Enterprise Array
Erasure Training
Enterprise Array Erasure
 •   EMC
 •   Network Appliance
 •   Total Storage System
 •   Compellent Storage
 •   Power Vault
Tools
• 2U Unit Server Chassis fitted with appropriate
  controller cards
• Monitor, Keyboard and Mouse
• Technician Cart
• Cable Management Straps

• Failed Drive Labels
1.
                                                     Process
         Verify with POC that all units to be wiped have been disconnected from the network.
2.       Perform a physical count of total drives in unit using architecture map
3.       Power on Techway 2U unit
4.       Connect cabling to unit to be wiped
5.       Power on unit to be wiped
6.       Allow drives to load (approx. 1 sec per drive) by using terminal view
7.       Connect cabling to Techway 2U Unit from system to be wiped
8.       Open Tabernus EE Array Application
9.       Verify all drives have been detected
10.      Select all drives and add unit asset serial number
11.      Select all drives and begin erasure
12.      After completion of wiping process view log csv file and verify the physical count to the recorded count of drives wiped.
13.      Pull ALL failed drives from unit and attached failed drive sticker, log drive on Pulled Failed Drive Reporting Form and give
         to site POC
14.      Only after 100% match of the physical count to the record count has been verified, then continue to the next batch and
         repeat steps 3 -13 until complete
15.      After unit completion contact TWS Project Manager with update
16.      Fill out TWS Daily Project Summary Form
17.      Email the following to TWS Project Manager daily :
•     Signed TWS Daily Project Summary Form
•     All log files from server
•     Architecture Map
•     Pulled Failed Drive Reporting Form
•     Onsite Acknowledgment Form (After Project Completion)
Disk Failure
In case of drive failure, a sticker will be attached
to the failed drive with the following information:




       1. Identify failed drive
       2. Affix completed label to top of hard drive
       3. Give to site POC


    Expected failure rate of 1-3% on enterprise level drives
Processing Time
 There are three determining factors in project processing expectation:

 1. Type of drive ( Fiber Channel, SAS, PATA,SATA)
 2. Type of Device Cabling ( 1-3 GB)
 3. Time allotted in facility


Drive Type   Drive Size in GB   MB per Second Erase   Hours (3x erase)

   SAS             300                  85                 3.00

   FC              300                  75                 3.40

   SCSI            300                  70                 3.70

  SATA             300                  50                 5.10

IDE / PATA         300                  40                 6.40
EMC SYMMETRIX DMX-4
Connection Chaining
THANK YOU!

More Related Content

What's hot

Macropus sap installation steps for ecc6_nonides_1.1
Macropus sap installation steps for ecc6_nonides_1.1Macropus sap installation steps for ecc6_nonides_1.1
Macropus sap installation steps for ecc6_nonides_1.1
Raghunatha Reddy
 
operating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS deviceoperating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS device
scooby_doo
 
524049 Manual
524049 Manual524049 Manual
524049 Manual
cibe tavar
 
Verigio Virtual Ethernet Hub
Verigio Virtual Ethernet HubVerigio Virtual Ethernet Hub
Verigio Virtual Ethernet Hub
verigio
 
Workstation pro-12 guía
Workstation pro-12 guíaWorkstation pro-12 guía
Workstation pro-12 guía
fhsjyjtyjit
 
Install telnet Linux
Install telnet LinuxInstall telnet Linux
Install telnet Linux
VCP Muthukrishna
 
LF_OVS_17_Riley: Pushing networking to the edge
LF_OVS_17_Riley: Pushing networking to the edgeLF_OVS_17_Riley: Pushing networking to the edge
LF_OVS_17_Riley: Pushing networking to the edge
LF_OpenvSwitch
 
Foreman and Puppet Master Install process - Customer Used Case
Foreman and Puppet Master Install process - Customer Used Case Foreman and Puppet Master Install process - Customer Used Case
Foreman and Puppet Master Install process - Customer Used Case
Kanwar Batra
 

What's hot (8)

Macropus sap installation steps for ecc6_nonides_1.1
Macropus sap installation steps for ecc6_nonides_1.1Macropus sap installation steps for ecc6_nonides_1.1
Macropus sap installation steps for ecc6_nonides_1.1
 
operating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS deviceoperating and configuring cisco a cisco IOS device
operating and configuring cisco a cisco IOS device
 
524049 Manual
524049 Manual524049 Manual
524049 Manual
 
Verigio Virtual Ethernet Hub
Verigio Virtual Ethernet HubVerigio Virtual Ethernet Hub
Verigio Virtual Ethernet Hub
 
Workstation pro-12 guía
Workstation pro-12 guíaWorkstation pro-12 guía
Workstation pro-12 guía
 
