CSIRO.
Library services national storage facility.
“After an extensive evaluation process we selected
              Dexion as offering the CSIRO the best value for
            money - with all the features we were looking for.”




Australia’s premier scientific research        Property Services, was tasked with
agency, the Commonwealth Scientific and        managing the conversion of the building to
Industrial Research Organisation (CSIRO),      its new role as a National Storage facility.
commands a vast reserve of printed             Not only did the internal layout of the
information. Located around the country,       building need a complete overhaul to
the separate libraries that make up CSIRO      accommodate the required amount of
Library Services support more than 740         shelving, but it also had to be done in a
activities in thirteen CSIRO research          way that would take care of Occupational
divisions. In addition to servicing internal   Health and Safety (OH&S) concerns that
needs, CSIRO Library Services is an            had been identified with earlier equipment.
invaluable resource available to ordinary      “The library people had experience with
Australians and overseas scientific            other [mobile storage] shelving on Black
communities alike.                             Mountain and found that the mechanically
                                               assisted, hand wound model was
In 2009 in order to streamline operations,
                                               presenting health and safety concerns for
the CSIRO began consolidating its library
                                               staff,” said Collin. “They requested
collections and relocating material to a
                                               consideration of an electrically operated
National Storage facility in the ACT.
                                               Compactus to avoid these concerns.”
Seeking a new, secure, high capacity
library storage location, the organisation     The open tender process, which called for
identified an old workshop building at         the installation of no less than eleven
Black Mountain on Canberra’s picturesque       kilometres of mobile shelving, attracted
western city edge, which offered sufficient    submissions from major office and storage
floor space and adequate internal height       equipment manufacturers.
to handle the consolidated library.
                                               Dexion, offering it’s high-tech, safety first,
Graeme Collin, Project Director at CSIRO       electrically driven, Spacesaver Eclipse




Dexion Case Study – CSIRO
“It’s a really nice conversion of what was a really
                old workshop into this nice new storage facility.”




Powered Compactus was recommended                installation of an advanced VESDA fire
as the preferred supplier.                       protection system. An important part of
                                                 the process involved preparation of the
“After an extensive evaluation process we
                                                 floors, where Dexion laid tracks for the
selected Dexion as offering the CSIRO the
                                                 Spacesaver Compactus prior to the
best value for money - with all the features     concrete being poured. Rails were installed
we were looking for,” said Collin.               onto the existing floor, laser levelled, then
Before the building could become a home          a unique cover strip was used to protect
for state-of-the-art document storage            the rails during the concrete pour.             nice new storage facility,” he said.            the architects came up with looked just
equipment, however, it would need to be          The result: a rail mechanism perfectly                                                          brilliant,” added Piskulich.
                                                                                                 “We enjoyed working with Dexion and
transformed from a substantially different       blended into the new floor, ensuring the        would be very happy working with them           In all, the CSIRO requirement was for a
earlier role as a machinery and automotive       highest standards in OH&S.                      again in the future.”                           total of 11,367 linear metres of storage
workshop. Dexion worked closely with                                                                                                             space, to be built in three stages. Work on
                                                 “We worked in closely with Dexion,” said        Storage on a scale of the CSIRO’s Black
leading ACT architects Daryl Jackson                                                                                                             the first stage, consisting of 4,531 L/metres
                                                 Beatman. “Once they had laid their rails        Mountain facility required special attention
Alastair Swayn, (DJAS) and fit-out experts                                                                                                       of storage, began in February 2010 and
                                                 we came along and topped up and levelled        to detail. As CSIRO had stated that its first
SMI Project Solutions, whose job it was to                                                                                                       was followed shortly after by the second
                                                 the concrete. A nice, beautifully level floor
fully refurbish the building. “There were oil                                                    priority was to maximise capacity, DJAS
                                                 to meet their track.”                                                                           stage, consisting of 3,313 L/metres.
sumps in the floor… internal brick walls                                                         collaborated closely with Dexion to achieve
                                                 Completing the building’s makeover, SMI         an efficient use of the space. “A lot of time   A comprehensive storage project by any
and a mezzanine floor, which all had to be
                                                 clad its front and sides with ALUCOBOND,        was spent with the architects,” said Dexion     standard!
demolished,” said Gus Beatman, Project
                                                 a proprietary aluminium composite material.     Office State Manager and Specialist
Manager at SMI Project Solutions. “We
                                                 Describing the refurbished building and         Systems consultant Brett Piskulich,             The new gear.
completely gutted the inside of the building.”
                                                 the strong camaraderie between contractors      “We worked closely with them to resolve         Compactus equipment at the CSIRO’s
The work carried out by SMI included a full      on the project, Beatman’s enthusiasm was        the final details.” In the end though, it       Black Mountain, off-site storage facility is
upgrade of electrical and mechanical             obvious. “It’s a really nice conversion of      wasn’t only technical features that made        Dexion Spacesaver Eclipse powered
services, insulation, lighting, and the          what was a really old workshop into this        for the winning design: “The colour scheme      carriages fitted with safety sweeps.




