Western Sydney
Records.
Records success with Government.
“The Records Management Team
                                                has gained industry respect
                                           for it’s depth of knowledge and
                                         for providing innovative solutions.”




Dexion’s recently released Ultima™ shelving       The Kingswood site, which is an hour’s
range will be playing a key role in ensuring      drive west of the Sydney CBD, has been
vital NSW government records will be              operating for 30 years; in that time,
securely stored for at least the next 40 years.   approximately every two years there has
                                                  been a significant extension to the facility
This Australian-developed and manufactured
storage product was manufactured at               to cater for the increased number of records
Dexion’s Kings Park manufacturing facility.       it has to hold.

Western Sydney Records Centre is a                The latest Stage 6 building was handed
Government Records Repository (GRR)               over on June 23 on budget and on time.
responsible for storing and managing              Its commissioning brings the total floor
records on behalf of the NSW state                area of the site to 50,000 square metres
government, Government departments,               with total storage capacity equivalent to
local councils, schools and hospitals.            485,000 linear meters.
In June this year, State Records’ $18.64          The storage capacity of Stage 6 is
million Stage 6 building at Kingswood, in         760,000 Type 1 boxes, the equivalent of
Western Sydney, was handed over.                  137,000 linear metres, and which has
According to Associate Director, John             increased on-site storage capacity by
Burke, the records centre provides a              nearly 40%. This capacity is projected to
central warehousing function for the NSW          meet the storage needs of GRR clients
Government.                                       for the next five years.

“We provide a central warehousing                 Dexion has been involved in four of the
function here, managing 2 million boxes           recent extensions, providing a different
- and we have to ensure they are stored           solution each time. Some time ago Dexion
and retrieved in the most efficient manner.”      recognised the need for a team that




Dexion Case Study – Ultima
“We rely on them to proactively contribute on
                                                                     how the storage element of the business
                                                                    can work more efficiently and how we can
                                                                   continue to drive greater occupational health
                                                                  and safety initiatives through the organisation.”



specialised in records and archive storage.    This approach, combined with the new           the Records Centre’s requirements that
Under the management of Mark Barraclough,      computerised repository management             shelving cope with day to day wear and
National Business Development Manager,         system (RS-SQL), should result in              tear for at least the next 40 years.
the Records Management Team has gained         significant efficiency savings and lower
industry respect for it’s depth of knowledge                                                  Chequer plate has been added to the end
                                               staff costs, said Bourke.
and for providing innovative solutions.                                                       of each line of shelving as reinforcement
                                               For Dexion, Stage 6 was the first major        and to provide additional buffers for the
“This is the fourth major installation that    project for its recently released Ultima       picker trolleys.
Dexion has been involved with, so over         shelving range, which was manufactured
the years they have developed a good           on Dexion’s newly installed production line    “Strategically, we can’t view the role of this
understanding of our business and our                                                         facility in the short term; when we design
                                               at its Australian manufacturing facility.
specific requirements,” said Burke.                                                           and construct, we have to think in terms of
                                               The shelves had to be specially designed       40 or 50 year windows,” said Burke.
“We rely on them to proactively contribute                                                                                                     •  itting of a gas fire suppression system,
                                                                                                                                                 F
                                               and manufactured to a dimension of
on how the storage element of the                                                             “That’s why it took three years to design          rather than water sprinklers, to minimise
                                               900mm wide by 800mm deep to handle
business can work more efficiently and                                                                                                           the prospects of damage to records.
                                               the dimensions of the Type 1 storage           and develop Stage 6”.
how we can continue to drive greater
                                               boxes. The flexibility of the new production   Compared with earlier stages at the              According to Burke, these changes are
occupational health and safety initiatives
through the organisation.”                     line makes this type of ‘tailor made’                                                           positive additions to previous styles and are
                                                                                              Records Centre, Stage 6 includes a
                                               solution possible.                                                                              driven by the need to maximise security,
For example, while previous extensions have                                                   number of improvements:
                                               Prior to placing the order samples of the                                                       improve climatic stability and reduce future
been based on a two floor design, the                                                         •  rchitectural enhancements relating
                                                                                                A
Stage 6 building comprises three floors and    new shelf were thoroughly tested by the                                                         maintenance costs.
                                                                                                to the higher use of insulation in the
uses low-level shelving.                       records centre, to ensure the system was
                                                                                                building envelope.                             In addition, government requirements that
                                               capable of coping with the load carrying
This means that most staff are able to                                                                                                         agencies favour options using longer-term
                                               claims made by Dexion.                         • Use of concrete floors throughout.
access all shelves without the use of                                                                                                          building life-cycle costings have provided
ladders, which were identified as an           A total 70,000 shelves were installed each     • ncreased compartmentalisation within
                                                                                                I                                              strategies useful to State Records, although
occupational health and safety risk.           with a 60 micron thick powder coat to meet       storage areas.                                 these have increased initial capital outlay.




