhi-110019 Tel: +91 11 41055534/ +91 11 41613033 Fax: ++91 11 41055535 Email: neha@continuityandresilience.com Continuity and Resilience P. O. Box 127557 Abu Dhabi, United Arab Emirates Mobile:+971 50 8460530 Tel: +971 2 8152831 Fax: +971 2 8152888 Email: info@continuityandresilience.com
  • 2.
    AE/HSC/NCEMA 7000:2012 Mohammed AlJenaibi BCM Specialist CBCP – MBCI (Hon)
  • 3.
     UAE GovernmentStrategy.  UAE BCM Standard and Guideline AE/HNSC 7000:2012.  AE/7000 related standard.  BCM roll-out example.  Current status.  Future steps.
  • 4.
    Government Strategy ofthe UAE 2021 vision '' seeking to be responsible and effective government, characterized by flexibility and creativity, and looking forward to the future''
  • 5.
    The aim isto explain what is the requirements and program elements required in order to build the organization's ability to business continuity. Part one : Specifications The aim is to clarify how to do those steps in the first part and general guidance about the program and method of implementation. Part Two: Guidelines has a business continuity plan template and explain its elements and how to build it. Part three: BC Plan Templates
  • 6.
     ISO/ 31000:2009Risk management -- Principles and guidelines.  BS 25999 BSI’s BCM system. New version soon will meet all requirements of:  ISO/ 22301 Requirements .. 2012  ISO/ 22313 Guidance .. 2013  Societal security -- Business continuity management system
  • 7.
     Infra Structure. Government entities.  Contractors.  Critical private sector.  Supply chain.  Public.
  • 8.
     Risk management– eliminate mitigate.  Planning – Plan for the residual risks.  ERP Emergency response plans – Save life and properties.  BCM – continuation of critical functions for the community.  Resiliency – Achieve full cycle of Total emergency management solutions.
  • 9.
     Strong supportfrom leadership to embrace EM up to resiliency stage.  Basic awareness in BCM throughout the Government of UAE.  A very well ERP maturity level throughout the government nevertheless critical.  Qualification of a good number of Gov. staff in Certified BCM training providers.  A complete BCM programme have been implemented in a number of entities.
  • 10.
     An awarenessprogram to be launched based on UAE BCM standard in both languages .  A centralized (UAE and Emirate level) body such as COE/or any proper authority to manage, coordinate, follow-up and provide assistance to entities.  A similar program to run in the private sector for selected entities by the BCM authority.  Build an auditing and certification body based on AE 7000:2012.  Build actual BC capabilities and resiliency throughout UAE.