Dexion Case Study – CSIRO
“We enjoyed working with Dexion
                                     and would be very happy working
                                          with them again in the future.”




The innovative ‘safety sweep’ concept           mounted on front panels, enable staff to
stops or prevents movement of the carriage      operate the Compactus with minimal
whenever an object or person breaks a           training. Ensuring that material is always
safety beam. If for any reason a carriage       accessible, each system is supplied with a
starts moving while a person is within an       portable battery pack to activate carriages
aisle, placing a foot against the carriage      in the event of a power failure.
can instantly halt the system. Likewise,
                                                Finally, an aesthetic touch of class - in the
any objects such as boxes, ladders or other
                                                form of laminated end panels - brought to
items that are within an aisle when the
                                                life the architectural vision of DJAS.
drive units are activated, will cut the beam
                                                “The alternating colour panels they came
and immediately deactivate the unit.
                                                up with liven up the space. We’re very
But Spacesaver’s unique features are not        pleased with the result - the appearance;
just designed to benefit librarians. At CSIRO   and the staff are very happy with the ease
Library Services, technical maintenance is      of operation,” said Collin.
made safe and easy by the Spacesaver’s
                                                “It was a significant contract to win to
“Works In A Drawer” concept, allowing
                                                showcase the Dexion Eclipse powered
access to electrical components without
                                                Compactus systems,” said Piskulich.
the need to climb inside, on top of, or
                                                “And it was a good site to operate in
around the carriages.
                                                because we had plenty of storage and
During the first and second construction        access. We also had a great relationship
phase, more than 8000 shelves of                with the builder and a great relationship
Dexion Ultima CI-80 Roll Post Shelving,         with CSIRO. It all worked very well.”
manufactured at Dexion Melbourne plant,
were provided and fitted to the Spacesaver
carriages. Simple, colour coded keypads,




