In this file, you can ref interview materials for quantity surveyors such as types of interview questions, quantity surveyors situational interview, quantity surveyors behavioral interview…
Cost-value reconciliation (CVR) compares the total costs of a construction project to the total valuation to determine profitability. The CVR forms the basis for statutory accounts and provides management information to identify problems. At each month-end, the contractor's quantity surveyor reconciles costs to the gross certified value, making adjustments for items like external preliminaries, over-measurements, and contractual claims. The adjusted valuation is then reduced by subcontract liabilities, snagging costs, defects costs, and the main contractor's core costs to arrive at the profit generated from the project to date.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
This document outlines information regarding a course on tender evaluation processes. It discusses the course objectives, which are to understand the tender evaluation process and criteria. It describes the typical evaluation process, which involves 6 stages from issuing the tender to acceptance of bids. It also outlines the criteria used, which differ based on project size. The document provides details on the typical information and documents required for bid submissions and evaluates the bidder. It describes the multi-stage evaluation process used to assess bids for compliance, completeness, financial capacity, and experience.
Project cost management ,cost estimation cost control and evm for large epc projects and is essential for knowing the cost parameters for all construction engineers.
Traditional procurement method involves separating design and construction works, with the client appointing a consultant team to design the project and a main contractor to carry out construction based on the completed design. While this allows the client close control, it also means dealing with multiple parties and responsibility points. The contractor is only responsible for construction and has no input into design. Communication must go through the client, increasing delays. However, it provides competitive tendering on a fully defined design and scope.
Lecture 1 introduction to construction procurement process.Aszahari Aie
This document provides an overview of construction procurement processes at Universiti Tun Hussein Onn Malaysia. It discusses the key stages in the procurement process including:
1) Pre-construction stages such as project initiation, feasibility studies, design, and tendering.
2) Construction stages including the construction and commissioning/handover phases.
3) Important elements of a project brief which outlines the client's requirements and a feasibility study which develops preliminary designs and cost estimates to determine if a project is viable.
The procurement process aims to satisfy client needs through acquiring construction projects using various procurement methods and contract types while considering factors like costs, schedules, and quality.
Cost engineering is the application of scientific principles and techniques to problems related to project cost estimation, cost control, planning, and scheduling with the objective of achieving the lowest cost. The document discusses key aspects of cost engineering including: cost structuring into direct, indirect, fixed and variable costs; classifying estimates; ensuring estimate accuracy; and developing cost estimates using elements like materials, labor, equipment, overhead and profit. It provides examples of cost breakdown structures, summary sheets for pricing, and unit price schedules to develop total project bids.
This document provides an overview and analysis of various procurement methods for construction projects, including traditional, design-build, management contracting, and public-private partnerships. It defines procurement as acquiring something through effort and discusses the client's main concerns of finishing on time, within budget, and achieving quality. The traditional method involves separate design and construction phases. Design-build combines design and construction responsibilities. Management contracting and construction management involve subcontractors managed by a consultant or manager. Public-private partnerships allow collaboration between public and private sectors. The conclusion emphasizes the importance of professional advice to help clients choose the most appropriate option based on their specific project needs and concerns.
Cost-value reconciliation (CVR) compares the total costs of a construction project to the total valuation to determine profitability. The CVR forms the basis for statutory accounts and provides management information to identify problems. At each month-end, the contractor's quantity surveyor reconciles costs to the gross certified value, making adjustments for items like external preliminaries, over-measurements, and contractual claims. The adjusted valuation is then reduced by subcontract liabilities, snagging costs, defects costs, and the main contractor's core costs to arrive at the profit generated from the project to date.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
This document outlines information regarding a course on tender evaluation processes. It discusses the course objectives, which are to understand the tender evaluation process and criteria. It describes the typical evaluation process, which involves 6 stages from issuing the tender to acceptance of bids. It also outlines the criteria used, which differ based on project size. The document provides details on the typical information and documents required for bid submissions and evaluates the bidder. It describes the multi-stage evaluation process used to assess bids for compliance, completeness, financial capacity, and experience.
Project cost management ,cost estimation cost control and evm for large epc projects and is essential for knowing the cost parameters for all construction engineers.
Traditional procurement method involves separating design and construction works, with the client appointing a consultant team to design the project and a main contractor to carry out construction based on the completed design. While this allows the client close control, it also means dealing with multiple parties and responsibility points. The contractor is only responsible for construction and has no input into design. Communication must go through the client, increasing delays. However, it provides competitive tendering on a fully defined design and scope.
Lecture 1 introduction to construction procurement process.Aszahari Aie
This document provides an overview of construction procurement processes at Universiti Tun Hussein Onn Malaysia. It discusses the key stages in the procurement process including:
1) Pre-construction stages such as project initiation, feasibility studies, design, and tendering.
2) Construction stages including the construction and commissioning/handover phases.
3) Important elements of a project brief which outlines the client's requirements and a feasibility study which develops preliminary designs and cost estimates to determine if a project is viable.
The procurement process aims to satisfy client needs through acquiring construction projects using various procurement methods and contract types while considering factors like costs, schedules, and quality.
