DHAKA CITY [MASTER PLAN]
 The first formal plan for Dhaka was made in 1917 by Professor Patrick Geddes.
 The Master Plan for Dhaka 1960 Master Plan report was comprehensive and
sensible.
 Plan and the population projections could not cover growth after 1971.
 At the predicted growth rate the plan was for an increase of 0.4 million in
population in 20 years time. In reality the increase in Dhaka's population 20 years
later was more than 3.0
DHAKA CITY [MASTER PLAN]
 Master plan of 1997 is still not executed, the process is too slow.
 By 2005 RAJUK [Rajdhani Unnayan Kartripakkha] should have completed all the
detailed area plans and started their implementation at the local level.
 Till now people are not sill aware of the DAP and its contents.
 One of the major components of the Master Plan "Institutional Strengthening of
RAJUK," has not been considered by RAJUK.
LONG TERM PLANS FOR DHAKA
 Dhaka Integrated Traffic Study (DITS)- 1994
 Strategic Transport Plan (STP)- 2004
 Dhaka Urban Transport Study (DHUTS)-2010
 The first report on town planning came in 1917
 Three Master Plans
 Town Improvement Act (TIA)-1953
 Dhaka Metropolitan Development Authority Ordinance-
1974
 Dhaka City Corporation Act-1983
 Town Improvement Act (TIA),1953 Modified in 1997
LONG TERM PLANS FOR DHAKA
 Creation of Dhaka Improvement Trust (DIT)-1956
 Preparation of Task Force Report on urbanization- 1991
 National Housing Policy -1993
 National Habitat Report with detail action plans of rural and urban development
-1996
 The Dhaka land Management Project (1993),
 Housing Sector Strengthening Project (1993)
 The Urban Poverty Reduction Project (1996)
LIMITATIONS OF LONG TERM PLANS
 Lacks proper goals and objectives.
 Discontinuity of Plans.
 Data issues.
 No co-ordination.
 Implementation issues:
– Long review process.
– Poor implementation and enforcement.
– Inherent weaknesses in plans often make them.
 No consistency with the master Plans.
TRANSPORTATION SYSTEM IN DHAKA CITY
 Cycle rickshaws and auto rickshaws are the main mode of transport, with close to
400,000 rickshaws running each day (Highest for any city), City Govt. approved
rickshaws – about 85000 only.
 Scooters, motor cycles, taxis and privately owned automobiles are increasingly
becoming popular with the city's growing middle class.
 The replacement of two-stroke engine taxis with "Green taxis" locally called CNG,
which run on compressed natural gas.
 Local bus, leguna etc. are popular in Dhaka, however many roads have got
restrictions on non-motorized vehicles in order to manage congestion.
PROBLEMS
 Road Networks are not organized.
 Mixed Mode Traffic.
 Absence of perfect road signs and markings, law enforcements.
 Small width of shoulder.
 Traffic Jam.
 Drainage.
 Lack of proper sight distance.
 Sudden road constructions/ recovery constructions/ repairing.
UNORGANIZED ROAD NETWORK OF DHAKA
PROBLEMS:
 Travel time delays
 Fuel consumption
 Tire consumption
 Engine oil consumption
 Environmental concerns
 Mitigating Nature Reserves
 Vehicle emissions
 Noise pollution
MIXED MODE TRAFFIC CONDITION OF DHAKA
Delivery Pickup
Bus
 Congestions. Micro-Bus
 Accidents. Non-motorized van
 Capacity reduction Ambulance
Rickshaw
Private Car
Pedestrian
Motorcycle
CNG
LACK OF LAW ENFORCEMENTS
Traffic Police:
Bribe!!!
IMPROPER SIGHT DISTANCE
TRAFFIC JAM
CAUSES:
 Traffic rule violation.
 Lack of Planning of city road.
 Low road space.
 Unplanned stoppage/parking.
 Different speed vehicle.
 Over population.
 Vehicle restrictions lacking.
 Insufficient road.
 Lack of law implementation,
 Lack or driving training/ sense.
 Political.
TRAFFIC JAM
DRAINAGE QUALITY
CAUSES:
 Dumping wastes.
 Valueless slope design.
Obstacle in water flow
EFFECTS:
 Water clogging.
Water Clogging due to poor drainage
ROAD REPAIRING AND CONSTRUCTION
 Sudden repairing and construction works affect the normal road and traffic situation.
# Repairing works # Flyover Construction # Mogbazar-Mouchak
flyover const.
POLITICAL VIOLENCE
 Uncertain political obstacles affects the traffic volume.
 VIP pass also causes traffic congestions.
PARKING
 Unnecessary parking on the side of the road.
 Uses a huge space from the limited width of the road, causes jam and problems to
the pedestrians.
#More than 60% of the road width used for parking and pedestrian movement
FOOTPATH BLOCKING
 Footpaths in Dhaka are mostly blocked by street hawkers and bus ticket counters.
 Pedestrians use the main road and congestions and accidents occur.
#Bus ticket counter #Footpath market
SOLUTIONS
The main solution of these problems is to find out the proper problems and sort out
the solutions to the individual problems.
 Trustworthy law enforcing.
 Driving qualifications must be fulfilled.
 Clarify the road signs and markings and must be made sure that those are
followed properly.
 Proper use of over bridges.
 Well planning needed and Implementation of proper plans.
 Proper knowledge must be provided among all types of road users about
transportations.
SOLUTIONS
 Parking facilities must be improved.
 Design for link roads.
 Vehicle restrictions, turn restrictions, pedestrian movement restrictions must be
provided and followed properly.
 Stop corruption.
 Construct over bridges, metro rails, increase the uses of double decker bus and
provide alternative bus per route.
 Hawker less area and CC camera coverage area must be ensured.
 Government and private sectors should act simultaneously.
THEEND