Dexion Case Study – CSIRO

Csiro case study

  • 1.
  • 3.
    “After an extensiveevaluation process we selected Dexion as offering the CSIRO the best value for money - with all the features we were looking for.” Australia’s premier scientific research Property Services, was tasked with agency, the Commonwealth Scientific and managing the conversion of the building to Industrial Research Organisation (CSIRO), its new role as a National Storage facility. commands a vast reserve of printed Not only did the internal layout of the information. Located around the country, building need a complete overhaul to the separate libraries that make up CSIRO accommodate the required amount of Library Services support more than 740 shelving, but it also had to be done in a activities in thirteen CSIRO research way that would take care of Occupational divisions. In addition to servicing internal Health and Safety (OH&S) concerns that needs, CSIRO Library Services is an had been identified with earlier equipment. invaluable resource available to ordinary “The library people had experience with Australians and overseas scientific other [mobile storage] shelving on Black communities alike. Mountain and found that the mechanically assisted, hand wound model was In 2009 in order to streamline operations, presenting health and safety concerns for the CSIRO began consolidating its library staff,” said Collin. “They requested collections and relocating material to a consideration of an electrically operated National Storage facility in the ACT. Compactus to avoid these concerns.” Seeking a new, secure, high capacity library storage location, the organisation The open tender process, which called for identified an old workshop building at the installation of no less than eleven Black Mountain on Canberra’s picturesque kilometres of mobile shelving, attracted western city edge, which offered sufficient submissions from major office and storage floor space and adequate internal height equipment manufacturers. to handle the consolidated library. Dexion, offering it’s high-tech, safety first, Graeme Collin, Project Director at CSIRO electrically driven, Spacesaver Eclipse Dexion Case Study – CSIRO
  • 4.
    “It’s a reallynice conversion of what was a really old workshop into this nice new storage facility.” Powered Compactus was recommended installation of an advanced VESDA fire as the preferred supplier. protection system. An important part of the process involved preparation of the “After an extensive evaluation process we floors, where Dexion laid tracks for the selected Dexion as offering the CSIRO the Spacesaver Compactus prior to the best value for money - with all the features concrete being poured. Rails were installed we were looking for,” said Collin. onto the existing floor, laser levelled, then Before the building could become a home a unique cover strip was used to protect for state-of-the-art document storage the rails during the concrete pour. nice new storage facility,” he said. the architects came up with looked just equipment, however, it would need to be The result: a rail mechanism perfectly brilliant,” added Piskulich. “We enjoyed working with Dexion and transformed from a substantially different blended into the new floor, ensuring the would be very happy working with them In all, the CSIRO requirement was for a earlier role as a machinery and automotive highest standards in OH&S. again in the future.” total of 11,367 linear metres of storage workshop. Dexion worked closely with space, to be built in three stages. Work on “We worked in closely with Dexion,” said Storage on a scale of the CSIRO’s Black leading ACT architects Daryl Jackson the first stage, consisting of 4,531 L/metres Beatman. “Once they had laid their rails Mountain facility required special attention Alastair Swayn, (DJAS) and fit-out experts of storage, began in February 2010 and we came along and topped up and levelled to detail. As CSIRO had stated that its first SMI Project Solutions, whose job it was to was followed shortly after by the second the concrete. A nice, beautifully level floor fully refurbish the building. “There were oil priority was to maximise capacity, DJAS to meet their track.” stage, consisting of 3,313 L/metres. sumps in the floor… internal brick walls collaborated closely with Dexion to achieve Completing the building’s makeover, SMI an efficient use of the space. “A lot of time A comprehensive storage project by any and a mezzanine floor, which all had to be clad its front and sides with ALUCOBOND, was spent with the architects,” said Dexion standard! demolished,” said Gus Beatman, Project a proprietary aluminium composite material. Office State Manager and Specialist Manager at SMI Project Solutions. “We Describing the refurbished building and Systems consultant Brett Piskulich, The new gear. completely gutted the inside of the building.” the strong camaraderie between contractors “We worked closely with them to resolve Compactus equipment at the CSIRO’s The work carried out by SMI included a full on the project, Beatman’s enthusiasm was the final details.” In the end though, it Black Mountain, off-site storage facility is upgrade of electrical and mechanical obvious. “It’s a really nice conversion of wasn’t only technical features that made Dexion Spacesaver Eclipse powered services, insulation, lighting, and the what was a really old workshop into this for the winning design: “The colour scheme carriages fitted with safety sweeps. Dexion Case Study – CSIRO
  • 5.
    “We enjoyed workingwith Dexion and would be very happy working with them again in the future.” The innovative ‘safety sweep’ concept mounted on front panels, enable staff to stops or prevents movement of the carriage operate the Compactus with minimal whenever an object or person breaks a training. Ensuring that material is always safety beam. If for any reason a carriage accessible, each system is supplied with a starts moving while a person is within an portable battery pack to activate carriages aisle, placing a foot against the carriage in the event of a power failure. can instantly halt the system. Likewise, Finally, an aesthetic touch of class - in the any objects such as boxes, ladders or other form of laminated end panels - brought to items that are within an aisle when the life the architectural vision of DJAS. drive units are activated, will cut the beam “The alternating colour panels they came and immediately deactivate the unit. up with liven up the space. We’re very But Spacesaver’s unique features are not pleased with the result - the appearance; just designed to benefit librarians. At CSIRO and the staff are very happy with the ease Library Services, technical maintenance is of operation,” said Collin. made safe and easy by the Spacesaver’s “It was a significant contract to win to “Works In A Drawer” concept, allowing showcase the Dexion Eclipse powered access to electrical components without Compactus systems,” said Piskulich. the need to climb inside, on top of, or “And it was a good site to operate in around the carriages. because we had plenty of storage and During the first and second construction access. We also had a great relationship phase, more than 8000 shelves of with the builder and a great relationship Dexion Ultima CI-80 Roll Post Shelving, with CSIRO. It all worked very well.” manufactured at Dexion Melbourne plant, were provided and fitted to the Spacesaver carriages. Simple, colour coded keypads, Dexion Case Study – CSIRO