TIME TO THINK FOR EXTRA CLOSING
INTERLOCK FOR EHV CIRCUIT BREAKERS
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 1
12th IndiaDoble Power Forum, 2014
Niraj Agrawal & Chetan Shete
ADANI POWER LIMITED , TIRORA
D
oble
Engineering
PRESENT SITUATION
• FOLLOWING ARE COVERED IN EHV CB
CLOSING INTERLOCK
1. TRIP CIRCUIT SUPERVISION
2. LOCKOUT RELAY RESET
3. ALL PROTECTION RELAY RESET
4. SF6 LEVEL OK & SPRING IS CHARGED
5. BOTH DC HEATHY
6. AC SUPPLY OK
7. PDR NOR OPERATED
8. ADJACENT ISOLATOR CLOSED.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 2
D
oble
Engineering
CASE STUDY-1
• ON 4TH JULY 2013 , CB OF 400KV WARORA-
TIRORA LINE CLOSED & OPENED > 20 TIMES.
1. 400KV WARORA – TIRORA LINE HAND TRIPED FROM TIRORA END .
2. 400KV TIE & MAIN CB AT WARORA OPENED SUCCESFULLY BUT MAIN
CB CLOSED FREQUENTLY SUBSEQUENT TO OPENING OF CB POLES.
3. RESULTING IN FREQUENT CHARGING OF OPEN-ENDED LINE FOR TWO
PHASES ( R & B).
4. FLICKRING OF LIGHTS & CHARGING –DISCHARGING SOUND WAS
NOTED.
5. OVERVOLTAGE STAGES TRIGGRED NO OF TIMES ..DANGER TO EHV
EQUIPMENTS.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 3
D
oble
Engineering
CASE STUDY-1
• FINDINGS.
1. MOISTURE INGRESS IN MECHANISM BOX , SPRING CHARGE LIMIT
SWITCH OF Y -POLE.
2. CB CLOSE INTERLOCK & CB HEALTHY CONTACTS GOT SHORTED DUE TO
MOISTURE INGRESS. RESULTING IN FAILURE OF CLOSING COIL , DUE
TO CONTINEOUS DC POSITIVE TO COIL.
3. CONTROL CIRCUITARY IS RESPONSIBLE FOR FREQUENT CLOSE /OPEN
OPERATION OF CB AFTER SHORTING OF CONTACTS.
4. CB POLES WERE OPENING ON PDR & AGAIN CLOSING FOR ONLY TWO
PHASES (R &B).
5. CONTINUES UNTILL MANUAL DC OFF BY OPERATOR.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 4
D
oble
Engineering
CASE STUDY-2
• ON 17TH JAN 2014 , 400KV CB OF GT#3
CLOSED ON FAULT.
1. GT#3 , 400KV CB TRIPPED ON FAILURE OF B-PHASE GT HV BUSHING .
2. ALL CONTROL CABLES FROM NEAR BY TRENCHES BURNT DUE OIL
SPILLAGE & FIRE.
3. 400KV MAIN CB CLOSED ON FAULT DUE TO SHORTING OF CLOSING
COMMAND CONTROL CABLE.
4. RESULTING IN MORE DANGEROUS CONDITION FOR SYSTEM.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 5
D
oble
Engineering
WHAT CAN BE DONE ?
1. SEGREGATE AUXILLIARY CONTACTS RELATING TO CB CLOSING CIRCUIT
APART FROM OTHER CONTACTS CARRYING DC +VE SUPLY.
2. ROUTE CB CLOSING CIRCUIT CABLES AWAY FROM GT AREA .
ABOVE SOLUTIONS ARE NOT 100% FULL PROOF , CAN WE CUT CLOSING
CIRCUIT AT TWO POINTS 1. +VE SIDE ( USUALLY DONE) 2. –VE SIDE
(INTENDED) ?.....
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 6
D
oble
Engineering
PROPOSED INTERLOCK IN CB CLOSING
CIRCUIT
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 7
BCU OUTPUT
CONTACT TO CUT
NEGATIVE OF
CLOSING COIL
D
oble
Engineering
LOGIC FOR CB CLOSING CIRCUIT
PROPOSED INTERLOCK
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 8
Reset Logic
(Except Line)
Reset Logic for Lines.
( Considering Auto
Reclose Operation)
D
oble
Engineering
PROPOSED INTERLOCK IN CLOSING
CIRCUIT
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 9
Possibility of unwanted SET –ON of Negative
Break contact for closing circuit is as follows
1. Restarting of BCU/IED/ SAS Server
a. Normally Open contact is used .
b. All inputs for logic are normally in reset condition (No internally
inverted signal is used), so possibility of closing of contact during
restarting of IED/BCU/SAS server is NIL.
2. SET & RESET control for same is given to Shift
engineer through OWS ( Operating work station ) ,
which helps during on time change in decision of
closing of circuit breaker.
D
oble
Engineering
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 10
THANKSD
oble
Engineering