More Related Content

What's hot

Traffic Congestion PowerPoint Presentation with Images
Traffic Congestion PowerPoint Presentation with ImagesTraffic Congestion PowerPoint Presentation with Images
Traffic Congestion PowerPoint Presentation with Images
Road Safety
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeer
Admeff Construction
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic Congestion
Zaid Kayani
 
Traffic congestion and Bottlenecks - Issues and Dimensions
Traffic congestion and Bottlenecks - Issues and DimensionsTraffic congestion and Bottlenecks - Issues and Dimensions
Traffic congestion and Bottlenecks - Issues and Dimensions
Emaan Sharma
 
Traffic Congestion PowerPoint Presentation
Traffic Congestion PowerPoint PresentationTraffic Congestion PowerPoint Presentation
Traffic Congestion PowerPoint Presentation
Road Safety
 
Traffic jam in dhaka city and its Solution
Traffic jam in dhaka city and its SolutionTraffic jam in dhaka city and its Solution
Traffic jam in dhaka city and its Solution
Abdullah Al Mamun
 
Traffic Jam in Dhaka
Traffic Jam in DhakaTraffic Jam in Dhaka
Traffic Jam in Dhaka
MarufMunna1
 
Traffic Jam in Dhaka City
Traffic Jam in Dhaka CityTraffic Jam in Dhaka City
Traffic Jam in Dhaka City
Badruzzman Jhon
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
Dhwani Shah
 
Traffic and Transportation problems
Traffic and Transportation problemsTraffic and Transportation problems
Traffic and Transportation problems
Dhwani Shah
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
Md Faizan Danish
 
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
Hossam Shafiq I
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )
Ahmad Ali Miftah
 
Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"
Asian Paint Bangladesh Ltd
 
Traffic jam in dhaka
Traffic jam in dhakaTraffic jam in dhaka
Traffic jam in dhaka
Harun Md. Shahed Bin Naim
 
Bangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTCBangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTC
Tushar Mojumdar
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
ayishairshad
 