Dexion Case Study – Ultima

Western sydney records case study

  • 1.
  • 2.
    “The Records ManagementTeam has gained industry respect for it’s depth of knowledge and for providing innovative solutions.” Dexion’s recently released Ultima™ shelving The Kingswood site, which is an hour’s range will be playing a key role in ensuring drive west of the Sydney CBD, has been vital NSW government records will be operating for 30 years; in that time, securely stored for at least the next 40 years. approximately every two years there has been a significant extension to the facility This Australian-developed and manufactured storage product was manufactured at to cater for the increased number of records Dexion’s Kings Park manufacturing facility. it has to hold. Western Sydney Records Centre is a The latest Stage 6 building was handed Government Records Repository (GRR) over on June 23 on budget and on time. responsible for storing and managing Its commissioning brings the total floor records on behalf of the NSW state area of the site to 50,000 square metres government, Government departments, with total storage capacity equivalent to local councils, schools and hospitals. 485,000 linear meters. In June this year, State Records’ $18.64 The storage capacity of Stage 6 is million Stage 6 building at Kingswood, in 760,000 Type 1 boxes, the equivalent of Western Sydney, was handed over. 137,000 linear metres, and which has According to Associate Director, John increased on-site storage capacity by Burke, the records centre provides a nearly 40%. This capacity is projected to central warehousing function for the NSW meet the storage needs of GRR clients Government. for the next five years. “We provide a central warehousing Dexion has been involved in four of the function here, managing 2 million boxes recent extensions, providing a different - and we have to ensure they are stored solution each time. Some time ago Dexion and retrieved in the most efficient manner.” recognised the need for a team that Dexion Case Study – Ultima
  • 3.
    “We rely onthem to proactively contribute on how the storage element of the business can work more efficiently and how we can continue to drive greater occupational health and safety initiatives through the organisation.” specialised in records and archive storage. This approach, combined with the new the Records Centre’s requirements that Under the management of Mark Barraclough, computerised repository management shelving cope with day to day wear and National Business Development Manager, system (RS-SQL), should result in tear for at least the next 40 years. the Records Management Team has gained significant efficiency savings and lower industry respect for it’s depth of knowledge Chequer plate has been added to the end staff costs, said Bourke. and for providing innovative solutions. of each line of shelving as reinforcement For Dexion, Stage 6 was the first major and to provide additional buffers for the “This is the fourth major installation that project for its recently released Ultima picker trolleys. Dexion has been involved with, so over shelving range, which was manufactured the years they have developed a good on Dexion’s newly installed production line “Strategically, we can’t view the role of this understanding of our business and our facility in the short term; when we design at its Australian manufacturing facility. specific requirements,” said Burke. and construct, we have to think in terms of The shelves had to be specially designed 40 or 50 year windows,” said Burke. “We rely on them to proactively contribute • itting of a gas fire suppression system, F and manufactured to a dimension of on how the storage element of the “That’s why it took three years to design rather than water sprinklers, to minimise 900mm wide by 800mm deep to handle business can work more efficiently and the prospects of damage to records. the dimensions of the Type 1 storage and develop Stage 6”. how we can continue to drive greater boxes. The flexibility of the new production Compared with earlier stages at the According to Burke, these changes are occupational health and safety initiatives through the organisation.” line makes this type of ‘tailor made’ positive additions to previous styles and are Records Centre, Stage 6 includes a solution possible. driven by the need to maximise security, For example, while previous extensions have number of improvements: Prior to placing the order samples of the improve climatic stability and reduce future been based on a two floor design, the • rchitectural enhancements relating A Stage 6 building comprises three floors and new shelf were thoroughly tested by the maintenance costs. to the higher use of insulation in the uses low-level shelving. records centre, to ensure the system was building envelope. In addition, government requirements that capable of coping with the load carrying This means that most staff are able to agencies favour options using longer-term claims made by Dexion. • Use of concrete floors throughout. access all shelves without the use of building life-cycle costings have provided ladders, which were identified as an A total 70,000 shelves were installed each • ncreased compartmentalisation within I strategies useful to State Records, although occupational health and safety risk. with a 60 micron thick powder coat to meet storage areas. these have increased initial capital outlay. Dexion Case Study – Ultima