Trends in Programming 
Languages 
Anton Moldovan 
@AntyaDev
• Horse-power of many-core… 
• …but how to program those? Concurrent 
• Schematized, static, dynamic… 
• …so, what’s the sweet spot? Dynamic 
• New level of expressiveness… 
• …how about the essence? Functional
Dynamic 
Languages 
Simple and succinct 
Implicitly typed 
Meta-programming 
No compilation 
Static 
Languages 
Robust 
Performant 
Intelligent tools 
Better scaling
• non-schematized data 
• 
• 
• 
• Metaprogramming 
• 
•
Theory of Computation 
(Lambda Calculus, Alonzo Church) 
LISP Heritage 
Reality of Hardware 
Fortran Heritage (Memory, John Von Neumann) 
ML 
SmallTalk 
C 
Java 
C++ 
C# 
Scheme 
Haskell
var res = xs.Where(C# x => x % 2 == 0); 
Visual Basic Dim res = xs.Where(Function(x) x Mod 2 = 0) 
F# let res = xs |> Seq.filter (fun x -> x % 2 = 0); 
var res = xs.filter(function(x) { 
return x % 2 == 0; 
}); 
JavaScript 
auto res = find_if(xs.begin(), xs.end(), [] (int i) { 
return x % 2 == 0; 
}); 
C++11
First class functions 
FP 
Immutable 
data 
Referential 
transparency 
Algebraic data types 
Type 
inference 
Pattern 
matching 
Essence 
Niceties
Visual 
Studio 
.NET 
Functional 
F#
Type Inference
“Local” Inference 
• Confine your focus to a single 
declaration 
• Compute the type directly 
• Move on to the next one… 
• Can't infer parameter types…
Pros 
• Mostly intuitive behavior 
• Very simple to implement 
• (the compiler does this work anyway)
“Global” Inference 
• Look at the literals 
• Look at the functions and other values 
something interacts with 
• Look at any explicit type constraints 
• If there are no constraints anywhere, 
automatically generalize to generic types
function printLabel(labelledObj: {label: string}) { 
console.log(labelledObj.label); 
} 
var myObj = {size: 10, label: "Size 10 Object"}; 
printLabel(myObj);
//start an instance of the firefox browser 
start firefox 
//go to url 
url "http://lefthandedgoat.github.io/canopy/testpages/" 
//assert that the element with an id of 'welcome' has 
//the text 'Welcome‘ 
"#welcome" == "Welcome"
project "F# DSL Article" starts "01/01/2009" 
resource "Dmitri" isa "Writer" with_rate 140 
resource "Computer" isa "Dumb Machine" with_rate 0 
group "DSL Popularization" done_by "Dmitri" 
task "Create basic estimation DSL" takes 1 day 
task "Write article" takes 1 day 
task "Post article and wait for comments" takes 1 week 
group "Infrastructure Support" done_by "Computer" 
task "Provide VS2010 and MS Project" takes 1 day 
task "Download and deploy TypograFix" takes 1 day 
task "Sit idly while owner waits for comments" takes 1 week 
prepare my_project
Trends in programming languages

Trends in programming languages

  • 1.
    Trends in Programming Languages Anton Moldovan @AntyaDev
  • 4.
    • Horse-power ofmany-core… • …but how to program those? Concurrent • Schematized, static, dynamic… • …so, what’s the sweet spot? Dynamic • New level of expressiveness… • …how about the essence? Functional
  • 6.
    Dynamic Languages Simpleand succinct Implicitly typed Meta-programming No compilation Static Languages Robust Performant Intelligent tools Better scaling
  • 7.
    • non-schematized data • • • • Metaprogramming • •
  • 9.
    Theory of Computation (Lambda Calculus, Alonzo Church) LISP Heritage Reality of Hardware Fortran Heritage (Memory, John Von Neumann) ML SmallTalk C Java C++ C# Scheme Haskell
  • 10.
    var res =xs.Where(C# x => x % 2 == 0); Visual Basic Dim res = xs.Where(Function(x) x Mod 2 = 0) F# let res = xs |> Seq.filter (fun x -> x % 2 = 0); var res = xs.filter(function(x) { return x % 2 == 0; }); JavaScript auto res = find_if(xs.begin(), xs.end(), [] (int i) { return x % 2 == 0; }); C++11
  • 11.
    First class functions FP Immutable data Referential transparency Algebraic data types Type inference Pattern matching Essence Niceties
  • 12.
    Visual Studio .NET Functional F#
  • 13.
  • 14.
    “Local” Inference •Confine your focus to a single declaration • Compute the type directly • Move on to the next one… • Can't infer parameter types…
  • 22.
    Pros • Mostlyintuitive behavior • Very simple to implement • (the compiler does this work anyway)
  • 31.
    “Global” Inference •Look at the literals • Look at the functions and other values something interacts with • Look at any explicit type constraints • If there are no constraints anywhere, automatically generalize to generic types
  • 43.
    function printLabel(labelledObj: {label:string}) { console.log(labelledObj.label); } var myObj = {size: 10, label: "Size 10 Object"}; printLabel(myObj);
  • 46.
    //start an instanceof the firefox browser start firefox //go to url url "http://lefthandedgoat.github.io/canopy/testpages/" //assert that the element with an id of 'welcome' has //the text 'Welcome‘ "#welcome" == "Welcome"
  • 47.
    project "F# DSLArticle" starts "01/01/2009" resource "Dmitri" isa "Writer" with_rate 140 resource "Computer" isa "Dumb Machine" with_rate 0 group "DSL Popularization" done_by "Dmitri" task "Create basic estimation DSL" takes 1 day task "Write article" takes 1 day task "Post article and wait for comments" takes 1 week group "Infrastructure Support" done_by "Computer" task "Provide VS2010 and MS Project" takes 1 day task "Download and deploy TypograFix" takes 1 day task "Sit idly while owner waits for comments" takes 1 week prepare my_project