Install telnet Linux
Install telnet LinuxInstall telnet Linux
Install telnet Linux
 
LF_OVS_17_Riley: Pushing networking to the edge
LF_OVS_17_Riley: Pushing networking to the edgeLF_OVS_17_Riley: Pushing networking to the edge
LF_OVS_17_Riley: Pushing networking to the edge
 
Foreman and Puppet Master Install process - Customer Used Case
Foreman and Puppet Master Install process - Customer Used Case Foreman and Puppet Master Install process - Customer Used Case
Foreman and Puppet Master Install process - Customer Used Case
 

Similar to TWS Enterprise Erase Array Training

Analyzing OS X Systems Performance with the USE Method
Analyzing OS X Systems Performance with the USE MethodAnalyzing OS X Systems Performance with the USE Method
Analyzing OS X Systems Performance with the USE Method
Brendan Gregg
 
eStation Maintenance - Session 3.pptx.pdf
eStation Maintenance - Session 3.pptx.pdfeStation Maintenance - Session 3.pptx.pdf
eStation Maintenance - Session 3.pptx.pdf
AhmedWasiu
 
Webinar: Untethering Compute from Storage
Webinar: Untethering Compute from StorageWebinar: Untethering Compute from Storage
Webinar: Untethering Compute from Storage
Avere Systems
 
Microsoft Power Point Am Ptracs Presenatation Brief Ppt
Microsoft Power Point Am Ptracs Presenatation Brief PptMicrosoft Power Point Am Ptracs Presenatation Brief Ppt
Microsoft Power Point Am Ptracs Presenatation Brief Ppt
us056444
 
VMS Troubleshooting Guide
VMS Troubleshooting GuideVMS Troubleshooting Guide
VMS Troubleshooting Guide
Michael Dotson
 
Tos tutorial
Tos tutorialTos tutorial
Tos tutorial
manikainth
 
IBM Power Systems E850C and S824
IBM Power Systems E850C and S824IBM Power Systems E850C and S824
IBM Power Systems E850C and S824
David Spurway
 
6 profiling tools
6 profiling tools6 profiling tools
6 profiling tools
videos
 
Autosar Basics hand book_v1
Autosar Basics  hand book_v1Autosar Basics  hand book_v1
Autosar Basics hand book_v1
Keroles karam khalil
 
EC8791-U5-PPT.pptx
EC8791-U5-PPT.pptxEC8791-U5-PPT.pptx
EC8791-U5-PPT.pptx
Pavithra525349
 
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERSROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
Deepak Shankar
 
It Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
It Essentials (Version 7.0) A+ Cert Practice Exam 1 AnswersIt Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
It Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
ITExamAnswers.net
 
39245147 intro-es-i
39245147 intro-es-i39245147 intro-es-i
39245147 intro-es-i
Embeddedbvp
 
Ec8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systemsEc8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systems
RajalakshmiSermadurai
 
Vizuri Exadata East Coast Users Conference
Vizuri Exadata East Coast Users ConferenceVizuri Exadata East Coast Users Conference
Vizuri Exadata East Coast Users Conference
Isaac Christoffersen
 
booting-booster-final-20160420-0700
booting-booster-final-20160420-0700booting-booster-final-20160420-0700
booting-booster-final-20160420-0700
Samsung Electronics
 
my_resume(eng)
my_resume(eng)my_resume(eng)
my_resume(eng)
Menard Robert
 
BRKRST-3068 Troubleshooting Catalyst 2K and 3K.pdf
BRKRST-3068  Troubleshooting Catalyst 2K and 3K.pdfBRKRST-3068  Troubleshooting Catalyst 2K and 3K.pdf
BRKRST-3068 Troubleshooting Catalyst 2K and 3K.pdf
ssusercbaa33
 
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_ArchitectureARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
Raahul Raghavan
 
OOW 2013: Where did my CPU go
OOW 2013: Where did my CPU goOOW 2013: Where did my CPU go
OOW 2013: Where did my CPU go
Kristofferson A
 

Similar to TWS Enterprise Erase Array Training (20)

Analyzing OS X Systems Performance with the USE Method
Analyzing OS X Systems Performance with the USE MethodAnalyzing OS X Systems Performance with the USE Method
Analyzing OS X Systems Performance with the USE Method
 
eStation Maintenance - Session 3.pptx.pdf
eStation Maintenance - Session 3.pptx.pdfeStation Maintenance - Session 3.pptx.pdf
eStation Maintenance - Session 3.pptx.pdf
 
Webinar: Untethering Compute from Storage
Webinar: Untethering Compute from StorageWebinar: Untethering Compute from Storage
Webinar: Untethering Compute from Storage
 