More Related Content

Similar to Time to think for ehv cb interlocks

BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
Ganesan Raja
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
Inverted Energy: eRickshaw Testing Report
Inverted Energy: eRickshaw Testing Report Inverted Energy: eRickshaw Testing Report
Inverted Energy: eRickshaw Testing Report
Inverted2019
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Ram lal choudhary (DG GENERATOR)
Ram lal  choudhary (DG GENERATOR)Ram lal  choudhary (DG GENERATOR)
Ram lal choudhary (DG GENERATOR)
Ramlal Choudhary
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
RAHULKUMARSAW1
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
johny renoald
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
abhishek357916
 
VINITH S RESUME
VINITH S RESUMEVINITH S RESUME
VINITH S RESUMEVINITH S
 

Similar to Time to think for ehv cb interlocks (20)

gautham CV updated
gautham CV updatedgautham CV updated
gautham CV updated
 
KARTHICK RESUME
KARTHICK RESUMEKARTHICK RESUME
KARTHICK RESUME
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEERBE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
 
bccl-presentation
bccl-presentationbccl-presentation
bccl-presentation
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Inverted Energy: eRickshaw Testing Report
Inverted Energy: eRickshaw Testing Report Inverted Energy: eRickshaw Testing Report
Inverted Energy: eRickshaw Testing Report
 
CV OF TARIQ MEHMOOD
CV OF TARIQ MEHMOODCV OF TARIQ MEHMOOD
CV OF TARIQ MEHMOOD
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Ram lal choudhary (DG GENERATOR)
Ram lal  choudhary (DG GENERATOR)Ram lal  choudhary (DG GENERATOR)
Ram lal choudhary (DG GENERATOR)
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
RAMA SUBRAMANIAN
RAMA SUBRAMANIANRAMA SUBRAMANIAN
RAMA SUBRAMANIAN
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
sathish kannan EEE
sathish kannan EEEsathish kannan EEE
sathish kannan EEE
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
 
my Resume
my Resumemy Resume
my Resume
 
CV 5 yrs
CV 5 yrsCV 5 yrs
CV 5 yrs
 
VINITH S RESUME
VINITH S RESUMEVINITH S RESUME
VINITH S RESUME
 

Recently uploaded

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 

Recently uploaded (20)

