PORTFOLIO
TXESUS ZUBIATE
DESIGNS
Project plans.
2008. Trapaga village’s City Hall. OrganizaƟon and distribuƟon of different working
areas, some of them separated by glass parƟƟon walls, which are displayed in front
view.
PROJECTS
TXESUS ZUBIATE
PORTFOLIO
Project plans.
2011. ESTE University of Deusto, DonosƟ. OrganizaƟon and distribuƟon of several
classrooms and design of a special recepƟon desk.
PROJECTS
TXESUS ZUBIATE
PORTFOLIO
Project plans.
2013. Tecnalia, Derio. The client’s idea was crystal clear: 500 people in just a floor. The
challenge was split between the lack of Ɵme, 8 hours and because of the fact of
geƫ ng a good comunicaƟon among different departments.
PROJECTS
TXESUS ZUBIATE
PORTFOLIO
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2004. Cultural Center for Youngsters, Portugalete. OrganizaƟon and distribuƟon of
furniture in a small reading area. Red chairs for a white context, good idea to catch
customers aƩ enƟon.
Prominent product list: Shelves and tables by Iduna, chairs by Kartell and side tables
and semispheric armchairs by Sedus.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2006. LabasƟda town’s City Hall. Nice three floor building project by decoraƟon and
wise furniture equipment.
Prominent product list: Metal cabinets with sliding microperforated doors and tables
by Iduna, armchairs by Sedus and chairs by Akaba.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2010. CIC, Vitoria-Gasteiz. Complex project done with a short budget but finished
with good criteria and a remarkable aspect in the integraƟon of elements.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2010. CIC, Vitoria-Gasteiz. Complex project done with a short budget but finished
with good criteria and a remarkable aspect in the integraƟon of elements.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2011. NaƟonal Historical Basque Archive, Bilbao. Some views of a Department
manager’s desk.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2011. El Cocherito, BullfighƟng’s Classy Club, Bilbao. “Cocherito” was an nearly a
century years old high class club in Bilbao and so long, it hardly had any changes. In
2011, the chairman of the Club decided to refresh the local’s appearance. Basically,
two facts triggered this effect: painƟng walls and roof in white colour, and some
furniture replacements and adjustments did almost the rest.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2011. El Cocherito, BullfighƟng’s Classy Club, Bilbao. “Cocherito” was an nearly a
century years old high class club in Bilbao and so long, it hardly had any changes. In
2011, the chairman of the Club decided to refresh the local’s appearance. Basically,
two facts triggered this effect: painƟng walls and roof in white colour, and some
furniture replacements and adjustments did almost the rest.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2011. New Police Department Headquarters’s Lockers, Bilbao.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2012. Eskolondo, Ea small village’s Library. OrganizaƟon and distribuƟon of furniture
in basement floor for a bar.
Prominent product list: Chairs and tables by Ondarreta.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2012. Eskolondo, Ea small village’s Library. OrganizaƟon and distribuƟon of furniture
in first floor’s library. Computer’s area.
Prominent product list: Chairs, desks and shelves by AcƟu.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2012. Private Dwelling, Bilbao. TesƟng some furniture pieces to set up lounge's
character
Prominent product list: Eames Lounge Chair and oƩ oman by Hermann Miller,
armchairs by Cassina, side tables and low table by Mobles 114, service unit by USM
and sofa by Sancal.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2012. Private Dwelling, Bilbao. TesƟng some furniture pieces to set up the dining
area.
Prominent product list: Cabinet by USM, table by Akaba and chairs by Carl Hansen.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2013. Conorte, Bilbao. Project proposal for a construcƟon company. Two floors
divided by an RecepƟon, an Working area and Manager’s office at the ground floor;
MeeƟng room on the first floor.
Prominent product list: Armchairs, desks and cabinets by AcƟu.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2013. Conorte, Bilbao. Project proposal for a construcƟon company. Two floors
divided by an RecepƟon, an Working area and Manager’s office at the ground floor;
MeeƟng room on the first floor.
Prominent product list: Armchairs, chairs, desks and cabinets by AcƟu, lights by Flos
and Tecnolumen. MeeƟng room chairs by Akaba and table by AcƟu.
PROJECTS. 3D
TXESUS ZUBIATE
PORTFOLIO
Project 3D renders.
2013. GV17, Bilbao. Project proposal for a small company. Prominent product list: Armchairs, chairs, desks and cabinets by AcƟu.
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Public tender
2011. NaƟonal Historical Basque Archive, Bilbao. Public tender for an integral
furniture equipment of the new Basque Archive.