Microsoft Power Point Am Ptracs Presenatation Brief Ppt
Microsoft Power Point Am Ptracs Presenatation Brief PptMicrosoft Power Point Am Ptracs Presenatation Brief Ppt
Microsoft Power Point Am Ptracs Presenatation Brief Ppt
 
VMS Troubleshooting Guide
VMS Troubleshooting GuideVMS Troubleshooting Guide
VMS Troubleshooting Guide
 
Tos tutorial
Tos tutorialTos tutorial
Tos tutorial
 
IBM Power Systems E850C and S824
IBM Power Systems E850C and S824IBM Power Systems E850C and S824
IBM Power Systems E850C and S824
 
6 profiling tools
6 profiling tools6 profiling tools
6 profiling tools
 
Autosar Basics hand book_v1
Autosar Basics  hand book_v1Autosar Basics  hand book_v1
Autosar Basics hand book_v1
 
EC8791-U5-PPT.pptx
EC8791-U5-PPT.pptxEC8791-U5-PPT.pptx
EC8791-U5-PPT.pptx
 
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERSROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
 
It Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
It Essentials (Version 7.0) A+ Cert Practice Exam 1 AnswersIt Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
It Essentials (Version 7.0) A+ Cert Practice Exam 1 Answers
 
39245147 intro-es-i
39245147 intro-es-i39245147 intro-es-i
39245147 intro-es-i
 
Ec8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systemsEc8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systems
 
Vizuri Exadata East Coast Users Conference
Vizuri Exadata East Coast Users ConferenceVizuri Exadata East Coast Users Conference
Vizuri Exadata East Coast Users Conference
 
booting-booster-final-20160420-0700
booting-booster-final-20160420-0700booting-booster-final-20160420-0700
booting-booster-final-20160420-0700
 
my_resume(eng)
my_resume(eng)my_resume(eng)
my_resume(eng)
 
BRKRST-3068 Troubleshooting Catalyst 2K and 3K.pdf
BRKRST-3068  Troubleshooting Catalyst 2K and 3K.pdfBRKRST-3068  Troubleshooting Catalyst 2K and 3K.pdf
BRKRST-3068 Troubleshooting Catalyst 2K and 3K.pdf
 
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_ArchitectureARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
ARM® Cortex™ M Bootup_CMSIS_Part_3_3_Debug_Architecture
 
OOW 2013: Where did my CPU go
OOW 2013: Where did my CPU goOOW 2013: Where did my CPU go
OOW 2013: Where did my CPU go
 

TWS Enterprise Erase Array Training

  • 2. Enterprise Array Erasure • EMC • Network Appliance • Total Storage System • Compellent Storage • Power Vault
  • 3. Tools • 2U Unit Server Chassis fitted with appropriate controller cards • Monitor, Keyboard and Mouse • Technician Cart • Cable Management Straps • Failed Drive Labels
  • 4. 1. Process Verify with POC that all units to be wiped have been disconnected from the network. 2. Perform a physical count of total drives in unit using architecture map 3. Power on Techway 2U unit 4. Connect cabling to unit to be wiped 5. Power on unit to be wiped 6. Allow drives to load (approx. 1 sec per drive) by using terminal view 7. Connect cabling to Techway 2U Unit from system to be wiped 8. Open Tabernus EE Array Application 9. Verify all drives have been detected 10. Select all drives and add unit asset serial number 11. Select all drives and begin erasure 12. After completion of wiping process view log csv file and verify the physical count to the recorded count of drives wiped. 13. Pull ALL failed drives from unit and attached failed drive sticker, log drive on Pulled Failed Drive Reporting Form and give to site POC 14. Only after 100% match of the physical count to the record count has been verified, then continue to the next batch and repeat steps 3 -13 until complete 15. After unit completion contact TWS Project Manager with update 16. Fill out TWS Daily Project Summary Form 17. Email the following to TWS Project Manager daily : • Signed TWS Daily Project Summary Form • All log files from server • Architecture Map • Pulled Failed Drive Reporting Form • Onsite Acknowledgment Form (After Project Completion)
  • 5. Disk Failure In case of drive failure, a sticker will be attached to the failed drive with the following information: 1. Identify failed drive 2. Affix completed label to top of hard drive 3. Give to site POC Expected failure rate of 1-3% on enterprise level drives
  • 6. Processing Time There are three determining factors in project processing expectation: 1. Type of drive ( Fiber Channel, SAS, PATA,SATA) 2. Type of Device Cabling ( 1-3 GB) 3. Time allotted in facility Drive Type Drive Size in GB MB per Second Erase Hours (3x erase) SAS 300 85 3.00 FC 300 75 3.40 SCSI 300 70 3.70 SATA 300 50 5.10 IDE / PATA 300 40 6.40