Cost engineering is the application of scientific principles and techniques to problems related to project cost estimation, cost control, planning, and scheduling with the objective of achieving the lowest cost. The document discusses key aspects of cost engineering including: cost structuring into direct, indirect, fixed and variable costs; classifying estimates; ensuring estimate accuracy; and developing cost estimates using elements like materials, labor, equipment, overhead and profit. It provides examples of cost breakdown structures, summary sheets for pricing, and unit price schedules to develop total project bids.
This document provides an overview and analysis of various procurement methods for construction projects, including traditional, design-build, management contracting, and public-private partnerships. It defines procurement as acquiring something through effort and discusses the client's main concerns of finishing on time, within budget, and achieving quality. The traditional method involves separate design and construction phases. Design-build combines design and construction responsibilities. Management contracting and construction management involve subcontractors managed by a consultant or manager. Public-private partnerships allow collaboration between public and private sectors. The conclusion emphasizes the importance of professional advice to help clients choose the most appropriate option based on their specific project needs and concerns.
The document discusses various types of contract structures and payment methods for construction projects. It describes conventional/traditional contracts, turnkey contracts, design-build contracts, construction management contracts, and guaranteed maximum price contracts. It also covers lump sum, measurement, and cost reimbursement pricing approaches. Factors that influence contract selection include project complexity, schedule, client experience, regulations, risk allocation, and the nature of the project. The document emphasizes that properly structuring the contract and payment terms is important to allocate risk appropriately between the client and contractor.
This document discusses various types of construction contracts. It describes direct employment, where the owner hires an organization to be responsible for construction. It also discusses fixed-price contracts like lump sums and unit prices, where the contractor agrees to a fixed total price or unit rates. Cost-plus contracts shift risks to the owner by paying the contractor's actual costs plus a percentage fee, without incentives for the contractor to control costs. Other contract types like target estimates and guaranteed maximum costs aim to balance risks between the owner and contractor.
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
This document is a tender submission for the construction of a 3-storey semi-detached house. It includes an introduction with the project details, plans showing the layout and elevations of the building, instructions for tendering, forms of contract, bills of quantities, appendices with schedules and rates. The group members and lecturer are listed and the site is described as generally flat with earthworks and infrastructure already completed. The tender submission contains standard forms and documents required for the tendering process.
Types of contract in Project managementAli Heydari
The document discusses different types of contracts that may be used in project management. It describes fixed price/lump sum contracts where a specific deliverable is agreed to for a set price, carrying more risk for the seller. Cost-reimbursable contracts reimburse the seller for all allowable costs and come in forms like cost plus fee or cost plus fixed fee. Time and materials contracts bill the buyer based on hours worked and materials used by the seller.
The document provides an introduction to the role of quantity surveyors. It discusses the traditional, evolved, and developing roles of quantity surveyors. Quantity surveyors play key roles in the planning, construction, and post-construction stages of projects. Their responsibilities include cost estimation, cost control, dispute resolution, and ensuring projects are delivered on time and on budget. The profession is evolving to take on new services including investment appraisal, value management, risk management, and facility management. Developments in areas like client focus, information technology, research, and sustainability will further shape the future of the profession.
This document discusses measure and pay contracts, also known as re-measurement contracts. With this type of contract, the contractor quotes unit prices for items in the bill of quantities (BOQ) provided by the employer. During construction, the actual quantities of work are measured and valued at the quoted rates for interim payments. After completion, the exact quantities are re-measured and valued at the quoted rates for the final payment. While the total cost is not known until completion, this contract allows for adjustments to scope and quantities and requires less design definition upfront than a lump sum contract. It is suitable for competitive bidding but requires accurate measurement and reporting of completed work units.
The document discusses different types of construction contract forms including traditional, design-build, management, and construction management contracts. It provides details on lump sum, measurement, and cost reimbursement contracts under the traditional method. Factors that influence the choice of contract form are also summarized such as project complexity, client experience, certainty of costs, allocation of risk, and nature of the project. The key differences between various contract types such as lump sum vs measurement contracts and management vs construction management contracts are highlighted.
For civil engineer quantity surveying and estimation costing is very important for any project.
In this presentation we study about the Important terms used in estimation and costing, contingencies, work charge establishment, tools and plants, etc. types of estimates and their functions.
We are an independent firm of Project Managers and Quantity Surveyors based in Preston, UK that has 60 years of combined experience in client negotiation. We offer a range of services including project management, quantity surveying, employers agency, commercial consultancy, and CDM coordination. As a Quantity Surveyor, some of our key responsibilities include measuring quantities of construction materials, preparing bills of quantities and schedules, cost planning, and ensuring projects are delivered on budget.
This document discusses different types of construction contracts:
- Lump sum contracts specify a single price for completing a project. They provide incentives for efficiency but carry high risks for contractors.
- Unit price contracts base payment on quantities of work completed. They allow for changes but the final cost is unknown.
- Cost plus contracts reimburse contractors for all costs plus a fee. They provide flexibility but lack incentives for cost control.
Hidden Horrors of Shoddy ( Poor Quality) ConstructionGAURAV. H .TANDON
Poor quality in construction projects is a common issue that can lead to costly failures and defects. The document discusses several key points regarding quality in construction:
1) Poor quality can result from issues like using low-quality materials, lack of proper supervision, no quality management systems, lack of project auditing, and complex designs.
2) Ensuring quality requires implementing quality standards and procedures throughout the entire project lifecycle from design to completion.