A3 paper size sheet and in landscape format, with technical informaƟon,
photographies, descripƟon, dimensions and finishings for a swivel chair.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Proposal
2011. IDOM, Bilbao. Proposal of office furniture for a very big engineering company. A4 paper size sheet and in landscape format, but not printed just created to see it on
screens. Contains a descripƟon, photographies, and dimensions for a preƩ y good
swivel chair.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
A2 paper size sheet and in landscape format shows photographies, technical data,
dimensions and finishings for an armchair.
Project Dossier. Proposal
2013. Tecnalia, Derio. Proposal of office furniture for a big service company.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Public tender
2011. Basque Country’s University, UPV-EHU , Leioa. Public tender of furniture
equipment for two new buildings in Leioa.
A2 paper size sheet and in landscape format. Contains: technical informaƟon,
descripƟon, photographies, dimensions and finishings for a desk. Includes informaƟon
about a drawer and electrificaƟon system advantages.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Public tender
2012. Subway of DonosƟa. Public tender for benches and trash bins, both in
aluminium for the next underground project in DonosƟa previously installed in
Norman Foster’s designed tube in Bilbao.
A3 paper size sheet and in landscape format, composiƟon by photographies,
descripƟon, dimensions and finishings for aluminium bench.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
A4 paper size sheet and in landscape format, but not printed just created to see it on
screens. Contains photographies of the most important pieces of every brand we
worked with. USM. I really love this!
Project Dossier. Proposal
2012. Kutxabank, Basque Country. Very large document of 164 pages displaying all
the range of products, services and resources that the studio I was working could do
for the leading bank in Basque Country and one of the top in Spain.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Proposal
2012. Kutxabank, Basque Country.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Proposal
2012. Kutxabank, Basque Country.
PROJECTS. DOSSIER
TXESUS ZUBIATE
PORTFOLIO
Project Dossier. Proposal
2012. Kutxabank, Basque Country.
PROJECTS. DOSSIER
GRAPHIC DESIGN
TXESUS ZUBIATE
PORTFOLIO
Christmas cards. Paper version
At the begining, in 2004 first cards were designed for paper but since 2010 they were
sent only by email. Honestly, technology decreases costs but paper has a differrent
aƩ racƟon.
2008 card. Inspired by eighƟes arcade videogames.
2009 card. Inspired by Frank Lloyd Wright’s Larkin building.
2010 card. Inspired by russian construcƟvism.
ENHORABUENA!
Preparate para 2008
ZORIONAK ETA URTE BERRI ON!
ENHORABUENA!
Preparate para 2008
ZORIONAK ETA URTE BERRI ON!
FELICIDADES
ZORIONAK
URTE BERRI ON!!
FELIZ AÑO NUEVO!
ZORIONAK! FELICIDADES!
URTE BERRI POZGARRI ETA OPARO BAT OPA DIZUEGU!
OSDESEAMOSUNFELIZYPROSPEROanONUEVO!
0
0
Portal de Gamarra, 1 Edif. Deba 131
01013 Gasteiz Araba
T 945 12 48 68 F 945 12 17 70
tecnica@bz2alava.com
Uribitarte 8, 6º izda.
48001 Bilbo Bizkaia
T 94 661 31 80 F 94 423 70 09
tecnica@bz2bilbo.com
Pol. Ind. 26 Avda. Donosti, 102
20115 Astigarraga Gipuzkoa
T 943 33 50 52 F 943 33 52 60
tecnica@bz2talde.com
Christmas cards. Email version
2011 card. Based on a schemaƟcal candel.
GRAPHIC DESIGN
TXESUS ZUBIATE
PORTFOLIO
Christmas cards. Email version
2013 card. Inspired by an image found in the internet, a bit of happiness among the
dramaƟcal situaƟon in Basque Country and Spain because of the hard crisis.
GRAPHIC DESIGN
TXESUS ZUBIATE
PORTFOLIO
LAST WORKS
TXESUS ZUBIATE
PORTFOLIO
Last works. Web.
2014. www.mgaa.es. Bilbao. A small website designed for a law firm which contains
four pages in total and works like a online bussiness card.
This Web has been drawn up with: some brain, Netbeans, HTML 5, CSS3 and a bit of
JS.
LAST WORKS
TXESUS ZUBIATE
PORTFOLIO
Last works. Logo.
2014. ErmuBerri. Ermua. Now in process and very close of the ending, a logo for a
local tv channel. The final logo will be used for a website and for paper stuff too.
This Web has been drawn up with: Corel Draw.
PORTFOLIO
TXESUS ZUBIATE
DESIGNS
07845663050
tyrell_corp_501@hotmail.com

Txesus Zubiate | landscape version portfolio

  • 1.
  • 2.
    Project plans. 2008. Trapagavillage’s City Hall. OrganizaƟon and distribuƟon of different working areas, some of them separated by glass parƟƟon walls, which are displayed in front view. PROJECTS TXESUS ZUBIATE PORTFOLIO
  • 3.