Planning for sustainable urban trasport
Planning for sustainable urban trasportPlanning for sustainable urban trasport
Planning for sustainable urban trasport
JIT KUMAR GUPTA
 
Traffic congestion
Traffic congestionTraffic congestion
Traffic congestionmona_kh
 

What's hot (20)

Traffic Congestion PowerPoint Presentation with Images
Traffic Congestion PowerPoint Presentation with ImagesTraffic Congestion PowerPoint Presentation with Images
Traffic Congestion PowerPoint Presentation with Images
 
origin and destination survey research papeer
origin and destination survey research papeerorigin and destination survey research papeer
origin and destination survey research papeer
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic Congestion
 
Traffic congestion and Bottlenecks - Issues and Dimensions
Traffic congestion and Bottlenecks - Issues and DimensionsTraffic congestion and Bottlenecks - Issues and Dimensions
Traffic congestion and Bottlenecks - Issues and Dimensions
 
Traffic Congestion PowerPoint Presentation
Traffic Congestion PowerPoint PresentationTraffic Congestion PowerPoint Presentation
Traffic Congestion PowerPoint Presentation
 
Traffic jam in dhaka city and its Solution
Traffic jam in dhaka city and its SolutionTraffic jam in dhaka city and its Solution
Traffic jam in dhaka city and its Solution
 
Traffic Jam in Dhaka
Traffic Jam in DhakaTraffic Jam in Dhaka
Traffic Jam in Dhaka
 
Traffic Jam in Dhaka City
Traffic Jam in Dhaka CityTraffic Jam in Dhaka City
Traffic Jam in Dhaka City
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Traffic and Transportation problems
Traffic and Transportation problemsTraffic and Transportation problems
Traffic and Transportation problems
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
 
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
2-Transportaion Survey ( Transportation and Traffic Engineering Dr. Sheriff E...
 
Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )Transportation modeling and planning ( The Four-Step Model )
Transportation modeling and planning ( The Four-Step Model )
 
URBAN TRANSPORTATION
URBAN TRANSPORTATIONURBAN TRANSPORTATION
URBAN TRANSPORTATION
 
Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"Researchon Monograph: "Traffic Jam in Dhaka City"
Researchon Monograph: "Traffic Jam in Dhaka City"
 
Traffic jam in dhaka
Traffic jam in dhakaTraffic jam in dhaka
Traffic jam in dhaka
 
Bangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTCBangladesh Road Transport corporation-BRTC
Bangladesh Road Transport corporation-BRTC
 
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
IDENTIFICATION OF THE RELATIONSHIP BETWEEN BLACK SPOT ROAD ACCIDENTS AND GEOM...
 
Planning for sustainable urban trasport
Planning for sustainable urban trasportPlanning for sustainable urban trasport
Planning for sustainable urban trasport
 
Traffic congestion
Traffic congestionTraffic congestion
Traffic congestion
 

Similar to Transportation complications in dhaka

Chapter 2
Chapter 2Chapter 2
Chapter 2
md rabiul
 
Traffic jam ppp
Traffic jam pppTraffic jam ppp
Traffic jam ppp
abdulla all rakib
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
Vikas Sukhwal
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
GLA University
 
transportation problem
 transportation problem transportation problem
transportation problem
Mohammad Jasim uddin
 
PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
Shivam Srivastava
 
Sustainable Mobility in the City of Bratislava
Sustainable Mobility in the City of BratislavaSustainable Mobility in the City of Bratislava
Sustainable Mobility in the City of BratislavaUNDP Eurasia
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
IRJET Journal
 
Hyderabad Infrastructure – Roads And Bridges
Hyderabad Infrastructure – Roads And BridgesHyderabad Infrastructure – Roads And Bridges
Hyderabad Infrastructure – Roads And Bridges
B. K. Vijay
 