3) Failing to ensure quality can increase costs due to failures, rework, and preventable expenses. It is important for the success of construction projects to balance quality, time and cost.
4) In cases where builders commit fraud or fail to deliver what
Financial management involves planning, acquiring, and managing funds to maximize the value of a firm. It includes forecasting, major investment decisions, coordination, control, and risk management. The key financial questions that must be addressed are what capital investments to make, how to raise funds to pay for investments, and how to handle daily financial activities like collections and payments. Financial management also deals with issues like evaluating new investment proposals, increasing stock value, determining working capital needs, and raising short- and long-term capital.
This document discusses various types of construction contracts, including lump-sum, cost-plus percentage, cost-plus fixed fee, percentage rate, item rate, turnkey, cost-plus sliding scale of fees, negotiated, target, labor, joint venture, and BOT contracts. Each type is briefly defined and its key advantages and disadvantages are outlined. The document provides a high-level overview of common construction contracting methods.
This document provides an introduction to the role of a Quantity Surveyor (QS). It discusses that a QS calculates materials needed, manages construction costs, and works in private practice, for local authorities or contractors. A QS applies building economics at the planning stage, prepares bills of quantities from plans, analyzes tenders, and provides cost consulting. They are involved at various construction stages from estimating budgets to valuations. The document also discusses tenders, tender drawings, bills of quantities, construction drawings, and common building materials.
This document provides an overview of quantity surveying as a profession. It defines key roles and responsibilities which include cost estimation, measurement, procurement, and payment services over the course of construction projects. The document also outlines the professional qualifications and regulatory bodies for quantity surveyors in Malaysia, such as the Board of Quantity Surveyors Malaysia and the Institution of Surveyors Malaysia. Quantity surveyors work across both public and private sector construction industries.
Your Construction Subcontract. The 23 Points That Matter MostAlex Barthet
Construction contracts in Florida can be especially tricky to navigate. A subcontract is no exception; learn the fundamentals, it could save you a lot of money.
The document outlines the key steps and deliverables in a typical construction project process flow. It includes phases for initiation and planning, design and drawings, execution including tenders and construction, monitoring and tracking, quality control, and closure. Key deliverables mentioned include a project request document, scope statement, preliminary estimates, work breakdown structure, detailed drawings, resource management, quality assurance documents, bills and payments, de-snagging documents, and project evaluation reports.
The document provides information on elemental cost analysis, including:
1) It explains the purposes of elemental cost analysis and the principles of preparing an analysis.
2) It describes the forms used in an analysis, including Form 1 which contains project and building information.
3) It details the specific information required in Form 1, such as building description, areas, storey heights, and ratios. Providing accurate cost data in the defined structure allows for comparison across projects.
Top 10 project quantity surveyor interview questions and answersmitchellparker911
In this file, you can ref interview materials for project quantity surveyor such as types of interview questions, project quantity surveyor situational interview, project quantity surveyor behavioral interview…
Top 10 civil quantity surveyor interview questions and answersmarryweasley
In this file, you can ref interview materials for civil quantity surveyor such as types of interview questions, civil quantity surveyor situational interview, civil quantity surveyor behavioral interview…
The document discusses various types of contract structures and payment methods for construction projects. It describes conventional/traditional contracts, turnkey contracts, design-build contracts, construction management contracts, and guaranteed maximum price contracts. It also covers lump sum, measurement, and cost reimbursement pricing approaches. Factors that influence contract selection include project complexity, schedule, client experience, regulations, risk allocation, and the nature of the project. The document emphasizes that properly structuring the contract and payment terms is important to allocate risk appropriately between the client and contractor.
This document discusses various types of construction contracts. It describes direct employment, where the owner hires an organization to be responsible for construction. It also discusses fixed-price contracts like lump sums and unit prices, where the contractor agrees to a fixed total price or unit rates. Cost-plus contracts shift risks to the owner by paying the contractor's actual costs plus a percentage fee, without incentives for the contractor to control costs. Other contract types like target estimates and guaranteed maximum costs aim to balance risks between the owner and contractor.
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
This document is a tender submission for the construction of a 3-storey semi-detached house. It includes an introduction with the project details, plans showing the layout and elevations of the building, instructions for tendering, forms of contract, bills of quantities, appendices with schedules and rates. The group members and lecturer are listed and the site is described as generally flat with earthworks and infrastructure already completed. The tender submission contains standard forms and documents required for the tendering process.
Types of contract in Project managementAli Heydari
The document discusses different types of contracts that may be used in project management. It describes fixed price/lump sum contracts where a specific deliverable is agreed to for a set price, carrying more risk for the seller. Cost-reimbursable contracts reimburse the seller for all allowable costs and come in forms like cost plus fee or cost plus fixed fee. Time and materials contracts bill the buyer based on hours worked and materials used by the seller.
The document provides an introduction to the role of quantity surveyors. It discusses the traditional, evolved, and developing roles of quantity surveyors. Quantity surveyors play key roles in the planning, construction, and post-construction stages of projects. Their responsibilities include cost estimation, cost control, dispute resolution, and ensuring projects are delivered on time and on budget. The profession is evolving to take on new services including investment appraisal, value management, risk management, and facility management. Developments in areas like client focus, information technology, research, and sustainability will further shape the future of the profession.