    Project plans. 2011. ESTEUniversity of Deusto, DonosƟ. OrganizaƟon and distribuƟon of several classrooms and design of a special recepƟon desk. PROJECTS TXESUS ZUBIATE PORTFOLIO
  • 4.
    Project plans. 2013. Tecnalia,Derio. The client’s idea was crystal clear: 500 people in just a floor. The challenge was split between the lack of Ɵme, 8 hours and because of the fact of geƫ ng a good comunicaƟon among different departments. PROJECTS TXESUS ZUBIATE PORTFOLIO
  • 5.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2004. Cultural Center for Youngsters, Portugalete. OrganizaƟon and distribuƟon of furniture in a small reading area. Red chairs for a white context, good idea to catch customers aƩ enƟon. Prominent product list: Shelves and tables by Iduna, chairs by Kartell and side tables and semispheric armchairs by Sedus.
  • 6.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2006. LabasƟda town’s City Hall. Nice three floor building project by decoraƟon and wise furniture equipment. Prominent product list: Metal cabinets with sliding microperforated doors and tables by Iduna, armchairs by Sedus and chairs by Akaba.
  • 7.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2010. CIC, Vitoria-Gasteiz. Complex project done with a short budget but finished with good criteria and a remarkable aspect in the integraƟon of elements.
  • 8.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2010. CIC, Vitoria-Gasteiz. Complex project done with a short budget but finished with good criteria and a remarkable aspect in the integraƟon of elements.
  • 9.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2011. NaƟonal Historical Basque Archive, Bilbao. Some views of a Department manager’s desk.
  • 10.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2011. El Cocherito, BullfighƟng’s Classy Club, Bilbao. “Cocherito” was an nearly a century years old high class club in Bilbao and so long, it hardly had any changes. In 2011, the chairman of the Club decided to refresh the local’s appearance. Basically, two facts triggered this effect: painƟng walls and roof in white colour, and some furniture replacements and adjustments did almost the rest.
  • 11.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2011. El Cocherito, BullfighƟng’s Classy Club, Bilbao. “Cocherito” was an nearly a century years old high class club in Bilbao and so long, it hardly had any changes. In 2011, the chairman of the Club decided to refresh the local’s appearance. Basically, two facts triggered this effect: painƟng walls and roof in white colour, and some furniture replacements and adjustments did almost the rest.
  • 12.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2011. New Police Department Headquarters’s Lockers, Bilbao.
  • 13.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2012. Eskolondo, Ea small village’s Library. OrganizaƟon and distribuƟon of furniture in basement floor for a bar. Prominent product list: Chairs and tables by Ondarreta.
  • 14.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2012. Eskolondo, Ea small village’s Library. OrganizaƟon and distribuƟon of furniture in first floor’s library. Computer’s area. Prominent product list: Chairs, desks and shelves by AcƟu.
  • 15.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2012. Private Dwelling, Bilbao. TesƟng some furniture pieces to set up lounge's character Prominent product list: Eames Lounge Chair and oƩ oman by Hermann Miller, armchairs by Cassina, side tables and low table by Mobles 114, service unit by USM and sofa by Sancal.
  • 16.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2012. Private Dwelling, Bilbao. TesƟng some furniture pieces to set up the dining area. Prominent product list: Cabinet by USM, table by Akaba and chairs by Carl Hansen.
  • 17.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2013. Conorte, Bilbao. Project proposal for a construcƟon company. Two floors divided by an RecepƟon, an Working area and Manager’s office at the ground floor; MeeƟng room on the first floor. Prominent product list: Armchairs, desks and cabinets by AcƟu.
  • 18.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2013. Conorte, Bilbao. Project proposal for a construcƟon company. Two floors divided by an RecepƟon, an Working area and Manager’s office at the ground floor; MeeƟng room on the first floor. Prominent product list: Armchairs, chairs, desks and cabinets by AcƟu, lights by Flos and Tecnolumen. MeeƟng room chairs by Akaba and table by AcƟu.
  • 19.
    PROJECTS. 3D TXESUS ZUBIATE PORTFOLIO Project3D renders. 2013. GV17, Bilbao. Project proposal for a small company. Prominent product list: Armchairs, chairs, desks and cabinets by AcƟu.
  • 20.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Public tender 2011. NaƟonal Historical Basque Archive, Bilbao. Public tender for an integral furniture equipment of the new Basque Archive. A3 paper size sheet and in landscape format, with technical informaƟon, photographies, descripƟon, dimensions and finishings for a swivel chair. PROJECTS. DOSSIER
  • 21.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Proposal 2011. IDOM, Bilbao. Proposal of office furniture for a very big engineering company. A4 paper size sheet and in landscape format, but not printed just created to see it on screens. Contains a descripƟon, photographies, and dimensions for a preƩ y good swivel chair. PROJECTS. DOSSIER
  • 22.
