We might sometimes forget, but Australia         new Greenfield DC at Larapinta in the bushy
is the only single nation to occupy an entire    outskirts of Brisbane.
continent. There are less than three people
                                                 Escalating demand, in particular for its
for every square kilometre, yet we’re also one
                                                 national timetable of road express services,
of the most urbanised countries in the world.
                                                 had meant that Toll IPEC’s barely-ten-years
With a few densely populated cities              -old Brisbane hub was already at capacity.
separated by long, lonely stretches, it’s no
                                                 The new plant at Larapinta is a key part of
surprise that Australia is the world’s most
                                                 Toll’s national strategy of creating capacity
intensive user of road freight on a tonne/
                                                 for growth without structural bottlenecks
kilometre basis. A whopping two-thirds of
                                                 or constraints at any point.
all domestic freight rolls up and down our
open roads.                                      Dexion had worked with the Toll Group
It seems that Australia no longer rides on       in the past and had a proven track record
the sheep’s back, but in the air-conditioned     in the field. During a competitive tender
passenger seat of a B-Double.                    process, Toll IPEC was shown live Dexion-
                                                 designed solutions in Melbourne and
Our domestic freight task has more than          Sydney to further support their bid and
doubled over the last 20 years, is expected      demonstrate their success with system
to almost double again by 2020 and triple        integration and project management
by 2050*.                                        capabilities, Dexion was appointed to the
It is against this backdrop that Dexion was      contract in April 2009.
invited by Toll IPEC, part of the Toll Group,
the Asian region’s leading provider of           Larapinta snapshot.
integrated logistics services, to provide a      Larapinta was officially opened, on schedule,
high-speed parcel sorting solution for their     on 19 February 2010.




Dexion Case Study – Toll IPEC                                                                    *IBISworld, 2009 report for Infrastructure Partnerships Australia.
“The central challenge was to sort the different
             kinds of freight when it came out of metropolitan
                  and regional vehicles and into the line hauls.
             Reducing this sort time window is where the big
                 efficiencies were to be gleaned for this client.”



The five-hectare site includes:                 equipment and is specifically engineered
                                                to complement rather than compete with
• 13,300m2 warehouse/depot
                                                the customer’s host computer system.
• 31,000m2 concrete pavements
                                                By controlling field devices, sensors, host
• 5,200m2 car park area                         connectivity and data driven rules, the
•  atehouse, fuel, gas and
  G                                             RDS can deliver real time management of
  weighbridge facilities                        all physical and logical processes.

• 2,400m2 of quality office space               The user-friendly interface is boldly
                                                graphical with the simplicity of point-and-
• Fully integrated CBUS electrical system       click control. Being web based, the system
There are 14 dock levellers for rear end        is accessible from anywhere at any time.
loading and unloading plus space to             The RDS is also modular in design, a             “To our mind, TGW’s Natrix sliding shoe        very different dimensions into multiple
process a large number of side load trailers.   concept that was attractive to Toll IPEC as      sorter was the sort of high-performance        discharge lanes.
In total, the site is designed to service the   it helped make the most of capital they had      solution this project needed.” said Dexion’s
                                                                                                                                                Sort capacity is a rapid 9,000 cartons
equivalent of 60 B-Doubles per day.                                                              Murdo McKinnon.
                                                already invested in. It also meant that they                                                    per hour.
                                                only paid for the modules they needed,           “The central challenge was to sort the
Real Time Distribution System (RDS).                                                                                                            Parcels are conveyed on a sorter bed
                                                with the flexibility to add further capability   different kinds of freight when it came out
The nerve centre of the site is Dexion’s                                                                                                        consisting of extruded aluminium profiles.
                                                in the future as required.                       of metropolitan and regional vehicles and
Real-Time Distribution System (RDS), a                                                                                                          Shoes slide across these profiles, diverting
                                                                                                 into the line hauls. Reducing this sort time
                                                                                                                                                products to pre-selected destinations.
multifunction control platform that             High performance sortation.                      window is where the big efficiencies were
                                                                                                                                                Gaps between parcels are optimised
coordinates the facility’s physical and                                                          to be gleaned for this client.”
                                                In previous projects similar to Larapinta,                                                      through use of a special batching conveyor,
operational aspects.
                                                Dexion had achieved good results with            By combining Natrix sortation with an          and then guided by means of rubber
Essentially, it bridges the gap between         their Austrian material handling equipment       integrated carousel system, Larapinta has      coated running wheels that ensure a quiet
enterprise systems and materials handling       partner, TGW.                                    the capacity to gently handle goods with       and low-wear operation.