This document discusses measure and pay contracts, also known as re-measurement contracts. With this type of contract, the contractor quotes unit prices for items in the bill of quantities (BOQ) provided by the employer. During construction, the actual quantities of work are measured and valued at the quoted rates for interim payments. After completion, the exact quantities are re-measured and valued at the quoted rates for the final payment. While the total cost is not known until completion, this contract allows for adjustments to scope and quantities and requires less design definition upfront than a lump sum contract. It is suitable for competitive bidding but requires accurate measurement and reporting of completed work units.
The document discusses different types of construction contract forms including traditional, design-build, management, and construction management contracts. It provides details on lump sum, measurement, and cost reimbursement contracts under the traditional method. Factors that influence the choice of contract form are also summarized such as project complexity, client experience, certainty of costs, allocation of risk, and nature of the project. The key differences between various contract types such as lump sum vs measurement contracts and management vs construction management contracts are highlighted.
For civil engineer quantity surveying and estimation costing is very important for any project.
In this presentation we study about the Important terms used in estimation and costing, contingencies, work charge establishment, tools and plants, etc. types of estimates and their functions.
We are an independent firm of Project Managers and Quantity Surveyors based in Preston, UK that has 60 years of combined experience in client negotiation. We offer a range of services including project management, quantity surveying, employers agency, commercial consultancy, and CDM coordination. As a Quantity Surveyor, some of our key responsibilities include measuring quantities of construction materials, preparing bills of quantities and schedules, cost planning, and ensuring projects are delivered on budget.
This document discusses different types of construction contracts:
- Lump sum contracts specify a single price for completing a project. They provide incentives for efficiency but carry high risks for contractors.
- Unit price contracts base payment on quantities of work completed. They allow for changes but the final cost is unknown.
- Cost plus contracts reimburse contractors for all costs plus a fee. They provide flexibility but lack incentives for cost control.
Hidden Horrors of Shoddy ( Poor Quality) ConstructionGAURAV. H .TANDON
Poor quality in construction projects is a common issue that can lead to costly failures and defects. The document discusses several key points regarding quality in construction:
1) Poor quality can result from issues like using low-quality materials, lack of proper supervision, no quality management systems, lack of project auditing, and complex designs.
2) Ensuring quality requires implementing quality standards and procedures throughout the entire project lifecycle from design to completion.
3) Failing to ensure quality can increase costs due to failures, rework, and preventable expenses. It is important for the success of construction projects to balance quality, time and cost.
4) In cases where builders commit fraud or fail to deliver what
Financial management involves planning, acquiring, and managing funds to maximize the value of a firm. It includes forecasting, major investment decisions, coordination, control, and risk management. The key financial questions that must be addressed are what capital investments to make, how to raise funds to pay for investments, and how to handle daily financial activities like collections and payments. Financial management also deals with issues like evaluating new investment proposals, increasing stock value, determining working capital needs, and raising short- and long-term capital.
This document discusses various types of construction contracts, including lump-sum, cost-plus percentage, cost-plus fixed fee, percentage rate, item rate, turnkey, cost-plus sliding scale of fees, negotiated, target, labor, joint venture, and BOT contracts. Each type is briefly defined and its key advantages and disadvantages are outlined. The document provides a high-level overview of common construction contracting methods.
This document provides an introduction to the role of a Quantity Surveyor (QS). It discusses that a QS calculates materials needed, manages construction costs, and works in private practice, for local authorities or contractors. A QS applies building economics at the planning stage, prepares bills of quantities from plans, analyzes tenders, and provides cost consulting. They are involved at various construction stages from estimating budgets to valuations. The document also discusses tenders, tender drawings, bills of quantities, construction drawings, and common building materials.
This document provides an overview of quantity surveying as a profession. It defines key roles and responsibilities which include cost estimation, measurement, procurement, and payment services over the course of construction projects. The document also outlines the professional qualifications and regulatory bodies for quantity surveyors in Malaysia, such as the Board of Quantity Surveyors Malaysia and the Institution of Surveyors Malaysia. Quantity surveyors work across both public and private sector construction industries.
Your Construction Subcontract. The 23 Points That Matter MostAlex Barthet
Construction contracts in Florida can be especially tricky to navigate. A subcontract is no exception; learn the fundamentals, it could save you a lot of money.
The document outlines the key steps and deliverables in a typical construction project process flow. It includes phases for initiation and planning, design and drawings, execution including tenders and construction, monitoring and tracking, quality control, and closure. Key deliverables mentioned include a project request document, scope statement, preliminary estimates, work breakdown structure, detailed drawings, resource management, quality assurance documents, bills and payments, de-snagging documents, and project evaluation reports.
The document provides information on elemental cost analysis, including:
1) It explains the purposes of elemental cost analysis and the principles of preparing an analysis.
2) It describes the forms used in an analysis, including Form 1 which contains project and building information.
3) It details the specific information required in Form 1, such as building description, areas, storey heights, and ratios. Providing accurate cost data in the defined structure allows for comparison across projects.