    TXESUS ZUBIATE PORTFOLIO A2 papersize sheet and in landscape format shows photographies, technical data, dimensions and finishings for an armchair. Project Dossier. Proposal 2013. Tecnalia, Derio. Proposal of office furniture for a big service company. PROJECTS. DOSSIER
  • 23.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Public tender 2011. Basque Country’s University, UPV-EHU , Leioa. Public tender of furniture equipment for two new buildings in Leioa. A2 paper size sheet and in landscape format. Contains: technical informaƟon, descripƟon, photographies, dimensions and finishings for a desk. Includes informaƟon about a drawer and electrificaƟon system advantages. PROJECTS. DOSSIER
  • 24.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Public tender 2012. Subway of DonosƟa. Public tender for benches and trash bins, both in aluminium for the next underground project in DonosƟa previously installed in Norman Foster’s designed tube in Bilbao. A3 paper size sheet and in landscape format, composiƟon by photographies, descripƟon, dimensions and finishings for aluminium bench. PROJECTS. DOSSIER
  • 25.
    TXESUS ZUBIATE PORTFOLIO A4 papersize sheet and in landscape format, but not printed just created to see it on screens. Contains photographies of the most important pieces of every brand we worked with. USM. I really love this! Project Dossier. Proposal 2012. Kutxabank, Basque Country. Very large document of 164 pages displaying all the range of products, services and resources that the studio I was working could do for the leading bank in Basque Country and one of the top in Spain. PROJECTS. DOSSIER
  • 26.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Proposal 2012. Kutxabank, Basque Country. PROJECTS. DOSSIER
  • 27.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Proposal 2012. Kutxabank, Basque Country. PROJECTS. DOSSIER
  • 28.
    TXESUS ZUBIATE PORTFOLIO Project Dossier.Proposal 2012. Kutxabank, Basque Country. PROJECTS. DOSSIER
  • 29.
    GRAPHIC DESIGN TXESUS ZUBIATE PORTFOLIO Christmascards. Paper version At the begining, in 2004 first cards were designed for paper but since 2010 they were sent only by email. Honestly, technology decreases costs but paper has a differrent aƩ racƟon. 2008 card. Inspired by eighƟes arcade videogames. 2009 card. Inspired by Frank Lloyd Wright’s Larkin building. 2010 card. Inspired by russian construcƟvism. ENHORABUENA! Preparate para 2008 ZORIONAK ETA URTE BERRI ON! ENHORABUENA! Preparate para 2008 ZORIONAK ETA URTE BERRI ON! FELICIDADES ZORIONAK URTE BERRI ON!! FELIZ AÑO NUEVO! ZORIONAK! FELICIDADES! URTE BERRI POZGARRI ETA OPARO BAT OPA DIZUEGU! OSDESEAMOSUNFELIZYPROSPEROanONUEVO! 0 0 Portal de Gamarra, 1 Edif. Deba 131 01013 Gasteiz Araba T 945 12 48 68 F 945 12 17 70 tecnica@bz2alava.com Uribitarte 8, 6º izda. 48001 Bilbo Bizkaia T 94 661 31 80 F 94 423 70 09 tecnica@bz2bilbo.com Pol. Ind. 26 Avda. Donosti, 102 20115 Astigarraga Gipuzkoa T 943 33 50 52 F 943 33 52 60 tecnica@bz2talde.com
  • 30.
    Christmas cards. Emailversion 2011 card. Based on a schemaƟcal candel. GRAPHIC DESIGN TXESUS ZUBIATE PORTFOLIO
  • 31.
    Christmas cards. Emailversion 2013 card. Inspired by an image found in the internet, a bit of happiness among the dramaƟcal situaƟon in Basque Country and Spain because of the hard crisis. GRAPHIC DESIGN TXESUS ZUBIATE PORTFOLIO
  • 32.
    LAST WORKS TXESUS ZUBIATE PORTFOLIO Lastworks. Web. 2014. www.mgaa.es. Bilbao. A small website designed for a law firm which contains four pages in total and works like a online bussiness card. This Web has been drawn up with: some brain, Netbeans, HTML 5, CSS3 and a bit of JS.
  • 33.
    LAST WORKS TXESUS ZUBIATE PORTFOLIO Lastworks. Logo. 2014. ErmuBerri. Ermua. Now in process and very close of the ending, a logo for a local tv channel. The final logo will be used for a website and for paper stuff too. This Web has been drawn up with: Corel Draw.
  • 34.