This document discusses the layout plan for a bottle production plant. It includes sketches of the layout with areas for raw material storage, production, finished goods storage, offices, prayer room, cafeteria, restrooms and more. Tables provide details on the space requirements calculated for each area and employee type. Process flow and material handling layouts are also included, as well as dimensions for the machine layout and building. The total area required for the building and land is calculated to be 49,632 square meters.