Top 10 project quantity surveyor interview questions and answersmitchellparker911
In this file, you can ref interview materials for project quantity surveyor such as types of interview questions, project quantity surveyor situational interview, project quantity surveyor behavioral interview…
Top 10 civil quantity surveyor interview questions and answersmarryweasley
In this file, you can ref interview materials for civil quantity surveyor such as types of interview questions, civil quantity surveyor situational interview, civil quantity surveyor behavioral interview…
This document provides approximate estimates for flyovers constructed at four different locations. It summarizes the key details of each flyover project such as location, client, contractor, scope of work, cost, duration, progress, resources used, and per meter cost. The average cost per meter of the flyovers according to the estimates given is Rs. 5,37,635.
The document provides an introduction to the role of quantity surveyors in construction projects. It discusses that quantity surveyors are responsible for financial aspects of construction and provide various services throughout a project, including preparing initial budgets and cost estimates, tender documents, valuations of work, and final accounts. It also describes the different stages of a project where quantity surveyors are involved, such as pre-tender, tender, and post-tender stages, and the tasks performed during each stage.
This document is a resume for Thowfeek Aliyarlebby Mohamed Haneefa for the position of Quantity Surveyor. It summarizes his educational and professional experience over the past 20 years. He has a HND in Quantity Surveying from the UK and experience in roles like CAD operator, designer, site supervisor, and quantity surveyor in Sri Lanka, Qatar, Saudi Arabia, and Kuwait. His experience includes preparation of drawings, estimates, and bills of quantities for various construction projects in fields like roads, buildings, and utilities. He provides details of his 10 past employers and roles, education qualifications, personal details, and references.
The document discusses tips and materials for second job interviews, including common questions. It provides links to free ebooks on interview questions, secrets to winning interviews, and sample cover letters and resumes. The main content recommends getting the interview agenda in advance, thoroughly researching the company, reviewing one's answers from the first interview, dressing professionally, addressing any unanswered questions from the first interview, asking the interviewer questions, assessing fit with the role and company, taking time to consider any job offers, and sending thank you notes after the interview. It also gives examples of how to answer common second interview questions about past experiences, education, and being a team player.
The document summarizes Lahore's first mass transit system, the Metro Bus Service (MBS). Some key points:
- The MBS was inaugurated in Lahore in 2013 as an ambitious project by the Punjab government to provide the city with a high-quality public transport system.
- Route 1 runs 27 km from Gajjumata to Shahdara. It has 27 stations, 9 of which are elevated. The buses are produced by Volvo and can hold 108 passengers.
- Fares are low but will increase after the first free month. Ridership exceeds 130,000 passengers daily.
- The $300 million project was constructed between 2012-2013 through public
Orange line train project impact in environmental pollutionShahzaib Khan
Lahore is the 2ND largest urban center and provincial capital of the Punjab Province with a population of 9 million inhabitants in 2006. The transport demand amounts to 6.8 million daily person trips for work, shopping or recreation other than walking.
So we expected to rise to more than 11 million by the year 2021. (LUTMP) in 2010-2011, recorded 8 million trips per day in the year 2010. The major percentage of this travel demand comprises of public transport.
To resolve public transport issues in Lahore and to provide safe, efficient, comfortable, and affordable transport to the public, Government of the Punjab has successfully completed METRO BUS project and currently planning to introduce a Metro Rail Transit System on the Orange Line (From Ali Town to Dera Gujran), Lahore.
Top 10 geotechnical engineer interview questions and answersboolady2131
This document provides resources for preparing for a geotechnical engineer interview, including sample interview questions, tips, and links to additional materials. It includes 10 common interview questions for geotechnical engineers and sample answers, such as why you want the job, what you know about the company, and what challenges you are looking for. The document also lists additional useful materials for interview preparation, including ebooks on interview questions and secrets to winning interviews, as well as guides on various interview types and techniques.
The document discusses the construction of the Orange Line metro train project in Lahore, Pakistan. The 27.1 km Orange Line will be the first line of Lahore's metro system. It will have 26 stations and be capable of transporting 30,000 passengers per hour. The metro line is expected to be completed within 27 months at an estimated cost of 165 billion rupees. The construction process involves activities like boring, piling, concreting, and erecting piers to support the elevated tracks.
Top 10 commissioning interview questions with answershenrybrown133
This document provides information and resources for commissioning interviews, including sample interview questions and answers, tips for the interview process, and related job titles and fields. Specifically, it outlines top commissioning interview questions and answers covering topics like relevant experience, conflicts with past employers, challenges sought in the position, and questions to ask the interviewer. It also provides six tips for the interview, such as doing research on the company, making a strong first impression, practicing interviews, and following up with a thank you note. Finally, it lists various commissioning and related job titles that could utilize the interview questions and fields like engineering, facilities management, and operations that commonly require commissioning roles.
The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour.
The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required.
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
The document discusses the analysis of rates for construction items. It provides materials costs, labor costs, and calculations to determine the total rate per unit of different construction works. For example, it calculates that the rate of excavation work is Rs. 9857 per cubic meter based on labor and materials. It also provides an example of determining the materials required for a 10 square meter conglomerate floor with two layers of concrete.
Top 16 ways to make money online foreverjobguide247
The document provides 16 ways to make money online, beginning with making money from YouTube videos. It recommends choosing popular niche topics and describes how to earn money from views via Google Adsense or YouTube partner networks. The second way discussed is affiliate marketing, explaining how affiliates are rewarded for promoting products. Top affiliate networks like Amazon, Rakuten, and Clickbank are recommended. Other methods discussed include making money from blogs on Blogger, using Clickbank to promote affiliate products, earning from shortened links on Adf.ly, freelancing on sites like Freelancer, creating websites using Wordpress or Blogger, and publishing ebooks on Amazon Kindle.
