Khi Solar One – East cavity boiler
Heavy lifting and installation of West cavity Lifting team
Aligning the structure for installation Installing bolts into flanges to secure the structure
Storage vessels for heated salt solution
Core drilling through 900mm of concrete for
installation of lateral flanges
Core Drilling for installation of elevated
walkway
Core drilling in gondola Core drilling on rope
Khi Solar One – Mirror field
Aiding on beam clamps 150 metres above
ground to perform Quality control on the
bolting on the flanges and to check the
torque values on the bolts
Installation of
lock nuts to M60
threaded bar and
tightening with
torque multiplier
Commissioning of East cavity
Installation of elevated walkway Lifting of module for roof structure

Tinus van Niekerk_Visual CV

  • 2.
    Khi Solar One– East cavity boiler Heavy lifting and installation of West cavity Lifting team Aligning the structure for installation Installing bolts into flanges to secure the structure
  • 3.
    Storage vessels forheated salt solution Core drilling through 900mm of concrete for installation of lateral flanges Core Drilling for installation of elevated walkway Core drilling in gondola Core drilling on rope
  • 4.
    Khi Solar One– Mirror field Aiding on beam clamps 150 metres above ground to perform Quality control on the bolting on the flanges and to check the torque values on the bolts Installation of lock nuts to M60 threaded bar and tightening with torque multiplier
  • 5.
    Commissioning of Eastcavity Installation of elevated walkway Lifting of module for roof structure