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 

Time to think for ehv cb interlocks

  • 1. TIME TO THINK FOR EXTRA CLOSING INTERLOCK FOR EHV CIRCUIT BREAKERS 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 1 12th IndiaDoble Power Forum, 2014 Niraj Agrawal & Chetan Shete ADANI POWER LIMITED , TIRORA D oble Engineering
  • 2. PRESENT SITUATION • FOLLOWING ARE COVERED IN EHV CB CLOSING INTERLOCK 1. TRIP CIRCUIT SUPERVISION 2. LOCKOUT RELAY RESET 3. ALL PROTECTION RELAY RESET 4. SF6 LEVEL OK & SPRING IS CHARGED 5. BOTH DC HEATHY 6. AC SUPPLY OK 7. PDR NOR OPERATED 8. ADJACENT ISOLATOR CLOSED. 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 2 D oble Engineering
  • 3. CASE STUDY-1 • ON 4TH JULY 2013 , CB OF 400KV WARORA- TIRORA LINE CLOSED & OPENED > 20 TIMES. 1. 400KV WARORA – TIRORA LINE HAND TRIPED FROM TIRORA END . 2. 400KV TIE & MAIN CB AT WARORA OPENED SUCCESFULLY BUT MAIN CB CLOSED FREQUENTLY SUBSEQUENT TO OPENING OF CB POLES. 3. RESULTING IN FREQUENT CHARGING OF OPEN-ENDED LINE FOR TWO PHASES ( R & B). 4. FLICKRING OF LIGHTS & CHARGING –DISCHARGING SOUND WAS NOTED. 5. OVERVOLTAGE STAGES TRIGGRED NO OF TIMES ..DANGER TO EHV EQUIPMENTS. 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 3 D oble Engineering
  • 4. CASE STUDY-1 • FINDINGS. 1. MOISTURE INGRESS IN MECHANISM BOX , SPRING CHARGE LIMIT SWITCH OF Y -POLE. 2. CB CLOSE INTERLOCK & CB HEALTHY CONTACTS GOT SHORTED DUE TO MOISTURE INGRESS. RESULTING IN FAILURE OF CLOSING COIL , DUE TO CONTINEOUS DC POSITIVE TO COIL. 3. CONTROL CIRCUITARY IS RESPONSIBLE FOR FREQUENT CLOSE /OPEN OPERATION OF CB AFTER SHORTING OF CONTACTS. 4. CB POLES WERE OPENING ON PDR & AGAIN CLOSING FOR ONLY TWO PHASES (R &B). 5. CONTINUES UNTILL MANUAL DC OFF BY OPERATOR. 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 4 D oble Engineering
  • 5. CASE STUDY-2 • ON 17TH JAN 2014 , 400KV CB OF GT#3 CLOSED ON FAULT. 1. GT#3 , 400KV CB TRIPPED ON FAILURE OF B-PHASE GT HV BUSHING . 2. ALL CONTROL CABLES FROM NEAR BY TRENCHES BURNT DUE OIL SPILLAGE & FIRE. 3. 400KV MAIN CB CLOSED ON FAULT DUE TO SHORTING OF CLOSING COMMAND CONTROL CABLE. 4. RESULTING IN MORE DANGEROUS CONDITION FOR SYSTEM. 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 5 D oble Engineering
  • 6. WHAT CAN BE DONE ? 1. SEGREGATE AUXILLIARY CONTACTS RELATING TO CB CLOSING CIRCUIT APART FROM OTHER CONTACTS CARRYING DC +VE SUPLY. 2. ROUTE CB CLOSING CIRCUIT CABLES AWAY FROM GT AREA . ABOVE SOLUTIONS ARE NOT 100% FULL PROOF , CAN WE CUT CLOSING CIRCUIT AT TWO POINTS 1. +VE SIDE ( USUALLY DONE) 2. –VE SIDE (INTENDED) ?..... 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 6 D oble Engineering
  • 7. PROPOSED INTERLOCK IN CB CLOSING CIRCUIT 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 7 BCU OUTPUT CONTACT TO CUT NEGATIVE OF CLOSING COIL D oble Engineering
  • 8. LOGIC FOR CB CLOSING CIRCUIT PROPOSED INTERLOCK 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 8 Reset Logic (Except Line) Reset Logic for Lines. ( Considering Auto Reclose Operation) D oble Engineering
  • 9. PROPOSED INTERLOCK IN CLOSING CIRCUIT 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 9 Possibility of unwanted SET –ON of Negative Break contact for closing circuit is as follows 1. Restarting of BCU/IED/ SAS Server a. Normally Open contact is used . b. All inputs for logic are normally in reset condition (No internally inverted signal is used), so possibility of closing of contact during restarting of IED/BCU/SAS server is NIL. 2. SET & RESET control for same is given to Shift engineer through OWS ( Operating work station ) , which helps during on time change in decision of closing of circuit breaker. D oble Engineering
  • 10. 12th IndiaDoble Power Forum, 2014, Vadodara, Gujarat, INDIA 10 THANKSD oble Engineering