Top 10 associate recruiter interview questions and answerstonychoper0106
The document provides resources for interview preparation for an associate recruiter position, including common interview questions, answers, and tips. It lists 10 frequently asked interview questions for associate recruiters along with sample answers. Additionally, it provides many links to further interview preparation materials on topics such as situational interviews, behavioral interviews, phone interviews, cover letters, resumes, and more. The document aims to equip job candidates with knowledge to successfully interview for associate recruiter roles.
Top 10 trainee surveyor interview questions and answerskatherinealex32
This document provides resources for interview preparation for a trainee surveyor position, including common interview questions, answers, and tips. It lists 10 frequently asked trainee surveyor interview questions covering topics like motivation for the role, learning from mistakes, challenges, and knowledge of the company. For each question, sample answers are provided. Additional materials on the website are recommended for comprehensive interview preparation. These include ebooks on common interview questions and tips for success, as well as guides on various interview types, follow-up etiquette, and career development.
Top 10 fingerprint examiner interview questions and answerssistmist
The document provides useful materials and interview questions for a fingerprint examiner position. It includes 10 common interview questions for fingerprint examiners along with sample answers, such as describing a typical work week. Additional resources are listed on preparing for interviews, researching the company, developing career skills, and similar career fields that may require similar interview questions. The materials aim to help candidates successfully prepare for and complete interviews for fingerprint examiner and related roles.
Top 10 materials supervisor interview questions and answerstonychoper4006
The document provides resources for interview preparation for a materials supervisor position, including common interview questions, tips, and links to additional materials. It lists 10 frequently asked interview questions for materials supervisor roles along with sample answers. These questions cover motivations for the role, learning from past experiences, challenges sought, describing typical work responsibilities, weaknesses, reasons for hiring, salary influences, and closing questions for the interviewer. The document also provides additional links to online resources on interview guides, questions, and preparation materials.
Top 10 senior surveyor interview questions and answerskatherinealex32
In this file, you can ref interview materials for senior surveyor such as types of interview questions, senior surveyor situational interview, senior surveyor behavioral interview…
Top 10 investigative assistant interview questions and answerscarlalowery943
In this file, you can ref interview materials for investigative assistant such as types of interview questions, investigative assistant situational interview, investigative assistant behavioral interview…
Top 10 trainee negotiator interview questions and answersanthonyken11
In this file, you can ref interview materials for trainee negotiator such as types of interview questions, trainee negotiator situational interview, trainee negotiator behavioral interview…
Top 10 mine surveyor interview questions and answerskatherinealex32
In this file, you can ref interview materials for mine surveyor such as types of interview questions, mine surveyor situational interview, mine surveyor behavioral interview…
Top 10 ticketing executive interview questions and answerslorenzospears19
In this file, you can ref interview materials for ticketing executive such as types of interview questions, ticketing executive situational interview, ticketing executive behavioral interview…
Top 10 skilled laborer interview questions and answerslikesbent
The document provides resources for skilled laborer interview preparation, including sample questions and answers. It lists the top 10 interview questions for skilled labor jobs, such as why the applicant wants the position, what they have learned from mistakes, challenges they are seeking, and describing a typical work week. For each question, it provides a paragraph of sample response guidance. It also includes additional links to online resources for further interview preparation materials.
Top 10 chief surveyor interview questions and answerskatherinealex32
In this file, you can ref interview materials for chief surveyor such as types of interview questions, chief surveyor situational interview, chief surveyor behavioral interview…
Top 10 academic registrar interview questions and answersramirezlewis78
In this file, you can ref interview materials for academic registrar such as types of interview questions, academic registrar situational interview, academic registrar behavioral interview…
Top 10 reset merchandiser interview questions and answersrimadumem
The document provides resources for interview preparation for a reset merchandiser position, including example interview questions, tips for different types of interviews, and links to additional preparation materials. It includes 10 sample interview questions covering topics like why the applicant wants the job, challenges they have overcome, describing a typical work week, weaknesses, and questions to ask the interviewer. Further resources are provided on interview styles, career development, performance reviews, and suggested fields that a reset merchandiser career could relate to.
Top 10 grant researcher interview questions and answersbarnesalex39
In this file, you can ref interview materials for grant researcher such as types of interview questions, grant researcher situational interview, grant researcher behavioral interview…
Top 10 inclusion coordinator interview questions and answerstonychoper1806
The document provides resources for inclusion coordinator interview preparation, including common interview questions, answers, and tips. It lists 10 typical interview questions for an inclusion coordinator role and suggests responses. Additional materials and advice are given, such as researching the company, practicing different interview types, and sending a thank you letter. The document aims to help candidates successfully prepare for and complete an inclusion coordinator interview.
Top 10 accommodation officer interview questions and answerstonychoper3006
This document provides resources for preparing for an accommodation officer interview, including sample interview questions and answers. It lists 10 common interview questions for an accommodation officer role like "Why do you want this job?" and "What challenges are you looking for?". For each question, it provides a detailed answer highlighting what the interviewer wants to hear. It also includes additional tips and materials on the accommodation officer career field, different interview types, sending thank you letters, and asking questions of the employer. The resources are intended to help candidates successfully prepare for and complete an accommodation officer interview.