Travel management system in html 1
Travel management system in html 1Travel management system in html 1
Travel management system in html 1
Ashik Khan
 
Retrofitting Plan To Promote NMT For IUT Final_KK Joaddder
Retrofitting Plan To Promote NMT For IUT Final_KK JoaddderRetrofitting Plan To Promote NMT For IUT Final_KK Joaddder
Retrofitting Plan To Promote NMT For IUT Final_KK Joaddder
IPPAI
 
NYC 2
NYC 2NYC 2
NYC 2
ce4710
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Justin Lyons
 
Project report smart city
Project report smart cityProject report smart city
Project report smart city
Vishwajeet Singh
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
Awinash Tiwari
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Avinash Shabade
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility plan
shubham sharma
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_ud
Uttipec Dda
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
Shruthi Kshirasagar
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - ReducedBenya Manajitt
 

Similar to Transportation complications in dhaka (20)

Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Traffic jam ppp
Traffic jam pppTraffic jam ppp
Traffic jam ppp
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
transportation problem
 transportation problem transportation problem
transportation problem
 
PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 
Sustainable Mobility in the City of Bratislava
Sustainable Mobility in the City of BratislavaSustainable Mobility in the City of Bratislava
Sustainable Mobility in the City of Bratislava
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
 
Hyderabad Infrastructure – Roads And Bridges
Hyderabad Infrastructure – Roads And BridgesHyderabad Infrastructure – Roads And Bridges
Hyderabad Infrastructure – Roads And Bridges
 
Travel management system in html 1
Travel management system in html 1Travel management system in html 1
Travel management system in html 1
 
Retrofitting Plan To Promote NMT For IUT Final_KK Joaddder
Retrofitting Plan To Promote NMT For IUT Final_KK JoaddderRetrofitting Plan To Promote NMT For IUT Final_KK Joaddder
Retrofitting Plan To Promote NMT For IUT Final_KK Joaddder
 
NYC 2
NYC 2NYC 2
NYC 2
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
 
Project report smart city
Project report smart cityProject report smart city
Project report smart city
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility plan
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_ud
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - Reduced
 

Recently uploaded

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 

Recently uploaded (20)