Dexion Case Study – Toll IPEC
“At full capacity, Larapinta has the ability to
                         process two-and-a-half parcels a second.”




Better data, better accountability.              system. By ‘reading’ information superior
The recent global financial crisis caused        to a simple barcode scan, the RDS has
many companies to lower inventories and          the capacity to better recognise and
in some cases eliminate private warehousing      correctly assign irregular parcels, identify
altogether. This has put new and extra           side-by-side parcels (which might be
demands on the road express business.            ‘hidden’ to a laser scanner) to be resorted,
                                                 and ensure that every item has been
In 2011, Toll IPEC’s customers want more         correctly priced.
stringent accountability by package and
more data collection for their own reporting.    Towards 2050.
At full capacity, Larapinta has the ability to   The name Larapinta comes from an
process two-and-a-half parcels a second.         Aboriginal word meaning ‘flowing water’.
To ensure this speed is not at the expense       In this southeast corner of Queensland,
of accuracy or revenue, the Dexion RDS is        the fastest growing metropolitan region in
fed a complex combination of dimensioning,       the country, these days it is economic
weight and photographic data of each and         growth that is flowing south and west along
every parcel.                                    the Ipswich Motorway.

Two systems from Scale Components, the           The Federal Treasury estimates that
Parcelscan II dimensioning system and            Australia’s population will have ballooned
Carrierweigh CW900 in-motion conveyer            to 35 million by 2050, and the need to
scale, provide comprehensive height,             drive efficiencies in the transport and
length, width and weight measurements.           logistics supply chain is fast attaining
                                                                                                ambitious program of network upgrade              It seems the road ahead for Toll IPEC and
                                                 critical national importance.
This information works hand-in-glove with                                                       rolls on. A near identical facility in WA, also   Dexion will be more travelled, not less.
five-sided photographs taken of each             Though the new Queensland hub has been         designed in partnership with Dexion,
parcel by the Datalogic NVS9000 vision           open barely twelve months, Toll IPEC’s         officially opened on 7th February 2011.