Top 10 trainee auditor interview questions and answerssugsgman
The document provides materials and advice for interview questions and answers for a trainee auditor position. It includes the top 10 interview questions for this role, such as why the applicant wants the job, what they have learned from mistakes, the challenges they are seeking, and describing a typical work week. For each question, the document provides guidance on effective ways to structure answers and highlight relevant experiences and skills. The overall document aims to help applicants prepare compelling responses to common interview questions for a trainee auditor role.
Top 10 title processor interview questions and answersriverred505
This document provides information and advice about interview questions and answers for a title processor position. It includes sample responses to common interview questions like "Why do you want this job?", "What are your weaknesses?", and "Why should we hire you?". The document recommends researching the company beforehand and linking skills and experience to the job requirements. It also provides additional resources on interview preparation.
Top 10 courier dispatcher interview questions and answerstonychoper6906
The document provides resources for preparing for a courier dispatcher interview, including sample interview questions and answers. It lists 10 common interview questions for courier dispatcher positions and provides detailed sample answers. Additionally, it includes links to ebooks and articles on interview skills, sample thank you letters, research tips, practice interview questions and more. The resources are intended to help candidates learn effective techniques for highlighting their qualifications and securing a courier dispatcher role.
Top 10 paramedical examiner interview questions and answerstonychoper7206
The document provides resources for preparing for a paramedical examiner interview, including common interview questions, tips for different types of interviews, and links to ebooks and articles on interview skills. It lists the top 10 paramedical examiner interview questions, such as why the applicant wants the job, mistakes they have made, and challenges they are seeking. Additional resources are provided on interview techniques, researching the company, developing career skills, and evaluating performance. The document aims to equip job seekers with comprehensive guidance for interviewing for paramedical examiner roles.
Similar to Top 10 quantity surveyors interview questions and answers (20)
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
A workshop hosted by the South African Journal of Science aimed at postgraduate students and early career researchers with little or no experience in writing and publishing journal articles.
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
Top 10 quantity surveyors interview questions and answers
1. Top 10 quantity surveyors interview
questions and answers
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
2. In this file, you can ref interview materials for quantity surveyors such as types of
interview questions, quantity surveyors situational interview, quantity surveyors
behavioral interview…
Other useful materials for quantity surveyors interview:
• interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
• interviewquestions360.com/13-types-of-interview-questions-and-how-to-face-them
• interviewquestions360.com/job-interview-checklist-40-points
• interviewquestions360.com/top-8-interview-thank-you-letter-samples
• interviewquestions360.com/free-21-cover-letter-samples
• interviewquestions360.com/free-24-resume-samples
• interviewquestions360.com/top-15-ways-to-search-new-jobs
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
3. 1. Why do you want this quantity surveyors job?
Again, companies want to hire people
who are passionate about the job, so you
should have a great answer about why
you want the position. (And if you don't?
You probably should apply elsewhere.)
First, identify a couple of key factors that
make the role a great fit for you (e.g., “I
love customer support because I love the
constant human interaction and the
satisfaction that comes from helping
someone solve a problem"), then share
why you love the company (e.g., “I’ve
always been passionate about education,
and I think you guys are doing great
things, so I want to be a part of it”).
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
4. 2. What have you learned from mistakes on the quantity
surveyors job?
Candidates without specific examples often
do not seem credible. However, the example
shared should be fairly inconsequential,
unintentional, and a learned lesson should
be gleaned from it. Moving ahead without
group assistance while assigned to a group
project meant to be collaborative is a good
example.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
5. 3. What challenges are you looking for in this quantity
surveyors position?
A typical interview question to determine what you
are looking for your in next job, and whether you
would be a good fit for the position being hired for,
is "What challenges are you looking for in a
position?"
The best way to answer questions about the
challenges you are seeking is to discuss how you
would like to be able to effectively utilize your
skills and experience if you were hired for the job.
You can also mention that you are motivated by
challenges, have the ability to effectively meet
challenges, and have the flexibility and skills
necessary to handle a challenging job.
You can continue by describing specific examples
of challenges you have met and goals you have
achieved in the past.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
6. 4. Describe a typical work week for quantity surveyors
position?
Interviewers expect a candidate for employment to
discuss what they do while they are working in
detail. Before you answer, consider the position
you are applying for and how your current or past
positions relate to it. The more you can connect
your past experience with the job opening, the
more successful you will be at answering the
questions.
It should be obvious that it's not a good idea talk
about non-work related activities that you do on
company time, but, I've had applicants tell me how
they are often late because they have to drive a
child to school or like to take a long lunch break to
work at the gym.
Keep your answers focused on work and show the
interviewer that you're organized ("The first thing I
do on Monday morning is check my voicemail and
email, then I prioritize my activities for the week.")
and efficient.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
7. 5. What is your biggest weakness?
No one likes to answer this question because it
requires a very delicate balance. You simply can’t
lie and say you don’t have one; you can’t trick the
interviewer by offering up a personal weakness
that is really a strength (“Sometimes, I work too
much and don’t maintain a work-life balance.”);
and you shouldn’t be so honest that you throw
yourself under the bus (“I’m not a morning person
so I’m working on getting to the office on time.”)