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 

Transportation complications in dhaka

  • 3. DHAKA CITY [MASTER PLAN]  The first formal plan for Dhaka was made in 1917 by Professor Patrick Geddes.  The Master Plan for Dhaka 1960 Master Plan report was comprehensive and sensible.  Plan and the population projections could not cover growth after 1971.  At the predicted growth rate the plan was for an increase of 0.4 million in population in 20 years time. In reality the increase in Dhaka's population 20 years later was more than 3.0
  • 4. DHAKA CITY [MASTER PLAN]  Master plan of 1997 is still not executed, the process is too slow.  By 2005 RAJUK [Rajdhani Unnayan Kartripakkha] should have completed all the detailed area plans and started their implementation at the local level.  Till now people are not sill aware of the DAP and its contents.  One of the major components of the Master Plan "Institutional Strengthening of RAJUK," has not been considered by RAJUK.
  • 5. LONG TERM PLANS FOR DHAKA  Dhaka Integrated Traffic Study (DITS)- 1994  Strategic Transport Plan (STP)- 2004  Dhaka Urban Transport Study (DHUTS)-2010  The first report on town planning came in 1917  Three Master Plans  Town Improvement Act (TIA)-1953  Dhaka Metropolitan Development Authority Ordinance- 1974  Dhaka City Corporation Act-1983  Town Improvement Act (TIA),1953 Modified in 1997
  • 6. LONG TERM PLANS FOR DHAKA  Creation of Dhaka Improvement Trust (DIT)-1956  Preparation of Task Force Report on urbanization- 1991  National Housing Policy -1993  National Habitat Report with detail action plans of rural and urban development -1996  The Dhaka land Management Project (1993),  Housing Sector Strengthening Project (1993)  The Urban Poverty Reduction Project (1996)
  • 7. LIMITATIONS OF LONG TERM PLANS  Lacks proper goals and objectives.  Discontinuity of Plans.  Data issues.  No co-ordination.  Implementation issues: – Long review process. – Poor implementation and enforcement. – Inherent weaknesses in plans often make them.  No consistency with the master Plans.
  • 8. TRANSPORTATION SYSTEM IN DHAKA CITY  Cycle rickshaws and auto rickshaws are the main mode of transport, with close to 400,000 rickshaws running each day (Highest for any city), City Govt. approved rickshaws – about 85000 only.  Scooters, motor cycles, taxis and privately owned automobiles are increasingly becoming popular with the city's growing middle class.  The replacement of two-stroke engine taxis with "Green taxis" locally called CNG, which run on compressed natural gas.  Local bus, leguna etc. are popular in Dhaka, however many roads have got restrictions on non-motorized vehicles in order to manage congestion.
  • 9. PROBLEMS  Road Networks are not organized.  Mixed Mode Traffic.  Absence of perfect road signs and markings, law enforcements.  Small width of shoulder.  Traffic Jam.  Drainage.  Lack of proper sight distance.  Sudden road constructions/ recovery constructions/ repairing.
  • 10. UNORGANIZED ROAD NETWORK OF DHAKA PROBLEMS:  Travel time delays  Fuel consumption  Tire consumption  Engine oil consumption  Environmental concerns  Mitigating Nature Reserves  Vehicle emissions  Noise pollution
  • 11. MIXED MODE TRAFFIC CONDITION OF DHAKA Delivery Pickup Bus  Congestions. Micro-Bus  Accidents. Non-motorized van  Capacity reduction Ambulance Rickshaw Private Car Pedestrian Motorcycle CNG
  • 12. LACK OF LAW ENFORCEMENTS Traffic Police: Bribe!!!
  • 14. TRAFFIC JAM CAUSES:  Traffic rule violation.  Lack of Planning of city road.  Low road space.  Unplanned stoppage/parking.  Different speed vehicle.  Over population.  Vehicle restrictions lacking.  Insufficient road.  Lack of law implementation,  Lack or driving training/ sense.  Political.
  • 16. DRAINAGE QUALITY CAUSES:  Dumping wastes.  Valueless slope design. Obstacle in water flow EFFECTS:  Water clogging. Water Clogging due to poor drainage
  • 17. ROAD REPAIRING AND CONSTRUCTION  Sudden repairing and construction works affect the normal road and traffic situation. # Repairing works # Flyover Construction # Mogbazar-Mouchak flyover const.
  • 18. POLITICAL VIOLENCE  Uncertain political obstacles affects the traffic volume.  VIP pass also causes traffic congestions.
  • 19. PARKING  Unnecessary parking on the side of the road.  Uses a huge space from the limited width of the road, causes jam and problems to the pedestrians. #More than 60% of the road width used for parking and pedestrian movement
  • 20. FOOTPATH BLOCKING  Footpaths in Dhaka are mostly blocked by street hawkers and bus ticket counters.  Pedestrians use the main road and congestions and accidents occur. #Bus ticket counter #Footpath market
  • 21. SOLUTIONS The main solution of these problems is to find out the proper problems and sort out the solutions to the individual problems.  Trustworthy law enforcing.  Driving qualifications must be fulfilled.  Clarify the road signs and markings and must be made sure that those are followed properly.  Proper use of over bridges.  Well planning needed and Implementation of proper plans.  Proper knowledge must be provided among all types of road users about transportations.
  • 22. SOLUTIONS  Parking facilities must be improved.  Design for link roads.  Vehicle restrictions, turn restrictions, pedestrian movement restrictions must be provided and followed properly.  Stop corruption.  Construct over bridges, metro rails, increase the uses of double decker bus and provide alternative bus per route.  Hawker less area and CC camera coverage area must be ensured.  Government and private sectors should act simultaneously.