Dexion Case Study – Toll IPEC

Toll ipec case study

  • 1.
    Toll IPEC. Road freighthub of tomorrow.
  • 3.
    “The nerve centreof the site is Dexion’s Real-Time Distribution System (RDS), a multifunction control platform that coordinates the facility’s physical and operational aspects.” We might sometimes forget, but Australia new Greenfield DC at Larapinta in the bushy is the only single nation to occupy an entire outskirts of Brisbane. continent. There are less than three people Escalating demand, in particular for its for every square kilometre, yet we’re also one national timetable of road express services, of the most urbanised countries in the world. had meant that Toll IPEC’s barely-ten-years With a few densely populated cities -old Brisbane hub was already at capacity. separated by long, lonely stretches, it’s no The new plant at Larapinta is a key part of surprise that Australia is the world’s most Toll’s national strategy of creating capacity intensive user of road freight on a tonne/ for growth without structural bottlenecks kilometre basis. A whopping two-thirds of or constraints at any point. all domestic freight rolls up and down our open roads. Dexion had worked with the Toll Group It seems that Australia no longer rides on in the past and had a proven track record the sheep’s back, but in the air-conditioned in the field. During a competitive tender passenger seat of a B-Double. process, Toll IPEC was shown live Dexion- designed solutions in Melbourne and Our domestic freight task has more than Sydney to further support their bid and doubled over the last 20 years, is expected demonstrate their success with system to almost double again by 2020 and triple integration and project management by 2050*. capabilities, Dexion was appointed to the It is against this backdrop that Dexion was contract in April 2009. invited by Toll IPEC, part of the Toll Group, the Asian region’s leading provider of Larapinta snapshot. integrated logistics services, to provide a Larapinta was officially opened, on schedule, high-speed parcel sorting solution for their on 19 February 2010. Dexion Case Study – Toll IPEC *IBISworld, 2009 report for Infrastructure Partnerships Australia.
  • 4.
    “The central challengewas to sort the different kinds of freight when it came out of metropolitan and regional vehicles and into the line hauls. Reducing this sort time window is where the big efficiencies were to be gleaned for this client.” The five-hectare site includes: equipment and is specifically engineered to complement rather than compete with • 13,300m2 warehouse/depot the customer’s host computer system. • 31,000m2 concrete pavements By controlling field devices, sensors, host • 5,200m2 car park area connectivity and data driven rules, the • atehouse, fuel, gas and G RDS can deliver real time management of weighbridge facilities all physical and logical processes. • 2,400m2 of quality office space The user-friendly interface is boldly graphical with the simplicity of point-and- • Fully integrated CBUS electrical system click control. Being web based, the system There are 14 dock levellers for rear end is accessible from anywhere at any time. loading and unloading plus space to The RDS is also modular in design, a “To our mind, TGW’s Natrix sliding shoe very different dimensions into multiple process a large number of side load trailers. concept that was attractive to Toll IPEC as sorter was the sort of high-performance discharge lanes. In total, the site is designed to service the it helped make the most of capital they had solution this project needed.” said Dexion’s Sort capacity is a rapid 9,000 cartons equivalent of 60 B-Doubles per day. Murdo McKinnon. already invested in. It also meant that they per hour. only paid for the modules they needed, “The central challenge was to sort the Real Time Distribution System (RDS). Parcels are conveyed on a sorter bed with the flexibility to add further capability different kinds of freight when it came out The nerve centre of the site is Dexion’s consisting of extruded aluminium profiles. in the future as required. of metropolitan and regional vehicles and Real-Time Distribution System (RDS), a Shoes slide across these profiles, diverting into the line hauls. Reducing this sort time products to pre-selected destinations. multifunction control platform that High performance sortation. window is where the big efficiencies were Gaps between parcels are optimised coordinates the facility’s physical and to be gleaned for this client.” In previous projects similar to Larapinta, through use of a special batching conveyor, operational aspects. Dexion had achieved good results with By combining Natrix sortation with an and then guided by means of rubber Essentially, it bridges the gap between their Austrian material handling equipment integrated carousel system, Larapinta has coated running wheels that ensure a quiet enterprise systems and materials handling partner, TGW. the capacity to gently handle goods with and low-wear operation. Dexion Case Study – Toll IPEC
  • 5.
    “At full capacity,Larapinta has the ability to process two-and-a-half parcels a second.” Better data, better accountability. system. By ‘reading’ information superior The recent global financial crisis caused to a simple barcode scan, the RDS has many companies to lower inventories and the capacity to better recognise and in some cases eliminate private warehousing correctly assign irregular parcels, identify altogether. This has put new and extra side-by-side parcels (which might be demands on the road express business. ‘hidden’ to a laser scanner) to be resorted, and ensure that every item has been In 2011, Toll IPEC’s customers want more correctly priced. stringent accountability by package and more data collection for their own reporting. Towards 2050. At full capacity, Larapinta has the ability to The name Larapinta comes from an process two-and-a-half parcels a second. Aboriginal word meaning ‘flowing water’. To ensure this speed is not at the expense In this southeast corner of Queensland, of accuracy or revenue, the Dexion RDS is the fastest growing metropolitan region in fed a complex combination of dimensioning, the country, these days it is economic weight and photographic data of each and growth that is flowing south and west along every parcel. the Ipswich Motorway. Two systems from Scale Components, the The Federal Treasury estimates that Parcelscan II dimensioning system and Australia’s population will have ballooned Carrierweigh CW900 in-motion conveyer to 35 million by 2050, and the need to scale, provide comprehensive height, drive efficiencies in the transport and length, width and weight measurements. logistics supply chain is fast attaining ambitious program of network upgrade It seems the road ahead for Toll IPEC and critical national importance. This information works hand-in-glove with rolls on. A near identical facility in WA, also Dexion will be more travelled, not less. five-sided photographs taken of each Though the new Queensland hub has been designed in partnership with Dexion, parcel by the Datalogic NVS9000 vision open barely twelve months, Toll IPEC’s officially opened on 7th February 2011. Dexion Case Study – Toll IPEC