Think of a small flaw like “I sometimes get
sidetracked by small details”, “I am occasionally
not as patient as I should be with subordinates or
co-workers who do not understand my ideas”, or “I
am still somewhat nervous and uncomfortable with
my public-speaking skills and would like to give
more presentations and talk in front of others or in
meetings.” Add that you are aware of the problem
and you are doing your best to correct it by taking
a course of action.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
8. 6. Why should the we hire you as quantity surveyors
position?
This is the part where you link your skills,
experience, education and your personality to the
job itself. This is why you need to be utterly
familiar with the job description as well as the
company culture. Remember though, it’s best to
back them up with actual examples of say, how
you are a good team player.
It is possible that you may not have as much skills,
experience or qualifications as the other
candidates. What then, will set you apart from
the rest? Energy and passion might. People are
attracted to someone who is charismatic, who
show immense amount of energy when they talk,
and who love what it is that they do. As you
explain your compatibility with the job and
company, be sure to portray yourself as that
motivated, confident and energetic person, ever-
ready to commit to the cause of the company.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
9. 7. What do you know about our company?
Follow these three easy research tips before your next
job interview:
1) Visit the company website; look in the “about us”
section and “careers” sections
2) Visit the company’s LinkedIn page (note, you must
have a LinkedIn account — its free to sign up) to view
information about the company
3) Google a keyword search phrase like “press releases”
followed by the company name; you’ll find the most
recent news stories shared by the company
Remember, just because you have done your
“homework”, it does not mean you need to share ALL of
it during the interview! Reciting every fact you’ve
learned is almost as much of a turn off as not knowing
anything at all! At a minimum, you should include the
following in your answer:
1. What type of product or service the company sells
2. How long the company has been in business
3. What the company culture is like OR what the
company mission statement is, and how the culture
and/or mission relate to your values or personality
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
10. 8. Why do you want to work with us?
More likely than not, the interviewer wishes to see
how much you know about the company culture,
and whether you can identify with the
organization’s values and vision. Every
organization has its strong points, and these are the
ones that you should highlight in your answer. For
example, if the company emphasizes on integrity
with customers, then you mention that you would
like to be in such a team because you yourself
believe in integrity.
It doesn’t have to be a lie. In the case that your
values are not in line with the ones by the
company, ask yourself if you would be happy
working there. If you have no issue with that, go
ahead. But if you are aware of the company culture
and realize that there is some dilemma you might
be facing, you ought to think twice. The best
policy is to be honest with yourself, and be honest
with the interviewer with what is it in the company
culture that motivates you.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
11. 9. Did the salary we offer attract you to this quantity
surveyors job?
The interviewer could be asking you this
question for a number of reasons.
Obviously, the salary is an important factor
to your interest in this job, but it should not
be the overriding reason for your interest. A
good answer to this question is, “The salary
was very attractive, but the job itself is what
was most attractive to me.”
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
12. 10. Do you have any questions to ask us?
Never ask Salary, perks, leave, place of
posting, etc. regarded questions.
Try to ask more about the company to show
how early you can make a contribution to
your organization like
“Sir, with your kind permission I would like
to know more about induction and
developmental programs?”
OR
Sir, I would like to have my feedback, so that
I can analyze and improve my strengths and
rectify my shortcomings.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
17. Other interview tips for quantity surveyors interview
1. Practice types of job interview such as screening
interview, phone interview, second interview,
situational interview, behavioral interview
(competency based), technical interview, group
interview…
2. Send interview thank you letter to employers
after finishing the job interview: first interview,
follow-up interview, final interview.
3. If you want more interview questions for entry-
level, internship, freshers, experienced candidates,
you can ref free ebook: 75 interview questions and
answers.
4. Prepare list of questions in order to ask the
employer during job interview.
5. Note: This file is available for free download.
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews
18. Fields related to quantity surveyors career:
The above job description can be used for fields as:
Construction, manufacturing, healthcare, non profit, advertising, agile, architecture, automotive,
agency, budget, building, business development, consulting, communication, clinical research,
design, software development, product development, interior design, web development,
engineering, education, events, electrical, exhibition, energy, ngo, finance, fashion, green card, oil
gas, hospital, it, marketing, media, mining, nhs, non technical, oil and gas, offshore,
pharmaceutical, real estate, retail, research, human resources, telecommunications, technology,
technical, senior, digital, software, web, clinical, hr, infrastructure, business, erp, creative, ict,
hvac, sales, quality management, uk, implementation, network, operations, architectural,
environmental, crm, website, interactive, security, supply chain, logistics, training, project
management, administrative management…
The above interview questions also can be used for job title levels: entry level quantity surveyors,
junior quantity surveyors, senior quantity surveyors, quantity surveyors assistant, quantity
surveyors associate, quantity surveyors administrator, quantity surveyors clerk, quantity
surveyors coordinator, quantity surveyors consultant, quantity surveyors controller, quantity
surveyors director, quantity surveyors engineer, quantity surveyors executive, quantity surveyors
leader, quantity surveyors manager, quantity surveyors officer, quantity surveyors specialist,
quantity surveyors supervisor, VP quantity surveyors…
Useful materials: • interviewquestions360.com/free-ebook-145-interview-questions-and-answers
• interviewquestions360.com/free-ebook-top-18-secrets-to-win-every-job-interviews